ML21165A203

From kanterella
Jump to navigation Jump to search
Unit 4, Resubmittal of Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.1.03.07.i (Index Number 78)
ML21165A203
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/14/2021
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML21165A203 (6)


Text

^ ,1 l. j 1 MichaelJ. Yox 7825 River Road oOU'tri0rn INUCl0dr Regulatory Affairs Director Waynesboro, GA 30830 Vogtle3&4 706-848-6459 tel JUN 1 h 2021 Docket Nos.: 52-025 52-026 ND-21-0552 10 CFR 52.99(c)(3)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 and Unit 4 Resubmittal of Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.1.03.07.1 [Index Number 781 Ladies and Gentlemen:

Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of June 2, 2021, Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.1.03.07.1 [Index Number 78] has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC.

Southern Nuclear Operating Company will, at a later date, provide additional notifications for Unit 4 ITAAC that have not been completed 225-days prior to initial fuel load.

Southern Nuclear Operating Company (SNC) previously submitted Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load for Item 2.1.03.07.1 [Index Number 78] ND-18-0709[ML18179A080], dated June 27, 2018. This resubmittal supersedes ND-18-0709 in its entirety and incorporates changes approved in Unit 3/Unit 4 license amendments 151/150.

This notification is informed by the guidance described in NEI 08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed. All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted.

Michael J. Yoxf ^ \J Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.1.03.07.1 [Index Number 78]

MJY/DLW/sfr

U.S. Nuclear Regulatory Commission ND-21-0552 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III Mr. D. L. McKinney Mr. M. D. Meier Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. M. Fisher Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil M C. P. Patel M G. J. Khouri M C. J. Even M B. J. Kemker Ms. N. C. Coovert M C. Welch M J. Gaslevic M O. Lopez-Santiago M . G. Armstrong M M. Webb M . T. Fredette M . C. Santos M . B. Davis M . J. Vasquez M . J. Eargle M . E. Davidson M . T. Fanelli Ms. K. McCurry M . J. Parent M B. Griman

U.S. Nuclear Regulatory Commission ND-21-0552 Page 3 of 3 Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinahouse Electric Company. LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NU8, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GD8 Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-21-0552 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-21-0552 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.1.03.07.1 [Index Number 78]

U.S. Nuclear Regulatory Commission ND-21-0552 Enclosure Page 2 of 3 ITAAC Statement Design Commitment

7. The reactor internals will withstand the effects of flow induced vibration.
10. The reactor lower internals assembly is equipped with holders for at least eight capsules for storing material surveillance specimens.

I nspections/Tests/Analvses i) Not Used per Amendment No. 151 [150].

ii) A pre-test inspection, a flow test and a post-test inspection will be conducted on the as-built reactor internals.

Inspection of the reactor lower internals assembly for the presence of capsules will be performed.

Acceptance Criteria i) Not Used per Amendment No. 151 [150].

ii) The as-built reactor internals have no observable damage or loose parts.

At least eight capsules are in the reactor lower internals assembly.

ITAAC Completion Description This ITAAC requires that tests and inspections be performed and documented to ensure the reactor internals will withstand the effects of flow induced vibration and that the reactor lower internals assembly is equipped with holders for at least eight capsules for storing material surveillance specimens.

7.ii) The as-built reactor internals have no observable damage or loose parts.

A pre-Hot Functional Test(HPT) inspection is performed to document the initial condition of the reactor internals, including all major load-bearing elements that retain the position of the core support structure: lateral, vertical, and torsional restraints; locking and bolting components; contact surfaces; and the reactor vessel interior. Next, a flow test is conducted on the reactor vessel internals during the HPT. A post-HPT inspection is then performed on the reactor internals to check for observable damage or loose parts. These inspections are documented on data sheets included in the inspection procedures (References 1 and 2). The test and inspections, described in UPSAR Section 3.9.2.4, are performed consistent with the guidelines of Regulatory Guide 1.20, Rev 2.

The inspection results, as documented in the Unit 3 and Unit 4 inspection procedures (References 1 and 2), conclude the as-built reactor internals have no observable damage or loose parts.

U.S. Nuclear Regulatory Commission ND-21-0552 Enclosure Page 3 of 3

10. At least eight capsules are in the reactor lower Internals assembly.

An inspection of the reactor lower internals assembly is performed to confirm that at least eight material surveillance specimen capsules are installed in holders for that purpose, in accordance with the installation manuals (References 3 and 4). These Inspections are documented on data sheets included in the inspection procedures (References 1 and 2).

The inspection results, as documented in the Unit 3 and Unit 4 inspection procedures (References 1 and 2), conclude that at least eight capsules are in the reactor lower Internals assembly.

References 1 and 2 provide evidence that the ITAAC Acceptance Criteria requirements are met:

  • The as-built reactor internals have no observable damage or loose parts; and
  • At least eight capsules are in the reactor lower internals assembly.

References 1 through 4 are available for NRG inspection as part of the Unit 3 and Unit 4 ITAAC 2.1.03.07.1 Completion Packages (References 5 and 6, respectively).

List of ITAAC Findings In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review, which included now-consolidated ITAAC Indexes 79 and 85,found there are no relevant ITAAC findings associated with this ITAAC.

References(avaiiabie for NRG inspection^

1. 3-RXS-ITPP-501,"Pre- and Post-Hot Functional Test Inspection of Reactor Vessel Internals"
2. 4-RXS-ITPP-501,"Pre- and Post-Hot Functional Test Inspection of Reactor Vessel Internals"
3. SV3-MI01-Z0M-001,"API000 RVI Installation Requirements Manual"
4. SV4-MI01-Z0M-001,"API000 RVI Installation Requirements Manual"
5. 2.1.03.07.i-U3-CP-Rev0, ITAAC Completion Package
6. 2.1.03.07.i-U4-CP-Rev0, ITAAC Completion Package
7. NEI 08-01,"Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"