ML21340A111
| ML21340A111 | |
| Person / Time | |
|---|---|
| Site: | 07200001 (SNM-2500) |
| Issue date: | 12/06/2021 |
| From: | GE Hitachi Nuclear Energy |
| To: | Office of Nuclear Material Safety and Safeguards |
| References | |
| Download: ML21340A111 (13) | |
Text
Year 2016 Survey Report For All Facilities Part I - Facility Information Report Date: 1/20/2017 3:54:00 PM OWTID: 7036 Category : FC OrgName: GE HITACHI NUCLEAR ENERGY FacilityName : MORRIS OPERATION Address : 7555 EAST COLLINS ROAD ContactName : Anthony McFadden MORRIS ContactTitle : PLANT MANAGER, MORRIS OPERATIO ContactPhone: (815) 942-5590 Email : anthony.mcfadden@ge.com County : GRUNDY PrincipalOfficer : Anthony McFadden PrincipalOfficerTitle : PLANT MANAGER, MORRIS OPERATIO ReportingPerson : Anthony McFadden ReportingPhone : (815) 942-5590 Part II - On-Site Waste Management IL I. Did you dispose of waste through the sanitary drain during 2016?
D 60450
- 2. Do you return unit dose syringes or other contaminated material to a radiophannacy?
D
- 3. Did you store LLRW on-site for decay to background during 2016?
D
- 4. Did you store any LLRW on-site that was in a form suitable for displosal in 2016 for future disposal?
liZl
- a. Ener the volume ofLLRW in storage as of 12/31/2015.
122 cu. ft.
- b. Enter the volume ofLLRW in storage as of 12/31/2016.
200 cu. ft.
- 5. Did you incinerate LLRW off-site, includeing scintillation fluids and specific wales?
- 6. Did you decomtaminate any articles on-site for re-ise or waste minimization?
liZl
- 7. Did you replace techniques that use radionuclides with techniques that do not?
- 8. Do you plan to generate LLRW at anytime during 2017 through 2023 that will require storage for future disposal? liZl
- 9. Will you need a Tracking System Permit Application to dispose of any LLRW at any time during 2016? D
- 10. If you already have a Tracking System Permit, does it need ammending?
D Part III - Mixed Waste I. Are you presently storing mixed wastes? D
- a. Enter the volume of mixed waste in storage during 2016 only.
0 cu. ft.
- b. Enter the total volume of mixed waste in storage as of 12/31/2016.
0 cu. ft.
- 2. What testing methods do you use to determine that your LLRW is mixed waste?
What testing methods do you use to determine that your LLRW is mixed waste?lf waste constituents are not readily apparent (contaminated lead, etc., an independent lab is used to verify waste status.
- 3. Do you plan to produce or possess mixed waste during 2017 through 2023 that will require on-site storage for future treatment or shipment for disposal at some time in the future? D
- 4. Did your facility ship mixed waste for treatment, storage, and/or disposal during 2016? D
- a. List the total volume of mixed waste shipped for treatment, storage, and/or disposal during 2016.
0 cu. ft.
Tuesdlly, June 22, 2021 Page 1 of2
Part IV-Off-Site Waste management I. Did you ship LLRW directly to a LLRW disposal facility during 2016?
- 2. Did you transfer LLRW to a waste broker and/or processor for treatment and/or disposal at a LLR W disposal facility during 2016?
0
- 3. Enter the total volume ofLLRW shipped during 2016.
0 cu. ft.
- 4. Did you have any articles decontaminated off-site for re-use or waste minimization?
D Table 1 Waste Stored On-Site for Decay to Background During 2016 Table 2 Waste Stored On-Site During 2016 for Future Disposal Waste Type Volume Activity Waste Class Treatment Radionuclides 39 __ Compactible Trash 150 0.7 40 __ Noncompactible Trash 50 0.3 Table 3 LLRWGeneration Projections (2017-2023)
Year 2017 ProjectedVolumeA:
300 ProjectedActivityA:
2 Year 2018 ProjectedVolmneA:
400 ProjectedActivityA:
4 Year 2019 ProjectedVolumeA:
500 ProjectedActivityA:
6 Year 2020 ProjectedVolumeA:
600 ProjectedActivityA:
8 Year 2021 ProjectedVolumeA:
700 ProjectedActivityA:
10 Year 2022 ProjectedVolmneA:
100 Proj ectedActivity A:
Year 2023 ProjectedVolumeA:
200 ProjectedActivityA:
2 Proj ectedV olumeB:
ProjectedActivityB:
ProjectedVolumeB:
ProjectedActivityB:
ProjectedVolumeB:
Proj cctcdActivityB:
ProjectedVolumeB:
ProjectedActivityB:
ProjectedVolumeB:
ProjectedActivityB:
ProjectedVolumeB:
ProjectedActivityB:
Proj ectedVolmneB:
Proj ectedActivityB:
Table 4 Storage of Mixed Wastes During 2016 Table 5 1l1ixed Waste Projections (2017-2023)
A 14 _ _standard Compaction A
98_],Jone o
ProjectedVolumeC:
0 ProjectedActivityC 0
ProjectedVolumeC:
0 ProjectedActivityC 0
ProjectedVolumeC:
0 ProjectedActivityC 0
ProjectedVolumeC:
o ProjectedActivityC 150 ProjectedVolumeC:
200000 ProjectedActivityC 0
ProjectedVolumeC:
0 ProjectedActivityC 0
ProjectedVolmneC:
0 ProjectedActivityC Table 6 Waste Shipped Directly to LLRW Disposal Sites During 2016 CO-60 CS-137 Nl-63 CO-60 CS-137 Nl-63 0
o 0
0 0
0 0
0 0
0 0
0 0
0 Table 7 Waste Transferred to LLRW Broker(s) and/or Processor(s) for Treatment and/or Disposal During 2016 Tuesday, June 22, 2021 Page 2 of2
Year 2017 Survey Report For All Facilities Part I - Facility I11for111atio11 Report Date : 1/8/2018 3:40:00 PM OWTID: 7036 Category : FC OrgName : GE HITACHI NUCLEAR ENERGY FacilityName: MORRIS OPERATION Address: 7555 EAST COLLINS ROAD ContactName: Anthony McFadden MORRIS ContactTitle: PLANT MANAGER, MORRIS OPERATIO ContactPhone: (815) 942-5590 Email: anthony.mcfadden@ge.com County: GRUNDY Principa!Officer : Anthony McFadden Principa!OfficerTitle : PLANT MANAGER, MORRIS OPERATIO ReportingPerson : Anthony McFadden ReportingPhone: (815) 942-5590 Part II - On-Site Waste Ma11age111e11t IL I. Did you dispose of waste through the sanitary drain during 2017?
D 60450
- 2. Do you return unit dose syringes or other contaminated material to a radiophannacy?
D
- 3. Did you store LLRW on-site for decay to background during 2017?
D
- 4. Did you store any LLRW on-site that was in a form suitable for displosal in 2017 for future disposal?
- a. Ener the volume ofLLRW in storage as of 12/31/2016.
200 cu. ft.
- b. Enter the volume ofLLRW in storage as of 12/31/2017.
210 cu. ft.
- 5. Did you incinerate LLR W off-site, includeing scintillation fluids and specific wales?
- 6. Did you decomtaminate any articles on-site for re-ise or waste minimization?
- 7. Did you replace techniques that use radionuclides with techniques that do not?
- 8. Do you plan to generate LLRW at anytime during 2018 through 2024 that will require storage for future disposal?
- 9. Will you need a Tracking System Permit Application to dispose of any LLRW at any time during 2017? D
- 10. If you already have a Tracking System Permit, does it need ammending?
D Part III - Mixed Waste I. Are you presently storing mixed wastes? D
- a. Enter the volume of mixed waste in storage during 2017 only.
0 cu. ft.
- b. Enter the total volume of mixed waste in storage as of 12/31/2017.
0 cu. ft.
- 2. What testing methods do you use to determine that your LLRW is mixed waste?
What testing methods do you use to determine that your LLRW is mixed waste?lf waste constituents are not readily apparent (contaminated lead, etc.), an independent lab is used to verify waste status.
- 3. Do you plan to produce or possess mixed waste during 2018 through 2024 that will require on-site storage for future treatment or shipment for disposal at some time in the future?
D
- 4. Did your facility ship mixed waste for treatment, storage, and/or disposal during 2017? D
- a. List the total volume of mixed waste shipped for treatment, storage, and/or disposal during 2017.
0 cu. ft.
Tuesday, June 22, 2021
Part IV-Off-Site Waste management I. Did you ship LLRW directly to a LLRW disposal facility during 2017? D
- 2. Did you transfer LLRW to a waste broker and/or processor for treatment and/or disposal at a LLRW disposal facility during 2017?
D
- 3. Enter the total volume ofLLRW shipped during 2017.
0 cu. ft.
- 4. Did you have any articles decontaminated off-site for re-use or waste minimization?
D Table 1 Waste Stored On-Site for Decay to Background During 2017 Table 2 Waste Stored On-Site During 2017 for Future Disposal Waste Type Volume Activity Waste Class Treatment Radionuclides 39 __ Compactible Trash 160 0.7 40 __ Noncompactible Trash 50 0.3 Table 3 LLRW Generation Projections (2018-2024)
Year 2018 ProjectedVolumeA:
300 ProjectedActivityA:
2 Year 2019 ProjectedVolumeA:
350 ProjectedActivityA:
3 Year 2020 ProjectedVolumeA:
400 ProjectedActivityA:
4 Year 2021 ProjectedVolumeA:
500 ProjectedActivityA:
6 Year 2022 ProjectedVolumeA:
100 Proj ectedActivity A:
Year 2023 ProjectedVolumeA:
150 ProjectedActivityA:
2 Year 2024 ProjectedVolumeA:
200 ProjectedActivityA:
3 ProjectedVolumeB:
ProjectedActivityB:
ProjectedVolumeB:
ProjectedActivityB:
ProjectedVolumeB:
Proj ectedActivityB:
ProjectedVolumeB:
ProjectedActivityB:
ProjectedVolumeB:
PrqjectedActivityB:
ProjectedVolumeB:
Proj ectedActivityB:
Proj ectedV olumeB:
ProjectedActivityB:
Table 4 Storage of Mixed Wastes During 2017 Table 5 11Jixed Waste Projections (2018-2024)
A 14_J,tandard Compaction A
98_.J\\Jone 0
ProjectedVolumeC:
0 ProjectedActivityC 0
ProjectedVolumeC:
0 ProjectedActivityC 0
ProjectedVolumeC:
0 ProjectedActivityC 150 ProjectedVolumeC:
200000 ProjectedActivityC 0
ProjectedVolumeC:
0 ProjectedActivityC 0
ProjectedVolumeC:
0 ProjectedActivityC 0
ProjectedVolumeC:
0 ProjectedActivityC Table 6 Waste Shipped Directly to LLRW Disposal Sites During 2017 CO-60 CS-137 Nl-63 CO-60 CS-137 Nl-63 0
0 0
0 0
0 0
0 0
0 0
0 0
0 Table 7 Waste Transfen*ed to LLRW Broker(s) and/or Processor(s) for Treatment and/or Disposal During 2017 Tuesday, June 22, 2021 Page2 of2
Year 2018 Survey Report For All Facilities Part I - Facility Information Report Date: 1/15/2019 2:50:00 PM OWTID: 7036 Category : FC OrgName: GE HITACHI NUCLEAR ENERGY FacilityName: MORRIS OPERATION Address : 7555 EAST COLLINS ROAD ContactN ame : Anthony McFadden MORRIS ContactTitle: PLANT MANAGER, MORRIS OPERATIO ContactPhone: (815) 942-5590 Email: anthony.mcfadden@ge.com County : GRUNDY Principa!Officer : Anthony McFadden PrincipalOfficerTitle: PLANT MANAGER, MORRIS OPERATIO ReportingPerson : Anthony McFadden ReportingPhone : (815) 942-5590 Part II - On-Site Waste Management IL I. Did you dispose of waste through the sanitary drain during 2018?
D 60450
- 2. Do you return unit dose syringes or other contaminated material to a radiophannacy?
D
- 3. Did you store LLRW on-site for decay to background during 2018?
D
- 4. Did you store any LLRW on-site that was in a form suitable for displosal in 2018 for future disposal?
[,iii
- a. Ener the volume ofLLRW in storage as of 12/31/17 210 cu. ft.
- b. Enter the volume ofLLRW in storage as of 12/31/2018 215 cu. ft.
- 5. Did you incinerate LLRW off-site, includeing scintillation fluids and specific wates?
- 6. Did you decomtaminate any articles on-site for re-ise or waste minimization?
[,iii
- 7. Did you replace techniques that use radionuclides with techniques that do not?
- 8. Do you plan to generate LLRW at anytime during 2019 through 2025 that will require storage for future disposal? [,iii
- 9. Will you need a Tracking System Permit Application to dispose of any LLRW at any time during 2018? D
- 10. If you already have a Tracking System Permit, does it need ammending?
D Part III - Mixed Waste
- 1. Are you presently storing mixed wastes? D
- a. Enter the volume of mixed waste in storage during 2018 only.
0 cu. ft.
- b. Enter the total volume of mixed waste in storage as of 12/31/2018 0 cu. ft.
- 2. What testing methods do you use to determine that your LLRW is mixed waste?
What testing methods do you use to determine that your LLRW is mixed waste?lf waste constituents are not readily apparent (contaminated lead, etc.), an independent lab is used to verify waste status.
- 3. Do you plan to produce or possess mixed waste during 2019 through 2025 that will require on-site storage for future treatment or shipment for disposal at some time in the future?
D
- 4. Did your facility ship mixed waste for treatment, storage, and/or disposal during 2018? D
- a. List the total volume of mixed waste shipped for treatment, storage, and/or disposal during 2018.
0 cu. ft.
Tuesday, June 22, 2021 Pagel
Part IV-Off-Site Waste management I. Did you ship LLRW directly to a LLRW disposal facility during 2018?
- 2. Did you transfer LLRW to a waste broker and/or processor for treatment and/or disposal at a LLRW disposal facility during 2020 ?
- 3. Enter the total volume ofLLRW shipped during 2018.
0 cu. ft.
- 4. Did you have any articles decontaminated off-site for re-use or waste minimization?
D Table 1 Waste Stored On-Site for Decay to Backgrou11d During 2018 Table 2 Waste Stored On-Site During 2018fo1* Future Disposal Waste Type Volume Activity Waste Class Treatment Radionuclides 39 __ Compactible Trash 165 0.8 40 __ Noncompactible Trash 50 0.3 Table 3 LLRW Ge11eration Projections ( 2019 - 2025)
Year 2019 ProjectedVolumeA:
350 ProjectedActivityA:
3 Year 2020 ProjectedVolumeA:
100 Proj ectedActivity A:
Year 2021 ProjectedVolumeA:
200 ProjectedActivityA:
2 Year 2022 ProjectedVolumeA:
100 ProjectedActivityA:
Year 2023 ProjectedVolumeA:
150 ProjectedActivityA:
2 Year 2024 ProjectedVolumeA:
200 ProjectedActivityA:
3 Year 2025 ProjectedVolumeA:
250 ProjectedActivityA:
4 ProjectedVolumeB:
ProjectedActivityB:
ProjectedVolumeB:
ProjectedActivityB:
ProjectedVolumeB:
ProjectedActivityB:
ProjectedVolumeB:
ProjectedActivityB:
ProjectedVolumeB:
ProjectedActivityB:
Proj ectedV olumeB:
Proj ectedActivityB:
Proj ectedV olumeB:
ProjectedActivityB:
Table 4 Storage of Mixed Wastes Duri11g 2018 Table 5 Mixed Waste Projections ( 2019-2025)
A 14 _..Standard Compaction A
98 _ _None 150 ProjectedVolumeC:
100000 ProjectedActivityC 0
ProjectedVolumeC:
0 ProjectedActivityC 150 ProjectedVolumeC:
200000 ProjcctcdActivityC 0
ProjectedVolumeC:
0 ProjectedActivityC 0
ProjectedVolumeC:
0 ProjectedActivityC 0
ProjectedVolumeC:
0 ProjectedActivityC 0
ProjectedVolumeC:
0 ProjectedActivityC Table 6 Waste Shipped Directly to LLRW Disposal Sites During 2018 CO-60 CS-137 Nl-63 CO-60 CS-137 Nl-63 0
0 0
0 0
0 0
0 0
0 0
0 0
0 Table 7 Waste Transferred to LLR W Broker(s) and/or Process01*(s) Jo,* Treatme11t a11d/or Disposal Duri11g 2018 Tuesday, June 22, 2021 Page2 of2
6/17/2021 Low Level Radioactive Waste I Generators' Survey] Previous Years Survey (JJJEJEMIA Illinois Emergency Managen1ent Agency Return to the main IEMA website Main Menu Survev. Instructions Glossarv.
Previous Years Select Year: 2019 v Part I - Facility Information Report Year: 2019 LLRW Registration Number: OWT-7036 Name of Organization:
GE HITACHI NUCLEAR ENERGY Name of Facility:
MORRIS OPERATION Street Address: 7555 EAST COLLINS ROAD City:
MORRIS State: IL Zip Code: 60450 Contact Person: Anthony McFadden Email Address: anthony.mcfadden@ge.com
Title:
PLANT MANAGER, MORRIS OPERATION Phone Number:
(815) 942-5590 County:
GRUNDY Principal Officer: Anthony McFadden Principal Officer Email:
anthony.mcfadden@ge.com
Title:
PLANT MANAGER, MORRIS OPERATION Name of person completing report: Anthony McFadden Phone Number:
{815) 942-5590 Radioactive Materials License #:
Part II - On-Site Waste Management
- 1. Did you dispose of waste through the sanitary drain during 2019?No
- i. Did you only dispose of waste through the sanitary drain?
- 2. Do you return unit dose syringes or other contaminated material to a radiopharmacy? No Help_
- i. Were these unit dose syringes or contaminated material decayed to background before being returned?
- 3. Did you store LLRW on-site for decay to background during 2019?No
- i. Did you only store waste for decay to background levels?
- 4. Did you store any other LLRW on-site that was in a form suitable for displosal in 2019for future disposal? Yes
- a. Enter the volume of LLRW in storage as of 12/31/2018. 215 cu. ft.
- b. Enter the volume of LLRW in storage as of 12/31/2019. 337 cu. ft.
5, Did you incinerate LLRW off-site, including scintillation fluids and specific wastes? No
- 6. Did you decontaminate any articles on-site for re-use or waste minimization? Yes On-site decontamination consists of: 1) Laundering contaminated clothing 2) Wiping/cleaning contaminated tools
- 7. Did you replace techniques that use radionuclides with techniques that do not? No
- 8. Do you plan to generate LLRW at anytime during 2020 through 2026 that will require storage for future displosal?
Yes https://public.iema.state.il.us/LLRWSurvey/PreviousYears.aspx 1/3
6/17/2021 Low Level Radioactive Waste I Generators' Survey I Previous Years Survey
- 9. Will you need a Tracking System Permit Application to dispose of any LLRW at any time during 2020? No
- 10. If you already have a Tracking System Permit, does it need ammending? No Part III - Mixed Waste
- 1. Are you presently storing mixed wastes? No
- a. Enter the volume of mixed waste in storage during 2019 only.
- b. Enter the total volume of mixed waste in storage as of 12/31/2019.
- 2. What testing methods do you use to determine that your LLRW is mixed waste?
If waste constituents are not readily apparent (contaminated lead, etc.), an independent lab is used to verify waste status.
- 3. Do you plan to produce or possess mixed waste during 2020 through 2026 that will require on-site storage for future treatment or shipment for disposal at some time in the future? No
- 4. Did your facility ship mixed waste for treatment, storage, and/or disposal during 2019? No
- a. List the total volume of mixed waste shipped for treatment, storage, and/or disposal during 2019.
Part IV - Off-Site Waste Management
- 2. Did you transfer LLRW to a waste broker and/or processor for treatment and/or disposal at a LLRW disposal facility during 2019? No
- 3. Enter the total volume of LLRW shipped during 2019, 195 cu, It,
- 4. Did you have any articles decontaminated off-site for re-use or waste minimization? No Table 2 Waste Stored On-Site During 2019 for Future Disposal Waste Type Volume Activity Waste Class Treatment Radionuclides 39 - Compactible Trash 186 0.005 A
14 - Standard Compaction CO-60,CS-137,Nl-63 40 - Noncompactible Trash 151 0.003 A
98 - None NI-63,CS-137,C0-60 Total Volume:
337 Table 3 LLRW Generation Projections (2020-2026)
Year Class A Volume Class A Activity Class B Volume Class B Activity Class C Volume Class C Activity 2020 100 1
0 0
0 0
2021 200 2
150 200000 0
0 2022 100 1
0 0
0 0
2023 150 1.5 0
0 0
0 2024 200 2
0 0
0 0
2025 250 2
0 0
0 0
2026 300 2.5 0
0 0
0 Table 6 Waste Shipped Directly to LLRW Disposal Sites During 2019 I
f"*'":;"'"ild::-,,, n-~.;-2;;:tot; II
'VVasta [)GSC:V i pkio.-n / Ttnsfc::tTCd VD~tl nrt(;
I Site Nuclide Activity Site Class Type Volume UT Am-241 0.00616 UT A
40 - Noncompactible Trash 195 UT C-14 0.00104 Total:
195 https://public.iema.state.il.us/LLRWSurvey/PreviousYears.aspx 2/3
6/17/2021 Low Level Radioactive Waste I Generators' Survey I Previous Years Survey UT Cm-242 1.77E-05 UT Cm-243 0.000412 UT Cm-244 0.000412 UT Co-60 271 UT Cs-137 793 UT Fe-55 0.0508 UT H-3 1.49E-05 UT 1-125 0.000487 UT 1-129 7.56E-07 UT Ni-59 0.121 UT Ni-63 133 UT Pu-238 0.000541 UT Pu-239 0.000714 UT Pu-241 0.0141 UT Sr-89 0.00446 UT Sr-90 0.0332 UT Tc-99 0.0353 UT Th-234 0.000963 UT U-234 0.0122 UT U-235 0.0011 UT U-238 0.0133 Total:
1197.296222356 https://public.iema.state.il.us/LLRWSurvey/PreviousYears.aspx 3/3
Part I - Facility Information 1/20/2021 12:41:00 PM Report Date :
7036 OWTID :
FC Category :
GE HITACHI NUCLEAR ENERGY OrgName :
MORRIS OPERATION Facility Name :
7555 EAST COLLINS ROAD Address :
Contact Name :
Contact Title :
Contact Phone :
Anthony McFadden PLANT MANAGER, MORRIS OPERATION (815) 942-5590 MORRIS IL 60450 anthony.mcfadden@ge.com GRUNDY Email :
County :
Principal Officer:
Principal Officer
Title:
Reporting Person:
Reporting Phone:
Anthony McFadden PLANT MANAGER, MORRIS OPERATION Anthony McFadden (815) 942-5590 Part II - Site Waste Management
- 1. Did you dispose of waste through the sanitary drain during 2020
- 2. Do you return unit dose syringes or other contaminated material to a radiopharmacy?
?
- 3. Did you store LLRW on-site for decay to background during
- 4. Did you store any LLRW on-site that was in a form suitable for displosal in
- a. Ener the volume of LLRW in storage as of
- b. Enter the volume of LLRW in storage as of
- 5. Did you incinerate LLRW off-site, includeing scintillation fluids and specific wates?
2020
?
2020 for future disposal?
12/31/2019 12/31/2020 No No No Yes 337 345 cu. ft cu. ft No
- 6. Did you decomtaminate any articles on-site for re-ise or waste minimization?
- 7. Did you replace techniques that use radionuclides with techniques that do not?
- 8. Do you plan to generate LLRW at anytime during Yes No for future disposal?
through 2021 2027 Yes
- 9. Will you need a Tracking System Permit Application to dispose of any LLRW at any time during 2021
- 10. If you already have a Tracking System Permit, does it need ammending? No
?
No that will require storage IL License :
1 3
of Print Date :
6/17/2021 11:59:41 AM Survey Report For All Facilities in Year 2020
Part III - Mixed Waste
- 1. Are you presently storing mixed wastes?
- a. Enter the volume of mixed waste in storage during
- b. Enter the total volume of mixed waste in storage as of
- 2. What testing methods do you use to determine that your LLRW is mixed waste?
What testing methods do you use to determine that your LLRW is mixed waste?
If waste constituents are not readily apparent (contaminated lead, etc.), an independent lab is used to verify waste status.
No 2020 only.
12/31/2020
- 3. Do you plan to produce or possess mixed waste during 2021 through 2027 on-site storage for future treatment or shipment for disposal at some time in the future?
- 4. Did your facility ship mixed waste for treatment, storage, and/or disposal during 2020
- a. List the total volume of mixed waste shipped for treatment, storage, and/or disposal during 2020 0
0 cu. ft cu. ft No 0 cu. ft Part IV - Off-Site Waste Management
?
- 2. Did you transfer LLRW to a waste broker and/or processor for treatment and/or disposal at a LLRW disposal 2020
?
facility during
- 3. Enter the total volume of LLRW shipped during 2020 0 cu. ft
- 4. Did you have any articles decontaminated off-site for re-use or waste minimization? No that will require Volume Activity Class Treatment Code Nuclide Waste Type WTDesc Method 1035 0.002127 194 0.000452 A
14 CO-60 39 Compactible Trash Standard Compaction 194 0.000452 A
14 CS-137 39 Compactible Trash Standard Compaction 194 0.000452 A
14 NI-63 39 Compactible Trash Standard Compaction Table 1 Waste Stored On-Site for Decay to Background During 2020 Table 2 Waste Stored On-Site During 2020 for Future Disposal No No No 2
3 of Print Date :
6/17/2021 11:59:41 AM Survey Report For All Facilities in Year 2020
Volume Activity Class Treatment Code Nuclide Waste Type WTDesc Method 151 0.000257 A
98 CO-60 40 Noncompactible Trash None 151 0.000257 A
98 CS-137 40 Noncompactible Trash None 151 0.000257 A
98 NI-63 40 Noncompactible Trash None Year Projected Volume A Projected Activity A Projected Volume B Projected Activity B Projected Volume C Projected Activity C 1300 12 150 200000 0
0 2021 100 1
0 0
0 0
100 1
0 0
0 0
2022 200 2
150 200000 0
0 200 2
150 200000 0
0 2023 100 1
0 0
0 0
100 1
0 0
0 0
2024 150 1.5 0
0 0
0 150 1.5 0
0 0
0 2025 200 2
0 0
0 0
200 2
0 0
0 0
2026 250 2
0 0
0 0
250 2
0 0
0 0
2027 300 2.5 0
0 0
0 300 2.5 0
0 0
0 Table 3 LLRW Generation Projections 2021 2027 Table 4 Storage of Mixed Wastes During 2020 Table 5 Mixed Waste Projections 2021
-- 2027 Table 6 Waste Shipped Directly to LLRW Disposal Sites During 2020 Table 7 Waste Transferred to LLRW Broker(s) and/or Processor(s) for Treatment and/or Disposal During 2020 3
3 of Print Date :
6/17/2021 11:59:41 AM Survey Report For All Facilities in Year 2020