|
---|
Category:Letter
MONTHYEARML24302A2402024-10-28028 October 2024 CFR 21 Report 1-BY-BC-1-LV Battery Charger IR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24302A2342024-10-23023 October 2024 Request for Project Number Related to Dominion Energy Services New Nuclear Program at North Anna Power Station ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to Prni High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 05000339/LER-2024-001, Loss of Generator Field for 2J EDG During 2-PT-82.282024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 2024-09-24
[Table view] Category:Periodic Monitoring Report (Radiological/Environmental)
MONTHYEARML23130A1472023-04-19019 April 2023 Annual Radioactive Effluent Release Report ML23130A1462023-04-19019 April 2023 Independent Spent Fuel Storage Installation (Isfsi), Annual Radiological Environmental Operating Report for Cy 2022 ML22122A0692022-04-14014 April 2022 Annual Radioactive Effluent Release Report for North Anna Power Station (January 01, 2021 to December 31, 2021) ML22119A1242022-04-14014 April 2022 Annual Radiological Environmental Operating Report ML21176A0092021-06-0808 June 2021 Correction Letter for 2010 Annual Radiological Effluent Release Report (ARERR) ML18128A2632018-04-25025 April 2018 Independent Spent Fuel Storage Installation Annual Radiological Environmental Operating Report for 2017 ML18116A4552018-04-16016 April 2018 Independent Spent Fuel Storage Installation (ISFSI) Annual Radioactive Effluent Release Report ML18128A2642017-12-31031 December 2017 Radiological Environmental Monitoring Program January 1, 2017 to December 31, 2017 ML12135A0422012-04-26026 April 2012 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report ML0134604162001-11-0202 November 2001 Virginia Electric and Power Co., North Anna Power Station Units 1 and 2, Independent Spent Fuel Storage Installation (ISFSI) Annual Radiological Environmental Operating Report ML0112403702001-04-27027 April 2001 Independent Spent Fuel Storage Installation Annual Radiological Environmental Operating Report 2023-04-19
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 June 8, 2021 United States Nuclear Regulatory Commission Serial No.21-185 Attention: Document Control Desk NAPS/DPM Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF~4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGYVIRGINIA)
NORTH ANNA POWER STATION UNITS 1 AND 2 CORRECTION LETiER FOR 2010 ANNUAL RADIOLOGICAL EFFLUENT RELEASE REPORT (ARERR)
In accordance with Regulatory Guide 1.21, Revision 2, Measuring, . Evaluating, and Reporting Radioactive Material in Liquid and Gaseous Effluents and Soild Waste, Section 7.4, Reporting Large Errors, enclosed is. a correction to ~orth Anna's 2010 Annual Radiological Effluent Release Report (ARERR) ..
During the review of previously submitted ARERRs it was identified that incorrect information was included in the 201 0 ARERR Table 3. For waste type B,'.the 12 month period" cubic meters ahd Curie values were incorrect. The values reported in the 2010 submittal were 1600 cubic meters and 7.70E+0 Ci. The correct values are 479 cubic meters and 7.69E+0 Ci. The corrected Table 3 is enclosed.
If you have.any questions or require additional information, please contact Mr. Marc A.
Hofmann at (540) 894-2100.
- Very truly you~s, Fred Mladen Site Vice President *e:-r1
Enclosure
- J~~
Serial No.21-185 2010 ARERR Correction Letter cc: U.S. Nuclear Regulatory Commission (w/o Enclosure)
Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Director, Division of Spent Fuel Management (w/o Enclosure)
Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, D. C. 20555 NRC Senior Resident Inspector (w/o Enclosure)
North Anna Power Station
TABLE 3 NORTH ANNA POWER STATION RADIOACTIVE EFFLUENT RELEASE-. REPOR.T SUMMATION OF SOLID RADIOACTIVE WASTE AND IRRADIATED FUEL SHIPMENTS FOR 01-01-10 THROUGH **12-31-10
.. Page 1
- of 2 A. *soUD WASTE SHIPPED OFFSITE FOR BURIAL OR DISPOSAL (NOT IRRADIATED FUEL) 12-Month Estimated Total
- 1. Type of Waste Unit Period P_ercent. Error (%) .
- a. Spent resins, sludges, filters sludge, m3 3.36E+01
- 2.50E'l'01 evaporator bottoms, etc., . Ci 2.88E+02 2.50E4-01
- b. Dry compressible waste, contaminated ni3 4.79E+02 ** 2.sOE+o1 equipment, etc., Ci 7.69E+OO ... .. .. , _2 ..501;+!)1 ..
- c. Irradiated components, control rods, ni3 O.OOE+OO 2.50E+Of etc., . . ... Ci 9_.00E+OO .. . ~.50E+01____
- d. Other (describe)
Used oil/Blast media/Sewage/Gravel 3*
m 2.12E+OO *** 2.50E+Ol Dessicant/Soil/Construction debris Ci 6.32E-04 2.50E+01 Animal Carcasses .. . , . , ..
- 2. Estimate of major nuclide composition Estimated Total (by tvpe_of waste) . (%) (Ci) P.ercerit Error: (%).
- a. Co-58 3.21E:t-01 9.24E+01 .. 2.50E+01: ..
Co-60 2.03E+01 5.85E+01 . 2.50E+01.
Ni-63 1.91E+01 5.50E+01 2.50E+01 Cs-137 . 1.05E+01 3.02E+01 . 2.50E+01 Cs-134 7.14E+00 2.05E+01 2.50E+01 Fe-55 . 5.09E+00 1.46E+01 2.50E-t:01 Mn-54 2.54E+00 7.29E+00 ,. 2.50E+01 * . ,
H-3 1.53E+00 4.39E+00 2.50E+01 Ni-59 3,~1 E-0_1 . 9.81 E-01 , ,. 2,50E+01 C-14 2.88E:01- 8.29E-01 2.50E+01 Eu-152 2.64E-01 7.59E-0_1 2.50E+01
- b. Co-60 6.25E+01 4.82E+00 ... 2.50E+_01 Fe-55 1.86E+01 1.43E+00 2.50E+01 Cs-137 3.84E+00 2.96E-01 2.50E+01 Mn-54 . , 3.34E+00 2.57E-01 2.50E+01 Co-58 3.24E+00 2.49E-01 2.50E+01 Cr-51 2.90E+00 2.23E-01 2.50E+01 Ni-63 1.54E+00 1.19E-01 2.50E+01 Zr-95 1.46E+00 1.13E-01 2.50E+01 Nb-95 .. 1.24E+00 9.55E-02 2.50E+01 Zn-65 3.66E-01 2.81E-02 2.50E+01
- c. none ...
- d. Co-60 6.10E+01 3.86E~04 2.50E+01 Fe-55 1.78E+01 1.12E-04 2.50E+01 Cs-137 1.04E+01 6.55E-05 2.50E+01 Ni-63 4.28E+00 2.70E-05 2.50E+01 Mn-54 .. 2.55E+00 1.61 E-05 2.50E+01 Sb-125 7.73E-01 4.89E-06 .. 2.50E+01 Nb-95 5.86E-01 3.71E-06 2.50E+0.1.
Co-58 5.44E-01 3.44E~06. 2.50E+0_1 Cs-134 4.23E-01 2.67E-06 2.50E+01.
Zn-65 3.86E-01 2.44E-06 2.50E+01 Zr-95 3.42E-01 2.16E-06 2.50E:t:01 .,
TABLE 3 NORlH ANNA POWER STATION RADIOACTIVE EFFLUENT RELEASE REPORT SUMMATION OF SOLID RADIOACTIVE WASTE AND IRRADIATED FUEL s*HIPMENTS FOR* 01-01-10 THROUGH 12 ..31 ..1O Page 2 of .f
- 3. Solid Waste Disposition Number of Shipments Mode of transpoitafion Destination 2 Truck Clive,Ui
12 Truck Oak Ridge, TN.
B. Irradiated Fuel Shipments {Disposition)
Number of Shipments Mode of Transportation Destination 0 N/A NIA (7) shipments containing resins were shipped to a licensed waste processor for processing.
(1) shipment of filters was shipped to licensed facility for disposal.
(shipment also contained de-watered powdered resin)
(1) shipment of filter waste was shipped to a licensed waste processor for processing.
(filters were transported with compactable wastes accounted for below)
(10) shipments containing contaminated equipment, dry compressible waste/ incinerable waste were shipped to a licensed waste processor for processing.
(1 shipment also contained filter waste accounted for above)
(1 shipment included oil)
(1 shipment included animal carcasses)
(1) shipment of compactable waste was shipped to a licensed facility for disposal.
(shipment included de-watered powdered resin, charcoal, asbestos)
- (1) shipment containing contaminated oil was shipped to a licensed waste processor for incineratioh.
(Shipment also contained dry compressible waste)