Text

0816.ltMJ.ro SECRETARIAT RECORDS

\\.

  • NUCLEAR REGULATORY COMMISSION IN THE MATTER OF:

POLICY SESSION 78-11 9~

SECY-78-...:7 Amendments to Table S-3 & Addendum to SECY-77-449, Response to NECNP Petition for Rulernaking (PRM-51-1) to Amend Table S-3

  • Place -

Washington, D. C.

Date _

Tuesday, 28 February 1978 ACE - FEDERAL REPORTERS, INC.

Official Reporters 444 North Ccpitol Street Washington, D.C. 20001 NATlONWIDE COVERAGE* DAILY Pages 1 -

45 Telephone:

(202) 3.47-3700

DISCLAIMER This is an unofficial transcript of a meeting of the United States Nuclear Regulatory Commission held on February 28, 1978 in the Commission 1s offices at 1717 H Street, N. W., Washington, D. C.

The meeting was open to public attendance and observation.

This transcript has not been reviewed, corrected, or edited, and it may contain inaccuracies.

The transcript is intended solely for general informational purposes.

As provided by 10 CFR 9.103, it is not part of the formal or informal record of decision of the matters discussed.

Expressions of opinion in this transcript do not necessarily reflect final determinations or beliefs.

No pleading or other paper may be filed with the Commission in any proceeding as the result of or addressed to any statement or arg~ment contained herein, except as the Commission may authorize.

'"\\

' 1 I

\\ t II

  • I ii

~

i1 11 !f * !

t i f *

~

f ;

{

11 ii

! ! i '

i i it J

{,

I 1 ' I

' (

' i I !l

WRBl-oom/wbl CR 6575 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 BEFORE:

UNITED STA.TES OJ; AMERJ:CA NUCLEAR REGULATORY COMMISSION POLICY SESSION 78-11 SECY-78 Amendments to Table S-3 & Addendum to SECY-77-449, Response to NECNP Petition for Rulemaking (PRM-51-1) to Amend Table S-3 Room 1130, 1717 H Street, N.W.,

Washington, D.C.

1 Tuesday 28 February 1978 The Commission met, pursuant to notice, at 9:50 a.m.

DR. JOSEPH M. HENDRIE, Chairman.

VICTOR GILINSKY, Commissioner.

PETER A. BRADFORD, Commissioner.

RICHARDT. KENNEDY, Commissioner.

lAl agbl 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 2

P R O C E E D I N G S CHAIRMAN HENDRIE: If we could come to order.

Commissioner Kennedy will join us in a moment, as soon as he can detach the telephone from his ear.

The subject this morning Amendment to Table S-3 in response to NECNP Petition for Rulemaking, PRM 51-1 is the docket number.

We have assorted recent legal papers, or rather, papers from the legal staff would be a better way to put it.

Lee, who should start?

MR. GOSSICK:

I think Mr. Malsch and Ms. Agnes Axelrad will carry the conversation this morning.

CHAIRMAN HENDRIE:

Good, let's start that way and then we'll look to the end of the table for comments.

MR. MALSCH:

Thank you.

This paper is a culmination of a long and careful Staff evaluation involving principally three separate Staff offices:

our office, OELD, the Office of Standards Develop-ment, and the Office of Nuclear Materials Safety and Safe-guards.

I think all the Staff offices and I think the Com-mission offices as a whole are in substantial agreement as to what the course of action should be.

It has involved a careful examination and then a re-examination of the proper NRC response to the New England Coalition Petition for. Rulemaking, which was filed in late-1975,

agb2 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 3

and then also an independent and careful examination of the Commission's S-3 rule, an examination which revealed some prob lerns that at least had not, before this time, been fully appre-ciated.

When the Table S-3 rule was promulgated,,,,as *you will recall, the Table S-3 rule specifies environmental im-pacts of the uranium fuel cycle to be included in the impact statements for individual nuclear power plant licenses and permits.

When S-3 was originally promulgated the Commission indicated the rule would be re-examined from time to time as new information was developed.

It was expected when the.

rule was promulgated that the table would be looked at from time to time and that changes would be made based upon new data.

There was a re-examination of the rule, but in the proper context of the overall GESMO proceeding, which is now no longer a viable proceeding, however, more recently a separate effort has been underway initiated to re-examine just the Table S-3 rule with a view toward making changes.

It's expected that the resultsof this overall examination would be available in the form of a draft report some time around mid-1979.

However, there are some more immediate problems that need to be addressed with the table and that's the subjec of the paper here today.

agb3 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 4

The Table-S-3 rule has been applied in individual cases as if it reflected all the fuel cycle environmental im-pacts, in fact, that was more or less the intent of the rule a it was originally written.

Indeed, only in the area of health effects is there any Commission authority for the proposition that the table may be supplemented in individual licensing cases.

Yet our examination of the table, our recent examin ~

tion of the table shows that the line entry for radon does not include radon released from mining and does not include radon releases after the milling activity has ceased.

Indeed, curre t Staff estimates of what the proper radon release numbers would be indicate that the factor presently set forth in the table is off by about a factor of 70.

CHAIRMAN HENDRIE:

What does it include?

MR. MALSCH:

It includes only releases from tailing piles during the time when the milling operations are going on.

It does not include releases from tailings piles while they're in the process of being stabilized after the milling has ceased and it does not include releases from stabilized tailings piles.

COMMISSIONER GILINSKY:

What was the logic there?

MR. MALSCH:

I've forgotten what the logic was, do you recall, Jane?

MS. AXELRAD:

The logic of not including releases

agb4 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 5

from stabilized tailings piles was that they could cover them over with dirt and there would not be any signiticant releases so they did not include -- evaluate the table.

There were several studies done, I think there was the Beir report and ~n EPA study that supported that conclusion, so the original valu did not reflect releases from the stabilized piles.

COMMISSIONER BRADFORD:

Were the piles in fact being covered over with dirt?

Do we require that that be done MR. MALSCH:

That was a practice at the time.

COMMISSIONER GILINSKY:

Why do we think this is not accurate?

Does radon get out in fact?

MR. MALSCH:

Some of it gets out, but actually the new numbers -- Let's see:

On Page 5 of the Commission paper there are current estimates of releases and it includes additional entries of over 4,000 caries for mining, which was never included in the original rule.

COMMISSIONER GILINSKY:

Why wasn't that included?

MR. MALSCH:

I'm not sure why it was not included originally in the rule.

COMMISSIONER GILINSKY:

Was there some rea:son*or was it merely an oversight?

MR. MALSCH:

I think.the belief was that there woul not be significant releases from mining at the time.

This was re-examined when GESMO was developed and it was decided at

agb5 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 A~ral Reporters, Inc.

25 6

point that it would be significant releases from mini::ng.

And, in fact, when the interim rule on reprocessing and waste manag -

ment was put out a note was added to the rule to the effect that oh, by the way, the:.-rule does not cover mining releases.

Under the current Staff estimates the mining re-leases are the major contributions.

CHAIRMAN HENDRIE:

It may have had to do with our licensing of mining but I'm not sure.

MR. MALSCH:

Well, it shouldn't have.

The rule was intended to address all the impacts of the fuel cycle licensin or not.

For example, it always covered the Richmond plants and yet they were never licensed.

CHAIRMAN HENDRIE:

But for whatever reason --

COMMISSIONER GILINSKY:

And where does most of the factor of 70 come from?

From mining?

MR. MALSCH:

From mining, according to current estimates, that's right, at this point.

Now, it's also clear that the rule does not cover health effects, as such.

It never really -- the table is primarily release values, it doesn't really contain, with some limited exceptions, it doesn't really contain dose numbers or health effects numbers like cancers or premature deaths and things of this sort.

la2 mpbl 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 7

COMMISSIONER BRADFORD:

When you said it was underestimated by a factor of 70, are you talking about per year?

MR. MALSCH:

Yes.

I think it is average annual fuel requirement is the way the table is expressed; that's right.

COMMISSIONER BRADFORD:

Isn't there also a question, though, of whether the numbers should be projected out a lot further than they were in the earlier table?

MR. MALSCH:

That's still an unresolved issue.

The Petitioner would request that the integration be carried over a very long period of time.

The Staff has problems with carrying out integration of releases over that long a period of time.

But that's an unresolved question and would not be -- and acting on this paper the Commission would not be making a decision on how far to carry out the calculation effect.

COMMISSIONER BRADFORD:

Is there agreement at least, though, that the arbitrary cutting off of it at the end of the reactor life is questionable?

MR. MALSCH:

I believe it is.

COMMISSIONER GILINSKY:

Didn't you say earlier the Staff assumption was that the pile would be stabilized and there would be *negligible releases after that?

mpb2 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 8

MR. MALSCH:

Yes.

COMMISSIONER GILINSKY:

In which case, what would it matter how long it was --

MR. MALSCH:

Well, there are still summaries after that.

COMMISSIONER GILINSKY:

I see.

So we're talking about the releases from stabilized piles?

You still have the assumption that the piles will be stabilized when covered with dirt?

MR. MALSCH:

That's generally correct.

One of the problems is if you assume you want to calculate -- inte-grate dose effects over, say, 100,000 years, it's difficult to say right now that 100,000 years from now the tailings piles will still be stabilized.

So as you go out more in the future you not only have more uncertainty as to whether the stabilizing measures will be in effect, but also questions about population dis-tributions, you know, who will be around to receive the doses and things of that sort. It's very difficult to decide if you're going that far ahead in the future.

But it's correct that there really wouldn't be a complete analysis of fuel cycle environmental impacts if one were to stop with either the end of the reactor license or to stop with the activities associated with just the annual fuel requirement.

You've got to look further out into the

mpb3 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 9

future.

COMMISSIONER GILINSKY:

That was a completely arbitrary stopping point?

MR. MALSCH:

Originally -- well, I guess you've got to make a decision at some point in time as to when the cutoff as to when to cut off the integration.

I suppose no matter what number you choose there is always going to be some arbitraryness associated with it.

COMMISSIONER GILINSKY:

Unless you go all the way out.

MR. MALSCH:

Well, if that's possible.

I guess as you go all the way out the various parameters involved in the integration become so uncertain and subject to conjecture that you really wonder if what you've got is really worth all that much.

But that is presently an unresolved i~sue as to how far to carry out the calculation. And the Staff is not recommending in this paper that the Commission make a generic decision on this issue now.

We prefer to let that issue be litigated in a couple of cases.

COMMISSIONER GILINSKY:

How could you assess the impact about making a decision about how far out.you carry out the integration?

MR. MALSCH:

You can't, and the Staff would be in effect making some sort of a decision along those lines

mpb4 2

3 4

5 6

7 8

10 in connection with presently presenting testimony in individual cases.

We're not saying that the issue can't be faced at all.

We're saying that we don't think the Commission ought to face the issue on a generic basis at this time and make a broadly applicable decision.

COMMISSIONER GILINSKY:

Why not?

MR. MALSCH:

The Staff feels we'd like to have a 9

little more experience in handling the issue in cases before 10 we made a firm recommendation.

11 COMMISSIONER KENNEDY:

What is it you would learn 12 in handling the cases?

13 14 15 MR. MALSCH:

In addition to preparing testimony we'd also get questioned in a bunch of cases to hear other intervenors' presentations and perhaps get just a better feel 16 for the issue.

17 18 19 20 COMMISSIONER KENNEDY:

Would that be different than the results that would be achieved through the rule-making process?

MR. MALSCH:

Not terribly different, although 2l the experience would be a little more intensive.

22 23 24 COMMISSIONER GILINSKY:

It seems to me how far to carry this integration is about as generic a question as you could get.

Ace-Federal Reporters, Inc.

25 MR. MALSCH:

These are all generic questions.

One

mpb5 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 11 can't distinguish between the various elements in the table and the issues associated with them on the grounds that some are generic and some are not.

They're all generic issues, issues of a type that at least based upon past Commission policy have been handled generically by rulemaking.

There's another problem, and that is that there is much new data coming in on -- particularly on the question of radon releases, and we have a generic environmentaL_im-pact on milling in preparation, and that should be~issued in draft form around mid-next year.

It's quite possible, and in fact a definite possibility is reflected in the paper that once that draft comes out we'll be in a position to actually propose a generic rule for Commission consideration and thereby avoid, say, from beginning to the end of '78 onward, avoid litigating the issue in individual cases any more.

So we're really talking about what. should be done in individual cases between now and, say, the end of this year.

COMMISSIONER BRADFORD:

How does that differ at all from the situation the.Commission was in at the point in time when the court said the back-end of the S-3 Table was inadequate and should no longer be used as a basis for continued licensing?

MR. MALSCH:

Well, it I s a similar.situation,.

that the Commission at that time could have either litigated

mpb6 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 12 that issue in individual cases or promulgated a rule.

As it turned out the analysis had not been,done fully at the time.

So there really -- and it had yet to be done.

So given the time already necessary to do the evalua-tion, the Commission decided to handle the matter by rule.

The Staff has already done the evaluation of milling impacts~

~.'They prepared testimony for presentation in individual testimony.

So there really is no question now about need to do additional work before we could even handle individual cases.

We can handle individual cases; there's no need to hold up until we do the work.

When the decision came down by the court we had to,... do the evaluation.

COMMISSIONER BRADFORD:

But the Commission specifically chose not to do it in individual cases in the back end of the fuel cycle.

MR. MALSCH:

That's right.

But, see, given the fact that it would take four months to do the evaluation, whether it was done in individual cases or by rule, if you're going to take four or five months to do the evaluation anyway you might as well handle the matter by rule.

COMMISSIONER BRADFORD:

But if the evaluation has already been done in this case why isn't it also better to have an applied rule?

mpb7 l

2 3

4 174 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 13 MR. MALSCH:

It would be if the Staff were certain that the values they are presently using would be the values that we'd.:_ still be advocating six or eight months from now.

The problem is we have a generic impact state-ment in preparation on milling which is going to have new information on radon releases.

If we proposed a rule now it's very likely that in J,une or so when we would otherwise be in a position to promulgate a final rule, we would have a whole new bunch of data in.

It would have to be re-examined, sent out for public comments, and then perhaps, depending upon the extent of the new data or information, propose the new rule and.get public comment on it.

So regardless of how you proceed, since you're going to have a big blob of new information coming in around June, whether you propose a rule now or propose a rule in June, you're really not going to be in a position to recommend the final rule until after the data has been evaluated and the public has had an opportunity to comment on it.

That"brings us until around late '78, which is what the Staff is recommending.

COMMISSIONER BRADFORD:

But then how would you know you've done the right thing in any of those individual reactors that may be licensed between now and the time the new data becomes available?

mpb8 1.190 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 MR. MALSCH:

Well, that's a question of how confident the Staff really is in presenting testimony in individual.cases.

I gather from talking with them that -~.:,

14 they're fairly confident that what they're doing is correct.

But there will be new information coming in.

It just seemed to the Staff that when you know new information is coming in it really is beneficial for the Commission to sit back and say, Well, let's wait and see what that looks like before we step in and promulgate_a rule of broad generic applicability.

COMMISSIONER GILINSKY:

We're always in a posi-tion where new information is coming in.

MR. MALSCH:

That's true, but this is an area where we had a definite planned program for producing the information, and it should be available on a reasonably close time frame.

COMMISSIONER GILINSKY:

What would you think of an interim?

MR. MALSCH:

Well, you could do that.

There'd be difficulties in making it immediately effective because you need to get public comment on the proposal.

If we proposed -- let's say right now, tomorrow we published in the Register a proposed new value for the radon entry in the table, and that's the most serious problem being discussed in the paper.

There'd be like a 60 day period

mpb9 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 15 for public comment.

Around the time that the Staff will be proposing to the Commission adoption of a final rule this whole new blob of information will be coming in.

It would have to be addressed in any recommendation to the Commission on what to do about a final rule.

It's also something the public would have.to be given an opportunity to comment on.

In fact, I would expect that maybe in commenting on the proposed rule they would say well these are our comments, but we'd really like to get a further opportunity to comment once we see all the new information in your draft EIS on milling.

So if we delay putting out a final rule until we get a chance to look at the new data.and got public comments on it, the earliest we can probably have a final,,let's say, interim rule with the new radon rule would be late 1978.

In that light it really doesn't make -- there really is not much of an advantage to proposing the rule now as opposed to in June.

COMMISSIONER BRADFORD:

Now how is it going to work out much differently in an individual proceeding; say that we approve that course of action now?

Then what's the next step in a case in which the matter is currently in question; the Staff~puts in testimony?

MR. MALSCH:

It puts in testimony.

The intervenors

mpbl0 1.225 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 will put in testimony.

Applicants presumably will put in testimony.

And the Board.will decide the matter.

COMMISSIONER BRADFORD:

And the Staff witness 16 goes on the stand and the intervenors say -- they cross-examine on the basis that isn't it true as of June you expect r~--- ---*-. - ----- - --

\\

to have much better information on it.

  • It __ j:µpt__J3~~ms_ to me

.it's going to play itself out the same way in the individual proceedings 11:ia :t: ~it~ wo~+/--_cL iri _a __ generic __ approach.

MR. MALSCH:

Well, it's simpler, except that I guess it really depends upon how confident you are about the data you have.

I guess I can see sort of three levels of confidence.

One is if we' re not confident,.,or we can't handle the issue at all, something has got to be done.

That's like the situation the Commission was presented with_when the court came down with a decision on the backend of the fuel cycle.

We nad to do an evaluation.

That's not the situation here.

The Staff feels fairly confident they can handle the issue in individual cases.

The next level is we're very confident of the results we have.

We have more information coming in.

But we're sufficiently confident with the information we do have that we're prepared to go forward in individual cases.

The third level of confidence would be that not

mpbll 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 17 only are we so sure we're right, but we're also sure we're going to remain right, and remain right for a period of time sufficient that it would be a __ worthwhile thing to do to have the Commission speak on the issue on a broad generic basis.

I think we fall sort of inbetween.

COMMISSIONER BRADFORD:

Well, then, when the Commission promulgated the interim rule as to the backend of the cycle, you're saying it was at a state of mind when it was in the first state of mind, when it could not be confident at all that its testimony would standup in indi-vidual cases?

MR. MALSCH:

No.

I think when the court's decision came down there was no detailed evaluation at all of the impacts from waste management, particularly -:--:-.:not in general, but particularly impacts from long._term problems in handling the high-level wastes.

An evaluation had to be done.

There.wasn't any choice at that point of launching forward immediately in individual case to litigate the issue.

MR. KELLEY:

There was a brief moratorium, wasn't there, Marty?

MR. MALSCH:

There was in fact, until at least the Staff had done its evaluation and a rule had been proposed.

COMMISSIONER BRADFORD:

And then the Staff went from your stage one to your stage three in a period of six weeks?

mpbl2 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 18 MR. MALSCH:

That's because there was new --

there was no big program underway that promised to produce significant new data within the time frame of interest.

COMMISSIONER GILINSKY:

They did it faster because there was no program?

MR. MALSCH:

No, between the time the Staff made its recommendation that the Commission publish a proposed rule and today, for example there has been no new significant information produced on the subjects and in fact when the interim rule was proposed and adopted by the Commission it was not anticipated that in the immediate future there would be new data generated.

So there was every indication at the time that the rule that the Commission would publish would withstand some reasonable test of time.

The Staff is just not so confident that that's going to be the case here.

COMMISSIONER BRADFORD:

But.then how are the individual licenses going to withstand the test of time?

MR. MALSCH:

Well, in individual licensing cases there's more flexibility to, first of all, to treat new information as it's developed during the course of the proceeding.

For example, if there are, say, five proceedings still pending before a board or the appeal board or the Commission at the time new information is generated, it's perfectly reasonable for people to request the record be

mpbl3 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 19 reopened to consider the new information if the information real~y indicates the values the Staff recommended were wrong.

Beyond that I think that handling issues on a case by case basis as opposed to by rule carries the kind of a connotation of more flexibility in dealing with the issue than would be the case if the Commission were to choose it-self to address the matter on a broad basis and put out a rule.

Now I think it is a fairly close question as to whether -- of the questions presented in the paper I think the closest question is the one that you're mentioning, whether we should right now elect to proceed by rule as opposed to handling it on a case by case basis.

there's no question something has to be done now.

I think The most difficult issue is whether what should be done is to proceed to correct~the rule now or to proceed to litigate the matter in individual cases.

By the way, there are,.I would say that in average nuclear power licensing cases the substantial majority of the issues are in fact generic, that is to say, common to other power reactor applications.

So there's nothing unusual about handling generic issues in individual cases.

And I think the Staff and the boards*. would be fully equipped to deal with them.

COMMISSIONER BRADFORD:

I understand this issue

mpbl4 2

3 4

5 6

7 8

9 10 ll 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 20 did come up in September, or thereabouts, in an earlier forum.

But how did we get all the way from November of '75 to September of '77 with an issue of this magnitude hanging over the S-3 table without having faced up to it before?

MR. MALSCH:

All I can say is that in connection with, say, the last four or five months taking a very careful look at the New England Coalition petition, but more so taking a careful look at the S-3 rule itself, we realize that there were these problems.

Now they were really surfaced in connection with the Purple Book and the Gray Bo0k, the backend interim rule.

COMMISSIONER GILINSKY:

Were these deficiencies in the radon numbers and the other matters, were they first noticed by the petitioners?

MR. MALSCH:

No, I think they were first noticed by the Staff.

Several people raised it at about the same time.

MR. KENNEKE:

I don't believe the issue was joined until the intervenors brought it up.

COMMISSIONER GILINSKY:

And it was brought to our attention by the petitioners?

MR. MALSCH:

Originally so, yes, fully realized in connection with the Staff in connection with the re-examination of the backend of the fuel cycle.

COMMISSIONER GILINSKY:

In other words, it really

mpbl5 la2 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 21 wasn't taken seriously until we got the Purple Book?

MR. MALSCH:

I believe that's a fair statement to make.

And also, we realized also there were problems when we put out the GESMO rule.

COMMISSIONER KENNEDY:

What period of time was that?

MR. MALSCH:

I 74

  • COMMISSIONER GILINSKY:

That antedates the petition.

MR. MALSCH:

In fact, the original course of action for acting on the petition was that well, there's no need to act on this as a separate matter.

We're alreadyy addressing all these issues in GESMO.

When it became.obvious GESMO was not going to produce a result in the immediate future we had to switch and decide the issues and deal with the petition as a separate matter.

lb ebl 1.325 5

6 7

8 9

10 11 12 13 14 19 20 21 22 23 24 I Ace-Federal Reporters, Inc.

25 22 COMMISSIONER KENNEDY:

It was being considered in the context of GESMO?

MR. MALSCH:

Yes.

COMMISSIONER BRADFORD:

But the parties themselves were not involved in GESMO?

MR. MALSCH:

I don't know.

Do you know whether they were, Jim?

don't know.

MR. KELLEY:

I would have to check the list.

I MR. MALSCH:

THey might have been.

I've forgotten COMMISSIONER KENNEDY:

That shouldn't be hard to check while we're sitting here.

Maybe somebody could call down to the Counsel's office and ask them.

MR. MALSCH:

It's the New England Coalition on Nuclear Pollution.

MR. KEHHEKE:

I think what you have is evolving value judgments as to the significance you put on the factor of extrapolating doses into the future.

That's only becoming one of growing awareness in the last couple of years.

It's hard to say precisely when it becomes an issue of the magnitude for Commission decision and when it is still more or less a professional concern.

COMMISSIONER GILINSKY:

But there: seem to be significant other areas.

Marty was mentioning the fact that the mining seems to have been left out.

eb2 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 23 MR. MALSCH:

Let me also say that the rule also, as I mentioned, does not include health effects as such.

In recent months, substantially as a result of the Appeal Board's decision in the Hartsville case, the Staff has been carrying out its evaluation of the comparative fuel cycle impacts from the nuclear fuel cycle and the fossil fuel cycle, and in a:n effort to reach a common basis for comparison, it has been actually calculating the impacts out to reach health effects numbers;as opposed to stopping short with just having re-leases, we're going one step further and having dose numbers.

The table is principally composed of release numbers and not either dose numbers or health effects numbers.

We think it will be useful at this point to clarify in the rule, and we have recommended that the rule be clarified, that it does not itself include for the most part any dose numbers or health effects numbers, and that it would be perfectly permissible for the Staff and other parties in individual cases to proceed with the release values in the table and to calculate, using them, dose numbers and then health effects.

In fact, the Staff is now doing that in pending cases pursuant to the Appeal Board's Hartsville decision.

COMMISSIONER GILINSKY:

By the way, in GESMO, what rule did the Staff adopt for the length of time over which these releases were considered?

eb3 2

3 4

5 6

X 7

8 9

10 11 X

12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 24 MR. MALSCH:

I don't know.

Homer, do you know what the cutoff was that was chosen?

MR. SCINTO:

Didn't we use a 26-year window -- a 26-year period from now until 2000-something, and 40 years thereafter?

MR. KENNEKE:

That's once the person inhaled it?

MR. SCINTO:

No, the environmental dose commitment We followed it in the environment for 40 years.

I think we used the standard ICRP 50-year impact on the person who received it.

MR. KENNEKE:

So you assumed radon releases for a period of 40 years after the close of the mill?

MR. SCINTO:

No, the radon releases for the 26-year period of the window.

The radon is followed in the environment for 40 years thereafter.

days?

MR. KENNEKE:

It only lasts a few days, though.

MR. SCINTO:

I'm sorry, wrong isotope.

MR. KENNEKE:

That's the one of concern.

MR. SCINTO:

Yes.

COMMISSIONER GILINSKY:

So it's 26 years plus two MR. SCINTO:

I 1 m pretty sure that 1 s the way we came out for radon.

For the other isotopes they're followed in the environment for a 40-year period.

eb4 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 come from?

GESMO --

25 COMMISSIONER GILINSKY:

Where did the 26 years MR. SCINTO:

That's the period covered by the MR. KENNEKE:

It's the li.fe of the mill I believe.

COMMISSIONER GILINSKY:

Is this up to the 2000?

MR. SCINTO:

Up to the year 2000.

(Pause.)

CHAIRMAN HENDRIE:

While that conference goes on:

Marty, if we start some sort of generic proceed-ing on these radon releases now, the effect in the individual licensing cases is what?

MR. MALSCH:

If we propose the rule now, we would still have to litigate the rule in individual cases until the rule became effective.

And we're probably talking about an effective rule some time the end of this year, so in effect there would be--

Assuming that we propose a rule now and had an effective rule the end of.the year, there would be 14 proceedings affected in which the Staff would have to litigate the issue in the proceedings where the NEPA review has not been completed, and there are 12 proceedings as to which the NEPA review has either been completed and i.t is pending before a Board or in which the NEPA review has been completed and the license has been issued and it's pending before the Appeal Board or the Commission.

So a total of 26 cases would

ebS 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 26 be impacted.

COMMISSIONER BRADFORD:

What do you do on some-thing like this when the plant is already in operation? If there is some point in time in which there's a need to change the S-3 table, do you just go back and the Staff proposes an amendment -- for what?

Is it a Board decision in those cases?

MR. MALSCH:

If an operating license had been issued and there were no pending proceedings before a Licensing Board, Appeal Board, or Commission, what I expect would happen would be the Commission would promulgate let's say a new effective rule, let's say the end of this year.

Let's suppose that it increases the radon number from the present value of about 75 curies to let's say -- oh, for purposes of argument, 5,000 curies.

The issue then would be what do you do about all these operating licenses that have been issued?

I think if the Commission were to become convinced that this was a real serious environmental impact problem,. it could, on its own initiative, initiate on a broad basis proceedings to re-examine.all existing licenses to see whether they ought to be suspended or modified.

If it were a matter in which it was clearly not a significant environmental impact, I think the Commission could state in connection with the rule that there's no need

eb6 2

3 4

5 6

7 8

9 10 11 12 13 14

1. 430 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 27 to reexamine the existing licenses.

If it fell somewhere in between where you might want to say there might be a case you could say where the original issue. of the license were so close to question that had they known then what they know now they might have reached

/-----

a different result, the Commission could say*while we're not prepared ourselves to institute a blanket enforcement' proceeding, *we would be prepared in individual cases to entertain requests by petitioners; we think this result might actually affect the earlier decisions.

And it would be acted on in the ordinary course of business under th.e Commission's regulations.under 2. 206 which provi.de a procedure for acting on these kinds of petitions.

COMMISSIONER BRADFORD:

Will the Staff itself undertake some kind of a review-tp see whether there were cases in which it might have an impact on the original deci-sion?

MR. MALSCH:

I think th.e Staff would only do that if it thought there were a. real serious question in this re-gard.

I think the Staff would on its own initiative under-take a reevaluation.

I think it's more likely, if it looked like the impacts were not all that significant, that the Staff would really conclude that there was no.need itself to look at the issue, but if-someone felt strongly about it, they'd be perfectly prepared to reexamine the issue in detail

eb7 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 28 on a case-by-case basis.

If someone filed a petition that would let's say -

let's say a year from now, let's say mid-next year after we promulgated the new rule -- and say "Hey, I just read your new rule.

My God, if I'd known this I never would have imagined you could have issued the operating license.

What are you going. to do about it?"

The Staff would take a look at the earlier Impact Statement and see how close the situation was, decide in its mind how it would have come out at the time if it had used the new number, and then reply to the petitioner, and then, in a fairly detailed evaluation of what the original basis for the license issuance was and how it might have been affected by the new rule, reply back to petitioner.

If he were dissatisfied, he could appeal.

In fact that's what we're recommending be done now in the case of completed proceedings but still existing licenses.

There is clearly no need for a licensing mora-torium because you have the option of handling the issue either by rule or on a case-by-case basis.

The real question is what do you do about existing licenses where there is no proceeding pending and in that case, I think the matter could be handled adequately under 10 CFR Section 2.206.

COMMISSIONER BRADFORD:

Explain to me just a little about the--

In a matter like the radon release, what

mpbl 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 29 is the distinction between the environmental impact and the health impact?

MR. MALSCH:

Well, there really shouldn't be that much.difference.

I think we've always included within the overall scope of environmental impacts, health and safety impacts.

The question is how you choose to express these impacts.

Then the rule was originally promulgated they were expressed in terms of release numbers, curies per year, things of this sort.

In fact, even now many entries in the table stop short of actual health effects data.

You could go one step further and carry the curie release numbers out and do a calculation and produce doses, you know, rems, many-rems, 1000 man-rem within 50 miles or something like that.

You could go one step further and actually carry out the health effects calculation of what deaths or premature deaths or cancers would result from those.. numbers of man-rems.

So there are three different levels to which you could carry it out.

In point of fact, its cost-benefit balances are always comparing apples and oranges.

It isn't really necessary to carry the calculation out to reach a common level of comparison.

You're always going to be looking at, you know, kilowatts per year versus ten acres committed over

mpb2 1e 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 30 40 years versus 87 rem, I mean, you never reach a point where you've got an exact equation.

Except, though, that in view of the appeal board's recent Hartsville decision calling for an evaluation of the fuel cycle impacts of both fossil and nuclear, it is very helpful to carry out the impact calcula-tion to health effects numbers.so~you do have a common basis for comparison.

COMMISSIONER BRADFORD:

But if you were assess-ing the impacts of radon in terms of health and safety and environmental_you would not be citing any environmental impacts that weren't health and safety impacts as well, I gather from what you say.

MR. MALSCH:

~.th£nk*we're talking about health environmental impacts, if I may use that kind of a term.

CHAIRMAN HENDRIE:

T.he environmental impact of the radon is a health and safety impact.

It has gross sort of physical or chemical effects from the natural environ-ment, the wildlife, and so on.

MR. MALSCH:

There are other things, for example, a tailings pond uses land area.

But that's, you know, not the big issue associated with tailings and radon.

MR. KENNEKE:

Assuming the views of people changed to give greater significance to these health effects from mill tailings, isn't the logical path a feedback to the mill tailings practices and isn't the issue therefore really going

mpb3 2

3 4

5 6

1.525 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 31 to be resolved over whatever we do about mill tailings?

That is, that's theomechan:ism by which we can reduce radon?

MR.**MALSCH:

That's true.

The Staff does have underway the reexamination of the whole question of millings and tailings stabilization.

It's quite possible that as a result of the uranium milling generic environmental impact statement that measures would be proposed by the Staff for Commission consideration that would have the effect of reducing radon releases from tailings ~~les.

So the place to deal with the problem is really in the generic EIS and in uranium milling license activities, not in the table.

But once action is taken, if action is taken to further reduce tailings pile releases as a result of rulemaking carried on as a followon to the GEIS that in turn would have an impact on what you might do in the table.

COMMISSIONER GILINSKY:

Let me ask you:

Suppose you did integrate out to 80,000 years, does the Staff have a view on whether that would change the cost-benefit balance?

MR. MALSCH:

We've done some calculations along those._lines in the paper.

Let me see if I can locate it.

(Pause.)

There's some information on that on page 13, where we carried out for a 10,000 year period.

MR. SCINTO:

Some of that information is in a

mpb4 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace---Federal Reporters, Inc.

25 32 record that's being submitted on appeal.

The Staff has filed testimony in the Three Mile Island proceeding which gives its estimate of the impacts after 1000 years in terms of health effects.

But you have that on appeal before you.

It's in the record that was filed by the Staff.

COMM:ISSIONER.BRADFORD:

What are the implications of all this for mill licensing apart from power plants?

What do we use for these values in the environmental impact state-ment when we license a bill?

MR. MALSCH:

I don't know.

We just recently issued the uranium milling impact statement.

We did one on Bear Creek.

Do you know what the yalues were we used?


-------- -- ---- ----~ ---- --- - --- -

I-1:R. LOWENBERG:

I understand the mill operators were requested to design down to twice the background.

In other words, an increment of one from the tailings piles in addition to natural background.

COMMISSIONER GILINSKY:

Double the natural back-ground?

MR. LOWENBERG:

That's correct.

COMMISSIONER BRADFORD:

What assumption was made as,: to the correct period of time to use?

MR. I.JOWENBERG:

I really-don't know.

COMMISSIONER GILINSKY:

Is this by and large the

mpb5 c2 lB lC 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 33 major health impact of the fuel cycle?

CHAIRMAN HENDRIE:

I can recall some calculations of this kind that we were attempting to make in connection with the academy study which has yet to yield its report~, _

MR. MALSCH:

We're drafting up a legislative proposal to deal with control over tailings..

EPA does have jurisdiction over tailings under its statutory authority.

So there are other agencies also involved.here.

They don't actively exercise that authority today.

CHAIRMAN HENDRIE:

Do I get to a recommendation in this paper eventually?

MR. MALSCH:

Oh, yes.

CHAIRMAN HENDRIE:

There's a recommendation from the Staff that says -:-:-"'"'..:cwould you summarize for us, please?

MR. MALSCH:

Briefly, the recommendation is as follows:

First, to delete. the entry in the table for radon, and therefore let the issue be litigated in individual cases.

And then further hold out as a definite possibility the. promulgation of an interim rule to add a new entry follow-ing examination of the generic impact statement, the draft generic impact statement on milling.

Secondly, to defer that aspect of the New England Coalition petition to ask that a new radon number be inserted

mpb6 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 in the table.

We can't grant it because we don't really agree with the number petitioner proposes.

On the other hand, it really isn't fair to deny it because we agree with 34 them.that the number in the table that is presently set forth is in error.

So we'd defer that part and inform him that this matter will be looked at.in detail in connection with the GEIS on milling and then much later on with the overall Table S-3 updateothan to deny the petition insofar as it requests a moratorium on pending and future cases.

There's no need for a moratorium clearly when you.have the option of handling the issue in individual cases and not by rule.

There's no need for a moratorium.

To also deny the petition insofar as it requests amendments.to the table dealing with the backend of the fuel*

cycle.

Here it will be denied on the grounds that the issue has already been dealt with with the Purple Book and the Gray Book and the interim rule on reprocessing and wasta manage-ment.

The issues raised by petitioner were also raised at that proceeding and disposed of in that proceeding.

Also.,. to deny the petition insofar as it asks the Commission itself to promulgate a rule dealing with doses and health effects.

As I indicated, we prefer to, at least for the present, handle this issue in individual cases with the option of maybe proposing a rule in this matter later.on after we've had a little bit more experience.

mpb7 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 35 That's the recommendation.

We've also got some detailed provisions in the notice as to exactly what this recommendation's impact would be,on pending casesoso as to remove any doubt in that regard.

CHAIRMAN HENDRIE:

Okay.

MR. MALSCH:

There's no pretense in the paper that this is anything resembling a long term solution to the problem.

It's an effort to do the best we can with an immediate problem and reach the most acceptable solution we can think of in the sort term, recognizing that in:the_iong term the best,solution is almost certainly going to be to propose a new rule and a new radon entry.

MR. KENNEKE:

In this connection, what kinds of new information do you expect to become available in the next six months or so as a result of the ongoing studies?

John, do you want to answer that?

MR. LEROHL:

With respect to mining, present estimates derived during GESMO are based on measurements of the radon in the air released from underground mines in New Mexico.

We are currently going to do more of the same.

Teams are ready to start the measurements within.weekq; so there will be more measurements of-__ tha t type.

With regard to mill tailings, measurements have been taken for the last three to four months, again in

mpb8 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 New Mexico at various distances from tailings piles measur-ing both radon concentrations at various distances and the particulates that arrived there.

36 That information is reaching the productive stage.

That should be available in three or four months.

It's becoming available now and should be pulled together nicely within three or four months.

MR. KENNEKE:

Will any of this information touch on the matter of the appropriate period of dose integration into the future?

MR. LEROHL:

Except in this extent:

EPA is addressing this question in seveial open hearings through the country which started over a year ago, and a meeting was held in -- out on the West Coast, a third meeting is scheduled for Denver at the end of this month.

And they have proposed treatment of how to handle these long term commitments and what the criteria should be.

So public attention has been focused and papers have been written.

And since this applies as well to waste management disposal, permanent disposal as well as mill tailings, it is generic and it's being addressed by several groups.

I think the thinking on it is it is being pulled together.

MR. KENNEKE:

EPA specifically excepted radon

mpb9 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 xx 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 37 from its 40 CF 190.

Have they got a position with regard to the period of integration?

MR. LEROHL:

Not precisely..

They view the ques-tion as when we disturb nature in a way not to create new radioactive material; but to enhance and release that which is already there,. that's a certai.n category in which radon applies.

The general thinking is now one should return that to its pristine conditi6n.

And iri terms of integra-tion time, in terms of -- and again in regard to that which we manufacture might be something different, but in terms of integration time they can think of 1000 years as being a reasonably foreseeable period as an upper limit to.which one can project people, resistence to disease, susceptibility to disease, and economic institutions that can control it.

CHAIRMAN HENDRIE:

Even that fails to deal with the sort of developments that.might occur in medical treat-ments to the health effects.

I know in the COENAY study one of the uncertain, the very uncertain propositions was what sort of discount factor might you want to apply to health effects as you went forward into the future to take account of developments in this line, and obviously a difficult proposition to settle down, but clearly an important consideration.

We are, as a race, not constrained on the one hand

mpb 10 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 38 either to let tailings piles continue to emit their radon if we don't want that, or, on the other hand, never to improve our ability to treat the health effects that may accrue.

It's a very difficult sort of a proposition to deal with.

And I must say, my own feeling is that there has been an increase in interest in. the matter.

There have been a number of discussions.

Bob Poole at Cornell raised this question about radon several years ago.

There have been arguments both ways about the integration time and how you might treat discount factors.

I have a notion that the discussion is going to go on for some time and that.we should not dilute ourselves that a crisp six month rulemaking effort here is going to settle anything for the long term.

Obviously the Commission has to have reasonable postures and bases for believing what it's doing is sensible in the interim.

But I think we have to recognize that there will be evolution for some time to come in the way in which society regards these effects.

settle down for the~long term.

Okay.

It's not clear how it will Well, let's see.

We understand what the Staff recommendation is.

MR. MALSCH:

Let me also add:

They were also clarifying the rule to indicate that what had always been

mpbll 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 39 understood to be the case.is not that it does not address economic or socioeconomic impacts,. that there are no dollars as such.

So in addition to deleting the radon number we're also clarifying exactly what is the scope of the table, and that should be very helpful in many cases.

CHAIRMAN HENDRIE:

Now, Jim and Leo, there was a paper from -- a late running paper from OGC.

Would you summarize it very briefly, and just the essential points?

It seemed to me as I read it that it agreed, but objected simultaneously with the Staff's proposal.

MR. KELLEY:

I think we can be brief.

We do support the substance of the Staff proposal.

I believe virtually all of our comments go to the Federal Register notice, the draft notice, and we have some concern about the justifications that are being offered for the various things that are being done.

Let.me answer an earlier question about the New England Coalition and GESMO.

I got the service list and they're not on it, so I would infer they were not a participant in that. proceeding.

Leo, I think, can summarize the main points that we want to make.

MR. SLAGGIE:

Well, actually, the main point, as Jim said, is we agree with what the Staff is recommending under the circumstances.

We feel that the draft notice

mpbl2 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 40 should make very clear the justification for what the Commissio is doing and what the Commission has in mind.

A number of questions have been asked this morning by the Commissioners, which indicates to:me that:the papers they read did not explain to them what the justifica-tion was, and that therefore they would also not explain to the public what the justification was.

So rather than go over these po.int by point, I think the draft notice --

CHAIRMAN HENDRIE:

You may be right, Leo.

But it is excessively kind of you to note the alternate sugges~

tion._. to.. that the Commission has not carefully read the paper.

I don't know that the questions prove the point one way or the.other.

MR. SLAGGIE:

Well, to those of you who have latent guilt feelings, it is my view that if you had read the paper you-would.still have asked the same questions.

(Laughter.)

CHAIRMAN HENDRIE:

Okay.

But then there are some matters of language in the draft notice which you would like to make some suggestions and perhaps in fact, in view of discussion this morning, the Staff might have some too, I don't know.

MR. MALSCH:

Well, let me say there will be no harm in adding language into the notice as suggested by OGC.

mpbl3 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 We might disagree as to whether it's absolutely essential that we do so. But there's no harm in adding some language in the notice where they have suggested it be done.

So we're not really disagreeing on what must be or must not be included in the notice.

CHAIRMAN HENDRIE:

Okay.

Then let me suggest a proposition to the Commission and see whether -- how the sentiment lies here.

41 The proposition would be to ask Counsel's office and ELD to please come together on the draft of this notice and agree on some language.

Now that goes in the direction of accepting the general thrust of the Staff recommendation, of course, and I would like to hear how see what the Commission sentiment is there, that is, if the sentiment is to accept that thrust, then I think the working out of these details is something that can be done py the offices, and we could then see some jointly recommended language.

But first let's see whether the.:.thrust is in that direction.

Peter?

COMMISSIONER BRADFORD:

. I am still puzzled, by the justification for treating this differently from the backend question.

I don't seeing the additional language may have a soothing effect on me, but I think a pretty strong case could be made for requiring that we follow the backend

mpbl4 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 format, the promulgation of the generic standard on an interim basis and then abiding by that.

The concern I have is it just looks to me as though these.individual proceedings that are being proposed will essentially follow or fall prey. to precisely the same sorts of delays that the Staff foresees for the generic proceeding.

CHAIRMAN HENDRIE:

My understanding is that the alternative -- that *. even if we go with an interim generic proceeding that on the assorted licensing cases in process at the moment that one's choice is either to shut them down pending completion of that generic proceeding or to allow litigation of the individual case anyway on the point.

MR. MALSCH:

Even if we propose the rule now and had an effective interim rule, let's say, by the end of the year, there would still be the need to litigate the issue in about 26 -- as much as 26 cases.

CHAIRMAN HENDRIE:

But let me for the moment count you as at least reluctant to accept that.

Vic, what about you?

COMMISSIONER GILINSKY:

I would like to think about it a little bit more.

42 I am inclined toward some generic approach, but I'm not sure how one goes about dealing with the complications

mpblS 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 of the individual proceedings.

CHAIRMAN HENDRIE:

I will vo.te myself in favor of the Staff recommendation.

Dick?

43 COMMISSIONER KENNEDY:

I share the feeling which I think both of our colleagues have.

There obviously is need to de~l with this in a generic sense, and my concern is only that we move to that end as rapidly as possible.

Meanwhile it seems to me,.:however, that the Staff recommendation effectively deals with the interim situation, in particular cases in-hand in a litigative sense, and indeed it seems to me in that process may well be helping us move more rapidly to the generic issue because data which is being developed and produced in the individual situations and litigated there will be examined and tested and we'll get more data from that than we might otherwise have sooner than by going through a rulemaking.

MR. MALSCH:

You've got to litigate in some individual cases, no matter what you choose to do because the only alternative is to suspend the licensing.

You've either got to deal iinii:th it immediately by rule or deal with it immediately by litigating it in individual,cases.

There's no way we can deal with it at least immediately by rule.

We may be able to deal with it by rule later on this year.

CHAIRMAN HENDRIE:

Let's see.

J

mpbl6 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 44 The Commission is clearly not gathered solidly on one consensus point, and I think I would not want to try to press the.issue.

I think it would be helpful to think about it some more and return to it as soon as we are able, and in the interim it allows. a chance for some further discussions.

And I will ask the Staff as well as counsel's office and OPE to see if you can please meet particularly with Commissioner Bradford and with Commissioner Gilinsky.

And we'd like for some further thrashing out of these things.

I sense, Peter, that you're sort of -- that there are still a number of questions to straighten out and some discussion like that might be helpful in seeing where you want to go.

COMMISSIONER BRADFORD:

Let me just try and focus again on a particular problem that I'm having, that is, in this case you're prepared to go forward in individual licens-ing.

You have sufficient confidence in the state of your knowledge that you're willing to put witnesses on the stand, have them cross-examined, and have licensing boards reach decisions on the materials you have in-hand now.

In the backend situation you weren't in that position.

You didn't go to the individual cases.

You held off. for six weeks, then promulgated an interim rule in which you must have had sufficient confidence.

So it only took six weeks to get from being less confident than you are now

mpbl7 le 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ace-Federal Reporters, Inc.

25 45 to being confident enough to have an interim rule applicable to all licenses issued anywhere in the country.

MR. MIRAGLIA:

The period was from July 21st until October --

COMMISSIONER BRADFORD:

Ten weeks, then; but the same idea.

CHAIRMAN HENDRIE:

It's precisely getting some of this straightened out that I would hope -- if we go on and try to do it here at the table this morning, why, you won't get on to the other things, you know.

There are certain complexities here, and I think perhaps some of the Staff who've been dealing wLth S-3 and the health effects and so on ought to join the qiscusston, give it a fair exercise.

So.I think we really have to leave this subject at this point.

It's a sort of a halfway situation.

We'll reschedule, unless it looks like --

I think we probably ought to reschedule again on it, but I think some more time for thrashing out some of the details and further explanations and so on would be helpful.

(Whereupon, at, 10: 50 a.m., the hearing in the above-entitled matter was concluded.)