Supplement to Supplemental Letter to (TMl-2) - License Amendment Request - Delete License Condition 2.C.(2) Physical Protection, Response to Questions
ML22203A107
Person / Time
Site: Crane 
Issue date: 07/19/2022
From: Lackey M
TMI-2 Solutions
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
TMl2-RA-COR-2022-0018
Download: ML22203A107 (3)


Text

SECURITY-RELATED INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 July 19, 2022 TMl2-RA-COR-2022-0018

~

TMl-2 SOLUTIONS U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 2 (TMl-2)

NRC Possession Only License No. DPR 73 NRC Docket No. 50-320 10CFR37 10 CFR 73.67 10CFR37.41 10 CFR 2.390 10 CFR 50.90 10 CFR 50.91

Subject:

Supplement to Supplemental Letter to Three Mile Island Nuclear Station, Unit 2 (TMl-2) -

License Amendment Request -

Delete License Condition 2.C.(2)

Physical Protection, Response to Questions

References:

1)

TMl-2 Letter TMl2-RA-COR-2022-0006 from M. Lackey (TMl-2 Solutions, LLC) to NRC, "Supplemental Letter to Three Mile Island Nuclear Station, Unit 2 (TMl-

2) - License Amendment Request - Delete License Condition 2.C.(2) Physical Protection," dated 3 May 2022
2)

TMl-2 Letter TMl2-RA-COR-2022-0014 from T. Devik (TMl-2 Solutions, LLC) to NRC, "Notification for Implementation of TMl-2 Materials Security Plan," dated 1 June 2022 (ML22154A187)

3)

Exelon Letter TMl1-21-018 from M. P. Gallagher (Exelon Generation) to NRC, "License Amendment Request -

Revised Three Mile Island Nuclear Station License in Support of Independent Spent Fuels Storage Installation (ISFSI) Only Security Plan (ML21145A183)

4)

TMl-2 Letter TMl2-RA-COR-2022-0015 from M. Lackey (TMl-2 Solutions, LLC) to NRC, "TMl-2 Materials Security Plan Scope of Activities," dated 9 June 2022 Reference 1 provided a description of the TMl-2 Materials Security Plan. Pursuant to 10 CFR 37.41 (a)(3), the 90-day notice of implementation was provided in Reference 2 to coincide with implementation of the TMl-1 ISFSI Only Security Plan as described in Reference 3 and SECURITY-RELATED INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 Decontrolled when separated from Security-Related Information f\\rt\\'>so \\

500\\ Pr f' ff\\ SJ

SECURITY-RELATED INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 subsequent TMl-1 submittals. A copy of the Contracted Scope of Work which will support TMl-2 Materials Security Plan implementation was provided to the NRC in Reference 4.

This submittal supplements Reference 1. Attachment 1 provides TMl-2 Solutions' responses to questions communicated by the NRC Technical Reviewer on 29 June 2022. Attachment 2 is a supplemented version of the 10 CFR 73.67/Part 37 comparative analysis matrix provided in Attachment 2 from Reference 1 that addresses the items discussed with the NRC.

Attachments 1 and 2 to this letter contain Security-Related Information. TMl-2 Solutions requests that Attachments 1 and 2 be withheld from public disclosure under 10 CFR 2.390.

This letter may be declassified upon removal of Attachments 1 and 2.

In accordance with 10 CFR 50.91 (7)(b)(1 ), a copy of this submittal has been sent to the Commonwealth of Pennsylvania.

There are no Regulatory Commitments contained in this letter.

If you have any questions concerning the contents of this submittal, please contact me at 509-420-3078 or Mr. Tim Devik, TMl-2 Licensing Manager, at 603-384-0239.

I declare under penalty of perjury that the foregoing is true and correct. Executed on July 19, 2022.

Sincerely, Michael B Lackey Mike Lackey Senior Vice President D&D Operations Energy Solutions Attachments:

Digitally signed by Michael B_ Lackey ON: C=US, O=Energysolutions, CN=Michael B_ Lackey, E=mblackey@emergysolutions.com Reason: I am the author of this document Location: Vision Date: 2022-07-19 16:11:D6 Foxit PhantomPDF Version: 9.7.0

1. Clarification of Information Provided
2. Supplemented Comparative Analysis Matrix of 10 CFR 73.67 and 10 CFR 37 cc: w/Attachments Regional Administrator - NRC Region I NRC Lead Inspector - Three Mile Island Nuclear Station - Unit 2 NRC Project Manager-Three Mile Island Nuclear Station - Unit 2 SECURITY-RELATED INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 Decontrolled when separated from Security-Related Information

SECURITY-RELATED INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 TMl-2 Service List Ken Robuck President and CEO Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 John Sauger President and Chief Nuclear Officer Reactor D&D Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Mike Lackey Senior Vice President D&D Operations Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Frank Helin Project Director TMl-2 Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Russ Workman General Counsel Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 Daniel F. Stenger Hogan Lovells US LLP 555 13th St NW Washington, D.C. 20004 Director, Bureau of Radiation Protection,

Department of Environmental Protection, Commonwealth of Pennsylvania Rachel Carson State Office BLDG.

13TH Floor P.O. Box 8469 Harrisburg, PA 17105-8469 Chief, Division of Nuclear Safety, Bureau of Radiation Protection, Department of Environmental Protection, Commonwealth of Pennsylvania Rachael Carson State Office BLDG.

13TH Floor P.O. BOX 8469 Harrisburg, PA 17105-8469 Chairman, Board of County Commissioners, Dauphin County 112 Market Street 7th Floor Harrisburg, PA 17101 Trevor Orth Site Decommissioning Director Three Mile Island Generating Station Route 441 South Middletown, PA 17057 Craig Smith Site Decommissioning Regulatory Assurance Lead Three Mile Island Generation Station Route 441 South Middletown, PA 17057 SECURITY-RELATED INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 Decontrolled when separated from Security-Related Information