ML21278A149
Jump to navigation
Jump to search
| ML21278A149 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 09/07/2021 |
| From: | Exelon Generation Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML21278A102 | List:
|
| References | |
| NEI 99-04 | |
| Download: ML21278A149 (1) | |
Text
CALVERT CLIFFS UFSAR LEP-5D-1 Rev. 47 APPENDIX 5D 5D STUDY OF UPPER VERTICAL TENDON BEARING PLATES Appendix 5D, Study of Upper Vertical Tendon Bearing Plates, is historical information about the construction phase of the plant. Appendix 5D has been removed from the Safety Analysis Report and has been sent to Plant History. An image of the contents of the appendix can be accessed in the NORMs Records System under Document ID (DOC ID) Appendix-5D.