Text
Orano NCS GmbH, Margarete-von-Wrangell-Strae 7, 63457 Hanau, Deutschland Telefon: +49 (0) 61 81 501-0, Telefax: +49 (0) 61 81 57 36 92, E-Mail: info.ncs@orano-ncs.com, www.orano-ncs.com Sitz der Gesellschaft: Hanau, RG Hanau HR B 4428, USt-Id.-Nr. DE113574961, Gerichtsstand: Hanau, Geschftsführer: Olaf Oldiges BaBankverbindung: Société Générale Frankfurt (BLZ 512 108 00), Konto: 1095013031, SWIFT: SOGEDEFF, IBAN: DE 45 5121 0800 1095 0130 31 AuAuftrge werden auf Grundlage unserer Allgemeinen Geschftsbedingungen übernommen. Diese stehen Ihnen auf Wunsch zur Verfügung.
SV-0808/00-GF 1/2 Orano NCS GmbH, Margarete-von-Wrangell-Strae 7, D-63457 Hanau Orano NCS GmbH Mr. Pierre M. Saverot, Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Two White Flint North - Mail Stop T4-B34 11545 Rockville Pike Rockville, MD 20852-2738 USA Ansprechpartner Abteilung Yara van Wijk Telefon Telefax
+49 6181 501 353 E-Mail yara.vanwijk@orano-ncs.com Datum 09.09.2022 Your reference: Docket No. 71-9388 and EPID No. L2020-NEW-0003 Our reference: 0045-SVK-2022-001
Subject:
Answers to RAIs for the review of the DN30-X package
Dear Mr. Saverot,
This letter is in response to your request for additional information (RAI, reference Docket No. 71-9388, EPID No. L2020-NEW-0003) from June 10th 2022.
We have revised the SAR 0045-BSH-2020-001 (now Rev2) to include additional calculations, explanations and clarifications in answer to the RAIs. An overview of our answers was discussed in the meeting on August 4 and is summarized in our presentation 0045-PRT-2022-006 for that meeting.
Due to the request to have a stand-alone SAR (no support from the DN30 SAR), we have restructured the complete SAR and added new appendices, especially for the technical analyses. It is important to note that this restructuring only consists of a reorganization of the SAR contents; any new or revised information in the SAR is in solely in answer to the RAIs.
The attached document 0045-BAR-2022-001 provides a guideline to our RAI answers. For each individual RAI, it contains a short summary of our answer as well as a reference to where the detailed answer is found in the SAR or its appendices. This document contains proprietary information.
Orano NCS GmbH Weitergabe sowie Vervielfltigung, Verbreitung und/oder Bearbeitung dieses Dokumentes, Verwertung und/oder Mitteilung seines Inhaltes sind verboten, soweit nicht ausdrücklich gestattet.
Zuwiderhandlungen verpflichten zu Schadenersatz. Alle Rechte für den Fall der Patent-, Gebrauchsmuster-oder Geschmacksmustereintragung vorbehalten.
SV-0808/00-GF 2/2 The following documents, attached, have been created or revised:
0045-BSH-2020-001-Rev2, SAR of the DN30-X package Appendix 1.1, List of applicable documents (proprietary)
Appendix 1.4.1A, Drawings 30B-10 cylinder (proprietary)
Appendix 1.4.1B, Drawings 30B-20 cylinder (proprietary)
Appendix 1.4.2, Material properties (proprietary)
Appendix 1.7.3, Facility operations Appendix 1.9.1, IMS Manual (proprietary)
Appendix 2.2, Structural analysis (proprietary)
Appendix 2.3, Thermal analysis (proprietary)
Appendix 2.4, Containment (proprietary)
Appendix 2.5, External dose rate analysis (proprietary)
Appendix 2.6, Criticality (proprietary)