ML22108A199

EQUATIONS Q = m cpT N = S/(1 Keff)

Q = m h CR11 Keff1= CR21 Keff2 Q = UAT 1/M = CR1/CRx Q m Nat Circ 3

A = r2 T m Nat Circ 2

F = PA Keff = 1/(1 )

m = Av

= (Keff 1)/Keff W Pump = m P SUR = 26.06/

P = I2R

= eff eff P = IE PA = 3IE

=

+

eff 1 + eff PT = 3IEpf

= 1.0 x 104 sec PR = 3IEsin eff = 0.1 sec1 (for > 0)

Thermal Efficiency = Net Work Out/Energy In DRW tip 2 /avg 2

g(z2 z1) gc

+ (v2 2 v1 2) 2gc

+ (P2 P1) + (u2 u1) + (q w) = 0 P = Poet/

P = Po10SUR(t)

A = Aoet g = 32.2 ft/sec2 gc = 32.2 lbm-ft/lbf-sec2 CONVERSIONS 1 MW = 3.41 x 106 Btu/hr

= (5/9)(32) 1 ftwater 3

= 7.48 gal 1 hp = 2.54 x 103 Btu/hr

= (9/5)() + 32 1 galwater = 8.35 lbm 1 Btu = 778 ft-lbf 1 kg = 2.21 lbm 1 Curie = 3.7 x 1010 dps

Southern Nuclear Operating Company ND-22-0281 Vogtle Electric Generating Plant (VEGP) Units 3 and 4 V34 ILT-5 SRO Test (Non-Proprietary)

(This enclosure consists of 101 pages including this cover page)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 1 ID: 12875 Points: 1.00 Given:

Reactor Trip occurs from 100% Reactor Power At time 1000:00 BOTH SG NR water levels are 14% and recovering SFW Flow to SG 1 is 600 gpm SFW Flow to SG 2 is 600 gpm RCS temperatures are slowly lowering At time 1005:00 The crew is performing ES-0.1 (Reactor Trip Response), Step 4 "Check SFW Pumps - OFF" BOTH SFW Pumps are running BOTH SG NR water levels are 17% and slowly rising SFW Flow to SG 1 is 300 gpm SFW Flow to SG 2 is 250 gpm RCS temperatures are slowly lowering At time 1006:00 The UO reduces SFW flow for SG # 1 to 195 gpm to arrest the cooldown At time 1007:00 The UO reduces SFW flow for SG # 2 to 190 gpm to arrest the cooldown BOTH SG NR water levels are 19% and slowly rising In accordance with ES-0.1 (Reactor Trip Response), which of the following is the EARLIEST indicated time below at which automatic PRHR actuation has occurred?

A.

1000:00 B.

1006:00 C.

1007:00 D.

1009:00 BL8 Page: 1 of 100 22 February 2022 SVP_SV0_006534 Page 1 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 2 ID: 12959 Points: 1.00 Given:

A LOCA has occurred At time 1000:00 The crew is performing ES-1.4 (ADS Stage 4 Actuation Response) Step 4.b RNO to actuate DAS ADS Stage 4:

The DAS Control Panel is enabled from the PDSP At time 1001:00 ADS Stage 4 ARM handswitch (DAS-HS207) is placed in ARM and is currently in the ARM position Which of the following completes the statements below?

With ADS Stage 4 ARM handswitch (DAS-HS207) in the ARM position, the ADS Stage 4 ACTUATE handswitch (3-DAS-HS208) ___(1)___ disabled.

To cause the 4th Stage ADS Squib Valves to open, there ___(2)___ a time limit to actuate the valves after returning the arming switch to neutral.

A.

B.

C.

D.

BL8 Page: 2 of 100 22 February 2022 is is NOT is NOT is NOT is is (1)

(2) is NOT is SVP_SV0_006534 Page 2 of 100 a,c ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 3 ID: 12876 Points: 1.00 Given:

The Unit is at 100% Reactor Power At time 1000:00 SG 1 MFCV (SGS-V250A) is 76% open and begins opening further TAVG-TREF deviation is (-) 1.3°F Current Axial Flux Distribution (AFD) is (-) 7.29%

AFD Target Operating Band is (-) 6% to (-) 8%

At time 1010:00 The crew is performing AOP-201 (Uncontrolled Cooldown) Step 3, "Check Reactor Power - LESS THAN OR EQUAL TO 100% RTP" Which of the following completes the statements below?

At 1001:00, in response to the MFCV failure, ___(1)___ bank rods will move.

In accordance with AOP-201, the EARLIEST time the crew is required to trip the Reactor is when TAVG-TREF deviation is NOT trending to within ___(2)___ °F.

A.

B.

C.

D.

BL8 Page: 3 of 100 22 February 2022 AO M

10 10 AO 5

(1)

(2)

M 5

SVP_SV0_006534 Page 3 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 4 ID: 12937 Points: 1.00 Given:

The Unit is at 100% Reactor Power At time 1000:00 BOTH Reactor Trip Breakers (RTB) A01 and A02 open PMSA-DIV-FLT - CAB FAULT alarm is in The crew entered AOP-402 (Malfunction of PMS)

At 1000:00, which of the following completes the statements below?

AOP-403 (Instrument Failure PMS Division A) entry conditions ___(1)___ met.

P-3 is ___(2)___.

A.

B.

C.

D.

BL8 Page: 4 of 100 22 February 2022 are are NOT OFF OFF are ON (1)

(2) are NOT ON SVP_SV0_006534 Page 4 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 5 ID: 12874 Points: 1.00 Given:

A LOCA has occurred At time 1000:00 The crew is performing E-1 (Loss of Reactor or Secondary Coolant) Step 42, "Check if Chilled Water should be restored to Containment" PXS-V108A and PXS-V108B (PRHR Hx Outlet FCV's) are CLOSED VWS-MP-01B (High Cap Chiller Pump) is RUNNING ALL Ctmt Recirc Fans are RUNNING VCS-TE053A and VCS-TE053B (DAS Containment temperature) indicate 185°F In accordance with E-1, which of the following completes the statements below?

At 1000:00, Chilled Water to Containment ___(1)___ allowed to be restored.

If the conditions are met to restore Chilled Water to Containment, to minimize water hammer, ___(2)___ valves will be opened FIRST.

A.

B.

C.

D.

BL8 Page: 5 of 100 22 February 2022 is is NOT supply supply is return (1)

(2) is NOT return SVP_SV0_006534 Page 5 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 6 ID: 12938 Points: 1.00 Given:

The Unit is at 100% Reactor Power The crew is performing AOP-702 (Loss of Component Cooling Water)

CCS Surge Tank level is 5% and lowering due to a leak in the surge tank RNS is in service to cool the Spent Fuel Pool SFS Pumps are unavailable In accordance with AOP-702, which of the following completes the statements below?

FPS ___(1)___

used to cool RNS.

The RCP VFD Supply Bkrs (ECS-ES-EV61(52-1) / 51(52-1) / 41(52-1) / 31(52-1))

___(2)___ required to be opened.

A.

B.

C.

D.

BL8 Page: 6 of 100 22 February 2022 is is NOT are NOT are NOT is are (1)

(2) is NOT are SVP_SV0_006534 Page 6 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 7 ID: 13008 Points: 1.00 Given:

At time 1000:00 The crew transitions from ES-0.1 (Reactor Trip Response) to ES-0.2 (Natural Circulation Cooldown)

At time 1020:00 At time 1030:00 Automatic CVS Letdown is in progress In accordance with ES-0.2, which of the following completes the statements below?

At 1020:00, when aligning for CVS boration, the HIGHEST allowed automatic CVS-RMCS Makeup Flow setpoint is less than or equal to ___(1)___ gpm.

At 1030:00, Automatic CVS letdown operation ___(2)___ contribute to rising IRWST temperatures.

A.

B.

C.

D.

BL8 Page: 7 of 100 22 February 2022 100 135 will NOT will NOT 100 will (1)

(2) 135 will SVP_SV0_006534 Page 7 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 8 ID: 12813 Points: 1.00 Given:

FR-S.1 (Response to Nuclear Power Generation - ATWS) is in progress The crew is performing Step 4 "Check PRHR Actuated" In accordance with FR-S.1 and FR-S.1-B, which of the following completes the statements below?

The reason PRHR Actuation status is checked at Step 4 is to ___(1)___.

If Safeguards Actuation is ON, the crew ___(2)___ required to transition out of FR-S.1 prior to completing FR-S.1.

Note:

FR-S.1-B (Background Information for FR-S.1 Response to Nuclear Power Generation-ATWS)

A.

B.

C.

D.

BL8 Page: 8 of 100 22 February 2022 ensure a positive reactivity insertion is NOT occurring mitigate the impact of increasing RCS inventory is is ensure a positive reactivity insertion is NOT occurring is NOT (1)

(2) mitigate the impact of increasing RCS inventory is NOT SVP_SV0_006534 Page 8 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 9 ID: 12896 Points: 1.00 Given:

The following steps from E-3 (Steam Generator Tube Rupture) are in progress (ECS-EC-124(52)) indicates open according to CPS The OATC determines that (ECS-EC-124(52)) is closed Which of the following completes the statements below?

In accordance with E-3, PZR NR level is required to be GREATER THAN ___(1)___ to Reset / Enable Pressurizer heater use.

In accordance with NMP-AP-005-GL04, the OATC ___(2)___ required to report the CPS discrepancy to the Shift Supervisor.

Note:

NMP-AP-005-GL04 (Transient Response Procedure User's Guide)

A.

B.

C.

D.

BL8 Page: 9 of 100 22 February 2022 10%

25%

is NOT is NOT 10%

is (1)

(2) 25%

is SVP_SV0_006534 Page 9 of 100 a,c ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 10 ID: 12852 Points: 1.00 Given:

MSIV Bypass CIV AOV (SGS-V240A) is open and can NOT be closed The faulted SG has NOT been identified At time 1000:00 The crew has completed E-1 (Loss of Reactor or Secondary Coolant) (Faulted SG Isolation) and returned to the main procedure Which of the following completes the statements below?

SG PORV setpoints ___(1)___ adjusted to 1160 psig in E-1 Attachment 1.

MSS-V025 (GSS/ASS Steam MOV) ___(2)___ directed to be closed while performing E-1 Attachment 1.

A.

B.

C.

D.

BL8 Page: 10 of 100 22 February 2022 are are NOT is NOT is NOT are is (1)

(2) are NOT is SVP_SV0_006534 Page 10 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 11 ID: 12882 Points: 1.00 Given:

The Unit is at 100% Reactor Power At time 1000:00 AOP-101 (Rapid Power Reduction) is entered In accordance with AOP-101-B (Background Information for Rapid Power Reduction) which of the following completes the statement below?

The reason why Pressurizer Backup heaters are required to be placed in MANUAL/ON is ______.

A.

because the boron addition rate is limited to 50 gpm B.

to ensure automatic rod control can prevent arming the steam dumps C.

to ensure the RCS minimum temperature for criticality is NOT reached D.

because the RCS spray valves response is faster than cycling Pressurizer heaters BL8 Page: 11 of 100 22 February 2022 SVP_SV0_006534 Page 11 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 12 ID: 13009 Points: 1.00 Given:

At time 1000:00 The control room has been evacuated A manual Reactor trip was attempted from the MCR and RSR Plant control can NOT be established from the RSR The Unit is at 100% Reactor Power At time 1001:00 The crew enters AOP-602 (DAS Operations at Local Cabinets)

At time 1010:00 The crew is performing AOP-602 (DAS Operations at Local Cabinets) Step 4b, "Check Rod Drive MG Set Voltages" The crew observes the following:

Which of the following completes the statements below?

At 1001:00, the local DAS cabinets ___(1)___ been enabled.

At 1010:00, the reactor ___(2)___ tripped.

A.

B.

C.

D.

BL8 Page: 12 of 100 22 February 2022 have have NOT is NOT is NOT have is (1)

(2) have NOT is SVP_SV0_006534 Page 12 of 100 a,c ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 13 ID: 12698 Points: 1.00 Given:

The crew is currently evaluating F-0 (Critical Safety Function Status Trees)

At time 1000:00 Containment pressure is 6.0 psig Core exit T/Cs are 900 °F RCS subcooling based on core exit T/Cs is (+) 35 °F In accordance with F-0, which Core Cooling entry condition is met, if any?

A.

FR-C.1 (Response to Inadequate Core Cooling)

B.

FR-C.2 (Response to Degraded Core Cooling)

C.

FR-C.3 (Response to Saturated Core Cooling)

D.

NO Core Cooling Safety Function entry condition is met BL8 Page: 13 of 100 22 February 2022 SVP_SV0_006534 Page 13 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 14 ID: 12909 Points: 1.00 Given:

A Reactor startup is in progress At time 1000:00 The Unit is at 7% Reactor Power EDS2-DS-1 is de-energized LOOP occurs At time 1005:00 The crew is evaluating AOP-302 (Loss of AC Power), Step 3 RNO:

At 1015:00, which of the following completes the statements below?

ECS-ES-7 ___(1)___ powered.

AOP-302, Attachment 1 (Alternate Power Source Sequencing and Load Management)

___(2)___ required to be performed.

A.

B.

C.

D.

BL8 Page: 14 of 100 22 February 2022 is is NOT is NOT is NOT is is (1)

(2) is NOT is SVP_SV0_006534 Page 14 of 100 a,c ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 15 ID: 12700 Points: 1.00 Given:

ES-1.1 (Safeguards Termination) Step 8 "Isolate Accumulators" is in progress In accordance with ES-1.1, which of the following completes the statement below?

The MAXIMUM indicated RCS pressure at which accumulators are allowed to be isolated is ______ psig.

A.

417 B.

700 C.

950 D.

1970 BL8 Page: 15 of 100 22 February 2022 SVP_SV0_006534 Page 15 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 16 ID: 12854 Points: 1.00 Given:

The Unit is at 100% Reactor Power At time 1000:00 IA Pressure is 112 psig and lowering 1 psig per minute At time 1005:00 The crew is performing AOP-703 (Loss of Instrument Air) Step 8, "Check IA Dryer Package For Running IA Compressor(s)"

Which of the following completes the statements below?

IA/SA X-Conn (CAS-V017) ___(1)___ be operated from the MCR.

At 1005:00, in accordance with AOP-703, CAS-V017 is required to be ___(2)___.

A.

B.

C.

D.

BL8 Page: 16 of 100 22 February 2022 can can NOT closed closed can open (1)

(2) can NOT open SVP_SV0_006534 Page 16 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 17 ID: 12702 Points: 1.00 Given:

The crew is responding to a LOCA outside of Containment At time 1000:00 The Shift Supervisor directs the operator to perform ECA-1.1 (LOCA Outside Containment) Step 6:

CVS-V045 and CVS-V059 are OPEN Which of the following completes the statements below?

A DAS Containment Isolation actuation ___(1)___ send a signal to close CVS-V045.

A DAS Containment Isolation actuation ___(2)___ send a signal to close CVS-V059.

A.

B.

C.

D.

BL8 Page: 17 of 100 22 February 2022 does does NOT does NOT does NOT does does (1)

(2) does NOT does SVP_SV0_006534 Page 17 of 100 a,c ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 18 ID: 12926 Points: 1.00 Given:

The crew enters SDP-2 (Response to Loss of Normal Residual Heat Removal System During Shutdown)

At time 1000:00 SDP-2 Step 49 is NOT met:

Which of the following completes the statements below?

In accordance with SDP-2, the crew ___(1)___ required to Actuate DAS Containment Isolation.

If a manual DAS Containment Isolation is performed, CVS-V092 (Zinc Add CIV AOV)

___(2)___ receive a signal to close.

A.

B.

C.

D.

BL8 Page: 18 of 100 22 February 2022 is is NOT will NOT will NOT is will (1)

(2) is NOT will SVP_SV0_006534 Page 18 of 100 a,c ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 19 ID: 12897 Points: 1.00 Given:

The Unit is at 55% Reactor Power At time 1000:00 AOP-104 (Rod Control System Malfunction) is in progress due to an Urgent Failure Alarm At time 1030:00 Rod motion has been restored The crew is performing Attachment 1 (Rod Control Malfunction), Step 5 "Stabilize RCS Temperature" In accordance with AOP-104, which of the following completes the statements below?

During power operations, boration flow rate is limited to ___(1)___ gpm when boration is used to reposition control rods.

In accordance with CVS-SOP-001 (Chemical and Volume Control System), Attachment 3 (RCS Makeup System Operation), Section 4.3 (Boration), the boration flow rate limit prevents reactivity change due to boron from exceeding ___(2)___.

A.

B.

C.

D.

BL8 Page: 19 of 100 22 February 2022 100 speed of control rod withdrawal 100 Generator load change limits 50 speed of control rod withdrawal 50 Generator load change limits SVP_SV0_006534 Page 19 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 20 ID: 12948 Points: 1.00 Given:

The Unit is at 100% Reactor Power At time 1000:00 DST Level is 80 inches and lowering at 4 inches per minute Condenser C level is rising AOP-202 (Condensate System Malfunction) is entered by the crew Which of the following completes the statements below?

With no operator action, the EARLIEST time at which a Main Feedwater Pump trips is

___(1)___.

In accordance with AOP-202, at the time chosen for the first part, the crew

___(2)___required to trip the reactor.

A.

B.

C.

D.

BL8 Page: 20 of 100 22 February 2022 1004:00 1006:00 is NOT is NOT 1004:00 is (1)

(2) 1006:00 is SVP_SV0_006534 Page 20 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 21 ID: 12706 Points: 1.00 Given:

A LOCA occurs The crew is performing FR-C.3 (Response to Saturated Core Cooling)

At time 1000:00 The crew is performing Step 3 "Check All Reactor Coolant Pumps - STOPPED" Which of the following completes the statements below?

This Core Cooling Critical Safety Function is ___(1)___.

In accordance with FR-C.3-B (Background Information for Response to Saturated Core Cooling), the reason for performing Step 3 is to ensure CMTs operate in ___(2)___

mode.

A.

B.

C.

D.

BL8 Page: 21 of 100 22 February 2022 ORANGE ORANGE steam displacement drain down water recirculation YELLOW water recirculation (1)

(2)

YELLOW steam displacement drain down SVP_SV0_006534 Page 21 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 22 ID: 12917 Points: 1.00 Given:

The Unit is in Mode 1 An automatic PCS actuation occurs due to failed Containment Temperature Instruments FR-Z.4 (Response to Low Containment Pressure) entry conditions are met At time 1000:00 The crew is performing FR-Z.4 Step 2 "Terminate PCS" Which of the following completes the statements below?

The PCS actuation signal caused ___(1)___ to reposition from closed to open.

In accordance with FR-Z.4, to terminate PCS flow, the crew is required to reset PCS Actuation signals on ___(2)___.

Note:

PCS-V001A/B (PCCWST Outlet AOVs)

PCS-V001C (PCCWST Outlet MOV)

PCS-V002A/B/C (PCCWST Outlet MOVs)

A.

B.

C.

D.

BL8 Page: 22 of 100 22 February 2022 PCS-V001A/B/C PCS-V002A/B/C ONLY DAS ONLY DAS PCS-V001A/B/C BOTH PMS and DAS (1)

(2)

PCS-V002A/B/C BOTH PMS and DAS SVP_SV0_006534 Page 22 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 23 ID: 12857 Points: 1.00 Given:

At time 1000:00 The Unit is at 100% Reactor Power At time 1005:00 MFW Pump A (FWS-MP-01A) trips The crew enters AOP-207 (Loss of Turbine Load)

Which of the following completes the statements below?

At 1030:00, with no operator action, SG levels will be ___(1)___ they were at 1000:00.

In accordance with AOP-207, the crew ___(2)___ required to transfer Steam Dumps to Pressure Control Mode.

A.

B.

C.

D.

BL8 Page: 23 of 100 22 February 2022 lower than the same as is NOT is NOT lower than is (1)

(2) the same as is SVP_SV0_006534 Page 23 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 24 ID: 12940 Points: 1.00 Given:

Unit 4 is at 100% Reactor Power BOTH PRHR HX outlet FCV (PXS-V108A/B) indicate magenta on Screen 12703 (PXS IRWST)

The crew enters AOP-401 (Malfunction on DDS)

The UO is performing AOP-401, Step 7 "Check DDS Operating Normally" Which of the following completes the statement below?

In accordance with AOP-401 and NMP-AP-005-GL04, the crew is required to ensure the valves are in the correct position by verifying ______.

Note:

NMP-AP-005-GL04 (Transient Response Procedure User's Guide)

A.

their position on PLS B.

the Output Value (OV) on Ovation C.

the Output Value (OV) on each PLS controller D.

their position on the PMS Component Status Screen BL8 Page: 24 of 100 22 February 2022 SVP_SV0_006534 Page 24 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 25 ID: 12962 Points: 1.00 Given:

The crew is performing FR-P.1 (Response to Imminent Pressurized Thermal Shock Condition) Step 5, "Depressurize RCS to Minimize Subcooling" 1st Stage ADS A MOV (RCS-V001A) fails to open In accordance with FR-P.1, which of the following completes the statement below?

The crew is required to ______ to depressurize the RCS.

A.

use Auxiliary Spray B.

perform an ADS Actuation C.

use Division A 2nd Stage ADS D.

use Division B 1st Stage ADS BL8 Page: 25 of 100 22 February 2022 SVP_SV0_006534 Page 25 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 26 ID: 12711 Points: 1.00 Given:

The Unit is at 80% Reactor Power A 500 gpm leak occurs on a weld for the feed line of SG 1 The leak is located inside the Auxiliary Building upstream of SG 1 MFCV (SGS-V250A)

The leak is NOT threatening plant equipment The crew enters AOP-205 (Feedwater System Malfunctions)

Which of the following completes the statements below?

The leak ___(1)___ be isolated from BOTH SG 1 and the Main Feed Pumps.

In accordance with AOP-205, the Reactor ___(2)___ required to be tripped.

A.

B.

C.

D.

BL8 Page: 26 of 100 22 February 2022 can can NOT is NOT is NOT can is (1)

(2) can NOT is SVP_SV0_006534 Page 26 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 27 ID: 12712 Points: 1.00 Given:

The Unit is at 100% Reactor Power At time 1000:00 Power is lost from IDSB-DD-1 to the PMS Solenoid for IRWST Gutter Isol (PXS-V130A)

The crew enters AOP-303 (Loss of DC Power or AC Instrument Power)

IDSB-DD-1 is still energized At 1005:00, which of the following completes the statements below?

PXS-V130A is ___(1)___.

In accordance with AOP-303, transition to AOP-402 (Malfunction of PMS) ___(2)___

required.

A.

B.

C.

D.

BL8 Page: 27 of 100 22 February 2022 open closed is NOT is NOT open is (1)

(2) closed is SVP_SV0_006534 Page 27 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 28 ID: 12713 Points: 1.00 Given:

The Unit is at 100% Reactor Power Which of the following conditions will result in an automatic containment isolation (T-signal)?

A.

High RCS THOT B.

Low-2 RCS TCOLD C.

High-2 PZR level D.

Low-2 Containment Pressure BL8 Page: 28 of 100 22 February 2022 SVP_SV0_006534 Page 28 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 29 ID: 12880 Points: 1.00 Which of the following completes the statement below?

SG 2 MFCV (SGS-V250B) is powered from ______.

A.

IDSB-DK-1 B.

IDSD-DD-1 C.

IDSB-EA-1 D.

IDSD-EA-1 BL8 Page: 29 of 100 22 February 2022 SVP_SV0_006534 Page 29 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 30 ID: 12715 Points: 1.00 Given:

The crew is performing GOP-205 (Plant Cooldown Mode 3 to Mode 5)

At time 1000:00 MSL/Feedwater Isol and Safeguards have been blocked in ALL divisions Steam Dumps are open and being used to maintain RCS temperature at 532°F At time 1005:00 Steam leak develops downstream of SGS-V040A (SG 1 MSIV CIV)

SG 1 pressure is 900 psig and lowering SG 2 pressure is 905 psig and lowering At time 1006:00 SG 1 Pressure is 700 psig and lowering At 1006:00, which of the following completes the statements below?

ALL Steam Dumps (MSS-V001/V002/V003/V004/V005/V006) ___(1)___ received a signal to close.

SG 1 PORV Block CIV MOV (SGS-V027A) ___(2)___ received a signal to close.

A.

B.

C.

D.

BL8 Page: 30 of 100 22 February 2022 have have NOT has NOT has NOT have has (1)

(2) have NOT has SVP_SV0_006534 Page 30 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 31 ID: 12820 Points: 1.00 Given:

The Unit is at 41% Reactor Power RNS Train A is cooling the Spent Fuel Pool (SFP)

At time 1000:00 LOOP occurs concurrent with a Main Generator trip At 1005:00, which of the following completes the statements below?

RNS Pump A ___(1)___ be running.

RNS Pump B ___(2)___ be running.

A.

B.

C.

D.

BL8 Page: 31 of 100 22 February 2022 will will NOT will NOT will NOT will will (1)

(2) will NOT will SVP_SV0_006534 Page 31 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 32 ID: 12717 Points: 1.00 Given:

At time 1000:00 PXS-V108B indicates as follows:

Which of the following completes the statements below?

At 1000:00, PRHR HX Outlet FCV (PXS-V108B) ___(1)___ required to be reset/enabled to be manually throttled from the MCR.

If required to be throttled, PRHR HX Outlet FCV (PXS-V108B) can be throttled using soft controls from ___(2)___.

A.

B.

C.

D.

BL8 Page: 32 of 100 22 February 2022 is is NOT PMS PMS is PLS (1)

(2) is NOT PLS SVP_SV0_006534 Page 32 of 100 a,c ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 33 ID: 12858 Points: 1.00 In accordance with PXS-SOP-001 (Passive Core Cooling System) and LCO 3.5.4 (PRHR HX - Operating), which of the following completes the statement below?

If any RCPs are running, then at least one RCP in Loop ___(1)___ must be running to minimize the likelihood of ___(2)___ in the PRHR HX.

A.

B.

C.

D.

BL8 Page: 33 of 100 22 February 2022 1

2 non-condensible gas buildup non-condensible gas buildup 1

reverse flow (1)

(2) 2 reverse flow SVP_SV0_006534 Page 33 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 34 ID: 12942 Points: 1.00 Given:

The Unit is in MODE 5 being cooled by RNS At time 1000:00 RCS Pressure is 250 psig and lowering slowly The crew suspects a tube leak in the RNS HX Which of the following completes the statements below?

If there is a leak in the RNS HX, CCS Surge Tank Level is expected to ___(1)___.

The RNS HX is located in Room ___(2)___.

A.

B.

C.

D.

BL8 Page: 34 of 100 22 February 2022 rise lower 12362 12362 rise 40503 (1)

(2) lower 40503 SVP_SV0_006534 Page 34 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 35 ID: 12720 Points: 1.00 Given:

Solid plant pressure control has been established in accordance with GOP-205 (Plant Cooldown Mode 3 to Mode 5)

CVS is aligned for Automatic Pressure Control Mode Makeup Pump A (CVS-MP-01A) is running At time 1000:00 Letdown Pressure (CVS-PT040) is 300 psig and stable At time 1010:00 CVS-PT040 is 400 psig and rising Which of the following completes the statements below?

At 1000:00, ___(1)___ is being used to automatically control RCS pressure.

At 1010:00, CVS-MP-01A is ___(2)___.

A.

B.

C.

D.

BL8 Page: 35 of 100 22 February 2022 Letdown CIV AOV (CVS-V045)

Letdown CIV FCV (CVS-V047) stopped or tripped stopped or tripped Letdown CIV AOV (CVS-V045) running (1)

(2)

Letdown CIV FCV (CVS-V047) running SVP_SV0_006534 Page 35 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 36 ID: 13017 Points: 1.00 Given:

ADS Stages 1-3 have automatically actuated Division A indicates 1st Stage ADS Actuation is ON At time 1000:00 The crew is performing ES-1.3 (ADS Stage 1-3 Actuation Response) Step 2, "Check 1st Stage ADS Actuation - ANY DIVISION ON" At time 1005:00 RCS-V001A (1st Stage ADS A MOV) indicates closed In accordance with ES-1.3, which of the following completes the statements below?

The crew will FIRST attempt to open RCS-V001A from ___(1)___.

The crew is required to place ADS & IRWST Injection Block switches in UNBLOCK

___(2)___ checking ADS valves are open.

A.

B.

C.

D.

BL8 Page: 36 of 100 22 February 2022 PMS DAS before before PMS after (1)

(2)

DAS after SVP_SV0_006534 Page 36 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 37 ID: 13027 Points: 1.00 Given:

The Unit is in MODE 1 Which of the following completes the statements below?

The setpoint for automatic ADS & IRWST Injection Actuation Unblock is reached once CMT Upper NR Level drops BELOW ___(1)___ %.

LCO 3.3.20 requires that four CMT Upper NR Level Channels be OPERABLE in each

___(2)___.

Note:

Function 1 (Core Makeup Tank Level For Automatic Unblocking)

LCO 3.3.20 (ADS and IRWST Injection Blocking Device)

A.

B.

C.

D.

BL8 Page: 37 of 100 22 February 2022 91.0 81.3 PMS Division PMS Division 91.0 CMT (1)

(2) 81.3 CMT SVP_SV0_006534 Page 37 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 38 ID: 12723 Points: 1.00 Given:

The Unit is at 8% Reactor Power Main Feedwater Pump A (FWS-MP-02A) is feeding BOTH SGs using the SFCVs (SGS-V255A/B)

BOTH SG water levels are 52.5%

At time 1000:00 SG 2 NR level begins to rise at 2% per minute At 1012:00, which of the following completes the statements below?

The Reactor ___(1)___ tripped.

MFW Disch to SFW Hdr AOV (FWS-V097) is ___(2)___.

A.

B.

C.

D.

BL8 Page: 38 of 100 22 February 2022 is is NOT closed closed is open (1)

(2) is NOT open SVP_SV0_006534 Page 38 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 39 ID: 12982 Points: 1.00 Given:

GOP-205 (Plant Cooldown MODE 3 to MODE 5) is in progress At time 1000:00, the crew observes the following:

At time 1005:00:

The following blocks have been inserted:

Low-3 PZR Press Safeguards MSL/Feedwater Isol and Safeguards At time 1500:00:

RNS Train A is aligned for shutdown cooling Which of the following automatic actuations can still occur if conditions are met?

A.

RNS Isolation Actuation due to High-2 Radiation B.

Safeguards Actuation due to Low-2 RCS temperature C.

MFW Isolation Actuation due to Low RCS temperature D.

Main Steam Line Isolation Actuation due to negative rate BL8 Page: 39 of 100 22 February 2022 SVP_SV0_006534 Page 39 of 100 a,c ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 40 ID: 13011 Points: 1.00 Given:

Unit 3 is in MODE 6 A fire is reported in Containment PCCWST NR level is 94.7%

In accordance with AOP-902 (Fire Response Emergency) which of the following completes the statements below?

3-FPS-V050 (Ctmt Supply CIV) will be opened ___(1)___.

3-PCS-V005 (PCS/FPS X-Conn) is required to be ___(2)___.

A.

B.

C.

D.

BL8 Page: 40 of 100 22 February 2022 locally from the MCR closed closed locally open (1)

(2) from the MCR open SVP_SV0_006534 Page 40 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 41 ID: 12981 Points: 1.00 Given:

A LOCA has occurred The DAS Control Panel is enabled from the PDSP At time 1000:00 BOTH CMT Upper NR Levels are 55%

RCS Pressure is 1500 psig and slowly lowering At time 1005:00 BOTH CMT Lower NR Level are 60%

RCS Pressure is 1100 psig and slowly lowering At time 1010:00 Manual ADS Stage 4 Actuation is performed at PMS At time 1015:00 IRWST Injection Actuation is performed at DAS Which of the following identifies the EARLIEST indicated time below that an IRWST Injection Actuation signal was generated?

A.

1000:00 B.

1005:00 C.

1010:00 D.

1015:00 BL8 Page: 41 of 100 22 February 2022 SVP_SV0_006534 Page 41 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 42 ID: 12727 Points: 1.00 Given:

Unit 4 is in MODE 1 PCCWST WR level is 86%

PCCAWST level is 98.4%

Which of the following completes the statements below?

Based on the PCCWST WR level, the PCCWST ___(1)___ required to be refilled in accordance with GEN-OTS-17-001 (7 day Technical Surveillance).

If the PCCWST is required to be refilled, the PCCAWST ___(2)___ be used as a source for makeup water in accordance with PCS-SOP-001 (Passive Containment Cooling System).

A.

B.

C.

D.

BL8 Page: 42 of 100 22 February 2022 is is NOT can NOT can NOT is can (1)

(2) is NOT can SVP_SV0_006534 Page 42 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 43 ID: 12728 Points: 1.00 Given:

The Unit is at 100% Reactor Power Steam line pressure is 814 psig and stable Containment pressure is 0.1 psig At time 1000:00 A steam line break occurs inside Containment SG 1 pressure is lowering at 100 psig/min Containment pressure is rising at 1.3 psig/min Which of the following completes the statements below?

A Steam Line Isolation (SLI) Actuation will FIRST occur based on ___(1)___ pressure.

MSR B Main Steam Supply AOV (MSS-V015B) ___(2)___ receive a close signal due to the SLI Actuation.

Note:

Assume rate of pressure change, in SG 1 and containment, is constant until SLI occurs A.

B.

C.

D.

BL8 Page: 43 of 100 22 February 2022 SG 1 containment will NOT will NOT SG 1 will (1)

(2) containment will SVP_SV0_006534 Page 43 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 44 ID: 12977 Points: 1.00 Given:

Generator Power (MTS-LOAD-PCT) is at 75%

At time 1000:00 A steam leak exists on the extraction line to FW Heater 6A The crew enters AOP-206 (Malfunction of Feedwater Heaters and Extraction Steam), Attachment 6 (High Pressure FW Heaters 6 & 7 At time 1003:00 FW Heater 6A level is 12 inches and slowly lowering At time 1005:00 MSS-V502A (FW Htr 6A Extraction MOV) is manually closed Which of the following completes the statements below?

3-FWS-V022 (MFW Header Heaters 6 & 7 Bypass) ___(1)___ automatically open to bypass the isolated Feedwater Heater.

In accordance with AOP-206 (Malfunction of Feedwater Heaters and Extraction Steam),

Reactor Power ___(2)___ required to be reduced.

A.

B.

C.

D.

BL8 Page: 44 of 100 22 February 2022 will will NOT is NOT is NOT will is (1)

(2) will NOT is SVP_SV0_006534 Page 44 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 45 ID: 12788 Points: 1.00 Given:

ECS-SOP-004 (Ancillary Diesels), Attachment 1 (Ancillary DG1 Operation),

Section 4.3 (Ancillary DG 1 Startup) is being performed to start Ancillary DG 1 (ECS-MG-01)

In accordance with ECS-SOP-004, which of the following completes the statements below?

To start Ancillary DG 1, control manipulations ___(1)___ required from the Main Control Room.

Once running, Attachment 1, Section 4.3, Step 6.d requires the Ancillary DG voltage to be approximately ___(2)___ Vac.

A.

B.

C.

D.

BL8 Page: 45 of 100 22 February 2022 are are NOT 480 480 are 120 (1)

(2) are NOT 120 SVP_SV0_006534 Page 45 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 46 ID: 12943 Points: 1.00 Given:

The Unit is at 100% Reactor Power At time 1000:00 EDS1-DU-1 (Inverter) loses DC supply power At 1030:00, which of the following identifies the effect on power to EDS1-EA-1 (Annex Building UPS Distribution Panel)?

A.

EDS1-EA-1 will remain energized with no change in its power supply lineup B.

EDS1-EA-1 will remain energized by automatic repositioning of the static transfer switch C.

EDS1-EA-1 will be deenergized unless the maintenance bypass switch is manually repositioned D.

EDS1-EA-1 will be deenergized regardless of manual manipulations or automatic switch repositioning BL8 Page: 46 of 100 22 February 2022 SVP_SV0_006534 Page 46 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 47 ID: 12732 Points: 1.00 Which of the following completes the statements below?

The DG A Starting Air Compressor (ZOS-MK-01A) is powered from ___(1)___.

In accordance with ZOS-SOP-001 (Onsite Standby Power System), the Diesel Generator starting air receiver is sized to provide AT LEAST ___(2)___ consecutive Diesel Generator starts without recharging.

A.

B.

C.

D.

BL8 Page: 47 of 100 22 February 2022 ECS-EC-123 ECS-EC-223 5

5 ECS-EC-123 3

(1)

(2)

ECS-EC-223 3

SVP_SV0_006534 Page 47 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 48 ID: 12881 Points: 1.00 Given:

The Unit is at 51% Reactor Power At time 1000:00 LOOP occurs At time 1001:00 ECS-ES-1M1(52) (Switchgear Bus 1 Preferred Pwr Bkr) opens No fault exists on ECS-ES-1 At 1010:00, which of the following completes the statements below?

Standby Diesel Generator B (ZOS-MS-05B) ___(1)___ running.

ECS-ES-1 ___(2)___ powered.

A.

B.

C.

D.

BL8 Page: 48 of 100 22 February 2022 is is is is NOT is NOT is NOT (1)

(2) is NOT is SVP_SV0_006534 Page 48 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 49 ID: 12734 Points: 1.00 Given:

The Unit is at 100% Reactor Power SWS Cooling tower basin makeup is in progress from the alternate source Which of the following completes the statements below?

The alternate makeup source to the SWS Cooling tower basin is the ___(1)___.

When SWS Cooling tower basin alternate makeup is in progress, and a high basin water level is reached, alternate makeup ___(2)___ automatically stop.

Note:

Raw Water System (RWS)

Fire Protection System (FPS)

Service Water System (SWS)

A.

B.

C.

D.

BL8 Page: 49 of 100 22 February 2022 FPS RWS will NOT will NOT FPS will (1)

(2)

RWS will SVP_SV0_006534 Page 49 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 50 ID: 12735 Points: 1.00 Given:

The Unit is at 50% Reactor Power At time 1000:00 Instrument Air is lost to SWS-V009 (Cooling Tower Basin Norm Makeup LCV)

SWS Cooling Tower Basin Level is 88%

Which of the following completes the statement below?

Assuming no operator actions, actual SWS basin level will ______.

A.

rise continuously B.

lower continuously C.

initially rise and then stabilize D.

initially lower and then rise and stabilize BL8 Page: 50 of 100 22 February 2022 SVP_SV0_006534 Page 50 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 51 ID: 13019 Points: 1.00 Given:

The Unit is at 100% Reactor Power IA Supply Header Pressure (CAS-PT011) is 118.7 psig At time 1000:00 Instrument Air Supply CIV AOV (CAS-V014) spuriously fails closed and can NOT be opened At time 1002:00 The crew enters AOP-703 (Loss of Instrument Air)

In accordance with AOP-703, which of the following completes the statements below?

The Reactor is required to be tripped once IA Supply Header Pressure lowers to less than a MAXIMUM of ___(1)___ psig.

Whenever a Reactor trip is required, Safeguards Actuation is required ___(2)___

evaluating E-0 (Reactor Trip or Safeguards Actuation) Step 4, "Check Safeguards Actuation Latched - ON".

A.

B.

C.

D.

BL8 Page: 51 of 100 22 February 2022 84.5 104.5 before before 84.5 after (1)

(2) 104.5 after SVP_SV0_006534 Page 51 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 52 ID: 12737 Points: 1.00 Given:

At time 1000:00 The Unit is at 100% Reactor Power At time 1010:00 Power is lost to IDSD-DD-1 At time 1020:00 An automatic PCS Actuation occurs due to containment pressure At time 1030:00 A manual Containment Isolation is performed from PMS At time 1040:00 A manual ADS Stage 1-3 Actuation is performed from DAS Which of the following completes the statement below?

The EARLIEST indicated time below that Instrument Air has been isolated to Containment is ______.

A.

1015:00 B.

1025:00 C.

1035:00 D.

1045:00 BL8 Page: 52 of 100 22 February 2022 SVP_SV0_006534 Page 52 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 53 ID: 12738 Points: 1.00 Given:

The crew is responding to a LOCA The operators observe the following indications in the MCR Containment pressure is 43.4 psig PCS has actuated Containment level is 96.5%

Containment radiation is 2.7 R/hr Which of the following completes the statement below?

___(1)___ is required to be entered based on ___(2)___ path condition criteria.

Note:

FR-Z.1 (Response to High Containment Pressure)

FR-Z.2 (Response to Containment Flooding)

A.

B.

C.

D.

BL8 Page: 53 of 100 22 February 2022 FR-Z.1 FR-Z.2 Red Red FR-Z.1 Orange (1)

(2)

FR-Z.2 Orange SVP_SV0_006534 Page 53 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 54 ID: 12739 Points: 1.00 Given:

ALL RCPs are operating at 100% speed with VFDs bypassed Which of the following completes the statements below regarding WR SG Water Level sensors?

The RCPs will receive a DAS signal to automatically trip when ___(1)___ indicate(s) below ___(2)___.

A.

B.

C.

D.

BL8 Page: 54 of 100 22 February 2022 ONLY 1 sensor on BOTH SGs BOTH sensors on ONLY one SG 35%

35%

ONLY 1 sensor on BOTH SGs 26%

(1)

(2)

BOTH sensors on ONLY one SG 26%

SVP_SV0_006534 Page 54 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 55 ID: 12740 Points: 1.00 Which of the following completes the statement below?

IRC Makeup CIV MOV (CVS-V091) is powered from ______.

A.

IDSA-DD-1 B.

IDSC-DD-1 C.

IDSA-DK-1 D.

IDSC-DK-1 BL8 Page: 55 of 100 22 February 2022 SVP_SV0_006534 Page 55 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 56 ID: 12978 Points: 1.00 Given:

The Unit is in MODE 1 A Turbine ramp is in progress Rod motion is in progress At time 1000:00 The Turbine ramp automatically stops Rod motion is blocked At time 1001:00 A Turbine Runback occurs Which of the following Control / Permissives actuated to cause the above conditions?

A.

C-3 B.

C-16 C.

C-20 D.

P-17 BL8 Page: 56 of 100 22 February 2022 SVP_SV0_006534 Page 56 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 57 ID: 12899 Points: 1.00 Given:

The Unit is at 100% Reactor Power At time 1000:00 LOOP occurs concurrent with Main Generator Trip DG B Engine (ZOS-MG-01B) fails to start Assuming no operator action, by design, which of the following completes the statement below?

The EARLIEST time indicated below when PZR Level (RCS-LT195B) will become unavailable in the MCR is __________ hours from 1000:00.

A.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> B.

5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> C.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> D.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> BL8 Page: 57 of 100 22 February 2022 SVP_SV0_006534 Page 57 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 58 ID: 12743 Points: 1.00 Given:

The Unit is at 100% Reactor Power At time 1000:00 One CET indication powered from IDS Division B fails low One CET indication powered from IDS Division C fails low Which of the following completes the statements below?

___(1)___ CETs remain available for Post Accident Monitoring via PMS.

___(2)___ CETs remain available for DAS monitoring.

A.

B.

C.

D.

BL8 Page: 58 of 100 22 February 2022 36 40 4

4 36 3

(1)

(2) 40 3

SVP_SV0_006534 Page 58 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 59 ID: 12744 Points: 1.00 Given:

Unit 3 is at 100% Reactor Power Which of the following completes the statements below?

Ctmt AHU A (VFS-MS-01A) ___(1)___ automatically start and stop to maintain Containment pressure.

If Containment pressure starts to degrade, CTMT Vacuum Relief CIV MOV (VFS-V800A/B) will automatically open if Containment Pressure drops below ___(2)___.

A.

B.

C.

D.

BL8 Page: 59 of 100 22 February 2022 will NOT will

(-) 0.025 psig

(-) 0.025 psig will NOT

(-) 0.8 psig (1)

(2) will

(-) 0.8 psig SVP_SV0_006534 Page 59 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 60 ID: 12945 Points: 1.00 Given:

The Unit is at 100% Reactor Power At time 1000:00 A Low-2 D/P alarm for the Fuel Handling Area (FHA) normal ventilation system is received in the MCR Which of the following completes the statements below?

The FHA normal ventilation system is ___(1)___.

VFS ___(2)___ auto-align to the FHA.

Note(s):

VAS (Radiologically Controlled Area Ventilation System)

VFS (Containment Air Filtration System)

VRS (Radwaste Building HVAC System)

A.

B.

C.

D.

BL8 Page: 60 of 100 22 February 2022 VAS VRS will NOT will NOT VAS will (1)

(2)

VRS will SVP_SV0_006534 Page 60 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 61 ID: 12746 Points: 1.00 Given:

The Unit is at 61% Reactor Power Condenser Air Removal Packages A/B (CMS-MS-01A/B) are aligned to their respective condensers Condenser Air Removal Package D (CMS-MS-01D) is aligned to Condenser C Condenser Air Removal Package C (CMS-MS-01C) is in auto At time 1000:00 Condenser B Vacuum Bkr (CMS-V005B) has lost its water seal Condenser B Pressure is 2.0 in HgA and rising at 1.0 in HgA per minute At time 1015:00 The turbine automatically trips ALL Condenser Vacuum Bkrs are open Which of the following completes the statements below?

At 1005:00, CMS-MS-01C ___(1)___ automatically re-aligned to Condenser B.

At 1015:00, opening ALL Condenser Vacuum Bkrs (CMS-V005A/B/C) ___(2)___ send a signal to secure ALL Condenser Air Removal Packages A.

B.

C.

D.

BL8 Page: 61 of 100 22 February 2022 has has NOT does NOT does NOT has does (1)

(2) has NOT does SVP_SV0_006534 Page 61 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 62 ID: 12893 Points: 1.00 Given:

At time 1000:00 GOP-305 (Refueling MODE 6) is in progress An irradiated fuel assembly has been dropped inside containment ALL radiation readings are rising At time 1020:00 ALL Containment High Range Rad instruments indicate 2.5 Rad/hr and stable Fuel Transfer Cart is in the Spent Fuel Pool AOP-701 (Fuel Handling Incident) is complete through Step 8 At 1020:00, in accordance with AOP-701 (Fuel Handling Incident), which of the following completes the statements below?

Fuel Xfr Tube Gate Valve (3-FHS-V001) is ___(1)___.

Ctmt Supply CIV AOVs (VFS-V003/V004) are ___(2)___.

A.

B.

C.

D.

BL8 Page: 62 of 100 22 February 2022 open closed closed closed open open (1)

(2) closed open SVP_SV0_006534 Page 62 of 100 a,c ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 63 ID: 12890 Points: 1.00 Given:

The Unit is at 100% Reactor Power At time 1000:00 Automatic CVS letdown occurs Gas Cooler Outlet Temp (WGS-TE008) is 80 °F and rising At time 1030:00 WGS-TE030-Carbon Bed Vault Temp-HIGH1 alarm (150 °F) is received in the MCR Which of the following completes the statements below?

The cause of the WGS-TE030-Carbon Bed Vault Temp-HIGH1 alarm ___(1)___ due to a carbon bed fire.

The WGS-TE030-Carbon Bed Vault Temp-HIGH1 alarm ___(2)___ cause nitrogen purge to automatically initiate.

A.

B.

C.

D.

BL8 Page: 63 of 100 22 February 2022 is is NOT will NOT will NOT is will (1)

(2) is NOT will SVP_SV0_006534 Page 63 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 64 ID: 12749 Points: 1.00 Given:

The Unit is at 75% Reactor Power ALL CWS Pumps are running At time 1000:00 Turbine trip occurs SD-LRERR (Load Error Loss) is 9.5 °F At time 1020:00 Condenser Pressure is 15 in HgA and improving slowly Which of the following completes the statements below?

At 1001:00, ___(1)___ bank(s) of Turbine Bypass Valves have received a trip open signal.

At 1020:00, C-9 (Condenser Available) ___(2)___ ON.

A.

B.

C.

D.

BL8 Page: 64 of 100 22 February 2022 ONLY one BOTH is NOT is NOT ONLY one is (1)

(2)

BOTH is SVP_SV0_006534 Page 64 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 65 ID: 12826 Points: 1.00 Given:

At time 1000:00 The crew is performing GOP-306 (Plant Startup Mode 2 to 25% Power)

The Unit has just entered MODE 1 Which of the following completes the statements below?

As the crew raises Reactor Power to approximately 15%, the Power Range Flux - High (low setpoint) trip signal will be ___(1)___ blocked.

The Power Range Flux - High (low setpoint) trip setpoint is ___(2)___%.

A.

B.

C.

D.

BL8 Page: 65 of 100 22 February 2022 automatically manually 25 25 automatically 15 (1)

(2) manually 15 SVP_SV0_006534 Page 65 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 66 ID: 12894 Points: 1.00 In accordance with NMP-OS-007-003 (Plant Operating Orders), which of the following completes the statements below?

If there is a conflict between a standing order and published plant procedure, the

___(1)___ will prevail in all cases without exception.

Night Orders are valid for ONLY ___(2)___ days.

A.

B.

C.

D.

BL8 Page: 66 of 100 22 February 2022 standing order plant procedure 6

6 standing order 3

(1)

(2) plant procedure 3

SVP_SV0_006534 Page 66 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 67 ID: 12752 Points: 1.00 In accordance with NMP-GM-005-002 (Human Performance Tools Instruction), which of the following completes the statements below?

___(1)___ is the tool used if an error with the action could result in an immediate and possibly irreversible harm to the plant.

___(2)___ requirements may be waived by the Shift Manager for ALARA concerns.

A.

B.

C.

D.

BL8 Page: 67 of 100 22 February 2022 Concurrent verification Independent verification Independent verification Independent verification Concurrent verification Concurrent verification (1)

(2)

Independent verification Concurrent verification SVP_SV0_006534 Page 67 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 68 ID: 12895 Points: 1.00 Given:

Unit 4 is in MODE 3 The steam dump controller is in automatic At time 1000:00 The UO initiates a cooldown to 515 °F at 50 °F/hr using the steam dumps At time 1020:00 RCS TAVG is 525 °F Which of the following completes the statements below?

Assuming no operator action, 60 seconds after TAVG reaches 525 °F, ___(1)___ of the Turbine Bypass Valves are open.

The Stage 1 Cooldown handswitches ___(2)___ allowed to be operated using two handed operation in accordance with NMP-OS-007-001 (Conduct of Operations Standards and Expectations) Attachment 2 (Two Handed Operation Examples).

A.

B.

C.

D.

BL8 Page: 68 of 100 22 February 2022 none ONLY one are NOT are NOT none are (1)

(2)

ONLY one are SVP_SV0_006534 Page 68 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 69 ID: 12963 Points: 1.00 In accordance with NMP-AD-003 (Equipment Clearance and Tagging), which of the following completes the statement below?

An Operating Permit Tag ___(1)___ allowed to be applied to a component bearing a Caution Tag.

A Danger Tag ___(2)___ allowed to be applied to a component bearing a Status Tag.

A.

B.

C.

D.

BL8 Page: 69 of 100 22 February 2022 is is NOT is NOT is NOT is is (1)

(2) is NOT is SVP_SV0_006534 Page 69 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 70 ID: 12827 Points: 1.00 Given:

The Unit is in MODE 1 In accordance with Technical Specifications, which of the following completes the statements below?

The MINIMUM RCS pressure at which Safety Limit (SL) 2.1.2 (RCS pressure SL) is exceeded is ___(1)___ psig.

Once SL 2.1.2 is violated, compliance must be restored within ___(2)___.

A.

B.

C.

D.

BL8 Page: 70 of 100 22 February 2022 2485.5 2733.5 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 1 hour 2485.5 5 minutes (1)

(2) 2733.5 5 minutes SVP_SV0_006534 Page 70 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 71 ID: 13020 Points: 1.00 Given:

The Unit is at 25% power with the Turbine online Tubesheet flushing of SG 1 is in progress At time 1000:00 A tube leak occurs in SG 2 The tube leak rate is 45 GPD hich of the following completes the statements below?

SGS-RE027B (Main Steamline N-16 Radiation Monitor) ___(1)___ alarm.

BDS-RE010 (EDI Product Radiation Monitor) ___(2)___ alarm.

A.

B.

C.

D.

BL8 Page: 71 of 100 22 February 2022 will will NOT will NOT will NOT will will (1)

(2) will NOT will SVP_SV0_006534 Page 71 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 72 ID: 12873 Points: 1.00 Given:

At time 1000:00 A Gaseous Radwaste release permit is being prepared At time 1005:00 WGS System Discharge Pressure (WGS-PT014) High alarm is received Which of the following completes the statements below?

In accordance with B-GEN-PLMC-120 (Radioactive Gaseous Effluent Permit Generation Data Control), the ___(1)____ Department has the responsibility of preparing radioactive gas release permits and reports.

At 1006:00, Sys Outlet PCV (WGS-V051) is fully ___(2)___.

A.

B.

C.

D.

BL8 Page: 72 of 100 22 February 2022 Radiation Protection Radiation Protection open closed Chemistry closed (1)

(2)

Chemistry open SVP_SV0_006534 Page 72 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 73 ID: 13021 Points: 1.00 Given:

The Unit is in MODE 1 The UO has been directed to perform 3-AOP-908 (Internal Flooding Response)

In accordance with NMP-AP-005 (Transient Response Guidelines), which of the following completes the statements below?

At 1000:00, while performing 3-AOP-908, the operator ___(1)___ allowed to perform Step 11 prior to completing Step 10.

At 1005:00, while performing 3-AOP-908, if A/ER Step 1.b. is NOT met, the next step the operator will perform is Step 1 RNO ___(2)___.

A.

B.

C.

D.

BL8 Page: 73 of 100 22 February 2022 is is NOT 2

2 is 1

(1)

(2) is NOT 1

SVP_SV0_006534 Page 73 of 100 a,c ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 74 ID: 12902 Points: 1.00 Given:

At 1000:00 The crew enters an ORANGE Path for FR-P.1 (Response to Imminent Pressurized Thermal Shock Conditions)

At time 1010:00 The crew is performing FR-P.1 Step 16 "Reset Containment Isolation" Conditions are met for entry into RED Path FR-P.1 At time 1018:00 FR-P.1 is still in progress Conditions are met for entry into RED Path FR-H.1 (Response to Loss of Heat Sink)

In accordance with F-0-B (Background Information for 3-EOP-F-0 Critical Safety Function Status Trees), which of the following completes the statements below?

At 1010:00, the crew ___(1)___ required to reperform FR-P.1 starting with Step 1.

At 1018:00, the crew ___(2)___ required to complete FR-P.1 prior to performing FR-H.1.

A.

B.

C.

D.

BL8 Page: 74 of 100 22 February 2022 is is NOT is NOT is NOT is is (1)

(2) is NOT is SVP_SV0_006534 Page 74 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 75 ID: 12979 Points: 1.00 Which of the following completes the statements below?

In accordance with NMP-EP-143 (Facility Activation), the location that staffs the ENS Communicator is the ___(1)___.

In accordance with NMP-EP-142 (Emergency Notifications), the ENS is used for communications with ___(2)___.

Note:

Emergency Notification System (ENS)

Emergency Offsite Facility (EOF)

Technical Support Center (TSC)

A.

B.

C.

D.

BL8 Page: 75 of 100 22 February 2022 EOF TSC State and Local Authorities State and Local Authorities EOF NRC (1)

(2)

TSC NRC SVP_SV0_006534 Page 75 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 76 ID: 13000 Points: 1.00 Given:

At time 1000:00 A DVI Line LOCA occurs from 50% Reactor Power At time 1008:00 ADS Stage 1-3 actuation occurs The crew enters ES-1.3 (ADS Stage 1-3 Actuation Response) for the first time The crew is performing ES-1.3, Step 39 "Check Cask Loading Pit Available For Injection" Cask Loading Pit (CLP) WR level (SFS-LT022) is 21.97 ft Cask Washdown Pit (CWP) level (SFS-LT020) is 15.75 ft At time 1020:00 ADS Stage 4 Actuation occurs FR-Z.1 (Response to High Containment Pressure) entry conditions are met on a RED path Which of the following completes the statements below?

At 1008:00, in accordance with ES-1.3 (ADS Stage 1-3 Actuation Response), the crew

___(1)___ required to immediately inject CLP inventory into the DVI Line.

At 1020:00, the Shift Supervisor is required to direct a transition to ___(2)___.

Note:

ES-1.4 (ADS Stage 4 Actuation Response)

A.

B.

C.

D.

BL8 Page: 76 of 100 22 February 2022 is is NOT FR-Z.1 FR-Z.1 is ES-1.4 (1)

(2) is NOT ES-1.4 SVP_SV0_006534 Page 76 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 77 ID: 12762 Points: 1.00 Given:

The Unit is at 77% Reactor Power At time 1000:00 An RCS to CCS leak exists on RCP 2A Heat Exchanger The crew enters AOP-114 (RCP Malfunction) due to elevated RCP stator temperatures At time 1020:00 An automatic Safeguards actuation occurs Which of the following completes the statements below?

At 1020:00, the RCS leak ___(1)___ stopped.

The HIGHEST required emergency classification is a(n) ___(2)___.

Note:

REFERENCES PROVIDED A.

B.

C.

D.

BL8 Page: 77 of 100 22 February 2022 has has NOT Unusual Event Unusual Event has Alert (1)

(2) has NOT Alert SVP_SV0_006534 Page 77 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 78 ID: 13022 Points: 1.00 Given:

The Unit is in MODE 4 with BOTH RNS Trains in service for shutdown cooling At time 1000:00 RNS Train A is secured in accordance with RNS-SOP-001 (Normal Residual Heat Removal System), Attachment 8 (Remove One of Two Operating RNS Trains from Service)

At time 1005:00 RNS Pump B (RNS-MP-01B) trips and can NOT be started The crew enters AOP-115 (Loss of Residual Heat Removal)

At time 1020:00 The crew is performing AOP-115 Step 12, "Check At Least One CCS Pump -

Running" In accordance with AOP-115, which of the following completes the statements below?

At 1001:00, CCS-FT302 (RNS HX B Flow) is required to be ___(1)___ gpm.

At 1020:00, if NEITHER CCS pump is running, the crew ___(2)___ required to perform AOP-702 (Loss of CCS) concurrently with AOP-115.

A.

B.

C.

D.

BL8 Page: 78 of 100 22 February 2022 2150-2315 2800-3000 is NOT is NOT 2150-2315 is (1)

(2) 2800-3000 is SVP_SV0_006534 Page 78 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 79 ID: 12961 Points: 1.00 Given:

The Unit is in MODE 5 BOTH RNS Trains are in service for shutdown cooling BOTH SWS Trains are in service The RCS is OPEN At time 1010:00 Fast and Slow speed breakers for SWS Cooling Tower Fan B (SWS-MA-01B) trip The breakers for SWS-MA-01B can NOT be reset Which of the following completes the statements below?

TRM 3.7.4 (SWS - RCS Open) ___(1)___ met.

NMP-OS-027 (Recording Limiting Conditions for Operation) ___(2)___ required to be performed.

Note:

TRM (Technical Requirements Manual)

A.

B.

C.

D.

BL8 Page: 79 of 100 22 February 2022 is is NOT is NOT is NOT is is (1)

(2) is NOT is SVP_SV0_006534 Page 79 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 80 ID: 12932 Points: 1.00 Given:

The crew is performing ES-0.1 Step 2 "Check ALL CMT Outlet AOVs - CLOSED" At time 1000:00 SG 1 NR Level is 15% and rising SG 2 NR Level is 22% and stable Total feed flow to SGs is 450 gpm PRHR HX flow is 890 gpm RCS TAVG is 560 °F and slowly rising BOTH SGs are at 1085 psig and slowly lowering At time 1005:00 The crew is performing FR-H.1, Step 26.c "Check Core Exit T/Cs - STABLE or LOWERING" RCS Pressure is 2265 psig and slowly rising Pressurizer Level is 55% and slowly rising Core Exit T/Cs are stable Which of the following completes the statements below?

At 1000:00, the crew entered FR-H.1 on a ___(1)___ path.

At 1005:00, the crew is required to ___(2)___.

Note:

ES-1.3 (ADS Stage 1-3 Actuation Response)

FR-H.1 (Response to Loss of Heat Sink)

ES-0.1 (Reactor Trip Response)

A.

B.

C.

D.

BL8 Page: 80 of 100 22 February 2022 RED YELLOW Go To ES-1.3 Go To ES-1.3 RED Return to ES-0.1 (1)

(2)

YELLOW Return to ES-0.1 SVP_SV0_006534 Page 80 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 81 ID: 12954 Points: 1.00 Given:

The Unit is in MODE 5 Mid loop operations are in progress BOTH trains of RNS are in service At time 1000:00 RCS level is lowering in an uncontrolled manner SDP-1 (Response to Loss of RCS Inventory During Shutdown) is entered At time 1015:00 BOTH HL 1 Lvl and HL 2 Lvl (RCS-LT160A, RCS-LT160B) are at 20% and lowering at 0.1% per minute BOTH RNS Pumps motor amps are fluctuating At time 1030:00 BOTH Ctmt Sump Pumps are discharging to the Waste Holdup Tank In accordance with SDP-1, which of the following completes the statements below?

At 1015:00, the NEXT action the crew is required to take is ___(1)___.

At 1030:00, the HIGHEST required emergency classification is a(n) ___(2)___.

Note:

REFERENCES PROVIDED A.

B.

C.

D.

BL8 Page: 81 of 100 22 February 2022 stop one RNS Pump Actuate RNS Isolation Unusual Event Unusual Event stop one RNS Pump Alert (1)

(2)

Actuate RNS Isolation Alert SVP_SV0_006534 Page 81 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 82 ID: 12767 Points: 1.00 Given:

At time 1000:00 MCR Isolation Actuation is ON In accordance with AOP-501 (Loss of Main Control Room Air Conditioning), which of the following completes the statements below?

MCR air flow from VES Air banks, as indicated on VES-FT003A (MCR Air Flow Rate) is required to be greater than a MINIMUM of ___(1)___ scfm.

When VES air banks are exhausted, the crew is required to perform ___(2)___.

Note:

VBS-P72-001 (Post 72-hour Operations of Main Control Room Ventilation)

VBS-SOP-001 (Nuclear Island Nonradioactive Ventilation System)

A.

B.

C.

D.

BL8 Page: 82 of 100 22 February 2022 60 600 VBS-SOP-001 VBS-SOP-001 60 VBS-P72-001 (1)

(2) 600 VBS-P72-001 SVP_SV0_006534 Page 82 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 83 ID: 13023 Points: 1.00 Given:

At time 1000:00 The crew is performing ES-0.1 (Reactor Trip Response)

The Shift Supervisor directs the crew to perform FR-H.2 (Response to Steam Generator Overpressure) due to meeting entry conditions on SG 1 At time 1010:00 SG 1 NR water level is 90% and stable In accordance with FR-H.2, which of the following completes the statements below?

At 1000:00, the affected SG refers to any SG in which pressure is greater than a MINIMUM of ___(1)___ psig.

At 1010:00, the crew ___(2)___ required to transition to FR-H.3 (Response to SG High Level).

A.

B.

C.

D.

BL8 Page: 83 of 100 22 February 2022 1185 1232 is NOT is NOT 1185 is (1)

(2) 1232 is SVP_SV0_006534 Page 83 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 84 ID: 12769 Points: 1.00 Given:

At time 1000:00 FR-C.2 (Response To Degraded Core Cooling) Step 10, "Check Core Exit T/Cs..." is in progress Core Exit T/Cs are 900 °F and slowly lowering At time 1005:00 Core Exit T/Cs are 890 °F and slowly lowering In accordance with FR-C.2, which of the following completes the statements below?

At 1000:00, CVS makeup flow is required to be set to ___(1)___ gpm.

At 1005:00, the crew ___(2)___ required to transition to ES-1.3 (ADS 1-3 Actuation Response).

A.

B.

C.

D.

BL8 Page: 84 of 100 22 February 2022 135 175 is NOT is NOT 135 is (1)

(2) 175 is SVP_SV0_006534 Page 84 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 85 ID: 13005 Points: 1.00 Given:

At time 1000:00 Unit 3 is at 100% Reactor Power Load Dispatch informs Shift Supervisor of grid instabilities At time 1003:00 Reactor Power is 100.3%

The crew entered AOP-304 (Degraded Grid)

The crew depresses GO to initiate a 20 MWe per minute load ramp At time 1005:00 Reactor Power is 100.4% and stable and can NOT be maintained less than 100%

At 1005:00, in accordance with AOP-304 (Degraded Grid), which of the following completes the statements below?

The crew is required to ___(1)___.

The crew ___(2)___ required to enter AOP-207 (Loss of Turbine Load) and perform concurrently with AOP-304.

A.

B.

C.

D.

BL8 Page: 85 of 100 22 February 2022 trip the Turbine open both 230 kV Line Breakers Unit 3 is NOT is NOT trip the Turbine is (1)

(2) open both 230 kV Line Breakers Unit 3 is SVP_SV0_006534 Page 85 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 86 ID: 12914 Points: 1.00 Given:

The Unit is at 100% Reactor Power At time 1000:00 Reactor Trip occurs The crew enters ES-0.1 (Reactor Trip Response)

The crew determined the RCS target pressure and temperature values are 2235 psig and 557 °F respectively At time 1010:00 RCS pressure is 2280 psig and stable ONLY RCS-EH-03 (Control Heaters) are energized at MAXIMUM Current In accordance with ES-0.1, which of the following completes the statements below?

At 1010:00, Control heaters are ___(1)___.

The Shift Supervisor will direct the crew to maintain RCS target pressure using

___(2)___.

Note:

ES-0.5 (RCS Pressure Control)

RCS-SOP-001 (Reactor Coolant System), Attachment 2 (RCS Pressure Control)

A.

B.

C.

D.

BL8 Page: 86 of 100 22 February 2022 required to be OFF/DISABLED allowed to remain ON RCS-SOP-001, Attachment 2 RCS-SOP-001, Attachment 2 required to be OFF/DISABLED ES-0.5 (1)

(2) allowed to remain ON ES-0.5 SVP_SV0_006534 Page 86 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 87 ID: 12936 Points: 1.00 Given:

The Unit is at 100% Reactor Power The crew is evaluating SA8 (Hazardous Event affecting a system NEEDED FOR SAFE COOLDOWN OR SAFE SHUTDOWN)

In accordance with NMP-EP-141-004 (Vogtle 3&4 Emergency Action Levels and Basis),

which of the following completes the statements below?

______ is one of the systems, as defined in UFSAR Table 7.4-1 (Systems Required for SAFE SHUTDOWN).

A.

CVS B.

PLS C.

PXS D.

SGS BL8 Page: 87 of 100 22 February 2022 SVP_SV0_006534 Page 87 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 88 ID: 12947 Points: 1.00 Given:

The Unit is at 100% Reactor Power IDSD-EA-2 is deenergized for maintenance At time 1000:00 IDSD-DU-1 (24 Hour Inverter) loses DC supply power The crew entered AOP-303 (Loss of DC Power or AC Instrument Power)

Which of the following completes the statements below?

LCO 3.8.5 (Distribution Systems - Operating) is ___(1)___.

In accordance with AOP-303, detailed procedural guidance in 3-IDSD-SOP-002 ___(2)___ required to energize IDSD-EA-1.

Note:

3-IDSD-SOP-002 Attachment 2 (PLACING INVERTER and AC DISTRIBUTION PANEL IN SERVICE)

A.

B.

C.

D.

BL8 Page: 88 of 100 22 February 2022 met NOT met is NOT is NOT met is (1)

(2)

NOT met is SVP_SV0_006534 Page 88 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 89 ID: 12955 Points: 1.00 Given:

Unit 4 has just been returned to 100% Reactor Power following a refueling outage It is discovered that PMS-OTS-18-001 (ESAS 24-Month Actuation Device Test) for 3.3.15.2 on Division C was NOT performed within its required Frequency In accordance with Technical Specifications, which of the following completes the statement below?

Assuming a risk evaluation has been performed, the performance of SR 3.3.15.2 for Division C can be delayed a MAXIMUM of ___(1)___.

If SR 3.3.15.2 for Division C is performed within the delay period and acceptance criteria is NOT met, the REQUIRED ACTION of LCO 3.3.15 is ___(2)___.

Note:

REFERENCES PROVIDED A.

B.

C.

D.

BL8 Page: 89 of 100 22 February 2022 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 24 months B.1 and B.2 B.1 and B.2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> A.1 (1)

(2) 24 months A.1 SVP_SV0_006534 Page 89 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 90 ID: 12957 Points: 1.00 Given:

The Unit is at 90% Reactor Power At time 1000:00 CCS-FT221 (CCS Flow to Letdown Heat Exchanger) is slowly rising The crew enters AOP-702 (Loss of Component Cooling Water)

The crew enters AOP-112 (Reactor Coolant Leak)

CVS-TE002 (Letdown HX Outlet Temp) is 136.5 °F and rising 1°F/minute Which of the following completes the statements below?

The EARLIEST indicated time below that CVS-V003 (Purification Stop MOV) is closed is ___(1)___.

In order to BLOCK the CVS-V003 (Purification Stop MOV) close signal and reopen CVS-V003, the crew is required to perform detailed procedural steps contained within an ___(2)___.

A.

B.

C.

D.

BL8 Page: 90 of 100 22 February 2022 1000:00 1010:00 SOP SOP 1000:00 AOP (1)

(2) 1010:00 AOP SVP_SV0_006534 Page 90 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 91 ID: 12927 Points: 1.00 Given:

The Unit is at 91% Reactor Power At time 1000:00 MA rods are 90 steps withdrawn MB / MC / MD banks at 264 steps withdrawn At time 1005:00 Rod F10 output to DRPI Ctmt Cab B (PLS-JD-RPI102) fails Which of the following completes the statements below?

Rod F10 will indicate magenta and ___(1)___.

A REQUIRED ACTION in LCO 3.1.7 (Rod Position Indication) ___(2)___ required to be performed.

Note:

DRPI Ctmt Cab (PLS-JD-RPI102) is Data Cabinet B Rod F10 is in Bank MA REFERENCES PROVIDED A.

B.

C.

D.

BL8 Page: 91 of 100 22 February 2022 fully inserted 90 steps withdrawn is NOT is NOT fully inserted is (1)

(2) 90 steps withdrawn is SVP_SV0_006534 Page 91 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 92 ID: 13013 Points: 1.00 Given:

The Unit is in MODE 1 VLS-OTS-17-001 (Hydrogen Igniter Surveillance Test) is being performed for maintenance retest 3-VLS-EH-11 reached a maximum temperature of 1590 °F 3-VLS-EH-12 reached a maximum temperature of 1810 °F 3-VLS-EH-13 reached a maximum temperature of 1790 °F 3-VLS-EH-14 reached a maximum temperature of 1650 °F Which of the following completes the statements below?

To perform the igniter retest, the capability ___(1)___ exist to actuate INDIVIDUAL Hydrogen Igniters from the Main Control Room.

Based on the results of 3-VLS-EH-11/12/13/14, TRM 3.6.2 (Hydrogen Igniters)

___(2)___ met.

Note:

REFERENCES PROVIDED A.

B.

C.

D.

BL8 Page: 92 of 100 22 February 2022 does NOT does NOT is NOT is does is (1)

(2) does is NOT SVP_SV0_006534 Page 92 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 93 ID: 12928 Points: 1.00 Given:

At time 1000:00 The Unit is at 19% Reactor Power Containment Sump Levels (WLS-LT034/035/036) are 16 inches and rising At time 1010:00 ALL Containment Sump Levels fail DOWNSCALE LOW In accordance with Technical Specifications, which of the following completes the statements below?

At 1000:00, the LEAKAGE to the Containment Sump will be classified as ___(1)___

LEAKAGE.

At 1010:00, LCO 3.0.3 entry ___(2)___ required.

Note:

REFERENCES PROVIDED A.

B.

C.

D.

BL8 Page: 93 of 100 22 February 2022 Identified Unidentified is NOT is NOT Identified is (1)

(2)

Unidentified is SVP_SV0_006534 Page 93 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 94 ID: 12779 Points: 1.00 Given:

The crew enters E-0 (Reactor Trip or Safeguards Actuation)

At time 1000:00 The crew is performing E-0, Attachment 1 (RNS Alignment for IRWST Cooling)

Conditions are met for YELLOW PATH FR-H.1 (Response to Loss of Heat Sink)

Before completing E-0, Attachment 1 the crew subsequently reaches the following step in E-0:

Which of the following completes the statement below?

The crew is required to ______.

A.

complete E-0 Attachment 1 actions prior to transitioning to E-1 B.

immediately discontinue E-0 Attachment 1 actions and Go To E-1 C.

perform actions in E-1 while restoring system lineups altered by E-0 D.

perform actions in E-1 while concurrently completing E-0, Attachment 1, as time and resources permit BL8 Page: 94 of 100 22 February 2022 SVP_SV0_006534 Page 94 of 100 a,c ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 95 ID: 13007 Points: 1.00 In accordance with B-RFL-FHP-031 (Fuel Handling Control Procedure), which of the following completes the statements below?

To be assigned as Fuel Handling Supervisor, an SRO's license ___(2)___ required to be active.

Prior to commencing CORE OFFLOAD, at least ___(2)___ hours shall have passed since the Reactor was made subcritical.

A.

B.

C.

D.

BL8 Page: 95 of 100 22 February 2022 is NOT is NOT 72 48 is 48 (1)

(2) is 72 SVP_SV0_006534 Page 95 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 96 ID: 12911 Points: 1.00 Given:

At time 1000:00 One subsystem is declared inoperable At time 1100:00 The affected subsystem is NOT isolated At time 1300:00 The affected subsystem is isolated Which of the following completes the statement below?

The subsystem must be restored to OPERABLE 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from ______.

A.

1000:00 B.

1200:00 C.

1300:00 D.

1900:00 BL8 Page: 96 of 100 22 February 2022 SVP_SV0_006534 Page 96 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 97 ID: 13026 Points: 1.00 Given:

Makeup CIV MOV (CVS-V090) has been manually opened using its handwheel Which of the following completes the statements below?

In accordance with NMP-OS-007-001 (Conduct of Operations Standards and Expectations), CVS-V090 ___(1)___ OPERABLE.

CVS-V090 is located ___(2)___ of reactor containment.

A.

B.

C.

D.

BL8 Page: 97 of 100 22 February 2022 is is NOT inside inside is outside (1)

(2) is NOT outside SVP_SV0_006534 Page 97 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 98 ID: 13025 Points: 1.00 Given:

At time 1000:00 WLS-SOP-001 (Liquid Radwaste System) Attachment 10 (Recirculate and Pump WMTs) Section 4.8 (Discharge of WMT A) is in progress At time 1010:00 WLS-RE229 (Liquid Radwaste Effluent Rad) fails with the following indication:

At time 1020:00 WLS-RE229 is flushed in accordance with WLS-SOP-001 Attachment 10 Which of the following completes the statements below?

At 1011:00, the liquid rad release ___(1)___ be automatically isolated.

At 1021:00, in accordance with WLS-SOP-001, the Liquid Release Permit for discharge of WMT A ___(2)___ required to include the volume of DWS water used to flush WLS-RE229.

A.

B.

C.

D.

BL8 Page: 98 of 100 22 February 2022 will NOT will is NOT is NOT will NOT is (1)

(2) will is SVP_SV0_006534 Page 98 of 100 a,c ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 99 ID: 12930 Points: 1.00 Given:

The Unit is in MODE 1 Which of the following Functions is listed in Technical Specification Table 3.3.17-1 (Post-Accident Monitoring Instrumentation) AND is also used when evaluating Emergency Action Level (EAL) Classifications?

A.

RCS Hot Leg Level B.

Ctmt Hydrogen Concentration C.

Ctmt Area Radiation (High Range)

D.

Plant Vent-Noble Gas (Accident Mid-Range & High-Range)

BL8 Page: 99 of 100 22 February 2022 SVP_SV0_006534 Page 99 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)

EXAMINATION ILT-5 NRC (Version 1.0 - 02.02.2022) 100 ID: 12933 Points: 1.00 Given:

A General Emergency has been declared on Unit 4 Main Control Room (MCR) Emergency Director is the Shift Manager In accordance with NMP-EP-144 (Protective Actions), which of the following completes the statement below?

The MCR Emergency Director is allowed to delegate ______.

A.

Potassium Iodide (KI) use authorizaiton B.

Protective Actions (PARS) recommendation approval C.

Emergency Response Organization Recall System activation D.

Emergency exposure authorization in excess of federal limits BL8 Page: 100 of 100 22 February 2022 SVP_SV0_006534 Page 100 of 100 ND-22-0281 V34 ILT-5 SRO Test (Non-Proprietary)