Letter Sequence Request |
---|
EPID:L-2021-LLA-0159, Request for Licensing Amendment Regarding Transition to GNF3 Fuel (Approved, Closed) |
|
MONTHYEARML21257A4192021-02-22022 February 2021, 14 September 2021 Request for Licensing Amendment Regarding Transition to GNF3 Fuel Project stage: Request ML21257A4202021-09-14014 September 2021 Request for Licensing Amendment Regarding Transition to GNF3 Fuel Project stage: Request ML21294A0032021-10-26026 October 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request Regarding Transition to GNF3 Fuel Project stage: Acceptance Review RS-21-113, Response to Supplemental Request for Information Related to Request for Licensing Amendment Regarding Transition to GNF3 Fuel2021-11-0303 November 2021 Response to Supplemental Request for Information Related to Request for Licensing Amendment Regarding Transition to GNF3 Fuel Project stage: Request ML21312A5612021-11-0808 November 2021 Acceptance Review: Quad Cities, Units 1 and 2 - License Amendment Request Regarding Transition to GNF3 Fuel Project stage: Acceptance Review ML21301A2202021-11-10010 November 2021 Request for Withholding Information from Public Disclosure for Quad Cities Nuclear Power Station, Units 1 and 2 License Amendment Request Regarding Transition to GNF3 Fuel Project stage: Withholding Request Acceptance ML21301A2262021-11-10010 November 2021 Request for Withholding Information from Public Disclosure for Quad Cities Nuclear Power Station, Units 1 and 2 License Amendment Request Regarding Transition to GNF3 Fuel Project stage: Request ML21301A2192021-11-10010 November 2021 Request for Withholding Information from Public Disclosure for Quad Cities Nuclear Power Station, Units 1 and 2 License Amendment Request Regarding Transition to GNF3 Fuel Project stage: Withholding Request Acceptance ML21342A3842021-12-0808 December 2021 NRR E-mail Capture - Request for Additional Information: Quad Cities 1 & 2 License Amendment Request Transition to GNF3 Fuel Project stage: RAI ML21347A0012021-12-20020 December 2021 Audit Plan to Support the Review of NEDC-33930p, Revision 0, Gexl98 Correlation for Atrium 10xm Fuel Included in the License Amendment Request Regarding Transition to Gnf3 Fuel Project stage: Other ML22032A1252022-02-0303 February 2022 Audit Plan to Support the Review of Licensees Information Related to Equipment Qualification License Amendment Request for Transition to Gnf3 Fuel Project stage: Other ML22076A1122022-03-15015 March 2022 Request for Additional Information Related to the Amendment Request to Transition to GNF3 Fuels (EPID L-2021-LLA-0159) (Redacted) Project stage: RAI ML22098A0832022-05-0404 May 2022 Regulatory Audit Report Regarding License Amendment Request to Transition to Gnf3 Fuel Project stage: Other ML22165A2752022-06-16016 June 2022 Audit Plan to Support the Review of Exelon Calculation for Dispersion Factors Included in the License Amendment Request Regarding Transition to Gnf3 Fuel Project stage: Other ML22214A0042022-08-0202 August 2022 Audit Plan to Support the Review of Amendments to Revise Criticality Safety Analysis Methodologies (Epids L-2022-LLA-0085, L-2021-LLA-0124, and L-2021-LLA-0159) Project stage: Other ML22229A0302022-09-0707 September 2022 Regulatory Audit Report Regarding License Amendment Request to Transition to GNF3 Fuel Project stage: Other ML22300A2532022-11-0303 November 2022 Regulatory Audit Report to Support the Review of Amendments to Revise Criticality Safety Analysis Methodologies (Epids L-2022-LLA-0085, L-2021-LLA-0124, and L-2021-LLA-0159) Project stage: Approval ML22298A0022022-12-15015 December 2022 Issuance of Amendment Nos. 293 and 289 Transition to GNF3 Fuel (EPID L-2021-LLA-0159) (Public) Project stage: Approval 2021-09-14
[Table View] |
|
---|
Category:Letter type:RS
MONTHYEARRS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-078, Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval2024-08-20020 August 2024 Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed2024-06-0606 June 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-05-10010 May 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-04-0505 April 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF2024-03-19019 March 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS2024-03-15015 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS RS-24-015, Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval2024-02-29029 February 2024 Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 262023-10-20020 October 2023 Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2023-06-0808 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0808 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-22-067, 10 CFR 50.46 Annual Report2023-05-0404 May 2023 10 CFR 50.46 Annual Report RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell2023-04-28028 April 2023 Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell RS-23-058, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges2023-04-24024 April 2023 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-007, Application to Adopt TSTF-564, Safety Limit MCPR2023-03-0303 March 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-032, Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location2023-02-0303 February 2023 Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location RS-23-034, Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program2023-02-0202 February 2023 Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-033, Request for Exemption from 10 CFR 2.109(b)2023-01-27027 January 2023 Request for Exemption from 10 CFR 2.109(b) RS-23-005, Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves2023-01-17017 January 2023 Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves RS-22-127, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-10 Reactor Pressure Vessel Penetration N-11B Repair2022-12-14014 December 2022 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-10 Reactor Pressure Vessel Penetration N-11B Repair RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-119, Withdrawal of Relief Request RV-11 Associated with the Sixth Inservice Testing Interval2022-10-31031 October 2022 Withdrawal of Relief Request RV-11 Associated with the Sixth Inservice Testing Interval RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-112, Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval2022-10-0707 October 2022 Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval RS-22-108, Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage2022-10-0505 October 2022 Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-102, Supplement to Request to Revise Technical Specification 3.1.4, Control Rod Scam Times2022-08-18018 August 2022 Supplement to Request to Revise Technical Specification 3.1.4, Control Rod Scam Times RS-22-095, Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel2022-08-10010 August 2022 Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel RS-22-096, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval2022-08-10010 August 2022 Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval 2024-08-20
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed2024-06-0606 June 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-05-10010 May 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-04-0505 April 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF2024-03-19019 March 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell2023-04-28028 April 2023 Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell RS-23-005, Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves2023-01-17017 January 2023 Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves ML23012A0832023-01-12012 January 2023 Response to Request for Additional Information for Alternative I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-108, Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage2022-10-0505 October 2022 Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage RS-22-095, Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel2022-08-10010 August 2022 Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel RS-22-096, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval2022-08-10010 August 2022 Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval RS-22-098, Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-282022-08-0101 August 2022 Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-28 RS-22-090, Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies2022-07-13013 July 2022 Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies RS-22-077, Response to Request for Additional Information for Quad Cities Relief Requests RV-08, Safety Relief Valves2022-06-30030 June 2022 Response to Request for Additional Information for Quad Cities Relief Requests RV-08, Safety Relief Valves RS-22-078, Response to Request for Additional Information for Quad Cities Relief Request RV-09, MSSVs2022-06-30030 June 2022 Response to Request for Additional Information for Quad Cities Relief Request RV-09, MSSVs RS-22-040, Response to Request for Additional Information Related to the License Amendment Request to Transition to GNF3 Fuel2022-04-11011 April 2022 Response to Request for Additional Information Related to the License Amendment Request to Transition to GNF3 Fuel RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-02-0202 February 2022 Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs RS-22-005, Response to Request for Additional Information for the GNF3 Fuel Transition License Amendment Request2022-01-11011 January 2022 Response to Request for Additional Information for the GNF3 Fuel Transition License Amendment Request RS-21-113, Response to Supplemental Request for Information Related to Request for Licensing Amendment Regarding Transition to GNF3 Fuel2021-11-0303 November 2021 Response to Supplemental Request for Information Related to Request for Licensing Amendment Regarding Transition to GNF3 Fuel JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-04-20020 April 2021 Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting RS-20-112, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-5682020-09-0303 September 2020 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-568 RS-20-008, Response to Request for Additional Information for the License Amendment Request to Change Technical Specifications to Increase Allowable MSIV Leakage Rates and Revise Secondary Containment.2020-02-24024 February 2020 Response to Request for Additional Information for the License Amendment Request to Change Technical Specifications to Increase Allowable MSIV Leakage Rates and Revise Secondary Containment. JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-06-0404 June 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants2019-05-0101 May 2019 Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-01-0808 January 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 RS-18-143, Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements2018-11-29029 November 2018 Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements RS-18-097, Response to Request for Additional Information and Supplemental Information-License Amendment.2018-07-27027 July 2018 Response to Request for Additional Information and Supplemental Information-License Amendment. RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2018-05-0202 May 2018 Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) RS-18-004, Additional Information Supporting Reactor Pressure Vessel Penetration N-11B Repair Relief Request I5R-112018-01-0404 January 2018 Additional Information Supporting Reactor Pressure Vessel Penetration N-11B Repair Relief Request I5R-11 RS-17-130, Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2017-09-28028 September 2017 Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RS-17-111, Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2017-07-27027 July 2017 Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RS-17-041, Response to Request for Additional Information Regarding Request for License Amendment to Revise Loss of Voltage Relay Settings2017-04-24024 April 2017 Response to Request for Additional Information Regarding Request for License Amendment to Revise Loss of Voltage Relay Settings RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-03-13013 March 2017 Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography RS-16-254, Supplemental Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-12-15015 December 2016 Supplemental Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RS-16-244, Additional Information Regarding Request for License Amendment to Address Secondary Containment Access Openings2016-12-12012 December 2016 Additional Information Regarding Request for License Amendment to Address Secondary Containment Access Openings RS-16-229, Supplemental Information Regarding Request for License Amendment to Revise Loss of Voltage Relay Settings2016-11-21021 November 2016 Supplemental Information Regarding Request for License Amendment to Revise Loss of Voltage Relay Settings RS-16-159, County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment to Address Secondary Containment Access Openings2016-07-28028 July 2016 County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment to Address Secondary Containment Access Openings RS-16-131, Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Methodology for Fuel Channel Bow/Bulge2016-06-0101 June 2016 Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Methodology for Fuel Channel Bow/Bulge RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure2016-05-26026 May 2016 Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure RS-16-105, Supplemental Information in Support of Request for License Amendment Regarding Transition to Areva Fuel2016-04-26026 April 2016 Supplemental Information in Support of Request for License Amendment Regarding Transition to Areva Fuel RS-16-077, Response to Request for Additional Information Regarding Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls.2016-04-14014 April 2016 Response to Request for Additional Information Regarding Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. RS-16-044, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima..2016-02-19019 February 2016 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.. RS-16-018, Response to Request for Additional Information Regarding Request for License Amendment Regarding Transition to Areva Fuel2016-01-28028 January 2016 Response to Request for Additional Information Regarding Request for License Amendment Regarding Transition to Areva Fuel 2024-06-06
[Table view] |
Text
4300 Winfield Road Warrenville, IL 60555 630 657 2000 Office 10 CFR 50.90 RS-21-113 November 3, 2021 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265
Subject:
Response to Supplemental Request for Information Related to Request for Licensing Amendment Regarding Transition to GNF3 Fuel
References:
- 1. Letter from P.R. Simpson (Exelon Generation Company, LLC) to U.S.
Nuclear Regulatory Commission, "Request for Licensing Amendment Regarding Transition to GNF3 Fuel," dated September 14, 2021 (ML21257A420)
- 2. Letter from B. Venkataraman (U.S. Nuclear Regulatory Commission) to D. P.
Rhoades (Exelon Generation Company, LLC), "Quad Cities Nuclear Power Station, Units 1 and 2 - Supplemental Information Needed for Acceptance of Requested Licensing Action Re: License Amendment Request Regarding Transition to GNF3 Fuel (EPID L-2021-LLA-0159)," dated October 26, 2021 (ML21294A003)
In the Reference 1 letter, Exelon Generation Company, LLC, (EGC) requested an amendment to Renewed Facility Operating License Nos. DPR-29 for Quad Cities Nuclear Power Station (QCNPS), Unit 1 and DPR-30 for QCNPS, Unit 2. The proposed change supports the transition from Framatome (formerly AREVA) ATRIUM 10XM fuel to Global Nuclear Fuel - Americas, LLC (GNF) GNF3 fuel at QCNPS. contains the response to the Reference 2 request for supplemental information. provides a revised Technical Specifications (TS) mark-up which supersedes the previous version provided in Reference 1. Attachment 3 is a retyped clean version of the affected TS pages and also supersedes the version previously provided in Reference 1.
EGC has reviewed the information supporting a finding of no significant hazards consideration, and the environmental consideration, that were previously provided to the NRC in Reference 1.
The additional information provided in this submittal does not affect the bases for concluding
November 3, 2021 U.S. Nuclear Regulatory Commission Page 2 that the proposed license amendment does not involve a significant hazards consideration. In addition, the information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
EGC is notifying the State of Illinois of this response related to a previous application for a change to the operating license by sending a copy of this letter and its attachments to the designated State Official in accordance with 10 CFR 50.91, "Notice for public comment; State consultation," paragraph (b).
There are no regulatory commitments contained within this letter.
Should you have any questions concerning this letter, please contact Ms. Rebecca L. Steinman at (630) 657-2831.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 3rd day of November 2021.
Respectfully, Patrick R. Simpson Sr Manager Licensing Exelon Generation Company, LLC Attachments:
- 1. Response to Request for Supplemental Information
- 2. Marked-up QCNPS, Units 1 and 2 Technical Specifications pages
- 3. Retyped QCNPS, Units 1 and 2 Technical Specifications pages cc: U.S. NRC Region III, Regional Administrator U.S. NRC Senior Resident Inspector, Quad Cities Nuclear Power Station Illinois Emergency Management Agency - Division of Nuclear Safety
ATTACHMENT 1 Response to Request for Supplemental Information
Background:
By application dated September 14, 2021, (Agencywide Document Access and Management System (ADAMS) Accession No. ML21257A420), Exelon Generation Company, LLC (EGC, or the licensee) submitted a license amendment request (LAR) with a proposed change that supports the transition from Framatome ATRIUM 10XM fuel to GNF3 fuel at Quad Cities Nuclear Power Station, Units 1 and 2 (Quad Cities). The proposed change includes revising Technical Specifications (TS) 5.6.5, "Core Operating Limits Report [COLR]," paragraph b, to add a report that supports the General Electric Standard Application for Reactor Fuel (GESTAR) analysis methodology to the list of approved methods to be used in determining the core operating limits in the COLR. The licensee also plans to utilize Framatome RODEX2A methodology with an additional thermal conductivity degradation penalty in mixed core thermal-mechanical calculations. Additionally, in support of the proposed transition to GNF3 fuel, EGC proposes to revise the alternative source term loss-of-coolant accident analysis to use a bounding core inventory.
During the NRC staff's acceptance review of the requested license amendment, the NRC staff found the application insufficient, and more information is needed to accept the application for review. The NRC staff concluded that the following items are necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed amendment.
Item 1 By application dated September 14, 2021, Exelon proposed to insert a reference to GNF Report NEDC-33930P, Revision 0, "GEXL98 Correlation for ATRIUM 10XM Fuel, dated February 2021 (NEDC-33930P) included in the application, and retain the remaining TS Core Operating Limits Report (COLR) References in Section 5.6.5 of the Quad Cities TS. The references list already contains a reference to the General Electric Standard Application for Reactor Fuel (GESTAR-II),
which is necessary, among other things, to perform cycle-specific analysis and determine parameter operating limits for the proposed Global Nuclear Fuel (GNF) GNF-3 fuel bundle design.
While evaluating the acceptability of the license amendment request, the NRC staff reviewed the Quad Cities Updated Final Safety Analysis Report (UFSAR), Chapter 15, Accident and Transient Analyses (ML19319A941). Excepting (1) historical information; (2) radiological consequences analyses; and (3) Chapter 15.8, Anticipated Transients Without SCRAM, the analyses described therein are based on General Electric and Framatome (AREVA) analytic methods.
In addition, the NRC staff also reviewed the most recent Quad Cities COLRs. The Unit 1, Cycle 27, report reflects that the current Unit 1 core is comprised entirely of Framatome fuel (ADAMS Accession No. ML21090A153). The Unit 2, Cycle 26, report states that some legacy analyses by Westinghouse are still applicable for OPTIMA2 fuel as described in Reference 2 (ADAMS Accession No. ML20112F148). Based on this statement, the NRC staff infers that this coresident fuel will be removed in an upcoming cycle.
Therefore, both the COLR and the UFSAR reflect safety analyses that are performed using both the existing, Framatome fuel, and the proposed, General Electric fuel. 10 CFR 50.36(b)
Page 1 of 3
ATTACHMENT 1 Response to Request for Supplemental Information requires that the TSs shall be derived from the safety analysis report. In addition, the definition of the COLR in Section 1.1 of the Quad Cities TSs reflects the enabling language contained in NRC Generic Letter 88-16, Removal of Cycle-Specific Parameter Limits from Technical Specifications (ADAMS Accession No. ML031130447) stating in part, These cycle-specific limits shall be determined for each reload cycle in accordance with Specification 5.6.5.
As it appears that the Westinghouse methods will no longer be in use to determine cycle-specific core operating limits, and are not included in the UFSAR, their retention in the TS is inappropriate. Please update the proposed TS revisions pages to reflect consistency with the Quad Cities UFSAR, the current and upcoming Quad Cities core designs, 10 CFR 50.36(b) requirements, and the guidance provided in GL 88-16, by removing references that will be unused and inapplicable, specifically those intended for use with Westinghouse fuel designs.
EGC Response to Item 1 Technical Specifications (TS) 5.6.5.b contains a list of methodology references used in the Core Operating Limits Report (COLR). This list currently contains eight Westinghouse topical reports that after the 2022 Unit 2 refueling outage will no longer be used to support COLR evaluations.
Since the proposed amendment, if approved, is scheduled for implementation in 2023, these unused references can be removed from the TS listing. Attachment 2 provides a revised TS mark-up to indicate the removal of the associated Westinghouse references, in addition to the addition of the GEXL98 reference described in the Exelon letter dated September 14, 2021 (ADAMS Accession No. ML21257A420). This version of the TS mark-up supersedes the previous version provided in ML21257A420 in its entirety. Attachment 3 is a retyped clean version of the affected TS pages and also supersedes the version previously provided.
Item 2 The NRC staff has reviewed Section 3.4 of the LAR and concluded that necessary analysis/calculations to update the Environmental Qualification (EQ) documentation has not been updated as a result of the revised dose. As the EQ documentation is not complete, its not clear to the NRC staff how the licensee can:
- 1) draw a conclusion that the EQ equipment is not adversely impacted and,
- 2) demonstrate that they continue to comply with 10 CFR 50.49.
Please discuss the technical basis for the EQ conclusions in the LAR.
EGC Response to Item 2 The core inventory changes associated with the transition to GNF3 fuel cause the numerical value of the accident dose used in the Quad Cities Environmental Qualification (EQ) Program to be revised. The resulting accident radiation dose changes have been evaluated and found to be acceptable. All EQ program equipments tested and/or analyzed radiation resistance envelopes the GNF3 fuels calculated accident radiation dose, calculated or measured normal operating radiation dose, and EQ program required margins. This new analysis will be used to update existing EQ program documents. This new analysis impacts nearly all of the EQ Page 2 of 3
ATTACHMENT 1 Response to Request for Supplemental Information packages that document qualification of equipment in the program need to be revised to ensure continuity of design basis information. However, it was impractical to complete all of these EQ documentation revisions prior to submittal of the proposed amendment request.
The Engineering Technical Evaluation that compared the revised Total Integrated Dose (TID),
which includes both normal, accident, and margin dose components, to the current qualified TID was prepared to evaluate the radiological impacts of the fuel transition on the Quad Cities EQ Program. The results of this evaluation were used as the basis for the radiological impact conclusions included in Section 3.4 of the letter dated September 14, 2021 (ADAMS Accession No. ML21257A420). The statements regarding the impacts of the fuel transition on other environmental parameters such as temperature, pressure, humidity, and chemical spray are based on vendor prepared documentation that were reviewed and accepted under Exelon procedural guidance as being accurate and applicable to Quad Cities. These two documents are sufficient to support the conclusion that the fuel transition does not compromise the ability of any qualified equipment to continue to perform its required safety function and thus continued compliance with 10 CFR 50.49, "Environmental Qualification of Electric Equipment Important to safety for Nuclear Power Plants."
Although the two existing documents are adequate to support continued compliance with 10 CFR 50.49, the EQ documentation updates should be updated to support continuity of design information related to the EQ Program. The EQ documentation revisions are being tracked and prioritized using the appropriate internal processes to ensure timely revision.
Page 3 of 3
ATTACHMENT 2 QUAD CITIES NUCLEAR POWER STATION UNITS 1 AND 2 Docket Nos. 50-254 and 50-265 Facility Operating License Nos. DPR-29 and DPR-30 MARKED-UP OF QCNPS, UNITS 1 AND 2 TECHNICAL SPECIFICATIONS PAGES
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
- 3. The LHGR for Specification 3.2.3.
- 4. Control Rod Block Instrumentation Setpoint for the Rod Block MonitorUpscale Function Allowable Value for Specification 3.3.2.1.
- 5. The OPRM setpoints for the trip function for SR 3.3.1.3.3.
- b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
delete
- 1. NEDE-24011-P-A, "General Electric Standard Application for Reactor Fuel."
- 2. NEDO-32465-A, "Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.
- 3. CENPD-300-P-A, "Reference Safety Report for Boiling Water Reactor Reload Fuel."
- 4. WCAP-16081-P-A, "10x10 SVEA Fuel Critical Power Experiments and CPR Correlation: SVEA-96 Optima2."
- 5. WCAP-15682-P-A, "Westinghouse BWR ECCS Evaluation Model:
Supplement 2 to Code Description, Qualification and Application."
- 6. WCAP-16078-P-A, "Westinghouse BWR ECCS Evaluation Model:
Supplement 3 to Code Description, Qualification and Application to SVEA-96 Optima2 Fuel."
- 7. WCAP-15836-P-A, "Fuel Rod Design Methods for Boiling Water Reactors - Supplement 1."
- 8. WCAP-15942-P-A, "Fuel Assembly Mechanical Design Methodology for Boiling Water Reactors Supplement 1 to CENPD-287."
- 9. CENPD-390-P-A, "The Advanced PHOENIX and POLCA Codes for Nuclear Design of Boiling Water Reactors."
(continued)
Quad Cities 1 and 2 5.6-3 Amendment No. 264/259
Reporting Requirements 5.6 5.6 Reporting Requirements delete 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
- 10. WCAP-16865-P-A, "Westinghouse BWR ECCS Evaluation Model Updates: Supplement 4 to Code Description, Qualification and Application," Revision 1, October 2011.
11.
3 XN-NF-81-58(P)(A) Revision 2 and Supplements 1 and 2, "RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," Exxon Nuclear Company, March 1984.
4
- 12. ANF-89-98(P)(A) Revision 1 and Supplement 1, "Generic Mechanical Design Criteria for BWR Fuel Designs,"
Advanced Nuclear Fuels Corporation, May 1995.
5
- 13. EMF-85-74(P) Revision 0 Supplement 1 (P)(A) and Supplement 2 (P)(A), "RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model," Siemens Power Corporation, February 1998.
6
- 14. BAW-10247PA Revision 0, "Realistic Thermal-Mechanical Fuel Rod Methodology for Boiling Water Reactors,"
AREVA NP, February 2008.
7
- 15. XN-NF-80-19(P)(A) Volume 1 and Supplements 1 and 2, "Exxon Nuclear Methodology for Boiling Water Reactors
- Neutronic Methods for Design and Analysis," Exxon Nuclear Company, March 1983.
8
- 16. XN-NF-80-19(P)(A) Volume 4 Revision 1, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," Exxon Nuclear Company, June 1986.
9
- 17. XN-NF-80-19(P)(A) Volume 3 Revision 2, "Exxon Nuclear Methodology for Boiling Water Reactors, THERMEX:
Thermal Limits Methodology Summary Description," Exxon Nuclear Company, January 1987.
18.
10 EMF-2158(P)(A) Revision 0, "Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/MICROBURN-B2," Siemens Power Corporation, October 1999.
(continued)
Quad Cities 1 and 2 5.6-4 Amendment No. 264/259
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued) delete 19.
11 EMF-2245(P)(A) Revision 0, "Application of Siemens Power Corporation's Critical Power Correlations to Co-Resident Fuel," Siemens Power Corporation, August 2000.
12
- 20. EMF-2209(P)(A) Revision 3, "SPCB Critical Power Correlation," AREVA NP, September 2009.
21.
13 ANP-10298P-A Revision 1, "ACE/ATRIUM 10XM Critical Power Correlation," AREVA, March 2014.
22.
14 ANP-10307PA Revision 0, "AREVA MCPR Safety Limit Methodology for Boiling Water Reactors," AREVA NP, June 2011.
23.
15 XN-NF-84-105(P)(A) Volume 1 and Volume 1 Supplements 1 and 2, "XCOBRA-T: A Computer Code for BWR Transient ThermalHydraulic Core Analysis," Exxon Nuclear Company, February 1987.
24.
16 ANF-913(P)(A) Volume 1 Revision 1 and Volume 1 Supplements 2, 3, and 4, "COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses,"
Advanced Nuclear Fuels Corporation, August 1990.
25.
17 EMF-2361(P)(A) Revision 0, "EXEM BWR-2000 ECCS Evaluation Model," Framatome ANP, May 2001.
26.
18 EMF-2292 (P)(A) Revision 0, "ATRIUMTM-10: Appendix K Spray Heat Transfer Coefficients," Siemens Power Corporation, September 2000.
27.
19 ANF-1358(P)(A) Revision 3, "The Loss of Feedwater Heating Transient in Boiling Water Reactors,"
Framatome ANP, September 2005.
20
- 28. EMF-CC-074(P)(A) Volume 4 Revision 0, "BWR Stability Analysis: Assessment of STAIF with Input from MICROBURN-B2," Siemens Power Corporation, August 2000.
The COLR will contain the complete identification for each of the TS referenced topical reports used to prepare the COLR (i.e., report number, title, revision, date, and any supplements).
(continued)
- 21. NEDC-33930P Revision 0, "GEXL98 Correlation for ATRIUM 10XM Fuel," February 2021 Quad Cities 1 and 2 5.6-5 Amendment No. 264/259
ATTACHMENT 3 QUAD CITIES NUCLEAR POWER STATION UNITS 1 AND 2 Docket Nos. 50-254 and 50-265 Facility Operating License Nos. DPR-29 and DPR-30 RETYPED QCNPS, UNITS 1 AND 2 TECHNICAL SPECIFICATIONS PAGES
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
- 3. The LHGR for Specification 3.2.3.
- 4. Control Rod Block Instrumentation Setpoint for the Rod Block MonitorUpscale Function Allowable Value for Specification 3.3.2.1.
- 5. The OPRM setpoints for the trip function for SR 3.3.1.3.3.
- b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
- 1. NEDE-24011-P-A, "General Electric Standard Application for Reactor Fuel."
- 2. NEDO-32465-A, "Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.
- 3. XN-NF-81-58(P)(A) Revision 2 and Supplements 1 and 2, "RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," Exxon Nuclear Company, March 1984.
- 4. ANF-89-98(P)(A) Revision 1 and Supplement 1, "Generic Mechanical Design Criteria for BWR Fuel Designs,"
Advanced Nuclear Fuels Corporation, May 1995.
- 5. EMF-85-74(P) Revision 0 Supplement 1 (P)(A) and Supplement 2 (P)(A), "RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model," Siemens Power Corporation, February 1998.
- 6. BAW-10247PA Revision 0, "Realistic Thermal-Mechanical Fuel Rod Methodology for Boiling Water Reactors," AREVA NP, February 2008.
- 7. XN-NF-80-19(P)(A) Volume 1 and Supplements 1 and 2, "Exxon Nuclear Methodology for Boiling Water Reactors -
Neutronic Methods for Design and Analysis," Exxon Nuclear Company, March 1983.
(continued)
Quad Cities 1 and 2 5.6-3 Amendment No. 264/259
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
- 8. XN-NF-80-19(P)(A) Volume 4 Revision 1, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," Exxon Nuclear Company, June 1986.
- 9. XN-NF-80-19(P)(A) Volume 3 Revision 2, "Exxon Nuclear Methodology for Boiling Water Reactors, THERMEX: Thermal Limits Methodology Summary Description," Exxon Nuclear Company, January 1987.
- 10. EMF-2158(P)(A) Revision 0, "Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/MICROBURN-B2," Siemens Power Corporation, October 1999.
- 11. EMF-2245(P)(A) Revision 0, "Application of Siemens Power Corporation's Critical Power Correlations to Co-Resident Fuel," Siemens Power Corporation, August 2000.
- 12. EMF-2209(P)(A) Revision 3, "SPCB Critical Power Correlation," AREVA NP, September 2009.
- 13. ANP-10298P-A Revision 1, "ACE/ATRIUM 10XM Critical Power Correlation," AREVA, March 2014.
- 14. ANP-10307PA Revision 0, "AREVA MCPR Safety Limit Methodology for Boiling Water Reactors," AREVA NP, June 2011.
- 15. XN-NF-84-105(P)(A) Volume 1 and Volume 1 Supplements 1 and 2, "XCOBRA-T: A Computer Code for BWR Transient ThermalHydraulic Core Analysis," Exxon Nuclear Company, February 1987.
- 16. ANF-913(P)(A) Volume 1 Revision 1 and Volume 1 Supplements 2, 3, and 4, "COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses," Advanced Nuclear Fuels Corporation, August 1990.
- 17. EMF-2361(P)(A) Revision 0, "EXEM BWR-2000 ECCS Evaluation Model," Framatome ANP, May 2001.
(continued)
Quad Cities 1 and 2 5.6-4 Amendment No. 264/259
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
- 18. EMF-2292 (P)(A) Revision 0, "ATRIUMTM-10: Appendix K Spray Heat Transfer Coefficients," Siemens Power Corporation, September 2000.
- 19. ANF-1358(P)(A) Revision 3, "The Loss of Feedwater Heating Transient in Boiling Water Reactors," Framatome ANP, September 2005.
- 20. EMF-CC-074(P)(A) Volume 4 Revision 0, "BWR Stability Analysis: Assessment of STAIF with Input from MICROBURN-B2," Siemens Power Corporation, August 2000.
- 21. NEDC-33930P Revision 0, "GEXL98 Correlation for ATRIUM 10XM Fuel," February 2021.
The COLR will contain the complete identification for each of the TS referenced topical reports used to prepare the COLR (i.e., report number, title, revision, date, and any supplements).
- c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
5.6.6 Post Accident Monitoring (PAM) Instrumentation Report When a report is required by Condition B or F of LCO 3.3.3.1, "Post Accident Monitoring (PAM) Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.
Quad Cities 1 and 2 5.6-5 Amendment No. 264/259