ML22154A187
| ML22154A187 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 06/01/2022 |
| From: | Devik T TMI-2 Solutions |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, NRC Region 1 |
| References | |
| TM I2-RA-COR-2022-0014 | |
| Download: ML22154A187 (3) | |
Text
June 1, 2022
. ~
TMl-2 SOLUTIONS TM I2-RA-COR-2022-0014 U.S. Nuclear Regulatory Commission, Region 1 4 75 Allendale Road Suite 102 King of Prussia, PA 19406-1415
Subject:
References:
Three Mile Island Nuclear Station, Unit 2 (TMl-2)
NRC Possession Only License No. DPR 73 NRC Docket No. 50-320 Notification for Implementation of TMl-2 Materials Security Plan 10 CFR 37
- 1)
LetterTMl2-RA-COR-2022-0012 from M. Lackey (EnergySolutions) to Document Control (NRC), "Supplemental Letter to Three Mile Island Nuclear Station, Unit 2 (TMl-2) -
License Amendment Request -
Delete License Condition 2.C.(2)
Physical Protection," dated 9 May 2022
- 2)
Letter TMl-21-018 from M. P. Gallagher (Exelon Generation) to NRC, "License Amendment Request - Revised Three Mile Island Nuclear Station License in Support of Independent Spent Fuels Storage Installation (ISFSI) Only Security Plan," dated 29 April 2021 (ML21145A183)
Pursuant to 10 CFR 37.41 (a)(3) and the Regulatory Commitment made by TMl-2 Solutions in Reference 1, TMl-2 Solutions hereby provides written notification for implementation of the TMl-2 Materials Security Plan. TMl-2 Solutions will coordinate implementation to coincide with the Three Mile Island, Unit 1 ISFSI Only Security Plan timeline as described in Reference 2 and subsequent TMl-1 submittals.
There are no Regulatory Commitments contained in this letter.
If you have any questions concerning the contents of this submittal, please contact me at 603-384-0239.
Sincerely, T.
h r - D,o.,*,gn,odb1TrnolhrDIJWll 1mot y,.. ~~~--*°"TW~2 I 1.5~--
Dev1k LA~~~...=rv:: e,,
Timothy Devik TMl-2 Licensing Manager Energy Solutions
r cc:
NRC Document Control Desk Regional Administrator - NRC Region I NRC Lead Inspector-Three Mile Island Nuclear Station - Unit 2 NRC Project Manager-Three Mile Island Nuclear Station - Unit 2
TMl-2 Service List Ken Robuck President and CEO Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 John Sauger President and Chief Nuclear Officer Reactor D&D Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Mike Lackey Senior Vice President D&D Operations Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Frank Helin Project Director TMl-2 Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Russ Workman General Counsel Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 Daniel F. Stenger Hogan Lovells US LLP 555 13th St NW Washington, D.C. 20004 Director, Bureau of Radiation Protection Department of Environmental Protection' Commonwealth of Pennsylvania Rachel Carson State Office BLDG.
13TH Floor P.O. Box 8469 Harrisburg, PA 17105-8469 Chief, Division of Nuclear Safety, Bureau of Radiation Protection, Department of Environmental Protection Commonwealth of Pennsylvania Rachael Carson State Office BLDG.
13TH Floor P.O. BOX 8469 Harrisburg, PA 17105-8469 Chairman, Board of County Commissioners, Dauphin County 112 Market Street 71h Floor Harrisburg, PA 17101 Trevor Orth Site Decommissioning Director Three Mile Island Generating Station Route 441 South Middletown, PA 17057 Craig Smith Site Decommissioning Regulatory Assurance Lead Three Mile Island Generation Station Route 441 South Middletown, PA 17057