ML21340A111
ML21340A111 | |
Person / Time | |
---|---|
Site: | 07200001 |
Issue date: | 12/06/2021 |
From: | GE Hitachi Nuclear Energy |
To: | Office of Nuclear Material Safety and Safeguards |
References | |
Download: ML21340A111 (13) | |
Text
Year 2016 Survey Report For All Facilities Part I - Facility Information Report Date: 1/20/2017 3:54:00 PM OWTID: 7036 Category : FC OrgName: GE HITACHI NUCLEAR ENERGY FacilityName : MORRIS OPERATION Address : 7555 EAST COLLINS ROAD MORRIS IL 60450 ContactName : Anthony McFadden ContactTitle : PLANT MANAGER, MORRIS OPERATIO ContactPhone: (815) 942-5590 Email : anthony.mcfadden@ge.com County : GRUNDY PrincipalOfficer : Anthony McFadden PrincipalOfficerTitle : PLANT MANAGER, MORRIS OPERATIO ReportingPerson : Anthony McFadden ReportingPhone : (815) 942-5590 Part II - On-Site Waste Management
I. Did you dispose of waste through the sanitary drain during 2016? D
- 2. Do you return unit dose syringes or other contaminated material to a radiophannacy? D
- 3. Did you store LLRW on-site for decay to background during 2016? D
- 4. Did you store any LLRW on-site that was in a form suitable for displosal in 2016 for future disposal? liZl
- a. Ener the volume ofLLRW in storage as of 12/31/2015. 122 cu. ft.
- b. Enter the volume ofLLRW in storage as of 12/31/2016. 200 cu. ft.
- 5. Did you incinerate LLRW off-site, includeing scintillation fluids and specific wales?
- 6. Did you decomtaminate any articles on-site for re-ise or waste minimization? liZl
- 7. Did you replace techniques that use radionuclides with techniques that do not?
- 8. Do you plan to generate LLRW at anytime during 2017 through 2023 that will require storage for future disposal? liZl
- 9. Will you need a Tracking System Permit Application to dispose of any LLRW at any time during 2016? D
- 10. If you already have a Tracking System Permit, does it need ammending? D Part III - Mixed Waste I. Are you presently storing mixed wastes? D
- a. Enter the volume of mixed waste in storage during 2016 only. 0 cu. ft.
- b. Enter the total volume of mixed waste in storage as of 12/31/2016. 0 cu. ft.
- 2. What testing methods do you use to determine that your LLRW is mixed waste?
What testing methods do you use to determine that your LLRW is mixed waste?lf waste constituents are not readily apparent (contaminated lead, etc., an independent lab is used to verify waste status.
- 3. Do you plan to produce or possess mixed waste during 2017 through 2023 that will require on-site storage for future treatment or shipment for disposal at some time in the future? D
- 4. Did your facility ship mixed waste for treatment, storage, and/or disposal during 2016? D
- a. List the total volume of mixed waste shipped for treatment, storage, and/or disposal during 2016. 0 cu. ft.
Tuesdlly, June 22, 2021 Page 1 of2 Part IV-Off-Site Waste management I. Did you ship LLRW directly to a LLRW disposal facility during 2016?
- 2. Did you transfer LLRW to a waste broker and/or processor for treatment and/or disposal at a LLR W disposal facility during 2016? 0
- 3. Enter the total volume ofLLRW shipped during 2016. 0 cu. ft.
- 4. Did you have any articles decontaminated off-site for re-use or waste minimization? D Table 1 Waste Stored On-Site for Decay to Background During 2016 Table 2 Waste Stored On-Site During 2016 for Future Disposal Waste Type Volume Activity Waste Class Treatment Radionuclides 39 __ Compactible Trash 150 0.7 A 14 _ _standard Compaction CO-60 CS-137 Nl-63 40 __ Noncompactible Trash 50 0.3 A 98_],Jone CO-60 CS-137 Nl-63 Table 3 LLRWGeneration Projections (2017-2023)
Year 2017 ProjectedVolumeA: 300 Proj ectedV olumeB: o ProjectedVolumeC: 0 ProjectedActivityA: 2 ProjectedActivityB: 0 ProjectedActivityC o Year 2018 ProjectedVolmneA: 400 ProjectedVolumeB: 0 ProjectedVolumeC: 0 ProjectedActivityA: 4 ProjectedActivityB: 0 ProjectedActivityC 0 Year 2019 ProjectedVolumeA: 500 ProjectedVolumeB: 0 ProjectedVolumeC: 0 ProjectedActivityA: 6 Proj cctcdActivityB: 0 ProjectedActivityC 0 Year 2020 ProjectedVolumeA: 600 ProjectedVolumeB: 0 ProjectedVolumeC: 0 ProjectedActivityA: 8 ProjectedActivityB: o ProjectedActivityC 0 Year 2021 ProjectedVolumeA: 700 ProjectedVolumeB: 150 ProjectedVolumeC: 0 ProjectedActivityA: 10 ProjectedActivityB: 200000 ProjectedActivityC 0 Year 2022 ProjectedVolmneA: 100 ProjectedVolumeB: 0 ProjectedVolumeC: 0 Proj ectedActivity A: ProjectedActivityB: 0 ProjectedActivityC 0 Year 2023 ProjectedVolumeA: 200 Proj ectedVolmneB: 0 ProjectedVolmneC: 0 ProjectedActivityA: 2 Proj ectedActivityB: 0 ProjectedActivityC 0 Table 4 Storage of Mixed Wastes During 2016
Table 5 1l1ixed Waste Projections (2017-2023)
Table 6 Waste Shipped Directly to LLRW Disposal Sites During 2016
Table 7 Waste Transferred to LLRW Broker(s) and/or Processor(s) for Treatment and/or Disposal During 2016
Tuesday, June 22, 2021 Page 2 of2 Year 2017 Survey Report For All Facilities Part I - Facility I11for111atio11 Report Date : 1/8/2018 3:40:00 PM OWTID: 7036 Category : FC OrgName : GE HITACHI NUCLEAR ENERGY FacilityName: MORRIS OPERATION Address: 7555 EAST COLLINS ROAD MORRIS IL 60450 ContactName: Anthony McFadden ContactTitle: PLANT MANAGER, MORRIS OPERATIO ContactPhone: (815) 942-5590 Email: anthony.mcfadden@ge.com County: GRUNDY Principa!Officer : Anthony McFadden Principa!OfficerTitle : PLANT MANAGER, MORRIS OPERATIO ReportingPerson : Anthony McFadden ReportingPhone: (815) 942-5590 Part II - On-Site Waste Ma11age111e11t
I. Did you dispose of waste through the sanitary drain during 2017? D
- 2. Do you return unit dose syringes or other contaminated material to a radiophannacy? D
- 3. Did you store LLRW on-site for decay to background during 2017? D
- 4. Did you store any LLRW on-site that was in a form suitable for displosal in 2017 for future disposal?
- a. Ener the volume ofLLRW in storage as of 12/31/2016. 200 cu. ft.
- b. Enter the volume ofLLRW in storage as of 12/31/2017. 210 cu. ft.
- 5. Did you incinerate LLR W off-site, includeing scintillation fluids and specific wales?
- 6. Did you decomtaminate any articles on-site for re-ise or waste minimization?
- 7. Did you replace techniques that use radionuclides with techniques that do not?
- 8. Do you plan to generate LLRW at anytime during 2018 through 2024 that will require storage for future disposal?
- 9. Will you need a Tracking System Permit Application to dispose of any LLRW at any time during 2017? D
- 10. If you already have a Tracking System Permit, does it need ammending? D Part III - Mixed Waste I. Are you presently storing mixed wastes? D
- a. Enter the volume of mixed waste in storage during 2017 only. 0 cu. ft.
- b. Enter the total volume of mixed waste in storage as of 12/31/2017. 0 cu. ft.
- 2. What testing methods do you use to determine that your LLRW is mixed waste?
What testing methods do you use to determine that your LLRW is mixed waste?lf waste constituents are not readily apparent (contaminated lead, etc.), an independent lab is used to verify waste status.
- 3. Do you plan to produce or possess mixed waste during 2018 through 2024 that will require on-site storage for future treatment or shipment for disposal at some time in the future? D
- 4. Did your facility ship mixed waste for treatment, storage, and/or disposal during 2017? D
- a. List the total volume of mixed waste shipped for treatment, storage, and/or disposal during 2017. 0 cu. ft.
Tuesday, June 22, 2021 Part IV-Off-Site Waste management I. Did you ship LLRW directly to a LLRW disposal facility during 2017? D
- 2. Did you transfer LLRW to a waste broker and/or processor for treatment and/or disposal at a LLRW disposal facility during 2017? D
- 3. Enter the total volume ofLLRW shipped during 2017. 0 cu. ft.
- 4. Did you have any articles decontaminated off-site for re-use or waste minimization? D Table 1 Waste Stored On-Site for Decay to Background During 2017 Table 2 Waste Stored On-Site During 2017 for Future Disposal Waste Type Volume Activity Waste Class Treatment Radionuclides 39 __ Compactible Trash 160 0.7 A 14_J,tandard Compaction CO-60 CS-137 Nl-63 40 __ Noncompactible Trash 50 0.3 A 98_.J\\Jone CO-60 CS-137 Nl-63 Table 3 LLRW Generation Projections (2018-2024)
Year 2018 ProjectedVolumeA: 300 ProjectedVolumeB: 0 ProjectedVolumeC: 0 ProjectedActivityA: 2 ProjectedActivityB: 0 ProjectedActivityC 0 Year 2019 ProjectedVolumeA: 350 ProjectedVolumeB: 0 ProjectedVolumeC: 0 ProjectedActivityA: 3 ProjectedActivityB: 0 ProjectedActivityC 0 Year 2020 ProjectedVolumeA: 400 ProjectedVolumeB: 0 ProjectedVolumeC: 0 ProjectedActivityA: 4 Proj ectedActivityB: 0 ProjectedActivityC 0 Year 2021 ProjectedVolumeA: 500 ProjectedVolumeB: 150 ProjectedVolumeC: 0 ProjectedActivityA: 6 ProjectedActivityB: 200000 ProjectedActivityC 0 Year 2022 ProjectedVolumeA: 100 ProjectedVolumeB: 0 ProjectedVolumeC: 0 Proj ectedActivity A: PrqjectedActivityB: 0 ProjectedActivityC 0 Year 2023 ProjectedVolumeA: 150 ProjectedVolumeB: 0 ProjectedVolumeC: 0 ProjectedActivityA: 2 Proj ectedActivityB: 0 ProjectedActivityC 0 Year 2024 ProjectedVolumeA: 200 Proj ectedV olumeB: 0 ProjectedVolumeC: 0 ProjectedActivityA: 3 ProjectedActivityB: 0 ProjectedActivityC 0 Table 4 Storage of Mixed Wastes During 2017
Table 5 11Jixed Waste Projections (2018-2024)
Table 6 Waste Shipped Directly to LLRW Disposal Sites During 2017
Table 7 Waste Transfen*ed to LLRW Broker(s) and/or Processor(s) for Treatment and/or Disposal During 2017
Tuesday, June 22, 2021 Page2 of2 Year 2018 Survey Report For All Facilities Part I - Facility Information Report Date: 1/15/2019 2:50:00 PM OWTID: 7036 Category : FC OrgName: GE HITACHI NUCLEAR ENERGY FacilityName: MORRIS OPERATION Address : 7555 EAST COLLINS ROAD MORRIS IL 60450 ContactN ame : Anthony McFadden ContactTitle: PLANT MANAGER, MORRIS OPERATIO ContactPhone: (815) 942-5590 Email: anthony.mcfadden@ge.com County : GRUNDY Principa!Officer : Anthony McFadden PrincipalOfficerTitle: PLANT MANAGER, MORRIS OPERATIO ReportingPerson : Anthony McFadden ReportingPhone : (815) 942-5590 Part II - On-Site Waste Management
I. Did you dispose of waste through the sanitary drain during 2018? D
- 2. Do you return unit dose syringes or other contaminated material to a radiophannacy? D
- 3. Did you store LLRW on-site for decay to background during 2018? D
- 4. Did you store any LLRW on-site that was in a form suitable for displosal in 2018 for future disposal? [,iii
- a. Ener the volume ofLLRW in storage as of 12/31/17 210 cu. ft.
- b. Enter the volume ofLLRW in storage as of 12/31/2018 215 cu. ft.
- 5. Did you incinerate LLRW off-site, includeing scintillation fluids and specific wates?
- 6. Did you decomtaminate any articles on-site for re-ise or waste minimization? [,iii
- 7. Did you replace techniques that use radionuclides with techniques that do not?
- 8. Do you plan to generate LLRW at anytime during 2019 through 2025 that will require storage for future disposal? [,iii
- 9. Will you need a Tracking System Permit Application to dispose of any LLRW at any time during 2018? D
- 10. If you already have a Tracking System Permit, does it need ammending? D
Part III - Mixed Waste
- 1. Are you presently storing mixed wastes? D
- a. Enter the volume of mixed waste in storage during 2018 only. 0 cu. ft.
- b. Enter the total volume of mixed waste in storage as of 12/31/2018 0 cu. ft.
- 2. What testing methods do you use to determine that your LLRW is mixed waste?
What testing methods do you use to determine that your LLRW is mixed waste?lf waste constituents are not readily apparent (contaminated lead, etc.), an independent lab is used to verify waste status.
- 3. Do you plan to produce or possess mixed waste during 2019 through 2025 that will require on-site storage for future treatment or shipment for disposal at some time in the future? D
- 4. Did your facility ship mixed waste for treatment, storage, and/or disposal during 2018? D
- a. List the total volume of mixed waste shipped for treatment, storage, and/or disposal during 2018. 0 cu. ft.
Tuesday, June 22, 2021 Pagel Part IV-Off-Site Waste management I. Did you ship LLRW directly to a LLRW disposal facility during 2018?
- 2. Did you transfer LLRW to a waste broker and/or processor for treatment and/or disposal at a LLRW disposal facility during 2020 ?
- 3. Enter the total volume ofLLRW shipped during 2018. 0 cu. ft.
- 4. Did you have any articles decontaminated off-site for re-use or waste minimization? D Table 1 Waste Stored On-Site for Decay to Backgrou11d During 2018 Table 2 Waste Stored On-Site During 2018fo1* Future Disposal Waste Type Volume Activity Waste Class Treatment Radionuclides 39 __ Compactible Trash 165 0.8 A 14 _..Standard Compaction CO-60 CS-137 Nl-63 40 __ Noncompactible Trash 50 0.3 A 98 _ _None CO-60 CS-137 Nl-63 Table 3 LLRW Ge11eration Projections ( 2019 - 2025)
Year 2019 ProjectedVolumeA: 350 ProjectedVolumeB: 150 ProjectedVolumeC: 0 ProjectedActivityA: 3 ProjectedActivityB: 100000 ProjectedActivityC 0 Year 2020 ProjectedVolumeA: 100 ProjectedVolumeB: 0 ProjectedVolumeC: 0 Proj ectedActivity A: ProjectedActivityB: 0 ProjectedActivityC 0 Year 2021 ProjectedVolumeA: 200 ProjectedVolumeB: 150 ProjectedVolumeC: 0 ProjectedActivityA: 2 ProjectedActivityB: 200000 ProjcctcdActivityC 0 Year 2022 ProjectedVolumeA: 100 ProjectedVolumeB: 0 ProjectedVolumeC: 0 ProjectedActivityA: ProjectedActivityB: 0 ProjectedActivityC 0 Year 2023 ProjectedVolumeA: 150 ProjectedVolumeB: 0 ProjectedVolumeC: 0 ProjectedActivityA: 2 ProjectedActivityB: 0 ProjectedActivityC 0 Year 2024 ProjectedVolumeA: 200 Proj ectedV olumeB: 0 ProjectedVolumeC: 0 ProjectedActivityA: 3 Proj ectedActivityB: 0 ProjectedActivityC 0 Year 2025 ProjectedVolumeA: 250 Proj ectedV olumeB: 0 ProjectedVolumeC: 0 ProjectedActivityA: 4 ProjectedActivityB: 0 ProjectedActivityC 0 Table 4 Storage of Mixed Wastes Duri11g 2018
Table 5 Mixed Waste Projections ( 2019-2025)
Table 6 Waste Shipped Directly to LLRW Disposal Sites During 2018
Table 7 Waste Transferred to LLR W Broker(s) and/or Process01*(s) Jo,* Treatme11t a11d/or Disposal Duri11g 2018
Tuesday, June 22, 2021 Page2 of2 6/17/2021 Low Level Radioactive Waste I Generators' Survey] Previous Years Survey Illinois Emergency Managen1ent Agency (JJJEJEMIA Return to the main IEMA website
Main Menu Survev. Instructions Glossarv. Previous Years Help_
Select Year: 2019 v
Part I - Facility Information
Report Year: 2019
LLRW Registration Number: OWT-7036
Name of Organization: GE HITACHI NUCLEAR ENERGY
Name of Facility: MORRIS OPERATION
Street Address: 7555 EAST COLLINS ROAD
City: MORRIS State: IL
Zip Code: 60450
Contact Person: Anthony McFadden
Email Address: anthony.mcfadden@ge.com
Title:
PLANT MANAGER, MORRIS OPERATION
Phone Number: (815) 942-5590
County: GRUNDY
Principal Officer: Anthony McFadden
Principal Officer Email: anthony.mcfadden@ge.com
Title:
PLANT MANAGER, MORRIS OPERATION
Name of person completing report: Anthony McFadden
Phone Number: {815) 942-5590
Radioactive Materials License #:
Part II - On-Site Waste Management
- 1. Did you dispose of waste through the sanitary drain during 2019?No
- i. Did you only dispose of waste through the sanitary drain?
- 2. Do you return unit dose syringes or other contaminated material to a radiopharmacy? No
- i. Were these unit dose syringes or contaminated material decayed to background before being returned?
- 3. Did you store LLRW on-site for decay to background during 2019?No
- i. Did you only store waste for decay to background levels?
- 4. Did you store any other LLRW on-site that was in a form suitable for displosal in 2019for future disposal? Yes
- a. Enter the volume of LLRW in storage as of 12/31/2018. 215 cu. ft.
- b. Enter the volume of LLRW in storage as of 12/31/2019. 337 cu. ft.
5, Did you incinerate LLRW off-site, including scintillation fluids and specific wastes? No
- 6. Did you decontaminate any articles on-site for re-use or waste minimization? Yes On-site decontamination consists of: 1) Laundering contaminated clothing 2) Wiping/cleaning contaminated tools
- 7. Did you replace techniques that use radionuclides with techniques that do not? No
- 8. Do you plan to generate LLRW at anytime during 2020 through 2026 that will require storage for future displosal?
Yes
https://public.iema.state.il.us/LLRWSurvey/PreviousYears.aspx 1/3 6/17/2021 Low Level Radioactive Waste I Generators' Survey I Previous Years Survey
- 9. Will you need a Tracking System Permit Application to dispose of any LLRW at any time during 2020? No
- 10. If you already have a Tracking System Permit, does it need ammending? No
Part III - Mixed Waste
- 1. Are you presently storing mixed wastes? No
- a. Enter the volume of mixed waste in storage during 2019 only.
- b. Enter the total volume of mixed waste in storage as of 12/31/2019.
- 2. What testing methods do you use to determine that your LLRW is mixed waste?
If waste constituents are not readily apparent (contaminated lead, etc.), an independent lab is used to verify waste status.
- 3. Do you plan to produce or possess mixed waste during 2020 through 2026 that will require on-site storage for future treatment or shipment for disposal at some time in the future? No
- 4. Did your facility ship mixed waste for treatment, storage, and/or disposal during 2019? No
- a. List the total volume of mixed waste shipped for treatment, storage, and/or disposal during 2019.
Part IV - Off-Site Waste Management
- 2. Did you transfer LLRW to a waste broker and/or processor for treatment and/or disposal at a LLRW disposal facility during 2019? No
- 3. Enter the total volume of LLRW shipped during 2019, 195 cu, It,
- 4. Did you have any articles decontaminated off-site for re-use or waste minimization? No
Table 2 Waste Stored On-Site During 2019 for Future Disposal
Waste Type Volume Activity Waste Class Treatment Radionuclides
39 - Compactible Trash 186 0.005 A 14 - Standard Compaction CO-60,CS-137,Nl-63
40 - Noncompactible Trash 151 0.003 A 98 -None NI-63,CS-137,C0-60
Total Volume: 337
Table 3 LLRW Generation Projections (2020-2026)
Year Class A Volume Class A Activity Class B Volume Class B Activity Class C Volume Class C Activity 2020 100 1 0 0 0 0
2021 200 2 150 200000 0 0 2022 100 1 0 0 0 0
2023 150 1.5 0 0 0 0 2024 200 2 0 0 0 0
2025 250 2 0 0 0 0 2026 300 2.5 0 0 0 0
Table 6 Waste Shipped Directly to LLRW Disposal Sites During 2019 I f"*'":;"'"ild::-,,, n-~.;-2;;:tot; II 'VVasta [)GSC:V i pkio.-n / Ttnsfc::tTCd VD~tl nrt(; I
Site Nuclide Activity Site Class Type Volume
UT Am-241 0.00616 UT A 40 - Noncompactible Trash 195
https://public.iema.state.il.us/LLRWSurvey/PreviousYears.aspx 2/3 6/17/2021 Low Level Radioactive Waste I Generators' Survey I Previous Years Survey
UT Cm-242 1.77E-05
UT Cm-243 0.000412
UT Cm-244 0.000412
UT 1-125 0.000487
UT 1-129 7.56E-07
UT Ni-59 0.121
UT Pu-238 0.000541
UT Pu-239 0.000714
UT Pu-241 0.0141
UT Sr-89 0.00446
UT Th-234 0.000963
UT U-234 0.0122
UT U-238 0.0133 Total: 1197.296222356
https://public.iema.state.il.us/LLRWSurvey/PreviousYears.aspx 3/3
Survey Report For All Facilities in Year 2020
Part I - Facility Information
Report Date : 1/20/2021 12:41:00 PM OWTID : 7036 IL License :
Category : FC OrgName : GE HITACHI NUCLEAR ENERGY Facility Name : MORRIS OPERATION
Address : 7555 EAST COLLINS ROAD MORRIS IL 60450 Contact Name : Anthony McFadden
Contact Title :PLANT MANAGER, MORRIS OPERATION Contact Phone : (815) 942-5590 Email : anthony.mcfadden@ge.com County : GRUNDY Principal Officer:Anthony McFadden Principal Officer
Title:
PLANT MANAGER, MORRIS OPERATION Reporting Person: Anthony McFadden Reporting Phone: (815) 942-5590
Part II - Site Waste Management
- 1. Did you dispose of waste through the sanitary drain during2020 ? No
- 2. Do you return unit dose syringes or other contaminated material to a radiopharmacy?No
- 3. Did you store LLRW on-site for decay to background during 2020 ? No
- 4. Did you store any LLRW on-site that was in a form suitable for displosal in2020for future disposal?Yes
- a. Ener the volume of LLRW in storage as of 12/31/2019 337 cu. ft
- b. Enter the volume of LLRW in storage as of 12/31/2020 345 cu. ft
- 5. Did you incinerate LLRW off-site, includeing scintillation fluids and specific wates?No
- 6. Did you decomtaminate any articles on-site for re-ise or waste minimization?Yes
- 7. Did you replace techniques that use radionuclides with techniques that do not?No
- 8. Do you plan to generate LLRW at anytime during 2021 through 2027 that will require storage for future disposal? Yes
- 9. Will you need a Tracking System Permit Application to dispose of any LLRW at any time during2021? No
- 10. If you already have a Tracking System Permit, does it need ammending?No
Print Date :6/17/2021 11:59:41 AM 1 of 3 Survey Report For All Facilities in Year 2020
Part III - Mixed Waste
- 1. Are you presently storing mixed wastes?No
- a. Enter the volume of mixed waste in storage during2020 only. 0 cu. ft
- b. Enter the total volume of mixed waste in storage as of 12/31/2020. 0 cu. ft
- 2. What testing methods do you use to determine that your LLRW is mixed waste?
What testing methods do you use to determine that your LLRW is mixed waste?
If waste constituents are not readily apparent (contaminated lead, etc.), an independent lab is used to verify waste status.
- 3. Do you plan to produce or possess mixed waste during 2021 through 2027 that will require on-site storage for future treatment or shipment for disposal at some time in the future?No
- 4. Did your facility ship mixed waste for treatment, storage, and/or disposal during 2020.No
- a. List the total volume of mixed waste shipped for treatment, storage, and/or disposal during2020 0 cu. ft Part IV - Off-Site Waste Management
- 2. Did you transfer LLRW to a waste broker and/or processor for treatment and/or disposal at a LLRW disposal facility during 2020 ? No
- 3. Enter the total volume of LLRW shipped during2020. 0 cu. ft
- 4. Did you have any articles decontaminated off-site for re-use or waste minimization?No
Table 1 Waste Stored On-Site for Decay to Background During 2020
Table 2 Waste Stored On-Site During 2020 for Future Disposal
Volume Activity Class Treatment Nuclide Waste WTDesc Method Code Type 1035 0.002127 194 0.000452 A 14 CO-60 39 Compactible Trash Standard Compaction 194 0.000452 A 14 CS-137 39 Compactible Trash Standard Compaction 194 0.000452 A 14 NI-63 39 Compactible Trash Standard Compaction
Print Date : 6/17/2021 11:59:41 AM 2 of 3 Survey Report For All Facilities in Year 2020 Volume Activity Class Treatment Nuclide Waste WTDesc Method Code Type 151 0.000257 A 98 CO-60 40 Noncompactible None Trash 151 0.000257 A 98 CS-137 40 Noncompactible None Trash 151 0.000257 A 98 NI-63 40 Noncompactible None Trash
Table 3 LLRW Generation Projections 2021 --2027
Year Projected Projected Projected Projected Projected Projected Volume A Activity A Volume B Activity B Volume C Activity C 1300 12 150 200000 0 0 2021 100 1 0 0 0 0 100 1 0 0 0 0 2022 200 2 150 200000 0 0 200 2 150 200000 0 0 2023 100 1 0 0 0 0 100 1 0 0 0 0 2024 150 1.5 0 0 0 0 150 1.5 0 0 0 0 2025 200 2 0 0 0 0 200 2 0 0 0 0 2026 250 2 0 0 0 0 250 2 0 0 0 0 2027 300 2.5 0 0 0 0 300 2.5 0 0 0 0
Table 4 Storage of Mixed Wastes During 2020
Table 5 Mixed Waste Projections2021 --2027
Table 6 Waste Shipped Directly to LLRW Disposal Sites During2020
Table 7 Waste Transferred to LLRW Broker(s) and/or Processor(s) for Treatment and/or Disposal During2020
Print Date :6/17/2021 11:59:41 AM 3 of 3