Changes Related to AP1000 Gts Subsection 3.1.6, Control Bank Insertion Limits
ML22240A027
Person / Time
Issue date: 06/02/2015
From:
NRC/NRR/DSS/STSB
To:
Craig Harbuck NRR/DSS 301-415-3140
Shared Package
ML22240A001 List: ... further results
References
Download: ML22240A027 (30)


Text

GTST AP1000-B16-3.1.6, Rev. 1 Date report generated:

Tuesday, June 02, 2015 Page 1 Advanced Passive 1000 (AP1000)

Generic Technical Specification Traveler (GTST)

Title:

Changes related to Section 3.1.6, Control Bank Insertion Limits I.

Technical Specifications Task Force (TSTF) Travelers, Approved Since Revision 2 of STS NUREG-1431, and Used to Develop this GTST TSTF Number and

Title:

TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b STS NUREGs Affected:

NUREG-1430, -1431, -1432, -1433, -1434 NRC Approval Date:

18-Mar-09 TSTF Classification:

Technical change

GTST AP1000-B16-3.1.6, Rev. 1 Date report generated:

Tuesday, June 02, 2015 Page 2 II.

Reference Combined License (RCOL) Standard Departures (Std. Dep.), RCOL COL Items, and RCOL Plant-Specific Technical Specifications (PTS) Changes Used to Develop this GTST RCOL Std. Dep. Number and

Title:

None RCOL COL Item Number and

Title:

None RCOL PTS Change Number and

Title:

VEGP LAR DOC A011:

Statements referring to OPDMS OPERABLE are revised to refer to OPDMS monitoring parameters. Statements referring to OPDMS inoperable are revised to refer to OPDMS not monitoring parameters.

VEGP LAR DOC A012:

Revise Required Action A.2 by replacing within limits with within insertion limits.

VEGP LAR DOC A013:

Required Action A.1.2 and B.1.2 are revised to make limit plural (i.e., limits).

GTST AP1000-B16-3.1.6, Rev. 1 Date report generated:

Tuesday, June 02, 2015 Page 3 III.

Comments on Relations Among TSTFs, RCOL Std. Dep., RCOL COL Items, and RCOL PTS Changes This section discusses the considered changes that are: (1) applicable to operating reactor designs, but not to the AP1000 design; (2) already incorporated in the GTS; or (3) superseded by another change.

TSTF-425 is deferred for future consideration.

GTST AP1000-B16-3.1.6, Rev. 1 Date report generated:

Tuesday, June 02, 2015 Page 4 IV.

Additional Changes Proposed as Part of this GTST (modifications proposed by NRC staff and/or clear editorial changes or deviations identified by preparer of GTST)

APOG Recommended Changes to Improve the Bases Throughout the Bases, references to Sections and Chapters of the FSAR do not include the FSAR clarifier. Since these Section and Chapter references are to an external document, it is appropriate to include the FSAR modifier. (DOC A003)

An editorial change is made in the first sentence of the third paragraph of the Background section in the Bases. The sentence is split into two sentences.

A capitalization is made in the 'Applicable Safety Analyses section of the Bases.

GTST AP1000-B16-3.1.6, Rev. 1 Date report generated:

Tuesday, June 02, 2015 Page 5 V.

Applicability Affected Generic Technical Specifications and Bases:

Section 3.1.6, Control Bank Insertion Limits Changes to the Generic Technical Specifications and Bases:

APPLICABILITY Note is modified replacing OPDMS OPERABLE with On-Line Power Distribution Monitoring System monitoring parameters. (DOC A011)

Required Action A.2 is revised to state insertion limits replacing limits. (DOC A012)

Editorial corrections are made replacing limit with limits within the ACTIONS Table. (DOC A013)

Bases are revised to replace OPDMS operable and OPDMS inoperable respectively with OPDMS monitoring parameters and OPDMS not monitoring parameters. (DOC A011)

In the last sentence of the fourth paragraph of the Background section of the Bases, operability of the Online Power Distribution Monitoring Systems (OPDMS). is replaced with status of the Online Power Distribution Monitoring System (OPDMS).Similarly, in the second sentence of the first paragraph of the Applicability section in the Bases, OPDMS operability is replaced with OPDMS status. (DOC A011)

The acronym FSAR is added to modify Section and Chapter in references to the FSAR throughout the Bases. (DOC A003)

An editorial change is made in the Background section of the Bases. The first sentence in the third paragraph was split into two sentences. (APOG Comment)

GTST AP1000-B16-3.1.6, Rev. 1 Date report generated:

Tuesday, June 02, 2015 Page 6 VI.

Traveler Information Description of TSTF changes:

None Rationale for TSTF changes:

NA Description of changes in RCOL Std. Dep., RCOL COL Item(s), and RCOL PTS Changes:

VEGP LAR DOC A011:

Statements referring to OPDMS OPERABLE are revised to refer to OPDMS monitoring parameters. Statements referring to OPDMS inoperable are revised to refer to OPDMS not monitoring parameters. Also, operability of OPDMS is revised to status of OPDMS in the fourth paragraph of the Background section and OPDMS operability is revised to OPDMS status in the first paragraph of the Applicability section in the Bases.

VEGP LAR DOC A012:

Revise Required Action A.2 by replacing within limits with within insertion limits.

VEGP LAR DOC A013:

Required Action A.1.2 and B.1.2 are revised to make limit plural (i.e., limits).

Rationale for changes in RCOL Std. Dep., RCOL COL Item(s), and RCOL PTS Changes:

VEGP LAR DOC A011 The On-Line Power Distribution Monitoring System (OPDMS) is not safety related and does not have a safety function. OPDMS is an advanced core monitoring and support package. With OPDMS operating, the power distribution parameters are continuously computed and displayed, and compared against their limits. The TS definition of Operable is applied to assure a system is capable of performing its specified safety function(s). As such the use of the defined term is not appropriate for the OPDMS. Additionally, there is no requirement for maintaining its non-safety related capability.

The online monitoring capability of OPDMS is utilized when complying with TS 3.2.5, OPDMS-Monitored Parameters. The parameters required to meet LCO 3.2.5 are only applicable when OPDMS is providing the monitoring for compliance with the applicable limits. When OPDMS is not being utilized, the limits of TS 3.1.6, 3.2.1, 3.2.2, 3.2.3, and 3.2.4 are applicable (note that certain Actions of TS 3.1.4 also impose requirements of TS 3.2.1 and 3.2.2 when OPDMS is not being utilized). The current use of OPERABLE (and inoperable) in referencing whether OPDMS is being utilized, is misleading and is more appropriately revised to monitoring (and not monitoring).

GTST AP1000-B16-3.1.6, Rev. 1 Date report generated:

Tuesday, June 02, 2015 Page 7 Replacing OPDMS with On-Line Power Distribution Monitoring System, is consistent with the guidance on use of acronyms provided in STS Writers Guide. OPDMS is not defined in TS 3.1.6 prior to its use in Note 2. The proposed wording change continues to provide appropriate TS controls with no change in implementation requirements.

VEGP LAR DOC A012 LCO 3.1.6 imposes requirements for insertion, sequence, and overlap limits. Condition B is Applicable to sequence and overlap limits, and its Required Action B.2 clearly establishes the requirement to restore sequence and overlap limits. Condition A is applicable only to insertion limits, however, its Required Action A.2 is inconsistent in requiring restoration of limits; implying all limits. The restoration action is intended to align with correcting the Condition. As such, the intent of Required Action A.2 is that the restoration be of insertion limits.

There is no change in the intent by adding the clarification of insertion to Required Action A.2, but it clarifies the Required Action.

VEGP LAR DOC A013 The alternative Required Actions A.1.1 and B.1.1 immediately preceding Required Actions A.1.2 and B.1.2 reference SDM limits (i.e., plural). For consistency the reference is also made plural in the optional Required Actions. There is no change in the implementation of the requirement for SDM to meet limits specified in the COLR.

Description of additional changes proposed by NRC staff/preparer of GTST:

The acronym FSAR is added to modify Section and Chapter in references to the FSAR throughout the Bases. (DOC A003)

The first sentence in the third paragraph of the Background section in the Bases was split into two sentences as follows:

The rod cluster control assemblies (RCCAs) are divided among control banks and shutdown banks., gGray rod cluster assemblies (GRCAs) are limited to control banks.

The following capitalization was made in the Applicable Safety Analyses section of the Bases:

1. sSpecified fuel design limits, or Rationale for additional changes proposed by NRC staff/preparer of GTST:

The changes are editorial. They provide improved clarity and correction.

GTST AP1000-B16-3.1.6, Rev. 1 Date report generated:

Tuesday, June 02, 2015 Page 8 VII. GTST Safety Evaluation Technical Analysis:

Replacing OPDMS Operable and OPDMS inoperable respectably with OPDMS monitoring parameters and OPDMS not monitoring parameters In TS, the term Operable is applied to assure that a system is capable of performing its specified safety function(s). OPDMS is not safety related and does not have a safety function. It is a core monitoring and support package. As described, when OPDMS is operating, the power distribution parameters are continuously computed and displayed, and compared against their limit. It is, therefore, appropriate to use the phrases OPDMS is monitoring and OPDMS not monitoring. These changes are acceptable for AP1000 STS because they accurately describe the status of the OPDMS as a condition of applicability of the LCO.

Remaining Changes The remaining changes are editorial, clarifying, grammatical, or otherwise considered administrative. These changes do not affect the technical content, but improve the readability, implementation, and understanding of the requirements, and are therefore acceptable.

Having found that this GTSTs proposed changes to the GTS and Bases are acceptable, the NRC staff concludes that AP1000 STS Subsection 3.1.6 is an acceptable model Specification for the AP1000 standard reactor design.

References to Previous NRC Safety Evaluation Reports (SERs):

None

GTST AP1000-B16-3.1.6, Rev. 1 Date report generated:

Tuesday, June 02, 2015 Page 9 VIII. Review Information Evaluator Comments:

None Pranab K. Samanta Brookhaven National Laboratory (631) 344-4948 samanta@bnl.gov Review Information:

Availability for public review and comment on Revision 0 of this traveler approved by NRC staff on 4/1/2014.

APOG Comments (Ref. 7) and Resolutions

1.

(Internal #3) Throughout the Bases, references to Sections and Chapters of the FSAR do not include the FSAR modifier. Since these Section and Chapter references are to an external document, it is appropriate to include the FSAR modifier. This is resolved by adding the FSAR modifier as appropriate.

2.

(Internal #80) 3.1.06, Pg. 08, The first sentence in the Technical Analyses of this GTST is deleted. This sentence is not needed since sufficient information is provided in the rest of the paragraph to justify the changes.

3.

(Internal #81) 3.1.06, Pg. 13, Two Notes for Applicability of LCO was mistakenly omitted.

The Notes are added.

4.

(Internal #82) 3.1.06, Pg. 24, An editorial change is made in the Background section of the Bases. The first sentence in the third paragraph was split into two sentences.

5.

(Internal #83) 3.1.06, Pg. 26, A capitalization was made in the Applicable Safety Analyses section in the Bases; specified was replaced with Specified.

NRC Final Approval Date: 6/02/2015 NRC

Contact:

T. R. Tjader United States Nuclear Regulatory Commission 301-415-1187 Theodore.Tjader@nrc.gov

GTST AP1000-B16-3.1.6, Rev. 1 Date report generated:

Tuesday, June 02, 2015 Page 10 IX.

Evaluator Comments for Consideration in Finalizing Technical Specifications and Bases None

GTST AP1000-B16-3.1.6, Rev. 1 Date report generated:

Tuesday, June 02, 2015 Page 11 X.

References Used in GTST

1.

AP1000 DCD, Revision 19, Section 16, Technical Specifications, June 2011 (ML11171A500).

2.

Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 3 and 4, Technical Specifications Upgrade License Amendment Request, February 24, 2011 (ML12065A057).

3.

RAI Letter No. 01 Related to License Amendment Request (LAR)12-002 for the Vogtle Electric Generating Plant Units 3 and 4 Combined Licenses, September 7, 2012 (ML12251A355).

4. Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Units 3 and 4, Response to Request for Additional Information Letter No. 01 Related to License Amendment Request LAR-12-002, ND-12-2015, October 04, 2012 (ML12286A363 and ML12286A360).
5.

NRC Safety Evaluation (SE) for Amendment No. 13 to Combined License (COL) No. NPF-91 for Vogtle Electric Generating Plant (VEGP) Unit 3, and Amendment No. 13 to COL No.

NPF-92 for VEGP Unit 4, September 9, 2013 (ADAMS Package Accession No. ML13238A337), which contains:

ML13238A355, Cover Letter - Issuance of License Amendment No. 13 for Vogtle Units 3 and 4 (LAR 12-002).

ML13238A359, - Amendment No. 13 to COL No. NPF-91 ML13239A256, - Amendment No. 13 to COL No. NPF-92 ML13239A284, - Revised plant-specific TS pages (Attachment to Amendment No. 13)

ML13239A287, - Safety Evaluation (SE), and Attachment 1 - Acronyms ML13239A288, SE Attachment 2 - Table A - Administrative Changes ML13239A319, SE Attachment 3 - Table M - More Restrictive Changes ML13239A333, SE Attachment 4 - Table R - Relocated Specifications ML13239A331, SE Attachment 5 - Table D - Detail Removed Changes ML13239A316, SE Attachment 6 - Table L - Less Restrictive Changes The following documents were subsequently issued to correct an administrative error in :

ML13277A616, Letter - Correction To The Attachment (Replacement Pages) - Vogtle Electric Generating Plant Units 3 and 4-Issuance of Amendment Re:

Technical Specifications Upgrade (LAR 12-002) (TAC No. RP9402)

ML13277A637, - Revised plant-specific TS pages (Attachment to Amendment No. 13) (corrected)

6.

TSTF-GG-05-01, Writer's Guide for Plant-Specific Improved Technical Specifications, June 2005.

GTST AP1000-B16-3.1.6, Rev. 1 Date report generated:

Tuesday, June 02, 2015 Page 12

7.

APOG-2014-008, APOG (AP1000 Utilities) Comments on AP1000 Standardized Technical Specifications (STS) Generic Technical Specification Travelers (GTSTs), Docket ID NRC-2014-0147, September 22, 2014 (ML14265A493).

GTST AP1000-B16-3.1.6, Rev. 1 Date report generated:

Tuesday, June 02, 2015 Page 13 XI.

MARKUP of the Applicable GTS Subsection for Preparation of the STS NUREG The entire section of the Specifications and the Bases associated with this GTST is presented next.

Changes to the Specifications and Bases are denoted as follows: Deleted portions are marked in strikethrough red font, and inserted portions in bold blue font.

GTST AP1000-B16-3.1.6, Rev. 1 Control Bank Insertion Limits 3.1.6 AP1000 STS 3.1.6-1 Amendment 0Rev. 0 Revision 19 Date report generated:

Tuesday, June 02, 2015 Page 14 3.1 REACTIVITY CONTROL SYSTEMS 3.1.6 Control Bank Insertion Limits LCO 3.1.6 Control banks shall be within the insertion, sequence, and overlap limits specified in the COLR.

APPLICABILITY:

MODE 1, MODE 2 with keff 1.0.


NOTES--------------------------------------------

1.

This LCO is not applicable while performing SR 3.1.4.2.

2.

This LCO is not applicable to Gray Rod Cluster Assembly (GRCA) banks during GRCA bank sequence exchange with OPDMS OPERABLEmonitoring parameters.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Control Bank insertion limits not met.

A.1.1 Verify SDM is within the limits specified in the COLR.

OR 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> A.1.2 Initiate boration to restore SDM to within limits.

AND 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> A.2 Restore control bank(s) to within insertion limits.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

GTST AP1000-B16-3.1.6, Rev. 1 Control Bank Insertion Limits 3.1.6 AP1000 STS 3.1.6-2 Amendment 0Rev. 0 Revision 19 Date report generated:

Tuesday, June 02, 2015 Page 15 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Control bank sequence or overlap limits not met.

B.1.1 Verify SDM is within the limits specified in the COLR.

OR 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> B.1.2 Initiate boration to restore SDM to within limits.

AND 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> B.2 Restore control bank sequence and overlap to within limits.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> C. Required Action and associated Completion Time not met.

C.1 Be in MODE 2 with keff < 1.0.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.6.1 Verify the estimated critical control bank position is within limits specified in the COLR.

Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to achieving criticality SR 3.1.6.2 Verify each control bank insertion is within the limits specified in the COLR.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.1.6.3 Verify sequence and overlap limits, specified in the COLR, are met for control banks not fully withdrawn from the core.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

GTST AP1000-B16-3.1.6, Rev. 1 Control Bank Insertion Limits B 3.1.6 AP1000 STS B 3.1.6-1 Amendment 0Rev. 0 Revision 19 Date report generated:

Tuesday, June 02, 2015 Page 16 B 3.1 REACTIVITY CONTROL SYSTEMS B 3.1.6 Control Bank Insertion Limits BASES BACKGROUND The insertion limits of the shutdown and control rods are initial assumptions in the safety analyses that assume rod insertion upon reactor trip. The insertion limits directly affect core power and fuel burnup distributions and assumptions of available SDM, and initial reactivity insertion rate.

The applicable criteria for these reactivity and power distribution design requirements are 10 CFR 50, Appendix A, GDC 10, Reactor Design, GDC 26, Reactivity Control System Redundancy and Protection, GDC 28, Reactivity Limits (Ref. 1) and 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (Ref. 2). Limits on control rod insertion have been established, and all rod positions are monitored and controlled during power operation to ensure that the power distribution and reactivity limits defined by the design power peaking and SDM limits are preserved.

The rod cluster control assemblies (RCCAs) are divided among control banks and shutdown banks., gGray rod cluster assemblies (GRCAs) are limited to control banks. Each bank may be further subdivided into two groups to provide for precise reactivity control. A group consists of two or more RCCAs or GRCAs that are electrically paralleled to step simultaneously. A bank of RCCAs consists of two groups that are moved in a staggered fashion, but always within 1 step of each other. The AP1000 design has seven control banks and four shutdown banks. See LCO 3.1.4, Rod Group Alignment Limits, for control and shutdown rod OPERABILITY and alignment requirements, and LCO 3.1.7, Rod Position Indication, for position indication requirements.

The control bank insertion sequence and overlap limits are specified in the COLR. The control banks are required to be at or above the applicable insertion limit lines. There will be two insertion limit lines.

Which is applicable will depend on the operabilitystatus of the Online Power Distribution Monitoring System (OPDMS).

The control banks are used for precise reactivity control of the reactor.

The positions of the control banks are normally controlled automatically by the Plant Control System (PLS), but can also be manually controlled.

They are capable of adding reactivity very quickly (compared to borating or diluting).

GTST AP1000-B16-3.1.6, Rev. 1 Control Bank Insertion Limits B 3.1.6 AP1000 STS B 3.1.6-2 Amendment 0Rev. 0 Revision 19 Date report generated:

Tuesday, June 02, 2015 Page 17 BASES BACKGROUND (continued)

The power density at any point in the core must be limited so that the fuel design criteria are maintained. Together, LCO 3.1.4, Rod Group Alignment Limits, LCO 3.1.5, Shutdown Bank Insertion Limits, LCO 3.1.6, Control Bank Insertion Limits, and LCO 3.2.5, OPDMS -

Monitored Parameters, when the OPDMS is OPERABLE monitoring parameters, or LCO 3.2.3, AXIAL FLUX DIFFERENCE (AFD), and LCO 3.2.4, QUADRANT POWER TILT RATIO (QPTR), when the OPDMS is inoperablenot monitoring parameters, provide limits on control component operation and on monitored process variables which ensure that the core operates within the fuel design criteria.

The shutdown and control bank insertion and alignment limits and power distribution limits are process variables that together characterize and control the three dimensional power distribution of the reactor core.

Additionally, the control bank insertion limits control the reactivity that could be added in the event of a rod ejection accident, and the shutdown and control bank insertion limits assure the required SDM is maintained when the OPDMS is inoperablenot monitoring parameters.

Operation within the subject LCO limits will prevent fuel cladding failures that would breach the primary fission product barrier and release fission products to the reactor coolant in the event of a loss of coolant accident (LOCA), loss of flow, ejected rod, or other accident requiring termination by a Reactor Trip System (RTS) trip function.

APPLICABLE SAFETY ANALYSES The shutdown and applicable control bank insertion limits, AFD and QPTR LCOs, are required when the OPDMS is inoperablenot monitoring parameters, to prevent power distributions that could result in fuel cladding failures in the event of a LOCA, loss of flow, ejected rod, or other accident requiring termination by an RTS trip function.

The acceptance criteria for addressing shutdown and control bank insertion limits and inoperability or misalignment are that:

GTST AP1000-B16-3.1.6, Rev. 1 Control Bank Insertion Limits B 3.1.6 AP1000 STS B 3.1.6-3 Amendment 0Rev. 0 Revision 19 Date report generated:

Tuesday, June 02, 2015 Page 18 BASES APPLICABLE SAFETY ANALYSES (continued)

a.

There be no violations of:

1.

sSpecified fuel design limits, or

2.

Reactor Coolant System (RCS) pressure boundary integrity; and

b.

The core remains subcritical after accident transients.

As such, the shutdown and control bank insertion limits affect safety analysis involving core reactivity and power distributions (Ref. 3).

The SDM requirement is ensured by the continuous monitoring of the OPDMS and by limiting the control and shutdown bank insertion limits when the OPDMS is inoperablenot monitoring parameters, so that allowable inserted worth of the RCCAs is such that sufficient reactivity is available in the rods to shut down the reactor to hot zero power with a reactivity margin which assumes the maximum worth RCCA remains fully withdrawn upon trip (Ref. 3).

Operation at the insertion limits or AFD limits may approach the maximum allowable linear heat generation rate or peaking factor, with the allowed QPTR present. Operation at the insertion limit may also indicate the maximum ejected RCCA worth could be equal to the limiting value in fuel cycles that have sufficiently high ejected RCCA worth.

The control and shutdown bank insertion limits ensure that safety analyses assumptions for SDM (with OPDMS inoperablenot monitoring parameters), ejected rod worth, and power distribution peaking factors are preserved (Ref. 3).

The insertion limits satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii) in that they are initial conditions assumed in the safety analysis.

LCO The limits on control banks sequence, overlap, and physical insertion as defined in the COLR, must be maintained because they serve the function of preserving power distribution, ensuring that the SDM is maintained (when OPDMS is inoperablenot monitoring parameters),

ensuring that ejected rod worth is maintained, and ensuring adequate negative reactivity insertion is available on trip. The overlap between control banks provides more uniform rates of reactivity insertion and

GTST AP1000-B16-3.1.6, Rev. 1 Control Bank Insertion Limits B 3.1.6 AP1000 STS B 3.1.6-4 Amendment 0Rev. 0 Revision 19 Date report generated:

Tuesday, June 02, 2015 Page 19 BASES LCO (continued) withdrawal and is imposed to maintain acceptable power peaking during control bank motion.

APPLICABILITY The control bank sequence, overlap, and physical insertion limits shall be maintained with the reactor in MODES 1 and 2 with keff 1.0. There will be two sets of insertion limits applicable to the control banks depending on OPDMS statusoperability. With OPDMS not monitoring parametersinoperable, these limits must be maintained since they preserve the assumed power distribution, ejected rod worth, SDM, and reactivity rate insertion assumptions. With OPDMS operable and continuously monitoring power distribution and SDM, the applicable insertion limits must be maintained since they preserve the accident analysis assumptions.

Applicability in MODES 3, 4, and 5 is not required, since neither the power distribution nor ejected rod worth assumptions would be exceeded in these MODES.

The applicability requirements are modified by a Note indicating the LCO requirements are suspended during the performance of SR 3.1.4.2. This SR verifies the freedom of the rods to move, and requires the control bank to move below the LCO limits, which would violate the LCO.

The second Note suspends LCO applicability during GRCA bank sequence exchange operations. The two exchanging banks will move out of sequence and overlap limits for several minutes during the sequence exchange. This operation, which occurs frequently throughout the fuel cycle, would normally violate the LCO. GRCA bank sequence exchange is only allowed with the OPDMS OPERABLE to monitoring the parameters of LCO 3.2.5, OPDMS Monitored Parameters.

GTST AP1000-B16-3.1.6, Rev. 1 Control Bank Insertion Limits B 3.1.6 AP1000 STS B 3.1.6-5 Amendment 0Rev. 0 Revision 19 Date report generated:

Tuesday, June 02, 2015 Page 20 BASES ACTIONS A.1.1, A.1.2, A.2, B.1.1, B.1.2, and B.2 When the control banks are outside the acceptable insertion limits, they must be restored to within those limits. This restoration can occur in two ways:

a.

Reducing power to be consistent with rod position; or

b.

Moving rods to be consistent with power.

Also, verification of SDM or initiation of boration to regain SDM is required within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, since with OPDMS not monitoring parametersinoperable, the SDM in MODES 1 and 2, ensured by adhering to the control and shutdown bank insertion limits (see LCO 3.1.1, SHUTDOWN MARGIN (SDM)), has been upset. If control banks are not within their insertion limits, then SDM will be verified by the OPDMS or if the OPDMS is not monitoring parametersinoperable, by performing a reactivity balance calculation, considering the effects listed in the BASES for SR 3.1.1.1.

Similarly, if the control banks are found to be out of sequence or in the wrong overlap configuration, they must be restored to meet the limits.

Operation beyond the LCO limits is allowed for a short time period in order to take conservative action because the simultaneous occurrence of either a LOCA, loss of flow accident, ejected rod accident, or other accident during this short time period, together with an inadequate power distribution or reactivity capability, has an acceptably low probability.

The allowed Completion Time of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for restoring the banks to within the insertion, sequence and overlap limits provides an acceptable time for evaluating and repairing minor problems without allowing the plant to remain outside the insertion limits for an extended period of time.

C.1 If Required Actions A.1 and A.2, or B.1 and B.2 cannot be completed within the associated Completion Times, the plant must be brought to MODE 2 with keff < 1.0, where the LCO is not applicable. The allowed Completion Time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is reasonable based on operating experience for reaching the required MODE from full power condition in an orderly manner and without challenging plant systems.

GTST AP1000-B16-3.1.6, Rev. 1 Control Bank Insertion Limits B 3.1.6 AP1000 STS B 3.1.6-6 Amendment 0Rev. 0 Revision 19 Date report generated:

Tuesday, June 02, 2015 Page 21 BASES SURVEILLANCE REQUIREMENTS SR 3.1.6.1 This Surveillance is required to ensure that the reactor does not achieve criticality with the control banks below their insertion limits.

The estimated critical position (ECP) depends upon a number of factors, one of which is xenon concentration. If the ECP was calculated long before criticality, xenon concentration could change to make the ECP substantially in error. Conversely, determining the ECP immediately before criticality could be an unnecessary burden. There are a number of unit parameters requiring operator attention at that point. Performing the ECP calculation within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to criticality avoids a large error from changes in xenon concentration, but allows the operator some flexibility to schedule the ECP calculation with other startup activities.

SR 3.1.6.2 Verification of the control banks insertion limits at a Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient to detect control banks that may be approaching the insertion limits since the insertion limits are monitored and alarms will occur on approach to and/or the exceeding of the limit and, normally, very little rod motion occurs in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SR 3.1.6.3 When control banks are maintained within their insertion limits as checked by SR 3.1.6.2 above, it is unlikely that their sequence and overlap will not be in accordance with requirements provided in the COLR. A Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is consistent with the insertion limit check above in SR 3.1.6.2.

REFERENCES

1.

10CFR50, Appendix A, GDC 10, GDC 26, and GDC 28.

2.

10CFR50.46.

3.

FSAR Chapter 15, Accident Analysis.

GTST AP1000-B16-3.1.6, Rev. 1 Date report generated:

Tuesday, June 02, 2015 Page 22 XII. Applicable STS Subsection After Incorporation of this GTSTs Modifications The entire subsection of the Specifications and the Bases associated with this GTST, following incorporation of the modifications, is presented next.

GTST AP1000-B16-3.1.6, Rev. 1 Control Bank Insertion Limits 3.1.6 AP1000 STS 3.1.6-1 Rev. 0 Date report generated:

Tuesday, June 02, 2015 Page 23 3.1 REACTIVITY CONTROL SYSTEMS 3.1.6 Control Bank Insertion Limits LCO 3.1.6 Control banks shall be within the insertion, sequence, and overlap limits specified in the COLR.

APPLICABILITY:

MODE 1, MODE 2 with keff 1.0.


NOTES--------------------------------------------

1.

This LCO is not applicable while performing SR 3.1.4.2.

2.

This LCO is not applicable to Gray Rod Cluster Assembly (GRCA) banks during GRCA bank sequence exchange with OPDMS monitoring parameters.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Control Bank insertion limits not met.

A.1.1 Verify SDM is within the limits specified in the COLR.

OR 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> A.1.2 Initiate boration to restore SDM to within limits.

AND 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> A.2 Restore control bank(s) to within insertion limits.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

GTST AP1000-B16-3.1.6, Rev. 1 Control Bank Insertion Limits 3.1.6 AP1000 STS 3.1.6-2 Rev. 0 Date report generated:

Tuesday, June 02, 2015 Page 24 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Control bank sequence or overlap limits not met.

B.1.1 Verify SDM is within the limits specified in the COLR.

OR 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> B.1.2 Initiate boration to restore SDM to within limits.

AND 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> B.2 Restore control bank sequence and overlap to within limits.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> C. Required Action and associated Completion Time not met.

C.1 Be in MODE 2 with keff < 1.0.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.6.1 Verify the estimated critical control bank position is within limits specified in the COLR.

Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to achieving criticality SR 3.1.6.2 Verify each control bank insertion is within the limits specified in the COLR.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.1.6.3 Verify sequence and overlap limits, specified in the COLR, are met for control banks not fully withdrawn from the core.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

GTST AP1000-B16-3.1.6, Rev. 1 Control Bank Insertion Limits B 3.1.6 AP1000 STS B 3.1.6-1 Rev. 0 Date report generated:

Tuesday, June 02, 2015 Page 25 B 3.1 REACTIVITY CONTROL SYSTEMS B 3.1.6 Control Bank Insertion Limits BASES BACKGROUND The insertion limits of the shutdown and control rods are initial assumptions in the safety analyses that assume rod insertion upon reactor trip. The insertion limits directly affect core power and fuel burnup distributions and assumptions of available SDM, and initial reactivity insertion rate.

The applicable criteria for these reactivity and power distribution design requirements are 10 CFR 50, Appendix A, GDC 10, Reactor Design, GDC 26, Reactivity Control System Redundancy and Protection, GDC 28, Reactivity Limits (Ref. 1) and 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (Ref. 2). Limits on control rod insertion have been established, and all rod positions are monitored and controlled during power operation to ensure that the power distribution and reactivity limits defined by the design power peaking and SDM limits are preserved.

The rod cluster control assemblies (RCCAs) are divided among control banks and shutdown banks. Gray rod cluster assemblies (GRCAs) are limited to control banks. Each bank may be further subdivided into two groups to provide for precise reactivity control. A group consists of two or more RCCAs or GRCAs that are electrically paralleled to step simultaneously. A bank of RCCAs consists of two groups that are moved in a staggered fashion, but always within 1 step of each other. The AP1000 design has seven control banks and four shutdown banks. See LCO 3.1.4, Rod Group Alignment Limits, for control and shutdown rod OPERABILITY and alignment requirements, and LCO 3.1.7, Rod Position Indication, for position indication requirements.

The control bank insertion sequence and overlap limits are specified in the COLR. The control banks are required to be at or above the applicable insertion limit lines. There will be two insertion limit lines.

Which is applicable will depend on the status of the Online Power Distribution Monitoring System (OPDMS).

The control banks are used for precise reactivity control of the reactor.

The positions of the control banks are normally controlled automatically by the Plant Control System (PLS), but can also be manually controlled.

They are capable of adding reactivity very quickly (compared to borating or diluting).

GTST AP1000-B16-3.1.6, Rev. 1 Control Bank Insertion Limits B 3.1.6 AP1000 STS B 3.1.6-2 Rev. 0 Date report generated:

Tuesday, June 02, 2015 Page 26 BASES BACKGROUND (continued)

The power density at any point in the core must be limited so that the fuel design criteria are maintained. Together, LCO 3.1.4, Rod Group Alignment Limits, LCO 3.1.5, Shutdown Bank Insertion Limits, LCO 3.1.6, Control Bank Insertion Limits, and LCO 3.2.5, OPDMS -

Monitored Parameters, when the OPDMS is monitoring parameters, or LCO 3.2.3, AXIAL FLUX DIFFERENCE (AFD), and LCO 3.2.4, QUADRANT POWER TILT RATIO (QPTR), when the OPDMS is not monitoring parameters, provide limits on control component operation and on monitored process variables which ensure that the core operates within the fuel design criteria.

The shutdown and control bank insertion and alignment limits and power distribution limits are process variables that together characterize and control the three dimensional power distribution of the reactor core.

Additionally, the control bank insertion limits control the reactivity that could be added in the event of a rod ejection accident, and the shutdown and control bank insertion limits assure the required SDM is maintained when the OPDMS is not monitoring parameters.

Operation within the subject LCO limits will prevent fuel cladding failures that would breach the primary fission product barrier and release fission products to the reactor coolant in the event of a loss of coolant accident (LOCA), loss of flow, ejected rod, or other accident requiring termination by a Reactor Trip System (RTS) trip function.

APPLICABLE SAFETY ANALYSES The shutdown and applicable control bank insertion limits, AFD and QPTR LCOs, are required when the OPDMS is not monitoring parameters, to prevent power distributions that could result in fuel cladding failures in the event of a LOCA, loss of flow, ejected rod, or other accident requiring termination by an RTS trip function.

The acceptance criteria for addressing shutdown and control bank insertion limits and inoperability or misalignment are that:

GTST AP1000-B16-3.1.6, Rev. 1 Control Bank Insertion Limits B 3.1.6 AP1000 STS B 3.1.6-3 Rev. 0 Date report generated:

Tuesday, June 02, 2015 Page 27 BASES APPLICABLE SAFETY ANALYSES (continued)

a.

There be no violations of:

1.

Specified fuel design limits, or

2.

Reactor Coolant System (RCS) pressure boundary integrity; and

b.

The core remains subcritical after accident transients.

As such, the shutdown and control bank insertion limits affect safety analysis involving core reactivity and power distributions (Ref. 3).

The SDM requirement is ensured by the continuous monitoring of the OPDMS and by limiting the control and shutdown bank insertion limits when the OPDMS is not monitoring parameters, so that allowable inserted worth of the RCCAs is such that sufficient reactivity is available in the rods to shut down the reactor to hot zero power with a reactivity margin which assumes the maximum worth RCCA remains fully withdrawn upon trip (Ref. 3).

Operation at the insertion limits or AFD limits may approach the maximum allowable linear heat generation rate or peaking factor, with the allowed QPTR present. Operation at the insertion limit may also indicate the maximum ejected RCCA worth could be equal to the limiting value in fuel cycles that have sufficiently high ejected RCCA worth.

The control and shutdown bank insertion limits ensure that safety analyses assumptions for SDM (with OPDMS not monitoring parameters), ejected rod worth, and power distribution peaking factors are preserved (Ref. 3).

The insertion limits satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii) in that they are initial conditions assumed in the safety analysis.

LCO The limits on control banks sequence, overlap, and physical insertion as defined in the COLR, must be maintained because they serve the function of preserving power distribution, ensuring that the SDM is maintained (when OPDMS is not monitoring parameters), ensuring that ejected rod worth is maintained, and ensuring adequate negative reactivity insertion is available on trip. The overlap between control banks provides more uniform rates of reactivity insertion and withdrawal

GTST AP1000-B16-3.1.6, Rev. 1 Control Bank Insertion Limits B 3.1.6 AP1000 STS B 3.1.6-4 Rev. 0 Date report generated:

Tuesday, June 02, 2015 Page 28 BASES LCO (continued) and is imposed to maintain acceptable power peaking during control bank motion.

APPLICABILITY The control bank sequence, overlap, and physical insertion limits shall be maintained with the reactor in MODES 1 and 2 with keff 1.0. There will be two sets of insertion limits applicable to the control banks depending on OPDMS status. With OPDMS not monitoring parameters, these limits must be maintained since they preserve the assumed power distribution, ejected rod worth, SDM, and reactivity rate insertion assumptions. With OPDMS continuously monitoring power distribution and SDM, the applicable insertion limits must be maintained since they preserve the accident analysis assumptions.

Applicability in MODES 3, 4, and 5 is not required, since neither the power distribution nor ejected rod worth assumptions would be exceeded in these MODES.

The applicability requirements are modified by a Note indicating the LCO requirements are suspended during the performance of SR 3.1.4.2. This SR verifies the freedom of the rods to move, and requires the control bank to move below the LCO limits, which would violate the LCO.

The second Note suspends LCO applicability during GRCA bank sequence exchange operations. The two exchanging banks will move out of sequence and overlap limits for several minutes during the sequence exchange. This operation, which occurs frequently throughout the fuel cycle, would normally violate the LCO. GRCA bank sequence exchange is only allowed with the OPDMS monitoring the parameters of LCO 3.2.5, OPDMS Monitored Parameters.

ACTIONS A.1.1, A.1.2, A.2, B.1.1, B.1.2, and B.2 When the control banks are outside the acceptable insertion limits, they must be restored to within those limits. This restoration can occur in two ways:

a.

Reducing power to be consistent with rod position; or

GTST AP1000-B16-3.1.6, Rev. 1 Control Bank Insertion Limits B 3.1.6 AP1000 STS B 3.1.6-5 Rev. 0 Date report generated:

Tuesday, June 02, 2015 Page 29 BASES ACTIONS (continued)

b.

Moving rods to be consistent with power.

Also, verification of SDM or initiation of boration to regain SDM is required within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, since with OPDMS not monitoring parameters, the SDM in MODES 1 and 2, ensured by adhering to the control and shutdown bank insertion limits (see LCO 3.1.1, SHUTDOWN MARGIN (SDM)), has been upset. If control banks are not within their insertion limits, then SDM will be verified by the OPDMS or if the OPDMS is not monitoring parameters, by performing a reactivity balance calculation, considering the effects listed in the BASES for SR 3.1.1.1.

Similarly, if the control banks are found to be out of sequence or in the wrong overlap configuration, they must be restored to meet the limits.

Operation beyond the LCO limits is allowed for a short time period in order to take conservative action because the simultaneous occurrence of either a LOCA, loss of flow accident, ejected rod accident, or other accident during this short time period, together with an inadequate power distribution or reactivity capability, has an acceptably low probability.

The allowed Completion Time of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for restoring the banks to within the insertion, sequence and overlap limits provides an acceptable time for evaluating and repairing minor problems without allowing the plant to remain outside the insertion limits for an extended period of time.

C.1 If Required Actions A.1 and A.2, or B.1 and B.2 cannot be completed within the associated Completion Times, the plant must be brought to MODE 2 with keff < 1.0, where the LCO is not applicable. The allowed Completion Time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is reasonable based on operating experience for reaching the required MODE from full power condition in an orderly manner and without challenging plant systems.

GTST AP1000-B16-3.1.6, Rev. 1 Control Bank Insertion Limits B 3.1.6 AP1000 STS B 3.1.6-6 Rev. 0 Date report generated:

Tuesday, June 02, 2015 Page 30 BASES SURVEILLANCE REQUIREMENTS SR 3.1.6.1 This Surveillance is required to ensure that the reactor does not achieve criticality with the control banks below their insertion limits.

The estimated critical position (ECP) depends upon a number of factors, one of which is xenon concentration. If the ECP was calculated long before criticality, xenon concentration could change to make the ECP substantially in error. Conversely, determining the ECP immediately before criticality could be an unnecessary burden. There are a number of unit parameters requiring operator attention at that point. Performing the ECP calculation within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to criticality avoids a large error from changes in xenon concentration, but allows the operator some flexibility to schedule the ECP calculation with other startup activities.

SR 3.1.6.2 Verification of the control banks insertion limits at a Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient to detect control banks that may be approaching the insertion limits since the insertion limits are monitored and alarms will occur on approach to and/or the exceeding of the limit and, normally, very little rod motion occurs in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SR 3.1.6.3 When control banks are maintained within their insertion limits as checked by SR 3.1.6.2 above, it is unlikely that their sequence and overlap will not be in accordance with requirements provided in the COLR. A Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is consistent with the insertion limit check above in SR 3.1.6.2.

REFERENCES

1.

10CFR50, Appendix A, GDC 10, GDC 26, and GDC 28.

2.

10CFR50.46.

3.

FSAR Chapter 15, Accident Analysis.