ML22284A130

From kanterella
Jump to navigation Jump to search

LAR-22-003 U4 Electrical ITAAC Consolidation Amendment Letter to B. Whitley from B. Gleaves
ML22284A130
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/22/2022
From: Bill Gleaves
NRC/NRR/VPOB
To: Whitley B
Southern Nuclear Operating Co
Gleaves B
Shared Package
ML22287A125:ML22284A125 List:
References
EPID L-2022-LLA-0130, LAR-22-003
Download: ML22284A130 (2)


Text

Mr. Brian H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.

3535 Colonnade Parkway, Bin N-226-EC Birmingham, AL 35243

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNIT 4 ISSUANCE OF AMENDMENT AND EXEMPTION REGARDING ELECTRICAL INSPECTIONS, TESTS, ANALYSES, AND ACCEPTANCE CRITERIA OPTIMIZATION (LAR-22003) (EPID L-2022-LLA-0130)

Dear Mr. Whitley:

In response to your application dated September 2, 2022, titled, Electrical Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Optimization, designated as License Amendment Request (LAR)22-003, the U.S. Nuclear Regulatory Commission has granted the enclosed exemption and issued the enclosed Amendment No. 187 to Combined License (COL) No.

NPF-92 for the Vogtle Electric Generating Plant (VEGP), Unit 4.

The amendment involves changes to VEGP, Unit 4, COL Appendix C, with corresponding changes to the associated plant-specific Tier 1 information (PS-DCD) information. Specifically, the amendment involves changes that remove certain ITAAC that are duplicated by other ITAAC, and consolidate a number of other certain ITAAC.

The exemption allows related changes to Tier 1 of the VEGP PS-DCD of the facility COL as specified in LAR-22-003. This exemption is associated with, and necessary for, the granting of the amendment which is being issued concurrently.

A copy of the related Safety Evaluation, which includes the evaluation of the changes, is also enclosed. A notice of issuance of the amendment documents included in this letter will be published in the Federal Register.

November 22, 2022

B. Whitley 2

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2, Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRCs Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

If you have any questions concerning the above, please contact me at (301) 415-5848 or via email at Bill.Gleaves@nrc.gov.

Sincerely, William (Billy) Gleaves, Senior Project Manager Vogtle Project Office Office of Nuclear Reactor Regulation Docket No.52-026

Enclosures:

1.

Amendment No. 187 to VEGP Unit 4 COL NPF-92 2.

Exemption associated with Amendment No. 187 3.

Safety Evaluation cc: ListServ Signed by Gleaves, William on 11/22/22

ML22284A125; Ltr ML22284A130 OFFICE NRR/VPO/VPOB NRR/VPO/VPOB NRR/DEX/ELTB R-II/DRP/RPB4 NAME WGleaves RButler WMorton SBailey DATE Oct 13, 2022 Oct 19, 2022 Oct 25, 2022 Oct 27, 2022 OFFICE NRR/DEX/EEOB NRR/VPO/VPOB OGC/GCHA

/AGCNRP/NLO*

NRR/VPO/VPOB NAME MWaters CSantos MSpencer VHall DATE Nov 1, 2022 Nov 1, 2022 Nov 22, 2022 Nov 22, 2022 OFFICE NRR/VPO/VPOB NAME WGleaves DATE Nov 22, 2022