Letter Sequence Other |
---|
EPID:L-2021-LLA-0157, Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis (Approved, Closed) |
|
MONTHYEARRA-21-0005, Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis2021-09-0202 September 2021 Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis Project stage: Request ML22063A4502022-03-0404 March 2022 Request for Additional Information Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump Project stage: RAI ML22046A0882022-03-11011 March 2022 Audit Summary Report in Support of the License Amendment Request for One-Time Note to Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System Project stage: Other RA-22-0089, Response to Request for Additional Information Regarding Application to Revise Technical Specification 3.7.7, Low Pressure Service Water System, to Extend the Completion Time for One Required Inoperable LPSW2022-04-14014 April 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specification 3.7.7, Low Pressure Service Water System, to Extend the Completion Time for One Required Inoperable LPSW Project stage: Response to RAI ML22124A2052022-05-0404 May 2022 Summary of May 4, 2022, Clarification Call with Duke Energy Carolinas, LLC, Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System Project stage: Approval ML22096A1872022-07-15015 July 2022 Issuance of Amendment Nos. 424, 426, and 425 Revise TS 3.7.7, Low Pressure Service Water (LPSW) System to Extend the Completion Time for One Required Inoperable LPSW Pump Project stage: Approval 2022-03-04
[Table View] |
|
---|
Category:Audit Report
MONTHYEARML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML22193A2542022-08-0505 August 2022 SLRA - Audit Report ML22046A0882022-03-11011 March 2022 Audit Summary Report in Support of the License Amendment Request for One-Time Note to Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System ML22045A0532022-02-14014 February 2022 SLRA - Audit Report ML22024A0522022-01-21021 January 2022 Breakout Questions - Trp 149.11 - Rvi Ductility ML22024A0532022-01-21021 January 2022 Breakout Questions - TRP149.12, 149.2, 149.3 ML22024A0382022-01-21021 January 2022 Breakout Questions - Trp 76 - Irradiated Conc Steel ML22024A0172022-01-20020 January 2022 Breakout Questions - Trp 18 - Bolting Integrity ML22024A0222022-01-20020 January 2022 Breakout Questions - Trp 27 - Fire Water System (Continued) ML22024A0432022-01-20020 January 2022 Breakout Questions - Trp 142.03 - PTS ML22024A0412022-01-20020 January 2022 Breakout Questions - Trp 140 - Secondary Shield Wall Tendon Surveillance ML22024A0392022-01-20020 January 2022 Breakout Questions - Trp 77 - Corrosion Structural ML22024A0372022-01-20020 January 2022 Breakout Questions - Trp 74 - Concrete ML22024A0352022-01-20020 January 2022 Breakout Questions - Trp 47 - Water Control Structures ML22024A0342022-01-20020 January 2022 Breakout Questions - Trp 46 - Structures Monitoring ML22024A0332022-01-20020 January 2022 Breakout Questions - Trp 45 - Masonry Walls ML22024A0322022-01-20020 January 2022 Breakout Questions - Trp 44 - Appendix J ML22024A0302022-01-20020 January 2022 Breakout Questions - Trp 42 - ASME XI, Subsection Iwl ML22024A0292022-01-20020 January 2022 Breakout Questions - Trp 41 - IWE ML22024A0232022-01-20020 January 2022 Breakout Questions - Trp 27 - Fire Water System ML22024A0152022-01-20020 January 2022 Breakout Questions - Trp 17 - FAC (Continued) ML22024A0512022-01-20020 January 2022 Breakout Questions - Trp 149.4 - LBB ML22024A0552022-01-20020 January 2022 Breakout Questions - Trps 62 and 145 - Tendon Prestress ML22024A0142022-01-20020 January 2022 Breakout Questions - Trp 16 - PWR Internals ML22024A0572022-01-20020 January 2022 Breakout Questions - Trps 149.5 and 23 - Crane and Inspection of Load Handling ML22024A0102022-01-20020 January 2022 Breakout Questions - Trp 10 - Boric Acid Corrosion ML22024A0092022-01-20020 January 2022 Breakout Questions - Trp 3 - RPV Closure Head Studs ML22024A0082022-01-20020 January 2022 Breakout Questions - Trp 2 - Water Chemistry ML22024A0062022-01-20020 January 2022 Breakout Questions - Structural Scoping and Screening ML22024A0362022-01-19019 January 2022 Breakout Questions - Trp 60 - Fatigue Monitoring ML22024A0162022-01-19019 January 2022 Breakout Questions - Trp 17 - Flow-Accelerated Corrosion ML22024A0032022-01-19019 January 2022 Breakout Questions - Fire Protection Scoping and Screening ML22024A0042022-01-19019 January 2022 Breakout Questions - Scoping - Letdown Cooler ML22024A0052022-01-19019 January 2022 Breakout Questions - Scoping and Screening - Reactor Coolant System ML22024A0212022-01-19019 January 2022 Breakout Questions - Trp 26 - Fire Protection ML22024A0122022-01-19019 January 2022 Breakout Questions - Trp 14 - Buried Piping ML22024A0202022-01-19019 January 2022 Breakout Questions - Trp 21 - Closed Treated Water System ML22024A0182022-01-19019 January 2022 Breakout Questions - Trp 19 - Steam Generators ML22024A0402022-01-19019 January 2022 Breakout Questions - Trp 85 - No Aging Effects ML22024A0422022-01-19019 January 2022 Breakout Questions - Trp 141 - Identification of TLAAs ML22024A0462022-01-19019 January 2022 Breakout Questions - Trp 143.2 - Non-Class 1 Fatigue Analyses ML22024A0482022-01-19019 January 2022 Breakout Questions - Trp 143.3 - EAF - Min ML22024A0492022-01-19019 January 2022 Breakout Questions - Trp 143.9 - Cycle Projections ML22024A0562022-01-19019 January 2022 Breakout Questions - Trps 142.1 and 149.13 - Fluence ML22024A0592022-01-19019 January 2022 ONS - Electrical On-Site and OE Audit (Virtual) - Continued ML21323A1132021-11-23023 November 2021 Subsequent License Renewal Environmental Review Requests for Additional and Subsequent Information - Letter ML20266G2192020-11-0303 November 2020 Regulatory Audit Report Regarding License Amendment Request to Revise the Licensing Basis for High Energy Line Breaks Outside of the Containment Building ML18197A2012018-07-25025 July 2018 Staff Review of Spent Fuel Pool Evaluation Associated with Reevaluated Seismic Hazard Implementation Near- Task Force Recommendation 2.1: Seismic ML18117A2702018-05-0101 May 2018 Summary of Regulatory Audit in Support of License Amendment Request No. 2017-03 ML16067A2912016-03-21021 March 2016 Report of Regulatory Audit Regarding License Amendment Request for Alternate Fission Gas Gap Release Fractions (CAC Nos. MF6480 - MF6486) 2023-10-10
[Table view] Category:Letter
MONTHYEARML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23075A0732023-04-0505 April 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Supplement (EPID Number L-2021-SLE-0002) ML23045A1332023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Achp Letter ML23045A1402023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Shpo Letter ML23045A1432023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - State Tribe Letter ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 ML22363A3942023-01-12012 January 2023 Subsequent License Renewal Environmental Report Supplement - Proposed Review Schedule ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22329A1042022-11-29029 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report ML22321A1582022-11-22022 November 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 ML22301A0112022-11-0303 November 2022 Request for Withholding Information from Public Disclosure Regarding the SLR Application - September 2, 2022 ML22298A0752022-10-27027 October 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application Duke Energy Letter Dated July 25, 2022 ML22264A0322022-10-20020 October 2022 _Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Duke Energy Letter Dated July 8, 2022 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22222A0072022-09-14014 September 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22234A0062022-08-30030 August 2022 SLRA - Closed Public Meeting Summary - August 18, 2022 2024-02-01
[Table view] |
Text
March 11, 2022 Mr. Steven M. Snider Site Vice President Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672-0752
SUBJECT:
OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 - AUDIT
SUMMARY
REPORT IN SUPPORT OF THE LICENSE AMENDMENT REQUEST FOR ONE-TIME NOTE TO TECHNICAL SPECIFICATION 3.7.7, LOW PRESSURE SERVICE WATER (LPSW) SYSTEM (EPID L-2021-LLA-0157)
Dear Mr. Snider:
On September 2, 2021 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML21245A210), Duke Energy Carolinas, LLC (Duke Energy) submitted a license amendment request (LAR) to revise Technical Specification (TS) 3.7.7, Low Pressure Service Water (LPSW) System, to extend the completion time for one required inoperable LPSW Pump on a temporary basis for Oconee Nuclear Station (ONS, Oconee), Units 1, 2, and 3. The proposed LAR would add a Note modifying the completion time associated with TS 3.7.7, Condition A, Required Action A.1, to 288 hours0.00333 days <br />0.08 hours <br />4.761905e-4 weeks <br />1.09584e-4 months <br /> during ONS Unit 2, Refuel 31 (fall 2023) to allow for the tie-in and testing of an alternate suction source to the shared Unit 1 and Unit 2 A and B LPSW pumps. Duke Energy stated that the alternate suction source to the shared Unit 1 and Unit 2 A and B LPSW pumps is needed to permit draining of the Condenser Circulating Water (CCW) System cross-connect header for the replacement of three CCW valves.
The U.S. Nuclear Regulatory Commission (NRC) staff determined that an audit was needed.
By letter dated January 6, 2022 (ADAMS Accession No. ML21362A753), the NRC staff issued the Audit Plan. On February 10, 2022, the NRC staff conducted a virtual audit in accordance with the Audit Plan. The audit remained opened until March 4, 2022, to provide NRC staff time to view documents on the licensees Portal. The Audit was closed at the conclusion of a March 4, 2022, call to discuss the proposed Requests for Additional Information.
Attached is the Audit Summary Report.
If you have any questions, please contact me at 301-415-1009 or via e-mail at Shawn.Williams@nrc.gov.
Sincerely, Digitally signed by Shawn Shawn A. A. Williams Date: 2022.03.11 Williams 10:19:50 -05'00' Shawn A. Williams, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
Audit Summary Report cc: Listserv
AUDIT
SUMMARY
REPORT BY THE OFFICE OF NUCLEAR REACTOR REGULATION LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 3.7.7, LOW PRESSURE SERVICE WATER (LPSW) SYSTEM DUKE ENERGY CAROLINAS, LLC OCONEE NUCLEAR STATION, UNITS NO. 1, 2, AND 3 DOCKET NOS. 50-269, 50-270, AND 50-287
1.0 BACKGROUND
By [[letter::RA-21-0005, Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis|letter dated September 2, 2021]] (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21245A210), Duke Energy Carolinas, LLC (Duke Energy, licensee) submitted a license amendment request (LAR) to revise Technical Specification (TS) 3.7.7, Low Pressure Service Water (LPSW) System, to extend the completion time for one required inoperable LPSW Pump on a temporary basis for Oconee Nuclear Station (ONS, Oconee),
Units 1, 2, and 3. Specifically, the proposed change would add a Note modifying the Completion Time associated with TS 3.7.7, Condition A, Required Action A.1, to 288 hours0.00333 days <br />0.08 hours <br />4.761905e-4 weeks <br />1.09584e-4 months <br /> during ONS Unit 2, Refuel 31 (fall 2023) to allow for the tie-in and testing of an alternate suction source to the shared Unit 1 and Unit 2 A and B LPSW pumps. Duke Energy stated that the alternate suction source to the shared Unit 1 and Unit 2 LPSW A and B pumps is needed to permit draining of the Condenser Circulating Water (CCW) System cross-connect header for the replacement of three CCW valves.
The U. S. Nuclear Regulatory Commission (NRC) staff determined that an audit was needed.
By letter dated January 6, 2022 (ADAMS Accession No. ML21362A753), the NRC staff issued the Audit Plan. From February 10 to March 4, 2022, the NRC staff conducted an audit in accordance with the NRR Office Instruction LIC-111, Regulatory Audits (ADAMS Accession No. ML19226A274). The NRC staff conducted the audit virtually with the following objectives:
- Gain a better understanding of the license amendment request.
- Gain a better understanding of the actions taken for a failure of the LPSW C pump during the proposed 288 hour0.00333 days <br />0.08 hours <br />4.761905e-4 weeks <br />1.09584e-4 months <br /> limiting condition for operation (LCO).
- Gain a better understanding of the risk insights.
- Discuss audit questions and determine the need for formal requests for additional information.
An opening audit meeting was held on February 10 that followed the audit plan. The licensee added documents to a read-only portal for NRC staff review as described in Section 3.0 below.
The audit was closed following the meeting on March 4 after a discussion regarding the proposed Requests for Additional Information. A request for additional information was issued on March 4, 2022 (ADAMS Accession No. ML22063A450).
Enclosure
2.0 AUDIT PARTICIPANTS NRC Micheal Markley, Chief, Office of Nuclear Reactor Regulation (NRR), Division of Reactor Licensing (DORL), Plant Licensing Branch II-1 (LPLII-1)
Stephanie Devlin-Gill, Project Manager, NRR, DORL, LPLII-1 Shawn Williams, Project Manager, NRR, DORL, LPLII-1 Zackary Stone, Project Manager, NRR, DORL, LPLII-1 Steve Jones, Acting Chief, NRR, Division of Safety Systems (DSS), Containment and Plant Systems Branch (SCPB)
Hanry Wagage, Technical Reviewer, DSS, SCPB Nan Chien, Technical Reviewer, DSS, SCPB Robert Elliott, Technical Reviewer, DSS, Technical Specifications Branch (STSB)
Caroline Tilton, Technical Reviewer, DSS, STSB Ahsan Sallman, NRR, DSS, Nuclear Systems Performance Branch (SNSB)
Thomas Scarbrough, Technical Reviewer, NRR, Division of Engineering and External Hazards (DEX), Mechanical Engineering and Inservice Testing Branch (EMIB)
Naeem Iqbal, Technical Reviewer, Division of Risk Assessment Kamishan Martin, Technical Reviewer, NRR, Division of Reactor Oversight (DRO), Operator Licensing and Human Factors Branch (IOLB)
Jared Nadel, ONS Senior Resident Inspector Adam Ruh, ONS Resident Inspector Duke Energy Lee Grzeck Jordan Vaughan Michael Grams Tony Green Alan Lee Jared Pittman Stephen Roe Charles Stroupe Aaron Swanson Thomas Yadon David Dobson Henry Harling 3.0 AUDIT
SUMMARY
During the February 10, 2022, audit call, Duke Energy presented the information requested in the Audit Plan. The NRC staff and the licensee then discussed the audit questions outlined in of the Audit Plan.
From February 10 to March 4, 2022, the NRC staff reviewed the following documents that were placed on the licensees Certrec on-line Portal as read-only for the purpose of determining
information needed to be submitted on the docket in a formal response for additional information.
Duke Energys Audit Presentation and responses to the Audit Discussion Topics Accident Analysis Clarification Question LPSW Design Basis Document (OSS-0254.00-00-1039, Revision 60)
The December 30, 1997, Final Safety Analysis Report (FSAR) 50.59 Evaluation associated with the LPSW cross-connect between from Unit 1/2 and Unit 3.
On March 4, 2022, the licensee and NRC staff held a clarification call to discuss the proposed request for additional information to ensure mutual understanding. The audit was closed at the conclusion of the March 4 meeting. A formal request for additional information was issued on March 4, 2022.
ML22046A088 OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DSS/STSB/BC NAME SWilliams KGoldstein VCusumano DATE 03/8/2022 03/08/2022 03/10/2022 OFFICE NRR/DSS/SNSB/BC NRR/DEX/EMIB/BC(A) NRR/DSS/SCPB/BC NAME SKrepel ITseng BWittick DATE 03/08/2022 03/10/2022 03/09/2022 OFFICE NRR/DORL/ LPL2-1/BC NRR/DORL/LPL2-1/PM NAME MMarkley SWilliams DATE 03/10/2022 03/11/2022