ML22041A283
ML22041A283 | |
Person / Time | |
---|---|
Issue date: | 02/09/2022 |
From: | Joseph Kanney Office of Nuclear Material Safety and Safeguards, NRC/RES/DRA |
To: | |
James O'Driscoll | |
Shared Package | |
ML22040A074 | List: |
References | |
10 CFR Part 50, 10 CFR Part 52, NRC-2009-0196, Part 50/52, RIN 3150-AI66 | |
Download: ML22041A283 (96) | |
Text
THIS DRAFT DOCUMENT IS BEING RELEASED TO SUPPORT THE FEBURARY 18, 2022, ADVISORY COMMITTEE ON REACTOR SAFEGUARDS (ACRS) 10 CFR PART 50/52 RULEMAKING ACTIVITIES SUBCOMMITTEE PUBLIC MEETING. THE NRC STAFF IS NOT REQUESTING OR ACCEPTING PUBLIC COMMENTS ON THIS DRAFT DOCUMENT. THIS DRAFT DOCUMENT HAS NOT BEEN SUBJECT TO NRC MANAGEMENT OR LEGAL REVIEWS AND APPROVALS, AND ITS CONTENTS SHOULD NOT BE INTERPRETED AS OFFICIAL AGENCY POSITIONS.
FOLLOWING THE PUBLIC MEETING WITH THE ACRS, THE NRC STAFF PLANS TO CONTINUE WORKING ON THIS DOCUMENT AND TO CONSIDER OPTIONS FOR INVITING PUBLIC PARTICIPATION IN THE RULEMAKING ACTIVITY.
U.S. NUCLEAR REGULATORY COMMISSION DRAFT REGULATORY GUIDE DG -4031
Proposed Revision 4 to Regulatory Guide 4.7
Issue Date: Month 20##
Technical Lead : Joseph Kanney GENERAL SITE SUITABILITY CRITERIA FOR NUCLEAR POWER STATIONS
A. INTRODUCTION Purpose
This regulatory guide (RG) describesa method the major site characteristics related to public health and safety and environmental issues that the staff of the U.S. Nuclear Regulatory Commission (NRC) considers acceptable to implementin determiningthe site suitability requirements of sites for light-water-cooled nuclear power stations.
Applicable Regulations
Applicability
This RG applies to applicants under Title 10, Part 50, of the Code of Federal Regulations (10CFR) Part 50 ),,Domestic Licensing of Production and Utilization Facilities, (Ref. 1) governs the licensing of); 10CFRPart 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions (Ref.2 ); 10CFRPart 52, Licenses, Certifications, and Approvals for Nuclear Power Plants (Ref. 3) ; and 10 CFRPart 100, Reactor Site Criteria (Ref. 4).Though intended for nuclear power reactors, this RG may also provide useful guidance relevant to applications for other nuclear installations.
Applicable Regulations plants.
Written suggestions regarding this guide or development of new guides may be submitted through the NRCs public Web site under the Regulatory Guides document collection of the NRC Library at http://www.nrc.gov/reading-rm/doc-collections/reg-guides/contactus.html.
Electronic copies of this regulatory guide, previous versions of this guide, and other recently issued guides are available through the NRCs public Web site under the Regulatory Guides document collection of the NRC Library at http://www.nrc.gov/reading -rm/doc-collections/. The regulatory guide is also available through the NRCs Agency wide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html, under ADAMS Accession No. ML12188A053. The regulatory analysis may be found in ADAMS under Accession No. ML12188A052 and the staff responses to the public comments on DG-4021 may be found under ADAMS Accession No. ML12188A054.
- Appendix A, General Design Criteria for Nuclear Power Plants, to 10CFRPart 50 providescontains general design criteria (GDC). Criterion 2 ( GDC 2),, Design Basesbases for Protection Against Natural Phenomenaprotection a gainst natural phenomena, requires that structures, systems,and components (SSCs) important to saf ety be designed to withstand the effects of expected natural phenomena when combined with the effects of normal accident conditions without loss of capability to perform their safety function.
- The National Environmental Policy Act of 1969, as amended (NEPA) (); 42 United States Code (U.S.C..) 4321 et seq.), as amended,implemented by Executive Orders 11514 and 11991 and the Council on Environmental Qualitys regulations (40 CFRParts 1500 -1508 [.) (Ref. 2] ),5) requires that allFederal agencies of the Federal Government prepare detailed environmental impact statements (EISs) on proposed major Federal actions that will significantly affect affecting the quality of the human environment. A principal objective of NEPA is to require the a Federal agency to consider, in its decision-making process, the environmental impacts of each proposed major Federal action and the available alternative actions, including alternative sites.
- 10 CFR Part 51, Environmental Additional direction is prov ided in Executive Order 11514 Protection Regulations for Domestic Licensing and Related Regulatory Functions and Enhancement of Environmental Quality (Ref. 3), 6), as amended byExecutive Order 11991 Environmental Impact Statements (Ref. 7), and in the Council on Environmental Qualitys regulations at 40 CFR Chapter V -Council on Environmental Quality - Parts 1500 -1508 (Ref. 8).
Regarding the Council on E nvironmental Q uality (CEQ) regulations, as stated in 10 CFR 51.10, the NRC takes account of those regulations voluntarily, subject to certain conditions.
- 10 CFR Part 51provides regulations applicable to the NRCs preparation and processing of environmental impact statements EISs and related documents pursuant to Section 102(2)(C) of NEPA. The The regulations in 10CFR51.10(c) specify the limitations on the Commissions authority and responsibility pursuant to NEPA,as imposed by the Clean Water Act (Federal Water Pollution Control Act ( FWPCA)) (also known as the Clean Water Act (CWA),33 U.S.C.
1251 et seq.), as amended, are specified in 10 CFR51.10(c). (Ref. 9 ).In 10CFR 51.45, Environmental report, the NRC sets forth the contents that an applicant must include in its environmental report.
- 10 CFR Part 52Licenses, Certifications, and Approvals for Nuclear Power Plants, (Ref. 4 )
governs the issuance of early site permits, (ESPs),standard design ce rtifications, combined licenses,(COLs),standard design approvals, and manufacturing licenses for nuclear power facilities licensed under Section 103 of the Atomic Energy Act of 1954, as amended (68Stat. 919),(Ref. 10) and Title II of the Energy Reorganization Act of 1974 (88 Stat. 1242 ). )
(Ref. 11).Some of the 10 CFR Part 52criteria are directly related to site characteristics, as well as to events and conditions outside the nuclear power unit.
- 10 CFR Part 100, Reactor Site Criteria (Ref. 5 ), requires the NRC to consider population density; use of the site environs, including proximity to manmade hazards; and the physical characteristics of the site, including seismology, meteorology, geology, and hydrology, in determining the acceptability of a site for a nuclear power reactor. Particularly relevant sections are10 CFR100.20 provides factors,Factorsto be considered,when evaluating sites; 10CFR100.21provides non,Non -seismic site criteria, ; and 10CFR100.23,provides geologicGeologic and seismic s iting c riteria..
RG 4.7, Rev. 3, Page 2 Related Guidance
- Regulatory Guide ( RG) 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants (Ref. 612), identifies requirements for safety -related site characteristics.
- RG 1.206, Combined License Applications fo r Nuclear Power Plants, (Ref. 7) 13),also identifies requirements for safety-related site characteristics.
- NUREG- 0800, Standard Review Plan (SRP) for the review Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition, (Ref. 8) 14),provides the criteria used by the NRC staff for reviewing safety analysis reports submitted with nuclear power plant license applications.
- NUREG-1555, Standard Review Plans for Environmental Reviews for Nuclear Power Plants:
Environmental Standard Review Plan, (Ref. 9) 15), provides the criteria used by the NRC staff for reviewing environmental reports submitted with nuclear power plant license applications.
Supplement 1 to NUREG-1555 covers license renewals.
- RG 4.2, Preparation of Environmental Reports for Nuclear Power Stations (Ref. 16),provides guidance to applicants for the format and content of environmental reports submitted as part of an application for a permit, license, or other authorization to site, construct, or operate a new nuclear power plant.
Purpose of Regulatory Guides
The NRC issues regulatory guidesRGs to describe to the public methods that the staff considersare acceptable to the staff for use in implementing specific parts of the agencys regulations, to explain techniques that the staff uses in evaluating specific problems issuesor postulated accidents events, and to provide guidance to applicants. describe information that the staff needs in its review of applications for permits and licenses. Regulatory guides are not substitutes forNRC regulations and compliance with them is not required. Methods and solutions that differ from those set forth in regulatory guides will be deemedRGs are acceptable if they pro videsupported by a basis for the findings required for the issuance or continuance of a permit or license by the Commission.
Paperwork Reduction Act
This regulatory guide containsRG provides voluntary guidance for implementing the mandatory information collection requirements covered bycollections in 10CFRPart Parts 50, 10 CFR Part 51, 10 CFR Part 52,and 10 CFR Part 100 that are subject to the Paperwork Reduction Act of 1995 (44U.S.C.3501 et. seq.). These information collections were approved by the Office of Management and Budget (OMB) approved), under OMB control number s 3150- 0011, 3150- 0021, 3150- 0151, and 3150-0093,respectively. Send comments regarding this information collectionto the FOIA, Library, and Information Collections Branch (T6-A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555- 0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202 (3150- 0011, 3150- 0021, 3150- 0151, 3150- 0093),
Office of Management and Budget, Washington,DC 20503.
Public Protection Notification
RG 4.7, Rev. 3, Page 3 The NRC may neithernot conduct nor or sponsor, and a per son is not required to respond to, an information a collection request or requirementof information unless the document requesting document or requiring the collection displays a currently valid OMB control number.
RG 4.7, Rev. 3, Page 4 B. DISCUSSION
REASON FOR Change
This revision of the guide (Revision 3) incorporates references to 10 CFR Part 52 and to relevant sections in the NRCs standard review plan (NUREG- 0800) that the NRC staff uses to evaluate nuclear power plant license applications and the standard review pl an for environmental review of nuclear power plants (NUREG-1555). In addition, the technical references were updated.
The NRC revised RG 4.7 to address siting criteria for ESP reviews conducted under 10 CFR 52.17 (b)(1). Specifically, the agency revised it to address the identification of physical characteristics of the proposed site that could significantly impede the development of emergency plans.
In addition, the NRC restructured the RG to remove repetition and to increase clarity. Text from the discussion s ection and the two tables in the previous revision of the RG were brought together in Section C, Staff Regulatory Guidance. For e ach topic in Section C, the document was structured to list (1) relevant statutes and regulations, (2) related guidance, and (3) considerations, regulatory experience, and staff position,in order to present this information cohesive ly.
Scope of RG Regulatory Guide 4.7
This guide discussesThis guide is intended to assist applicants in the initial stage of selecting potential sites for a nuclear power station. It describes the major site characteristics related to public health and safety and environmental issues that the NRC staff considers in determining the suitability of sites for light-water-cooled nuclear power stations. Applicants may use the guid elines in identifying suitable candidate sites for nuclear power stations. The decision that a station may be built on a specific candidate site is based on a detailed evaluation of the proposed site -plant combination and a cost-benefit analysis comparing it with alternative site-plant combinations, as discussed in RG 4.2, Preparation of Environmental Reports for Nuclear Power Stations 0F1 (Ref. 10 ).
This guide does not discuss the details of the engineering designs required to ensure the compatibility ofthat the nuclear station and the site are compatible, or the detailed information required for the preparation ofto prepare the safety analysis and environmental reports. The NRC discusses t hese topics in RG 1.70,NUREG -0800,RG 4.2,and NUREG-1555.
Site Selection
See Chapter 9Each site that appears to be compatible with the general criteria discussed in this guide needs to be examined in greater detail before it can be considered a candidate site (i.e., one of RG 4.2 for a discussionthe groups of site selection procedures. sites to be considered further in selecting a proposed or preferred site). The proposed or preferred site submitted by an applicant for a construction permit, early site permit ( ESP), or combined operating licenses (, or COL),is that site chosen from a number of candidate sites the applicant prefers and on which the applicant proposes to construct a nuclear power station.
- 1. For the purpose of this guide, nuclear power station refers to the nuclear reactor unit or units, nuclear steam supply, electric generating units, auxiliary systems including the cooling system and structures such as docks that are located on a given site, and any new electrical transmission towers and lines erected in connection with the facilities.
RG 4.7, Rev. 3, Page 5 Selecting a suitable site for a nuclear power station1station1F2 may require a significant commitment of time and resources, including safety and environmental considerations..Site selection involves consideration of the human environment, 2F3 public health and safety, engineering and design, economics, institutional requirements, environmental impacts, andother factors. The potential impacts of the construction and operation of nuclear power stations on the human environment and on social, cultural, and economic features (including environmental justice) are usually similar to the potential impacts of any major industrial facility, but nuclear power stations are unique in the degree to which potential impacts of the environment on may affect their safety must be considered. The safety. S afety requirements are the primary determinants of the site suitability of a site for nu clear power stations, but, although environmental impacts are also important and need to be evaluated.
In the site selection process, coordination between applicants for nuclear power stations and various Federal, State, local, and Native American tribalT ribal agencies will be useful in identifying potential problem areas.
Appendices A and B to this guide summarize the important safety -related and environmental considerations for assessing the site suitability of nuclear power stations, including a listing of relevant regulations and regulatory guidance. While the listings of Appendices A and B are not all inclusive, the cited regulations and regulatory guidance documents provide information on where further details can be found on NRC requirements and acceptance criteria.
Information Limitations at site selection stage is as sumed to be limited S ite S election S tage
The information needed to evaluate potential sites at thisthe initial stage of site selection is assumed to be limited to information that is obtainable from published reports, public records, public and private agencies, and individuals knowledgeable about the locality of a potential site. Although in some cases the applicants may have conducted on-the-spot investigations, it is assumed here this RG assumes that these such investigations would be limited to reconnaissance-type surveys at this stagein the site selection process..
Safety and environmental issuesE nvironmental I ssuesin site selectionSite S election
In accordance with 10 CFR Part 100, the safety issues to be addressed in site selection include geologic/seismic, hydrologic, and meteorological characteristics of proposed sites; exclusion area and low-population zone; population consider ations as they relate to protecting the g eneral public from the potential hazards of serious accidents; potential effects on a station from accidents associated with nearby industrial, transportation, and military facilities; emergency planning; and security plans. The environmental issues to be addressed in site selection are covered by NEPA and include potential impacts from the construction and operation of nuclear power stations on ecological systems, water use, land use, the atmosphere, aesthetics, socioeconomics, and environmental justice.
1 For the purpose of this guide, the term nuclear power station refers to the nuclear reactor unit or units, nuclear steam supply, electric generating units, auxiliary systems (including the cooling system ) and structures such as docks that are located on a given site, and any new electrical transmission towers and lines erected in connection with the facilities.
2 The human environment is defined as the natural and physical environment and the relationship of people to t hat environment. The human environment includes, but is not limited to, geology, geomorphology, surface and ground water hydrology, climatology, air quality, limnology, water quality, fisheries, wildlife habitat, scenic resources, recreation resources, archeological and historical resources, and community (environmental justice) resources, and land use.
RG 4.7, Rev. 3, Page 6 Geology and Seismology
Nuclear power stations must be designed to prevent the loss of safety-related functions.
Generally, the most restrictive safety -related site characteristics considered in determining the suitability of a site are potential surface faulting, potential ground motion and, foundation conditions3F4 (including liquefaction, subsidence, and landslide potential), and seismically induced floods. Criteria that describe the nature of the investigations required to obtain the geologic and seismic data necessary to determine site suitability are in 10 CFR100.23and 10CFR52.17(a)(1)(vi). Safety-related site characteristics are identified in and water waves.RG 1.206which deals with combined license applications for nuclear power plants.Guidance for addressing them can be found in RG 1.208, A Performance -Based Approach to Define the Site-Specific Earthquake Ground Motion (Ref. 1 1); RG 1.132, Site Investigations for Foundations of Nuclear Power Plants (Ref. 1 2), RG 1.138, Laboratory Investigations of Soils and Rocks for Engineering Analysis and Design of Nuclear Power Plants (R ef. 13), and RG 1.198, Procedures and Criteria for Asse ssing Seismic Soil Liquefaction at Nuclear Power Plant Sites (Ref. 14).
Atmospheric Extremes and Dispersion
The atmospheric characteristics at a site are an important consideration in evaluating the dispersion of radioactive effluents from both postulated accidents and routine releases in gaseous effluents. Radiation doses associated with airborne radioactive materials from routine releases and anticipated operational occurrences must be kept as low as is reasonably achievable (ALARA) (see 10CFR20.1101(b), (Ref. 15) and must comply with effluent concentration limits of Appendix B to 10 CFR Part 20 and dose limits for members of the public under 10 CFR 20.1301 and 20.1302. In addition, 10 CFR 20.1301(e) requires compliance with the EPAs generally applicable environmental radiation standards of 40 CFR Part 190. The requirements for design objectives for equipment to control releases of radioactive material in effluents from nuclear power reactors are set forth in 10 CFR50.34a. Appendix I, Numerical Guides for Design Objectives and Limiting Conditions for Operation to Meet the Criterion As Low as is Reasonably Achievable for Radioactive Material in Light -Water-Cooled Nuclear Power Reactor Effluents, to 10CFR Part 50 provides guidance on the requirements for design objectives and technical specification for limiting conditions for operation for light-water-cooled nuclear power plants.
Further, 10 CFR50.36a(a) provides that, to keep pow er reactor effluent releases ALARA, each license authorizing operation of such a facility will include technical specifications regarding the establishment of effluent control equipment and reporting of actual releases.
as low as is reasonably achievable (ALARA) and must comply with effluent concentration limits, dose limits for members of the public, and the U.S.Environmental Protection Agencys ( EPAs )
environmental radiation standards.In addition to meeting the NRC requirements for the dispersion of airborne radioactive material, the station must meet the State and Federal requirements of the Clean Air Act (42 U.S.C. 7401 et seq.), as amended. This is unlikely to be an important consideration for nuclear power station siting unless (1) a site is in an area where existing air quality is near or exceeds standards, (2) there is a potential for interaction of the cooling system plume with a plume containing noxious or toxic substances from a nearby facility, or (3) the
- 4. See NUREG-0800, Section 2.5.1, Basic Geologi c and Seismic Information, as well as RG 1.206, Section C.I.2,, Site Characteristics, and Section C.I.5, Geology, Seismology, and Geotechnical Engineering.
RG 4.7, Rev. 3, Page 7 auxiliary generators are expected to operate routinely. ( Ref. 17).
Formatted: List Paragraph, Indent: Left: 0.5", Hanging:
RG 1.23, Meteorological Monitoring Programs for Nuclear Power Plants (Ref. 16), describes 0.25" atmospheric data that the staff considers acceptable for the required assessment of the potential Formatted: Normal, Indent: Left: 0.5" dispersion of radioactive material. NUREG- 0800, Section 2.3.3, describes the NRC staffs review procedures for onsite meteorological measurements programs.
The concentration of radioactive materials in the atmosphere downwind from a release source is determined through the use of an atmospheric dispersion factor know nas a /Q value or relative concentration factor. It is defined as the airborne concentration (curies per cubic meter (Ci/m 3)) at the downwind location of interest divided by the rate of release of radioactive materials from the source Q (curies per second) (Ci/s)). A similar term, atmospheric deposition factor or D/Q value, is used to determine the rate of ground level deposition at a downwind location of interest. It is defined as the rate of ground level deposition D (curies per square meter per second (Ci/m2-s)) at the downwind location of interest divided by the rate of release of radioactive materials from the source Q. /Q and D/Q values have become commonly evaluated terms because they depend only on atmospheric variables, distance from the source, the radionuclide chemical and physical characteristics, and whether airborne releases occur from a single plant stack or via multiple building vents or plant stacks. If the dispersion of radioactive material released following a design-basis accident is insufficient at the boundary of the exclusion area (see the following section, Exclusion Area and Low -Population Zone) or the outer boundary of the low -
population zone, the plant design would not satisfy the requirements in 10CFR50.34(a)(1). I n this case, the design of the station would be required to include appropriate and adequate compensating engineered safety features. In addition, meteorological conditions are to be determined (1) for use in the environmental report required by10CFRPa rt 51, (2) for verification of the criteria specified in the design control document for a certified plant design, and (3) for use in demonstrating that radiological airborne effluent release limits can be met for any individual located offsite as required by 10 CFR 100.21(c)(1).
Local fogging and icing can result from water vapor discharged into the atmosphere from cooling towers, lakes, canals, or spray ponds,but can generally be acceptably mitigated by station design and operational practices. Howev er, some sites have the potential for severe fogging or icing because of local atmospheric conditions. For example, areas of unusually high moisture content that are protected from large-scale airflow patterns are most likely to experience these conditions. The impacts are generally of greatest potential importance relative to transportation or electrical transmission systems in the vicinity of a site. Section 5.1.1, The Site and Vicinity, of NUREG-1555,describes the NRC staffs review procedures for evaluation of fogging and icing induced by a nuclear power plant, while NUREG-1555, Section 5.3.3.1, Heat Dissipation to the Atmosphere, addresses the physical and aesthetic impacts of cloud formation, cloud shadowing, additional precipitation, icing and fogging and increased ground-level humidity.
Cooling towers produce cloudlike plumes that vary in size and altitude depending on the atmospheric conditions. The plumes often extend a few miles in length before dissipating, but; the plumes themselves or their shadows could have aesthetic impacts. Visible plumes emitted from cooling towers in the vicinity of airports could cause pose a hazard to a viation.
Exclusion Area and Low-Population Zone
A reactor licensee is required by 10CFR100.21(a) to designate an exclusion area and to have Formatted: Normal, Indent: Left: 0.25" authority to determine all activities within that area, including removal of personnel and property. In selecting a site for a nuclear power station, it is necessary to provide for an exclusion area in which
RG 4.7, Rev. 3, Page 8 the applicant has such authority. Transportation corridors such as highways, railroads, and waterways are permitted to traverse the exclusion area provided (1) these are not so close to the facility as to interfere with normal operation of the facility and (2) in case of emergency, appropriate and effective arrangements are made to control traffic on the highway, railroad, or waterwayin order to protect public health and safety.
Formatted: Normal, Indent: Left: 0.5" In accordance with 10CFR 50.34(a)(1)(ii)(D)(1),10 CFR 52.17(a)(1)(ix)(A),and 10CFR 52.79(a)(1)(vi)(A),the exclusion area is required to be of such a size that an individual assumed to be located at any point on its outer boundary would not receive a radiation dose in excess of 25 rem total effective dose equivalent (TEDE) over any 2-hour period following a postulated fission product release.
The required exclusion area size involves consideration of the atmospheric characteristics of the site as well as plant design.
A reactor licensee is also required by 10CFR100.21(a) to designate an area immediately surrounding the exclusion area as a low-population zone (LPZ). The size of the LPZ must be such that the distance to the boundary of the nearest densely populated center containing more than about 25,000 residents must be at least one-and-one-third times the distance from the reactor to the ou ter boundary of the LPZ. The boundary of the population center should be determined by considering population distribution, not political boundaries. population zone (LPZ).
Transportation corridors such as highways, railroads, and waterways are permitted to traverse the exclusion area provided (1) these are not so close to the facility as to interfere with normal operation of the facility,and (2) in case of emergency, appropriate and effective arrangements are made to control traffic on the highway, railroad, or waterway to protect public health and safety.
Population Considerations
In accordance with 10CFR 50.34(a)(1)(ii)(D)(2), 10 CFR 52.17(a)(1)(ix)(B) and 10CFR 52.79(a)(1)(vi)(B),the LPZ is required to be of such a size that an individual located on its outer boundary during the course of the postulated accident would not receive a radiation dose in excess of 25 rem TEDE. The size of the LPZ depends on atmospheric dispersion characteristics and population characteristics of the site, as well as aspects of plant design.
10CFR52.17, Contents of Applications; Technical Information, for early site permitsand 10CFR52.79, Contents of Applications; Technical Information in Final Safety Analysis Report, for combined licenses require an applicants final safety analysis report to include information related to site location, the facility location on the site, population considerations, locations of nearby facilities, postulated releases in the event of an accident, and other technical requirements. NUREG- 0800, Sections 2.1.1, and Section 2.1.2, and RG 1.206, Section C.I.2, describe the NRC staffs review procedures for the site location,description, and exclusion area authority and control.
Population Considerations
As stated in 10 CFR100.21(h), reactors should be located away from very densely populated centers; areas of low population density are generally preferred. In addition, 10 CFR100.21(h) states that, in determining the acceptability of a particular site located away from a very densely populated center but not in an area of low density, consideration will be given to safety, environmental, economic, or other factors that may result in the site being found acceptable. Population data shouldbe estimated in
RG 4.7, Rev. 3, Page 9 relation to the time of initial plant approval4F5, as recommended byRG 1.206. Also, RG 1.206 contains guidance regarding predicting population for periods beyond the start of power plant operations and notes that population projections may be made by decade for a 40- year period beyond the latest date that the early site permit unit could start operation. Section 2.1.3, Population Distribution, of Revie w Standard RS-002, Process Appli cations for Early Site Permits, issued May 2004 (Ref.17 ), describes methods for projecting populations over the lifetime of the facility.
Locating reactors away from densely populated centers is part of the NRCs defense-in-depth philosophy and facilitates emergency planning and preparedness, as well as reducesreduc ingpotential doses and property damage in the event of a severe accident. The numerical values given in this guide (see Staff Regulatory Guidance 4, Population Considerations) are generally consistent with past NRC practice and reflect consideration of severe accidents, as well as the demographic and geographic conditions of the United States.
Emergency Planning
According To ensure that adequate measures can be taken to 10CFR100.21(g), Physical protect members of the public in an emergency, the applicant should identify the physical characteristics unique toof the proposed site that could pose significant impediment to significantly impede the development of emergency plans must be identified..
Formatted: Normal, Indent: Left: 0.25" Additionally, 10CFR50.47(a)(1) requires a reasonable assurance finding that adequate protective measures can and will be taken in the event of a radiological emergency before the NRC can issue an operating license for a nuclear power plant. 10 CFR50.47(d) allows issuance of an operating license authorizing only fuel loading or low-power testing and training (up to 5 percent of the rated power) without certain NRC or Federal Emergency Management Agency reviews, findings, or determinations concerning the state of offsite emergency preparedness.
Formatted: Normal, Indent: Left: 0.5", Hanging: 0.25",
Adequate plans must be developed for two areas, or emergency planning zones (EPZs) : the plume Don't add space between paragraphs of the same style exposure pathway EPZ and ingestion pathway EPZ. As stat ed in 10CFR50.47, the plume exposure pathway EPZ for nuclear power plants generally consists of an area about 16 kilometers (km) (10 miles (mi)) in radius, and the ingestion pathway EPZ generally consists of an area about 80km (50 mi) in radius. The exact size and configuration of the EPZs should be determined in relation to local emergency response needs and capabilities, as they are affected by such conditions as demography, topography, land characteristics, access routes, and jurisdictional boundaries.
Security
10 CFR 52.17(a)(1)(x) requires an Early Site Permit (ESP) applicants site safety analysis reportPotential sites should be examined to include information demonstrating thatdetermine whether anysite characteristics are such that adequate security planswould prevent the development and measures can be developed. 10 CFR 100.21(f) state s that applications for site approval for commercial nuclear power reactors shall demonstrate that: Site chara cteristics must be such thatimplementation of adequate security plans and measures can be developed.. This should include examination of any existing or potential natural or manmade hazards at or near the site.
- 5. For an early site permit (ESP), assume plant approval is the end of the term of the permit.
RG 4.7, Rev. 3, Page 10 Hydrology
Flooding
The physical characteristics of a site that must be considered when evaluating suitability of a site are outlined in 10 CFR 100.10 and 10 CFR 100.20. Potential sites should be examined for suitability with respect to flooding hazards. The number and types of flood-causing phenomena, flooding mechanisms, and flooding hazards to consider will depend on the site. The potential for site-scale flooding due to intense local precipitation affects all site s. Sites near streams or rivers may be affected by riverine flooding due to rainfall or snowmelt, dam failure, river blockage, or channel diversion. Sites near lakes, reservoirs, estuaries, or oceans may be affected by storm surge s, seiches, or tsunami s. Where applicable, the potential for flooding events due to the combined effects of multiple flooding mechanisms (e. g.,
rainfall with snowmelt, rainfall with dam failure, storm surge with wind waves and tides) should be considered.The potential for sea level rise and other global climate change effects should also be considered.10 CFR 100.23 requires determination of the seismically induced floods and water waves that could affect a site from either locally or distantly generated seismic activity to be determined. 10 CFR 100.21requires that the physical characteristics of site including non -seismic floods must be evaluated and site parameters established. RG 1.59, Design Basis Floods, (Ref. 18) describes an acceptable method for determining the design-basis floods for sites along streams or rivers and discusses the phenomena producing comparable design-basis floods for coastal, estuary, and Great Lakes sites. The design-basis flood determinations include the effects of sea level riseand other global climate change effects. The effects on station safety functions of a probable maximum flood (as defined in RG 1.59),
seiche, surge, or seismically induced flood (such as might be caused by dam failures or tsunamis) can generally be controlled by engineering design or protection of the safety-related SSCs identified in RG 1.29, Seismi c Design Classification (Ref. 19 ). RG 1.206 and NUREG- 0800, Section 2.4 provide information on how the NRC staff will review design -basis flooding and flood mechanisms at power reactor sites. Additional information can be obtained from American National Standards Institute/American Nuclear Society (ANSI/ANS) 2.8, Determining Design Basis Flooding at Power Reactor Sites (Ref. 2 0); DOE -STD-1020- 2002, Natural Phenomena Hazards Design and Evaluation Criteria for Department of Energy Facilities (Ref. 2 1); DOE-STD-1021-93, Natural Phenomena Hazards Performance Categorization Guidelines for Structures, Systems, and Components (Ref. 2 2);
DOE STD-1021-94, Natural Phenomena Hazards Characterization Criteria (Ref. 23); and DOE -STD-1023-95, Natural Hazards Phenomena Hazards Assessment Criteria (Ref. 24). Study of the potential for river and local floods, tsunami, storm surge, dam failure, river blockage, or diversion in the river system or distantly and locally generated sea waves might be needed to determine the suitability of a site.
Water Availability
Nuclear power stations require reliable sources of water for steam condensation, service water, the emergency core cooling system, and other functions. Where water is in short supply, closed-cycle cooling or the recirculation of the hot cooling water through cooling towers, artificial ponds, or impoundments has been practiced.
The limitationsLimitations imposed by existing laws or allocation policies govern the use and consumption of cooling water at potential sites for normal operation. RG 1.27, Ultim ate Heat Sink for Nuclear Power Plants (Ref. 25), provides guidance on water supply for the ultimate heat sink and discusses the safety requirements. Consumption of water may necessitate an evaluation of existing and future water uses in the area to ensure adequate water supply during droughts for both station operation and other water users (i.e., nuclear power station requirements versus public water supply).NUREG-1555 contains the guidance to staff for evaluating the environmental impacts of consumptive water use.
RG 4.7, Rev. 3, Page 11 Regulatory agencies should be consultedIt may be necessary to consult other F ederal, S tate, or local regulatory agenciesto avoid potential conflicts.
Water Quality
Thermal and chemical effluents discharged to navigable streams are governed by the FWPCA (Federal Water Pollution Control Act, also known as the Clean Water Act (CWA) ),as amended ;
40CFRPart 122, EPA Administered Permit Programs: The National Pollutant Discharge Elimination System (Ref. 26) ; 40 CFRPart 4 23, Steam Electric Power Generati ng Point Source Category (Ref.
- 27) ; andState water quality standards. Section 316(a) of the CWA is typically administered by the state and specifies maximum impacts allowed on water quality based on flow volume and thermal loading of the plant discharge. Section 401(a)(1) of the FWPCA requires, in part, that any applicant fo r an NRC construction permit, early site permit, or combined license for a nuclear power station provide to the NRC certification from the State that any discharge will comply with applicable effluent limitations and other water pollution control requireme nts. In the absence of such certification, the NRC cannot issue a construction permit, early site permit, or combined license,unless the requirement is waived by the State or the State fails to act within a reasonable period of time. A National Pollut ant Discharge Elimination System (NPDES) permit to discharge effluents to navigable streams pursuant to Section 402 of the FWPCA may be required for a nuclear power station to operate in compliance with the Act, but it is not a prerequisite to an NRC construction permit, operating license, ESPor combined license.
Thermal and chemical effluents discharged to navigable streams are governed by the CWA,as amended, and regulated by Federal and Statewater quality standards. The states administer s ignificant portions of the CWA. In some instances, S tate approvals or permits are needed before the NRC can issue a license.
Radionuclide Retention and Transport
Aquifers that are or may be used for domestic, municipal, industrial, or irrigation water s upplies provide potential pathways for the transport of radioactive material to man in the event of an accident.
Evaluationof the The retardation, dispersion, and dilution capabilities and potential contamination pathways of the ground water environment under operating and accident conditions with respect to present and future users are important factors in site selection. ASTM C 1733-10, Standard Test Methods for Distribution Coefficients of Inorganic Species by the Batch Method, (Ref. 28 ) provides guidance for obtaining distribution coefficients especially for radionuclides.Potential radiological and nonradiological contaminants affecting ground water in the vicinity of the nuclear plant and beyond the site boundaries should be evaluated. Site-specific adsorption coefficients (e.g., for the subsurface soils and backfills/structural fills, chemistry of the subsurface media, preferential flow in the subsurface and other physiographic conditions) shouldbe assessed to evaluate the most severe impact on users of surface and/or ground water and environment and to calculate a conservative estimate of travel time for the contaminants.
,with respect to present and future users, are important factors in site selection. Formatted: List Paragraph, Indent: Left: 0.75", Hanging:
RG 4.21, Minimization of Contamination and Radioactive Waste Generation: Life -Cycle Planning 0.25" (Ref. 29), provides guidance on addressing the requirements of 10CFR20.1406, Minimizati on of Contamination. It recommends that applicants should strive to minimize contamination and radioactive waste generation over the total life cycle of a facility, from initial layout and design through procedures for operation and final decontamination and dismantlement at the time of decommissioning. With respect to site hydrology, Regulatory Position C.2 of RG 4.21 focuses on gathering sufficient information to support the development of a conceptual site model and in planning design features for the early detection of leakage and migration of radioactivity in soils and ground and surface water.
RG 4.7, Rev. 3, Page 12 Industrial, Military, and Transportation Facilities
Accidents at present or projected nearby industrial, military, and transportation facilities may affect the safety of a nuclear power station (see Section 2.2.3, Evaluation of Potential Accidents, of NUREG- 0800). According to 10CFR100.21(e), Potential hazards associated with nearby transportation routes, industrial and military facilities must be evaluated and site parameters established such that potential hazards from such routes and facilities will pose no undue risk to the type of facility proposed to be located at the site..
Accidents at nearby industrial facilities, such as chemical plants, refineries, mining and quarrying operations, oil or gas wells, or gas and petroleum product storage installations, mightmay produce missiles, shock waves, flammable vapor clouds, toxic chemicals, or incendiary fragments. These accidents mightmay affect the station itself or the station operators in a way that jeopardizes the station safety of the station. RG 1.78, Evaluating the Habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical Release (Ref. 30), describes assumptions acceptable to the NRC staff for use in assessing the habitability of the control room during and after a postulated external release of hazardous chemicals and describes criteria that are acceptable to the staff for the protection of the control room operators..
Accidents at nearby military facilities, such as munitions storage areas and ordnance test ranges, may threaten station safety. An otherwise unacceptable site may be shown t o be acceptable if the cognizant military organization agrees to change the installation or mode of operation to reduce the likelihood or severity of potential accidents involving the nuclear station to an acceptable level.
An accident during the transport of hazardous materials (e.g., by air, waterway, railroad, highway, or pipeline) near a nuclear power plant might station may generate shock waves, missiles, and toxic or corrosive gases that can could affect the safe station operation of the station..The consequences of thesuch an accident will depend on the proximity of the transportation facility to the site, the nature and maximum quantity of the hazardous material per shipment, and the layout of the nuclear station. RG 1.91, Ev aluations of Explosions Postulated To Occur on Transportation Routes Near Nuclear Power Plants (Ref. 31 ), describes a method acceptable to the NRC staff for determining distances from a plant to a railway, highway, or navigable waterway beyond which any explosion that might occur on these routes is not likely to adversely affect plant operation or to prevent a safe shutdown.per shipment of the hazardous material, and the layout of the nuclear station.
Airports are transportation facilities that pose spe cialized hazards to nearby nuclear power stations. Potential threats to stations from aircraft results from the impact of the include aircraft impact andfrom the secondary effects of a crash (e.g., fire). Section 3.5.1.6 of NUREG-0800 describes review procedures regarding potential aircraft hazards. For further information, see DOE -STD-3014, Accident Analysis for Aircraft Crash into Hazardous Facilities (Ref. 32 ), and RG 1.206.
Ecological Systems and Biota
Areas of great importance to the local aquatic and terrestrial resourcesmay present major difficulties in assessingThe potential impacts impact of station construction and operation on populations of important biota (plant or animal speciesor ) and on their habitats and supporting ecological systems.
Such areas include those used for breeding (e.g., nesting and spawning), wintering, and feeding, as well as areas where there may be seasonally high concentrations of individuals of important species. needs to be assessed. Considerations may in clude preservation of habitats and migratory routes as well as direct impacts (e.g., entrainment, impingement, or entrapment of aquatic organisms).
RG 4.7, Rev. 3, Page 13 A species, whether animal or plant, is important (for the purpose purposes of this guide) if a specific causal link can be identified between the nuclear power station and the species and if at least one or more of the following applies:
(1) if theThe species is commercially or recreationally valuable,.
(2) if theThe species is endangered or threatened, or.
(3) if theThe species affects the well -being of some important species within criteria (a under either criterion ( 1) or (b) or if it 2), is critical to the structure and function of a valuable ecological system, or is a biological indicator of radionuclides in the environment.
Endangered and threatened species are defined by theThe Endangered Species Act of 1973 (16 U.S.C.
1531 et seq.), as amended, as follows: (Ref. 18), makes the following definitions:
The term endangered species species means any species which is in danger of extinction throughout all or a significant portion of its range other than a species of the Class Insecta determined by the Secretary to constitute a pest whose protectionunder the provisions of this Act would present an overwhelming and overriding risk to man. The term threatened species species means any species which is likely to become an endangered species within the foreseeable future throughout all or a significant p ortion of its range..
The Secretary of the Interior periodically publishes lists of endangered and threatened species in the Federal Register.
Where the ecological sensitivity of a site under consideration cannot be established from existing information, more detailed studies, as discussed in RG 4.2, might be necessary. Impacts of station construction and operation on the biota and ecological systems may be mitigated by design and operational practices. The alteration of one or more of the existing environmental conditions may render a habitat unsuitable as a breeding or nursery area. In some cases, organisms use identical breeding and nursery areas each year; if the characteristics of the areas are chan ged, breeding success may be substantially reduced or enhanced. may be necessary. D esign and operational practices may mitigate the impacts of station construction and operation on biota and ecological systems.
Destruction of part or all of a breeding or nursery area may cause population shifts that result in increased competition for the remaining suitable areas. Such population shifts cannot compensate for the reduced size of the breeding or nursery areas if the remaining suitable area is already occup ied by the species. Some species will desert a breeding area because of human activities in proximity to the area, even in the absence of physical disturbance of the actual breeding area.
Of special concern in site selection are those unique or especially rich feeding areas that might be destroyed, degraded, or made inaccessible to important species by station construction or operation.
Evaluation of feeding areas in relation to potential construction or operation impacts includes the following considerations: size of the feeding area on site in relation to the total feeding area off site, food density, time of use, location in relation to other habitats, topography relative to access routes, and other factors (including human activities). Site modification may reduce the quality of feeding areas by destruction of a portion of the food base, destruction of cover, or both.
RG 4.7, Rev. 3, Page 14 Construction and operation of nuclear power stations can create barriers to migration, occurring mainly in the aquatic environment. Narrow zones of passage for migratory animals in some rivers and estuaries may be restricted or blocked by station operation. Partial or complete blockage of a zone of passage may result from the discharge of heat or chemicals to receiving water bodies or the construction and placement of power station structures in the water body. Strong-swimming aquatic animals often avoid waters of adverse quality, but larval and immature forms are usu ally moved and dispersed by water currents. It is therefore important in site selection that the routes and times of movement of the immature stages be considered in relation to potential effects.
Land Use and Aesthetics
Appropriate facility designs and operational practices can mitigate impacts on land use and aesthetic impacts at the site and in the nearby neighborhoods caused by the construction and operation of the plant, transmission lines, and transportation.Aesthetic impacts can be reduced by selecting sites where existing topography and forests can be used to screen station structures from nearby scenic, historical, or recreational resources. Restoration of natural vegetation, creative landscaping, and the integration of structures with the environment can mitigate adverse visual impacts. However, station protection requirements for nuclear safeguards may influence landscape design and clearing of vegetation. The definition of aesthetics needs to include all five senses sin ce land use and aesthetics are interrelated (see Bureau of Land Management, Manual Handbook H-8410- 1, Visual Resource Inventory, issued January 1986 (Ref. 33 ).
Site suitability may be limited by the existence of nearbyestablished public resource areas; prospective designated resource areas; l and use plans adopted by Federal, State, regional, or local agencies; or a esthetic considerations.
Formatted: Normal, Indent: Left: 0.25", Hanging: 0.25",
Another class of impacts involves the preempting of existing land use at the site itself. For Don't add space between paragraphs of the same style example, nuclear power station siting in areas uniquely suited for growing specialty crops may be considered a type of land conversion involving unacceptable economic dislocation. Under 7CFRPart 1491, Farm and Ranch Lands Protection Program (Ref. 34 ), workingagricultural lands are protected from conversion to nonagricultural use. Since power reactor sites under consideration are likely to be in rural areas and potentially under cultivation, this regulation mightapply in determinations of site suitability.
Formatted: Normal, Indent: Left: 1.25", Hanging: 0.25",
Locating a nuclear power station adjacent to lands devoted to public use might be unacceptable to Don't add space between paragraphs of the same style local jurisdictions. In particular, locating a nuclear power station, transmission lines or transportation corridors close to special areas administered by Federal, State, or local agencies for scenic or recreational use mightcause unacceptable impacts regardless of design parameters. Such cases are most apt to arise in areas adjacent to natural -resource-oriented areas (e.g., Yellowstone National Park) as opposed to recreation-oriented areas such as a national park, forest, wildlife refuge, or recreation areas. Some significant historical and archeological sites might also fall into this category.
Formatted: Normal, Indent: Left: 1.25", Hanging: 0.25",
Some areas might be unsuitable for siting a nuclear power station because of public interest in Don't add space between paragraphs of the same style reserving land for future to public scenic, recreational, or cultural use. Relatively rare land types such as sand dunes andlarge wetland a reas are examples. However, the acceptability of sites for nuclear power stations at some future time in these areas will depend on the existing impacts from industrial, commercial, and other developments.
RG 4.7, Rev. 3, Page 15 Socioeconomics
Social and economic issues are important determinants of siting policy. It is difficult both to assess the nature of the impacts involved and to determine value schemes for predicting the level or the acceptability of potential impacts.
The siting, construction, and operation of a nuclear power station might have significant impacts on the socioeconomic structure of a community and might place severe stresses on the local labor supply, transportation facilities, and community services in general. T he tax basis and community expenditures mightchange, and problems might occur in determining equitable levels of compensation for persons relocated as a result of the station siting. It is usually possible to resolve such difficulties by proper coordination with the affected communities; however, some impacts might be locally unacceptable and too costly to avoid by any reasonable program for their mitigationnearby communit ies. However, i t is difficult both to assess the nature of such impacts and to determine value schemes for predicting their level or acceptability.
Certain communities in the neighborhood of a site might be subject to unusual impacts that would be excessively costly to mitigate. Among such communities are towns that possess notably distinctive cultural character (i.e., towns that have preserved or restored numerous places of historic interest, have specialized in an unusual industry or a vocational activity, or have otherwise markedly distinguished themselves from other communities). Sction 4.4.2, Social and Economic Impacts, of NUREG-1555 contains guidance on NRC staff reviews of socioeconomicissues.
Siting decisions should reflect fair treatment and meaningful involvement of all people, regardless of race, ethnicity, culture, income,or educational level,to ensure equitable consideration, including.Decisions should include an analysis to determine whether there are any significant impacts that willwould fall disproportionate ly on minority communities and or low -income communities.The determination of whether a proposed power reactor siting action would disproportionately and adversely affect a minority community or a low-income community mightThis couldinvolve the assembly and analysis of considerable quantitative data. Because o f the depth of the analysis, the environmental justice aspects often rival the length and complexity of the discussion of the general population in the socioeconomics context. Policy Statement on the Treatment of Environmental Justice Matters in NRC Regulatory and Licensing Actions, (69 FR 52040), (Ref. 35 ) andNUREG-1555 contain additional guidance information on NRC staff reviews of environmental justice issues. The NRC policy statement states that the NRC is committed to the general goals of Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations (59 FR 7629)
(Ref. 36) and will strive to meet those go als through its normal and traditional NEPA review process.
Executive Order 12898 requires an agency to analyze disproportionately high and adverse human health or environmental effects of its programs, policies, and activities on minority populations and low -income populations. Executive Order 12898 is not binding upon the NRC as the NRC is an independent regulatory agency. However Executive Order 12898, § 6-604 states that Independent agencies are requested to comply wit h the provisions of this order (emphasis added).
Noise
Noise levels at nuclear stations during both the construction and operation phases could have unacceptable impacts. Cooling towers, turbines, and transformers contribute to the noise levels during station operation.
RG 4.7, Rev. 3, Page 16 Limited Work Authorization
In 2007, the NRC amended 10 CFR 50.10 regarding limited work authorizations (LWAs) to allow certain construction activities to commence before a construction permit or combined operating license is issued (72 FR 57416). In particular, the NRC modified the definition of construction to eliminate (a) preparation of a site for construction (clearing, grading, installation of environmental mitigation measures, construction of temporary roads and borrow areas), (b) excavation,(c) erection of support buildings, and (d) building of service facilities (paved roads, parking lots, railroad spurs, sewage treatment facilities, and trans mission lines).
The activities above, which are considered preconstruction activities are not under the NRCs regulatory jurisdiction and are evaluated as part of the cumulative impact analysis. Cumulative impact is the impact on the environment that results from the incremental impact of the action when added to other past, present, and reasonably foreseeable future actions regardless of what agency (Federal or non-Federal) or person undertakes such other actions. Cumulative impacts can result from individually minor but collectively significant actions taking place over a period of time. The preceding cumulative impact definition appears in the regulations of the Council on Environmental Quality implementing The limited work authorization (LWA) process allows applicants to request approval to perform certain limited construction activities before the issuance of a COL. The regulations in 10 CFR50.10, License required; limited w ork authorization, govern the iss uance of LWAs and specify the information to be included in an LWA application. The regulations clarify that activities defined as construction are those that fall within the NRCs regulatory authority, and require an LWA, because they have a reasonable nexus to radiological health and safety or the common defense and security. A ctivities not considered construction are referred to as preconstruction and may occur without an NRC licensing action.
Consideration of NEPA (40 CFR 1508.7). NRC regulations state that 40 CFR 1508.7 will be used by the NRC in implementing NEPA [10 CFR 51.14(b)]. Specifically, cumulative impacts include those resulting from preconstruction, construction, operation, and decommissioning of the proposed nuclear power plant, and past, present, and reasonably foreseeable future actions regardless of what agency (Federal or non-Federal) or person undertakes such other actions.
Harmonization with International Codes and Standards
The International Atomic Energy Agency (IAEA) has established a series of safety standards works with member states and other partners to promote the safe, secure, and peaceful use of nuclear technologies. The IAEA develops Safety Requirements and Safety Guides for protecting people and the environment.Safety Guides present international good practices to help users striving to achieve high levels of safety. Similar to this regulatory from harmful effects of ionizing radiation. This system of safety fundamentals, safety requirements, safety guides, and other relevant reports, reflects an international perspective on what constitutes a high level of safety. To inform its development of this RG, the NRC considered IAEA Safety Requirements and Safety Guides pursuant to the Commissions International Policy Statement (Ref. 19) and Management Directive and Handbook6.6, Regulatory Guides (Ref.20 ). The following IAEA safety requirements and guides were considered in the development of this guide, :
- IAEA Safety Guide Standards Series, Safety Requirements No. NS -R-3, Site Evaluation for Nuclear Installations, issued 2003 (Ref. 37 ), addressesrecommendations 21 )
- IAEA Safety Standards Series, Safety Guide No. NS -G-1.5, External Events Excluding Earthquakes in the Design of Nuclear Power Plants, issued 2003 (Ref. 22)
RG 4.7, Rev. 3, Page 17
- IAEA Safety Standards, Specific Safety Requirement s No. SSR -1, Site Evaluation for Nuclear Installations, issued 2019 (Ref. 2 3)
- IAEA Safety Standards, Specific Safety Guide No. SSG -18, Meteorological and Hydrological Hazards in Site Evaluation for the collection of information to assess the safety and environmental suitability of a site Nuclear Installations, issued 2011( Ref. 2 4)
- IAEA, Safety Standards, Specific Safety Guide No. SSG -21, Volcanic Hazards in Site Evaluationfor a nuclear installation. The NRC has an interest in facilitating the harmonization of standards used domestically and internationally. Use of this regulatory guide would generally be consistent with the principles and basic safety aspects described in the IAEA safe ty guide on site evaluation. Nuclear Installations, issued 2012 (Ref. 25)
Documents Discussed in Staff Regulatory Guidance
This regulatory guide addresses, in part, the use of one or more codes or standards developed by external organizations, and other third party guidance documents. These codes, standards and third party guidance documents may contain references to other codes, standards or third party guidance documents (secondary references). If a secondary reference has itself been incorporated by reference into NRC regulations as a requirement, then licensees and applicants must comply with that standard as set forth in the regulation. If the secondary reference has been endorsed in a regulatory guide as an acceptable approach for meeting an NRC requirement, then the standard constitutes a method acceptable to the NRC staff for meeting that regulatory requirement as described in the specific regulatory guide. If the secondary reference has neither been incorporated by reference into NRC regulations nor endorsed in a regulatory guide, then the secondary reference is neither a legally -binding requirement nor a generic NRC approved acceptable approach for meeting an NRC requirement. However, licensees and applicants may consider and use the information in the secondary reference, if appropriately justified, consistent with current regulatory practice, and consistent with applicable NRC requirements.
RG 4.7, Rev. 3, Page 18 C. STAFF REGULATORY GUIDANCE
This guide is intended to assist applicants in the initial stage of selecting potential sites for a nuclear power station. Each site that appears to be compatible with the general criteria discussed in this guide should be examined in greater detail before it can be considered a candidate site (i.e., one of the groups of sites to be considered in selecting a proposed or preferred site).
This guide should be used only in the initial stage of site selection because it does not provide detailed guidance on the various relevant factors and format for ranking the relative suitability or desirability of possible sites. It provides a general set of safety and environmental criteria that the NRC staff has found to be valuable in assessing candidate site ide ntification in specific licensing cases.
potential sites. This guide should be used only in the initial stage of site selection, because it does not provide detailed guidance on ranking the relative suitability or desirability of possible sites.Each site that appears to be compatible with the general criteria in this guide should be examined in greater detail before being considered a candidate site (i.e., one of the groups of sites to be considered in selecting a proposed or preferred site). Chapter 9 of RG 4.2 and Chapter 9 of NUREG-1555, as well as Chapter 2 of the Electric Power Research Institute document N o. 3002005435, Site Selection and Evaluation Criteria for an Early Site Permit, issued June 2015 (Ref. 26),discuss the selection of a site from among alternative sites.
- 1. Site selection can be facilitated by establishing limits for various parameters based on the best judgment of specialists knowledgeable about the region under consideration. For example, limits can be chosen for the fraction of water that can be diverted in certain situations without adversely affecting the local populations of important species. Selection from among alternative sites
The applicant should present its site-plant selection process as the consequence of an analysis of alternatives for which environmental costs and benefits were evaluated and compared and then weighed against those of the proposed facility. Ch apter 9 of both RG 4.2 and Although simplistic ( because they do not account for factors such as the distribution of important species in the water body ), such limits can be useful in a screening process for site selection.
- 1. Safety Considerations for Assessing Site Suitability for Nuclear Power Stations
NUREG-1555, discuss the selection of a site from among alternative sites. Chapter 2 of the Electric Power Research Institute (EPRI), Site Selection and Evaluation Criteria for an Early Site Permit, (Ref. 38), also discussesthe selection of sites from among alternatives. The following address the safety and environmental issues to be addressed in site selection.
1.1 Geology and /Seismology
Geologic and seismic characteristics of a site, such as surface faulting, ground motion, foundation conditions (including liquefaction, subsidence, and landslide potential), tectonic and nontectonic deformation, and manmade activities, may affect the safety of a nuclear power station.
1.1.1 Relevant Statutes and Regulations
RG 4.7, Rev. 3, Page 19
- 10 CFR Part 100, Appendix A, Seismic and Geologic Siting Criteria for Nuclear Power Plants
1.1.2 Related Guidance
- RG 1.29, Seismic Design Classificationfor Nuclear Power Plants (Ref. 27), (discusses plant safety features that should be controlled by engineering design)
- RG 1.132, Site Investigations for Foundations of Nuclear Power Plants (Ref. 28)
- RG 1.138, Laboratory Investigations of Soils and Rocks for Engineering Analysis and Design of Nuclear Power Plants (Ref. 29) ;
- RG 1.198, Procedures and Criteria for Assessing Seismic Soil Liquefaction at Nuclear Power Plant Sites (Ref. 30 )
- RG 1.208, A Performance -Based Approach to Define the Site -Specific Earthquake Ground Motion (Ref. 31)
- NUREG- 0800Determination of t he seismic,
- U.S. Department of Energy (DOE) DOE -STD-1020- 2016, Natural Phenomena Hazards Analysis and Design Criteria for DOE Facilities (Ref. 32)
- DOE-HDBK-1220, Natural Phenomena Hazards Analysis and Design Handbook for DOE Facilities (Ref. 33)
1.1.3 Considerations, Regulatory Experience, and Staff Position
Geologic and seismic characteristics of a site, such as surface faulting, ground motion, foundation conditions (including liquefaction, subsidence, and landslide potential), tectonic and nontectonic deformation, and manmade activities, may affect the safety of a nuclear power station. The principal geologic and seismic considerations that guide the NRC in its evaluation of the suitability of a proposed site are set forth in AppendixA to 10CFRPart 50, 10CFR52.17(a)(1)(vi),10 CFR100.23,
and AppendixA to 10CFR Part 100. The NRC identifies safety -related site characteristics in RG 1.206,which deals with COL applications for nuclear power plants. Guidance for addressing these characteristics can be found in RG 1.208; RG 1.132; and RG 1.198.
Where the potential for permanent ground deformation such as faulting, folding, subsidence, collapse, tectonic and nontectonic deformation, and manmade activities exists at a site, the NRC staff considers it prudent to select an alternative site.
Sites should be selected in areas for which an adequate geologic database exists or can be expeditiously developed through site-specific investigations to identify and characterize potential geologic and seismic hazards. The seismic and geologic (and meteorologic,and hydrologic,and geologic
) characteristics of the proposed site should considerbe inferred from the most severe of the natural
RG 4.7, Rev. 3, Page 20 phenomena that have been historically reported for the site and surrounding area and should include sufficient margin to account for the limited accuracy, quantity, and period of time in which the historical data have been accumulated (see 10CFR52.17). RG 1.208 discusses the level of complexity of investigations that are necessary for all sites and design considerations recommended for areas of high earthquake potential, such as sites located near a geologic fault. Because of the uncertainties and difficulties in mitigating the effects of permanent ground displacement phenomena such as surface faulting or folding, fault creep, subsidence or collapse, the NRC staff considers it prudent to select an alternative site when the potential for permanent ground displacement exists at the site.
Sites located near geologic structures for which,at the time of application,the database is inadequate to determine their potential for causing surface deformation (e.g., paleoliquefaction features, possible active faults, poor soil zones, tectonic and nontectonic deformation, manmade activities such as withdrawal or injection of fluids, issues related to mineral extraction, induced seismicity caused by reservoir impoundment) are likely to be subject to a longer licensing process. The longer process mightbe ne eded to allowwere collected and for the possibility that the data are limited in accuracy or quantity. The need for extensive and detailed geologic and seismic investigations of the site and surrounding region and for rigorous analyses of the site-plant combination. can delay licensing. W hen geologic, seismic, and foundation information is questionable, the design of safety -related structures should be conservati ve.
Sites with competent bedrock generally have suitable foundation conditions. In regions with few or no suchIf bedrock sites are not available, it is prudent to select sites in areas known to have low subsidence and liquefaction potential (i.e., sites with competent and stable solid soils, such as dense sands and glacial tills. ).Other materials might also provide satisfactory foundation conditions, but a detailed geologic and geotechnical investigation should be conducted to determine static anddynamic engineering properties of the material underlying the site, in accordance with AppendixA to 10CFRPart 100 and with 10CFR100.23.
1.2 Atmospheric Extremes and Dispersion
The potential effect of natural atmospheric extremes (e.g., tornadoes and hurricanes 5F6 and exceptional icing conditions6F7), regional climatology, and local meteorology7F8 on the safety -related structures of a nuclear station should be considered. Data and studies on longer term weather cycles shouldbe examined because of the potential impact of climate change as it applies to nuclear safety and the environment. Site atmospheric conditions of importance important to site suitability also relate to the calculation of radiation doses resulting from the airborne release of fission products from routine operations, anticipated operational occurrences, and postulated design-basis accidents.
1.2.1 Atmospheric Extreme s
The potential effect of natural atmospheric extremes (e.g., tornadoes,hurricanes,and exceptional icing conditions), regional climatology, and local meteorology on the safety-related structures of a nuclear station should be considered.
- 6. See RG 1.76, Design -Basis Tornado and Tornado Missiles for Nuclear Power Plants (Ref. 39 ) and RG 1.221, Design -Basis Hurricane and Hurricane Missiles for Nuclear Power Plants, (Ref. 40 ).
- 7. See NUREG-0800, Section 2.4.7, Ice Effects.
- 8. See NUREG-0800, Sections 2.3.1, Regional Climatology, and 2.3.2, Local Meteorology.
RG 4.7, Rev. 3, Page 21 1.2.1.1 Relevant Statutes and Regulations
1.2.1.2 Related Guidance
- RG 1.76, Design -Basis Tornado and Tornado Missiles for Nuclear Power Plants (Ref. 3 4)
- RG 1.221, Design -Basis Hurricane and Hurricane Missiles for Nuclear Power Plants (Ref. 35 )
- NUREG- 0800
1.2.1.3 Considerations, Regulatory Experience, and Staff Position
NUREG- 0800, Section 2.3.1, Regional Climatology, contains the NRC staffs review procedures for examination of examining the long-term weather cycles, such as 100-year return periods for extreme weather conditions such as (e.g.,winter precipitation,), maximum wind speed, and temperatures, that define a sites meteorological characteristics. A minimum 30 -year weather record should be considered in an
Anevaluation of the water requirements for the ultimate heat sink should consider a minimum 30- year weather record.The applicability of these and other climatological data to represent site conditions during the expected period of reactor operation should be substantiated.. The applicability of these and other climatological data to represent site conditions during the expected period of reactor operation should be substantiated. Current literature on possible changes in the weather in the site region should also be reviewed to be confident that the methods used to predict weather extremes are reasonable. However, the atmospheric
Data and studies on longer term weather cycles should be examined because climate change may affect nuclear safety and the environment.
Atmospheric extremes that may occur at a site should be considered, even though the extremesthey are not normallynecessarily critical in determining the suitability of a site becausesuitability, sincesafety -related structures, systems, and components (SSCs) can be designed to withstand most atmospheric extremes (with associated site-specific costs. ).Current literature on possible weather changes in the site region should also be reviewed to confirm that the methods used to predict weather extremes are reasonable.
In the evaluation of potential sites, available atmospheric data for the area should be considered.
Canyons or deep valleys frequently have atmospheric variables that are substantially different from those variables measured for the general region. Other topographical features such as hills, mountain ranges, and lake or ocean shorelines can affect the local atmospheric conditions at a site and can cause the dispersion characteristics at the site to be less favorable than those in the general area or region. More stringent design or effluent objectives might be required in such cases.In s ome areas, local atmospheric
RG 4.7, Rev. 3, Page 22 conditions cause inversion, which severely limit local atmospheric dispersion capabilities. Therefore, the likelihood of inversion due to local conditions should be considered in siting of a nuclear power plant.
Nonradiological atmospheric considerations, such as local fogging and icing, cooling tower drift, cooling tower plume lengths, and plume interactions between cooling tower plumes, as well as plumes from nearby industrial facilities, should be considered in evaluating the suitability of potential sites.
Consideration should be given to evaluating fogging and icing induced by nuclear power plants and the physical and aesthetic impacts of cloud formation, cloud shadowing, additional precipitation, and increased ground-level humidity. Vapor plumes from heat-dissipation systems may have physical or aesthetic impacts due to the increased moisture and chemical content of the air, the nature and extent of these increases, and the significance of their potential environmental impacts to mans activities in the site vicinity. If a potential impact is judged tobe significant, the site selection for the proposed facility should provide a basis for evaluating appropriate mitigation measures or alternative heat -transfer-system designs.
It should include prediction and assessment of the following:
Formatted: Indent: Left: 0.5", Hanging: 0.25", Don't add
- length and frequency of elevated plumes space between paragraphs of the same style, Adjust space between Latin and Asian text, Adjust space between Asian text and numbers
1.2.2 Atmospheric Dispersion
The atmospheric characteristics at a site are an important consideration in evaluating the dispersion of radioactive effluents from both postulated accidents and routine releases in gaseous effluents.
Radiation doses associated with airborne radioactive ma terials from routine releases and anticipated operational occurrences must be ALARA and must comply with effluent concentration limits. In addition to meeting the NRC requirements for the dispersion of airborne radioactive material, the station must meet t he State and Federal requirements of the Clean Air Act.
1.2.2.1 Relevant Statutes and Regulations
- 10 CFR Part 52frequency and extent of ground level fogging and icing in the site vicinity Formatted: Indent: Left: 0.75", Bulleted + Level: 1 +
Aligned at: 2.25" + Indent at: 2.5", Adjust space between
- solids deposition (e.g., drift deposition) in the site vicinity Latin and Asian text, Adjust space between Asian text and numbers
- cloud formation, cloud shadowing, and additional precipitation
- interaction of the vapor plume with existing pollutant sources located within 2
- 10 CFR Part 20, Standards for Protection a gainst Radiation, Appendix B,Annual Limits onIntake (ALIs) and Derived Air Concentrations (DACs) of Radionuclides for Occupational Exposure; Effluent Concentrations; Concentrations for Release to Sewerage
- 10 CFR 20.1301, Dose limits for individual members of the publi c
- 10 CFR 20.1302, Compliance with dose limits for individual members of the public
- 10 CFR 20.1101, Radiation protection programs, on keeping doses to members of the public from airborne effluent releases ALARA
RG 4.7, Rev. 3, Page 23
- 10 CFR 50.34a, Design objectives for equipment to control releases of radioactive material in effluents nuclear power reactors
- 10CFRPart 50, Appendix I, Numerical Guides for Design Objectives and Limiting Conditions for Operation to Meet the Criterion As Low as i s Reasonably Achievable for Radioactive Material in Light-Water-Cooled Nuclear Power Reactor Effluents
- 40 CFR Part 190, Environmental Radiation Protection Standards for Nuclear Power Operations (Ref. 36)
1.2.2.2 Related Guidance
- RG 1.23, Meteorological Monitoring Programs for Nuclear Power Plants (Ref. km of the plant
- ground level humidity increase in the site vicinity.
A cooling system designed with special consideration for reducing drift might be needed because of the sensitivity of the natural vegetation or the crops in the vicinity of the site to damage from airborne salt particles. The vulnerability of existing industries or other facilities in the vicinity of the site to corrosion by drift from cooling tower or spray system drift should be considered. Not only are the amount, direction, and distance of the drift from the cooling system important, but the salt concentration above the natural background salt deposition at the site is also important in assessing drift effects. S pecial cooling system design requirements or the need for a larger site to confine the effects of drift within the site boundarymay be needed to address salt drift.The environmental effects of salt drift are most severe where saline water or water with high mineral content is used for condenser cooling.
- 2. Exclusion Area and Low-Population Zone
An applicant for a reactor license is required by 10CFR Part 100 to designate an exclusion area and to have authority to determine all activities within that area, including removal of personnel and property. Transportation corridors such as highways, railroads, and waterways are permitted to traverse the exclusionarea provided (1) these are not so close to the facility as to interfere with normal operation of the facility and (2) appropriate and effective arrangements are made to control traffic on the highway, railroad, or waterway in the case of emergency to protect public health and safety.
According to 10CFR50.34(a)(1)(ii)(D)(1), 10 CFR 52.17(a)(1)(ix)(A) and 10CFR 52.79(a)(1)(vi)(A),the exclusion area must be of such a size that an individual assumed to be located at any point on its boundary would not receive a radiation dose in excess of 25 rem TEDE over any 2-hour period following a postulated fission product release into the containment.
- 37)
- RG 1.145, Atmospheric Dispersion Models for Potential Accident Consequence Assessments at Nuclear Power Plants (Ref. 38)
- RG 1.109, Calculation of Annual Doses to Man from Routine Releases of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50, Appendix I (Ref. 3 9)
NUREG- 0800, Section 2.3.3, Onsite Meteorological Measurements Programs, and Formatted: Normal, Indent: Left: 0.25", Hanging: 0.25"
RG 4.7, Rev. 3, Page 24 The regulations in 10CFR Part 100 also require an applicant to designate an area immediately beyond the exclusion area as anLPZ. The size of the LPZ must be such that the distance to the nearest boundary of a densely populated center containing more than about 25,000 residents (population center distance) must be at least one-and-one-third times the distance from the reacto r to the outer boundary of the LPZ. The boundary of the population center should be determined based on population distribution, not political boundaries.
According to 10CFR50.34(a)(1)(ii)(D)(2), 10CFR 52.17(a)(1)(ix)(B) and 10CFR 52.79(a)(1)(vi)(B),the LPZ must be of such a size that an individual located on its outer radius for the course of the postulated accident would not receive a radiation dose in excess of 25 rem TEDE.
- Technical requirements for an ESPfor a proposed sit e are contained in10CFR52.17.
The technical contents for a combined license (COL) are specified in 10 CFR 52.79.
Requirements for site location, facility location within the site, population considerations, and location of nearby facilities (as it relates to postulated releases in the event of an accident) should be evaluated according to the provisions of 10 CFR 52.17 for an ESP and 10CFR52.79for a COL. For large light water reactors, Section 15.0.3, Design Basis Accident Radiological Consequences of Analyses for Advanced Light Water Reactors, of NUREG- 0800, and
- RG 1.183, Alternative Radiological Source termsTerms for Evaluating Design Basis Accidents at Nuclear Power Plants, ( Ref. 41 ) provide useful information on the design basis accident radiological consequences analyses performed to show compliance with the siting dose requirements for the EAB ( ExclusionArea Boundary) and LPZ. (Ref.
40)
- 3. Population Considerations
As stated1.2.2.3 Considerations, Regulatory Experience, and Staff Position
The atmospheric conditions at a site should provide sufficient dispersion of radioactive materials released during a postulated accident to reduce the radiation exposures of individuals at the exclusion area and LPZ boundaries to the values in 10 CFR50.34, Contents of a pplications; technical information ; 10 CFR52.17, Contents of a pplications ; and 10CFR52.79, Contents of a pplications; technical i nformation.
The atmospheric conditions at a site should also be characterized to appropriately model dispersion of radioactive materials from airborne release of fission products during routine operations and anticipated operational occurrences, to show compliance with the effluent concentration limits of Appendix B to 10 CFR Part 20 and with dose limits for members of the public under 10 CFR 20.1301 and 10 CFR20.1302.
The concentration of radioactive materials in the atmosphere downwind from a release source is determined using an atmospheric dispersion factor known as a /Q value or relative concentration factor. It is defined as the airborne concentration (in curies per cubic meter) at the downwind location of interest,divided by the rate of release of radioactive materials from the source, Q (in curies per second). A similar term, the atmospheric deposition factor or D/Q value, is used to determine the rate of ground-level deposition at a downwind location of interest. It is defined as the rate of ground-level deposition D (curies per square meter per second) at the downwind location of interest,divided by the rate of release of radioac tive materials from the source,Q. It
RG 4.7, Rev. 3, Page 25 has become common to evaluate /Q and D/Q values because they depend only on atmospheric variables, distance from the source, radionuclide chemical and physical characteristics, and whether airborne releases occur from a single plant stack or through multiple building vents or plant stacks. If the dispersion of radioactive material released following a design -basis accident is insufficient at the boundary of the exclusion area (see Section C.1.3 of this RG ) or at the outer boundary of the LPZ, the plant design will not satisfy the requirements in 10CFR 50.34(a)(1). In this case, the design will be required to include appropriate and adequate compensating engineered safety features. In addition, meteorological conditions are to be determined (1) for use in the environmental report required by 10 CFR Part 51, (2) for verification of the criteria in the design control document for a certified plant design, and (3) for use in demonstrating that airborne radiological effluent release limits can be met for any individual located off site,as required by 10 CFR 100.21( c)(1).
RG 1.23 describes atmospheric data that the staff considers acceptable for the required assessment of the potential dispersion of radioactive material. NUREG- 0800, Section 2.3.3, describes the NRC staffs review procedures for onsite meteorological measurements programs.
h), ReactorEvaluations of potential sites should be located away from very densely populated centers. Areas of consider available atmospheric data for the local site area. Atmospheric variables for canyons or deep valleys often differ substantially from those measured for the general region. Other topographical features,such as hills, mountain ranges, and lake or ocean shorelines, can affect the local atmospheric conditions at a site and can cause the dispersion characteristics at the site to be less favorable than those in the general region. Such case s might require more stringent design or effluent objectives. In some areas, local atmospheric conditions cause inversion, which severely limits local atmospheric dispersion capabilities. Therefore, siting decisions should consider the likelihood of invers ion due to local conditions.
Engineered safety features can compensate for unfavorable, safety -related design-basis atmospheric dispersion characteristics. Accordingly, the regulatory position on atmospheric dispersion of radiological effluents is also incorporated in to S ection C.1.3 of this RG.
1.3 Exclusion Area and Low Population Zone
In the event of a postulated accident at a nuclear power station, radiological consequences for individual members of the public outside the station must be acceptably low.To achieve this goal, it is critical to define exclusion areas and LPZs around the station.A reactor licensee is required to designate an exclusion area and to have authority to determine all activities within that area, including removal of personnel and property. In selecting a site for a nuclear power station, it is necessary to provide for an exclusion area in which the applicant has such authority. A reactor licensee is also required to designate an area immediately surrounding the exclusion area as anLPZ.The s ite selection process should account for this as well.
1.3.1 Relevant Statutes and Regulations
- 10 CFR Part 50, Appendix E, Emergency Planning and Preparedness for Production and Utilization Facilities
RG 4.7, Rev. 3, Page 26 1.3.2 Related Guidance
- RG 1.183 (which gives calculation methods )
- NUREG- 0800, Section 2.1.2, Exclusion Area Authority and Control
1.3.3 Considerations, Regulatory Experience and Staff Position
The regulations in 10CFR Part population density are, generally, preferred. However, in determining the acceptability of a particular site located away from a very 50 and 10 CFR Part 52 require that, at any point on the exclusion area boundary and on the outer boundary of the LPZ, the exposure of an individual to a postulated release of fission products (as a consequence of an accident) be less than 25rem total effective dose equivalent, for time periods specified in the regulations.
The regulations in 10CFR 100.21(a) require an exclusion area surrounding the reactor, in which the reactor licensee has the authority to determine all activities, including exclusion or removal of personnel and property.Transportation corridors such as highways, railroads, and waterways are permitted to traverse the exclusion area,provided that (1) these are not so close to the facility as to interfere with normal operation of the facility,and (2) in case of emergency, appropriate and effective arrangements are made to control traffic on the highway, railroad, or waterwayin order to protect public health and safety.
A reactor licensee is also required by 10 CFR 100.21(a) to designate an area immediately surrounding the exclusion area as anLPZ. The size of the LPZ must be such that the distance from the reactor to the boundary of the nearest densely populated center containing more than about 25,000 residents is at least oneand one-third times the distance from the reactor to the outer boundary of the LPZ. The boundary of the population center is determined by population distribution, not political boundaries.
In accordance with 10CFR 50.34(a)(1)(ii)(D)(1),but not in an area of low density, consideration will be given to safety, environmental, economic, or 10 CFR 52.17(a)(1)(ix)(A), and 10CFR52.79(a)(1)(vi)(A), the exclusion area is required to be of such a size that an individual located at any point on its outer boundary would not receive a radiation dose above 25rem total effective dose equivalent (TEDE) over any 2-hour period following a postulated fission product release. The required exclusion area size depends on the atmospheric characteristics of the site,as well as on plant design.
In accordance with 10 CFR 50.34(a)(1)(ii)(D)(2), 10 CFR 52.17(a)(1)(ix)(B),and 10CFR52.79(a)(1)(vi )(B), the LPZ is required to be of such a size that an individual located on its outer boundary during a postulated accident would not receive a radiation dose above 25 rem TEDE.
The required LPZ size depends on the atmospheric dispersion characteristics and population characteristics of the site, as well as on plant design.
The regulations in 10 CFR 52.17for ESPs and 10 CFR52.79for COLs require an applicants final safety analysis report to include information on site location, the facility location on the site, population characteristics, locations of nearby facilities, postulated releases in the event of an accident, and other technical factors, which may result in the site being found acceptable..
NUREG- 0800, Sections 2.1.1 and Section 2.1.2, and RG 1.206, Section C.I.2, describe the NRC staffs review procedures for the site location, description, and exclusion area authority and con trol.
RG 4.7, Rev. 3, Page 27 Based on the assumptions in the design-basis accident radiological consequence analyses, the required distances to the exclusion area boundary and the outer boundary of the LPZ will depend on aspects of the plant design, such as the reactor power level, allowable containment leak rate, and engineered safety features, as well as the atmospheric dispersion characteristics of the site.
RG 1.183 specifies the fractional releases of radiological groups from the core inventory, the timing of the releases, their composition, and the chemical form of the design-basis accident source term.
1.4 Population Considerations
Locating reactors away from densely populated centers is part of the NRCs defense-in-depth philosophy and facilitates emergency planning and preparedness, as well as reducesreducing potential doses and property damage in the event of a severe accident.
1.4.1 Relevant Statutes and Regulations
1.4.2 Related Guidance
- RG 1.206, Section C.I.2
- NUREG-0800, Section 2.1.3, P opulation D istribution
- American National Standards Institute/American Nuclear Society (ANSI/ANS) standard ANSI/ANS-2.6-2018, Standard Guidelines for Estimating Present & Projecting Future Population Distributions Surrounding Power Reactor Sites (Ref. 41)
1.4.3 Considerations, Regulatory Experience,and Staff Position
As stated in 10 CFR 100.21(h), reactors are to be located away from very densely populated centers; areas of low population density are generally preferred. In addition, 10 CFR 100.21(h) states that, for a site located away from a very densely populated center but not in an area of low density, acceptability will be determined after consideration of safety, environmental, economic, and other factors.
Locating reactors away from densely populated centers is part of the NRCs defense-in-depth philosophy and facilitates emergency planning and preparedness, as well as reducing potential doses and property damage in the event of a severe accident. Numerical The numerical values in this guide are generally consistent with past NRC practice and reflect considerat ion of severe accidents, as well as the demographic and geographic conditions characteristic of the United States.
AANSI/ANS-2.6-2018provides i nformation on performing population counts and estimat ing future population.
Preferably, a reactor should be located so that, at the time of initial plantsite approval within and for about 5years thereafter, the population density, including weighted transient population, averaged
RG 4.7, Rev. 3, Page 28 over any radial distance out to 20 mi miles (cumulative population at a distance divided by the circular area at that distance), does not exceed is at most 500 persons per square mile. A reactor should not be located at a site where the population density is well in excess of this value. A reactor should not be located at a site where the population density is well in excess of this value.
If the population density of the proposed site exceeds, but is not well in excess of, the above preferred value, the analysis of alternative sites should pay particular attention to alternative sites with lower population density. However, consideration of other Other factors, such as safety, environmental, or economic concernscharacteristics, may result in render the site with the higher population density being found acceptable. Examples of such factors include, but are not limited to, the For example, the site with higher population density site havingmay have superior seismic characteristics, better rail or highway access, or sh orter transmission line requirements, or construction there may have less environmental impact on undeveloped areas, wetlands, or endangered species.
The transientTransient population should be included for those sites where many people (other than those just passing through the area) work, reside part - time, or engage in recreational activities but are not permanent residents of the area. The transient population should be considered for site evaluation purposes by weightingCalculations should weight members of t he transient population according to the fraction of time that the transients arethey spend in the area.
PopulationAs noted above, populationdata should be estimated in relation to for the time of initial plant approval, as noted above..Population projections should be considered over throughthe lifetime of the facility. This is consistent with RS -002, Section 2.1.3. Further should be considered,with further population projections should be made by decade for a 40- year period beyond the start of power plant operation,as described in Section I.2.1.3, Population Distribution, of RG 1.206.
ProjectedFor an ESP, it should be assumed that plant approval occurs at the end of the term of the permit.
Evaluations of the proposed site and any alternative sites considered should include projected changes in population within about 5years after initial plant approval should be evaluated for the proposed site and any alternative sites considered..Popula tion growth in near the sitevicinity after initial plant approval is normal and expected and should be periodically be factored into the emergency plan for the site, but population increases after initial plant approval should not be a factor in license renewal or, by itself,themselves, be used to impose other license conditions or restrictions on an operating plant.
1.41.5 Emergency Planning
As stated in 10 CFR100.21(g), Physical characteristics unique to the proposed site that could pose a significant impediment to significantly impede the development of emergency plans must be identified.
The regulations in.
1.5.1. Relevant Statutes and Regulations
- 10CFR50.47(a)(1) (i) require a reasonable assurance finding that adequate protective measures can and will be taken in the event of a radiological emergency before the NRC can issue an operating lice nse for a nuclear power plant. Part 52
RG 4.7, Rev. 3, Page 29
- To provide consistency with 10 CFR 52.17(b)(2)(ii), the DOE Report on Lessons Learned from the NP 2010 Ea rly Site Permit Program (Ref. 10 CFRPart 100
1.5.2 Related Guidance
- NUREG- 0654/FEMA-REP-1, Revision 242 ) and the Vogtle ESP, Safety Evaluation Report (Ref. 43 ), an applicant considering a proposed site that is contiguous with an existing NPP site should integrate the emergency plans for that site with the existing power plant. For green-field siting of nuclear power plants, emergency plans for one or more react ors should be considered (see Supplement 2 to NUREG- 0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, issued December 2019(Ref. 42 ) : Criteria for Emergency Planni ng in an Early Site Permit Application (Ref. 44 ), and guidance in Section 13.3, Emergency Planning, of Review Standard RS-002.
- NUREG/CR-7002, Revision 1,Criteria for Development of Evacuation Time Estimate Studies, issued February 2021(Ref. 43 )
- DOE, Report on Lessons Learned from the NP 2010 Early Site Permit Program, dated March 26,2008 (Ref. 4 4)
- NRC, Vogtle ESP Final Safety Evaluation Report, dated February 5, 2009(Ref. 45)
- Final Safety Evaluation Report for the Early Site Permit Application for the Clinch River Nuclear Site, June, 2019 (Ref. 46).
1.5.3 Considerations, Regulatory Experience, and Staff Position
According to 10 CFR 100.21(g), physical characteristics unique to the proposed site that could pose significant impediment to the development of emergency plans must be identified.
The regulations in 10 CFR 52.17(b)(1) require an ESP applicants safety a nalysis report to identify physical characteristics of the proposed site, such as egress limitations from the area surrounding the site, that could significantly impede the development of emergency plans. For siting purposes, it suffices for an applicant t o identifyany physical characteristics that could pose a significant impediment, primarily to ensure that a range of protective actions for emergency workers and the public can be developed for the plume exposure pathway emergency planning zone.
Additionally, under 10 CFR 52.17(b)(1), if physical characteristics are identified that could significantly impede the development of emergency plans, the application must identify measures whose implementation would mitigate or eliminate the impediment. The impact on emergency planning is reviewed under 10 CFR 52.18, Standards for review of applications.
The areaunder consideration should be the larger of the plume exposure pathway emergency planning zone and the LPZ. 8F9 The site and its vicinity, including the population distribution and transportation routes, should be examined and evaluated to determine whether there are any
9 If an emergency planning zone size has not been determined at the time of application, then the site and vicinity under consideration is the LPZ.
RG 4.7, Rev. 3, Page 30 characteristics that would pose a significant impediment to taking significantly impede actions to protect the public in an emergency. As authorized in 10CFR 52.17(b)(2)(ii), a proposed site that is contiguous with an existing nuclear power plant site should be evaluated for the complete and integrated emergency plans that would be necessary for construction and operation of one or more reactors at the proposed site.
For green-field siting of nuclear power plants,Other factors important for emergency plans for one or more reactors should be evaluated (see Ref s.42 and 44 ).
Special population groups, such as those in also be addressed when identifying significant impediments to the development of emergency plans; these include the availability of adequate shelter facilities, local building practices and land use (e.g., outdoor recreation facilities, including camps, beaches, and hunting or fishing areas), and the presence of large institutional or other special needs populations (e.g., schools, hospitals, nursing homes, prisons, schools,or other facilities, that could have special needs during an emergency should be identified. ).
Physical characteristics of the proposed site that could pose a significant impediment to taking protective measures, such as egress limitations from the area surrounding the site, should be identified.
The DOEs Report on Lessons Learned from the NP 2010 Early Site Permit Program and the NRCs Vogtle ESP Final Safety Evaluation Report and Final Safety Evaluation Report for the Early Site Permit Application for the Clinch River Nuclear Site document recent emergency planning experience.
An evacuation time estimate (ETE) must be made for the time that would be required to evacuate various sectors of the plume exposure EPZ, including the entire EPZ. may be used to identify favorable and unfavorable physical characteristics.The ETE analysis is an emergency planning tool that systematically assesses, in an organized and systematic fashion,the feasibility of taking protective measures for the population in the surrounding area. NUREG /CR 7002, Criteria for Development of Evacuation Time Estimate Studies, ( Ref.45 ) gives information on performing an ETE analysis. The population. Its value of the ETE analysis lies in the methodology required to performused for the analysis rather than in the calculated ETE times. ETE s.While lower ETEs mightmay reflect favorable site characteristics from an that are favorable for emergency planning standpoint, the regulations do not specify, there is no requirement for an applicant to meet a minimum required evacuation ti me that an applicant must meet..NUREG/CR -7002, Revision 1, gives information on performing ETE analyses for new reactors and ESPs.
1.6 Security
Formatted: A Level 4.1.4 Security Formatted: List Paragraph, Indent: Left: 0", Hanging:
0.25", Outline numbered + Level: 2 + Numbering Style: 1, 2, Applicants should analyze whether potential sites are suitable for the development and implementation of 3, + Start at: 4 + Alignment: Left + Aligned at: 0" +
Indent at: 0.31" security plans, and whether site characteristics may adversely affect response activities related to security Formatted: Don't keep with next operations.
1.6.1 Relevant Statutes and Regulations
RG 4.7, Rev. 3, Page 31
- 10 CFR Part 73, Physical Protection of Plants and Materials (Ref. 47 )
1.6.2 Related Guidance
- NUREG- 0800
1.6.3 Considerations, Regulatory Experience, and Staff Position
The applicant should perform an analysis of analyze site characteristics and hazards to determine and identify ifwhether adequate security plans and measures can be developed to prevent radiological sabotage. T herefore, theThe characteristics and hazards of natural,featuresand of existing,or proposed man-madeprojected manmade features at or located in proximity tonear a proposed site should not preclude development of adequate security plans,and will should not adversely affect the proposed site sprevent security operations with regard tofrom meeting NRC requirements (see also 10 CFR Part 73, Physical Protection of Plants and Materials, (Ref. 4 6).).
ESP applicants must comply with 10 CFR 52.17(a)(1)(x) and 10CFR100.21(f), which specifyrequire that site characteristics must be such thatallow for the development of adequate security plans and measurescan be developed..NUREG- -0800, Section 13.6.1 and 13.6.3 related to the, Physical Security of Combined License and Operating Reactors, and Se ction 13.6.3, Physical SecurityEarly Site Permits respectively,Permit and Reactor Siting Criteria, address in part: the location of transportation routes (e.g., rail, water, and roads), pipelines, airports, hazardous material facilities, and pertinent environmental features that should be considered for the implementation of whose effects on security plans and for potential adverse impacts for response activities related to security operationsshould be considered.
- 5. HydrologyHydrology
1.7 8.
Hydrologic site suitability criteria relate to potential flooding hazards, safety-related water supply, and radionuclide transport.
1.7.1 Flooding
Potential sites should be examined for suitability with respect to flooding hazards. The number and types of flood-causingphenomena, flooding mechanisms,and floodingha zards to consider will depend on the site. The potential for site -scale flooding due to intense local precipitation affect s all sites. Sites near streams or rivers may be affected by riverine flooding due to rainfall or snowmelt, dam failure, river blockage, or channel diversion. Sites near lakes, reservoirs, estuaries, or oceans may be affected by storm surge s, seiches, or tsunami s. Where applicable, t he potential for f looding events due to the combined effects of multiple flooding mechanisms (e. g., rainfall with snowmelt, rainfall with dam fai lure, storm surge with wind waves and tides) should be considered.
1.7.1.1 Relevant Statutes and Regulations
RG 4.7, Rev. 3, Page 32
1.7.1.2 Related Guidance
- RG 1.59, Design Basis Floods for Nuclear Power Plants (Ref. 48)
- RG 1.206, Section C.I.2.4, Floods
- ANSI/ANS-2.8-2019, Probabilistic Evaluation of External Flood Hazards for Nuclear Facilities (Ref. 49)
- DOE-STD-1020
- DOE-HDBK-1220
1.7.1.3 Considerations, Regulatory Experience, and Staff Position
The regulations in 10CFR 100.10 and 10CFR100.20, both titled Factors to be considered when evaluating sites, outline t he physical characteristics to consider when evaluating site suitability.
The regulations in 10 CFR 100.23 require determination of the size of seismically induced floods and water waves that could affect a site from either locally or distantly generated seismic activity,
while 10 CFR 100.21requires that the physical site characteristics, including non-seismic flood hazards,be evaluated and site parameters established.
RG 1.59describes an acceptable method for determining the design -basis floods for sites along streams or rivers and discusses the phenomena producing comparable design -basis floods for coastal, estuary, and Great Lakes sites. This method accounts for sea level rise and other global climate change effects.
It is generally possible to control the effects on station safety functions of a probable maximum flood (as defined in RG 1.59), seiche, surge, or seismically induced flood (such as might be caused by a dam failure or tsunami) through engineering design or protection of the safety-related SSCs identified in RG 1.29.
RG 1.206 and NUREG-0800, Section 2.4,describe how the NRC staff will review design -basis flooding and flood mechanisms at power reactor sites.
ANSI/ANS-2.8-2019, DOE-STD-2020, and DOE -HDBK-1220give more information on estimating flooding hazards.
Water AvailabilityTo evaluate sites located in river valleys, on flood plains, or along coastlines where there is a potential for flooding,RG 1.59 and RG 1.206, Section C. I.2.4 Hydrologic Engineering present acceptable analytical techniques for evaluating seismically and non -seismically induced flooding.
1.7.2 8.2 Water Availability
RG 4.7, Rev. 3, Page 33 1.7.2.1 Relevant Statutes and Regulations
1.7.2.2 Related Guidance
RG 1.27, Ultimate Heat Sink for Nuclear Power Plants (Ref.
- A 50)
- NUREG- 0800
1.7.2.3 Considerations, Regulatory Experience, and Staff Position
A safety-related water supply is required for normal or emergency shutdown and cooldown, and for fire protection.
It should be shown that a highly dependable system of water supply sources shouldbe shown to be is available during under postulated occurrences of natural phenomena and site-related accidental phenomena,or combinations of such phenomena,as discussed in RG 1.59.
Nuclear power plants must have sufficientRG 1.27 provides guidance onwater available and acquirablesupplyfor cooling during plant operation and normal shutdown, for the ultimate heat sink, and for fire protection. A highly dependable system of water supply sources shouldbe shown to be available for postulated occurrences of natural and site-discusses the related accident phenomena as discussed in RG 1.59. safety requirements.
NUREG- 0800, Section2.4.1, Hydrologic Description, notes that the applicant should identify the sources of hydrometeorological and stream flow data for determination of used to determine that an adequate water supply exists for safety--related SSCs shouldbe identified..
NUREG- -0800, Section 2.4.4, Potential Dam Failures, describes NRC staff revie w procedures forrelated to potential loss of water supply due to dam failures and the effect effects of this loss on safety-related SSCs.
To evaluate the suitability of sites For a site to be suitable, there shouldmust be reasonable assurance that the applicant can obtain, from the appropriate State, local, or regional agency, permits for consumptive use of water use and for water consumption in the quantities needed for a nuclear power plant operation forof the stated approximate capacity and type of cooling from the appropriate State, local, or regional agency, in accordance with the agencys programs and policies, which may incorporatesystem.
For both safetyand administer applicable Federal policies. Where required by law, demonstration of a request for certification of the rights to withdraw or consume water and an indication
RG 4.7, Rev. 3, Page 34 that the request is consistent with appropriate State, local,and regional programs and policies are to be provided as part of the application for a construction permit,operating license, ESP or combined license.
The suitability of sites for a specific plant design in areas with a complex ground water hydrology, or of sites located over aquifers that are or may be used for domestic or industrial water supplies or for irrigation water, can be determined only after the potential impacts of the reactor on the ground water have been reliably assessed. Site environmental parameters, which include hydrological and meteorological characteristics, should be comparable to those used in the plant probabilistic risk assessment and environmental analysis.
Although management of the quality of surface waters is important, water quality is not generally a determining factor in assessing the suitability of a site since adequate design alternatives can be developed to meet FWPCA requirements and the Commissions regulations implementing NEPA. The following are examples of potential environmental effects of station construction and operation that should be assessed: physical and chemical environmental alterations in habitats of important species, including plant-induced rapid changes in environmental conditions; changes in normal current direction or velocity of the cooling water source and receiving water ; scouring and siltation resulting from construction and cooling water intake and discharge; alterations resulting from dredging and spoil disposal; and interference with shoreline proce sses.
The availability of essential water during periods of low flow or low-water level and the ability to meet flow requirements is an important initial consideration forenvironmental reasons,when identifying potential sites on rivers, small shallow lakes, or coastlines, it is important to consider whether essential water will be available and flow requirements can be met during periods of low flow or low water level. Both the frequency and duration of periods of low flow or low water level should be determined from the historical record and, if the coolin g water is to be drawn from impoundments, for projected operating practices. along coastlines for both safety and environmental reasons. Both the frequency and duration of periods of low flow or low water level should be determined from the historical re cord and, if the cooling water is to be drawn from impoundments, for projected operating practices. If stream flow records do not cover a sufficiently long period to encompass major droughts or the probable minimum flow for the region, statistical techniques or numerical models may be used to extend and complement the period of record and in order to identify the expected minimum low flow for the region. The U.S.
Geological Survey 7Q10 calculation is an accepted screening -level method offor estimating potential low--flow conditionconditions from regional stream flow historical records. This statistical method identifies the lowminimumvalue as the lowest 7 -day average flow in a 10- year period. If the 7Q10 is too low to supply adequate water for the plant, then other sources of water for nonsafety-related and safety-related structures and ultimate heat sink requirements would need to be identified. See Bedient,et al.,. (Ref. 4751 ) and Riggs et al.,(Ref. 48 ) for 52) provide hydrologic frequency analysis applied toof regional stream gauges with sufficient record lengths to represent expected minimum flows.
If applicable, potential sources of cooling water should also be screened by their capacity to meet intake flow limitations specified in CWA 316(b) as implemented in 40 CFR Parts 9, 122, 123, 124 and 125 (EPA NPDES: Regulations Addressing Cooling Water Intake Structures for New Facilities; 66 FRN 65256) which sets forth criteria based on type of water body in order to reduce environmental impact.
8.3 Water Quality Formatted: Font: Not Italic
The potential impacts of nuclear power stations on water quality are likely to be acceptable if Formatted: Normal, Indent: Left: 0.5", Don't add space effluent limitations, water quality criteria for receiving waters, and other requirements between paragraphs of the same style
RG 4.7, Rev. 3, Page 35 promulgated pursuant to the FWPCA are applicable and satisfied. The applicant should also determine whether there are other relevant regulations current at the time sites are under consideration.
Formatted: Normal, Indent: Left: 0.25", Hanging: 0.25",
The NRC staff will use the criteria in 10 CFRPart 20 and 10 CFRPart 50 to determine permissible Don't add space between paragraphs of the same style concentrations of radioactive materials discharged to surface water or to ground water. Appendix I to 10CFRPart 50 provides guidance on the requirements for design objectives and technical specification for limiting conditions for operationfor light -water-cooled nuclear power stations.
8.4 Radionuclide Retention and Transport Formatted: Font: Not Italic Formatted: Indent: Left: 0.56", Hanging: 0.19", Don't add As speci fied in 10 CFR100.20( c),t he si tes physical cha racteristics (i ncluding seismology, space between paragraphs of the same style meteorology,geolo gy,and hydr ology) must be conside red w hen determining i ts accep tabilit y for Formatted: Normal, Indent: Left: 0.5", Don't add space a nuclear pow er r eactor. S pecial pr ecautionshouldbe planned if a r eact or is t obe loca ted at a si te between paragraphs of the same style where a si gnificant quantityof radioactive e ffluent might f ind r eady accesst oground water. 10 CFR 100.20(c)(3) stipulates that factors important to hydrological radionuclide transport (such as soil, sediment, and rock characteristics, adsorption and retention coefficients, ground water velocity, and distances to the nearest surface body of water) must be obtained from on-site measurements. Tosa tisfyt he hy dr ologic r equirements of 10CF R Pa rt 100, applican ts shoul d verify ground-water conditions at a pr oposedsi te and how those condi tions w ill be a ffect ed by the cons tructionand ope rationof a nuclear pow er plan t. Meeting this r equirement pr ov ides a level of assurance t hat g roundw ater at or near the site of a nuclear pow er plan t will not be significantly affected byt he r elease of r adioactive e ffluent s f rom the plan t.
Formatted: Normal, Indent: Left: 0.31", Hanging: 0.19",
To assess radionuclide retention and transportation via ground water, the following information Don't add space between paragraphs of the same style should be determined for the site: Formatted: Normal, Indent: Left: 0.5", Don't add space between paragraphs of the same style
- a. soil, sediment, and rock characteristics (e.g., grain size, hydraulic conductivity, Formatted: Normal, Indent: Left: 0.56", Hanging: 0.19",
fracturing), Don't add space between paragraphs of the same style
- b. chemistry of the subsurface media,
- c. source of radioactivity, radionuclide and radioactivity inventories, and assumed release mechanism from the nuclear island, taking into account plant design features,
- d. site-specific adsorption coefficients for radionuclides of concern in the subsurface soils and backfills/structural fills,
- e. preferential flow in the subsurface, and other physiographic conditions shouldbe determined to evaluate the most severe impact on people and the environment and to calculate a conservative estimate of travel time for the contaminants,
- f. ground water velocity if ground water is impacted,
- g. dispersion and dilution processes in surface water bodies if surface water is impacted,
- h. distance to the nearest offsite point of entry in a surface water body or ground water resources, and Formatted: Indent: Hanging: 0.25"
RG 4.7, Rev. 3, Page 36
- f. environmental transport mechanisms and exposure pathways leading to direct uses (e.g.,
as drinking water) or indirect uses (e.g., crop and pasture irrigation, livestock watering, or use of water as a food ingredient) of surface water and/or ground water.
Formatted: Indent: Left: 0.75", Hanging: 0.25", Don't add Aquifers that are or could be used by large populations for domestic, municipal, industrial, or space between paragraphs of the same style irrigation water supplies provide potential pathways for the transport of radioactive material to man in the event of an accident or of chronic leaks. When choosing sites within areas that EPA has designated as a sole source aquifer or a site that has the pote ntial to be designated as an sole source aquifer in the future, detailed justification based on potential impacts to the affected community should be provided.
Formatted: Indent: Left: 0.25", Hanging: 0.25", Don't add To identify potential migration and ground water transport pathways for events with the potential space between paragraphs of the same style to cause environmental contamination, a conceptual ground water site model should be developed. If a surface water body is assumed to be impacted, the evaluation should consider the characteristics and associated parameters of the receiving water body. For example, such characteristics include, am ong others, direction and flow rate of currents, near and far field mixing and dispersion patterns, thermal differences between the assumed release event and r eceiving water body, tidal effects, if applicable, and types of surface water use, usage rates, and location downstream from the point of entry.Alternate conceptual models should be developed that reasonably bound hydrogeological conditions at the site. A bounding set of plausible surface and subsurface pathways from potential points of accidental release should be developed to determine the critical pathways that may result in the most severe impact on existing uses and known and likely future uses of ground and surface water resources in the vicinity of the site.
For events that may impact a surface water body, the evaluation should consider the characteristics of the receiving water body. Such characteristics include, among others, direction and flow rate of currents, near and far field mixing and dispersion patterns, thermal differences between the assumed release event and receiving water body, impacts of tidal effects, if applicable, and types of surface water use, usage rates, and location downstream from the point of entry.
Formatted: Indent: Left: 0.31", Hanging: 0.19", Don't add The basis of the assumed liquid radioactive source term should be clearly stated and include space between paragraphs of the same style sufficient information for the staff to perform an independent evaluation or confirmation. The discussions should indicate the type of reactor design forming the basis of the source term and state whether the radioactive material inventories are based on a designs certification or were adjusted (e.g., upward or downward) in whole or in part for designs whose certifications are not yet approved by the NRC at the time that the application was submitted to the NRC. The site conceptual model should consider the ability of ground and surface water environment with respect to their ability to delay, disperse, dilute, or concentrateaccidentally released radioactive liquid effluent during i ts transport. The site conceptual model should assess scenarios wherein accidental release of radioactive effluents iscombined with hydrologic extreme events such as floods or low flows.The assessment should consider scenarios wherein accidental release of radioactive effluents is combined with potential effects of seismic and non-seismic events (e.g., assessing effects of hydraulic structures located upstream and downstream of the plant in the event of structural or operational failures and the ensuing sudden changes in the regime of flow).
1.71.8 9. Industrial, Military, and Transportation Facilities
Potential sites should be evaluated with respect to possible safety impacts of operations at nearby industrial, military, and transportation facilities.
1.8.1 Relevant Statutes and Regulations
RG 4.7, Rev. 3, Page 37
- 10CFRPart 50, Appendix A, GDC 4, Environmental and dynamic effects d esign bases
1.8.2 Related Guidance
- RG 1.206, Section C.I.2.1, Geography and Demography
- RG 1.78, Evaluating the Habitability of a Nuclear Power Plant Control Room d uring a Postulated Hazardous Chemical Release ( Ref. 53 )
- RG 1.91, Evaluations of Explosions Postulated to Occur on Transportation Routes Near Nuclear Power Plants (Ref. 54)
- NUREG- 0800, Section 2.2.3, Evaluation of Potential Accidents
- NUREG- 0800, Section 3.5.1.4, Missiles Generated by Tornadoes and Extreme Winds
- NUREG- 0800, Section 3.5.1.5, Site Proximity Missiles (Except Aircraft)
- NUREG- 0800, Section 3.5.1.6, Aircraft Hazards
- DOE-STD-3014, Accident Analysis for Aircraft Crash into Hazardous Facilities (Ref.
According to 10CFR100.21(e), 55 )
1.8.3 Considerations,RegulatoryExperience, and Staff Position
Accidents at present or projected nearby industrial, military, and transportation facilities may affect the safety of a nuclear power station.
The regulation in 10 CFR 100.21(e) states the following:
Potential hazards associated with nearby transportation routes, industrial and military facilities must be evaluated and site parameters established such that potential hazards from such routes and facilities will pose no undue risk to the type of facility proposed to be located at the site..
RG 4.7, Rev. 3, Page 38 The acceptability of a site depends on establishing that (1) an accident at a nearby industrial, military, or transportation facility would not result in radiological consequences that exceed the dose specified in 10CFR50.34, or (2) the accident poses no undue risk because it is sufficiently unlikely to occur (less than about 10-7 per year). T he identification of design-basis events resulting from the presence of hazardous materials or activities in the vicinity of the plant or plants is acceptable if all postulated types of accidents are included for which the expected rate of occurrence of potential exposures resulting in radiological doses in excess of 10 CFR 50.34(a)(1),10 CFR 52.17 (a)(1) and 52.79 (a)(1), as it relates to the requirements of 10 CFR Part 100, is estimated to exceed the NRC staff objective of the order of magnitude of 10-7 per year.
Potentially hazardous facilities and activities within 8 km kilometers (5 mi) of a proposed site,miles )
and major airports within 16 km kilometers (10 mi miles) of a proposed site,should be identified. If a preliminary evaluation of potential accidents at these facilities indicates that the potential hazards from shock waves and missiles approach or exceed those of the design-basis tornado for the region,or there arethatpotential hazards such as flammable vapor clouds, toxic chemicals, or incendiary fragments e xist, the suitability of the site should be determined by throughdetailed evaluation of the degree of risk imposed by the potential hazard. RG 1.76 describes t he design-basis tornado. RG 1.91 describes a method acceptable to the NRC staff for determining distances from a plant to a railway, highway, or navigable waterway beyond which any possible explosion on these routes is not likely to adversely affect plant operation or to prevent a safe shutdown.Section 3.5.1.6 of NUREG -0800 describes review procedures for potential aircraft hazards. DOE -STD-3014 and RG 1.206provide further information.
In view of the low-probability events under consideration, theThe acceptability of a site depends on establishing that (1) an accident at a nearby industrial, military, or transportation facility will not result in radiological consequences that exceed the dose specified in 10 CFR 50.34, or (2) such an accident posesno undue risk because the probability of its occurring is sufficiently low (less than about 1x10 -7 per year). The identification of design-basis events resulting from the presence of hazardous materials or activities near the plant or plants is acceptable if it includes all postulated types of accidents for which it is estimated that the expected rate of occurrence of exposures resulting in radiological doses above those in 10CFR50.34(a)(1) ( as it relates to the requirements of 10 CFR Part 100) exceeds the order of magnitude of 1x10 -7 per year, which is the NRC staff objective.
The probability of occurrence of initiating events leading to potential consequences in excess of the dose specified in 10CFR50.34(a)(1), 10 CFR52.17 (a)(1)),and 10CFR52.79(a)(1 ), ) should be based onestimated usingassumptions that are as realistic as practicable. Because the events being consideredunder considerationare of such low probability, valid statistical data are often not available to permit accurate quantitative calculation of probabilities. Accordingly, a conservative calculation showing that the probability of occurrence of doses in excess ofabove the value specified in 10CFR50.34(a)(1), 10CFR 52.17(a)(1 )),and 10CFR 52.79 (a)(1),) is approximately 101x10 -6 per year is acceptable if, when combined withthrough reasonable qualitative arguments, the realistic probability can be shown to be lower. Because of the difficulty of assigningSince it is difficult to assign precise numerical va lues to the probability of occurrence of the relevant types of potential hazards generally considered in determining the acceptability of sites for nuclear stations, judgment should be used as to the acceptability of the whether each event presents an acceptable overall risk presented by an event.
The NUREG- 0800, Section 2.2.3, Evaluation of Potential Accidents, describes t he staffs evaluation procedures and criteria for potential accidents in the site vicinity are described in Section 2.2.3, Evaluation of Potential Accidents, of NUREG- 0800..The hazards described in Section 2.2.3,there
RG 4.7, Rev. 3, Page 39 should be evaluated in detail to determine site suitability of a site in regard with respect to potential accidents involving hazardous materials and activities at nearby industrial, military, and transportation facilities. The effects of design Design-basis events have been appropriately considered if analyses have been performed of the effects of those accidentssuch events on the safety -related features of a proposed nuclear station have been performed, and if appropriate measures (e.g.,
hardening, fire protection) have been proposed to mitigate the consequences of such events. If there are unusual site characteristics, plant design features, or other factors, then different assumptions mightmay be considered made on an individual a case-by-casebasis. In such cases, analyses should conform to the recommendations in RG 1.183 for alternative radiological source terms for evaluating design - basis accidentsat nuclear power plants found in RG 1.183.
RG 1.78describes assumptions acceptable to the NRC staff for use in assessing the habitability of the control room during and after a postulated external release of hazardous chemicals. It also describes criteria acceptable to the staff for the protection of control room operators.
An otherwise unacceptable site may be shown to be acceptable if the cognizant organization agrees to change the installation or mode of operation to reduce the likelihood or severity of potential accidents involving the nuclear station to an acceptable level.
RG 4.7, Rev. 3, Page 40
- 2. Environmental Protection Considerations for AssessingSite Suitability for Nuclear Power Stations
2.1 Atmospheric Dispersion
The atmospheric characteristics at a site are an important consideration in evaluating the dispersion of radioactive effluents from both postulated accidents and routine releases in gaseous effluents.
2.1.1 Dispersion of Airborne Radioactive Material
Radiation doses associated with airborne radioactive materials from routine releases and anticipated operational occurrences must be ALARA and must comply with effluent concentration limits,dose limits for members of the public, the EPAs environmental radiation standards,and Clean Air Act requirements.
2.1.1.1 Relevant Statutes and Regulations
- Clean Air Act
- 40CFR Part 190
2.1.1.2 Related Guidance
2.1.1.3 Considerations, Regulatory Experience, and Staff Position
Radiation doses associated with airborne radioactive materials from routine releases and anticipated operational occurrences must be ALARA (see 10 CFR20.1101(b) ) and must comply with the effluent concentration limits of Appendix B to 10 CFR Part 20 and the dose limits for members of the public under 10 CFR 20.1301 and 10CFR 20.1302. In addition, 10CFR20.1301(e) requires compliance with the EPAs generally applicable environmental radiation standards of 40 CFR Part 190.
The requirements for design objectives for equipment to control releases of radioactive material in effluents from nuclear power reactors are set forth in 10CFR50.34a. Further, 10CFR50.36a(a) states that, to keep power reactor effluent releases ALARA, each license authorizing operation of such a facility must include technical specifications for the establishment of effluent control equipment and reporting of actual releases.
In addition to meeting the NRC requirements for the dispersion of airborne radioactive material, the station must meet the State and Federal requirements of the Clean Air Act, as amended.
RG 4.7, Rev. 3, Page 41 Clean Air Act compliance is unlikely to be an important consideration for nuclear power station siting unless (1) a site is in an area where existing air quality is near or exceeds standards, (2) the cooling system plume may interact with a plume containing noxious or toxic substances from a nearby facility, or (3) the auxiliary generators are expected to operate routinely.
2.1.2 Local Fogging and Icing
Local fogging and icing can result from water vapor discharged into the atmosphere from cooling towers, lakes, canals, or spray ponds.
2.1.2.1 Relevant Statutes and Regulations
2.1.2.2 Related Guidance
2.1.2.3 Considerations, Regulatory Experience, and Staff Position
Water and water vapor released to the atmosphere from recirculating cooling systems can lead to ground fog and ice, resulting in transportation hazards and damage to electric transmission systems and vegetation.
Section 5.1.1, The Site and Vicinity, of NUREG-1555 describes the NRC staffs review procedures for evaluation of fogging and icing induced by a nuclear power plant, while NUREG-1555, Section 5.3.3.1, Heat Dissipation to the Atmosphere, addresses the physical and aesthetic impacts of cloud formation, cloud shadowing, additional precipitation, icing and fogging,and increased ground -level humidity.
The hazards for transportation routes from fog or ice resulting from station operation should be evaluated. The evaluation should include estimates of the frequency of occurrence of station-induced fogging and icing and their impact on transportation, electrical transmission, vegetation, and other activities and functions. It should also address t he potential increase in the number of hours of fogging or icing caused by station operation.
Some sites are liable to severe fogging or icing because of local atmospheric conditions. For example, these conditions are most likely in areas of unusually high moisture content that are protected from large-scale airflow patterns. The greatest impact is generally on transportation or electrical transmission systems in the vicinity of a site.
2.1.3 Cooling Tower Plume Drift
Cooling tower plume drift could affect nearby transportationand industrial activities or have environmental or aesthetic impacts.
2.1.3.1 Relevant Statutes and Regulations
RG 4.7, Rev. 3, Page 42 2.1.3.2 Related Guidance
2.1.3.3 Considerations, Regulatory Experience, and Staff Position
Plumes often extend a few miles in length before dissipating ; the plumes themselves or their shadows could have aesthetic impacts. Visible plumes emitted from cooling towers may affect nearby transportation or industrial activities. For example, plumes in the vicinity of airports could pose a hazard to aviation.
Concentrations of chemicals, dissolved solids, and suspended solids in cooling tower drift could affect terrestrial biota and cause unacceptable damage to vegetation and other resources.
Water vapor from cooling tower plumes can interact with industrial emissions from nearby facilities to form noxious or toxic substances that could adversely affect public health or cause unacceptable levels of damage to biota, structures, and other resources. The degree of impact will depend on the distance between the nuclear and fossil-fueled sites, the hours per year of plume interaction, the type and concentration of chemical reaction products, the area of chemical fallout, and the local atmospheric conditions.
The hazards for transportation routes from plume drift resulting from station operation should be evaluated. The evaluation should include estimates of frequency of occurrence of station-induced effects and their impact on transportation, electrical transmission, vegetation, and other activities and functions.
The percent drift loss from recirculating condenser cooling water, particle size distribution, salt deposition rate, local atmospheric conditions, and loss of sensitive terrestrial biota affected by salt deposition from cooling tower drift should be considered. The potential loss of important terrestrial species and other resources should be considered.
The hazards to public health, structures, and other resources from potential interaction between cooling tower plumes,plumes from fossil -fueled sites,a nd industrial emissions from nearby facilities should be considered.
If a potential impact is judged to be significant, the site selection should provide a basis for evaluating mitigation measures or alternative heat-transfer system designs,predicting and assessing the following:
- length and frequency of elevated plumes
- frequency and extent of ground-level fogging and icing in the site vicinity
- solids deposition (e.g., drift deposition) in the site vicinity
- cloud formation, cloud shadowing, and additional precipitation
- interaction of the vapor plume with existing pollutant sources located within 2kilometers of the plant
RG 4.7, Rev. 3, Page 43
- ground-level humidity increase in the site vicinity
If the natural vegetation or crops near the site are vulnerable to damage from airborne salt particles,a cooling system designed with special consideration for reducing drift may be needed.
The vulnerability of existing industries or other nearby facilities to corrosion by cooling tower or spray system drift should be considered. Important factors in assessing drift effects include n ot only the amount, direction, and distance of the drift from the cooling system, but also the salt concentration above the natural background salt deposition at the site. Salt drift may necessitate special cooling system design features or a larger site to confine drift effects within the site boundary. The environmental effects of salt drift are most severe when condenser coolingwater is saline or has high mineral content.
2.2 Hydrology
The hydrologic characteristicsof potential sites should be evaluated from the perspectives of water quality, water availability, and radionuclide transport.
2.2.1 Water Quality
The impact of station construction and operation on water quality in the vicinity of potential sites should be evaluated.
2.2.1.1 Relevant Statutes and Regulations
- CWA
- 40 CFR Part 122, EPA Administered Permit Programs: t he National Pollutant Discharge Elimination System (Ref. 56)
- 40 CFR Part 423, Steam Electric Power Generating Point Source Category (Ref. 57)
- applicable State water quality standards approved by EPA
2.2.1.2 Related Guidance
2.2.1.3 Considerations, Regulatory Experience, and Staff Position
The potential impacts of nuclear power stations on water quality are likely to be acceptable if they satisfy effluent limitations, water quality criteria for receiving waters, and other requirements pursuant to the CWA. The applicant should also identify any other relevant regulations current at the time when it is considering sites.
RG 4.7, Rev. 3, Page 44 Thermal and chemical effluents discharged to navigable streams are governed by the CWA, as amended, and are regulated under 40 CFR Part 122, 40 CFR Part 423, and State water quality standards. Section 316(a) of the CWA is typically administered by the S tate and specifies maximum impacts allowed on water quality based on flow volume and thermal loading of plant discharge.
Section 401(a)(1) of the CWA requires, in part, that any applicant for an NRC construction permit, ESP, or COL for a nuclear power station provide to the NRC certification from the State that any discharge will comply with applicable effluent limitations and other water pollution control requirements. Without such certification, the NRC cannot issue a construction permit, ESP, or COL, unless the State waives the requirement or fails to act within a reasonable period.
A National Pollutant Discharge Elimination System permit to discharge effluents to navigable streams pursuant to Section 402 of the CWA may be required for a nuclear power station to operate in compliance with the Act, but it is not a prerequisite for an N RC construction permit, operating license, ESP or COL.
Where station construction or operation could degrade water quality to the detriment of other users, more detailed analyses and evaluation of water quality may be necessary.
The NRC staff will use the criteria in 10 CFR Part 20 and 10 CFR Part 50 to determine permissible concentrations of radioactive materials discharged to surface water or to ground water. Appendix I to 10 CFR Part 50 provides guidance on the requirements for design objectives and technical specification s for limiting conditions for operation for light -water-cooled nuclear power stations.
2.2.2 Water Availability
The impact of station operation on the availability of water resources should be evaluated. Limitations imposed by existing laws or allocation policies govern the use and consumption of cooling water at potential sites for normal operation.
2.2.2.1 Relevant Statutes and Regulations
- CWA Section 316(b), as implemented bythe EPA through National Pollutant Discharge Elimination System: Regulations Addressing Cooling Water Intake Structures for New Facilities, Volume 66 of the Federal Register, page 65255 (66FR 65255; December 18,2001), and 40 CFRParts 9, 122, 123, 124,and 125
2.2.2.2 Related Guidance
2.2.2.3 Considerations, Regulatory Experience,and Staff Position
Adequate capacity is required to limit the impacts of withdrawal of cooling water from the cooling water source. The consumptive use of water for cooling may be restricted by statute, may be inconsistent with water use planning, or may have an unacceptable impact on the water resource.
RG 4.7, Rev. 3, Page 45 Water use and consumption must comply with Federal, State, and local statutory requirements and must be compatible with water use plans of cognizant water resources planning agencies. For a site to be suitable, there should be reasonable assurance that the applicant can obtain permits for consumptive use of water in the quantities needed to operate a power plant with the approximate capacity and type of cooling envisioned from the appropriate State, local, or regional agency, in accordance with the agencys programs and policies, which may incorporate and administer applicable Federal policies. Where required by law, an application for a construction permit, operating license, ESP, or COL should include demonstration of a request for certification of the rights to withdraw or consume water and an indication that the request is consistent with appropriate State, local, and regional programs and policies. In the absence of a w ater use plan, the effect on other water users should be evaluated, considering flow or volume reduction and the resultant ability of all users to obtain adequate supply and to meet applicable water quality standards (see Section C. 2.2.1of this RG ).
Consumptive use should be restricted so that the supply of other users is not impaired and applicable surface water quality standards can be met, assuming normal station operational discharges and extreme low-flow conditions as defined by generally accepted engineering practices.
For multipurpose impounded lakes and reservoirs, consumptive use should be restricted so that the magnitude and frequency of drawdown will not cause unacceptable damage to important habitats or be inconsistent with the management goals for the water body.
In areas with complex ground water hydrology, or with aquifers that are or may be used for domestic or industrial water supplies or for irrigation water, the suitability of a site for a specific plant design can be determined only after a reliable assessment of the potential impacts of the reactor on the ground water. Site environmental parameters, which include hydrological and meteorological characteristics, should be comparable to those used in the plant probabilistic risk assessment and environmental analysis.
Statistical techniques and numerical modeling (e.g., the 7Q10 low-flow condition) should be used, if applicable, to extend and complement the period of record to help identify the expected minimum flow for the region. If the water supply is not adequate for the plant, then other sources of water need to be identified.
If applicable, potential sources of cooling water should also be screened by their capacity to meet intake flow limitations specified in CWA Section 316(b),as implemented by the EPA (66FR 6525 5) in 40CFR Parts 9, 122, 123, 124,and 125.CWA Section 316(b) sets forth criteria based on type of water body in order to reduce environmental impact. It is typically administered by S tate programs.
Although management of surface water quality is important, water quality is not generally a determining factor in assessing the suitability of a site, since adequate design alternatives can be developed to meet CWA requirements and the Commissions regulations implementing NEPA.
The following are examples of potential environmental effects of station construction and operation that should be assessed:
- physical and chemical environmental alterations in habitats of important species, including plant-induced rapid changes in environmental conditions
RG 4.7, Rev. 3, Page 46
- changes in normal current direction or velocit y of the cooling water source and receiving water
- scouring and siltation due toconstruction and cooling water intake and discharge
- alterations due to dredging and spoil disposal
- interference with shoreline processes
Where water is in short supply, closed-cycle cooling (the recirculation of the hot cooling water through cooling towers, artificial ponds, or impoundments) has been practiced.
2.2.3 Radionuclide Retention and Transport
The retardation, dispersion, and dilution capabilities and potential contamination pathways of the ground water environment under operating and accident conditions,with respect to present and future users,are important factors in site selection.
2.2.3.1 Relevant Statutes and Regulations
- CWA
- applicable State water quality standards approved by EPA
2.2.3.2 Related Guidance
- ASTM C1733, Standard Test Method for Distribution Coefficients of Inorganic Species by the Batch Method (Ref. 58)
- RG 4.21, Minimization of Contamination and Radioactive Waste Generation:
Life-Cycle Planning (Ref. 59)
2.2.3.3 Considerations, Regulatory Experience, and Staff Position
As speci fied in 10 CFR100.20( c),t he si tes physical cha racteristics (i ncluding seismology, meteorology,geolo gy,and hydr ology) must be conside red w hen determining i ts accep tabilit y for a nuclear pow er r eactor. Special precaution s should be planned if a reactor is to be located at a site where a significant amount of radioactive effluent might find ready access to ground water.
According to 10 CFR 100.20(c)(3),factors important to hydrological radionuclide transport (such as soil, sediment, and rock characteristics; adsorption and retention coefficients; ground water velocity; and distances to the nearest surface body of water) must be obtained from onsite measurements. To satisfy the hydrologic requirements of 10CFRPart 100, applicants should
RG 4.7, Rev. 3, Page 47 verify ground water conditions at a proposed site and asses s how plant construction and operation will affect those conditions. This provides assurance that the release of radioactive effluents from the plant will not significantly affect ground water at or near the plant site.
To assess radionuclide retention and transportation throughground water, the following information should be determined for the site:
- soil, sediment, and rock characteristics (e.g., grain size, hydraulic conductivity, fracturing)
- chemistry of the subsurface media
- source of radioactivity, radionuclide, and radioactivity inventories, and assumed release mechanism from the nuclear island, considering plant design features
- site-specific adsorption coefficients for radionuclides of concern in the subsurface soils and backfills/structural fills ( ASTM C1733 provides guidance for obtaining distribution coefficients,especially for radionuclides )
- preferential flow in the subsurface and other physiographic conditions (to evaluate the most severe impact on people and the environment and to conservatively estimate contaminant travel time )
- ground water velocity if ground water is affected
- dispersion and dilution processes in surface water bodies if surface water is affected
- distance to the nearest offsite point of entry to a surface water body or ground water resources
- environmental transport mechanisms and exposure pathways leading to direct uses (e.g., as drinking water) or indirect uses (e.g., crop and pasture irrigation, livestock watering, or use of water as a food ingredient) of surface water and/or ground water
Aquifers that are or could be used by large populations for domestic, municipal, industrial, or irrigation water supplies provide potential pathways for the transport of radioactive material to man in the event of an accident or of chronic leaks. When choosing sites within an area that the EPA has designated (or could designate in the future) as a sole source aquifer,applicants should provide detailed justification based on potential community impact.
To identify potential migration and ground water transport pathways for events that could cause environmental contamination, a conceptual ground water site model should be developed.If a surface water body is assumed to be impacted, the evaluation should consider the characteristics and associated parameters of the receiving water body. These characteristics include, among others, direction and flow rate of currents, near - and far -field mixing and dispersion patterns, thermal differences between the assumed release event and the receiving water body, tidal effects (if applicable), types and rates of surface water use, and location downstream from the point of entry.Alternate conceptual models should be developed that reasonably bound hydrogeological conditions at the site. A bounding set of plausible surface and subsurface pathways from potential points of accidental release should be developed,to determine the critical pathways that may have
RG 4.7, Rev. 3, Page 48 the most severe impact on existing uses and known and likely future uses of ground and surface water resources near the site.
The basis of the assumed liquid radioactive source term should be clearly stated and should include sufficient information for the staff to perform an independent evaluation or confirmation.
The discussions should indicate the type of reactor design forming the basis of the source term.
They should state whether the radioactive material inventories are based on a designs certification or have been adjusted (e.g., upward or downward), in whole or in part,for designs whose certifications the NRC has not yet approved at the time of submission of the application.
The site conceptual model should consider whether the ground and surface water environment could delay, disperse, dilute, or concentrate accidentally released radioactive liquid effluent during its transport. The model should assess scenarios combining accidental release of radioactive effluents with hydrologic extreme events such as floods or low flows, as well as with seismic and non-seismic events (e.g., it should assess the effects of structural or operational failures of hydraulic structures located upstream and downstream of the plant, and the ensuing sudden changes in the flow regime).
Applicants need to minimize contamination and radioactive waste generation over the total life cycle of a facility, from initial layout and design through operation and final decontamination and dismantlement at the time of decommissioning. RG 4.21provides guidance on addressing the requirements of 10 CFR 20.1406, Minimization of c ontamination.
- 10. Ecological Systems and BiotaEcological Systems and Biota
2.3
The potential impact of station construction and operation on biota (plant or animal species) and on their habitats and supporting ecological systems needs to be assessed. The ecological systems and biota at potential sites and their environs should be sufficiently well known to allow reasonably certain predictionsreasonable certain ty that the construction or operation of a nuclear power station at the site would have no unacceptable or unnecessary deleterious impacts on populations of important species or on the ecological systems with which they are associated.
Section 2.4, Ecology, of NUREG -1555 and RG 4.11, Terrestrial Environmental Studies for Nuclear Power Stations (Ref. 60 ), provide the NRC staff with guidance on determining the adequacy of a site with respect to ecological systems and biota. They also list recommended studies o necological systems and biological resources and discuss potential species and habitat protection under State, local, and Native American governance.
If justifiable in terms of costs and benefits, it is generally possible to mitigate the potential impact s of plant construction and operation on biota and ecological systems through engineering design and site planning and through proper construction and operations,given adequate information about the vulnerability of important species and ecological systems.
2.3.1 Preservation of Important Habitats
In areas of great importance to the local aquatic and terrestrial ecosystems, it may be difficult to assess potential impacts o n important species or ecological systems. Such areas include those used for breeding (e.g., nesting and spawning), wintering, and feeding, as well as areas where there may be seasonally high concentrations of individuals of important species. Where the ecological sensitivity of a
RG 4.7, Rev. 3, Page 49 site cannot be established from existing information, more detailed studies, as discussed in RG 4.2, should be conducted.
2.3.1.1 Relevant Statutes andRegulations
- Fish and Wildlife Coordination Act, as amended (16 U.S.C. 661 et seq.)
- Bald and Golden Eagle Protection Act (16 U.S.C. 668 et seq.)
- Migratory Bird Treaty Act of 1972, as amended (16 U.S.C. 703 et seq.)
- Marine Mammal Protection Act of 1972, as amended (16 U.S.C. 1361 et seq.)
- Magnuson-Stevens Fishery Conservation and Management Act, as amended (16U.S.C.1801 et seq.)
- CWA Section 316(b), as implemented in 40CFRParts 9, 122, 123, 124, and 125 (66FR 6525 5)
2.3.1.2 Related Guidance
2.3.1.3 Considerations, Regulatory Experience, and Staff Position
The construction and operation of nuclear power stations (including new transmission lines and access corridors constructed in conjunction with the station) can destroy or alter habitats of important species, affecting the abundance of a species or the species composition of a community.
Formatted: Normal, Indent: Left: 0.25", Hanging: 0.25",
When early site inspections and evaluations indicate that critical or exceptionally complex Don't add space between paragraphs of the same style ecological systems will have to be studied in detail to determine the appropriate plant designs, proposals to use such sites should be deferred unless sites with less complex characteristics are not available.
It should be determined whether any important species (as defined in the Discussion section of this guide under Ecological Systems and Biota ) inhabit or use the proposed site or its environs.
If so, the relative abundance and distribution of their populations should be considered.Potential adverse impacts on important species should be identified and assessed. Potential adverse impacts on important species should be identified and assessed. The relative abundance of individuals of an important species inhabiting a potential site should be compared to the total local population, as estimated in the available information in the literature.Any predicted impacts on the species should be evaluated relative to effects on the local population and the total
RG 4.7, Rev. 3, Page 50 population of the species. concerning the total estimated local population. An y predicted impacts on the species should be evaluated relative to effects on the local population and the total population of the species. The destruction of, or sub lethal sublethal effects on, a number of individuals that would not adversely affect the reproductive capacity and vitality of a population, or the harvestable crop of an economically important harvestable population or recreationally important population,should generally be acceptable, except in the case of certain endangered species. If th ere area site contains endangered or threatened speciesat a site, the potential effects should be evaluated relative to the impact on the local population and the totalestimated total population over the entire range of the species as noted in the literature.
Any important ecological systems at a site or in its environs should be identified. If such systemsImportant habitats are present, a determination should be made as those that are essential to whether maintaining the ecological systems are especially vulnerable to change or if they contain reproductive capacity and vitality of populations of important specieshabitats, such as,or the harvestable crop of economically or recreationally important species. Such habitats include breeding areas (e.g., nesting and spawning areas),); nursery, feeding, resting, and wintering areas,
or ; wetlands ; and other areas of havingseasonally high concentrations of individuals of important species.
The alteration of existing environmental conditions may render a habitat unsuitable as a breeding or nursery area. In some cases, organisms use identical breeding and nursery areas each year; changes in the characteristics of the areas may substantially reduce or enhance breeding success.
Destruction of part or all of a breeding or nursery area may cause population shifts that result in increased competition for the remaining suitable areas. Important considerations inSuch population shifts cannot compensate for the reduced size of the breeding or nursery areas if members of the species already occupy the remaining suitable areas. Some species will desert a breeding area because of human activities nearby, even if these activities do not physical ly disturb the actual breeding area.
Of special concern in site selection are those unique or especially rich feeding areas that station construction or operation might destroy, degrade, or make i naccessible to important species.
Evaluations of potential effects of construction or operation on feeding areas should consider the size of the feeding area on site in relation to that of the total feeding area off site, food density, time of use, location in relation to other habitats, topography relative to access routes, and other factors (including human activities). Site modification may reduce the quality of feeding areas by destroying part of the food base, destroying cover, or both.
Inbalancing costs and benefits include, it is important to consider the uniqueness of a habitat or ecological system within the region under consideration, the amount of the habitat or ecological system that would be destroyed or disrupted relative to the total amount in the region, and the vulnerability of the reproductive capacity of important species populations to the effects of construction and operation of the station and ancillary facilities. Th e proportion of an important habitat that would be destroyed or significantly altered, in relation to the total habitat within the region,is a useful parameter for estimating potential impacts of station construction or operation.
This proportion varies across species and habitats; it is determined based on the normal geographic range of the population in question. In general, a detailed justification should be provided for the proposed destruction or sign ificant alteration of more than a few percent of important habitat types.
RG 4.7, Rev. 3, Page 51 The reproductive capacity of important populations and the harvestable crop of economically or recreationally important populations should be maintained unless proposed or probable changes can be justified.
If sites contain, are adjacent to, or could have an impact onaffect important ecological systems or habitats (e.g.,wetlands and estuaries) that are unique, limited in extent, or necessary to the productivity of populations of important species, they cannot be evaluated as to suitability for a nuclear power station until adequate assessments for the reliable prediction of impacts have been completed to reliably predict impactsand the facility design characteristics have been defined that would satisfactorily mitigate the potential ecologicalthese impacts have been defined..In areas where reliable and sufficient data are not available, the collectionit may be necessary to collect and evaluation of evaluate appropriate seasonal data may be required.
When early site inspections and evaluations indicate a need to study critical or exceptionally complex ecological systems in detail to determine the appropriate plant designs, proposals to use such sites should be deferred unless sites with less complex characteristics are not available.
2.3.2 Migratory Routes of Important Species
Migration routes of important species and migration routes that pass through the site or its environs should be identified. Construction and operation of nuclear power stations can create barriers to migration.
2.3.2.1 Relevant Statutes andRegulations
- Fish and Wildlife Coordination Act, as amended
- Migratory Bird Treaty Act of 1972, as amended
- Magnuson-Stevens Fishery Conservation and Management Act, as amended
2.3.2.2 Related Guidance
2.3.2.3 Considerations, Regulatory Experience, and Staff Position
Generally, the most critical migratory routes relative relevant to nuclear power station siting are those of aquatic species in water bodies associated with the cooling systems. Site In assessing potential impacts on aquatic migratory species, five site conditions that should be identified and evaluated in assessing po tential impacts on important aquatic migratory species include : (1) narrow zones of passage, (2) migration periods that are coincident coincide with maximum ambient temperatures, (3) the potential for major modification of currents by station structures, (4) the potential for increased turbidity during construction, and (5) the potential for entrapment, entrainment, or impingement by or in the cooling water system or and for blocking of migration by facility structures or effluents.
RG 4.7, Rev. 3, Page 52 Seasonal or daily migrations are essential to the reproductive capacity of some important species.
Disruption of migratory patterns can result from partial or complete blockage of migratory routes by structures, discharge plumes, environmental alterations, or human activities (e.g., transportation or transmission corridor clearing and site preparation).
Narrow zones of passage for migratory animals in some rivers and estuaries may be restricted or blocked by station operation. Partial or complete blockage of a zone of passage may result from the discharge of heat or chemicals to receiving water bodies or from the construction and placement of power station structures in the water body.Strong -swimming aquatic animals often avoid waters of adverse quality, but larval and immature forms are usually moved and dispersed by water currents. The potential It is therefore important in site selection to consider potential effects on the routes and times of movement of immature individuals.
Some species migrate in central, deeper areas,while others use marginal, shallow areas. Rivers, streams, and estuaries are seldom laterally homogeneous in depth, current velocity, and habitat type. Thus, the determination of adequate zones of passage should be based onboth width or cross-sectional area criteria and knowledge of the specific migratory requirements of important species.
Narrow reaches of water bodies should be avoided as sites for intake or discharge structures. A zone of passage should be provided that will permit normal movement of important species and maintenance of the harvestable crop of economically important populations. The width or cross-sectional area of a water body at a proposed site, relative to the general width or cross-sectional area in the portion of the water used by migrating species,should be estimated.
Suggested minimum zones of passage range from one-third to three-fourths of the width or cross-sectional areas of narrow water bodies.9F10
Site evaluations should also assess t he potential for blockage of movements of important terrestrial animal populations caused by the use of the site for a nuclear power station and the availability of alternative routes that would provide for maintenance of allow the species species to maintain their bree ding population should be assessed. population s.
2.3.3 Entrainment and Impingement of A quatic Organisms
Several variables, including site characteristics,and intake structure design,and placement of the structures at the site, determine the potential for impingement of organisms on cooling water intake structures and entrainment of organisms through the cooling system.
2.3.3.1 Relevant Statutes andRegulations
- Fish and Wildlife Coordination Act, as amended
- Magnuson-Stevens Fishery Conservation and Management Act, as amended
10 See EPA/505/2-90 -0 01, Technical Support Document for Water Quality-Based Toxics Control, Washington, DC, issued March 1991.
RG 4.7, Rev. 3, Page 53
- CWA Section 316(b), as implemented in 40CFRParts 9, 122, 123, 124, and 125 (66FR 6525 5)
- CWA Section 316(a)
2.3.3.2 Related Guidance
- NUREG-1555, Section 2.4
2.3.3.3 Considerations, Regulatory Experience, and Staff Position
Plankton, including eggs, larvae, and juvenile fish, can be killed or injured by entrainment through power station cooling systems or in discharge plumes. Fish and other aquatic organisms can be killed or injured by impingement on cooling water intake screens10F11 or by entrainment in discharge plumes.
The reproductive capacity of important populations may be impaired by lethal stresses or by sublethal stresses that affect the reproduction of individuals or result in increased predation on the affected population.
Site evaluations should consider t he depth of the water body at the point of intake relative to the general depth of the water body in the vicinity of the site. The simplistic parameter (proportion of water withdrawal) is suitable for use in a screening process or site selection. However, other factors, such as distribution of important species, should be considered, and in all cases, experts on the local fisheries should be consulted to ensure that proposed withdrawals will not be excessive.
The site should allow for placement of intake stru ctures where the relative abundance of important species is small and where low approach velocities can be attained. (Deep regions are generally less productive than shallow areas. It is not implied that benthic intakes are necessary.)
Important habitats should be avoided as locations for intake structures.
2.3.4 Entrapment of Aquatic Organisms
To limit the potential impact for entrapment of aquatic organisms by intake or discharge structureson aquatic species, evaluations of potential sites should in clude consideration ofconsider the requirements of applicable Federal, state State, and local regulations.
If justifiable relative to costs and benefits, the potential impacts of plant construction and operation on the biota and ecological systems can generally be mitigated by adequate engineering design and site planning and by proper construction and operations when there is adequate information about the vulnerability of the important species and ecological systems.
2.3.4.1 Relevant Statutes andRegulations
11 Approach velocity and screen-face velocity are design criteria that may affect the impingement of larger organisms, principally fish, on intake screens. Acceptable approach and screen -face velocities are based on the swimming speeds of fish, which will vary with the species, site, and season.
RG 4.7, Rev. 3, Page 54
- Fish and Wildlife Coordination Act, as amended
- Magnuson-Stevens Fishery Conservation and Management Act, as amended
- CWA Section 316(a), National Pollutant Discharge System Regulations Addressing Cooling Water Discharges
- CWA Section 316(b), as implemented in 40CFRParts 9, 122, 123, 124, and 125 (66FR 6525 5)
2.3.4.2 Related Guidance
- NUREG-1555, Section 2.4
2.3.4.3 Considerations, Regulatory Experience, and Staff Position
Cooling water intake and discharge system features, such as canals and thermal plumes, can attract and entrap organisms, principally fish. This can increase the concentration of important fish species near the station site,leading to higher mortalities from station-related causes such as impingement, cold shock, or gas bubble disease. Entrapment can also interrupt normal migratory patterns.
Site characteristicsevaluationshould be considered relative to consider the design and placement of Formatted: Normal, Don't add space between paragraphs of cooling system features and the potential of risk that the cooling system towill hold fish in an area for the same style longer than the normal period of migration,or to will entrap resident populations them in areas where they would be adversely affected, either directlydirect or indirectly, by indirect factors, such aslimited food supply or adverseunfavorable temperatures. Canals, may adversely affect them. The unnatural warmth of canals or areas where cooling waters are discharged may induce fish to remain in an unnaturally warmed habitat. The cessation ofthere; if the station operation ceases to operateduringthe winter can be lethal to these fish because of an, the abrupt drop in water temperature.
Section 2.4, Ecology, of NUREG -1555 and RG 4.11, Terrestrial Environmental Studies for Nuclear Power Stations (Ref. 49 ), provides NRC staff guidance on the adequacy of the site with respect to ecological issues and biota. They also provide a list of studies recommended in the area of ecological systems and biological resources, including discussions of potential species and habitat protection under State, local, and Native American governance. Appendix B to this guide summarizes environmental considerations, parameters, and regulatorypositions for use in evaluating sites for nuclear power stations.
may be lethal to these fish.
Site characteristics should therefore accommodate design features that mitigate or prevent entrapment.
Sites requiringthe construction of intake or discharge canals should be avoided unless it would be possible to prevent or limit the entry of important species in to the canal through screening.
RG 4.7, Rev. 3, Page 55 The CWA regulates the impact of cooling water intake ( Section 316(b) ) and d ischarge (Section 316(a)) on water bodies. These regulations are typically administered by State programs that specify maximum impacts allowed on source water volume and discharge water quality.
2.12.4 Land Use and Aesthetics
Land use Site suitability may be limited by the proximity of established public resource areas or prospective designated resource areas; by land use plans adopted byof Federal, State, regional, or local agencies; or by aesthetic considerations.
2.4.1 Established Public Resource Areas
Locating a nuclear power station adjacent to lands devoted to public use might be unacceptable to Federal, State, or local jurisdictions.
2.4.1.1 Relevant Statutes andRegulations
- National Historic Preservation Act, as amended (16 U.S.C. 470 et seq.)
- 7 CFRPart 1491, Farm and Ranch Lands Protection Program ( Ref. 61 )
2.4.1.2 Related Guidance
2.4.1.3 Considerations, Regulatory Experience, and Staff Position
The siting of nuclear power stations near established public resource areas could cause the loss or deterioration of important public resources, and therefore generally require s extensive evaluation and justification. Such evaluations should be examined, and any conflic t between these plans and use of a potential consider how the specific plant design and station layout may affect the public resource area.
It is generally prohibited to site power stations in a reas dedicated by Federal, State, or local governments to scenic, recreational, or cultural purposes. In particular, locating nuclear power stations, transmission lines, or transportation corridors close to special areas administered by Federal, State, or local agencies for scenic or recreational use might have unacceptable impacts regardless of design parameters. Such cases are most apt to arise near natural -resource-oriented areas (e.g., national forests ),as opposed to recreation-oriented areas such as national parks,
forests, or wildlife refuge s. Some significant historical and archeological sites might also fall into this category.
Another class of impacts involves the preempting of existing land use at the site itself.For example, nuclear power station siting in areas uniquely suited for growing specialty crops may be
RG 4.7, Rev. 3, Page 56 considered a type of land conversion involving unacceptable economic dislocation. Under 7CFRPart 1491, working agricultural lands are protected from conversion to nonagricultural use. Since power reactor sites under consideration are likely to be in rural areas and potentially under cultivation, this regulation may apply in determining site suitability.
To determine whether it would be acceptable to loc ate a nuclear power station near a special area of public use,the applicant should be resolved by consultation with the appropriate consult the responsible government agency. The Council on Environmental Quality has published a list of Federal agencies that have jurisdiction or expertise in land use planning, regulation, or management.11F12
The following are some of the Federal agencies that should be consulted for the special areas listed:
- Advisory Council on Historic Preservation
- National Park Service (U.S. Department of the Interior)
- National Park Service Preservation Program
- Bureau of Sport Fisheries and Wildlife (U.S. Department of the Interior) (for national wildlife r efuges)
- Forest Service (U.S. Department of Agriculture) (for n ational f orest w ilderness areas, primitive a reas, and n ational f orests)
Individual States states and local governments administer parks, recreation areas, and other public use and benefit areas. Information on these areas should be obtained from State and local agencies. The State Information on local historic areas should be obtained from the State or Tribal historic preservation officer should be contacted for information on local historic areas..
2.4.2 Prospective Designated Resource Areas
Some areas might be unsuitable for siting a nuclear power station because of public interest in reserving land for future scenic, recreational, or cultural use.
2.4.2.1 Relevant Statutes andRegulations
2.4.2.2 Related Guidance
- 12. See U.S. Council on Environmental Quality, See National Environmental Policy Act (NEPA) Implementation Procedures; Appendixes I, II, and III, (49 FR 49750,; December 21, 1984), U.S. Council on Environmental Quality.
RG 4.7, Rev. 3, Page 57 2.4.2.3 Considerations, Regulatory Experience, and Staff Position
Areas containing important resources for scenic, recreational, or cultural use might not currently be designated as such by public agencies,but their conversion to power generation might constitute a net loss to the public.For example, this may be true of r elatively rare land types such as sand dunes and large wetland areas. Whether it will be acceptable to site nuclear power stations in these areas in the future will depend on the existing impacts of industrial, commercial, and other developments.
Land use conflicts might make a site unsuitable for a nuclear power station (e.g., if a community has planned to use the site for other purposes or has restricted it to uses that would be compatible with existing adjacent land use ). Applicants should therefore consult land use plans developed by local governments and regional agencies for possible conflicts.
Public resource areas that are distinctive, unique, or rare in a region should be avoided as sites for nuclear power stations.Surveys can identify archeological and historic sites so action can be taken to avoid or mitigate anythat potential impacts toeffects on these resources. The can be avoided or mitigated. If areas of concern are identified, applicants should contact t he State Archeologist and the State Historic Preservation Officer should be contacted if areas of concern are identified. Both,both of whom are responsible for the preservation and protection of historic properties in the State under the national National H istoric Preservation Act.
Applicants should consult local agencies when there are potential areas containing important resourcesfor the State. scenic, recreational, or cultural use might not currently be designatedas such by public agencies.
2.4.3 Public Planning
Land use conflicts might make a site unsuitable for a nuclear power station. For example, if a community (1) has planned to use the site for other purposes, or (2) has restricted the range of land use to onlyshould be compatible uses vis--vis existing adjacent land use. Therefore, land use plans developed by local governments and/or regional agencies should be consulted for possible land use conflicts with power station siting established land use or zoning plans of governmental agencies.
2.4.3.1 Relevant Statutes andRegulations
- 7 CFR Part 1491
2.4.3.2 Related Guidance
2.4.3.3 Considerations, Regulatory Experience, and Staff Position
RG 4.7, Rev. 3, Page 58 Nuclear power stations can preempt large areas, especially when large cooling lakes are constructed. This is likely to be an important issue when a proposed site is on productive land (e.g., agricultural land) that is locally limited in availability and is important to the local economy, or that may be needed to meet foreseeable national demand for agricultural products.
For a potential site on land devoted to specialty crop production where changes in land use might result incause market dislocations dislocation, a detailed investigation should be conducted to demonstrate that potential impacts have been identified. For e xample,under 7 CFR Part 1491, working agricultural lands are protected from conversion to nonagricultural use. Since power reactor sites under consideration are likely to be in rural areas and potentially under cultivation, this regulation may apply in determining site suitability.
The potential aesthetic impact of nuclear power stations at sites near natural -resource-oriented public use areas is important, and evaluation of such sites is dependent on consideration of the specific station design layout. Applicants must examine land use plans adopted by Federal, State, regional, or local agencies and must resolve any conflict between these plans and use of a proposed siteNUREG-1555 and RS-002offer guidance for analysis of power plant siting suitability re lated to l and use and aesthetics.
The Bureau of Land Managements Manual Handbook H-8410- 1contains information on the impact of land use and aesthetics onall five senses, and RS-002 provides guidance on State and local interaction in land use planning issues and land use control topics.
The acceptability of locating a nuclear power station near special areas of public use should be determined by consulting the responsible government agenc y. The Council on Environmental Quality has published a list of Federal agencies that have jurisdiction or expertise in land use planning, regulation, or management.12F13 Formatted: Normal, Indent: Left: 0.25", Hanging: 0.25",
The following are some of the Federal agencies that should be consulted for the special areas Don't add space between paragraphs of the same style listed:
- Advisory Council on Historic Preservation(ACHP) Formatted: List Paragraph, Indent: Left: 0.75", Bulleted +
Level: 1 + Aligned at: 2.25" + Indent at: 2.5"
- National Park Service (U.S. Department of the Interior) Formatted: Normal, Indent: Left: 0.75", Hanging: 0.25",
Don't add space between paragraphs of the same style
- National Park Service Preservation Program Formatted: List Paragraph, Indent: Left: 0.75", Bulleted +
Level: 1 + Aligned at: 2.25" + Indent at: 2.5"
- Bureau of Sport Fisheries and Wildlife (U.S. Department of Interior) National Wildlife Formatted: Normal, Indent: Left: 0.75", Hanging: 0.25",
Refuges Don't add space between paragraphs of the same style appropriate governmental entity. Formatted: List Paragraph, Indent: Left: 0.75", Bulleted +
Level: 1 + Aligned at: 2.25" + Indent at: 2.5"
- Forest Service (U.S. Department of Agriculture) Formatted: Normal, Indent: Left: 0.75", Hanging: 0.25",
Don't add space between paragraphs of the same style
- National Forest Wilderness, Primitive Areas, National Forests Formatted: Normal, Indent: Left: 0.75", Hanging: 0.25",
Don't add space between paragraphs of the same style Individual S tatesstates and local governments administer parks, recreation areas, and other public Formatted: List Paragraph, Indent: Left: 1" use and benefit areas. Information on these areas should be obtained from State and local agencies. The Information on local historic areas should be obtained from the State or Tribal historic preservation officer should be contacted for information on local historic areas..
- 13. See U.S. Council on Environmental Quality, See National Environmental Policy Act (NEPA) Implementation Procedures; Appendixes I, II, and III, (49 FR 49750,; December 21, 1984), U.S. Council on Environmental Quality.
RG 4.7, Rev. 3, Page 59 If a preliminary evaluation indicates that the use of productive land for a nuclear power station could cause significant economic dislocation, the NRC staff will require a detailed evaluation of the potential impact, together with a justification for the use of the site based on a cost-effectiveness comparison of alternative station designs and site-station combinations. The staff will also need to know whether and to what extent the land use would affect national requirements for agricultural products.
2.4.4 Visual Resources
The presence of power station structures may have adverse visual impact on residential, recreational, scenic, or cultural areas or on other areas where desirable viewing characteristics are important.
2.4.4.1 Relevant Statutes andRegulations
2.4.4.2 Related Guidance
- Bureau of Land Management Manual H -8410- 1, Visual Resource Inventory, January17, 1986 (Ref. 62)
2.4.4.3 Considerations, Regulatory Experience, and Staff Position
The presence of power station structures may have adverse visual impact on residential, recreational, scenic, or cultural areas or on other areas where desirable viewing characteristics are important.The solid angle subtended by station structures at critical viewing points is a relevant parameter.
It is important to consider t he potential aesthetic impact of nuclear power stations at sites near natural-resource-oriented public use areas and to consider the specific station design layout when evaluating such sites. Aesthetic consideratio ns need to include all five senses, since land use and aesthetics are interrelated (see Bureau of Land Management Manual H -8410- 1).
The visual intrusion of nuclear power station structures as viewed from nearby residential, recreational, scenic, or cultural areas should be controlled by selecting sites where existing topography and forests can screen station structures from areas in which visual impacts would be unacceptable.
Appropriate facility designs and operational practices can also mitigate t he land use and aesthetic effects of the construction and operation of plant s, transmission lines, and transportation corridors. For example, the r estoration of natural vegetation, creative landscaping, and the integration of structures with the environment can mitigate adverse visual impacts. However,
RG 4.7, Rev. 3, Page 60 station protection requirements for nuclear safeguards may constrain landscape design and clearing of vegetation.
NUREG-1555 offers guidance for analyzing power plant siting suitability in relation to land use and aesthetics.
- 11. NoiseSocioeconomics
2.4.5 Evaluation of the suitability of a site should therefore include consideration of purpose
Undesirable noise levels at nuclear power stations could occur during both constructionand operation.
2.4.5.1 Relevant Statutes and Regulations
- applicable Federal, State, and local noise regulations
2.4.5.2 Related Guidance
2.4.5.3 Considerations, RegulatoryExperience, and Staff Position
Undesirable noise levels at nuclear power stations could occur during both construction and operation and could have unacceptable impacts near the plant.
Noise levels at proposed sites must comply with applicable Federal, State, and local noise regulations.probable adequacy of
2.5 Socioeconomic Impacts
The siting, construction, and operation of a nuclear power station significantly affect the socioeconomic impact mitigation plans for such economic impacts on any structure of a community where local acceptance.
2.5.1 Relevant Statutes andRegulations
RG 4.7, Rev. 3, Page 61
- applicable Federal, State, and local socioeconomic policies and initiatives
2.5.2 Related Guidance
2.5.3 Considerations, Regulatory Experience, and Staff Position
The siting, construction, and operation of a nuclear power station might significantly affect the socioeconomic structure of a community and might place severe stresses on the local labor supply, transportation facilities, and community services. The tax basis and community expenditures might change, andproblems can be reasonably foreseen. might arise in determining equitable compensation for persons relocated as a result of the station siting. Section 4.4.2, Social and Economic Impacts, of NUREG-1555 contains guidance for NRC staff reviews of socioeconomic issues.
The NRC staff considers that To demonstrate that a site near a distinctive community is suitable for a nuclear power station,an evaluation of the suitability of nuclear power station sites near distinctive communities should demonstrate show that neither the construction and operation of the nuclear station, ( including transmission lines and transportation corridors, and) nor any potential problems relatingarising in relation to community services, ( such as schools, police and fire protection, water and sewage, and health facilities,) will not adversely affect the distinctive character of the community noror disproportionately affect minority or low -income populations. A preliminary investigation should be made to address environmental justice considerations and to identify and analyze problems that may arise from the proximity of a distinctive community to a proposed site. A preliminary investigation should be made to address environmental justice considerations and to identify and analyze problems that may arise from the proximity of a distinctive community to a proposed site.
Section 4.4.2, Social and Economic Impacts, of NUREG -1555 contains guidance on NRC staff reviews of socioeconomic impacts on nuclear power plant site suitability.
- 13. Certain communities near a site might be subject to unusual impacts that it would be excessively costly to mitigate. Among such communities are towns of distinctive cultural character (i.e., towns that have preserved or restored numerous places of historic interest, specialized in an unusual industry or vocational activity, or otherwise markedly distinguished themselves from other communities).
Manydifficulties can be resolved by proper coordination with the affected communities; however, some impacts might be locally unacceptable and impossible to mitigate through any reasonable program.
2.22.6 Environmental Justice
Siting decisions should reflect fair treatment and meaningful involvement of all people, including an analysis to determine whether there are any significant impacts that will fall The use of a proposed site could disproportionately onaffect minority commu nities or low --income communities. NRCs policy statement on the treatment of e nvironmental justice matters in NRC
2.6.1 Relevant Statutes and Regulations
RG 4.7, Rev. 3, Page 62
- applicable Federal, State, and local statutory and regulatory and l icensing requirement s
- Executive Order 12898, Federal Actions (Ref. 35), and Section 4.4.3, to Address Environmental Justice Impacts,in Minority Populations and Low -Income Populations, dated February 11,1994(59 FR 7629) (Ref. 63)
- Policy Statement on the Treatment of Environmental Justice Matters in NRC Regulatory and Licensing Actions (69 FR 52040; August 24,2004) (Ref. 64 )
2.6.2 Related Guidance
2.6.3 Considerations, Regulatory Experience,and Staff Position
Siting decisions should reflect fair treatment and meaningful involvement of all people and should include analysis of whether any significant impacts will fall disproportionately on minority or low-income communities. Because of the depth of this analysis, the discussion of environmental justice in the evaluation of a proposed site often rival s, in length and complexity, the discussion of socioeconomic effects on the general population.The construction of nuclear power stations should be avoided on s ites where this would have significant impacts fall ingdisproportionately on minority or low-income communities.
The NRCs policy statement in this area, Policy Statement on the Treatment of Environmental Justice Matters in NRC Regulatory and Licensing Actions (69 FR 52040),and NUREG-1555 contain guidance more information on NRC staff reviews of environmental justice issues.
- 14. Noise
Noise levels at proposed sites must comply with applicable Federal, State, and local noise regulations.
The policy statement says that the NRC is committed to the general goals of Executive Order 12898 and will strive to meet those goals through its normal and traditional NEPA review process.
Executive Order 12898 requires an agency to analyze whether its programs, policies, and activities have disproportionately high and adverse human health or environmental effects on minority or low-income populations. Executive Order 12898 is not binding upon the NRC,as the NRC is an independent regulatory agency. However, Section 6-604 of Executive Order 12898 states,
Independent agencies are requested to comply with the provisions of this order (emphasis added).
3 Limited Work Authorization Authorizations
The LWA process allows applicants to request approval to perform certain limited construction activities before the issuance of a COL.
3.1 Relevant Statutes and Regulations
RG 4.7, Rev. 3, Page 63
- 40 CFR 1508.7, Cumulative i mpacts
3.2 Related Guidance
3.3 Considerations, Regulatory Experience,and Staff Position
The LWA process allows applicants to request approval to perform certain limited construction activities before the issuance of a COL. The regulations in 10 CFR 50.10 govern the issuance of LWAs and specify the information to be included in an LWA application. The regulations clarify that activities defined as construction are those that fall within the NRCs regulatory authority, and they require an LWA because they have a reasonable nexus to radiological health and safety or the common defense and security. A ctivities not considered construction are referred to as preconstruction and may occur without an NRC licensing action.
On October 9,2007, the NRC amended 10 CFR 50.10 onLWAs to allow certain construction activities to commence before a construction permit or COL is issued (72 FR 57416). In particular, the NRC modified the definition of construction to eliminate ( 1) preparation of a site for construction (clearing, grading, installation of environmental mitigation measures, and construction of temporary roads and borrow areas), (2) excavation, ( 3) erection of support buildings, and (4) building of service facilities (paved roads, parking lots, railroad spurs, sewage treatment facilities, and transmission lines).
The activities above, which are considered preconstruction activities, are not under the NRCs regulatory jurisdiction and are evaluated as part of the cumulative impact analysis. Cumulative impact is the impact on the environment that results from the incremental impact of the action when added to other past, present, and reasonably foreseeable future actions,regardless of what agency (Federal or non-Federal) or person undertakes such other actions. Cumulativ e impact can result from individually minor but collectively significant actions taking place over a period of time. (This definition of cumulative impact appears in the regulations of the Council on Environmental Quality implementing NEPA (40 CFR 1508.7).NRC regulations state that the NRC will use 40 CFR 1508.7 in implementing NEPA ( 10 CFR 51.14(b)).) Specifically, cumulative impacts include those resulting from preconstruction, construction, operation, and decommissioning of the proposed nuclear power plant and from other past, present, and reasonably foreseeable future actions, regardless of what agency (Federal or non-Federal) or person undertakes such other actions.
The resource areas to be evaluated for cumulative impacts are generally the same onesas those evaluated in NUREG- -1555.For each project identified as contributing to the cumulative im pacts, applicants should provide a short description of briefly describe the contribution to the cumulative impact for the resource area being discussed. A table listing giving the project, the resource affected, and a short description is generally sufficient. However, if the evaluation for a resource area foundfinds that the
RG 4.7, Rev. 3, Page 64 proposed action has no impact to that on a givenresource from the action area, then that specific resource area does not need to be evaluated for cumulative impact s. For each resource area for which there is no need to evaluate cumulative impacts for that resource area. For each resource area on which there is a direct or indirect impact, applicants should do the following:
- Identify the geographic area and time per iod to be considered in evaluating the cumulative impact.
- DevelopCollect information on the relevant impacts of the proposed action relevant to cumulative impacts within the identified geographic area.
- Identify other past,p resent, or reasonably foreseeable actions that have awould contribute to the cumulative impact when added to the proposed action.
- Determine the cumulative impact to on the resource area.
- Identify plans (if any) for mitigation of adverse cumulative impacts, or actions (if any) to avoid, minimize, or mitigate adverse cumulative impacts.
RG 4.7, Rev. 3, Page 65 D. IMPLEMENTATION
RG 4.7, Rev. 3, Page 66 D. IMPLEMENTATION
The purpose of methods described inthis section is to provide information to applicantsRG will be used in evaluating applications for nuclear power reactor construction permits, early site permits, limited work authorizations, and combined licenses on how applicants may use this regulatory guide and how the NRC staff plans to use this regulatory guide.
The methods described in this regulatory guide will be used in evaluating applications for construction permits, early site permits, combined licensesESPs, COLs, and limited work authorizations, which includes information under 10 CFR 51.49(b) or (f), with respect to compliance with applicable regulations governing the siting of new nuclear power plants and testing facilities, unless the applicant proposes an acceptable alternative method for complying with those regulations. Methods that differ from those described in this regulatory guideRG may be deemed acceptable if they provide the applicant provides sufficient basis and information for the NRC staff to verify that the proposed alternative demonstrates compliancecomplies with the ap plicable NRC regulations.
RG 4.7, Rev. 3, Page 67 REFERENCES13F14
Formatted: Indent: Left: 0.25", First line: 0", Don't add The NRCs consideration of the information provided by ( I) the applicant for, or the holder of, an space between paragraphs of the same style operating license, (ii) the holder of an early site permit who subsequently seeks, under 10 CFR 52.27, a limited work authorization under 10 CFR 50.10, and (iii) the holder of a combined license, is not a siting determination. Therefore, such NRC consideration is neither backfitting nor an action inconsistent with the applicable issue finality requirements in 10 CFR Part 52.This regulatory guide may also be used by applicants for, and holders of, operating licenses and combined licenses to comply with 10 CFR 50.34.The NRCs consideration of the information provided by the holder of an operating license or combined license to address 10 CFR 50.34 is not a siting determination, nor is it considered to be backfitting or an action inconsistent with the applicable issue finality requirements in 10 CFR Part 52.
- 14. Publicly available NRC published documents are available electronically through the NRC Library on the NRCs public Web site at: http://www.nrc.gov/reading-rm/doc -collections/. Copies are and through the NRCs Agencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html. The documents can also available for inspectionbe viewed online or copying printed for a fee from in the NRCs Public Document Room (PDR) at 11555 Rockville Pike, Rockville, MD. The PDRs mailing address is USNRC For problems with ADAMS, contact the PDR, Washington, DC 20555; telephone is staff at (301) 415-4737 or (800) 397--4209; fax is (301) 415--3548; andor e--mail is PDR.Resource@nrc.gov. pdr.resource@nrc.gov.
RG 4.7, Rev. 3, Page 68 REFERENCES14F15
- 1. U.S. Code of Federal Regulations, (CFR),Domestic Licensing of Production and Utilization Facilities, Appendix A, General Design Criteria for Nuclear Power Plants, Part 50, Chapter I, Title 10, Energy. 15F16
- 2. U.S. Code of Federal Regulations,Title 40, Protection of the Environment, Parts 1500-1508, Regulations for Implementing NEPA, Council on Environmental Quality, Washington DC.
1.2. U.S. Code of Federal RegulationsCFR, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, Part 51, Chapter I, Title 10, Energy.
2.3. U.S. Code of Federal RegulationsCFR,Licenses, Certifications, and Approvals for Nuclear Power Plants, Part 52, Chapter I, Title 10, Energy.
3.4. U.S. Code of Federal RegulationsCFR,Reactor Site Criteria, Part 100,Chapter I, Title 10,
Energy.
- 5. National Environmental Policy Act of 1969 (NEPA), as amended, 42 United States Code (U.S.C.) 4321 et seq. 16F17
- 6. Executive Order 11514, Protection and Enhancement of Environmental Quality. Federal Register, 35 FR 4247. March 5, 1970, Office of the President, Washington, DC.17F18
- 7. Executive Order 11991, Environmental Impact Statements, Federal Register, 42 FR 26967.
May 25, 1977, Office of the President, Washington, DC.
- 8. CFR Chapter V -Council on Environmental Quality - Parts 1500 Through 1508, Parts 1500 - 1508, Title 40, Protection of Environment.
- 9. Federal Water Pollution Control Act of 1972 (also referred to as Clean Water Act), 33 U.S.C.
1251 et seq.
- 10. Atomic Energy Act of 1954, 42 U.S.C. 2011 et seq.
- 15. Publicly available NRC published documents are available electronically through the NRC Library on the NRCs public Web site at: http://www.nrc.gov/reading-rm/doc -collections/. Copies are and through the NRCs Agencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html. The documents can also available for inspectionbe viewed online or copying printed for a fee from in the NRCs Public Document Room (PDR) at 11555 Rockville Pike, Rockville, MD. The PDRs mailing address is USNRC For problems with ADAMS, contact the PDR, Washington, DC 20555; telephone is staff at (301) 415-4737 or (800) 397--4209; fax is (301) 415--3548; andor e--mail is PDR.Resource@nrc.gov. pdr.resource@nrc.gov.
- 10. The code of Federal Regulations is available electronically from the U.S. Government Printing Office at:
http://www.gpo.gov/fdsys/browse/collectionCfr.action?collectionCode=CFR
17 The United States Code (USC) can be obtained electronically from the Office of the Law Revision Counsel of the House of Representatives at http://uscode.house.gov/.
18 Publicly available executive orders and similar documents may be obtained through the National Archives and Records Administration at their Web site (http://www.archives.gov/), by telephone (1-866-272 -6272), fax (301 -837-0483), or U.S.
Mail at The National Archives and Records Administration, 8601 Adelphi Rd., College Park, MD 20740- 6001.
RG 4.7, Rev. 3, Page 69
- 11. Energy Reorganization Act of 1974, as amended, 42 U.S.C. 5801 et seq.
4.12. U.S. Nuclear Regulatory Commission (NRC )),Regulatory Guide (RG) 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants., Washington, DC.
5.13. NRC, RG 1.206, Combined License Application s for Nuclear Power Plants, LWR Edition, Washington, DC.
6.14. NRC, NUREG -0800, Standard Review Plan (SRP) for the review Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition, Washington, DC.
- 15. NRC, NUREG-1555, Standard Review Plans for Environmental Reviews for Nuclear Power Plants: Environmental Standard Review Plan, Washington, DC.
- 16. NRC, RG 4.2, Preparation of Environmental Reports for Nuclear Power Stations, Washington, DC.
3.1. NRC, NUREG-1555, Standard Review Plans for Environmental Reviews for Nuclear Power Formatted: Indent: Hanging: 0.5", Outline numbered +
Plants: Environmental Standard Review Plan, Washington, DC. Level: 1 + Numbering Style: 1, 2, 3, + Start at: 1 +
Alignment: Left + Aligned at: 0.5" + Indent at: 0.75" 4.1. NRC, RG 4.2, Preparation of Environmental Reports for Nuclear Power Statio ns, Formatted: Indent: Hanging: 0.5", Outline numbered +
Washington, DC. Level: 1 + Numbering Style: 1, 2, 3, + Start at: 1 +
Alignment: Left + Aligned at: 0.5" + Indent at: 0.75"
- 17. Clean Air Act of 1970, 42 U.S.C. 7401 et seq.
- 18. Endangered Species Act of 1973, 16 U.S.C. 1531 et seq.
- 19. NRC, Nuclear Regulatory Commission International Policy Statement, Federal Register,
Vol. 79, No. 132, July 10, 2014, pp. 39415-39418.
- 20. NRC, Management Directive 6.6, Regulatory Guides, Washington, DC, May 2, 2016.
Agencywide Documents Access and Management System ( ADAMS) Accession No. ML18073A170
- 21. International Atomic Energy Agency (IAEA), Safety Standards Series, Safety Requirements No. NS-R-3, Site Evaluations for Nuclear Installations, Vienna, Austria, 2003. 18F19
- 22. IAEA,Safety Standards Series, Safety Guide No. NS -G-1.5, External Events Excluding Earthquakes in the Design of Nuclear Power Plants, Vienna, Austria, 2003.
- 23. IAEA, Safety Standards, Specific Safety Requirements No. SSR -1, Site Evaluation for Nuclear Installations, Vienna, Austria, 2019.
- 24. IAEA, Safety Standards, Specific Safety Guide No. SSG -18, Meteorological and Hydrological Hazards in Site Evaluation for Nuclear Installations, Vienna, Austria, 2011.
9 Copies of International Atomic Energy Agency (IAEA) documents may be obtained through the IAEA Web site at WWW.IAEA.Org/ or by writing to the International Atomic Energy Agency, P.O. Box 100 Wagramer Strasse 5, A-1400 Vienna, Austria; telephone (+431) 2600- 0, Fax (+431) 2600 -7, or e -mail at Official.Mail@IAEA.Org.
RG 4.7, Rev. 3, Page 70
- 25. IAEA, Safety Standards, Specific Safety Guide No. SSG -21, Volcanic Hazards in Site Evaluation for Nuclear Installations, Vienna, Austria, 2012.
- 26. Electric Power Research Institute, N o. 3002005435, S ite Selection and Evaluation Criteria for New Nuclear Power Generation Facilities (Siting Guide), Palo Alto, CA, June 2015. 19F20
NRC, RG 1.29, Seismic Design Classi fication
- 5. NRC, RG 1.208, A Performance-Based Approach To Define the Site -Specific Earthquake Ground Motion, Washington, DC.
- 27. for Nuclear Power Plants, Washington, DC.
7.28. NRC, RG 1.132, Site Investigations for Foundations of Nuclear Power Plants, Washington, DC.
8.29. NRC, RG 1.138, Laboratory Investigations of Soils and Rocks for Engineering Analysis and Design of Nuclear Power Plants, Washington, DC.
9.30. NRC, RG 1.198, Procedures and Criteria for Assessing Seismic Soil Liquefaction at Nuclear Power Plant Sites, Washington, DC.
- 6. U.S. Code of Federal Regulations Standardsfor Protection Against Radiation, Part 20, Title 10, Energy.
Formatted: List Paragraph, Indent: Hanging: 0.5" 7.1. NRC, RG 1.23, Meteorological Monitoring Programs for Nuclear Powe r Plants, Formatted: Indent: Hanging: 0.5", Outline numbered +
Washington, DC. Level: 1 + Numbering Style: 1, 2, 3, + Start at: 1 +
Alignment: Left + Aligned at: 0.5" + Indent at: 0.75" NRC, Review Standard (RS) RS-002, Processing Applications for Early 10.31. NRC, RG 1.208, A Performance-Based Approach to Define theSite Pe rmits-Specific Earthquake Ground Motion, Washington, DC, ADAMS Accession No. ML032340334.
- 8. NRC, RG 1.59, Design Basis Floods for Nuclear Power Plants, Washington, DC.
Formatted: List Paragraph
- 9. NRC, RG 1.29, Seismic Design Classi fication, Washington, DC.
- 10. American National Standards Institute/American Nuclear Society (ANSI/ANS) ANSI/ANS -2.8, Determining Design Basis Flooding at Power Reactor Sites, Washington, DC, 1992. 20F21
11.32. U.S. Department of Energy ( DOE),, DOE -STD-1020- 2002, Natural Phenomena Hazards Analysis and Design and Evaluation Criteria for Department of EnergyDOE Facilities.,
Washington, DC.
- 11. DOE, STD -1021-93DOE -HDBK-1220, Natural Phenomena Hazards Performance Categorization Guidelines for Structures, SystemsAnalysis and Components, Change Notice No. 1, Washington, DC, January 1996 (reaffirmed with errata, April 2002).
10 Copies of Electric Power Research Institute documents may be obtained by contacting the Electric Power Research Institute, 3420 Hillview Avenue, Palo Alto, CA 94304; telephone: 650-855 -2000; or online at http://my.epri.com/portal/server.pt.
- 11. Copies of this document may be purchased from the American National Standards Institute (ANSI), 1819 L Street, NW., 6th floor, Washington, DC 200 36 [phone: (202) 293-8020)]. Purchase information is available through the ANSI Web site at http://webstore.ansi.org/ansidocstore/.
RG 4.7, Rev. 3, Page 71 Formatted: List Paragraph
- 12. DOE,STD -1021-94, Natural Phenomena Hazards Characterization Criteria, Change Notice No. 1, Washington, DC, January 1996 (reaffirmed with errata, April 2002).
Formatted: List Paragraph, Indent: Left: 0"
- 13. DOE, STD -1023-95, Natural Phenomena Hazards Assessment Criteria, Change Notice No. 1, Washington, DC, January 2002 (reaffirmed with errata, April 2002).
- 14. NRC, RG 1.27, Ultimate Heat Sink for Nuclear Power Plants, Washington, DC.
- 15. U.S. Code of Federal Regulations,Title 40, Protection of the Environment Pa rt 122, EPA Administered Permit Programs: The National Pollutant Discharge Elimination System, U.S.
Environmental Protection Agency, Washington, DC.
16.56. U.S. Code of Federal Regulations,Title 40, Protection of the Environment,Part 423, Steam Formatted: List Paragraph, Indent: Hanging: 0.5",
Electric Power Generating Point Source Category. Numbered + Level: 1 + Numbering Style: 1, 2, 3, + Start at: 56 + Alignment: Left + Aligned at: 0.5" + Indent at:
0.75" 17.56. America Society for Testing and Materials(ASTM), ASTM C 1733-10, Standard Test Formatted: Indent: Left: 0.25", Hanging: 0.5" Methods for Distribution Coefficients of Inorganic Species by the Batch Method, West Conshohocken, Pennsylvania.21F22 Formatted: Indent: Hanging: 0.5", Numbered + Level: 1 +
Numbering Style: 1, 2, 3, + Start at: 56 + Alignment: Left
+ Aligned at: 0.5" + Indent at: 0.75" NRC, RG 4.21, Minimization of Contamination and Radioactive Waste Generation: Life -Cycle Formatted: Indent: Left: 0.25", Hanging: 0.5" Planning, Washington, DC.
- 52. NRC, RG 1.78, Evaluating the Habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical Release, Washington, DC.
Formatted: Indent: Left: 0"
- 18. NRC, RG 1.91, Evaluations of Explosions Postulated To Occur on Transportation Routes Near Nuclear Power Plants, Washington, DC.
12.33. U.S. Department of Energy, STD -3014-2006, Accident Analysis for Aircraft Crash into HazardousDesign Handbook for DOE Facilities., Washington, DC.
- 19. U.S. Department of the Interior,22F23 Visual Resource Inventory, Bureau of Land Management, Manual Handbook H-8410- NRC, RG 1.
- 20. U.S. Code of Federal Regulations,Title 7, Agriculture, Part 1491, Farm 76, Design -Basis Tornado and Ranch Lands Protection Program.
- 21. NRC, Policy Statement on the Treatment of Environmental Justice Matters in NRC Regulatory and Licensing Actions, Federal Register, Vol. 69 No. 163, August 24, 2004, pp. 5240- 52048.
52040.
12.14 Copies of American Society for Testing and Materials (ASTM) standards may be purchases purchased from ASTM, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, Pennsylvania 19428-2959; telephone (610) 832-9585.
Purchase information is available through the ASTM Web site at http://www.astm.org.http://www.astm.org.
- 13. Copies of Department of Interior Reports can be obtained from the Department at 1849 C Street, N.W., Washington DC 20240, telephone: (202) 208-3100 or electronically through their Web site at: http://www.doi.gov/index,cfm
RG 4.7, Rev. 3, Page 72
- 22. Executive Order 12898, Federal Actions to Address Environmental Justi ce in Minority Populations and Low -Income Populations, Federal Register, Vol. 59, No. 32, pp. 7629, (59 FR 7629), February 11, 1994.23F24
- 23. International Atomic Energy Agency (IAEA), Safety Standard Series No. NS-R-3, Site EvaluationsTornado Missilesfor Nuclear Installations, Vienna, Austria.24F25 Formatted: Normal, Indent: Left: 0.5" 13.34. Electric Powe r Research Institute, (EPRI), Site Selection and Evaluation Criteria for an Early Site Permit, NO. 1006878, Palo Alto, California, March 2002. 25F26Plants, Washington, DC.
14.35. NRC, RG 1.221, Design-Basis Hurricane and Hurricane Missiles for Nuclear Power Plants, Washington, DC.
- 24. NRC, RG 1.76, Design -Basis Tornado and Tornado Missiles CFR, Environmental Radiation Protection for Nuclear Power Plants, Washington, DC.
25.1. NRC, RG 1.183, Alternative Radiological Source Terms for Evaluating Design Basis Formatted: List Paragraph, Indent: Hanging: 0.5", Outline Accidents at Nuclear Power Plants, Washington, DC. numbered + Level: 1 + Numbering Style: 1, 2, 3, + Start at: 1 + Alignment: Left + Aligned at: 0.5" + Indent at:
15.36. U.S. DepartmentOperations, Part 190, Chapter I, Title 40, Protectionof Energy Formatted: Normal, Indent: Left: 0.25", Hanging: 0.5" (DOE),26F27 Report on Lessons Learned from the NP 2010 Early Site Permit Program. Environment.
- 37. NRC, RG 1.23, Meteorological Monitoring Programs for Nuclear Powe r Plants, Washington, DC.
- 26. NRC. Vogtle ESP Safety Evaluation Report, Washington, DC,, RG 1.145, Atmosphere Dispersion ModelsADAMS Accession No. ML071581031.
16.38. NRC, NUREG-0654, Supplement 2, Criteria for Preparation and Evaluation of Radiological Emergency Plans and Preparedness in Support of Potential Accident Consequence Assessments at Nuclear Power Plants: Criteria for Emergency Planning in an Early Site
- 14. Executive orders of the President of the United States are available electronically at:
http://www.whitehouse.gov/briefing-room/presidential -action s/executive-orders.
- 15. Copies of International Atomic Energy Agency (IAEA) documents may be obtained through their Web site:
WWW.IAEA.ORG/ or by writing the International Atomic Energy Agency P. O. Box 100 Wagramer Strasse 5, A-1400 Vienna, Austria. Telephone (+431)2600-0, Fax (+431) 2600-7, or Email at Official.Mail@IAEA.org The electronic link to this document is: http://www-pub.iaea.org/MTCD/publications/PDF/Pub1177_web.pdf
- 16. Copies of Electric Power Research Institute (EPRI) documents may be obtained by contacting the Electric Power Research Institute, 3420 Hillview Avenue, Palo Alto, CA 94304, Telephone: 650- 855-2000 or on -line at http://my.epri.com/portal/server.pt.
- 17. Copies of U.S. Department of Energy (DOE) documents may be obtained from DOE at 1000 Independence Avenue, SW, Washington DC, 20585 or electronically from their web site: www.doe.gov.
RG 4.7, Rev. 3, Page 73 Permit Application, Washington, DC, ADAMS Accession No. ML050130188, Washington, DC.
- 27. NRC, NUREG/CR-7002, Cri teria for development of Evacuation Time Estimate Studies, Washington, DC, December 2012, ADAMS Accession No. ML11329A053.
- 28. U.S. Code of Federal Regulations, Physical Protection of Plants and Materials, Part 73, Title 10, Energy.
- 29. Bedient, P.B., W.F. Huber, and B.E. Vieux, Hydrology and Floodplain Analysis, Fourth Edition, Prentice Hall, Upper Saddle River, NJ, July 2007.
- 30. Riggs, H.C., Book 4, Hydrologic Analysis and Interpretation, Techniques of Water -Resources Investigations, U.S. Geological Survey, Washington, DC, 1972.27F28 Formatted: Default, Indent: Left: 0.25", Hanging: 0.5" 31.56. NRC, RG 4.11, Terrestrial Environmental Studies for Nuclear Power Stations, Washington, Formatted: Indent: Hanging: 0.5", Numbered + Level: 1 +
DC. Numbering Style: 1, 2, 3, + Start at: 56 + Alignment: Left
+ Aligned at: 0.5" + Indent at: 0.75" 17.39. NRC, RG 1.109, Calculation of Annual Doses to Man from Routine Releases of Reactor Formatted: Default, Indent: Left: 0.25", Hanging: 0.5" Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50, Appendix I, Washington, DC.
- 18. Copies of US Geological Survey publications may be obtained from the USGS National Center, 12201 Sunrise Valley Drive, Reston, VA 20192, through their Web site: http://www.usgs.gov/, or from their publications warehous e at http://pubs.er.usgs.gov/.
RG 4.7, Rev. 3, Page 74 APPENDIX A Site Safety Considerations For Assessing Site Suitability For Nuclear Power Stations This appendix provides a checklist of site safety characteristics, relevant regulations,and regulatory guides and regulatory experience and positions for assessing site suitability for nuclear power stations.
Relevant Regulations and Regulatory Experience Considerations Guidance and Position
A.1 Geology/Seismology
Geologic and seismic Title 10 of the Code of Federal Where the potential for permanent characteristics of a site, such as Regulations, Section 100.23 ground deformation such as faulting, surface faulting, ground (10 CFR 100.23), Geologic and folding, subsidence, collapse, tectonic motion, foundation conditions Seismic Siting Criteria and nontectonic deformation, and (including liquefaction, manmade activities exists at a site, the subsidence, and landslide RG 1.208, A Performance -Based staff of the U.S. Nuclear Regulatory potential), tectonic and Approach To Define the Site -Specific Commission (NRC) considers it nontectonic deformation, and Earthquake Ground Motion prudent to select an alternative site.
manmade activities may affect the safety of a nuclear power RG 1.29, Seismic Design Sites should be selected in areas for station. Classification (discusses plant safety which an adequate geologic database features that should be controlled by exists or can be expeditiously engineering design) developed through site -specific investigations to identify and RG 1.132, Site Investigations for characterize potential geological and Foundations of Nuclear Power Plants seismic hazards. The seismic and geologic (and me teorologic and RG 1.206, Combined Lic ense hydrologic) characteristics of the Applications for Nuclear Power proposed site should consider the Plants, LWR Edition most severe of the natural phenomena that have been historically reported RG 1.198, Procedures and Criteria for the site and surrounding area and for Assessing Seismic Soil include sufficient margin for the Liquefaction at Nuclear Power Plant limited accuracy, quantity, and period Sites of time in which the historical data have been accumulated. Delay in NUREG- 0800, Standard Review licensing can result from a need for Plan for the Review of Safety extensive geologic and seismic Analysis Reports for Nuclear Powe r investigations. Conservative design Plants: LWR Edition of safety-related structures should be presented when geologic, seismic, See also U.S. Department of Energy and foundation information is (DOE) documents DOE-STD-1020, questionable.
1021-93, 1022-94, 1023-95, and 1189-2008 on natural phenomena Sites with competent bedrock hazards generally have suitable foundation conditions.
If bedrock sites are not available, it is prudent to select sites in areas known to have a low subsidence and liquefaction potential. Investigations are required to determine the static
Appendix A to RG 4.7, Rev. 3, Page A-1 Relevant Regulations and Regulatory Experience Considerations Guidance and Position and dynamic engineering properties of the material underlying the site under Appendix A, Seismic and Geologic Siting Criteria for Nuclear Power Plants, to 10 CFR Part 100, Reactor Site Criteria, and 10 CFR 100.23.
A.2 Atmospheric Dispersion
The atmospheric conditions at 10 CFR Part 50, Domestic Licensing Engineered safety features can a site should provide sufficient of Production and Utilization compensate for unfavorable, dispersion of radioactive Facilities safety-related design-basis materials released during a atmospheric dispersion postulated accident to reduce 10 CFR 52.17, Contents of characteristics. Accordingly, the the radiation exposures of Applications regulatory position on atmospheric individuals at the exclusion dispersion of radiological effluents is area and low-population zone 10 CFR 52.79, Contents of also incorporated in the section boundaries to the values in Applications; Technical Information Exclusion Area and Low -Population 10 CFR 50.34, Contents of Zone (see A.3 of this appendix).
Applications; Technical Appendix B to 10 CFR Part 20, Information, 10 CFR 52.17, Annual Limits On Intake (ALIs) and Contents of Applications, Derived Air Concentrations (DACs) and 10 CFR 52.79, Contents of Radionuclides for Occupational of Applications; Technical Exposure; Effluent Concentrations; Information. Concentrations for Release to Sewerage.
The atmospheric conditions at a site should also be 10 CFR 20.1301, Dose limits for characterized to appropriately individual members of the public model dispersion of radioac tive materials released during 10 CFR 20.1302, Compliance with airborne release of fission dose limits for individual members of products from routine the public operations and anticipated operational occurrences to 10 CFR 20.1101(b), Radiation show compliance with effluent Protection Programs, as it relates to concentration limits of keeping doses to members of the Appendix B to 10 CFR Part 20 public ALARA from airborne effluent and dose limits for members of releases.
the public under 10 CFR 20.1301 and 20.1302. 10 CFR 50.34a. Appendix I, Numerical Guides for Design Objectives and Limiting Conditions for Operation to Meet the Criterion As Low as is Reasonably Achievable for Radioactive Material in Light-Water-Cooled Nuclear Power Reactor Effluents
40 CFR Part 190, Environmental Radiation Protection Standards for Nuclear Power Operations
Appendix A to RG 4.7, Rev. 3, Page A -2
Relevant Regulations and Regulatory Experience Considerations Guidance and Position
RG 1.23, Meteorological Monitoring Programs for Nuclear Power Plants
RG 1.145, Atmospheric Dispersion Models for Potential Accident Consequence Assessments at Nuclear Power Plants
RG 1.109, Calculation of Annual Doses to Man from Routine Releases of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50, Appendix I (Ref. 50 )
NUREG- 0800, Section 2.3.3, Onsite Meteorological Measurements Programs, and Section 15.0.3, Design Basis Accident Radiological Consequences of Analyses for Advanced Light Water Reactors
RG 1.183, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Plants
A.3 Exclusion Area and Low -Population Zone
In the event of a postulated 10 CFR Part 100 requires an Based on the assumptions in the accident at a nuclear power exclusion area surrounding the design basis accident radiological station, radiological reactor, in which the reactor licensee consequence analyses, the required consequences for individual has the authority to determine all distances to the exclusion area members of the public outside activities, including exclusion or boundary and the outer boundary of the station must be acceptably removal of personnel and property, the LPZ will depend on plant design low. and a low-population zone (LPZ), aspects, such as the reactor power which immediately surrounds the level, allowable containment leak exclusion area. The size of the LPZ rate, and those engineered safety must be such that the distance to the features incorporated in the design, as nearest boundary of a densely well as the atmospheric dispersion populated center with more than characteristics of the site.
25,000 residents is at least one -and-one-third times the distance from the reactor to the outer boundary of the LPZ.
10 CFR Part 50 and 10 CFR Part 52, requires that, at any point on the exclusion area boundary and on the outer boundary of the LPZ, the exposure of an individual to a postulated release of fission products (as a consequence of an accident) be
Appendix A to RG 4.7, Rev. 3, Page A -3
Relevant Regulations and Regulatory Experience Considerations Guidance and Position less than 25 rem total effective dose equivalent, for time periods specified in the regulations.
RG 1.183, Alternative Radiological RG 1.183 specifies the fractional Source Terms for Evaluating Design releases of radiological groups from Basis Accidents at Nuclear Power the core inventory, the timing of the Plants, gives calculation methods. release, their composition, and the chemical form of the design basis RG 1.206, C.I.2 Site characteristics accident source term.
NUREG- 0800, Section 2.1.2, Exclusion Area Authority and Control
A.4 Population Considerations
Locating reactors away from 10 CFR Part 100 provides the A reactor should preferably be densely populated centers is following: located such that, at the time of initial part of the NRCs defense -in-
- The applicant must determine an site approval and within about 5 years depth philosophy and facilitates exclusion area surrounding the thereafter, the population density, emergency planning and reactor, in which the reactor including weighted transient preparedness, as well as licensee has the authority to population, averaged over any radial reduces potential doses and determine all activities, including distance out to 20 miles (cumulative property damage in the event of exclusion or removal of personnel population at a distance divided by a severe accident. and property, and an LPZ, which the area at that distance), does not immediately surrounds the exceed 500 persons per square mile.
Population data ar e to be exclusion area. A reactor should not be located at a estimated in relation to the time site where the population density is of initial plant approval.
- The nearest distance to the well in excess of the above value.
Population projections should boundary of a densely populated be made by decade for a center containing more than about If the population density of the 40- year period beyond the start 25,000 residents must be at least proposed site exceeds, but is not well of power plant operations. one-and-one-third times the in excess of, the preferred value, the distance from the reactor to the analysis of alternative sites should outer boundary of the LPZ. pay particular attention to alternative sites with lower population density.
- Reactor sites should be located Other factors, such as safety, away from very densely populated environmental, or economic centers. Areas of low population characteristics, will be considered, density are generally preferred. which may result in the site with However, in determining the higher population density being found acceptability of a particular site acceptable.
located away from a very densely Transient population should be populated center but not in an area included for those sites where many of low density, consideration will people (other than those just passing be given to safety, environmental, through the area) work, reside part economic, or other factors, which time, or engage in recreational may result in the site being found activities, but are not permanent acceptable. residents of the area. The transient
population should be consi dered by
Appendix A to RG 4.7, Rev. 3, Page A -4
Relevant Regulations and Regulatory Experience Considerations Guidance and Position RG 1.206, C.I.2 Site weighing the transient population characteristics according to the fraction of time the transients are in the area.
Review Standard RS-002, Processing Population data should be estimated Applications for Early Site Permits, in relation to the time of initial plant Section 2.1.3, on consideration of approval rather than initial site projected population over the lifetime approval, as recommended in RG of the facility 1.206. Population projections should be considered over the lifetime of the NUREG-0800, Section 2.1.3, facility. This is consistent with P opulation distribution RS-002, Section 2.1.3. Further population projections should be made by decade for a 40-year period beyond the start of power plant operation. For an Early Site Permit (ESP) assume plant approval is the end of the term of the permit.
A.5 Emergency Planning
To ensure that adequate 10 CFR Part 100 requires that site The site should be examined and measures can be taken to characteristics be such that adequate evaluated to determine whether any protect members of the public plans to protect members of the public characteristics would pose a in an emergency, the in an emergency can be developed. significant impediment to taking characteristics of the site actions to protect the public in an should not preclude 10 CFR Part 50 requires the emergency.
development of such plans. following:
10 CFR 50.47(a)(1) requires a
- reasonable assurance that adequate reasonable assurance finding that protection can and will be taken in adequate protective measures can and the event of a radiological will be taken in a radiological emergency emergency. As authorized in 10 CFR 52.17(b)(2)(ii), a proposed
- generally, emergency planning site that is contiguous with an existing zones (EPZs) consisting of the nuclear power plant site should be plume exposure pathway EPZ with evaluated for the complete and an area about 16 kilometers (km) integrated emergency plans that (10 miles (mi)) in radius, and the would be necessary for construction ingestion pathway EPZ with an and operation of one or more reactors area about 80 km (50 mi) in radius at the proposed site (see also the DOE Report on Lessons Learned from the RG 1.183, on the appropriate use of NP 2010 Early Site Permit Program, alternate source terms in establishing dated March 26, 2008). For emergency response procedures such green-field siting of nuclear power as those for emergency dose plants, emergency plans for one or projections, protective measures, and more reactors should be evaluated severe accident management (see RS-002 and NUREG -0654).
NUREG- 0654/FEMA-REP-1, Rev. 1, Physical characteristics of the Criteria for Preparation and proposed site that could pose a Evaluation of Radiological significant impediment to taking Emergency Response Plans and protective actions, such as egress
Appendix A to RG 4.7, Rev. 3, Page A -5
Relevant Regulations and Regulatory Experience Considerations Guidance and Position Preparedness in Support of Nuclear limitations from the area surrounding Power Plants, for guidance on the site, should be identified.
performing an evacuation time estimate (ETE) Consideration should be given to population distribution in emergency NUREG/CR-7002 Criteria for planning Development of Evacuation Time Estimate Studies Special population groups, such as those in hospitals, prisons, schools, or other facilities that could have special needs during an emergency, should be identified.
An ETE should be performed to estimate the time that would be required to evacuate various sectors of the plume exposure EPZ, including the entire EPZ. The ETE analysis is an emergency planning tool that assesses, in an organized and systematic fashion, the feasibility of taking protective measures for the population in the surrounding area.
While lower ETEs may reflect favorable site characteristics from an emergency planning standpoint, there is no minimum required evacuation time that an applicant must meet.
A.6 Security
To prevent radiological 10 CFR 52.17(a)(1)(xii) requires, in ESP applicants should submit sabotage, the characteristics part, that an Early Site Permit (ESP) applications consistent with the and hazards of natural, applicants site safety analysis report Standard Review Plans (SRP) (see 10 existing, or proposed man-include an evaluation of the site CFR 52.17(a)(1)(xii)) and 10 CFR made features at or located in against applicable sections of the 52.17(a)(1)(x).
proximity to a proposed site Standard Review Plan (SRP) revision should not preclude in effect 6 months before the docket The proposed site characteristics and development of adequate date of the application. hazards regarding natural, existing, or security plans. proposed man-made features at or 10 CFR 52.17(a)(1)(x) requires an located in proximity to a proposed ESP applicants site safety analysis site should not preclude development report to include information of adequate security plans, and should demonstrating that site characteristics be examined and identified to are such that adequate security plans determine if they are characteristics and measures can be developed. and hazards that will not adversely affect the proposed sites security 10 CFR 100.21(f) requires that operations.
applications for site approval for commercial nuclear power reactors shall demonstrate that: Site characteristics must be such that
Appendix A to RG 4.7, Rev. 3, Page A -6
Relevant Regulations and Regulatory Experience Considerations Guidance and Position adequate security plans and measures can be developed.
NUREG- 0800, Section 13.6.1 and 13.6.3 related to the Physical Security of Combined License and Operating Reactors and Early Site Permits, addresses in part: the location of transportation routes (e.g., rail, water, and roads), pipelines, airports, hazardous material facilities, and pertinent environmental features that should be considered for the implementation of security plans and for potential adverse impacts for response activities related to security operations.
A.7 Hydrology
A.7.1 Flooding
Precipitation, wind, or 10 CFR 100.23, Geologic and To evaluate sites located in river seismically induced flooding Seismic Siting Criteria valleys, on flood plains, or along (e.g., resulting from dam coastlines where there is a potential failure, from river blockage or RG 1.59, Design Basis Floods for for flooding, the studi es described in diversion, or from distantly and Nuclear Power Plants RG 1.59 should be conducted.
locally generated sea waves) can affect the safety of a RG 1.206, C.I.2.4 Floods nuclear power station.
10 CFR Part 50, Appendix A, General Design Criteria for Nuclear Power Plants; Criterion 2, Design Bases for Protection Against Natural Phenomena
A.7.2 Water Availability
A safety-related water supply is 10 CFR 100.10, F actors to be A highly dependable system of water required for normal or considered when evaluating sites supply sources should be shown to be emergency shutdown and cools available under postulated down. 10 CFR 100.20, F actors to be occurrences of natural phenomena considered when evaluating sites and site-related accidental phenomena or combinations of such phenomena as discussed in RG 1.59.
10 CFR 100.23, Geologic and Seismic Siting Criteria To evaluate the suitability of a site, there must be a reasonable assurance RG 1.59, Design-Basis Floods For finding that the applicant can obtain, Nuclear Power Plants from the appropriate State, local, or regional agency, permits for water use
Appendix A to RG 4.7, Rev. 3, Page A -7
Relevant Regulations and Regulatory Experience Considerations Guidance and Position RG 1.27, Ultimate Heat Sink for and for water consumption in the Nuclear Power Plants quantities needed for a nuclear power plant of the stated approximate See NUREG- 0800, Section 2.4.1, for capacity and type of cooling system.
identification of sources of hydrometeorological and stream flow Statistical techniques (e.g., the 7Q10 data for determination of an adequate low-flow condition) should be used to water supply for safety-related extend and complement the period of structures, systems, and components, record to help identify the expected and Section 2.4.4, for consideration of minimum low flow for the region. If loss of water supply and its effects on the 7Q10 is too low to supply safety-related structures, systems, and adequate water for the plant, then components. other sources of water for nonsafety-related and safety-related structures and ultimate heat sink requirements should be identified.
Appendix A to RG 4.7, Rev. 3, Page A -8
Relevant Regulations and Regulatory Experience Considerations Guidance and Position
A.7.3 Water Quality
Surface and ground water 10 CFR Part 20, Standards for The NRC staff will use the criteria in conditions at a site should be Protection Against Radiation, and 10 CFR Part 20 and 10 CFR Part 50 characterized to appropriately Part 20, Appendix B, Table 2. to determine permissible model dispersion, dilution, and concentrations of radionuclides retardation of radioactive 10 CFR 20.1101(b) discharged to surface water and materials released during ground water during normal liquid effluent releases of 10 CFR 50.34a and 50.36a, and 10 operations, AOOs, and postulate d fission products generated CFR 50 Appendix I. failure of radwaste tanks containing during routine operations a nd radioactive materials.
anticipated operational occurrences (AOOs) to show 40 CFR Part 190, Environmental For sites within areas that the U.S.
compliance with liquid effluent Radiation Protection Standards f or Environmental Protection Agency concentration limits of Nuclear Power Operations (EPA) has designated as sole source Appendix B to 10 CFR Part 20 aquifers, or in sites with the potential and dose limits for members of RG 1.109, Calculation of Annual to be designated a sole source aquifer the public under 10 CFR Doses to Man from Routine Releases in the future, detailed justification 20.1301 and 20.1302, and of Reactor Effluents for the Purpose based on potential impacts to the design objectives of 10 CFR of Evaluating Compliance with 10 affected community should be Part 50, Appendix I. CFR Part 50, Appendix I. provided.
This information should also be 10 CFR Part 50 10 CFR 20.1406 require s the used to evaluate the minimization (to the extent radiological impacts on an 10 CFR 52.17, Contents of practicable) of contamination and offsite dose receptor associated applications; technical radioactive waste generation. RG with the postulated failure of a information 4.21 explains that applicants should radwaste system tank strive to minimize contamination and containing radioactive 10 CFR 52.79, Contents of radioactive waste generation over the materials via surface and applications; technical information in total life cycle of a facility, from ground water pathways. final safety analysis report initial layout and design through procedures for operation and final RG 4.21, Minimization of decontamination and dismantlement Contamination and Radioactive Waste at the time of decommissioning.
Generation: Life-Cycle Planning, as it relates to the development of a site conceptual model and early detection of radioactive leakage and offsite migration.
A.8 Industrial, Military, and Transportation Facilities
Accidents at present or 10 CFR 100.21, Non-seismic Siting Potentially hazardous facilities and projected nearby industrial, Criteria activities within 8 km (5 mi) and military, and transportation major airports within 16 km (10 mi) facilities may affect the safety 10 CFR Part 50, Appendix A, of a proposed site should be of the nuclear power station. Criterion 4, Environmental and identified. If a preliminary evaluation Dynamic Effects Design Bases of potential accidents at these facilities indicates that the potential hazards from shock waves and missiles approach or exceed those of the design-basis tornado for the
Appendix A to RG 4.7, Rev. 3, Page A -9
Relevant Regulations and Regulatory Experience Considerations Guidance and Position RG 1.206, C.I.2.1 Geography and region, or potential hazards such as Demography flammable vapor clouds, toxic chemicals, or incendiary fragments RG 1.78, Evaluating the Habitability exist, the suitability of the site should of a Nuclear Power Plant Control be determined by detailed evaluation Room During a Postulated Hazardous of the potential hazard.
Chemical Release The acceptability of a site depends on RG 1.76, Design-Basis Tornado and establishing that (1) an accident at a Tornado Missiles for Nuclear Power nearby industrial, military, or Plants transportation facility will not result in radiological consequences that RG 1.91, Evaluations of Explosions exceed the dose specified in Postulated To Occur on 10 CFR 50.34, or (2) the accident Transportation Routes Near Nuclear poses no undue risk because it is Power Plants sufficiently unlikely to occur (less than about 10-7 per year). The RG 1.183 on the appropriate use of identification of design-basis events alternate source terms in resulting from the presence of establishing emergency response hazardous materials or activities in procedures such as those for the vicinity of the plant or plants is emergency dose projections, acceptable if all postulated types of accidents are included for which the protective measures, and severe expected rate of occurrence of accident management potential exposures resulting in radiological doses in excess of 10 CFR 50.34(a)(1) as it relates to the requirements of 10 CFR Part 100, is estimated to exceed the NRC staff objective of the order of magnitude of 10-7 per year.
Appendix A to RG 4.7, Rev. 3, Page A -10
APPENDIX B Environmental Protection Considerations for Assessing Site Suitability f or Nuclear Power Stations This appendix summarizes environmental considerations related to site characteristics that should be addressed in the early stages of thesite selection proc ess. The relative importance of the different factors to be considered varies with the region or State in which the potential sites are located.
- 40. Site selection processes can be facilitated by establishing limits for various parameters based on the best judgment of specialists knowledgeable about the region under consideration.
NRC, RG 1.183, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Plants, Washington, DC.
- 41. American National Standards Institute/American Nuclear Society,ANSI/ANS -2.6-2018, Standard Guide lines for Estimating Present & Projecting Future Population Distributions SurroundingPower Reactor Sites, La Grange Park, IL.28F29
- 42. NRC, NUREG-0654/FEMA-REP-1, Revision 2, Criteri a for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, Washington, DC, December 2019.ADAMS Accession No. ML19347D139
- 43. NRC, NUREG/CR-7002, Revision 1, Criteria for D evelopment of Evacuation Time Estimate. Studies, Washington, DC, February2021. ADAMS Accession No.ML21013A504
- 44. U.S. Department of Energy (DOE),29F30 Report on Lessons Learned from the NP 2010 Early Site Permit Program, Washington, DC, March26,2008.
11 Copies of ANSI/ANS standards may be purchased from the ANS Web site (http://www.new.ans.org/store/ ), or by writing to the American Nuclear Society, 555 North Kensington Avenue, La Grange Park, IL 60526 (telephone: 800-323 -3044).
12 Copies of U.S. Department of Energy (DOE) documents may be obtained from DOE at 1000 Independence Avenue SW, Washington, DC 20585, or electronically from the DOE W eb site: www.doe.gov.
Appendix B to RG 4.7, Rev. 3, Page B -1 This RG is being issued in draft form to involve the public in the development of regulatory guidance in this area. It has not received final staff review or approval and does not represent an NRC final staff position. Public comments are being solicited on this DG and its associated regulatory analysis. Comments should be accompanied by appropriate supporting data. Comments may be submitted through the Federal rulemaking Web site, http://www.regulations.gov, by searching for draft regulatory guide DG -
4031 or Docket ID NRC -2009 -0196. Alternatively, comments may be submitted to Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Rulemakings and Adjudications Staff. Comments must be submitted by the date indicated in the Federal Register notice.
Electronic copies of this DG, previous versions of DGs, and other recently issued guides are available through the NRCs publ ic Web site under the Regulatory Guides document collection of the NRC Library at https://nrcweb.nrc.gov/reading-rm/doc -
collections/reg-guides/. The DG is also available through the NRCs Agencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html, under Accession No. ML21221A258. The regulatory analysis may be found in ADAMS under Accession No. ML21159A069.
- 45. NRC,NUREG -1923, Vogtle ESP Final Safety Evaluation Report, February 5, 2009l Washington, DC.
- 46. NRC, Final Safety Evaluation Report for the Early Site Permit Application for the Clinch River Nuclear Site, June, 2019, ADAMS Accession No. ML19162A157.
- 47. CFR, Physical Protection of Plants and Materials, Part 73, Chapter I, Title 10,Energy.
- 48. NRC, RG 1.59, Design Basis Floods for Nuclear Power Plants, Washington, DC.
- 49. American National Standards Institute/American Nuclear Society, ANSI/ANS -2.8-2019, Probabilistic Evaluation of External Flood Hazards for Nuclear Facilities, La Grange Park, IL.
- 50. NRC, RG 1.27, Ultimate Heat Sink for Nuclear Power Plants, Washington, DC.
- 51. Bedient, P.B., W.F. Huber, and B.E. Vieux, Hydrology and Floodplain Analysis, Fourth Edition, Prentice Hall, Upper Saddle River, NJ, July 2007.
- 52. Riggs, H.C., Hydrologic Analysis and Interpretation, Techniques of Water-Resources Investigations,Book 4,U.S. Geological Survey, Washington, DC, 1972. 30F31
- 53. NRC, RG 1.78, Evaluating the Habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical R elease, Washington, DC.
- 54. NRC, RG 1.91, Evaluations of Explosions Postulated t o Occur on Transportation Routes Near Nuclear Power Plants, Washington, DC.
- 55. DOE, DOE -STD-3014-2006, Accident Analysis for Aircraft Crash into Hazardous Facilities, Washington, DC.
- 56. CFR, EPA Administered Permit Programs: t he National Pollutant Discharge Elimination System, Part 122, Chapter I, Title 40, Protection of Environment.
- 57. CFR, Steam Electric Power GeneratingPoint Source Category, Part 423, Chapter I, Title 40, Protection of Environment.
- 58. America Society for Testing and Materials(ASTM), ASTM C 1733, Standard Test Method for Distribution Coefficients of Inorganic Species by the Batch Method, West Conshohocken, PA.31F32
- 59. NRC, RG 4.21, Minimization of Contamination and Radioactive Waste Generation:
Life-Cycle Planning, Washington, DC.
13 Copies of U.S. Geological Survey (USGS) publications may be obtained from the USGS National Center, 12201 Sunrise Valley Drive, Reston, VA 20192; through the USGS Web site: https://www.usgs.gov/; or from the USGS publications warehouse at https://pubs.er.usgs.gov/.
12.14 Copies of American Society for Testing and Materials (ASTM) standards may be purchases purchased from ASTM, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, Pennsylvania 19428-2959; telephone (610) 832-9585.
Purchase information is available through the ASTM Web site at http://www.astm.org.http://www.astm.org.
Formatted: Font: 11 pt
Appendix B to RG 4.7, Rev. 3 DG-4031, Page B-2
- 60. NRC, RG 4.11, Terrestrial Environmental Studies for Nuclear Power Stations, Washington, DC.
- 61. CFR,Farm and Ranch Lands Protection Program, Part 1491, Chapter XIV, Title 7, Agriculture.
- 62. U.S. Department of the Interior,Bureau of Land Management Manual H -8410- 1, Visual Resource Inventory, Grand Junction, CO, January 17, 1986. 32F33
- 63. Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low -Income Populations, Federal Register, Vol. 59, No. 32, February11, 1994, pp. 7629-7633. 33F34
- 64. NRC, Policy Statement on the Treatment of Environmental Justice Matters in NRC Regulatory and Licensing Actions, Federal Register, Vol. 69,No. 163, August 24, 2004, pp.52040- 52048.
For example, limits can be chosen for the fraction of water that can be diverted in certain situations without adversely affecting the local populations of important species. Although simplistic because important factors such as the distribution of important species in the water body are not considered, such limits can be useful in a screening process for site selection.
Considerations Parameters Regulatory Position
B.1 Preservation of Important Habitats
Important habitats are those that are The proportion of an important In general, a detailed justification essential to maintaining the habitat that would be destroyed or should be provided when the reproductive capacity and vitality of significantly altered in relation to destruction or significant important species populations the total habitat within the region alteration of more than a few (defined in Section B of this guide where the proposed site is to be percent of important habitat types under Ecological Systems and located is a useful parameter for is proposed.
Biota ) or the harvestable crop of estimating potential impacts of the economically or recreationally construction or operation of a The reproductive capacity of important species. Such habitats nuclear power station. This populations of important species include breeding areas (e.g., nesting proportion varies among species and the harvestable crop of and spawning areas), nursery, and among habitats. The region economically or recreationally feeding, resting, and wintering areas, considered in determining important populations should be wetlands, or other areas of seasonally proportions is the normal maintained unless proposed or high concentrations of individuals of geographic range of the specific probable changes can be justified.
important species. population in question.
The construction and operation of nuclear power stations (including new If endangered or threatened species transmission lines and access occur at a site, the potential effects corridors constructed in conjunction of the construction and operation of with the station) can result in the a nuclear power station should be destruction or alteration of habitats of evaluated relative to the potential
15 Copies of U.S. Department of the Interior reports can be obtained from the Department at 1849 C Street, N.W., Washington,
DC 20240; telephone: (202) 208-3100; or electronically through the Departments Web site at http://www.doi.gov/index,cfm.
16 Executive orders of the President of the United States are available electronically at http://www.whitehouse.gov/briefing-room/presidential-actions/executive-orders.
Formatted: Font: 11 pt
Appendix B to RG 4.7, Rev. 3 DG-4031, Page B-3 Considerations Parameters Regulatory Position important species, leading to changes impact on the local population and in the abundance of a species or in the the total estimated population over species composition of a community. the entire range of species.
See also Chapter 2 of RG 4.2, Preparation of Environmental Reports for Nuclear Power Stations.
See also the following statutes that provide specific mandates to protect habitats and the species that use them:
- Endangered Species Act of 1973, as amended (16 U. S.C.
1531 et seq.)
- The Fish and Wildlife Coordination Act, as amended (16 U.S.C. 661 et seq.)
- The Bald and Golden Eagle Protection Act (16 U.S.C.
668et seq.)
- The Migratory Bird Treaty Act of 1972, as amended (16 U.S.C. 703 et seq.)
- The Marine Mammal Protection Act of 1972, as amended (16 U.S.C. 1361 et seq.)
- Magnuson-Stevens Fishery Conservation and Management Act, as amended (16 U.S.C.
1801 et seq.)
- CWA Section 316(b), as implemented by National Pollutant Discharge System:
Regulations Addressing Cooling Water Intake Structures for New Facilities (40 CFR Parts 9, 122, 123, 124 and 125; 66 FRN 65256, 12/18/2001).
B.2 Migratory Routes of Important Species
Seasonal or daily migrations are The width or cross-sectional area of Narrow reaches of water bodies essential to maintaining the a water body at a proposed site should be avoided as sites for reproductive capacity of some relative to the general width or locating intake or discharge important species populations. cross-sectional area in the portion structures. A zone of passage that Formatted: Font: 11 pt
Appendix B to RG 4.7, Rev. 3 DG-4031, Page B-4 Considerations Parameters Regulatory Position of the water used by migrating will permit normal movement of Disruption of migratory patterns can species should be estimated. important species populations and result from partial or complete Suggested minimum zones of maintenance of the harvestable blockage of migratory routes by passage range from one-third to crop of economically important structures, discharge plumes, three-fourths of the width or populations should be provided.
environmental alterations, or human cross-sectional areas of narrow activities (e.g., transportation or water bodies.34F35 transmission corridor clearing and site preparation). Some species migrate in central, deeper areas while others use marginal, shallow areas. Rivers, streams, and estuaries are seldom homogeneous in their lateral dimension with respect to depth, current velocity, and habitat type.
Thus, the use of width or cross-sectional area criteria for determining adequate zones of passage should be combined with knowledge of important species and their migratory requirements.
See NUREG-1555, Standard Review Plans for Environmental Reviews for Nuclear Power Plants, Section 2.4, Ecology.
See also the following statutes as they relate to migratory routes of important species:
- The Fish and Wildl ife Coordination Act, as am ended (16 U.S.C. 661 et seq.)
- The Migratory Bird Treaty Act of 1972, as amended (16 U.S.C. 703 et seq.)
- Magnuson-Stevens Fishery Conservation and Management Act, as amended (16 U.S.C.
1801 et seq.)
B.3 Entrainment and Impingement of Aquatic Organisms
Plankton, including eggs, larvae, and The depth of the water body at the The site should have juvenile fish, can be killed or injured point of intake relative to the characteristics that allow by entrainment through power station general depth of the water body in placement of intake structures cooling systems or in discharge the vicinity of the site should be where the relative abundance of plumes. considered. The simplistic important species is small and
35 See Technical Support Document for Water Quality -based Toxics Control, United States Environmental Protection Agency, EPA/505/2-90 -001, Washington, DC, and March 1991. Formatted: Font: 11 pt
Appendix B to RG 4.7, Rev. 3 DG-4031, Page B-5 Considerations Parameters Regulatory Position parameter (proportion of water where low approach velocities The reproductive capacity of withdrawal) is suitable for use in a can be attained. (Deep regions important species populations may be screening process or site selection. are generally less productive than impaired by lethal stresses or by sub However, other factors, such as shallow areas. It is not implied lethal stresses that affect reproduction distribution of important species, that benthic intakes are of individuals or result in increased should be considered, and in all necessary.)
predation on the affected species cases, experts on the local fisheries population. should be consulted to ensure that Important habitats (see B.1 of this proposed withdrawals will not be Appendix B) should be avoided as Fish and other aquatic organisms can excessive. locations for intake structures.
be killed or injured by impingement on cooling water intake screens 35F36 or See NUREG-1555, Section 2.4, by entrainment in discharge plumes. Ecology.
See also the following statutes as they relate to e ntrainment and impingement of aquatic organisms:
- The Fish and Wildlife Coordination Act, as amended (16 U.S.C. 661 et seq.)
- Magnuson-Stevens Fishery Conservation and Management Act, as amended (16 U.S.C. 1801 et seq.)
- CWA Section 316(b), as implemented by National Pollutant Discharge System:
Regulations Addressing Cooling Water Intake Structures for New Facilities (40 CFR Parts 9, 122, 123, 124 and 125; 66 FRN 65256, 12/18/2001).
- CWA Section 316(a), National Pollutant Discharge System Regulations Addressing Cooling Water Discharges
B.4 Entrapment of Aquatic Organisms
Cooling water intake and discharge The site should have characteristics Sites where the construction of system features, such as canals and that will accommodate design intake or discharge canals would thermal plumes, can attract and entrap features that mitigate or prevent be necessary should be avoided organisms, principally fish. The entrapment. unless the site and important resulting concentration of important species characteristics are such fish species near the station site can that entry of important species to
36 Approach velocity and screen-face velocity are design criteria that may affect the impingement of larger organisms, principally fish, on intake s creens. Acceptable approach and screen-face velocities are based on swimming speeds of fish, which will vary with the species, site, and season. Formatted: Font: 11 pt
Appendix B to RG 4.7, Rev. 3 DG-4031, Page B-6 Considerations Parameters Regulatory Position result in higher mortalities from See NUREG-1555, Section 2.4, the canal can be prevented or station-related causes, such as Ecology. limited by screening.
impingement, cold shock, or gas bubble disease, than would otherwise See also the following statutes as CWA Sections 316(a) and 316(b) occur. they relate to entrapment of regulates the impact on water aquatic organisms: bodies resulting from cooling Entrapment can also interrupt normal water intake (316(b) and migratory patterns.
- The Fish and Wildlife discharge (316(a)). These are Coordination Act, as amended typically administered by state (16 U.S.C. 661 et seq.) programs which specify maximum impacts allowed on
- Magnuson-Stevens Fishery source water volume and Conservation and Management discharge water quality.
Act, as amended (16 U.S.C. 1801 et seq.)
- CWA Section 316(b), as implemented by National Pollutant Discharge System:
Regulations Addressing Cooling Water Intake Structures for New Facilities (40 CFR Parts 9, 122, 123, 124 and 125; 66 FRN 65256, 12/18/2001).
- CWA Section 316(a), National Pollutant Discharge System Regulations Addressing Cooling Water Discharges
B.5 Water Quality
Effluents discharged from nuclear Applicable State water quality Pursuant to Section 401(a)(1) of power plants are governed under the standards approved by EPA. the FWPCA (or the Clean Water authority of the Federal Water Act), certification from the State Pollution Control Act (FWPCA) See also the provisions of the that any discharge will comply (PL 92-500). FWPCA (33 U.S.C. 661 et seq.) with applicable effluent regarding restoring and maintaining limitations and other water Adequate capacity is required to limit the chemical, physical, and pollution control requirements is the impacts of discharge of cooling biological integrity of the N ation s necessary before the NRC can water into the receiving water body. waters and Title 40 of the Code of issue a construction permit, early Federal Regulations, Part 149, for site permit, or combined license, sole source aquifer designations. unless the requirement is waived by the State or the State fails to CWA Section 316(a), National act within a reasonable length of Pollutant Discharge System time.
Regulations Addressing Cooling Water Discharges Issuance of a permit pursuant to Section 402 of the FWPCA is not a prerequisite to issuance of an NRC license or permit.
Formatted: Font: 11 pt
Appendix B to RG 4.7, Rev. 3 DG-4031, Page B-7 Considerations Parameters Regulatory Position Where station construction or operation has the potential to degrade water quality to the possible detriment of other users, more detailed analyses and evaluation of water quality may be necessary.
CWA Section 316(a) regulates the impact on water bodies resulting from cooling water discharge.
316(a) is typically administered by state programs which specify maximum impacts allowed on water quality based on flow volume and thermal loading of plant discharge.
B.6 Water Availability
The consumptive use of water for Applicable Federal, State, and local Water use and consumption must cooling may be restricted by statute, statutory requirements must be met. comply with statutory may be inconsistent with water use Compatibility with the water use requirements and be compatible planning, or may lead to an plan of the cognizant water with water use plans of cognizant unacceptable impact to the water resource planning agency must be water resources planning resource. achieved. agencies.
Adequate capacity is required to limit In the absence of a water use plan, Consumptive use should be the impacts of withdrawal of cooling the effect on other water users is restricted such that the supply of water from the cooling water source. evaluated, considering flow or other users is not impaired and volume reduction and the resultant applicable surface water quality ability of all users to obtain standards can be met, assuming adequate supply and to mee t normal station operational applicable water quality standards discharges and extreme low -flow (see B.5 of this appendix). conditions defined by generally accepted engineering practices.
CWA Section 316(b), as implemented by National Pollutant For multipurpose impounded Discharge System: Regulations lakes and reservoirs, consumptive Addressing Cooling Water Intake use should be restricted such that Structures for New Facilities (40 the magnitude and frequency of CFR Parts 9, 122, 123, 124 and drawdown will not result in 125; 66 FRN 65256, 12/18/2001) unacceptable damage to important habitats (see B.1 of this appendix) or be inconsistent with the management goals for the water body.
Statistical techniques and numerical modeling (e.g., the 7Q10 low-flow condition) should be used, if applicable, to extend and complement the period of record to help identify the Formatted: Font: 11 pt
Appendix B to RG 4.7, Rev. 3 DG-4031, Page B-8 Considerations Parameters Regulatory Position expected minimum low flow for the region. If the water s supply is not adequate water for the plant, then other sources of water would need to be identified.
CWA Section 316(b) regulates the impact on water bodies resulting from cooling water withdrawal. 316(b) is typically administered by state programs which must limit impacts through ensuring proportional flow requirements.
B.7 Established Public Resource Areas
Areas dedicated by Federal, State, or Proximity to public resource area. Siting in the vicinity of designated local governments to scenic, See the National Historic public resource areas will recreational, or cultural purposes are Preservation Act, as amended (16 generally require extensive generally prohibited areas for siting U.S.C. 470 et seq.) in relation to evaluation and justification.
power stations. established resource areas.
The evaluation of the suitability Siting nuclear power stations in the Viewability (see B.10 of this of sites in the vicinity of public vicinity of established public resource appendix). resource areas is dependent on areas could result in the loss or consideration of a specific plant deterioration of important public design and station layout in resources. relation to potential impacts on the public resource area.
B.8 Prospective Designated Resource Areas
Areas containing important resources The number and extent of possible Public resource areas that are for scenic, recreational, or cultural use resource areas compared with other distinctive, unique, or rare in a might not currently be designated as similar areas available on a local, region should be avoided as sites such by public agencies but might regional, or national basis, as for nuclear power stations.
involve a net loss to the public if appropriate. Also, distinct, unique, Applicants should c onsult local converted to power generation. These or rare characteristics, since agencies if there are no adopted areas may include locally rare land prospective resource areas are land use plans.
types, such as sand dunes, wetlands, protected by land use plans.
or coastal cliffs.
B.9 Public Planning
Land use for a nuclear power station Officially adopted land use plans. Land use plans adopted by should be compatible with established Federal, State, regional, or local land use or zoning plans of Lands that will be converted to a agencies must be examined, and governmental agencies. different use by building and any conflict between these plans operating the nuclear plant. and use of a proposed site must be Nuclear power stations can preempt resolved by consultation with the large areas, especially when large appropriate governmental entity.
cooling lakes are constructed. The land requirement is likely to be an If a preliminary evaluation of the important issue when a proposed site net local economic impact of the Formatted: Font: 11 pt
Appendix B to RG 4.7, Rev. 3 DG-4031, Page B-9 Considerations Parameters Regulatory Position is on productive land (e.g., use of productive land for a agricultural land) that is locally nuclear power station indicates a limited in availability and is important potential for large economic to the local economy, or which may dislocation, the NRC staff will be needed to meet foreseeable require a detailed evaluation of national demands for agricultural the potential impact and products. justification for the use of the site based on a cost -effectiveness Under 7 CFR Part 1491, Farm and comparison of alternative station Ranch Lands Protection Program, designs and site -station working agricultural lands are combinations. To complete its protected from conversion to evaluation, the staff will also need nonagricultural use. Since power information on whether and to reactor sites under consideration are what extent the land use affects likely to be in rural areas and national requirements for potentially under cultivation, this agricultural products.
regulation could be an applicable parameter for site suitability.
B.10 Visual Resources
The presence of power station The solid angle subtended by The visual intrusion of nuclear structures may introduce adverse station structures at critical viewing power station structures as viewed visual impacts on residential, points. from nearby residential, recreational, scenic, or cultural areas recreational, scenic, or cultural or other areas with significant The definition of aesthetics needs areas should be controlled by dependence on desirable viewing to include all five senses, since land selecting sites where existing characteristics. use and aesthetics are interrelated topography and forests can be (see Bureau of Land Management, used to screen station structures Manual Handbook H -8410- 1, from those areas in which visual Visual Resource Inventory, impacts would otherwise be issued in January 1986). unacceptable.
B.11 Local Fogging and I cing
Water and water vapor released to the Increase in number of hours of The hazards for transportation atmosphere from recirculating cooling fogging or icing caused by routes from fog or ice that result systems can lead to ground fog and operation of the station. from station operation should be ice, resulting in transportation hazards evaluated. The evaluation should and damage to electric transmission include estimates of frequency of systems and vegetation. occurrence of station-induced fogging and icing and their impact on transportation, electrical transmission, vegetation, and other activities and functions.
B.12 Cooling Tower Drift
Concentrations of chemicals, The percent drift loss from The potential loss of important dissolved solids, and suspended solids recirculating condenser cooling terrestrial species and other in cooling tower drift could affect water, particle size distribution, salt resources should be considered.
terrestrial biota and result in deposition rate, local atmospheric conditions, and loss of sensitive Formatted: Font: 11 pt
Appendix B to RG 4.7, Rev. 3 DG-4031, Page B-10 Considerations Parameters Regulatory Position unacceptable damage to vegetation terrestrial biota affected by salt and other resources. deposition from cooling tower drift.
B.13 Cooling Tower Plume Lengths
Natural draft cooling towers produce The number of hours per year the The visibility of cooling tower cloud-like plumes that vary in size plume is visible as a function of plumes as a function of direction and altitude depending on the direction and distance from the and distance from cooling towers atmospheric conditions. The plumes cooling towers. should be considered. The are usually a few miles in length evaluation should include before they dissipate, although plume estimates of frequency of lengths of 20 to 30 miles have been occurrence for plumes, as well as reported from cooling towers. Visible potential hazards to aviation in the plumes emitted from cooling towers vicinity of commercial and could cause a hazard to commercial military airports.
and military aviation in the vicinity of commercial and military airports.
The plumes themselves or their shadows could have aesthetic impacts. NUREG-1555, Section 5.3.3.1, discusses procedures for evaluating the frequency of nuclear power plant plumes, as well as hazards to aviation.
B.14 Plume Interaction
Water vapor from cooling tower The degree to which impacts will The hazards to public health, plumes can interact with industrial occur will vary depending on the structures, and other resources emissions from nearby facilities to distance between the nuclear and from potential plume interaction form noxious or toxic substances that fossil-fueled sites, the hours per between cooling tower plumes could cause adverse public health year of plume interaction, the type and plumes from fossil -fueled impacts, or result in unacceptable and concentration of chemical sites and industrial emissions levels of damage to biota, structures, reaction products, the area of from nearby facilities should be and other resources. chemical fallout, and the local considered.
atmospheric conditions.
B.15 Noise
Undesirable noise levels at nuclear Applicable Federal, State, and local Noise levels at proposed sites power stations could occur during noise regulations. must comply with statutory both the construction and operation requirements.
phases and could have unacceptable impacts near the plant.
B.16 Socioeconomic Impacts
The siting, construction, and The level of impacts to the The impacts to the community operation of a nuclear power socioeconomic structure of the and surrounding area should be station might have significant community and surrounding area. considered including aspects such impacts on the socioeconomic as the economy, taxes, structure of a community and community services (e.g., schools, might place severe stresses on the police and fire protection, water
Formatted: Font: 11 pt
Appendix B to RG 4.7, Rev. 3 DG-4031, Page B-11 Considerations Parameters Regulatory Position local labor supply, transportation and sewer, and health facilities),
facilities, and community services traffic, aesthetics, and recreation.
in general. The tax basis and community expenditures might change, and problems might occur in determining equitable levels of compensation for persons relocated as a result of the station siting.
Certain communities in the neighborhood of a site might be subject to unusual impacts that would be excessively costly to mitigate. Among such communities are towns that possess notably distinctive cultural character (i.e., towns that have preserved or restored numerous places of historic interest, have specialized in an unusual industry or a vocational activity, or have otherwise markedly distinguished themselves from other communities).
A proposed site may result in Applicable Federal, State, and local Sites that will result in significant significant impacts that will fall and statutory and regulatory impacts that will fall disproportionately on minority requirements. disproportionately on minority communities or low-income communities or low-income communities. See Policy Statement on the communities should be avoided as Treatment of Environmental sites for nuclear power stations.
Justice Matters in NRC Regulatory and Licensing Actions (69 FR 52040) (Ref. 35), for consideration of environmental justice impacts.
Formatted: Font: 11 pt
Formatted: Font: 11 pt
Appendix B to RG 4.7, Rev. 3 DG-4031, Page B-12