d_ DUKE

ENERGY

FEB 2 4 2021 Serial: RA-21-0061 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400/Renewed License No. NPF-63

Subject:

Notification of NPDES Permit Renewal Application Ladies and Gentlemen:

Kim E. Maza Vice President Harris Nuclear Plant 5413 Shearon Harris Road New Hill, NC 27562-9300 In accordance with Section 3.2 of the Environmental Protection Plan (Nonradiological), issued as Appendix B to the Renewed Facility Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1, Duke Energy Progress, LLC (Duke Energy), is providing notification of a renewal application to the facility's National Pollutant Discharge Elimination System (NPDES) Permit No. NC0039586. A copy of the renewal application is provided in the enclosure to this letter. The NPDES permit renewal application has been submitted to the State of North Carolina permitting agency.

Please refer any questions regarding this submittal to Bob Wilson at (984) 229-2444.

Sincerely,

-K'h--- [. --rn7-Kim E. Maza

Enclosure:

NPDES Permit No. NC0039586 Renewal Application cc:

J. Zeiler, NRC Senior Resident Inspector, HNP M. Mahoney, NRC Project Manager, HNP NRC Regiocial Administrator, Region n

Document Control Desk Serial: RA-21-0061 Enclosure ENCLOSURE NPDES PERMIT NO. NC0039586 RENEWAL APPLICATION

~"") r~~fGY.

PROGRESS FEB 2 4-2021 Serial RA-21--0058 Certified Mail Number: 7014 2120 0003 3196 7309 Return Receipt Requested Mr. Danny Smith, Director NC DEQ Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617

Subject:

Duke Energy Progress, LLC Shearon Harris Nuclear Plant NPDES Permit No. NC0039586 Wake County

Dear Mr. Smith:

Kim E. Maza Vice President Hams Nuclear Plant 5413 Shearon Harris Road New Hill NC 27562-9300 Duke Energy Progress, LLC, Harris Nuclear Plant (HNP) submits the following NPDES permit renewal application for NPDES Permit Number NC0039586, which expires August 31, 2021.

The attached permit application package consists of the following documentation: -

US EPA Form 1 - General Information -

US EPA Form 2C-Existing Manufacturing, Commercial, Mining and Silvacultural Operations, including Tables A-E for Outfall 006 (Combined Discharge), Outfall 007 (Harris Energy & Environmental Center), and the Water Supply Intake - Form 1 - Section 6 - Existing Environmental Permits - Form 1 - Section 7 - Maps - Form 1 - Section 9-CWA Section 316(b) Cooling Water Intake Structure Reports - Form 2C-Section 2.1 - Line Drawing I Water Balance I Flow Table - Form 2C - Section 3.1 - Flows, Sources of Pollution, and Treatment Technologies - Form 2C-Section 8-Used or Manufactured Toxics - Form 2C - Section 9.2 - Toxicity Test Results - Form 2C - Section 10.2 - Contract Laboratories

NPDES Permit Application Package RA-21-0058 Page 12 316 (b) Cooling Water Intake Structure Rule In accordance with Part I, Condition A(17) of the existing NPDES permit, Harris Nuclear Plant is in submitting the appropriate reports as required by Cooling Water Intake Structure Rule 40 CFR Part 125.95. These reports are enclosed are Attachment 3-Form 1 -Section 9-Intake Structures.

Copper & Zinc Limitations Duke Energy and NC DEQ DWR have been working together throughout the term of the current permit regarding proposed effluent limitations for copper & zinc contained in the previous NPDES permit issued August 29, 2016. Duke Energy has complied with the terms contained in the Schedule of Compliance within the current permit and has recently submitted the Year 4 Report which demonstrates a site specific mixing zone alleviates the need for copper and zinc limits. Duke Energy respectfully requests the removal of copper & zinc limits associated with Part I (A)(6) Effluent Limitations and Monitoring Requirements (Outfall 006) and the compliance language and date of September 30, 2021 as addressed in Part I (A)(9) Schedule of Compliance (Outfall 006).

Industrial Stormwater NPDES Obligations and Responsibilities Please note that no stormwater related information is included in this NPDES permit renewal application package since the NC DEQ Division of Energy, Mineral and Land Resources (DEMLR) has requested the industrial stormwater permit application package be submitted directly to their office. Our understanding is NC DEQ DEMLR will be issuing a separate individual industrial stormwater NPDES permit to satisfy such NPDES obligations and responsibilities.

This permit renewal package is being submitted at least 180 days prior to the permit expiration date as required by NC GS 143-215.1 (C). and Part 11, Section B, Condition No. 1 O of NPDES Permit No. NC0039586.

Should you have questions concerning this permit application please contact Mr. Bob Wilson, HNP Site Environmental Field Support, by phone at 984-229-2444, or via e-mail at Bob.Wilson@duke-energy.com.

NPDES Permit Application Package RA-21-0058 Page 13 I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.

Sincerely,

-J<~ f. 'j'r'LJ..-

Kim E. Maza Vice President Duke Energy Progress, LLC Harris Nuclear Plant Enclosures cc:

Mr. David Hill, Industrial NPDES Permitting Branch Certified Mail Number: 7014 2120 0003 3196 7316 Return Receipt Requested Mr. Scott Vinson, Water Quality Regional Operations, Raleigh Regional Office Certified Mail Number: 7014 2120 0003 3196 7323 Return Receipt Requested

NPDES Permit Application Package RA-21-0058 Page 14 Enclosures

Duke Energy Progress, LLC Harris Nuclear Plant National Pollutant Discharge Elimination System Permit Number NC0039586 Form 1 - General Information

EPA Identification Number NCD991278284 NPOES Penni! Number NC0039586 I

Facility Name Harris Nuclear Plant I Fonn Approved 03i115/19 0MB No. 2040-0004 Form 1

NPOES

&EPA U.S. Environmental Protection Agency Application for NPDES Pennlt to Discharge Wastewater GENERAL INFORMATION SECTION 1. ACTIVITIES REQUIRING AN NPDES PERMIT (40 CFR 122.21(f) and (f)(1 ))

1.1 AppHcants Not Required to Submit Fonn 1 1.1.1 Is the facility a new or existing publlcly owned treatment works?

If yes, STOP. Do NOT complete Form 1. Complete Form 2A.

No 1.2 Applicants Required to Submit Fonn 1 1.2.1 Is the facility a concentrated animal feeding operation or a concentrated aquatic animal production facility?

Yes-+ Complete Form 1 and Form 2B.

0 No 1.2.3 Is the facility a new manufacturing, commercial, mining, or silvicultural facility that has not yet commenced to discharge?

Yes -+ Complete Form 1 0

No and Form 2D.

1.2.5 Is the facility a new or existing facility whose discharge is composed entirely of stonnwater associated with Industrial activity or whose discharge is composed of both stonnwater and non-stonnwater?

0 Yes -+ Complete Form 1 D

No and Form 2F unless exempted by 40CFR 122.26(b)(14)(x) or b 15.

1.1.2 1.2.2 1.2.4 Harris Nuclear Plant and Harris Energy and Environmental Center j

1 2.2 EPA Identification Number NCD991278284 2.3 Facility Contact Name (first and last)

John DIiis Email acl<ress John.Dills@duke-energy.com 2.4 Facility Mailing Address Street or P.O. box 5413 Shearon Harris Road City or town New Hill EPA Form 3510-1 (revised 3-19)

TIiie Plant Manager State North Carolina Is the facility a new or existing treatment works treating domestic sewage?

If yes, STOP. Do NOT No complete Fonn 1. Complete Form 2S.

Is the facility an existing manufacturing, commercial, mining, or silvicultural facility that Is currently discharging process wastewater?

Yes-+ Complete Form

  • No 1 and Form 2C.

Is the facility a new or existing manufacturing, commercial, mining, or siMcullural facility that discharges only nonprocess wastewater?

Yes-+ Complete Form 1 and Form 2E.

Phone number (984) 229-2000 ZIP code 27562 0

No Page 1

EPA Identification Number NCD991278284 I

NPDES Pemilt Number NC0039586 2.5 Facility Location Street, route number, or other specific identifier 5413 Shearon Harris Road I

F adlity Name Harris Nuclear Plant County name Wake County code (if known)

Cityorlown New HIii State North Carolina SECTION 3. SIC AND NAICS CODES (40 CFR 122.21 (f)(3))

3.1 SIC Code{s)

Description (optional) 4911 Electric Power Service I

0

~

~

3.2 NAICS Code(s)

DescripUon(optional) l

  • 22113 Electric Power Generation, Nuclear Q

Cl)

I SECTION 4. OPERATOR INFORMATION (40 CFR 122.21(n(4))

4.1 Name of Ooerator Duke Energy Progress, LLC 4.2 Is the name you listed in Item 4.1 also the owner?

0 Yes D No 4.3 Onerator Status I

ZIP code 27562 Fonn Approved 0M!S/19 0MB No. 2040-0004 D Public-federal D Public-state D Other public (specify) ____

D Private 0 Other (specify) Public Utility 4.4 Phone Number of Operator (919) 362-2000 4.5 Operator Address Street or P.O. Box 5413 Shearon Harris Road City or town New Hill Email address of operator John.Dllls@duke-energy.com SECTION 5. INDIAN LAND (40 CFR 122.21(f)(5))

State North Carolina 5.1 Is the facility located on Indian Land?

  • Yes

@No EPA Fann 3510-1 (revised 3-19)

ZIP code 27562 Page2

EPA Identification Numbef' NPDES Pennit Number NC0039586 Facility Name Facility Name Harris Nuclear Plant Form Approved 03Kl5/19 0MB No. 2040-0004 SECTION 6. EXISTING ENVIRONMENTAL PERMITS (40 CFR 122.21(f)(6))

6.1 Existing Env!ronmental Pennlta (check all that apply and print or type the corresponding permit number for each)

D NPDES (discharges to surface D RCRA (hazardous wastes)

D UIC (underground injection of water) ftuids)

See Attachment l D PSO (air emissions)

D Nonattainment program (CAA)

D NESHAPs (CAA)

  • Ocean dumping (MPRSA)

D Dredge or fill (CWA Section 404)

D Other (specify}


~

SECTION 7. MAP (40 CFR 122.21(f)(7))

7.1 Have you attached a topographic map containing an required information to this application? (See instructions for specific requirements.}

0 Yes D No D CAF~NotApplicable (See requirements in Form 28.)

SECTION 8. NATURE OF BUSINESS (40 CFR 122.21(f)(8))

8.1 Describe the nature of your business.

The Harris Nuclear Plant (HNP) consists of a 1,016 megawatt generating unit and associated facilities. The Harris Energy and Environmental Center (HEEC) Includes facilities that provide support services (laboratories and tralnlng) for the HNP and other Duke Energy Progress, LLC facilities.

SECTION 9. COOLING WATER INTAKE STRUCTURES (40 CFR 122.21(f)(9))

9.1 9.2 Does your facility use cooling water?

@ Yes O No ~ SKIP to Item 10.1.

Identify the source of cooling water. (Note that facilities that use a cooling water intake structure as described at 40 CFR 125, Subparts I and J may have additional application requirements at 40 CFR 122.21(r}. Consult with your NPDES permitting authority to determine what specific information needs to be submitted and when.}

Harris Reservoir SECTION 10. VARIANCE REQUESTS (40 CFR 122.21(f}(10))

10.1 Do you intend to request or renew one or more of the variances authorized at 40 CFR 122.21(m}? (Check all that apply. Consult with your NPDES permitting authority to determine what information needs to be submitted and when.)

D Fundamentally different factors (CWA Section 301(n))

D Non-(()nventional pollutants (CWA Section 301(c) and (g))

0 Not applicable D

Water quality related effluent limitations (CWA Section 302(b}(2))

Thermal discharges (CWA Section 316(a))

EPA Fonn 3510*1 (revised 3-19)

P1911 l

I 11.2 Facility Name Fonn Approved 03Kl5/19 0MB No, 2040-0004 In Column 1 below, mark lhe sections of Fo,m 1 Iha! you have completed and are submitting wilh your application.

For each section, specify in Column 2 any attachments Iha! you are enclosing to alert lhe pe,mitting authority. Note that not all a licants are r uired to rovide attachments.

Column1 Column2 0

Section 1: Activities Requiring an NPDES Permit

  • w/ attachments 0

Section 2: Name, Mailing Address, and Location

  • w/ attachments 0

Section 3: SIC Codes w/ attachments 0

Section 4: Operator lnfo,mation w/ attachments 0

Section 5: Indian Land w/ attachments 0

Section 6: Existing Environmental Permits 0

w/ attachments 0

Section 7: Map 0

w/ topographic 0 w/ additional attachments ma 0

Section 8: Nature of Business w/ attachments 0

Section 9: Cooling Water Intake Structures 0

w/ attachments 0

Section 10: Variance Requests w/ attachments 0

Section 11: Checklist and Certification Statement

  • w/ attachments Certification Statement I certify under penaffy of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Name (print or type first and last name)

Kim E. Maza Signature Official tiUe Vice President Date signed EPA Form 3510-1 (revised 3-19)

Duke Energy Progress, LLC Harris Nuclear Plant National Pollutant Discharge Elimination System Permit Number NC0039586 Form 2C - Existing Manufacturing, Commercial, Mining and Silvicultural Operations

EPA Identification Number NC0991278284 NPDES Permit Number NC0039586 Facility Name Harris Nuclear Plant I Form Approved 03/0S/19 0MB No. 2040-0004 Form 2c

&EPA U.S. Environmental Protection Agency Application for NPDES Pennit to Discharge Wastewater NPDES EXISTING MANUFACTURING, COMMERCIAL, MINING, AND SILVICULTURE OPERATIONS SECTION 1. OUTFALL LOCATION (40 CFR 122.21(9)(1))

1.1 Provide information on each of the facilitv's outfalls in the table below.

t

..J Outfall Number 006 Receiving Water Name Harris Reservoir Latitude 35*

34' 47" N

Longitude 78° 58' 01' 007 Harris Reservoir 35*

38' 34.6" N 78° 55' 45.5" W

SECTION 2. LINE DRAWING (40 CFR 122.21(9)(2))

2.1 Have you attached a line drawing to this application that shows the water flow through your facility with a water balance? (See instructions for drawing requirements. See Exhibit 2C-1 at end of instructions for example.)

@ Yes D No SECTION 3. AVERAGE FLOWS AND TREATMENT (40 CFR 122.21(g)(3))

J l

j u..

f

~

3.1 For each outfall identified under Item 1.1, provide average flow and treatment information. Add additional sheets if necessa.

"Outfall Number--_006 Operations Contributing to Flow 0 ration See Attachment 4 Treatment Units Description (include size, flow rate through each treabnent uni~

retention time etc.

Code from Table2C-1 Avera eFlow EPA Form 3510*2C (Revised 3-19) mgd mgd mgd mgd

EPA Identification Number NCD991278284 NPDES Permit Number NC0039586 Facility Name Harris Nuclear Plant

,:: g u I I-ll Ill J

t

~

3.1 cont.

See Attachment 4 Treatment Units Description (include size, flow rate through each treatment unit retention time. etc.\\

1, Code from Table 2C-1

.. Outfall Numberet ___ _

Operations Contributing to Flow 01t11ratlon I

Treatment Units Description (include size, flow rate through each treatment unit, retention time, etc.

Code from Table2C*1 Form Approved OJAJS/19 0MB No. 2040-0004 mgd mgd mgd mgd Final Disposal of Solid or Liquid Wastes other Than hu Discharae AveraaeFlow mgd mgd mgd mgd Final Disposal of Solid or Liquid Wastes other Than Dlscha e 3.2 Are you applying for an NPDES permit to operate a privately owned treatment works?

J i D Yes No ~ SKIP to Section 4.

3.3 Have you attached a list that idenUfies each user of the treatment works?

D Yes D

No EPA Form 3510-2C (Revised 3-19)

4.1 4.2 J

LL.

I I NPOES Permit Number F aality Name Form Approved 03Al5/19 0MB No. 2040-0004 Except for stonn runoff, leaks, or spills, are any discharges described in Sections 1 and 3 intermittent or seasonal?

[Z) Yes No ~ SKIP to Section 5.

Outfall Operation Number (list)

Duration Radwaste Svstem 1 to2 days/week 12 months/year 0.020 mgd

.022 mgd 0.5 days Outfall days/week months/year mgd mgd days 005 days/week months/year mgd mgd days days/week months/year mgd mgd days days/week months/year mgd mgd days days/week months/year mgd mgd days days/week months/year mgd mgd days days/week months/year mgd mgd days days/week months/year mgd mgd days SECTION 5. PRODUCTION (40 CFR 122.21 (g)(5))

5.1 Do any effluent limitation guidelines (ELGs) promulgated by EPA under Section 304 of the CWA apply to your facility?

@ Yes No ~ SKIP to Section 6.

!3 5.2 Provide the following information on applicable ELGs.

ELG Cateaoiv ELG Subcateaorv Reaulatorv Citation w

.a Steam Electric Steam Electric Power Generating 40 CFR Part 423 1:

c(

5.3 Are any of the applicable ELGs expressed in terms of production (or other measure of operation)?

C

  • Yes

[Z)

No~ SKIP to Section 6.

j 5.4 Provide an actual measure of daily production expressed in terms and units of applicable ELGs.

Ji Outfall Operation, Product. or Material Quantity per Day Unit of Number Measure 11 cl.

s g e Q.

EPA Form 3510-2C (Revised 3-19)

EPA Identification Number NPDES Permit Number NPDES Permit Number NC0039586 Facility Name Facility Name Harris Nuclear Plant Form Approved 03/05/19 0MB No. 2040-0004 NCD991278284 SECTION 6. IMPROVEMENTS (40 CFR 122.21 (9)(6))

6.1 Are you presently required by any federal, stale, or local authority lo meet an implementation schedule for constructing, upgrading, or operating wastewater treatment equipment or practices or any other environmental programs that could affect the discharges described in this application?

6.2

  • Yes No -+ SKIP to llem 6.3.

Brief Identification and Description of Project Affected Outfalls (list outfall number Source(s) of Discharge Final Compliance Dates Required Proj~

6.3 Have you attached sheets describing any additional waler pollution control programs (or other environmental projects that may affect your discharges) thal you now have underway or planned? (optional item)

D Yes D No 0

Not applicable SECTION 7. EFFLUENT AND INTAKE CHARACTERISTICS (40 CFR 122.21(9)(7))

See the instructions lo determine the pollutants and parameters you are required to monitor and, in tum, the tables you must complete. Nol all applicants need to complete each table.

Table A. Conventional and Non-Conventional Pollutants 7.1 Are you requesting a waiver from your NPDES permitting authority for one or more of the Table A pollutants for any of your outfalls?

  • Yes

@ No -+ SKIP to Item 7.3.

7.2 If yes, indicate the applicable outfalls below. Attach waiver request and other required information lo the application Outfall Number --

Outfall Number --

Outfall Number __

7.3 Have you completed monitoring for all Table A pollutants at each of your outfalls for which a waiver has not been u li requested and attached the results to this application package?

I 0

Yes D No; a waiver has been requested from my NPDES oermittina authoritv for all oollutants al all outfalls.

1111

.z=

Table B. Toxic Metals, cvanlde, Total Phenols, and Orilanlc Toxic Pollutants u

D 7.4 Do any of the facility's processes that contribute wastewater fall into one or more of the primary industry categories

.al: i listed in Exhibit 2C-3? (See end of instructions for exhibit.)

[Z] Yes

  • No -+ SKIP to Item 7.8.

C as.. !

7.5 Have you checked "Testing Required" for all toxic metals, cyanide, and total phenols in Section 1 of Table B?

!j

[Z] Yes

  • No 7.6 List !he applicable primary industry categories and check the boxes indicating the required GC/MS fraction(s) identified in Exhibit 2C-3.

Primary Industry Category Required GC/MS Fraction(a}

(Check aoolicable boxes.)

Steam Electric Power Plants

@Volatile

@Acid

  • Base/Neutral
  • Pesticide
  • Volatile
  • Acid
  • Base/Neutral
  • Pesticide
  • Volatile
  • Acid
  • Base/Neutral
  • Pesticide EPA Form 3510-2C (Revised 3-19)

Page4

II I

I II EPA ldenti6cation Number NCD991278284 I

NPDES Permit Number NC0039586 I

Facility Name Harris Nuclear Plant I

fom, Approved 03/05/19 0MB No. 2040-0004 7.7 Have you checked "Testing Required" for all required pollutanls in Sections 2 through 5 of Table B for each of the GC/MS fractions checked in Item 7.6?

0 Yes D No 7.8 Have you checked "Believed Present" or "Believed Absent" for all pollutants listed in Sections 1 through 5 of Table B where testing is not required?

0 Yes D No 7.9 Have you provided (1) quantitative data for those Section 1, Table B, pollutanls for which you have indicated testing is required or (2) quantitative data or other required infonnation for those Section 1, Table B, pollutants that you have indicated are "Believed Presenl" in your discharge?

IZI Yes D No 7.10 Does the applicant qualify for a small business exemption under the criteria specified in the instructions?

D Yes

  • Nole that you qualify at the top of Table B, No then SKIP lo Item 7.12.

7.11 Have you provided (1) quantitative data for those Sections 2 through 5, Table B, pollutants for which you have delennined testing is required or (2) quantitative data or an explanation for those Sections 2 through 5, Table B, pollutants you have indicated are "Believed Present" in your discharge?

IZl Yes D

No Table C. Certain Conventional and Non-Conventional Pollutants 7.12 Have you indicaled whether pollutants are "Believed Present" or "Believed Absent" for all pollutanls listed on Table C for all outfalls?

IZl Yes D No 7.13 Have you completed Table C by providing (1) quantitative data for those pollutants that are limited either directly or indirectly in an ELG and/or (2) quanHtative data or an explanation for those pollulants for which you have indicated "Believed Present"?

[Z] Yes D No Table D. Certain Hazardous Substances and Asbestos 7.14 Have you indicaled whether pollulants are "Believed Present" or "Believed Absent" for all pollutanls listed in Table D for all outfalls?

0 Yes D No 7.15 Have you completed Table Oby (1) describing the reasons the applicable pollulants are expected to be discharged and (2) by providing quantilative data, if available?

0 Yes D No Table E. 2,3,7,B*Tetrachlorodlbenzo-o-Dloxln 12 3 7 B*TCDD) 7.16 Does the facility use or manufacture one or more of the 2,3,7,8-TCDD congeners lisled in the instructions, ordo you know or have reason lo believe that TCDD is or may be present in the effluent?

0 Yes* Complete Table E.

[Z]

No

  • SKIP lo Section 8.

7.17 Have you completed Table E by reporting qualitative data for TCDD?

[Z] Yes D

No SECTION 8. USED OR MANUFACTURED TOXICS (40 CFR 122.21(g)(9))

8.1 Is any pollutant listed in Table B a substance or a component of a substance used or manufactured al your facility as l!

an intermediate or final product or byproduct?

.a

[Z] Yes D

No

  • SKIP to Section 9.

i-~-1-----------------=------------~

c.!=!

IC 82 List the pollutanls below.

E ~

c5

~

1. See Attachment 6
2.
3.

EPA Fo,m 3510-2C (Revised 3-19)

4.
7.
5.
8.
6.
9.

Pages

EPA Identification Number NPDES Permit Number NPDES Permit Number NC0039586 SECTION 9. BIOLOGICAL TOXICITY TESTS (40 CFR 122.21(g)(11))

Facility Name Facility Name Harris Nuclear Plant Form Approved 03/05/19 0MB No. 2040.0004 Do you have any knowledge or reason to believe that any biological test for acute or chronic toxicity has been made within the last three years on ( 1) any of your discharges or (2) on a receiving water in relation to your discharge?

@ Yes D

No

  • SKIP to Section 10.

9.2 ldenli the tests and their u ses below.

Test(s)

Purpose ofTest(s)

Date Submitted D Yes 0 No D Yes 0 No D Yes 0 No SECTION 10. CONTRACT ANALYSES (40 CFR 122.21 (g)(12))

10.1 Were any of the analyses reported in Section 7 performed by a contract laboratory or consulting firm?

@ Yes O

No

  • SKIP to Section 11.

10.2 Provide information for each contract laboratory or consulting firm below.

Laboratorv Number 1 Laboratory Number 2 Laboratorv Number 3 Name of laboratory/firm Pace Analytical Services, LLC Duke Energy Analytical Laboratory address Phone number Pollutanl(s) analyzed 9800 Kincey Ave, Suite 100 Huntersvllle, NC 28078 (704) 875-9092 laboratory 13339 Hagers Ferry Road Huntersville, NC 28078-7929 (980) 875-5245 BOD, COD, NH3, N03-N02, Oil & Grease, TDC, Metals, TKN, TP, Fecal Coliform, Fluoride & Sulfate voes, PCBs, Radiological, Bromide, Cyanide, Phenols, Sulfite, & Sulfide SECTION 11. ADDITIONAL INFORMATION (40 CFR 122.21(9)(13))

11.1 Has the NPDES permitting authority requested additional information?

I 0

Yes IZ]

No

  • SKIP lo Section 12.

11.2 List the information requested and attach it to this application.

1.
4.
2.
5.
3.
6.

EPA Form 3510-2C {Revised 3-19)

P.al)e6

EPA Identification Number N(D991278284 NPDES Peonit Number F aciity Name F aciity Name Harris Nuclear Plant SECTION 12. CHECKLIST AND CERTIFICATION STATEMENT (40 CFR 122.22(a) and (d))

Form Approved 03i115/19 0MB No. 2040-0004 12.1 In Column 1 below, mark the sections of Fonn 2C that you have completed and are submitting with your application.

For each section, specify in Column 2 any attachments that you are enclosing to alert the permitting authority. Note that not all a licants are f uired to com lete all sections or rovide attachments.

Column 1 Column 2 IZ] Section 1: Outfall Location 0

Section 2: Line Drawing 1Z] Section 3: Average Flows and Treatment 0

Section 4: Intermittent Flows 0

Section 5: Production IZ] Section 6: Improvements D

w/ attachments IZ]

w/ line drawing IZ]

w/ attachments D

w/ attachments D

w/ attachments D

w/ attachments D w/ request for a waiver and supporting infonnation 0

w/ additional attachments w/ list of each user of D

privately owned treatment works w/ optional additional sheets describing any additional pollution control Jans wt explanation for identical outfalls D

wt small business exemption request 0

w/ other attachments IZl Section 7: Effluent and Intake Characteristics IZl Section 8: Used or Manufactured Toxics l21 Section 9: Biological Toxicity Tests

[Z) Section 10: Contract Analyses IZ]

w/TableA IZ]

w/TableC IZ]

w/TableE 121 w/ attachments

[Z) wt attachments

[Z) w/ attachments IZ] Section 11: Additional lnfonnation D w/ attachments

[Z) Section 12: Checklist and D

w/ attachments Certification Statement 12.2 Certification Statement 0

wt Table B w/TableD wt analytical results as an attachment I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inqui,y of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate. and complete. I am aware that there are significant penalties for submitting false infonnalion, including the possibility of fine and imprisonment for knowing violations.

Name (print or type first and last name)

Official tiUe Kim E. Maza Vice President Signature Date signed

.:I I ::l.'/ /.:2 I EPA Form 3510-2C (Revised 3-19)

Page7

OUTFALL 006 & INTAKE DATA -TABLE A

Pollutant Maximum Maximum Long-Tenn Long Tenn Waiver Dally Monthly Average Daily Number of Average Number of Requested Units Discharge Discharge Discharge Analyses Value Analyses (if applicable)

(specify)

(required)

(if available)

(if available)

Check here if you have applied to your NPDES permitting authority for a waiver for all of the poRutants listed on this table for the noted outfall.

Biochemical oxygen demand Concentration mglL 3.1 1

<2.0 1

1.

(BOO5)

Mass Ibid 511 Concentration mgll 64.8 1

22.6 1

2.

Chemical oxygen demand (COD)

Mass Ibid 10,680 Concentration mgll 20 1

7.8 6

3. Total organic carbon (TOC)

Mass Ibid 3,296 Concentration mgll 47.5 18.1 14 3.8 1

4. Total suspended solids (TSS)

Mass Ibid 7,829 Concentration mg-NIL 1.3 0.7 13

<0.02 1

5. Ammonia (as N)

Mass Ibid 214

6.

Flow Rate MGD 19.8 16.3 14.9 366 28.3 366 Temperature (winter) oc oc 26.9 23.0 16.7 21 13.1 152

7.

Temperature (summer) oc oc 33.1 30.5 26.5 30 24.3 214 pH (minimum)

Standard Units s.u.

6.6 6.9 6.9 52 6.2 366

8.

pH (maximum)

Standard Units s.u.

7.6 7.5 7.5 52 7.8 366

OUTFALL 006 & INTAKE DATA* TABLE B

TABl.E B, TOXIC METALS, CYANIDE._T_OTAl. PHiOl.S, AND ORGANIC TOXIC POl.l.UTANTS l<O CFR 122.,1l9ll'll'JI'

,P,...nc:* or Absence (check one)

Outfall DOI Intake (optional) 1.1 1.2 1.3 u

1.5 1.6 1.7 1.8 1.9 1.10 1.11 PonutanWarameter (and CAS Number, If available)

Tasting Required Believed Ballavad p,..ant Abllent Unlta (specify)

Maximum Dally Dlacha,.

ulred Maximum Monthly Dlacharge f available Long-Tenn Average Dally Dlacharga If available Numbarof AnalysN Long-Tarm Average Value Number of Analyns Check here if you quaUfy as a small business per the instructions to Fonn 2C and, therefore, do not need to submit quantitative data for any of the organic toxic pollutants In Sections 2 through 5 of this table. Note, however, that you must stiU Indicate in the appropriate column of this table if you believe any of the ponutants listed are present In your discharge.

Antimony, total (7<<0-36-0)

B 0

El Arsenic, total (7 ** 0-38-2) 13 C

la Beryllium, total (7<<1>-41-7)

B 0

El

<O.

Cadmium, total (7*-41>-43-9) 13 C

la Chromium, total (7*-41>-47-3) 13 0

B 0.255 0.041 Copper, total (7<<0-50-8) 13 Iii C

6.8 0.022 36

  • 0 Lead, total (7*39-92-1)

Iii 0

El

<0.0 Mercury, total (7*39-97-6)

Iii 0

Ibid

<0.083 oncentratlo 2.43 1

Nickel, total (7*-40-02-0)

El 0

El Selenium, total (7782-*9-2) 13 0

Sliver, total (7*-40-22-*)

13 0

El

-*-~... -- -

II 11 Intake Presence or Abnnce Outfall 006 (optional)

(check one)

Long.Tenn Long.

Units Number Pollutant/Pana meter Tatlng (specify)

Maximum Maximum Average Number of Tenn of (and CAS Number, If available)

Monthly Dally Avenige Required BelleYed BelleYed Dally Analyses Analyses Pl'Htlnt AbHnt Discharge Discharge,

Discharge

  • Value (required)

(If available)

,,_, (if available) i'1 centratio 1.12 Thallium, total (7440*28-0)

[3 Cl l:l ass

<,033 Concent g

. 19

. 08

<0,005 1

1.13 Zinc, total (7440-66-6) 13 13 Mass

.1 Con Ii n

<0.0 1

<.008 1.14 Cyanide, total (57-12*5) 13 Cl 13 Ma Concentration mg/L 1.15 Phenols, total 13 13 Mass

e
I c,, i19nh ~c,.~ I *c llutan i-lu M "11 ~I ~ vota ~le _;ompou ids1 nl 1

1 2.1 Acrolein (107-02-8)

El Cl

[3 t

ug/L

<5.0 1

1 2.2 Acrylonilrile ( 107-13-1) 13 13 s

<0.824 n

lio ug

1.

1 2.3 Benzene (71-43*2) 13 13 s

0 on

/L 2.4 Bromoform (75-25-2) 13 0

nt 1

2.5 Carbon tetrachloride (56-23-5) 13 0

II ss ncentratio g

.0 1

2,6 Chlorobenzene (108-90-7) 13 D

13 ss

<0.3

<2.0 Co Ii

<.o 2.7 Chlorodibromomethane 13 Cl 13 Mass (124-48-1}

cent n

<2.

2.8 Chloroelhane (75-00-3) 13 13 II

Intake Outfall 006 (optional)

Prnenc:e or Absence

_J (check one)

II -

Long-Tenn Units II Long-Number Pollutant/Pan1meter Tntlng (specify)

Maximum Maximum Aven1ge Number of Tenn of (and CAS Number, If available)

Required Believed Belleved Delly Monthly Dally Analyan Average AnalysM

  • PreHnt Absent Discharge Discharge Discharge Value (required)

(If available), '

(if avalable_l c--

Concentration

/l 29 2-chloroethylvinyl ether G

C e

a

<0.824 (110-75-8) t Concentration ug/l

<2.0 2.10 Chlorofonn (67-66-3)

El El Mass

<0.329 ntration ug/L 2.11 Dichlorobromomethane El 13 (75-27-4) s C

u 1

2.12 1, 1-dichloroethane (75-34-31 13 D

13 1n a 2.13 1,2-dichloroethane (107-06-2)

El

[ii M

2.14 1, 1-dichloroelhylene (75-35-4)

El D

[3 IM 1

0 2.15 1,2-dichloropropane (78-87-5)

G e

s 1

Uy 2.16 1,3-dichloropropylene El El II (542-75-6)

C t

g 2.17 Ethytbenzene (100-41-4) 13 0

13 5

IM 0

nt 0

<2.0 1

2.18 Methyl bromide (74-83-9)

El El

<0.329 nl u

<2.0 2.19 Methyl chloride (74-87-3)

G D

G ncentraUon ug/l 2.20 Methylene chloride (75-09-2) 13 0

13 ass

<0.329 oncentration ug/l

<2.0 2.21 1, 1,2,2-tetrachloroethane G

13

<. 29 (79-34-5)

Pnt11ence ot' Abnnce Outfall 006 Intake (check one)

(optional)

Pollutant/Parameter Unit.

Long-Tenn (and CAS Number, If Tnting (specify)

Maximum Maximum Average 1 Long-Number available)

Required Believed Belleved Dally Monthly Dally Number of Term of Prasent AbHnt

\\

AnalyNs Avarage Discharge Discharge Discharge Value Analyses

~

(required)

(If available)

(If available)

Telrachloroethylene io 1

<2.

2.22 (127-18-4) e 1:1 ass

<0.

C ti g/l

<1,0 1

<1.

2.23 Toluene (108-88-3) 13 13

<0.16 1,2-trans-dichloroethylene Concentration ug/l 1

2.24 a

[3 (156-60-5)

Mass

.2 1, 1.1-trichloroethane ConcentraUon ug

2.

2.25 13 13 (71-55-6)

Mass

.2 1, 1,2-trichloroethane Conce t tio u

1 2.26

[3

[3 (79-00-5)

Mass ce ti

<2.

1

<2.0 2.27 Trichloroethylene (79-01-6) 13 13 as

<.3 t'

Q 2.28 Vinyl chlonde (75-01-4) 13 13 as

<0,

~ - ~

0 i

<5.0 3.1 2-chlorophenol (95-57-8) 13 13 2,4-dichlorophenol 1

3.2 (120-83-2) 1:1

[:J I~

<0,824 2,4-dimethylphenol Concentration ug/l

<10.0 1

1 3.3 (105-67-9) 13 13 Mass 4,6-dinitro-o-cresol n

nt ug/L 1

1 3.4 (534-52-1)

[3 121

1.

7 ncentration

<50.

1 1

3.5 2,4-dinitrophenol (51-28-5) 13 13 I~ a S

Outfall 006 Units long-Number Pollutant/Parameter Teatlng (specify)

Maximum Number of Tann of (and CAS Number, If Required Believed Betleved Dally Analyses Average Analysaa available)

Prnent Absent Discharge Value (required) 5.0 2-nilrophenol

[3

[3 3.6 (88-75-5) 3.7 4-nilrophenol (100-02-7)

[3 13

<10 1

1 Con 3.8 p-chloro-m-cresol

[3 0

ss

.8 (59-50-7) oncenl ti L

1.

3.9 Pentachlorophenol m

m

<1.64 (87-86-5) enlralion Phenol ltJ

[3

<0.003 3.10 Mass (108-95-2) 3.11 1

<10 1

4.1 0

ug

<0.82 ugJL 4.2 Acenaphthylene

[3

<0.824 (208-96-8) ug/L 4.3 Anthracene (120-12-7) 8 4.4 Benzldine (92-87-5)

D

<50 1

1 Concent I

4.5 Benzo (a) anthracene 0

El (56-55-3) 4.6 Benzo (a) pyrene 0

[3 Mas (50-32-8)

--. - -- -~--

~

~ -

Intake Outfall 006 (optional)

Presence or Abnnc:e 11 (check one)

Long-Term,

I Units II Long-Number PollutantlParameter T..Ung 1, Mlllllmum Mlllllmum AVttntgG Number of Tenn (specify)

~

of (and CAS Number, If avallable)1, Requlrad Believed Believed Dally Monthly Dally Analyses Avenge Analyses Present Absent Discharge Discharge Discharge '

Value

1.

(required)

(If available\\

flt available}

1 0

Ir ti g

5.

3,4-benzoffuoranlhene D

13 Mass 4.7 (205-99-2) 1 Concentration ug/L

<5.0 4.8 Benzo (ghi) perylene (191-24-2)

C m

Mass 1

Concentralion ug/L 4.9 Benzo (k) ftuoranthene (207

  • 8 II

<0.824

9)

<10 II I

i L

4.10 Bis (2-chloroethoxy) methane 0

m Mass

<1.648 (111-91-1) 1 1

<5.0 II I

L 4.11 Bis (2-chloroelhyl) ether (111

  • D 13 Mass

<0.824

4) 1 1

II I

IL

<5.0 4.12 Bis (2-chloroisopropyl) ether m

Mass

<0.8 (102-80-1) 1 oncenlralion ug/L

<5.0 4.13 Bis (2-ethylhexyl) phthalate (117-13 81-7)

5.

Concentralion ug/L 4.14 4-bromophenyl phenyl ether (101 13 ass

<0.824 55-3)

Concentra

<5.0 4.15 Butyl benzyl phlhalale (85-68-7) 13 Mass

<0,824 C

1

<5.0 4.16 2-chloronaphthalene (91-58-7)

C m

Mass 1

C I r

5.

4.17 4-chlorophenyt phenyl ether 13 I&

(7005-72-3) 0 I Ii

<5.0 1

4.18 Chrysene (218-01-9) m I&

1 1

0 tr lion g

4.19 Dibenzo (a,h) anlhracene (53-70 C

13 I&

3)

Pruence or Absence Outfall OCHI (optlooal)

(chec:kone)

Long-Tenn Units Long.

Number PoHutllnt/Panimeter Testing (specify)

Maximum Maximum Average Number of Term of (and CAS Number, If Raqulred Belleved BeUeved Dally Monthly Dally AnalysN Average AnalysN available)

Preaent AbHnt Discharge Dtacherge Discharge Value J (required)

(If available}

~ available)

--=-=

1

<5.0 C

entratlon L

<5.0 4.20 1,2-dichlOlobenzene 13 Mass

<0.824 (95-50-1) 1 C

I ti L

4.21 1,3-dichlorobenzene D

m Mass

<0.824 (541-73-1)

I II 4.22 1,4-dichlorobenzene a

13 0.824 (106-46-7)

I Ii 4.23 3,3-dichlorobenzicline a

m Mass 8

(91-94-1) 1

<5.0 Concentra 4.24 Diethyl phlhalate a

13 I

s

<0.824

(~2) 1 1

<5.0 Concenlratlon ug/L

<5.0 4.25 Dimethyl phthalate D

m 1ft

<0.824 (131-11-3) 1 1

<.0 ncenl Ii ug

<5.0 4.26 Di-n-bulyl phthalate a

13 II (84-74-2)

<5.

I i

ug

<5.

4.27 2,4-dlnltrotoluene m

(121-14-2) 1 I I 4.28 2,6-dinilrotoluene 13 Mass

<0.824 (606-20-2) 1 I r 4.29 Di-n-octyl phthalale D

m Mass

<0.824 (117-84-0) 1

<5.

Concenl Ii 4.30 1.2-Diphenylhydrazine D

13 II ss

<0.824 (as azobenzene) (122-66-7) 1 1

Concentration

/L

<5.0 4.31 Fluoranthene C

m (206-44-0) 111 ncentratloo 4.32 Fluorene a

m 1r. ss (86-73-7)

,~u Presence or Absence Outfall 006 (opUonal)

(check one)

II Units Long.Term I Long-I; Number Pollutant/Parameter Tnttng (specify)

Maximum Maximum Average Number of Term of (and CAS Number, tf Required Believed Believed Oally Monthly Dally Analyses Average Analyses available)

Preaant Absent Discharge Discharge Discharge Value I

(required)

(If avatlable)

(If available)

I L 1

1

<5.0 C n ug/L

<5.0 4.33 Hexachlorobenzene CJ Iii II ss (118-74-1) 1

<.0 cenlralion ug/L

<5,0 4.34 Hexachlorobutadiene 13 I*

(87-68-3)

Concentration ug/L

<10.0 4.35 Hexachlorocyclopentadiene Cl m

I~

(77-47-4) 1 Concentration ug/L

5.

4.36 Hexachloroethane 13 I~ s

<0.824 (67*72*1) 1 Concentration L

4.37 lndeno (1,2,3-cd) pyrene m

I~

s

<0.824 (193-39-5) 1 u n t ti 10.0 4.38 lsophorone Mass (78-59-1)

<5.0 1

ug/L centralion 4.39 Naphthalene m

I.

<0.824 (91-20-3) 1 1

Conce 0

4.40 Nitrobenzene 13 s

<0,824 (98-95-3) 1 1

5.

Concentratio 4.41 N-nilrosodimelhylamine m

Mass

<0.824 (62-75-9) 1 1

5.

cen i

4.42 N-nitrosodi-n-propylamlne El Mass

<0.824 (621-64-7) 1 I

~

.0 4.43 N-nitrosodiphenylamine m

Mass

<1.

(86-30-6) tr I

~

.0 4.44 Phenanthrene 13 Mass (85-01-8) 1

<5.0 t

i 4.45 Pyrene 13 I~

ss (129-00-0)

Presence or Absence 1 Outfall 006 II Intake (check one)

I I (optloff!lJ)

I

~

Pollutant/Parameter Testing Units Long-Term "1

(and CAS Number, If (specify)

I* MaxJmum Maximum Long-Required AYerage Number avallable)

Believed Believed Number of Term Present Absent Dally Monthly Dally*

Analyses Average of Discharge Discharge Discharge Value Analyses IL (required)

(If avaHable)

{If available) 4 46 1,2,4-trichlorobenzene Concentration ug/L

<5.0

<5.0 (120-82-1) 121

~

. ic ~Dn 4 I,) -ga ~11. Tox llutanhl I~ IMS Fra.;tlol Bue 'Net 1tral OfflDOllftf is

~

Aldrin Concentration Ig

.050 1

  • 50 1

5.1 (309-00-2) liJ Mass 5.2 a-BHC ug/L

<0.05 1

<0.0 (319-84-6)

B I~

<0.008 13-BHC Concentration IL

<0.050 1

5.3 (319-85-7)

Iii Mass 8

y-BHC Concentration ug/L

<0.0 1

<0.050 1

5.4 (58-89-9)

IJ Iii IM

<0.00 i5-BHC Concent Ii ug/L

<0.05

<0.050 1

5.5 (319-86-8)

IJ CJ Iii Mass

<0.008 Chlordane ncentration ug 1

<0.50 1

5.6 (57-74-9)

IJ B

1~ ass

<0.082 4,4'-DDT Concentration ug/L

<0.050

<0.050 1

5.7 (50-29-3)

B Mass

<0.008 4,4'-DDE Concentration u

1

<0,0 1

5.8 (72-55-9)

IJ C

lil II 4,4'-DDD Cance r

<0,050 1

<0.050 5.9 (72-54-8) 121 Mass

<0.008 Dieldrin lion ug/L 1

5.10 (60-57-1)

C C

El s

<O.

a-endosulfan Concentrali ug/l.

<0.050

.050 1

5.11 (115-29-7) 121 I~

~~--

~~

Intake PrNence or Absence Outfall 006 l

(optional)

(check one}

Units Long-Tenn Long-Number Pollutant/Parameter Testing (specify)

Maximum Maximum Average Number of

  • Tenn of (and CAS Number, If Required Believed Believed
  • Dally Monthly Dally Analyses I

Average Analyses available)

Pl"8Hnt Absent Discharge Discharge Discharge Value (required)

(If available),

(If available)

<.050 0

i ug/L 13 -endosulfan C

lil II 5.12 ( 115-29-7)

Concentration ug/L Endosulfan sulfate C

lil Mass

<0.008 5.13 ( 1031-07-8)

<0.050 1

e 5.14 Endrin lil Mass

<0.008 (72-20-8) 1 C n gt 5.15 Endrin aldehyde lil Mass

<0.

(7421-93-4) n I Ii I

5.16 Heptachlor 0

Mass (7~-8)

.5 Concentration ug/L 5.17 Heptachlor epoxlde m

<0.008 (1024-57-3) 1 Con tr lion I

5.18 PCB-1242 0

<0.082 (53469-21-9)

<0.50 1

Co I llo I

5.19 PCB-1254 C

lil Mass (11097-69-1) 1 t Ii

~/L 5.20 PCB-1221 lil II 2

(11104-28-2) 1

.5 nt r QI 5.21 PCB-1232 lil (1 t 141-16-5)

If 1

<0.50 1

II n

on ug/L

<0.50 5.22 PCB-1248 0

II (12672-29-6) s

<0.50 1

1 Concentralion ug/L 5.2 PCB-1260 lil

<0.082 3 (11096-82-5)

II s 1

1

<0.50 Concentration ug/L 5.2 PCB-1016 0

4 (12674-11-2)

Mass

Units Long-Term Long-Number Pollutant/Parameter T*tlng (specify)

Maximum Maximum Average Number of Term of (and CAS Number, If Required Believed Believed Dally Monthly Dally Analy...

Average AnafyHs available)

Prnent Al>Hnt Discharge Discharge Discharge Value (required)

(If available)

(If available)

C C

OUTFALL 006 & INTAKE DATA-TABLE C

Presence or Absence Outfall 006 Intake (check one) 1IL_

J~,:,_tlonal)

Pollutant/Parameter II Units Long-Term

,~

(and CAS Number, lf available)

(specify)

Maxtmum MaxJmum Average l!.ong-Number

, Believed Believed Dally Monthly Dally Number of Term of Present Absent I

Analyaea Average Discharge Discharge Discharge I. Value Analyses 1 (reaulred)

(if available)

(if available)

Checl< here if you believe an pollutanls on Table C to be present in your discharge from lhe noled oulfall. You need not complele lhe "Presence or Absence* column of Table C for each pollutant Check here if you believe all pollulants on Table C to be absent in your discharge from Iha noled oulfall. You need not complete the "Presence or Absence* column of Table c for each pollutant Bromide II mg/L 0.31 1

0.54

1. (24959-67-9) el ss Chlorine, total Concentration ug/L 14 1

<1 1

2. residual el Mass 2.31 tralion units 58 1

<25 1

3. Color el Mass NA Concentralion CFU/100ml

<1.0 10 1

4. Fecal Coliform el Mass NA Fluoride Concentration mg/L
o.

1 0.11 1

5. (16984-48-8) el

,~

s 52.7 Concentration mg-0.75 1

0.02 1

6. Nitrate-nitrite el Mass 123.6 Nitrogen, total Concentration mg-NIL 2.4 1

0.53 1

7. organic (as N) el ncentration mg/L 1

1

8. Oil and Grease I

ss 823.6 Phosphorus (as P),

Concentration P/L 3.75 1

0.036 1

9. total (7723-14-0) el Mass 617.

Sulfate (as S04)

Concentration mg/L 27 1

6.5 1

10. (14808-79-8) m Mass 4,447 Concentration

<0.10 1

<0.10 1

11. Sulfide (as S)

Mass

<16.5

Presence or Absence Intake (check one)

Outfall 006 i,

(optional)

PollutanUParamater Units II Long-Term (and CAS Number, If (specify}

Maximum Maximum Average Long-Number avaUable)

Believed Believed I*

Dally Monthly Daiiy Number of Term Present Absent Analyses Average of Discharge Discharge Discharge Value Analyses 1,

{required)

(If available)

(If available)

_J Sulfite (as SO3)

Concentration ug/L 1

1

12. (14265-45--3) 0 Mass

<494

13.

Concentration mg/L 0.4 1

0.13 1

Surfactants Mass 65.9 Aluminum, total Concentr n

mgll 0.180 1

0.103 1

14. (7429-90-5)

El Mass 29.7 Barium, total Concentration mg/L

0. 1 1
0. 8 1
15. (7440-39-3) 121 II s

2.97

16. Boron, total Concentration mg/L 0.132 1

0.051 1

(7440-42-8) 13 Mass 21.7 Cobalt, total Concentration ugll

<1 1

<1.0 1

17. (7440-46-4) 8 Mass

<0.165

18. Iron, total Concentration mg/L 0.424 1

0.494 1

(7439-89-6) 8 Mass 69.8

19. Magnesium, total Concentration mg/L 4.29 1

1.93 1

(7439-95-4) 8 Mass 706.6

20. Molybdenum, total Concentration ug/1 1.62 1

<1.

1 (7439-95-4) 0 Mass 0.268 Manganese, total Concentration mg/L 0.228 1

0.121 1

21. (7439-96-5) 8 Mass 37.6 Tin, total t

i mg/L

<0,01 1

<0.01 1

22. (7440-31-5) a 0

Mass

<1.65

23. Titanium, total Concentration mgll

<0.005 1

0.

5 1

(7440-32-6) 0 Mass

<0.824

Outfall 006 Pollutant/Parameter Units Long-Term (and CAS Number, If (specify)

Maximum Maximum Average Long-Number available)

Believed Believed Dally Monthly Dally Number of Term of Present Absent AnalyllH Average Dlacha,ge Discharge Discharge Value Analylln required (If available}

(If available)

Concentration pCi/L

<0.790 NA NA Alpha, total la Mass NA NA NA Concentration pCilL 5.62 NA NA 1

Beta, total 13 Mass NA NA NA Concentration pCi/L

<1.38 NA NA 1

Radium, total

[ii Mass NA NA NA Concentration pCilL

<1.38 NA NA Radium 226,. total I!)

Mass NA NA NA

OUTFALL 006 & INT AKE DATA *TABLE D

TABLED. CERTAIN HAZARDOUS SUBSTANCES AND ASBESTOS (40 CFR 122.21(g)(7)(v))

1 Pollutant Presence or Absence

{check one)

Believed Believed Present Absent Reason Pollutant Believed Present In Discharge I

Avallable Quantitative Data 7 (specify units)

. __ j ama 0

Insulation used on piping or other equipment (trace amounts)

2. Acelaldehyde 0
3. Allyl alcohol 0
4. Allyl chloride 0
5. Amyl acetate 0

6, Aniline 0

7. Benzonitrile 0
8. Benzyl chloride 0

9, Butyl acetate 0

10. Butylamine 0
11. Caplan 0
12. Carbary!

0 13, Carbofuran 0

14. Carbon disulfide 0
15. Chlorpyrifos G
16. Coumaphos 0
17. Cresol G
18. Crotonaldehyde 0
19. Cyclohexane 0

1*--~~............

Presence or Absence I I I

Pollutant (check one)

Reason Pollutant Believed Present in Discharge Available Quantitative Data Believed Believed (specify units)

Present Absent

20. 2,4-D (2,4-dichlorophenoxyacetic acid)
21. Oiazinon a

0

22. Dicamba 121
23. Dichlobenil 0
24. Dichlone 0
25. 2,2-dichloropropionic acid 0
26. Dichlorvos 0
27. Diethyl amine D

0 28 Dimethyl amine El

29. Dintrobenzene 0
30. Oiquat 121 31. Oisulfoton 0
32. Oiuron El
33. Epichlorohydrin 0
34. Ethion 0
35. Ethylene diamine 121
36. Ethylene dibromide El
37. Formaldehyde 0
38. Furfura\\

0

.--~---ammmnn Im***"--**

-~-, -*

,11--~

Presence or Absence Pollutant (check one)

Reason Pollutant Believed Present In Discharge Available Quantitative Data Believed Believed

{specify units)

Present Absent I

I

39. Guthion 0

El

40. lsoprene El
41. lsopropanolamine El
42. Kelthane 0
43. Kepone El
44. Malathion El
45. Mercaptodimethur El
46. Methoxychlor 0
47. Methyl mercaptan El
48. Methyl methacrylate El
49. Methyl parathion El
50. Mevinphos 0
51. Mexacarbate El
52. Monoethyl amine El
53. Monomethyl amine

[J El

54. Naled 0
55. Naphthenic acid 0
56. Nitrotoluene 57 Parathion El

...... ~..:-~:::a~*~*-l***=**--..,~ ** ~

mmD**.. :*-*~-mu I

Presence or Absence Pollutant (check one)

Reason Pollutant Believed Present In Discharge I

Available Quantitative Data Believed Believed (specify u_nlts)

Present Absent 58, Phenolsulfonate (2)

59. Phosgene (2)
60. Propargite (2)
61. Propylene oxide (2)
62. Pyrethrins (2)
63. Quinoline (2)
64. Resorcinol (2)
65. Strontium 0
66. Strychnine 0
67. Styrene 0
68. 2,4,5-T (2,4,5-0 trichlorophenoxyacetic acid)
69. TOE (telrachlorodiphenyl ethane) 0
70. 2,4,5-TP [2-(2,4,5-trichlorophenoxy) propanoic acid]

D 0

71. Trichlorofon 0
72. Triethanolamine D

!2)

73. Triethylamine D

!2)

74. Trimethylamine D

8

75. Uramum 0

D Trace amounts occasionally present in oil used to fuel auxiliary boilers None

76. Vanadium

!2)

Trace amounts occasionally present in oil used to fuel auxiliary boilers Nolle

TABLED. CERTAIN HAZARDOUS SUBSTANCES AND ASBESTOS (40 CFR 122.21(gl(7l(v))1 Pollutant

77. Vinyl acetate
78. Xylene
79. Xylenol Presence or Absence (check one)

Believed Present Believed Absent Reason Pollutant Believed Present In Discharge Avallable Quantitative Data (specify units)

BO. Zirconium m

Trace amounts occasionally present in oil used to fuel auxiliary boilers None

  • Sampling shall be conducted according to sufficiently sensitive test procedures (i.e., methods) approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or required under40 CFR chapter I, subchapter Nor 0. See instructions and 40 CFR 122.21(e)(3).

OUTFALL 006 & INTAKE DATA* TABLE E

Pollutant Congeners Used or Believed Manufactured Pruent 2,3,7,8-TCDO Believed Absent Results of Screenlng1Proc:edunt NO (Nol Delecled)

  • Melhod 1613B 1 Sampling shall be conducted according lo sufficienUy sensitive test procedures (i.e., methods) approved under 40 CFR 136 for the analysis of poUutants or pollutant parameters or required under 40 CFR chapter I, subchapter N or 0. See instructions and 40 CFR 122.21 (e)(3).

OUTFALL 007 - TABLE A

TABLE A. CONVENTIONAL AND NON CONVENTIONAL POLLUTANTS (40 CFR 122.21(g)(7)(iii))1 Intake (Optional)

Pollutant Maximum Maximum Long-Tenn Long Tenn Waiver Daily Monthly Average Dally Number of Average Number of Requested Units Discharge Discharge Discharge Analyses Value Analyses (if applicable)

(specify)

(required)

(if available)

(if available)

D Check here if you have applied to your NPDES permitting authority for a waiver for all of the pollutants listed on this table for the noted outfall.

Biochemical oxygen demand Concentration mg/L 6.6 4.7 16

1. (BOD5)

Mass lb/Day 1.4 Concentration mg/L

<250

2.

Chemical oxygen demand (COD)

Mass lb/Day

<52.1 Concentration mg/L 4.3

3. Total organic carbon (TOC)

Mass lb/Day 0.9 Concentration mg/L 3.8 1.9 16

4. Total suspended solids (TSS)

Mass lb/Day 0.8 Concentration mg-N/L 0.072 0.04 16

5.

Ammonia (as N)

Mass lb/Day 0.015

6. Flow D

Rate 0.025 0.022 78 Temperature (winter)

  • c
  • c 16.8 12.4 7
7.

Temperature (summer)

  • c
  • c 30.9 21.6 8

pH (minimum)

D Standard Units s.u.

7.6 7.9 15

8.

pH (maximum)

Standard Units s.u.

9.0 8.0 15

OUTFALL 007

  • TABLE B

TABLE B. TOXIC METALS. CYANIDE. TO.OLS. ANO ORGANIC TOXIC POLLUTANTS (<O CFR m.211911'11')('

Pollutant/Paramei.r (and CAS Number, If avallable)

P,...nc. or Absence' (check one)

Units (specify)

Outfal007 Long-Tenn Average Dally Discharge If available r

Intake (Optional) j 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.6 1.9 1.10 1.11 Tntlng Required Believed Believed Prn*nt Absent Maximum Dally Discharge ulred Maximum Monthly Discharge If avatlable Number of AnalyaN Long-Tenn Av*rage Value Number of Analyus Check here lf you qualify as a small business per the lnstructlons to Form 2C and, therefore, do not need to submit quantitative dala for any of the organic toxic pollutants in Sections 2 through 5 of this table. Note, however, that you must stiN Indicate in the appropriate column of this table If you believe any of the pollutants llsled are present in your discharge.

Antimony, total (7440-36-0) 13 13 Arsenic, total (7440-38-2) 13 Iii C

BeryNlum, total (7441M1-7)

El El Cadmium, total (7441M3-9) ta m

Chromium, total (7441M7-3)

El 13 1

Copper, lotal (7440-50-8) ta Iii Lead, total (7439-92*1) 13 El 55

<0.00002 Mercury, lolal (7439-97-6)

Iii CJ e

Nickel, total (7440-02-0) 13 13 a

Selenium, total (7782-49-2) 13 a

Sliver, tolal (7440-22-4) 13 13

.. - *-~

~". -

Intake Presence or Abaence Outfall 007 (Optional)

(check one)

Units Long-Term Long-Number Pollutant/Parameter TNUng (specify)

Maximum Maximum Average Number of Term of (and CAS Number, If available)

Required Believed Belleved Dally Monthly Dally AnalyHB Average Analyses PntNnt Absent Discharge Discharge Discharge Value I

(required)

(If available)

(if avaHable) 0

<0.2 1

1.12 Thallium. total (7440-28-0) 13 13 a

C t

0 m /L 1.13 Zinc, total (7440-66-6) 13 13 II ay t

1.14 Cyanide, total (57-12-5) 13 Cl 13 I

Ii n mg/L 1

1.15 Phenols, total Iii 13 s

lb/Day

itte tlO

~ -

I - ti 1111~'11 [GCIMS *ractl0 -

1181

~

p&,<11 ~-

in IL 2.1 Acrolein (107-02-8) 13 13 I

1 centrati 1

2.2 Ac,ylonitrile (107-13-1) 13 a

13 Mass y

Con nl f

.o 1

2.3 Benzene (71-43-21 13 13 Mass

<, 002 ce t Ii g

<2.0 1

2.4 Bromofonn (75-25-2) 13 13 s

I

<0.00 cen ti 2.5 Carbon telrachloride (56-23-5) 13 13 s

ay

<O.

IL 2.6 Chlorobenzene (108-90-7) ra 13

,I

<0.

C I

g 2.7 Chlorodibromomethane 13 13 IM I /Day (124-48-1)

I tion 1g

<2.

1 2.8 Chloroethane (75-00-3) 13 El I

,n:m, Intake Presence or Absence Outfall 007 (Optional)

(check one)

I Long-Term Units Long-Number Pollutant/Parameter Testing (specify)

Maximum Maximum Average Number of Term of (and CAS Number, If available) Required Believed Believed Dally Monthly Dally

' Anelysn Average Analyses Present Absent Discharge Discharge Discharge Value TT (requlrad)

(If available)

,(if available)

C I

2.9 2-chloroelhylvinyl ether 13 a

I 1

(110-75-8)

Con I

2.10 Chlorofonn (67-66*3)

El 13 Mass I

I 2.11 Dichlorobmmomethane 13 13 I

(75-27-4) s Concentration 2.12 1, 1-dichloroelhane (75-34-3)

El El Mass I

Cance 2.13 1,2-dichloroethane (107-06-2) 13 C

13 1

0 ntrallon 2.14 1, 1-dichloroethylene (75-35-4) 13 13 ay 1

2. 15 1,2-dichloropropane (78-87-5) 13

[:I I~

a 1

ce f n mg/L 2.16 1, 3-dk:hloropropylene El B

1r.

lb/Day

<. 7 (542-75-61 1

0 n

ti ug/l 2.17 Ethylbenzene (100-41-4) 13 13 I~

b

<u. *-

1 II ti

/l

.0 2.18 Methyl bromide (74-83-9) 13

[3 II s

I a

II ti 2.19 Methyl chloride (74-87*3)

I~

1 II ti 2.20 Methylene chloride (7S-09-2)

El 13 II y

II n

ti 2.21 1, 1,2,2* tetrachloroelhane Cl 13 b

IY (79-34-5)

- ~--------------

~ -

.-. -~ -. ---*-*--*--.

Intake

'Pl'lltlltnca or Absenca Outfall 007 (Optional)

!I (check one)

Long-Tenn I I II Units Long-Number Pollutant1P1ram11ter I TnUng (specify)

Maximum Maximum Average Number of Tenn of (and CAS Number, if

, 'Required Believed Believed Dally Monthly Dally Analyses Average Analyse&

available)

Prnent Absent*

Discharge Discharge Discharge Value (required!

(if available)

(If available) 1 Con t ti 2.22 Tetrachloroethylene 13 13 Mass

. 00 (127-18-4) 1, Concentration 2.23 Toluene (108-88-3)

B B

Mass ID Concentration g

1,2-trans-dichloroethylene 13 13 2.24 Mass (156-60-5)

Concentration ug/L 1, 1, 1-trichloroethane B

B lb/Day 2.25 Mass (71-55-6) ntration ug/L 1, 1,2-trichloroelhane 13 0

13

<.OU~

2.26 s

(79-00-5}

Co g

2.27 Trichloroelhylene (79-01-6}

B E

C i

IL 2.28 Vinyl chloride (75-01-4) 13 13 as I

~ti,n '", -

~a 11

-Clll -Cllhlll~"'

11 ~fnK lo*

d IDOntlfllSI 1

/L 3.1 2-chlorophenol (95-57-8)

B E

I

<O. 0 Con t

L

.0 3.2 2,4-dichlorophenol 13 0

[3 Mass I

(120-83-2)

Concentration

~

3.3 2,4-dimethylphenol E

E Mass I

(105-67-9) centration 3.4 4, 6-dinitro-o-cresol

[3 (3

Mass lb/Oa (534-52-1)

Concentration 1g 3.5 2,4-dinitrophenol (51-28-5}

E B

I

PrNence or Absence Outfall 007 (Optional)

(check one)

Units

  • Long-Tenn Long-Number Pollutant/Parameter Testing (specify)

Maximum Maximum Average Number of Tenn of (and CAS Number, If Required Believed Believed Dally Monthly Dally Analyses Average Analyses available)

Prnent Absent Discharge Discharge Discharge Value I

(required)

(If available)

(If avallable) l e I

II ce ralion 2-nitrophenol la la 3.6 (88-75-5)

I~ ass ugfl Conce 3.7 4-nilrophenol III

[J B

,. s J

a 2

(100-02-7) mg/L Co nt I

3.8 p-chloro-m.cresol B

a B

(59-50-7) ug/L Concent Ii 3.9 Pentachlorophenol la a

m (87-86-5) 1 Concent tlo

/L Phenol a

B lb/Day 3.10 B

(108-95-2)

Concentration gf

<10 2,4,6-lrichlorophenol 3.11 m

IJ m

I~

lb/Day (88-05-2)

~

Pol tu tants,~1c:JMa F racttci n dasa, M LI II LIIIGa ISa :tt ~1 ** * *11 ta tic: lo al

<5.

IL 4.1 Acenaphlhene a

1:1 IM a

1 (83-32-9)

Concent Ii u L

<.0 4.2 Acenaphthylene a

a B

lb/

y (208-96-8) t centralio

'ljl 4.3 Anthracene (120-12-7)

B Mass Day 1

n u

4.4 Benzldlne (92-87-5)

B Mass I

<0.01 1

ug/L 4.5 Benzo (a) anthracene B

Mass I

<0,001 (56-55-3) n t II 4.6 Benzo (a) pyrene a

El IM s b/Da 1

(50-32-8)

...... -*-*-- - ----~-*-

Intake Outfall 007 (Oplional)

Praunce or Absence 11 (checkooe)

Long-Tenn II Units Long*

Number Pollutant/Parameter Testl11i1 (specify)

Maximum Maximum Average Number of Tann of (and CAS Number, If avallable) Required Ballavad Ballavad ' II Dally Monthly Dally Analyses,

Average Analyses Present Absent '

Discharge Discharge Discharge Value (required)

(If available)

(If available) 1 Concentration

/L 3,4-benzofluoranlhene D

Mass lb/Day

<O.

4.7 (205-99-2)

C I

<5.0 4.8 Benzo (ghi) perylene (191-24-2) a m

Mass I /

Hon ug/L

<5.0 4.9 Benzo (k) fluoranthene (207

  • D Mass I
9) 1 Concentration ug/L

<10.0 4.10 Bis (2-chloroethoxy) methane a

m I

(111-91-1) 1 Concentration ug/L

<5.0 4.11 Bis (2*chloroelhyl) ether (111 D D

13 ss I

<0.001

4)

Concentration L

5.

4.12 Bis (2-chloroisopropyl) elher D

C m

11 ass lb/Day

<0.001 (102-80-1) 1 Concentration L

<5,0 4.13 Bis (2-ethylhexyl) phlhalate (117-D D

13 1~ ass lb/Day 81-7)

I alion ug/L 4.14 4-bromophenyl phenyl elher (101 C

D m

<0.001 55-3)

Concent

/L 1

4.15 Butyl benzyl phlhalale (85-68-7) 13 lb/Day

<0,001 Concenlr 1

4.16 2-chloronaphlhalene (91-58-7)

D m

Mass lb/Day

<0.001 1

n I

5.

4.17 4-chlorophenyl phenyl elher Mass lb/Day

<0.001 (7005-72-3) r II i

4.18 Chrysene (218-01-9)

C m

Mass lb/Day 1

ntrali g/

<5.0 4.19 Dibenzo (a,h) anlhracene (53-70 13 11 a 1

3)

-~

~-

lntaka PreHnc:e or Absence Outfall 007 11 (Opllonal)

~

(check one)

I

~

Long-Term Long.

Units Number PoHutant/Panimeter T..Ung

{Specify)

Maximum Maximum Average Number of Term of (and CAS Number,. If Requl,ed B~leved Believed Dally Monthly Dally Analyua Average AnalysN available}

Pl'IIHnt Absent Dlschat'ge Discharge Discharge II Value (required)

(If available)

(If available) 1 Concentration ug/L

<5.0 4.20 1,2-<llchlorobenzene a

a 13 Mass

'1

<0.001 (95-50-1) 1 C n I ti l!I L 4.21 1,3-dichlorobenzene a

l2l Mas (541-73-1) 1 C

lio ug/L 4.22 1,4-<llchlorobenzene a

G Mass lb/Day

<0.

(106-46-7) 1 C

nl Ii'"

ug L 4.23 3,3-dfchlorobenzidine a

lj]

Mass

/Day

<0.002 (91-94-1) 1 ncentralio,,

<5.0 4.24 Diethyl phthalate 0

13 II s

Day 0.001 (84-66-2) 1 Concentration

<5.0 4.25 Dlmelhyl phthalate 0

Ii) s I

0.001 (131-11-3) 1 Concentratlo

<5.0 4.26 Dl-n-butyl phthalate 13 ID (84-74-2) 11 ntr II g/L

.0 4.27 2,4-<linitrotoluene 0

Ii)

(121-14-2)

II 1

t ti 4.28 2,6-dinilrololuene a

0 13 1

(606-20-2) 1 C

t ti 4.29 Di-n-octyl phthalate 0

Ill Mass Day

<0.001 (117-84-0) 1 Concentrali

'II

<5.0 4.30 1,2-Diphenylhydrazine a

a G

11 s

lb/Day

<0.

(as azobenzene) (122-66-7) 1 Concentration ug/L

<5.

4.31 Fluoranthene a

l2l 11 D

(206-44-0)

I II n ug/L 4.32 Fluorene 13 lb/Day (86-73-7)

~. -*-

. ~

auNoo, 11 (check one)

Long-Term Long*

I I

Units Number Pollutant/Parameter Teetlng (specify)

Maximum Maximum Average Number of Term of (and CAS Number, If 11Requlred Bellav.d Believed Dally Monthly Dally I* Analyses Average I Analyses available)

Preaent Abnnt Discharge Discharge Discharge Value

~(required)

(If available)

(If available)

I I

~.T

<5.0 1

Concenlrati

  • ~ L 4.33 Hexachlorobenzene Cl G

1~ ass I

(118-74-1)

Concentration ug/L 4.34 Hexachlorobutadlene a

G I~

s I

<0.

(87-68-3) 1 Concenl u

<.0 4.35 Hexachlorocyclopentadiene C

lu ss lb/Day

<.o (77-47-4) 1 C

<5.0 4.36 Hexachloroethane El Mass lb 1

(67-72-1) 1 I ti ug/L

<5.

4.37 tndeno (1,2,3-cd) pyrene C

lu Mass

<0.001 (193-39-5) 1 centralion ug/L 4.38 lsophorone G

ss I Day

<0.002 (78-59-1)

Conce i

L

5.

4.39 Naphthalene l:J l2l It lb/Day (91-20-3) 1

<5.0 4.40 Nltrobenzene a

1:1 Mass lb/Day

0.

(98-95-3) 1 C n

<5.0 4.41 N-nitrosodimethylamine C

(;£1 Mass lb/D 1

(62-75-9) 1 0

I tlo ug/L

<5.

4.42 N-nilrosodi-n-propylamlne 13 Mass

'1

<0.001 (621-64-7)

Concentration ug/L 4.43 N-nitrosodiphenylamine C

lu Mass Day

<0.002 (86-30-6)

5.

oncentral 4.44 Phenanlhrene El I~ ss lb/

(85-01-8) 1 ce l

4.45 Pyrene lu 1

(129-00-0)

~

Presence or Absence I r Intake (check one)

OutfaU 007 I

(OptlonaQ Pollutant/Parameter Units Long-Term (and CAS Number, If Testing (specify)

Maximum Maximum Average I

Long-Number available)

Required Believed Believed Dally Monthly Dally Number of Tenn of Present Absent Analyses Average I<

I Discharge Discharge Discharge Value Analyses (required)

(If available)

(Ir available) 4 46 1,2,4-trichlorobenzene Concentration ug/l

<5.0 1

(120-82-1) 121 I~

I Aldrin II io

. 5 5.1 (309-00-2)

El Mass lb/Day

<0.000 a-BHC Con ntration ug/L

<0.050 1

5.2 (319-84-6)

B I~

I

'1 1

13-BHC centra 5.3 (319-85-7)

B Mass lb/Day

<0.00001 y-BHC Cone tralion ug/L

<0.050 1

5.4 (58-89-9)

~

Mass lb/Day

<0.00 1

6-BHC II centralion ug

<0. 50 1

5.5 (319-86-8)

IJ C

Iii I~

Chlordane Concentration ug/L

<0.50 1

5.6 (57-74-9)

IJ 8

Mas lb/Day

<0.00001 4,4'-DDT II 1

5.7 (50-29-3) tJ B

I~

s I

01 4,4'-DOE Concentralion ug/L

<0.050 1

5.8 (72-55-9) 8 Mass lb/Day

<0.00001 4,4'-ODD i

.050 1

5.9 (72*54-8)

Iii I~

s lb/0

<0.

1 Dieldrin Concentration ug/L

<0.050 1

5.10 (60-57-1)

IJ 121 I~ ass

<. 001 a-endosulfan Concentratio 1

5.11 (115-29-7)

El Mass lb/Da

<0.

Presence or Abnnca Outfall 007 (Optional)

(check one)

I ii Units Long.Tann Long.

Number Pollutant/Paramatar Testing I

(specify)

Maximum Malllmum Average Number of Tenn I

of (and CAS Number, If Monthly Dally Avenge Required Believed Bellevid Dally AnalyaN AnalyaN available)

Praaent Abnnt Discharge Discharge Discharge Value

~. (required)

(If avallable)

(If available)

I Ii

~,

<.0 0

p -endosulfan 0

II I

5.12 ( 115-29-7)

<0.05 1

Concentrar ug/L E ndosulfan sulfate 0

Mass I D,y 1

5.13 ( 1031-07-8) 1 II e ration ug/L 5.14 Endrin 0

I

<0.00001 (72-20-8)

. 50 1

Concentralion ug/

5.15 Endrin aldehyde a

II lb/Day (7421-93-4)

.050 1

Concentration g/

5.16 Heptachlor 13 1*

s lb/0 (76-44-8) 1 Conce ug/L 5.17 Heptachtor epoxide 0

I D

<0.00001 (1024-57-3) ug/L C

Ion 5.18 PCB-1242 13 I I

<0.0001 (53469-21-9) ass 1

ration ug

.0 5.19 PCB-1254 m

Mass lb/Day

<0.0001 (11097-69-1) 1 II

!ration I

5.20 PCB-1221 13 lb/Day

<0.00 (11104-28-2)

I~ s

<.50 Cone I 5.21 PCB-1232 0

lb/Da

.o (11141-16-5) 1 ug/L 5.22 PCB-1248 1:1 Mass I

<0.0001 (12672-29-6)

.0 1

tr II ug 5.2 PCB-1260 0

<0.000 3 (11096-82-5)

Mass 1

n lion ug/L PCB-1016 a

13 lb/Day 5.2 4 (12674-11-2)

I~

TABLE B. TOXIC METALS, CYANIDE, TOTAL PHENOLS, AND ORGANIC TOXIC POLLUTANTS (40 CFR 122.21(g)(7)(v)) 1 Pollutant/Parameter (and CAS Number, If available)

TesUng Prnenc:e or AbHnce (check one)

Required Believed Believed Absent Present Units (specify)

Maximum Dally Discharge (required)

Outfall D07 Maximum Monthly Discharge (If avallable)

Long-Tenn Average Dally Discharge (If available)

Number of Analy...

Intake 1

(Optional)

Long-Term Average Value Number of AnalyH9

OUTFALL 007 -TABLE C

  • I* -

Presence or Absence Outfall007 Intake (check one)

(Optional) 11 I

Pollutant/Parameter Units Long-Tenn 11 (and CAS Number, If avaHable)

(specify)

Maximum MaxJmum Average Long-II Number Believed Believed Dally Monthly Dally Number of Tenn of Present Absent Analyses Average Discharge 1

Discharge Discharge Value Analvses (required)

(If available),

(If available)

  • Check here if you believe all pollulants on Table C to be present in your discharge from the noted outfall. You need not complete the "Presence or Absence* column or Table C for each pollutant.
  • Check here if you believe all poHutants on Table C to be 1bs1111r in your discharge from the noted outfall. You need not complete the "Presence or Absence" column or Table C for each pollutant.

Bromide Concentration mg/L 122 1

1. (24959-67-9) 8 Mass lb/Day 25.4 Chlorine, total Concentration ug/L

<0.50

2. residual Iii II ass lb/Day

<0.0001 Concentration units 1

3. Color Iii Mass

/Day NA Concentration CFU/100ml

<1.0 1

4. Fecal Colifonn 0

CFU1100ml NA Fluoride Concentration mg/L

<0.2 1

5. (16984-48-8) 0 Mass lb/Day

<0.042 Concentralio g-N/L 1.1 1

6. Nitrate-nitrite Iii ss lb/Day 0.2 Nitrogen, total Concentration mg-Nil 0.5 1
7. organic {as N)

Iii Mass lb/D 0.10 Concentrati IL

<5 1

8. Oil and Grease B

Mass lb/Day

<1.0 Phosphorus (as P),

n Ii mg-P/L 1.09 t

9. total (7723-14-0)

Iii Mass lb/Day

. 3 Sulfate (as S04)

Concentration mg/L 32 1

10. (14808-79-8) 0 1:1 Mass lb/Day 6.7 mg/L

<0.

1

11. Sulfide (as S)

[21 Mass lb/Day

<0.02

mm!***"'**"--

Presence or Absence Outfall llntake (check one)

I (optional)

I

~

PollutantJParameter Units Long-Term (and CAS Number, if j

(specify)

Maximum Maximum Average Long-Number available)

Believed Believed Dally Monthly Dally Number of Term of Present Absent Analyses Average Discharge Discharge Ii Discharge Value Analyses I

~

(required)

(If available) 1, (lfiavallable)

Sulfite (as SO3)

Concentration ug/L

<3000 1

12.

(14265-45-3)

Mass lb/Day

<0.63 Concentration mg/L 0.2B 1

13. Surfactants 13 Mass lb/Day 0.06 Aluminum. total Concentration mg/L 0.403 1
14. (7 429-90-5) 8 Mass lb/Day 0.084 Barium, total Concentration m

<0.005 1

15. (7440-39-3)

I!)

Mass lb/Day

<0.001 Boron, total Concentration mg/L 0.066 1

16. (7440-42-B)

Mass lb/Day 0.014 Cobalt. total Concentration ug/L

<1 1

17. (7440-4M) 13 Mass lb/Day

<0.0002 Iron, total Concentration mg/L 0.148

18. (7439-89-6) 8 D

Mass lb/Day 0.031 Magnesium. total Concentration mg/L 1.70 1

19. (7439-95-4) 13 Mass lb/Day 0.36 Molybdenum. total Concentration ug/L 1

1

20.

13 (7439-95-4) lb/Day 0.023 Manganese, total Concentration mg/L 0.035 1

21. (7439-96-5) 13 Mass lb/Day 0.007 Tin, total tration mg/L

<0.01 1

22. (7440-31-5) 13 Mass lb/Day

<0.002 Titanium, total Concentration mg/L

<0.005 1

23. (7440-32-6) 13 Mass lb/Day

<0.001

Effluent Pollutant/Parameter Units Long-Tenn (and CAS Number, if (specify)

Maximum Maximum Average Long-Number available)

Believed Believed Dally Monthly Dally Number of Tenn of Present Absent Analyses Average Discharge Discharge Discharge Value Analyses

(

ulred)

. (if available)

(If avaHabfe)

Concentration pCi/L

<8.53 NA NA 1

Alpha, total El Mass NA NA NA Concentration pCi/L

<4.42 NA NA 1

Beta, total m

Mass NA NA NA Concentration pCi/L

<0.949 NA NA Radium, total El Mass NA NA NA Concentration pCi/L

<0.710 NA NA 1

Radium 226, total m

Mass NA NA NA

OUTFALL 007 - TABLE D

TABLED. CERTAIN HAZARDOUS SUBSTANCES AND ASBESTOS (40 CFR 122.21(g)(7)(v))1 Presence or Absence Pollutant (check one)

Believed Belleved Reason Pollutant Believed Present ln1Dlscharge Present Absent 1-Asbestos 0

D Insulation used on piping o, other equipment (lrace amounts)

2. Acetaldehyde D

0

3. Allyl alcohol D

G

4. Ally/ chloride D

G

5. Amyl acetate D

0

6. Aniline D

G

7. Benzonltrile D

0

8. Benzy/ chloride D

G

9. Butyl acetate D

13 1 O. Butylamlne D

G 11-Caplan D

G

12. Carbary!

D G

13. Carbofuran D

G

14. Carbon disulfide D

G

15. Chlorpyrifos D

0 16, Coumaphos D

0 17-Cresol D

0

18. Crotonaldehyde D

0

19. Cyclohexane D

G Available Quantitative Data (specify units)

None

    • ------~ ---

111111*

...,~J* *

.-..u1 i**-----: :1

  • II

'Presence or Absence Pollutant (check one)

Reason Pollutant Believed Present In Discharge Available Quantitative Data Believed Believed (specify units)

Present Absent

20. 2,4-0 (2,4-dichlorophenoxyacetic acid)

D m

21. Diazinon m
22. Oicamba 13
23. Dichlobenil D

13

24. Dichlone D

m

25. 2,2-dichloropropionic acid D
26. Dichlorvos D

0

27. Diethyl amine D

0 28 Dimethyl amine D

m

29. Dintrobenzene D

13

30. Diquat D

0

31. Disulfoton D

13

32. Diuron D

El

33. Epichlorohydrin
34. Ethion 13
35. Ethylene diamine 13
36. Ethylene dibromide 0
37. Formaldehyde Iii
38. Furfural D

13

  • ~***<~*1**--~--........

Presence or Absence Pollutant (check one)

,Reason Pollutant Bellevud Present fn Discharge Available Quantltatlve Data I

I Believed Believed (specify units)

Present Absent

39. Guthion El
40. lsoprene D

El

41. lsopropanolamine 12:1
42. Kelthane D

El

43. Kepone D

[!I

44. Malathion D

El

45. Mercaptodimethur D

El

46. Methoxychlor D

0

47. Methyl mercaptan 121
48. Methyl methacrylate

[!I

49. Methyl parathion D

Iii

50. Mevinphos D

El

51. Mexacarbate

[!I

52. Monoethyl amine

[!I

53. Monomelhyl amine 121
54. Naled D

0

55. Naphthenic acid

[!I

56. Nitrotoluene

[!I 57 Parathion D

El

TABLED. CERTAIN HAZARDOUS SUBSTANCES AND ASBESTOS (40 CFR 122.21(g)(7)(v))

1 Presence or Absence Pollutant (check one)

Reason Pollutant Believed Present In Discharge Believed Believed Present Absent

58. Phenolsulfonate D

IZI

59. Phosgene IZI
60. Propargite IZI
61. Propylene oxide IZI
62. Pyrethrins D

IZI

63. Quinoline IZI
64. Resorcinol IZI
65. Strontium IZI
66. Strychnine D

IZI

67. Styrene IZI
68. 2,4,5-T (2,4,5-trichlorophenoxyacetic acid)

IZI

69. TOE (letrachlorodiphenyl ethane) 0
70. 2,4,5-TP (2-(2,4,5-trichlorophenoxy) propanoic acid)

D 0

71. Trichlorofon D

IZI

72. Triethanolamine IZI
73. Triethylamine 0
74. Trimethylamine IZI
75. Uranium IZI
76. Vanadium IZI Available Quantitative Data (specify units)

TABLED. CERTAIN HAZARDOUS SUBSTANCES AND ASBESTOS (40 CFR 122.21(g)(7)(v)l1 Presence or Absence Pollutant (check one)

Believed Believed Reason Pollutant Belfeved*Present In Discharge Present Absent

77. Vinyl acetate
78. Xylene
79. Xylenol
80. Zirconium Available Quantltative Data (specify units) 1 Sampling shall be conducted according to sufficiently sensitive test procedures (i.e., methods) approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or required under 40 CFR chapter I, subchapter Nor 0. See instructions and 40 CFR 122.21(e)(3).

OUTFALL 007

  • TABLE E

Pollutant Congeners UHd or Bell9ved Manufactured Present 2,3,7,8-TCDD Believed Absent Results of Scl'Hnlng Procadura ND (Not Oelededl

  • Method 1613B 1

Sampling shall be conducted according to sufficiently sensitive test procedures (i.e.* methods) approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or required under 40 CFR chapter I, subchapter N or 0. See instructions and 40 CFR 122.21 (e)(3).

Duke Energy Progress, LLC Harris Nuclear Plant National Pollutant Discharge Elimination System Permit Number NC0039586 Form 1 - Section 6 - Existing Environmental Permits Form 1 - Section 6 - Existing Environmental Permits Issuing Agency Type of Permit Division of Health Services Main Reservoir Division of Health Services Auxiliary Reservoir Division of Air Quality Synthetic Minor Division of Environmental Well Construction Management (DEM)*

DEM*

Well Construction DEM*

Well Construction DEM*

Well Construction DEM*

410 Certification DEM*

401 Certification Division of Solid Waste Industrial Landfill Management Division of Waste Management Underground Storage Tank DWR Laboratory Certification DWR Oil Terminal Facility DWR NPDES (HNP/HEEC)

DEM*

NPDES (HNP Landfill)

DEM*

Nondischarge DEM*

Nondischarge DEM*

Nondischarge DWQ Nondischarge Wake County Planning Land Use Wake County Planning Land Use Nuclear Regulatory Commission Facility Operating License Division of Radiation Protection Radioactive Materials License USEPA Hazardous Waste

  • Since issu1111ce ofpennit agency nnme has changed to Division of Water Resources.

0 Pennits held by contract disposal linn ID Number 633 633 08455 2497 1290 1145 922 WQC-1198 WQC-214 92-10 0-006715 398 924020063 NC0039586 COC NGG 120032 WQ0009475 WQ0000584**

WQ0000506**

WQ0000838**

3830 13383 NPF63 092-0218-4 NCD991278284

Duke Energy Progress, LLC Harris Nuclear Plant National Pollutant Discharge Elimination System Permit Number NC0039586 Form 1 - Section 7 - Maps

North Carolina - Form l - Section 7 - i\\lap Duke Energy Progress, LLC Horris Nuclenr Plant Woke County Page I orJ

North Carolina - Form 1 - Sedion 7 - Map Duke Energy Progress, LLC Harris Nucleor Plant W11ke County Page 2or3

North Carolina - Form I - Section 7 - Map Duke Energy Progress, LLC Harris Nuclear Plant Wake County Page 3 of3

Duke Energy Progress, LLC Harris Nuclear Plant National Pollutant Discharge Elimination System Permit Number NC0039586 Form 1 -Section 9-CWA Section 316(b) Cooling Water Intake Structure Reports

Clean Water Act§ 316(b)

Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT New Hill, North Carolina NPDES Permit NC0039586 Duke Energy Environmental Services I Environmental Programs 526 South Church Street Charlotte NC 28202 February 2021 e.f._~ DUKE

~ ENERGY

Contents 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Executive Summary....................................................................................................................................... 1 1

Introduction........................................................................................................................................ 3 2

Source Water Physical Data [§122.21(r)(2))....................................................................................... 6 2.1 Description of Source Waterbody (§122.21(r)(2)(i)J................................................................................ 7 2.2 Characterization of Source Waterbody [§122.2l{r)(2)(ii))..................................................................... 10 2.3 Locational Maps (§122.21(r)(2)(iii)J....................................................................................................... 13 3

Cooling Water Intake Structure Data [§ 122.21(r)(3)]...................................................................... 14 3.1 Description of CWIS Configuration (§122.21(r)(3)(i)J............................................................................ 14 3.2 Latitude and Longitude of CWIS (§122.21(r)(3)(ii)]................................................................................ 15 3.3 Description of CWIS Operation (§122.21(r)(3)(iii)]................................................................................ 16 3.4 Description of Intake Flows and Water Balance [§122.21(r)(3)(iv))...................................................... 17 3.5 Avoided Withdrawals Due to Cooling Tower Utilization....................................................................... 18 3.6 Engineering Drawings of CWIS [§122.21(r)(3)(v)).................................................................................. 19 4

Source Water Baseline Biological Characterization Data [§122.21(r)(4))......................................... 20 4.1 List of Unavailable Biological Data (§122.21(r)(4)(i))............................................................................. 21 4.2 List of Species and Relative Abundance in the vicinity of CWIS (§122.2l(r)(4)(ii))................................ 21 4.3 Identification of Species and Life Stages Susceptible to Impingement and Entrainment

(§122.21{r)(4)(iii)J.................................................................................................................................. 30 4.4 Identification and Evaluation of Primary Growth Period [§122.2l(r)(4)(iv))......................................... 35 4.5 Data Representative of Seasonal and Daily Activities of Organisms in the Vicinity of CWIS

[§122.2l{r)(4)(v)J................................................................................................................................... 37 4.6 Identification of Threatened, Endangered, and Other Protected Species Susceptible to Impingement and Entrainment at CWIS (§122.2l(r)(4)(vi)).................................................................. 42 4.7 Documentation of Consultation with Services [§122.2l(r)(4)(vii)]........................................................ 43 4.8 Methods and QA Procedures for Field Efforts [§122.21(r)(4l(viii)]....................................................... 43 4.9 Definition of Source Water Baseline Biological Characterization Data [§122.21(r)(4)(ix)J.................... 43 4.10 Identification of Protective Measures and Stabilization Activities [§122.21{r)(4l(x))........................... 43 4.11 List of Fragile Species [§122.2l(r)(4)(xi)]............................................................................................... 43 4.12 Information Submitted to Obtain Incidental Take Exemption or Authorization from Services

(§122.21(r)(4)(xii)).................................................................................................................................. 44 S

Cooling Water System Data [§122.21(r)(S)]...................................................................................... 45 5.1 Description of Cooling Water System Operation (§122.2l(r)(S)(i)J....................................................... 45 5.2 Design and Engineering Calculations [§122.21(r)(S){ii))........................................................................ 47 5.3 Description of Existing Impingement and Entrainment Reduction Measures [§122.21(r)(Sl(iii)J......... 47 6

Chosen Method(s) of Compliance with Impingement Mortality Standard [§122.21(r)(6)1.............. 49 7

Entrainment Performance Studies [40 CFR § 122.21(r)(7)].............................................................. 51 7.1 Site-Specific Studies (40 CFR §122.2l(r)(7l(i)]....................................................................................... 51 7.2 Studies Conducted at Other Locations (40 CFR §122.21(r)(7)(ii)).......................................................... 51

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 8

Operational Status [§ 122.21(r)(8))................................................................................................... 52 8.1 Description of Operating Status(§ 122.21(r)(8)(i)J................................................................................ 52 8.2 Descriptions of Consultation with Nuclear Regulatory Commission (§122.21(r)(8)(ii))........................ 53 8.3 Other Cooling Water Uses for Process Units (§122.21(r)(S)(iii))............................................................ 53 8.4 Description of Current and Future Production Schedules [§122.2l(r)(S)(iv))....................................... 53 8.5 Description of Plans or Schedules for New Units Planned within 5 years [§122.21(r)(8)(v))................ 54 9

References......................................................................................................................................... 55 II

Tables 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Table 1-1. Facility and Flow Attributes and Permit Application Requirements...................................................... 4 Table 1-2. Summary of §316(b) Rule for Existing Facilities Submittal Requirements for §122.21(r)(2)-(8) and (14).......................................................................................................................................................................... 5 Table 2-3. Monthly Average River Flows (ds) from USGS Gage Stations near Harris Nuclear Plant during October 1980- April 2017................................................................................................................................... 11 Table 3-1. Number of Hours of CWIS Operation at Harris Nuclear Plant in 2016-2018...................................... 16 Table 3-2. Monthly Average Withdrawals (MGD) from Harris Reservoir during 2016-2018 to Support Harris Nuclear Plant Operations...................................................................................................................................... 17 Table 4-1. 2014-2015 Biological Monitoring Transects on Harris Reservoir........................................................ 21 Table 4-2. Fish Species and Community Composition(%) for each Transect (E, H, P, S, and V), collected by Boat Electrofishing on Harris Reservoir, 2008-2016..................................................................................................... 23 Table 4-3. Fish Species Collected and Relative Abundance (Fish/Hour) for all transects combined by Year from Boat Electrofishing on Harris Reservoir, 2008-2016............................................................................................. 24 Table 4-4. Fish Species Collected, Composition, and Relative Abundance (Fish/Hour) for all transects combined by Year from Boat Electrofishing on Harris Reservoir, 2014-2016....................................................................... 26 Table 4-5. Fish Species, Number Collected, Community Composition% (COMP), and Relative Abundance(# of Fish/Hour) for Transect P by Year from Boat Electrofishing on Harris Reservoir, 2008-2012.............................. 27 Table 4-6. Entrainment Potential for Fish Species Identified in Shearon Harris Reservoir.................................. 30 Table 4-7. Period of Peak Abundance for Relevant Taxa in Table 4-4. Known Spawning and Recruitment Period of Native Species with Documented Occurrence in Shearon Harris Reservoir, North Carolina (Jenkins and Burkhead 1993; Rohde et al. 2009)............................................................................................................... 35 Table 4-8. Seasonal and Daily Activities of Species Present in Shearon Harris Reservoir (Jenkins and Burkhead 1194; Rohde et al. 2009)....................................................................................................................................... 37 Table 4-9. Summary of Rare, Threatened, or Endangered (RTE) Aquatic Species Listed for Shearon Harris Reservoir, North Carolina, and Record of Occurrence or Potential to Occur in Harris Reservoir........................ 42 Table 4-10. list of Fragile Species as Defined by the EPA and their Occurrence in Shearon Harris Reservoir1... 44 Table 5-1. Percent of Design Flow Used in the Cooling Water System................................................................ 46 Table 5-2. Estimated Through-screen Velocities at Harris Nuclear Plant............................................................. 47 Table 5-3. Design and Actual (2016-2018) Flow Data........................................................................................... 48 Table 8-1. Annual Capacity Factors at Harris Nuclear Plant, 2014-2019............................................................. 53 m

Figures 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Figure 2-1. Aerial Photo of Harris Nuclear Plant and Its Environs.......................................................................... 8 Figure 2-2. Location of Harris Nuclear Plant within the Cape Fear River Basin (Source: regions.noaa.gov).......... 9 Figure 2-3. Vicinity Map with Intake Structure..................................................................................................... 13 Figure 3-1. Topographical Map with Intake Structure.......................................................................................... 15 Figure 3-1. Harris Nuclear Plant Water Balance Diagram..................................................................................... 18 Figure 4-1. Map of 2008-2016 Biological Monitoring Transects on Harris Reservoir.......................................... 22 Figure 4-2. Transect V sampling stations Vl and V3 adjacent and near-field to CWIS........................................ 22 i,v

Appendices 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Appendix A. Harris Nuclear Plant § 122.21(r)(2)-(8) Submittal Requirement Checklist.

Appendix B. Engineering Drawings of Cooling Water Intake Structure.

Appendix C. Engineering Calculations for Through-Screen Velocity.

V

  • c
  • F AIF AOI BTA CCC CFR cfs cm coc CPUE CTMU CWA CWIS DIF Director DO Duke Energy EPA ESA EPRI fps ft ft msl gpm HUC IPAC m

µm

µS/cm m'

MGD mm MW MWIS NCDENR*DWQ NCDNCR NDCT NPDES OTC POA PVC Rule TL TSV USEPA USFWS USGS degrees Celsius degrees Fahrenheit actual intake flow area of Influence Best Technology Available closed cycle cooling Code of Federal Regulations cubic feet per second centimeter cycles of concentration catch per unit effort cooling tower makeup Clean Water Act Cooling Water Intake Structure design Intake flow NPDES Director dissolved oxygen Duke Energy Progress, LLC Environmental Protection Agency Endangered Species Act Electronic Power Research Institute feet per second foot/feet feet above mean sea level gallons per minute Hydrologlc Unit Code Abbreviations Information for Planning Conservation meter micron mlcroSlemens per centimeter cubic meters million gallons per day millimeters megawatts makeup water Intake structure 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT North Carolina Department of Environment and Natural Resources - Department of Water Quality North Carolina Department of Natural and Cultural Resources natural draft cooling tower National Pollutant Discharge Elimination System once-through cooling percent open area polyvinyl chloride Clean Water Act §316lb) rule total length through-screen velocity U.S. Environmental Protection Agency U.S. Fish and Wildlife Service U.S. Geological Survey

Executive Summary 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT On August 15, 2014, regulations implementing §316(b) of the final Clean Water Act (CWA) rule for existing facilities (the Rule) were published in the Federal Register with an effective date of October 14, 2014.

Facilities subject to the Rule are required to develop and submit technical material, in accordance with

§122.21(r), that will be used by the National Pollutant Discharge Elimination System (NPDES) permit Director (Director) to make a Best Technology Available (BTA) determination for the facility.

Harris Nuclear Plant (HNP) began commercial operations in May 1987 and was permitted in pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency (NC0039586).

Based on the §122.21{r) submittal material provided herein, HNP's selected method of compliance with the Impingement Mortality Standard is the continued operation of a closed-cycle recirculating system.

Further, HNP requests that the Department designates the existing closed-cycle system as Best Technology Available {STA) for entrainment reduction. Give that HNP currently employs closed-cycle cooling as described below, no further impingement or entrainment controls are necessary to comply with the standards.

Impingement BTA The final Rule, at §125.94(c), requires existing facilities to employ one of seven impingement BTA alternatives 1. HNP already employs two of these alternatives:

Primary impingement BTA-Closed-cycle cooling with a natural draft cooling tower is utilized to provide makeup water which is consistent with a closed-cycle recirculating system (CCRS) defined at §125.92(c) and meets the BTA Standards for Impingement Mortality at §125.94(c)(l).

Accordingly, this is HNP's preferred option for complying with the impingement standard.

Entrainment BTA The Rule does not prescribe BTA for entrainment but does require BTA to be determined by the permitting authority on a site-specific basis. Based on the information presented in this report, HNP requests that the Department designate closed-cycle cooling at HNP as BTA for entrainment based on the following:

When compared against the factors in 40 CFR § 122.25(f), an existing closed-cycle cooling system provides benefits to entrainment relative to once-through cooling (OTC) without additional costs.

The HNP uses closed-cycle cooling, which minimizes entrainment through flow reduction. The flow reduction achieved is calculated at 91% flow reduction based on design flow and 365 days 1 Or under specific circumstances one of nine alternatives, which includes §125.94(c)(ll) and (12) in addition to

§125.94(c)( 1)-(7).

1

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT per year operation. Generally, only one CTMU pump is operated which results in a more realistic flow reduction of approximately 95%. Using actual CTMU flows during the 2016-2018 period, the withdrawal reduction is 97.2%.

Statements made by the United States Environmental Protection Agency (EPA) in the preamble to the Rule support a conclusion that an existing closed-cycle cooling system is appropriate for designation as BTA for entrainment:

"Although this rule leaves the BTA entrainment determ;notion to the Director, with the possible BTA decisions ranging from no additional controls to closed-cycle recirculating systems plus additional controls as warranted, EPA expects thot the Director, in the site-specific permitting proceeding, will determine that facilities with properly operated closed-cycle recirculating systems do not require additional entrainment reduction control measures. "2 (emphasis added)

This conclusion is further reiterated In the Response to Public Comments document, where EPA states:

"EPA hos mode it clear that a facility that uses a closed-cycle recirculating system, as defined in the rule, would meet the rule requirements for impingement mortality at§ l25.94(c}(l). This rule language specifically identifies closed-cycle as a compliance alternative for the [impingement mortality]

performance standards. EPA expects the Director would conclude that such a facility would not be subject to additional entrainment controls to meet BTA. "3 (emphasis added)

Overall, entrainment at the facility Is low and is not expected to involve federally protected species or their designated critical habitat. Potential impacts to fish and shellfish populations at HNP due to entrainment is also extremely unlikely due to the operation and configuration of the intake. Based on these findings, the existing closed-cycle cooling system is the best technology available for reduction of entrainment.

2 79 Fed. Reg. 48344 (15 August 2014) 3 Response to Comments, Essay 14, p. 62.

2

1 Introduction 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Section 316(b) was enacted under the 1972 Clean Water Act (CWA), which also introduced the National Pollutant Discharge Elimination System (NPDES) permit program. Certain facilities with NPDES permits are subject to §316(b) requirements, which require the location, design, construction, and capacity of the facility's cooling water intake structure (CWIS)4 to reflect Best Technology Available (BTA) for minimizing potential adverse environmental impacts.

On August 15, 2014, regulations implementing §316(b) of the final CWA rule (Rule) for existing facilities were published in the Federal Register with an effective date of October 14, 2014. The Rule applies to existing facilities that withdraw more than 2 million gallons per day (MGD) from waters of the United States, use at least 25 percent of that water exclusively for cooling purposes, and have or require an NPDES permit.

Facilities subject to the Rule are required to develop and submit technical material that will be used by the NPDES Director (Director) to evaluate an applicant's preferred technology for compliance with the impingement standard and to make a site-specific Best Technology Available (BTA) determination regarding entrainment for the facility. The actual intake flow (AIF)5 and design intake flow (DIF)6 at a facility determines which submittals will be required. As shown in Table 1-1, facilities with an AIF of 125 MGD or less have fewer application submittal requirements and will generally be required to select from the impingement compliance options contained in the final Rule. Facilities with an AIF in excess of 125 MGD are required to address both impingement and entrainment, and provide specific entrainment studies, which may involve extensive field studies and the analysis of alternative methods to reduce entrainment (§122.21(r)(9)-(13)).

The §316(b) compliance schedule under the Rule is dependent on the facility's NPDES permit renewal date. Facilities were required to submit their §316(b) application material to their Director with their next permit renewal application unless that permit renewal application was due prior to July 14, 2018, in which case an alternate schedule could have been requested.

4 CWIS is defined as the total physical structure and any associated constructed waterways used to withdraw cooling water from Waters of the United States. The CWIS extends from the point at which water is first withdrawn from waters of the United States up to, and including, the intake pumps.

s AIF is defined as the average volume of water withdrawn on an annual basis by the cooling intake structure over the past 3 years initially and past 5 years after Oct. 14, 2019. The calculation of AIF includes days of zero flow. Alf does not include flows associated with emergency and fire suppression capacity.

5 DIF is defined as the value assigned during the CWIS design to the maximum instantaneous rate of flow of water the CWIS is capable of withdrawing from a source waterbody. The facility's DIF may be adjusted to reflect permanent changes to the maximum capabilities of the cooling water intake system to withdraw cooling water, including pumps permanently removed from service, flow limit devices, and physical limitations of the piping. DIF does not include values associated with emergency and fire suppression capacity or redundant pumps (i.e., back-up pumps).

3

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Table 1-1, Facility and Flow Attributes and Permit Application Requirements.

Facility and Flow Attributes Existing faclllty with DIF greater than 2 MGD and Alf greater than 125 MGD, Existing faclllty with DIF greater than 2 MGD @nd AIF less than 125 MGD.

Existing facility with DIF of 2 MGD or less, or less than 25 percent of Alf used for cooling purposes.

New units at existing facility.

Permit Application Requirements

§122.21(r)(2)-(13)

§122.2l(r)(2)-(S)

Dlrector Best Professional Judgment

§122.2l(r)(2), (3), (5), (8), and (14) and applicable paragraphs (r)(4),

(6), and (7) of §122.21(r)

Duke Energy Progress, LLC's (Duke Energy) Shearon Harris Nuclear Plant (HNP) is subject to the existing facility rule and, based on its current configuration and operation (i.e., the facility has an AIF of less than 125 MGD), Duke Energy is required to develop and submit each of the §122.21(r)(2)-(8) submittal requirements (Table 1-2) with its next permit renewal application in accordance with the Rule's technical and schedule requirements. Appendix A provides a checklist summary of the specific requirements under each of the §122.21(r)(2)-(8) submittal requirements and how each is addressed in this report or why it is not applicable to HNP.

4

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Table 1-2. Summary of §316(b) Rule for Existing Facilities Submittal Requirements for §122,21(r)(2)-(8) and (14).

(2)

(4)

(5)

(6)

Submittal Requirements at §122.21{r)

Source Water Physical Data Coollng Water Intake Structure Data Source Water Baseline Biological Characterization Data Cooling Water System Data Chosen Method of Compliance with Impingement Mortality Standard Entrainment Performance Studies (7) ~..____~~--

(8)

Operatlona I Status Submittal Description Characterization of the source waterbody Including Intake area of Influence.

Characterization of the cooUna water Intake system; Includes drawtnas and narrative; description of operation; water balance.

Characterization of the biological community In the vicinity of the Intake; life history summaries; susceptibility to Impingement and entrainment; existing data; Identification of missing data; threatened and endangered species and designated critical habitat summary for action area; Identification of fragile fish and shellfish species list {<30 percent Impingement survival).

Narrative description of coollng water system and Intake structure; proportion of design flow used; water reuse summary; proportion of source waterbody withdrawn (monthly); seasonal operation summary; existing Impingement mortaltty and entrainment reduction measures; flow/MW efficiency.

Provides facility's proposed approach to meet the lmplnsement*

mortality requirement (chosen from seven available options);

provides detailed study plan for monitoring compliance, tf required by selected compliance option; addresses entrapment where required.

Provides summary of relevant entrainment studies (latent mortaltty, technology efficacy); can be from the facility or elsewhere with justification; studies should not be more than 10 years old without justlflcatlon; new studies are not required.

Provldes operational status for each unit; age and capacity utilization for the past 5 years; upgrades within last 15 years; uprates and Nuclear Regulatory Commtttee relicensing status for nuclear facilities; decommissioning and replacement plans; current and future operation as It relates to actual and design Intake now.

s

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 2

Source Water Physical Data [§122.21(r)(2)]

The information required to be submitted per 40 CFR §122.21(r){2), Source Water Physical Data, is as follows:

(i)

A narrative description and scaled drawings showing the physical configuration of all source water bodies used by the facility, including areal dimensions, depths, salinity and temperature regimes, and other documentation that supports the applicant's determination of the waterbody type where each cooling water intake structure is located; (ii)

Identification and characterization of the source waterbody's hydrological and geomorphological features, as well as the methods used to conduct any physical studies to determine the intake's area of influence within the waterbody and the results of such studies; (iii) locational maps; and, (iv)

For new offshore oil and gas facilities that are not fixed facilities, a narrative description and/or locational maps providing information on predicted locations within the waterbody during the permit term in sufficient detail for the Director to determine the appropriateness of additional impingement requirements under §125.134(b)(4).

Each of these requirements is described in the following subsections.

6

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 2.1 Description of Source Waterbody [§122.21(r)(2)(i)]

HNP is a nuclear-powered electrical generation facility located in the southwest corner of Wake County, North Carolina. Portions of HNP site also lie in southeastern Chatham County. HNP consists of one pressurized light water reactor nuclear steam supply system and turbine generator rated at 992 megawatts with a cooling tower-based heat dissipation system. HNP began commercial operation in May 1987. A 4,150-acre main reservoir was constructed to serve as the source of cooling tower makeup. A smaller, 321-acre auxiliary reservoir was also constructed to serve as the primary source for the Emergency Cooling Water System, which is designed to remove heat from the reactor and critical components following a loss-of-coolant accident or a loss of off-site power.

HNP has two cooling water intake structures; one (Emergency Service Water and Cooling Tower Makeup Intake Structure) on the main reservoir (aka Harris Reservoir}, from which cooling tower makeup water is obtained, and one (Emergency Service Water Intake Screening Structure} on the auxiliary reservoir (aka West Reservoir), from which water is obtained for the plant's Emergency Service Water (ESW)

System. Harris Reservoir is a freshwater reservoir located in Chatham and Wake Counties, North Carolina. The reservoir was created by impounding Buckhorn Creek, a tributary of the Cape Fear River.

The main body of Harris Reservoir has a surface area of approximately 4,150 acres, a maximum depth of 18 meters, a mean depth of 5.3 meters, a volume of approximately 8.9 x 107 cubic meters, a full-pool elevation of 67.1 meters National Geodetic Vertical Datum (NGVD) [220 ft], and an average residence time of 28 months. The reservoir began filling in December 1980 and full pool elevation was reached in February 1983. The 40-mile shoreline is mostly wooded, and the 71-square mile drainage area is mostly rolling hills with land used primarily for forestry and agriculture. A smaller 317-acre auxiliary reservoir was also built to serve as the primary source for the Emergency Colling Water System, which is designed to remove heat from the reactor and critical components following a loss-of-coolant accident (LOCA) or a loss of off-site power (LOOP).

From its headwaters east of HNP near Fuquay-Varina, Buckhorn Creek flows in a southwesterly direction for most of its length, then moves south to its confluence with the Cape Fear. Buckhorn Creek has five tributaries above the Harris Reservoir dam; Tom Jack Creek, Thomas Creek, little White Oak Creek, White Oak Creek and Cary Branch (HNP FSAR). Buckhorn Creek and its tributaries drain an area of 76.3 square miles (USGS 2004). Flows in Buckhorn Creek showed dramatic daily and seasonal fluctuations prior to the development of Harris Reservoir, but are now regulated by the Harris Reservoir dam. From 1981 to 2016, annual mean streamflow (measured at USGS station 02102192 located approximately one mile downstream of the dam) ranged from 1.33 to 137 cubic feet per second.

7

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Figure 2-1. Aerial Photo of Harris Nuclear Plant and its Environs.

8

Legend

  • c.y A

Fb!CI Arfm D ecu,.,.,

~Bnt1 MdcStlla9n A.

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Figure 2-2. Location of Harris Nuclear Plant within the Cape Fear River Basin (Source: reglons.noaa.gov).

2.1.1 Water Quality Surface water dissolved oxygen in Harris Lake ranged from 5.2 to 8.5 mg/Land surface water pH ranged from 6.9 to 7.6 s.u (Appendix A). Secchi depths were at or greater than a meter at all three lake sampling sites (range= 1.0 to 1.6 meters), indicating that the water clarity was good. Total phosphorus ranged from 0.02 to 0.05 mg/Land total Kjeldahl nitrogen ranged from 0.62 to 0.77 mg/L. Nitrite plus nitrate concentrations were less than the laboratory detection level of 0.02 mg/Land ammonia ranged from <0.02 to 0.05 mg/L. Chlorophyll a values ranged from 9.3 to 41.0 ug/L, the latter of which was the single value that was greater than the state water quality standard of 40.0 ug/L for chlorophyll a.

Based on the calculated North Carolina Trophic State Index scores for the growing season of 2013, Harris Lake was determined to exhibit elevated biological productivity or eutrophic conditions. This 9

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT reservoir was also determined to be eutrophic in 2003 and 2008 when it was last monitored by the North Carolina Division of Water Resources (DWR) (DWR Intensive Survey Unit 8/4/2014).

Duke Energy Progress conducted an environmental monitoring program in 2012 at Harris Lake to assess the reservoir's overall water quality, identify potential introduction and expansion of invasive plant and animal species to the reservoir and to demonstrate the existence of a recreational fishery in the lake. In this study, Harris Lake was found to have high biological productivity with chlorophyll a values ranging from 3 to 37 ug/L. Biological surveys identified the presence of Asiatic clams (Corbiculo fluminea) as well as the invasive plants hydrilla (Hydrilla verticillata) and Creeping Water Primrose (Ludwigia uruguayensis).

2.2 Characterization of Source Waterbody [§122.21(r)(2)(ii)]

To identify and characterize the primary source water body (i.e., Harris Reservoir) the following resources were reviewed and summarized:

Environmental Monitoring Reports 2008, 2010, 2012, 2014, 2016 These data were compiled and analyzed for this report and are summarized below. This report was developed utilizing the existing, available data for Shearon Harris Reservoir.

The Harris Reservoir shoreline is mostly wooded; the drainage area is mostly rolling hills with land used primarily for silviculture and agriculture. Although the immediate watershed is forested, the expanding towns of Apex and Holly Springs are to its north and east, respectively. The HNP facility NPDES permit (NCNC0039586) regulates discharges to the reservoir. The reservoir also receives treated discharge from a wastewater treatment plant in Holly Springs via Utley Creek (a tributary of White Oak Creek),

which flows into Harris Reservoir's northeastern-most arm.

An analysis of land use coverage in 2004 showed more than 70 percent of the sub-basin (which includes several watersheds, including the Buckhorn Creek-Harris Reservoir watershed) is forested (NCDENR 2004a). However due to accelerated urban growth especially around the towns of Holly Springs and Fuquay-Varina, the amount of land in pasture, cultivated crops, and forest will probably continue to decrease while the amount of land committed to residential and commercial uses will increase.

Harris Reservoir was classified by North Carolina Department of Environmental Quality as eutrophic in the agency's most recent Basinwide Assessment Report (NCDENR 2004a, pages 89, 93, and 94). The reservoir was sampled by the agency in 2003. At that time, despite heavy rainfall in the watershed, Secchi depths were greater than one meter at all sampling sites. Fecal coliform bacteria concentrations were low. Total phosphorus concentrations were similar to those previously measured. Ammonia concentrations were consistently below detection level at all sites and these concentrations were the lowest ever observed. Aquatic macrophytes, including Hydrilla sp., were observed throughout the reservoir. NCDENR classified Harris Reservoir as eutrophic based on calculated North Carolina Trophic State Index scores (which are in turn based on water clarity, algal densities, and phosphorus concentrations); it had received this classification in previous monitoring cycles as well.

Duke Energy Progress, formally Progress Energy, has monitored water quality and biological communities in Harris Reservoir since the reservoir filled, in the early 1980s, in an effort to evaluate the waterbody's health, track changes in water quality, document the appearance of nonnative plants and 10

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT animals, and assess the recreational fishery. Water quality (including temperature, dissolved oxygen, pH, and turbidity), water chemistry (including major nutrients and various trace metals), fish have been sampled quarterly and aquatic vegetation once annually (Progress Energy 2003a, pp. 4-6, Duke Energy Progress 2016}.

Like several other impoundments in piedmont of North Carolina, Harris Reservoir is a biologically productive reservoir. Harris Reservoir has many of the characteristics of eutrophic southeastern reservoirs including elevated nutrient concentrations, extensive growth of aquatic vegetation in shallows, oxygen-deficient hypolimnetic water in summer (Duke Energy Progress 2016 The nearest USGS gage station is located at Buckhorn Creek near Corinth, North Carolina (USGS 02102192). The drainage area of this gaging station is 76.3 square miles. Downstream from Harris Nuclear Plant on the Cape Fear River near Lillington, North Carolina is a USGS gaging station (02102500).

USGS 02098206 Haw River near Monclure, North Carolina, is located upstream from the mouth of the Cape Fear River and has a drainage area of 1,691 square miles (Figure 2-3).

The estimated drainage area of the Cape Fear River Basin is approximately 9,164 square miles.

Table 2-3. Monthly Average River Flows (cfs) from USGS Gage Stations near Harris Nuclear Plant during October 1980-Aprll 2017.

January February March April ----

May June July Buckhorn Creek near Corinth, NC (cfs) [A]

66 87 109 80 38 33 22 Augusf -r-25 II September October November December 22 21 24 39

[A] - USGS Gauging Station 02102192

[BJ - USGS Gauging Station 02102500 Cape Fear River near Lillington, NC (cfs) [BJ 4610 5f90 6230 4520 2390 2100 1670 1540 1800 1870 2120 2950 11

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT The HNP is located in the Piedmont physiographic province near the fall line separating the Coastal Plain from the Piedmont (FSAR p. 2.4.13-1). The site is located within the southeastern portion of the Durham Basin and is underlain by rocks of the Triassic Newark Group. The plant area is covered by residual soils derived from the underlying rock which consists of claystone, shale, siltstone, sandstone, conglomerate, and fanglomerate (FSAR p. 2.4.13-1). The surficial clay soils and saprolite prevent ready recharge to the rocks below (FSAR p. 2.4.13-2).

Vegetation at most of the HNP site is typical of the eastern Piedmont province of North Carolina (CP&L 1982). Forests at HNP are in various stages of ecological succession and consist of pine forest, hardwood forest, or pine-hardwood mixtures. loblolly pine (Pinus toeda) dominates the pine forests, but shortleaf (P. echinoto), Virginia (P. virginiono), and longleaf (P. pollustris) are also found at the site.

Hardwood forests at HNP are found primarily in lowland areas along streams. Dominant lowland forest species are sweet gum (Liquidambor styraciflua), red maple (Acer rubrum), American sycamore (Platonus occldento/is), American elm (Ulnus americano), and river birch (Betula nigra). Most of the upland forests at HNP are a mixture of pines (Pinus spp.), oaks (Quercus spp.) and hickories (Carya spp.)

(NRC 1983).

Harris Reservoir provides some limited marsh habitat in shallow backwaters. These marshes and adjacent shallows are used by waterfowl such as the mallard (Anos p/atyrhynchos), wood duck (Aix sponso), and Canada goose (Branta canodensis), and wading birds such as herons and egrets. A great blue heron (Ardea herodias) rookery, known to be active during recent breeding seasons, is located at the mouth of Jim Branch in the southeastern portion of Harris Reservoir.

12

316{b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 2.3 Locational Maps [§122.21(r)(2)(iii)]

A vicinity map has been provided in Figure 2-3.

f * '

HOJTHCMOUN&

t:

i,*

. :.-~-""'

Figure 2-3. Vicinity Map with Intake Structure.

0 N

0 1

I I -*

Mitt 13 WlitaO*

c:, **

I 2

I

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 3

Cooling Water Intake Structure Data [§ 122.21(r)(3)]

The information required to be submitted per 40 CFR §122.21(r)(3), Cooling Water Intake Structure Data, is outlined as follows:

(i)

A narrative description of the configuration of each of the cooling water intake structures and where it is located in the waterbody and in the water column; (ii)

Latitude and longitude in degrees, minutes, and seconds for each of the cooling water intake structures; (iii)

A narrative description of the operation of each of the cooling water intake structures, including design intake flows, daily hours of operation, number of days of the year in operation and seasonal changes, if applicable; (iv)

A flow distribution and water balance diagram that includes all sources of water to the facility, recirculating flows, and discharges; and (v)

Engineering drawings of the cooling water intake structure.

Each of these requirements is described in the following subsections.

3.1 Description of CWIS Configuration [§122.21(r)(3)(i)]

HNP has two cooling water intake structures but only one is equipped with cooling water makeup (intake) pumps.

The first structure is the Cooling Tower Makeup and Emergency Service Water Intake Structure (CTMUESW). It is located at the end of a canal that stems from an arm of the Harris Reservoir. This structure Is equipped with two Coollng Tower Makeup (CTMU) pumps, each rated at 26,000 gallons per minute (gpm), and two Emergency Service Water (ESW) pumps, each rated at 21,000 gpm. The structure was constructed with 14 bays but only two bays are used for the CTMU pumps and two bays are used for the ESW pumps. The remaining 10 bays are unused and do not have any pumps. Each of the ESW pump bays have a concrete dividing wall with an eight by ten foot butterfly valve. The dividing wall butterfly valve arrangement along with pipe valving permits operation of the EWS pumps by accessing water from either the main or auxiliary reservoir. The CTMU pump bays are each equipped with traveling screens with 3/8-inch openings. The ESW pump bays are fitted with traveling screens with 3/8-inch openings. Normal water elevation is 220 feet. The invert to the suction for the pumps in located at approximately 191.5 feet.

The second intake structure is the Emergency Service Water Intake Screening Structure which is located at the end of a canal coming from the auxiliary reservoir. This structure has no cooling water intake pumps and functions only as an alternate screened intake opening for water withdrawal by the two ESW pumps located at the CTMUESW. This structure has traveling screens with 3/8-inch opening. The normal water elevation in the auxiliary reservoir is 250 feet and the invert to the conveyance pipes is approximately 233.3 feet in elevation. The structure does have two screen wash pumps (@500 gpm) 14

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT which are operated about one hour per year each; two fire protection system pumps (@3000 gpm) which are operated about 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> per year each; and one fire jockey pump with negligible flow rate and run time.

3.2 Latitude and Longitude of CWIS [§122.21(r)(3)(ii)]

The latitude and longitude (in degrees, minutes, and seconds) of HNP's CTMUESW structure are:

Latitude: 35* 37' 49" N; Longitude: 78° 57' 13" W The latitude and longitude of HNP's Emergency Service Water Intake Screening Structure are:

Latitude: 35° 37' 48" N; Longitude: 78° 57' 20" W Figure 3-1. Topographical Map with Intake Structure.

15

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 3.3 Description of CWIS Operation [§122.21{r)(3)(iii)]

Under normal design operating conditions, the cooling water flow of HNP is 538,000 gallons per minute (gpm). This total includes circulating water (487,000 gpm) and Normal Service Water (50,000 gpm) flows, apportioned as follows: three circulating water pumps@ 162,300 gpm each (Progress Energy 2003d) and two NSW pumps @ 25,000 gpm each (Progress Energy 2003c). After passing through the main condenser, cooling water (combined flow of circulating water and service water) is routed to a 100 percent capacity, 523-foot-tall, hyperbolic natural-draft cooling tower where the bulk of the waste heated is removed (Progress Energy 2003b). The tower is designed to remove 6.663 X 109 BTU/hr at the design flow rate of 538,000 gpm and reduce water temperature 25 degrees F.

Cooling Tower Makeup Pumps (two located in the ESW and CTMU Intake Structure) supply makeup water from the main reservoir. Each Cooling Tower Makeup (CTMU) Pump has a 26,000 gpm capacity.

Normally, one CTMU pump operates continuously, supplying makeup water to the cooling tower, while the other is kept in reserve. One pump supplies all the necessary makeup water to replace losses to drift, evaporation, and blowdown.

Under certain extraordinary circumstances, CTMU pumps are also used to transfer water from the main reservoir to the auxiliary reservoir. When drought limits the amount of water entering the auxiliary reservoir and water levels drop beyond those considered optimal for safe operations, water is pumped from the main reservoir to the 321-acre auxiliary reservoir. This typically requires 2 to 3 days of pumping in drought years.

Finally, HNP has a non-recirculating Emergency Service Water system that allows the pumping of water from the auxiliary reservoir or the main reservoir to various essential components following a loss-of-coolant accident or loss of off-site power. This system, which is tested periodically to ensure reliability, is equipped with two 20,000 gpm pumps. Under typical circumstances, one of these pumps is operated while the other is kept in reserve.

The number of CWIS operating hours from 2016 to 2018 is provided in Table 3-1. During these 3 years, CWIS operated 8,760 hours0.0088 days <br />0.211 hours <br />0.00126 weeks <br />2.8918e-4 months <br /> per year (i.e., 100 percent of the time). Note this should not be confused with the capacity factor of the HNP facility. Plant outages typically occur in the spring and/or fall each year.

Table 3-1. Number of Hours of CWIS Operation at Harris Nuclear Plant In 2016-2018.

January February March April May Month I

I I

744 672 744 720 744 Number of Hours per Month of CWIS Operation 744 720 744 16 672 744 720 744 2016-2018 Average 744 672 744 720 744

I Month June 720 July 744 August 744 September 720 October 744 November 720 December Total Number of Hours 316{b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Number of Hours per Month of CWIS Operation 2016-2018 Average 720 744 744 720 744 720 720 720 744 744 8760 876D 3.4 Description of Intake Flows and Water Balance

[§ 122.21{r)(3 )(iv)]

Monthly average water withdrawals from 2016 through 2018 are provided in Table 3*2. The average withdrawal for this period was 23.5 MGD compared to a DIF of 74.9 MGD. Note that the actual intake flow (Alf) for the cooling tower makeup pumps represents a 68.6 percent decrease from the DIF.

Table 3*2. Monthly Average Withdrawals (MGD) from Harris Reservoir during 2D16-2D18 to Support Harris Nuclear Plant Operations.

Month I

January February March April May June July August September October 2016 14.3 13,7 13.B 14.2 14.9 14.9 15.3 13.7 14.2 Withdrawals (MGD) --

26,2 24.6 28.2 28.6 28.7 22.7 33.3 34.5 29.6 29.6 30.6 30.5 2B.8 17 2016-2018 I

Average 21.7 23.3 23.5 19.4 21.9 25,9 26.3 26,0 24.9 23.2

Month November December Annual Average Notes:

t.lH--Uw I

11 SeMCeWater

'--------i t

II S.cancllry Wast.

Hoking Tanks 2016 14.2

!I t

11 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Withdrawals (MGD) 2016-2018 Average 2018 t

Hanis ReNMlir w---: I '7.W** I*

It

~

A&ailery Soi.,..

.-.&t<EEC -

Re-CIIGWII S)'Slem Q

a.om.c.*

VCU!WC-23.4 22.6 23.6 Figure 3-1. Harris Nuclear Plant Water Balance Diagram.

3.5 Avoided Withdrawals Due to Cooling Tower Utilization The utilized natural draft cooling tower provides effective reductions in withdrawals. Assuming that the cooling water withdrawal without cooling towers would be the combined flow from the circulating water pumps (774.15 MG0) and the normal service water pumps (72.00 MGD), the total comparable once-through cooling withdrawal would be 846.15 MGD. As the actual withdrawal of water used for makeup to the cooling tower is only 23.5 MGD, the reduction is expressed by:

[1 * (23.5 MGD / 846.15 MGD))

  • 100 = 97.2%

18

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 3.6 Engineering Drawings of CWIS [§122.21(r)(3)(v)]

The following engineering drawings of cooling water intake structures are provided in Appendix 8:

Emergency Service Water System Main Reservoir Intake Structure MAS-SH 1 Emergency Service Water System Main Reservoir Intake Structure MAS-SH 2 Emergency Service Water Intake Structure MAS-SH 3 Emergency Service Water Intake Structure MAS-SH 4 Emergency Service Water System Auxiliary Reservoir Screen Structure MAS-SH 1 Emergency Service Water System Auxiliary Reservoir Screen Structure MAS-SH 2 Emergency Service Water System Auxiliary Reservoir Scree Structure MAS-SH-3 19

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 4

Source Water Baseline Biological Characterization Data [§122.21(r)(4)]

The information required to be submitted per 40 CFR §122.2l{r)(4), Source Water Baseline Biological Characterization, is outlined as follows:

(i)

A list of the data supplied in paragraphs {r)(4)(ii) through {vi) of this section that are not available and efforts made to identify sources of the data;

{ii)

A list of species (or relevant taxa) for all life stages and their relative abundance in the vicinity of CWIS;

{iii)

Identification of the species and life stages that would be most susceptible to impingement and entrainment; (iv)

Identification and evaluation of the primary period of reproduction, larval recruitment, and period of peak abundance for relevant taxa; (v)

Data representative of the seasonal and daily activities of biological organisms in the vicinity of CWIS; (vi)

Identification of all threatened, endangered, and other protected species that might be susceptible to impingement and entrainment at a cooling water intake structure(s);

(vii)

Documentation of any public participation of consultation with Federal or State agencies undertaken in development of the plan; (viii)

Methods and QA procedures for any field efforts;

{ix)

In the case of the owner or operator of an existing facility or new unit at an existing facility, the Source Water Baseline Biological Characterization Data is the information included in {i) through (xii);

(x)

Identification of protective measures and stabilization activities that have been implemented, and a description of how these measures and activities affected the baseline water condition in the vicinity of CWIS; (xi)

List of fragile species as defined at 40 CFR 125.92(m) at the facility; and (xii)

Information submitted to obtain incidental take exemption or authorization for its cooling water intake structure(s) from the U.S. Fish and Wildlife Service or the National Marine Fisheries Service.

Each of these requirements is described in the following subsections.

20

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 4.1 List of Unavailable Biological Data [§122.21(r)(4)(i)]

The biological data needed to prepare the information required under 40 Code of Federal Regulations (CFR) §122.21(r)(4) are available. A list of historical data reviewed to develop the baseline biological characterization of the source waterbody, Shearon Harris Reservoir, includes the following:

2008-2016 Environmental monitoring and electrofishing studies, unpublished data (DEP 2019)

Environmental Monitoring Reports 2008, 2010, 2012, 2014, 2016 These data were compiled and analyzed for this report and are summarized below. This report was developed utilizing the existing, available data for Shearon Harris Reservoir. No impingement or entrainment studies were performed in support of the development of this compliance documentation.

4.2 List of Species and Relative Abundance in the vicinity of CWIS

[§ 122.21( r)(4)(ii)]

Duke Energy has monitored the fish community in Harris Reservoir and near the CWIS since 1975 using electrofishing and other gear types. The following sections describes the results of boat electrofishing surveys on Harris Reservoir from 2008-2016, the fish assemblage summary based on a composite of survey locations from 2008-2016, and summaries of the fish community composition and their relative abundance from 2008-2016 for Transect P and V.

2008-2016 Sample Transects Fish were sampled with boat electrofishing at Transects E, H; P, S, and V (Table 4-1, Fig 4-1). Transect V is adjacent to the CWIS and is in the hydraulic zone of influence and near-field to the CWIS (Fig 4-2).

Transect Pis approximately 2.3 km downlake ofV and is far. field in relation to the CWIS. The other monitoring Transects, E, H, and Sare approximately 7.1 km, 10.5 km, and 6.4 km from V, respectively.

Each monitoring transect consisted of two, fixed position stations situated on opposite shorelines from each other, for a total of 10 stations (El, E3, Hl, H3, P2, P3, Vl, V3.) that were sampled quarterly in even years (2008, 2010, 2012, 2014, 2016). The stations and quarterly samples at each transect were combined annually to produce the fish community summaries and relative abundance.

Table 4-1. 2014-2015 Biological Monitoring Transects on Harris Reservoir.

Transect Designation E

H p

Description Approximately 500 meters uplake of Dam, 7.8 km downlake of CWIS Buckhorn Creek/Cary Branch Cove, approximately 4 km uplake of dam, 10 km from CVVIS Far-field to the CWIS, Midlake, approximately 5 km uplake of dam, near NCWRC Holleman Rd boat access area, 2.6 km downlake of CWIS 21 Latitude (North) 1 35.570944 35.591625 35.609928 Longitude (West)

-78.967673

-78,940209

-78.948025

Transect Designation s

V 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Description White Oak Creek and Utley Creek Cove, UP!ake of New Hill Holleman Rd, approximately 1 0 km uplake of dam, 6.3 km away from CWIS CWIS Hydraulic zone of influence and near-field; Thomas Creek cove adjacent to intake canal, approximately 7.3 km uplake of dam, 0. 7 km away from CWIS Latitude (North) 35.62noe 35.630598 Longitude (West)

-78.907922

-78.946179 Figure 4-1. Map of 2008-2016 Biological Monitoring Transects on Harris Reservoir.

Figure 4-2. Transect V sampling stations Vl and V3 adjacent and near-field to CWIS.

Boat electrofishing was conducting following standard methods (Murphy and Willis 1996) and Duke Energy Internal procedures. Electrofishing was conducted for 900 seconds (15 minutes) of effort at each station (10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> annual total effort across all stations and transects). Fish were identified to the species level when possible using regional taxonomic references (Menhinick 1993, Jenkins and Burkhead 1994), measured for total length (TL) to the nearest millimeter, and weighed to the nearest gram. Fish that could not be accurately identified in the field were preserved with 10 percent buffered formalin solution and transported to the laboratory for identification and body measurements. Each specimen was examined for hybridization, anomalies, disease, parasites, and general condition. Photographs were also taken of fish with any deformity or anomaly. Some specimens were retained in 70 percent ethanol for identification in the laboratory and for voucher purposes.

In total there were 27 species of fish (excluding hybrids) collected on Harris Reservoir from 2008 to 2016. There were 25 species of fish encountered at Transect E, followed by V with 22, S with 20, H with 19, and P with 18 species. Differences in species assemblages between transects were attributed to 22

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT species that were low in abundance and characterized as being less than 0.5% of the total fish assemblage. The transects also had some differences in habitat such as presence of aquatic macrophytes, water depth and structure. Species common to all transects were generally greater than 1% of the community assemblage. The fish community is representative of a typical southeastern reservoir sportfish and forage fish assemblage comprised of(% fish community composition) Bluegill (40%), Threadfin Shad (19%), Redear Sunfish (15%), Largemouth Bass (12%), Gizzard Shad (4%), White Perch (2%), Golden Shiner (2%}, and Black Crappie (1%) (Table 4-2). The fish community composition for each of the years that were sampled (2008, 2010, 2012, 2014, 2016) had similar composition percentages between years.

The most numerous species collected in the reservoir from 2008 to 2016 (Table 4-3) were Bluegill (54.5-178.1 Fish/Hour), followed by Threadfin Shad (7.5-92.9 Fish/Hour), Redear Sunfish (23.8-54.8 Fish/Hour), Largemouth Bass (18.4-52.5 Fish/Hour), Gizzard Shad (4.3-15.7), and Black Crappie (0.4-10.4 Fish/Hour).

Table 4-2. Fish Species and Community Composition(%) for each Transect (E, H, P, S, and V), collected by Boat Electroflshlng on Harris Reservoir, 2008-2016.

Scientific Name Amelurus brunneus Amelurus catus Ame/urus natalis Amelurus nebulosus Amelurus p/atycephalus Amiaca/w, Cyprlnel/a nlvea Cyprinus carplo Dorosoma cepedlanum Dorosoma petenense Enneacanthus glorlosus Esoxn/ger Etheostoma fuslforme Etheostoma olmstedl Common Name Snail Bullhead White Catfish Yellow Bullhead Flat Bullhead Bowfln Whltefln Shiner Common Carp GluardShad Threadfln Shad Bluespotted Sunfish Chain Pickerel Swamp Darter Tessellated D;irter 0.75 0.40 0.74 0.42 0.63 0.05 0.09 0.06 0,04 0.32 0.08 0.25 0.19 0.04 0.10 0.10 0.19 0.74 0.78 1.42 7.73 1.58 4.44 5.22 2.47 2.59 22.37 13.61 0.05 0.09 0.71 0.21 0.35 0.22 0.03 0.05 23 Total Fish Collected 15 ao 6

42 12 62 2

82 522 30 55 1

1 Total Composition 0.12 0.62 0.05 0.09 0.48 0.02 0.64 4.05 18.56 0.23 0.43 0.01 0.01

Scientific Name Fundulus sp.

lctalurus punctatus Lepomls aurltus Lepomls ~nellus Lepomls glbbosus Lepomls gulosus Lepomls mouochirus Lepomls mlaolophus Lepomls sp. X (Hybrid}

Common Name A Kllliflsh Channel Catfish Redbreast Sunfish Green Sunfish Pumpklnseed Warmouth Bluegill Redear Sunfish Sunfish (Hybrid) 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 0.70 0.22 0,04 0.00 Total Fish Collected 23 49 6

4 44.62 38.78 36.41 41,37 39.78 5163 0.09 0.03 0.08 1930 5

Total Composition 0,18 0.38 0.05 0.03 0.01 40.10 14.99 0.04 Mlcropterus so/mo/des Largemouth Bass 9.62 Marone omerlcona Notemigonus cryso/eucas Notropls spp.

Pomoxis nigromaf ulatus White Perch Golden Shiner Shiners and Minnows Black Crappie 3.59 4.43 1.25 0.62 0.35 0.25 0.83 0.16 0.04 239 1.86 3.22 239 1.86

____J 0.60 0.29 0.42 47 0.37 Table 4-3. Fish Species Collected and Relative Abundance {Fish/Hour) for all transects combined by Year from Boat Electroflshlng on Harris Reservoir, 2008-2016

  • Scientific Name Amelurus brunneus Amelurus catus Amelurus natalls Common Name Snail Bullhead White Catfish Yellow Bullhead *****

0.1 2.4 0.1 24 0.7 0.3 0.2 0.1 2.3 0.1 0.1 2.4 0.1

Scientific Name Amelurus nebulosus Amelurus platycephalus Amla calva Cyprlnella nlvea Dorosoma cepedlanum Dorosoma petenense Enneacanthus glorlosus Esox nlger Etheostoma fuslforme Etheostoma olmstedl Fundulus sp.

lctalurus punctatus Lepomls aurltus Lepomls cyanellus lepomls gibbosus Lepomls gulosus Lepomls macrochlrus Lepomls sp. X (Hybrid)

Mlcropterus salmoldes 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Common Name ~ *-=-

11; ****

Brown Bullhead FlatBullhud Bowfln Whltefin Shiner Ginard Shad Threadfln Shad Bluespotted Sunfish Chain Plckerer Swamp Darter A Kllllflsh O,annel l!atflsh Redbreast Sunfish Green Sunfish Pumpklnseed Warmouth Bluegill Redear Sunfish Sunfish (Hybrid)

Largemouth Bass 0.6 llS u

7.7 92.9 0.7 1.8 0,3 0.6 4.1 129.6 0.3 28.1 25 1.2 0.2 1.0 0.2 0.9 4.3 0.9 u

1.3 0.4 O.l 0.1 0.0 3.8 178.1 SUi 0.7 1.3 0.2 0.1 0.2 1.0 3.4 12.0 15.7 12.5 7.5 68.4 0.6 0.5 0.3 1.3 0.9 0.4 0.1 0.0 0.1 0.6 0.5 L8 1.S 0.1 0.3 (J.l.

0.2 0.1 1.1 1.1 0.8 51.5 54.5 101.5 l,-

54.8 26,2 23.8 0.2 20.,

18.4 39.7

Scientific Name Marone amerlcana Common Name White Perch Notemlgonus crysoleucas G~lden Shiner Notropls spp.

Pomo1ds nlgromaculatJ.ls Shiners and Minnows Black Crappie 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 2

1.8 0.9 10.4 Table 4-4. Fish Species Collected, Composition, and Relative Abundance (Fish/Hour) for all transects combined by Vear from Boat Electroflshlng on Harris Reservoir, 2014-2016.

Scientific Name Amelurus catus Amelurus natalls Amelurus nebulosus Amelurus platycephalus Amla calva Cyprlnus carplo Dorosoma cepedlanum Dorosoma petenense Enneacanthus glorlosus Esoxnlger Fundulus sp.

lctalurus punctatus Lepomls aurltus Common Name White Catfish Brown Bullhead Flat Bullhead Bowfln Common carp Gizzard Shad Threadfln Shad Bluespotted Sunfish Chain Pickerel A Klltiflsh Channel Catfish Redbreast Sunfish 2014 2016 i+M:MN * **

IIN=Mfl'fi:MN Composition 11¥11 3

0.02 1

0,01 o.s 4

0.02 2

3 0.47 LS 7

16 0.09 8

12 1.86 6

63,82 205.S 1

0.01 0.5 2

1 0.78 2.S 1

0.16 0.5 26

Scientific Name Lepomls cyanellus Lepomls gulosus Lepomls macrochlrus Lepomls mlcrolophus Le11omfs sp. X (Hybrid)

Mlcropterus salmoldes Common Name Green Sunfish Warmouth Bluegill Redear Sunfish 5t!nflsh (Hy6rid)

Largemouth Bass Morone amerl~

~

hlte Perch Notemlgonus Golden Shiner crysoleucas Notropls spp.

Pomoxls Black Crappie nlgromaculatus l

61 24 2

2014 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 2016 Composition l#M=ii+HrMM Composition l#M=i 0.01 0.5 29.5 0.34 30.5 36 5.59 18 1

0,16 0.5 0.13 12 S1 7..92 25.5 1

0.16 05 0.01 l

3 1.5 5

0.78 2.5 Table 4-5. Fish Species, Number Collected, Community Composition% (COMP), and Relative Abundance (# of Fish/Hour) for Transect P by Year from Boat Electroflshlng on Harris Reservoir, Z00S-2012.

Scientific Name -

  • 1 1fi:lbMM*l:rlEIIM=lfi'ii:IBMM-i,,1¥11Mili+iH'IIM*l::liiiMll 2008 2012 2010 Amelurus catus White 8

2.68 4

Catfish 1

0.13 o.s 1

0.30 o.s Amelurus natalts Yellow Bullheai:I Amelurus Brown 1.00 1.5 1

0.30 0.5 nebulosus Bullhead Amla calva Bowfln 2

0,67 1

0~

0.30 o.s Cyprlnus carplo Common 1

0.13 o.s Carp Dorosoma Gizzard Shad 13

,UIS 6.5 cepedlanum 9

1.17 4.S 19 5.65 9.S 27

2008 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 2010 2012 Scientific Name -

flifi:IIMN+i::lliitti=Nfl+i:IWN+i::iiiiMNl+MMll+i::iliiMN Dorosoma Threadfln lS 5..3S 8

345 44.75 172:.5 1.19 2

petenense Shad Enneacantnus Bluespotted 1

o.u 05 glorlosus Sunfish Esox nlger 0.33 lctalurus punctatus Lepomls gulosus Warmouth 1

0.33 128 42.81 64 189 24.51 94.S 154

.csn 77 Lepomls Redear 40 13.38 20 49 6.S6 24.5 113 33..63 56.S mlcrolophus Sunfish lepomfs Sp. X Sunfish 2

0.(/1 1

(Hy6rid)

(Hybrid)

Mlcropterus Largemouth 62 20.74 31 104 13.49 52 38 11.31 19 salmoldes Bass Morone amerlcana 2

Notemlgonus Golden 10 3.34 5

10 1.30 5

2 0.60 1

crysoleucas Shiner Notropls spp.

Shiners Pomoxls Black 9

nlgromaculatus Crappie 3.01 4.5 51 6.61 25.5 Table 4-5. Continued.

Scientific Name -

i+M:MM 2014 Composition 2016 IIMIM+ii:MM ' Composition MIMI Amelurus catus White Catfish 9

2.84 4.5 1

0.23 0.5 Amelurus nataUs Yellow 1

0.32 o.s 1

0.23 Bullhead 0.5 Amelurus nebulosus Brown 3

0.95 Bullhead 28

Scientific Name AJnla calva Bowfln Cyprlnus carplo Common Carp 3

Dorosoma cepedlanum Gillard Shad 29 Oorosoma petenense Threadfln 17 Shad Enneacanthus glorlosus 1

Eso,c nlger Chain Pickerel lctiilurus punctatus Channel 2

Catfish Lepomls gulosus Warmouth 2

Lepomls macrochlrus Blueglll Lepomls mlcrolophus Redear 35 Sunfish Lepom*,p. X (Hybri<I) J Sunfish (Hybrid)

Mlcropterus salmoldes Largemouth 47 Bass Morone amerlcana J

3 Notemlgonus crysoleucas Golden Shlner 5

Notropls spp.

Shiners Pomo,cls nlgromaculatus Black Crappie 2

4.2.1 Invasive Species 2014 Composition 0.95 9.15 5.36 032 0.63 0.63 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT

)IMIIM+M:14+

2 2

1.5 12 102 1

1 3

1 1

2016 Composition 0.45 2.72 S.90 0.23 0.68 0,23 MIMI 1

51 0,5 1.5 0.5 48.58 _J 77 36.96 11,04 17.5 27 14.83 84 1.58 0.63 1

5 6.12 19.05 2.27 0.45 0.23 1.13 13.S 42 s

1 0,5 2.5 Common Carp, which were stocked everywhere for decades by the U.S. Fish Commission beginning the late 1870's (Cole 1905), are considered exotic and potentially invasive and have been collected in Shearon Harris Reservoir. White Perch, which were first observed in the reservoir during 1996 from an undocumented stocking, are not exotic, but are non-native to the interior waters of North Carolina and could be considered invasive. These fishes do not appear to be having an impact on the extant reservoir fish community. The presence and operation of the CWIS has not contributed to the presence of the 29

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT exotic or invasive species nor has the structure contributed to the decline of the established fishes in the reservoir.

4.3 Identification of Species and Life Stages Susceptible to Impingement and Entrainment [§122.21(r)(4)(iii)]

The CWIS design, with a TSV of less than 0.5 fps, is compliant with impingement BTA requirements of the Rule. As such, no species or life stages are anticipated to be susceptible to impingement at the Shearon Harris CWIS. To the extent any species may have the potential to be entrained, based on the operational parameters of the CWIS on Shearon Harris Reservoir (low 0IF and TSV), interactions with aquatic organisms are expected to be limited with no potential for adverse environmental impacts.

4.3.1 Impingement The degree of vulnerability to impingement exhibited by adult and juvenile fish species depends upon biological and behavioral factors including but not limited to: Seasonal fish community structure, spawning effects on distribution, habitat surrounding intake structures, water quality stressors, high flow events, and the location and attraction to the flow associated with the intake. In addition, swimming speed, intake velocity, screen mesh size, trash rack spacing, and other intake configurations will also affect the susceptibility to impingement. For example, clupeids have high susceptibility to impingement based on multiple factors such as schooling behavior, distribution in the water column, negative rheotactic response to intake flows, and poor swimming performance in winter months due to lower water temperatures (Loar et al 1978).

No ongoing or historical impingement studies have been performed at the CWIS on Shearon Harris Reservoir. The CWIS withdraws water from Harris Reservoir through traveling screens with a design TSV of less than 0.5 fps. In the Rule, intake screens designed to achieve a TSV at or below 0.5 fps are compliant with the impingement reduction standard.

4.3.2 Entrainment Table 4-6. Entrainment Potential for Fish Species Identified In Shearon Harris Reservoir.

Species (Common Name)

Bowfin Habitat Use/Preference Constructs nests In vegetation fn Potential for Entrainment*

Unlikely due to water depth In the vicinity of the CV\\11S, eggs are dernersal and adhesive shallow water, over submersed tree roots, eggs are demersal and stick to surrounding vegetation

=-======.::.........._

=====~= ___ _.;:====:::...-====;;;;::

Black Crappie Construct nests around vegetation close to other nests 30 Unlikely due to water depth In the vicinity of the CWIS, demersal and adhesive eggs, parental care of nest until larvae swim-up

Species (Common Name)

Bluegill Bluespotted Sunfish Green Sunfish Largemouth Bass Pumpkinseed Redbreast Sunfish Redear Sunfish Warmouth Gizzard Shad Threadfin Shad Cyprfnklae Common Carp Golden Shiner Whitefin Shiner Chain Pickerel Habitat Use/Preference Nest generally constructed in shallow waters Occupies and spawns in vegetated areas Construct nests around vegetation Nest constructed In shallow areas of one to six feet Spawns in vegetation, associated with vegetated areas Construct nests over silt-free or lightly silted sand and gravel In cover Nest generally constructed in shallow waters Constru.¢ nests in cover 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Potential for Entrainment*

Unlikely due to water depth in the vicinity of the CW1S, demersal and adhesive eggs, parental care of nest until larvae swim-up Unlikely due to habitat and spawning preference Unlikely; limited quantity of vegetation available in the vicinity of the CW1S Unlikely due to water depth In the vicinity of the CV\\/IS Unlikely due to habitat and spawning preferences and low abundance of adults (only 1 collected from 2008-16 at Transect S)

Unlikely; ~pacific substrate type not present Unlikely due to water depth in the vicinity of the CV\\/1S, demersal and adhesive eggs, parental care of nest until larvae swim*UP Unlikely.; no cover near intake Broadcast spawners Broadcast spawners

____ 1 Likely, broadcast spawner increases su~ptlbility Likely, broadcast spawner increases susceptibility Lays adhesive eggs in shallow vegetation Adhesive eggs are cast over rooted aq"atic vege~tlon, filamentous algae, gravel, and sometime on nests of black basses and sunfisties, schools in open water and along edges of weedy habitat Assumed to spawn in crevices, travels in schools Prefers vegetated areas for spawning and daily activities, eggs demersal and adhesive 31 Unlikely due to absence of shallow, vegetated habitat in the vicinity of the CWIS Unlikely due to h~ltat ~nd ~Ing preference, adhesive and demersal eggs, relatively low a~undance Unlikely due to habitat and spawning preference and very low abundance Unlikely due to habitat and spawning preference, adhesive and demersal eggs

Species (Common Name)

Brown Bullhead Channel Catfish Flat Bullhead White Catfish Snail Bullhead Habitat Use/Preference Females lay eggs in dark shallow areas under rocks and inside logs

~

nesters, found In large open areas with woody clebrls, bank cavities; moderate currents Cavity nesters Cavity nesters Cavity nesters Cavity nesters Broaclcast spawners on primary White Perch points with hard substrates, eggs are adhesive and demersal l;ggs attached to underside of Swamp Darter leaves, found near streams In reservoirs Eggs attached to underside of Tesselated Darter rocks, found near streams in reservoirs 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT I

Potential for Entrainment*

Unlikely due to habitat preference Unlikely due to habitat preference Unlikely due to habitat preference Unlikely due to habitat preference Unlikely due to habitat preference Unlikely due to habitat preference Unlikely due to habitat preference In the vicinity of the CWIS and having adhesive and demersal eggs Unlikely due to habitat and spawning preference, rarity of adults Unlikely due to habitat and spawning preference, rarity of adults

  • rsv below 0.5 fps at the CWIS will minimize potential for entrainment fqr all species based on their ability for avoidance of the intake. Species with floating eggs would continue to have some susceptibility to entrainment 4.3.3 Selected Species A subset of species present in Shearon Harris Reservoir with the likelihood to be entrained was selected for detailed life history descriptions including reproduction, recruitment, and peak abundance.

Threadfin Shad and Gizzard Shad were selected as target species because of reproduction (i.e.,

broadcast spawner or floating eggs). Bluegill was also selected as a target species because it was the most abundant species in historic electrofishing collections, is a substantial contributor to the recreationaJ fishery, and is an important forage species for game fish. Other selected species that contribute to the recreational fishery of Shearon Harris Reservoir and were among the most dominant species collected in historic electrofishing sampling include Redear Sunfish, Largemouth Bass, White Perch, Golden Shiner, and Black Crappie.

32

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Of the selected species, two (i.e., Threadfin Shad and Gizzard Shad) are recognized as having the highest potential for entrainment at the CWIS. The species account descriptions below are ordered from most abundant to least.

Threadfin Shad Spawning occurs in shallow waters such as near shorelines or riverbanks. Threadfin Shad spawn from April to July in water temperatures above l6°C between dawn and sunrise (Jenkins and Burkhead 1993; Rohde et al 2009) (Citation). Spawning occurs near the shoreline and over aquatic plants and other submerged objects with eggs that are demersal and adhesive. Threadfin Shad are sensitive to sudden changes in water temperature and oxygen content resulting in frequent die-offs in late summer and winter (Jenkins and Burkhead 1993; Rohde et al 2009). (Citation). This species is not considered fragile but are similar to the fragile classified Gizzard Shad in their biology, physiology, and morphology. The Threadfin Shad similar enough to Gizzard Shad to warrant treatment as a fragile species in this report.

Gizzard Shad Gizzard Shad are classified by the EPA as a fragile species (Table 4-10). Gizzard Shad spawning can occur from mid-March to late August, with peak population spawning in May and June at water temperatures ranging from 15.6-22.S"C (Wallus et al. 1990). They spawn in large schools and their adhesive eggs are deposited on roots, fibers, and debris along the shore (Miller 1960). Gizzard Shad are extremely prolific spawners and can deposit as many as 400,000 eggs at one time (Tomelleri and Eberle 1990).

Bluegill Bluegill occur in most rivers and lakes in the southeastern U.S. and are frequently found in backwater habitats containing vegetation and woody debris. Bluegill spawn at water temperatures between 19.4 and 26.7"C (Cornish and Welke 2004; Spotte 2007). The spawning season begins in spring or early summer when the water temperature reaches approximately 21.1 *c with the peak of spawning in the mid-Atlantic region occurring in May or June. Individual fish may spawn several times within the same season (Rohde et al. 1994).

Bluegill are colonial breeders and build nests to spawn in that are usually in close proximity to each other. Males construct nests that are approximately 1 foot in diameter in shallow water (i.e., depths of 1 to 3 feet). The eggs from several females can be fertilized and deposited in the nest, which is then defended by the male until the eggs have hatched. Because the nests are located in shallow depths, water level fluctuations can severely impact successful reproduction as nests can be stranded by low water level or disrupted by strong wave action. The adhesive eggs hatch after 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> at 22.2°C and 34 hours3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> at 26.7°C (Cornish and Welke 2004). The yolk sac is absorbed when larvae are 6 millimeters long, at which time they leave the nest and move into littoral vegetation. Fry are free swimming after approximately 10 days (Carlander 1977). Fecundity ranges from 2,000 to 8,000 eggs at age 3 and up to 60,000 eggs at ages 4 to 8.

RedearSunfish Redear Sunfish inhabit a variety of habitat including vegetated ponds, lake, reservoirs, pool and backwater of streams and small rivers over mud or sandy bottoms (Jenkins and Burkhead 1993).

Spawning starts, usually in synchrony, in May when water temperatures reach 20 to 21

  • C and can 33

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT continue into mid-summer. Redear Sunfish are colonial breeders and build nests in close proximity to each other in water shallower than two meters. Females can produce from 12,000 to 30,000 demersal sticky eggs. Males guard the eggs and fry in the nests. Redear Sunfish consumes a wide variety of insects, but due to large molariform teeth, the fish also crushes and eats snail, small mussels and clams.

Largemouth Bass Largemouth Bass spawn when water temperatures reach 15.6-23.9 °c (Heidinger 1975). The male builds a nest in substrate typically comprised of rocky sand or gravel and cleared of organic debris and silt (Emig 1966; Rohde et al. 1994; Pflieger 1997). The nests are 2 two 3 feet in diameter and usually widely spaced (i.e., 30 feet apart) unless the available nesting area is limited. Nests are built in areas of no current or wave action (Pflieger 1997) at depths of 1 to 15 feet.

Males remain at the nest to fan the eggs to keep them silt-free and to protect the young for up to two weeks (Pflieger 1997). Eggs hatch in 2 to 5 days (Emig 1966) and the fry form tight schools over the nest and begin to feed in five to eight days. The schools break up approximately 1 month after hatching when the young bass are approximately one inch long. Growth rates are variable and depend on the lake productivity and food availability. Largemouth Bass typically mature at about ages 1 to 2 in the region (Carlander 1977; Rohde et al. 1994), or when they reach approximately 10 inches long (Pitlo et al. 2004).

White Perch White Perch are native to Atlantic slope rivers and are a semianadromous species typically found in lower and mid-estuary areas that make spawning runs into upstream reaches of rivers. White Perch have been introduced into may freshwater reservoirs inside and outside of their native range. They were first observed in Shearon Harris Reservoir in 1996. White Perch are broadcast spawners and can produce from 20,000 to 150,000 adhesive and demersal eggs (Jenkins and Burkhead 1994). Spawning occurs in aggregations and takes place when temperatures are between 10 and 16° C during a one to two-week period. Peak spawns may occur in Shearon Harris in February, March, or April. Spawning takes place on primary points (rather than secondary points in embayment areas), on cover-free shallow sloping points that have hard/sand clay features (Wong 2002). White perch are opportunistic feeders and eat insects, zooplankton and fishes. Older fishes concentrate on young of the year shad when available (Wong 2002). White Perch school in open water and are found in shallow to moderate depths for most of the year but move to deeper water during the winter. In reservoirs, White Perch can occupy similar areas as Black Crappie.

Golden Shiner The Golden Shiner is widely distributed throughout eastern North America and found in a variety of habitats including streams, river, ponds, lake, and reservoirs. The shiner typically associates with vegetation and often swims in schools in alongside vegetation shorelines (Jenkins and Burkhead 1994).

The Shiner feeds on plankton from midwater to surface depths and will often follow the plankton daily migration. Midge larvae, microcrustaceans, and insects are also a component of the diet. Spawning may occur from April through August from 15 to 26° C. Adhesive eggs are cast over rooted aquatic vegetation, filamentous algae, gravel, and sometimes on the nests of black basses and sunfishes (Etnier and Starnes 1993). Females can produce up to 200,000 eggs. Sexual maturity is reached at two years of growth usually at lengths of 65-80 mm.

34

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 4.4 Identification and Evaluation of Primary Growth Period

[§ 122.21(r)(4)(iv)]

Fish are cold blooded, thus primary growth occurs when water temperatures are l0°C or above. The conventional view on seasonal variation in fish growth in North America is that growth is fastest in the spring and early summer, slows in the late summer and fall, and virtually stops in the winter (Gebhart and Summerfelt 1978). The majority of fishes will have their highest densities shortly after the hatch occurs when larvae are concentrated, and natural mortality has not yet reduced numbers. Feeding competition is especially important during late spring through early summer when the bulk of fish are in their early life stages. During this time, they are more susceptible to starvation (May 1974). This is a critical stage in development, where larval fish have a short time period to initiate exogenous feeding before starving (Ehrlich 1974; Miller et al. 1988).

Table 4-7. Period of Peak Abundance for Relevant Taxa In Table 4-4. Known Spawning and Recruitment Period of Native Species with Documented Occurrence In Shearon Harris Reservoir, North Carolina (Jenkins and Burkhead 1993; Rohde et al. 2009t, Common Name' Chain Pici<enil Bowfin Bluegill Biuespottaa Sunfish Hybrid Sunfish

~Redbreast Sunfish Redear Sunfish Warmouth GiiurdShad Threadfin Shad I ***

I * *

  • 35

Common Namo*

Channel Catfish Tesselated Darter Gray-shaded months indicate the known spawning and recruitment

period, 36 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Darker-shaded months indicates period of potential peak abundance.

316(b} Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 4.5 Data Representative of Seasonal and Daily Activities of Organisms in the Vicinity of CWIS [§122.21(r)(4)(v)]

Table 4-8. Seasonal and Dally Activities of Species Present In Shearon Harris Reservoir (Jenkins and Burkhead 1194; Rohde et al. 2009).

Species (Common Name)

Bowfin Cehtrardhidae Black Crappie Bluegill Bluespotted Sunfish Seasonal Activities (Spawning) spawns from March to early Jy_ne at temperatures ~tween 1f>.19" c, construc;;ts ~owl shaped nests in depntaion In shallow waters-on bottom, in dense vegetatiqn, among weeds, tree roots, or under logs, nest may occur singly or In groups, eggs are demersal, adhesive, covered with filaments, and stick to surroundings, young remain in nest guarded by male and are also guarded when they lea\\/8 the nest spawning occurs from late February to early June. Nests are constructed in shallow water to moderately deep water (to 6 meters), sometimes In close proximity to each other and usually associated with vegetation or structure, larvae are pelagfc and move Inshore as larger juveniles spawns from May through September, generally most of the growing season, peaking in June; constructs nests in aggregations in shallow water on sand or gravel bottoms, eggs are guarded by male spawning occurs from May to September, spawns several times, likely in aquatic vegetation Daily Activities (Feeding and Habitat) inhabits slow water, usually found concealed fn or near vegetation, near or in cover such as logs, branches, cut banks; young eat Insects and crustaceans, adults prey on fish and anything catchable usually found in vegetated areas of backwaters In streams and rivers in ponds and reservoirs, aggregates around structure and associates with aquatic vegetation, fallen trees, stumps; young Black Crappie feed on aquatic Insects and small fishes*and adults feed primarily on fis~.

young are planktivores, adults eat aquatic and terrestrial insects; found in pools, lakes, streams, and rivers, with vegetation, overhead cover, structure habitats include heavily vegetated, slow waters of swamps, ponds, streams, clitches, tree roots; eats small crustaceans, insects from water column and vegetation 37

Species (Common Name)

Green Sunfish Largemouth Bass Pumpkinseed Redbreast Sunfish Redear Sunfish Seasonal Activities (Spawning) spawns April through August, constructs nests In colonies as shallow depressions in sand and gravel in pools in sand and gravel near shelter such as logs and vegetation, males guard eggs ln nests spawning ~rs,late April to.June when temperatures are bet.ween 16 to 1 B

  • C, with peak spawning occuning In April and*May; nests are generaHy located in sand or gravel at the base of logs, stumps, and emergent V!Qetatlon along shorelines usually at depths of 0,6 meters; both male and female guard eggs in nest spawns in April and May between 16 and 21" C, but may extend to August, constructs solltary nests in open shallow water on sand and gravel, males guard eggs in nest spawns from June thru August between 16-28" C, nests are constructed generally at one-meter depth on bottom over sand and gravel, often with overhead cover, eggs are adhesive and can furm large clumps In the nest, males guards eggs in nest generally spawns from April through August, spawning onsets with temperatures of 20-21
  • C, nests found in aggregate and are constructed in waters shallower than 2 meters, often near vegetation and in colonies, males gurads eggs in nest 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Daily Act1v,ties (Feeding and Habitat) prefers slow pools and backwaters of low-and moderate gradient streams and rivers, but also occur In ponds, lakes, and reservoirs; highly tolerant of conditions such as turbidity and drought and can rapidly colonize new habitats: Food preferences are aquatic Insects and small fishes; frequently associated with vegetation and large rocky areas or rip-rap shorelines occupies a wide variety of ha!;>ltats; prefer wann, calm, and clear water and thrive in slow streams, fann ponds, lakes. ana reservoirs; young feed prim@rfly on plankton, insects, small fish;es, adults feed on fish~. frogs, and almost any other animal of appropriate size feeds on mfcrocrustaceans, aquatic insects, snails, small clams, some small fishes; found in ponds, lakes, reservoirs, creeks, and streams a generalist predator that eats fnsects, crayfish, arthropods, mollusks, and fishes; Inhabits pool habitat, lakes, and rivers, associates with woody debris, stumps, and undercut banks, abundant in,upstream*reaches of reservoirs, rip-rap shoreline, and l'9cl(}' points generally, eats small prey, snails, and small mussels and clams, small insects and fishes; habitat is primarily iacustrine, generally found in vegetated lakes, ponds, reservoirs, streams, rivers, or backwater areas.

38

Species (Common Name) wannouth I.,..

Gizzard Shad Threadfin Shad Common Carp Golden Shiner VVhitefin Shiner Seasonal Activities (Spawning) spawns from mld~sprlng into summer, occasionally e~rly fall, starts spawning at 21* C, male constructs solitary nests often hidden in vegetation and guards eggs spawns in aggrega_tlons*'!t near surface d_epths from March to A1.1gust, from 1 o to 29° C, peaklng above 18° C, eggs are demersal and adhere to algae, rocks, or other objects spawns in aggregations at near surface depths often over structure, eggs are demersal and adhere to vegetation and brush spawning occurs in the spring in the shallow water and along shorelines in reservoirs, over vegetation, tree roots, or open bottom, peak spawning occurs between 15 and 20° C and usually when aquatic vegetation is flooded during April and May, spawning activities create lots of turbidity, eggs attach to vegetation or sink into the mud spawning may oec.ur from April thru August, from 15 to 26° C, adhesive eggs are cast over rooted aquatic vegetation, filamentous algae, gravel, and sometime on nests of black basses and sunfishes spawns from June thru August, assumed to be spawn in crevices 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Daily Activities (Feeding and Habitat) young eat plankton and small Insects while adults eat Insects, snalls, cravfishes, an1t fishes; lnh~blts pools and backwaters, swamps, lakes, and frequently associates with aquatic vegetation, and large rocky areas, commonly associates with rip-rap shorelines in reservoirs filter feeders that strain the plankton from the watar column; open water. pelagicschooling*fish filter feeders that strain the plankton from the mid-water column: open water, pelagic schooling fish tolerant of a wide range of environmental conditions.

Typically found In the calm and mud-bottomed waters of sluggish pools, backwaters, and reservoirs where vegetation is present ;omnivores That ingest mouthfuls of the soft bottom sediments (detritus), expels them into the water, and then feeds on the disclosed insects, crustaceans, annelid wonns, mollusks, weed and tree seeds, aquatic plants, and algae feeds primarily from miclwater to surface depths on plankton, microcrustace~ns, and insects, sometimes algae; sometimes schools In open water and along edges of weedy habitat, moves from shallow insh0f'8 areas to open waters followfng plankton mlgra__tions diet consists mainly of insects and some plant material; found in small schools over sand and gravel in larger creeks and rivers, sometimes along reservoir shorelines 39

Species (Common Name)

Chain Pickerel Killifish Brown Bullhead Channel Cstfish Flat Bullhead Vllhlte Catfish Seasonal Activities (Spawning) coldwater spawners, between 2 and 22°, during winter and early spring; scatters sticky eggs over in and around vegetation or tree roots spawns from April to Septembers, in open spaces in vegetation or sandy areas, eggs have filaments that adhere vegetation and other surroundings spawning temperatures ranged between 14 to 29* C from March through June, nesting occurs on firm or shallow sandy areas in or in open, under cover such as logs, burrows, or in trash litter (cans, buckets, etc.), both male and female guard eggs spawning Is from May through iluly, between 21 and 30° C, nests are constructed in sheltered areas spawning occurs in May and June at peaking at temperatures between 21-24° C in May, assumed to construct nests and guard eggs similar to other Bullhead catfishes

  • ~awns from May through July starting at temperatures of 21
  • C In May, large nests are constructed on bottom in sand or gravel, near or in fallen tree and logs, eggs are then guarded by male 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Daily Activities (Feeding and Habitat) young feed on small crustaceans and Insects, adults feed on fish, frogs, snake, and mice opportunistically, active predators In winter; solitary fish found in slow waters and lakes that are well vegetated, found In depths less than 3 meters, juveniles prefer shallower water eats small organisms from the bottom, water column, and surface, mainly on midge larvae and microcrustaceans, Invertebrates, insects; inhabits ponds, lakes, streams, rivers, often found schooling In or near vegetated, shoreline habitats, or open sandy areas feeds on aquatic invertebrates and fish: omnivorous feeding on aquatic Invertebrates and fishes; occupies warm, medium and large rivers, reservoirs In near-shore habitats, associates with cover such as large rock. rip-rap shorelines, logs, fallen trees young feed primarily on plankton and insect l~rvae a!l(i larger fish eat al!flost any available food-items incl09ing other fish; found In lakes, rivers, streams occupying a variety of habitats and su!;>strates feeds on aquatic invertebrates and fishes; occupies warm, medium and large rivers, reservoirs In near-shore habitats, associates with cover such as large rock, logs, fallen trees young feed on aquatic insects, adults are omnivorous, consuming invertebrates, Asian Clams, fishes, and plants; found in reservoirs, rivers, ponds 40

Species (Common Name)

Snail Bullhead Yellow Bullhead White Perch

~wamp Darter Tesselated Darter Seasonal Activities (Spawning) similar to flat bullhead, spawns from May thru July starting at temperatures of21" C in May, large nests are constructed on bottom in sand or gravel, near or in fallen tree and logs, eggs are then guarded by male spawns from late Aprll lhru June, excavates shallow nests near cover o~ in the open, eggs are guarded by male spawns from March to June, most spawning takes places In 1 to 2 weeks when water temperatures are between 10 to 16

  • C, peak spawning period variable but likely to be In February, March, or Api'il, aggregates during spawning period on primary points and scatters/broadcasts eggs over hard clay, sandy, rocky areas.

eggs are adhesive and demersal sP.@Wnlng 0£!:Urs from late winter to September, eggs are unguaraed and are attached to leaves, debris, vegetation, stone spawning occurs from late March thru June between 16 to 1 B ° C, creates a nest depression under rock and attaches eggs to rock, and guards eggs 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Daily Activities (Feeding and Habitat) similar to flat bullhead, feeds on aquatic Invertebrates and fish, omnivorous feeding on aquatic invertebrates and fishes; occupies warm, medium and large rivers, reservoirs in near-shore habitats, associates with cover such as large rock, logs, fallen trees young feed primarily on microcrustaceans and insect larvae, adults are omnivorous and mainly eat aquatic macroinvertebrates and fishes; found In reservoirs.

streams, a~tes with cover, dense aquatic veQEttation, large rock outcrops feeds on microcrustaceans, crayfishes, insect larvae, and fishes; found in rfvers., reservoirs, sg100ls in open water, found during most of year in shallow and moderate depths, but much deeper during the winter, occupies similar areas as Black Crappie feeds on microcrustaceans, aquatic Insect larvae, and midges; found mainly in swam~. streams, and rivers, occasionally found in reservoirs near streams feeds on immature insects, small invertebrates, midge larvae; found in creeks, streams, rivers, swampy flows, occasional found in reservoirs near streams 41

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 4.6 Identification of Threatened, Endangered, and Other Protected Species Susceptible to Impingement and Entrainment at CWIS

[§ 122.21(r)( 4)(vi)J The Rule requires the permittee to document the presence of federally listed species and designated critical habitat in the action area (see 40 CFR 125.98[f]). For the purpose of defining listed species, the action area is defined as Shearon Harris Reservoir.

A desktop review of available resources was performed to develop a list of species with protected, endangered, or threatened status that might be susceptible to impingement and entrainment at the CWIS on Shearon Harris Reservoir. The USFWS's map-based search tool (Information for Planning and Consultation [IPaC]) was used to identify state or federally listed rare, threatened, or endangered (RTE) aquatic species or critical habitat designations within Shearon Harris Reservoir. Listed species spatial occurrence data from the North Carolina Natural Heritage Program was cross-referenced spatially with Shearon Harris Reservoir. Because the Shearon Harris CWIS is in a freshwater environment, marine and anadromous federally listed species and designated critical habitat under National Marine Fisheries Service jurisdiction were not considered.

State or federally listed rare, threatened, or endangered (RTE) aquatic species or critical habitat designations occurring with Shearon Harris Reservoir, are provided in Table 4-7. Federal species of concern and candidate species were omitted from the list (unless they were also state threatened or endangered), as there are no requirements to address those species under the Rule or Section 7 of the ESA. The following materials were reviewed to develop the species list in Table 4-7:

IPaC (https://ecos.fws.gov/ipac/) (USFWS 2019) for the search area shown on Figure 4-1, and North Carolina Department of Natural and Cultural Resources (NCDNCR) Natural Heritage Program Data explorer listed species element occurrence data (NCDNCR 2018).

Historical electrofishing results for Harris Reservoir are discussed in Section 4.2 of this report. No federally or state-listed species were collected during electrofishing surveys on Harris Reservoir from 2008 to 2016. The UFWS IPAC search indicated that the Cape Fear Shiner (Notropis mekistocholas) might be affected by activities in the search location (Shearon Harris Reservoir). The reservoir is outside of any critical habitat designation and is not included in any of the known or managed populations (USFWS 1987, 1988, 2017). The NCNHP element of occurrence spatial search did not have any records for federal or state listed species in the reservoir. The Cape Fear Shiner is not likely to occur in the reservoir.

Table 4-9. Summary of Rare, Threatened, or Endangered (RTE) Aquatic Species Listed for Shearon Harris Reservoir, North Carolina, and Record of Occurrence or Potential to Occur in Harris Reservoir.

USFWS Scientific Name Notropis mekistocholas -

Cape Fear Shiner State Status Endangered Endangered 42 Record of occurrence or potential to occur in Harris Reservoir Not likely to occur, No historical records in reservoir, Harris Reservoir outside of critical habitat

NCNHP Scientific Name

======:;

n/a nta nil 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT State Status Record of occurrence or potential to occur in Harris Reservoir No occurrences of state listed species in Shearon Harris Reservoir 4.7 Documentation of Consultation with Services

[§ 122.21(r)( 4)(vii)]

In preparing this response package for compliance with the Rule, there has been neither public participation, nor coordination undertaken with the Services. DEP has not submitted information to obtain incidental take exemption or authorization from the Services.

4.8 Methods and QA Procedures for Field Efforts

[§ 122.21( r)( 4 )(viii)]

DEP has not submitted information to obtain incidental take exemption or authorization from the Services.

4.9 Definition of Source Water Baseline Biological Characterization Data [§122.21(r)(4)(ix)]

Data presented in this report were compiled from DEP's historic and ongoing Environmental Monitoring Program on Shearon Harris Reservoir. Relevant reports have been provided as attachments to this document (Appendix E).

4.10 Identification of Protective Measures and Stabilization Activities [§122.21(r)(4)(x)]

DEP has performed habitat improvements in Shearon Harris to increase angling success by recreational users at the DEP employee use area. The design of the cooling water intake structure (i.e., TSV less than 0.5 fps) are anticipated to minimize impingement and greatly reduce entrainment.

4.11 List of Fragile Species [§122.21(r)(4)(xi)]

In the Rule, the EPA identifies 14 species of fish as fragile or having post-impingement survival rates of less than 30 percent. Occurrence of fragile species in Harris Reservoir was evaluated using historical sampling data (Table 4-2 Fish Species and Community Composition). The environmental monitoring program for Harris Reservoir has documented Gizzard and Threadfin Shad in electrofishing surveys.

Gizzard Shad are listed by the EPA as a fragile species (Table 4-10). Threadfin Shad, which is not on the EPA's list of fragile species, is closely related to several fragile species (family Clupeidae) and is expected to have very low post-impingement survival. Both the Gizzard and Threadfin Shad are discussed in 43

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Section 4.3.3 Selected Species Reviewed, and their seasonal and daily activities are summarized in Table 4-8. Because the CWIS has coarse-mesh screens with a TSV less than 0.5 fps, the facility is compliant with impingement mortality compliance option §125.94(c)(2). Impingement is anticipated to be negligible at this facility based on the low TSV; therefore, a discussion or assessment of potential fragile species is not warranted.

Table 4-10. List of Fragile Species as Defined by the EPA and their Occurrence In Shearon Harris Reservolr1, 4.12 Scientific Name Alosa pseudoharengus Alosa sapfdlssima Clupea harengus Anchoa mltch/JII Alosa aestlvalis Pomatomus saltatrht Poronotus tr/acanthus Dorosoma cepedlanum lutjonus griseus Alosa mea/ocrls Brevoortio tyrannus Osmerus mofdox Etrumeus sodina Engrau/fs eurystole Common Name Blueback Herring Bluefish Butterflsh Gizzard Shad Grev Snapper Atlantic Menhaden Rainbow Smelt Round Herring Sliver Anchovy Occurrence in vicinity of Shearon Harris cw1s*

No

  • No No No No No No Yes No No No No No No 1 Threadfln Shad are not included on the EPA Fragile Species list; however, It Is In the same family as Gizzard Shad and Is documented as having a low post-impingement survival rate.

Information Submitted to Obtain Incidental Take Exemption or Authorization from Services [§122.21(r)(4)(xii)]

Duke Energy has not submitted information to obtain incidental take exemption or authorization from the Services. There is no potential for impacts to any endangered species from operation of the Harris Nuclear Plant makeup water intake structure.

44

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 5

Cooling Water System Data [§122.21(r)(S)]

The information required to be submitted per 40 CFR §122.21(r)(S), Cooling water system data, is outlined as follows:

(i)

A narrative description of the operation of the cooling water system and its relationship to cooling water intake structures; the proportion of the design intake flow that is used in the system; the number of days of the year the cooling water system is in operation and seasonal changes in the operation of the system, if applicable; the proportion of design intake flow for contact cooling, non-contact cooling, and process uses; a distribution of water reuse to include cooling water reused as process water, process water reused for cooling, and the use of gray water for cooling; a description of reductions in total water withdrawals including cooling water intake flow reductions already achieved through minimized process water withdrawals; a description of any cooling water that is used in a manufacturing process either before or after it is used for cooling, including other recycled process water flows; the proportion of the source waterbody withdrawn (on a monthly basis);

(ii)

Design and engineering calculations prepared by a qualified professional and supporting data to support the description required by paragraph (r)(S)(i) of this section; and, (iii)

Description of existing impingement and entrainment technologies or operational measures and a summary of their performance, including but not limited to reductions in impingement mortality and entrainment due to intake location and reductions in total water withdrawals and usage.

Each of these requirements is described in the following subsections.

5.1 Description of Cooling Water System Operation

[§ 122.21{r)(S )(i)]

HNP's circulating water system is a closed-loop system; that is, the water is recycled and reused in the steam turbine condensers. The purpose of the circulating water system is to supply cooling water to various plant components and systems. The heat transferred to the circulating water in the condenser is rejected to the atmosphere by the evaporation process in the cooling tower. Approximately 99 percent of the intake water is used for non-contact cooling and no water is used for contact cooling.

The closed cycle cooling system consists of a natural draft, hyperbolic cooling tower that provides a heat sink for the recirculating condenser cooling water and the normal service water systems. The normal service water is withdrawn from the closed-cycle cooling water system (cooling tower basin) and provides cooling water to various plant components and systems. During normal operation, one CTMU pump supplies all the necessary makeup water (37.44 MGD, design) for the closed-cycle cooling system in order to restore losses due to drift, evaporation, blowdown and internal consumption. Infrequently, in drought years, the CTMU pumps are also used to transfer water from the main reservoir to the auxiliary reservoir. Additionally, during periods of extreme cold weather, heated cooling water may be discharged to the auxiliary reservoir in order to ensure that ice does not build up at the emergency cooling water intake screening structure. The closed-cycle recirculating cooling system is generally in operation when the plant is in operation. Assuming a capacity factor of 90%, the plant would operate approximately an average of about 329 days per year. However, the circulating water pumps operated 45

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT continuously during the 2016-2018 period. The closed-cycle recirculating system has a blowdown that averages approximately four MGD per month.

The two ESW pumps are intended for emergency use only but are tested periodically to ensure reliable operation. Typically, one or the other EWS pump draws water from the auxiliary reservoir about four days per quarter and draws water from the main reservoir about 10 days per year. This amount totals approximately 786 million gallons per year. This water is conveyed through critical plant components and discharged back to the auxiliary reservoir by the ESW discharge canal.

Under normal operating conditions, the recirculating (internal) cooling water flow is 774.15 MGD. This total includes recirculating cooling water (702.15 MGD) and Normal service water (NSW, 72.0 MGD) flows apportioned as follows:

3 circulating water pumps@ 234.05 MGD each 1 NSW pump@ 72 MGD The total flow to the cooling tower is 846.15 MGD. The cooling tower makeup pump design flow is 74.9 MGD and this is considered to be the cooling water DIF.

5.1.1 Proportion of Design Flow Used in the Cooling Water System Historical water withdrawals from Harris Reservoir to support HNP operations from 2016 to 2018 are provided in Table 3-2 (Section 3.4). Based on the water balance diagram (Figure 3-1), approximately 99 percent of the intake flow is used for non-contact cooling purposes (i.e., cooling tower makeup water).

The remainder is used as service water for various plant uses such as fire protection water, boiler wash water, and demineralizer water. Table 5-1 provides the proportion of the 74.88 MGD DIF withdrawn from the Harris Reservoir from 2016 through 2018. Although the historical averages are not necessarily indicative of future withdrawals, only 31.4 percent of the DIF was withdrawn from the Harris Reservoir from 2016 to 2018.

Table S-1. Percent of Design Flow Used In the Cooling Water System.

January February March April May June July August September Percent(%) of Design Flow (i.e., 74.88 MGD)

Used in the Cooling Water System 19.1%

35.0%

32.9%

29.0%

37.7%

37.5%

31.2" 18.4%

37.7" 37.9%

31.3%

18.4" 38.2" 21.0%

25.9" 19.0" 38.3%

30.3%

29.2%

19.9%

44.5%

39.5" 34.6%

19.9" 46.1%

39.5%

35.2%

20.4" 44.3" 39.5" 34.8" 18.3%

40.9%

40.7%

33.3%

46

316(b} Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT November December Annual Average Percent(3/4) of Design Flow (i.e., 74.88 MGD)

Used in the Cooling Water System 19.0%

19.9%

19.0%

35.7%

36.7%

35.7" 39.2%

38.S" 37.1%

36.3" 35.9%

31.0%

31.3%

29.9%

31.4%

5.2 Design and Engineering Calculations [§122.21(r}(S)(ii)]

Table 5-1 provides the estimated TSV under low and full pond water depths. The maximum withdrawal rate from the period of record (January 2016-December 2018) is 34.5 MGD (23,958 gpm) and occurred one time in July 2017. The engineering calculations ofTSV prepared by a qualified professional are provided in Appendix C.

Lake elevations are typically at or above 215 ft-msl. Based on the data reviewed to prepare this report, lake elevations below 213 ft-msl feet would be a rare if not exceptional event. At a lake elevation of approximately 212.8 ft-msl, the resultant through-screen velocity would be 0.50 fps.

Table 5-2. Estimated Through-screen Velocities at Harris Nuclear Plant.

Operating Scenario and Reservoir level Condition Design Through Screen Velocity (fps)

Estimated Approach Velocl~es with Alternate Operational Scenarios (fps)

Normal Pond (220 ft-msl)

Low Pool (215 ft-msl)

Low Technical Specification (205 ft-msl)

Maximum flow at,normal pond (220 ft-msl)

Maximum Flow at Technical Specification (205 ft-msl)

TSV (fps}

0.38 0.46 0.74 0.2 0.5 5.3 Description of Existing Impingement and Entrainment Reduction Measures [§122.21(r)(S)(iii)]

~

HNP achieves substantial reductions in entrainment and impingement by means of flow reduction. The underlying assumption for entrainment is that entrainable organisms have limited or no motility and passively move with the water entering the power plant; therefore, reduction in flow results in a 47

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT commensurate reduction in entrainment'. This flow reduction is achieved through the use of dosed-cycle recirculating cooling system.

The design flow of the recirculating cooling system is 846.15 MGD. Assuming a 365 day per year operation this results in an annual flow of approximately 308,844.75 Million gallons per year or if the plant operated a once-through cooling system they would withdraw approximately this amount per year. The plant is designed to withdraw the following amount per year assuming no emergency withdrawal is needed:

Table 5-3. Design and Actual (2016-2018) Flow Data.

CTMU ESW Design Total Operation Total Actual Total (2016-2018)

Daily Volume 74.9 MGD design 37.44 MGD expected operation 23.5 MGD actual (2016-2018)


~-----.-

Annual Volume 27,338.SMG 13,665.6MG 8577.5 MG 786MG 28,124.5 MG 14,451.6 MG 9,363.5 MG Proportioning the recirculating water (hypothetical once-through) to the amount withdrawn by the closed-cycle system, a flow reduction of approximately 91% is realized. Since generally only one CTMU pump is in operation a more realistic flow reduction is approximately 95%. Actual operational data from January 2016-December 2018 shows a flow reduction of 97%. With either scenario, the flow reduction is certainly commensurate with those flows generally achieved by closed-cycle recirculating systems on a freshwater system.

7 This is the underlying assumption in EPA's calculation of entrainment reduction associated with closed-cycle cooling - see USE PA 2014.

48

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 6

Chosen Method(s) of Compliance with Impingement Mortality Standard [§122.21(r)(6)]

The information required to be submitted per 40 CFR § 122.21(rl(6) is as follows:

The owner or operator of the facility must identify the chosen compliance method for the entire facility; alternatively, the applicant must identify the chosen compliance method for each cooling water intake structure at its facility. The applicant must identify any intake structure for which a BTA determination for Impingement Mortality under 40 CFR 125.94 (c)(11) or (12) is requested.

The Rule at 40 CFR 125.94(c) gives existing facilities seven BTA options for achieving impingement mortality compliance. These are listed below. A facility needs to implement only one of these options.

1. Operate a closed-cycle recirculating system as defined at 40 CFR 125.92(c)(l) (this includes wet, dry or hybrid cooling towers, a system of impoundments that are not WOTUS, or any combination thereof);
2. Operate a cooling water intake structure that has a maximum design through-screen velocity of 0.5 fps or less;
3. Operate a cooling water intake structure that has a maximum actual through-screen velocity of 0.5 fps or less;
4. Operate an existing offshore velocity cap that is a minimum of 800 feet offshore and has bar screens or otherwise excludes marine mammals, sea turtles, and other large aquatic organisms; S. Operate a modified traveling screen system such as modified Ristroph screens with a fish handling and return system, dual flow screens with smooth mesh, or rotary screens with fish returns. Demonstrate that the technology is or will be optimized to minimize impingement mortality of all non-fragile species;
6.

Operate any combination of technologies, management practices, and operational measures that the Director determines is BTA for reducing impingement. As appropriate to the system of protective measures implemented, demonstrate the system of technologies has been optimized to minimize impingement mortality of all non-fragile species; and

7.

Achieve a 12-month performance standard of no more than 24 percent mortality including latent mortality for all non-fragile species.

Compliance options 1, 2, and 4 are essentially pre-approved technologies that require minimal additional monitoring after their installation and proper operation. Options 3, 5, and 6 require that more detailed information be submitted to the Director before they can be specified as the BTA to reduce impingement mortality. Options 5, 6, and 7 require demonstrations with field studies that the technologies have been optimized to minimize impingement mortality of non-fragile species.

In addition, the Rule provides two other impingement compliance BTA options for which the Director may consider little or no additional controls for impingement mortality (USEPA 2014a). These options apply under very specific circumstances.

49

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT De minimis rate of impingement - if the rates of impingement at a facility are so low that additional impingement controls may not be justified (Section 125.94(cl(ll)); and Low Capacity utilization of generating units - if the annual average capacity utilization rate of a 24-month contiguous period is less than 8 percent (Section 125.94(c)(12)).

Harris Nuclear Plant meets the requirements of 40 CFR §125.94(c)(l) (BTA Option #1) based on data provided in Table 5-2. In addition, the cooling tower makeup pumps have a design and actual through-screen velocity of <0.5 fps and therefore compliant with the requirements of 40 CFR §125.94(c)(2) and (3) (BTA Options 2 and 3).

By meeting the CCRS criterion (BTA #1) the existing technologies in use at Harris Nuclear Plant are BTA for impingement mortality compliance. Furthermore, the cooling water makeup pumps have a design through-screen velocity that is lower than the 0.Sfps standard for impingement mortality compliance.

so

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 7

Entrainment Performance Studies [40 CFR § 122.21(r)(7)]

The information required to be submitted per 40 CFR § 122.21(r)(7), Entrainment performance studies, is as follows:

The owner or operator of an existing facility must submit any previously conducted studies or studies obtained from other facilities addressing technology efficacy, through-focility entrainment survival, and other entrainment studies. Any such submittals must include a description of each study, together with underlying data, and a summary of any conclusions or results. Any studies conducted at other locations must include an explanation as to why the data from other locations are relevant and representative of conditions at your facility. In the case of studies more than 10 years old, the applicant must explain why the data ore still relevant and representative of conditions at the facility and explain haw the data should be interpreted using the definition of entrainment at 40 CFR l25.92{h).

7.1 Site-Specific Studies [40 CFR §122.21(r)(7)(i)]

Harris utilizes a CCRS, therefore entrainment survival is not anticipated. Hence, no site-specific entrainment performance studies (i.e., studies evaluating biological efficacy of specific entrainment reducing technologies or through-facility entrainment survival) have been conducted at Harris.

7.2 Studies Conducted at Other Locations [40 CFR §122.21(r)(7)(ii)]

As of the date of this report, no entrainment performance studies conducted at other facilities have been determined relevant for documentation in this section.

51

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 8

Operational Status [§ 122.21(r)(8)]

The information required to be submitted per 40 CFR §122.21(r)(8), Operational status, is outlined as follows:

(i)

For power production or steam generation, descriptions of individual unit operating status including age of each unit, capacity utilization rate (or equivalent) for the previous 5 years, including any extended or unusual outages that significantly affect current data for flow, impingement, entrainment, or other factors, including identification of any operating unit with a capacity utilization rate of less than 8 percent averaged over a 24-month block contiguous period, and any major upgrades completed within the last 15 years, including but not limited to boiler replacement, condenser replacement, turbine replacement, or changes to fuel type; (ii)

Descriptions of completed, approved, or scheduled uprates and Nuclear Regulatory Commission relicensing status of each unit at nuclear facilities; (iii)

For process units at your facility that use cooling water other than for power production or steam generation, if you intend to use reductions in flow or changes in operations to meet the requirements of 40 CFR 125.94(c), descriptions of individual production processes and product lines, operating status including age of each line, seasonal operation, including any extended or unusual outages that significantly affect current data for flow, impingement, entrainment, or other factors, any major upgrades completed within the last 15 years, and plans or schedules for decommissioning or replacement of process units or production processes and product lines; (iv)

For all manufacturing facilities, descriptions of current and future production schedules;

and, (v)

Descriptions of plans or schedules for any new units planned within the next 5 years.

Each of these requirements is described in the following subsections.

8.1 Description of Operating Status [§ 122.21(r)(8)(i)]

HNP is normally used for base load generation. Plant outages typically occur during the spring (February to May) and/or in the fall/winter (October to December) months.

HNP began commercial operations in May of 1987. The HNP Unit 1 original operating license was renewed and will expire on October 24, 2046.

During 2018 the low pressure turbine was upgraded with a resultant electrical generation capability of 992 MWe.

Utilization for Previous 5 Years Monthly and annual average capacity factor information for 2014-2019 is provided in Table 8-1. Annual capacity factors during this period ranged from 90 to 101 percent.

52

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Table 8-1. Annual Capacity Factors at Harris Nuclear Plant, 2014-2019.

Capacity Factor(%)

Month ------

Januarv Februarv March April May June July Auqust September October November December 88 78 100 101 101 101 101 102 101 103 102 103 104 104 102 s,

90 L 104 104 83 104 103 99 104 7

100 103 103 19 103 64 101 102 101 101 101 101 102 101 101 20 81 102 104 105 104 103 101 90 8.2 Descriptions of Consultation with Nuclear Regulatory Commission [§122.21(r)(8)(ii)]

104 103 103 101 101 99 99 31 104 No consultations with the Nuclear Regulatory Commission (NRC) were conducted for this report.

However, during the "Initial License Renewal Application" process, the NRC published a Supplemental Environmental Impact Statement (NRC, 2008) that with respect to cooling water concerns, NRC staff concluded that there would be no impacts with continued operation.

8.3 Other Cooling Water Uses for Process Units [§122.21(r)(8)(iii)]

HNP does not use cooling water for process units; therefore, this subsection is not applicable.

8.4 Description of Current and Future Production Schedules

[§ 122.21( r)(8)(iv)]

HNP is not a manufacturing facility; therefore, this subsection is not applicable.

S3

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT 8.5 Description of Plans or Schedules for New Units Planned within 5 years [§122.21(r)(8)(v)]

There are no plans for decommissioning, replacing, or adding new units at this station during the next five years.

54

9 References 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Cole, L. J. 1905. The German carp in the United States. Pages 523-641 in Report of the Bureau of Fisheries for 1904. U.S. Department of Commerce and Labor, Government Printing Office, Washington, D. C.

Ehrlich, K. F. 1974. Chemical changes during growth and starvation of herring larvae. Pages 301-323 in J.

H. S. Blaxter, editor. The early life history of fish. Springer-Verlag, New York.

Etnier, D. A., & Starnes, W. C. 1993. The fishes ofTennessee. The University ofTennessee Press, Knoxville, Tennessee.

Gebhart, G. E., and R.C. Summerfelt. 1978. Seasonal Growth of Fishes in Relation to Conditions of Lake Stratification. "Oklahoma Cooperative Fishery Research Unit 58 (1978): 6-10. Oklahoma State University, Stillwater, Oklahoma.

Jenkins, R.E., and N.M. Burkhead. 1993. Freshwater Fishes of Virginia. American Fisheries Society, Bethesda, Maryland.

Loar, J.M., J.S. Griffith, and K.D. Kumar. 1978. An analysis offactors influencing the impingement of threadfin shad at power plants in the southeastern United States. Pages 245-255 in L.D. Jensen, editor. Fourth national workshop on entrainment and impingement. EA Communications, Melville, New York.

May, R. C. 1974. Larval mortality in marine fishes and the critical period concept. Pages 3-19 in J. H.S.

Blaxter, editor. The early life history of fish. Springer-Verlag, New York.

Miller, T.J., Crowder, L.B., Rice, J.A., Marshall, E.A. 1988. Larval size and recruitment mechanisms in fishes: toward a conceptual framework. Canadian Journal of Fisheries and Aquatic Sciences 45:1657-1670 p.

Menhinick, E.F. 1991. The Freshwater Fishes of North Carolina. North Carolina Wildlife Resources Commission, Raleigh, NC.

Murphy, B.R., and D. W. Willis, editors. 1996. Fisheries techniques, 2nd edition. American Fisheries Society, Bethesda, Maryland.

NCDNCR (North Carolina Department of Natural and Cultural Resources. 2018. North Carolina Natural Heritage Data Explorer element occurrence data. NCDNCR, Raleigh, NC.

Rohde, F.C., R.G. Ardt, J.W. Foltz and J.M. Quattro. 2009. Freshwater Fishes of South Carolina. The University of South Carolina Press, Columbia, 544 pp.

USFWS (U.S. Fish and Wildlife Service). 1987. Endangered and threatened wildlife and plants:

determination of endangered species status and designation of critical habitat for the Cape Fear shiner. Federal Register 52:186(25 September 1987):36034-36039.

USFWS (U.S. Fish and Wildlife Service). 1988. Cape Fear Shiner recovery plan. USFWS, Atlanta.

USFWS (U.S. Fish and Wildlife Service. 2017. Cape Fear Shiner (Notropis mekistocholas) 5-Year Review:

Summary and Evaluation. U.S. Fish and Wildlife Service, Southeast Region, Raleigh Ecological Services Field Office. Raleigh, NC.

S5

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT USFWS (U.S. Fish and Wildlife Service). 2019. Information for Planning and Consulting (IPaC}.

https://ecos.fws.gov/ipac/ accessed February 5, 2019.

United States Nuclear Regulatory Commission (NRC). 2008. Generic Impact Statement for License Renewal of Nuclear Plants (NUREG-1437), Supplement 33 Regarding Shearon Harris Nuclear Power Plant, Unit 1, Final Report. Office of Nuclear Reactor Regulation. Washington, DC.

Wong, R.K. 2002. White Perch Expansion and life History Within a Southern Reservoir. Master's Thesis.

North Carolina State University, Raleigh, NC.

Electric Power Research Institute (EPRI). 2004. Using Computational Fluid Dynamics Techniques to Define the Hydraulic Zone of Influence of Cooling Water Intake Structures. 1005528. EPRI, Palo Alto, CA.

EPRI. 2007. Cooling Water Intake Structure Area-of-Influence Evaluations for Ohio River Ecological Research Program Facilities. 1015322. EPRI, Palo Alto, CA.

MACTEC Engineering and Consulting, Inc. 2007. Duke Energy 316(b) Impingement and Entrainment Study Summary Report: Submitted in Support of the Duke Energy's 316(b) Impingement and Entrainment Characterization Studies (Pursuant to 40 CFR 125.95(b)(3)). Charlotte, North Carolina. November 27, 2007.

National Geographic Holdings, Inc. 2001. North Carolina seamless USGS topographic maps on CD-ROM.

National Geographic Maps. San Francisco, CA.

North Carolina Department of Natural and Cultural Resources (NCDNCR). 2016. Natural Heritage Program. NCDNCR, Division of land and Water Stewardship. June 15, 2016.

http://www.ncnhp.org/ data/species-community-search.

Seaber, P. R., F. P. Kapinos, and G. L. Knapp. 1987. Hydrologic Unit Maps. U.S. Geological Survey Water-Supply Paper 2294. 23pp.

United States Environmental Protection Agency (USEPA). 2014. National Pollutant Discharge Elimination System - Final Regulations to Establish Requirements for Cooling Water Intake Structures at Existing Facilities and Amend Requirement at Phase I Facilities; Final Rule. 40 CFR Parts 122 and 125. Federal Register Vol. 79 No. 158. August 15, 2014.

Wiegel, Robert L. 1964. Oceanographic Engineering, Prentice-Hall, Inc. Englewood Cliffs, NJ, 56

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Appendices

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Appendix A. Harris Nuclear Plant §122.21(r)(2) - (8)

Submittal Requirement Checklist.

1 Till!!

  • Requirement Provided in Report?

~

(2)(1)

Narrative description and scaled drawings of source waterbody.

Yes ldentlflcatlon and charatterlzatlgn of the source waterbody's 0.....

hydrological and geomorpholojlcal features, as well as the QI -s (2)(11) methods used to conduct ~ny,physlcal studies to determine Yes 3 2l

~

Intake's area of Influence within the waterbody and the results of such studies.

,5l E

(2)(111)

Locational maps.

Yes Jl (3)(1)

Narrative descrlptlo!l of the configuration of each CWIS and where Yes

.I!

It Is located In the waterbody and In the water column *

.5.I!

s~

(3)(11)

Latitude and Longitude of CWIS.

Yes 3 I!!

1!'5 Narrative description of the operation of each CWIS.

si (3)(1v)

Flow distribution and water balance diagram.

Yes u g (3)(v)

Engineering drawtng of CWIS.

Yes J!

A list of the data supplied In paragraphs (r)(4)(i1) through (vi) of Yes, but not c!!

(4)(1) this section that are not available and efforts made to Identify applicable because all C

0 ;;

sources of the data.

data are available.

ra...

A 11st of species (or relevant taxa) for all llfe stages and their (4)(il)

QI Yes tl relative abundance In the vicinity of CWIS.

I!

ra u

Identification of the species and life stages that would be most

-i; (4)(111)

Yes eel susceptible to Impingement and entrainment.

0 i Identification and evaluation of the primary period of QI C

(4)(lv) reproduction, 'larval r~crultment, and period of peak abundance Yes 5i for relevant taxa.

ra CICI...

~

(4)(v)

Data representative of the seasonal and dally activities of Yes ra

==

blological organisms ln the vicinity of CWIS.

QI

~

Identification of an threatened, endangered, and other protected

,Si!

(4)(vl) species that might be susceptible to impingement and Yes

~

entrainment at cooling water Intake structures.

I I

Til l!!

I 1

(4)(vll)

(4)(vlll)

(4)(1x)

(4)(x)

(4)(xl)

(4)(xll)

(5)(1)

J!l (5)(1) l E.,

I j

(5)(1) 1111 C

8 (5)(1) u -

!!l.

(5)(1) 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Requirement Documentation of any public participation or consultation with Federal or State agencies undertaken in development of the plan.

Methods and QA procedures for any field efforts.

In the case of the owner or operator of an existing faclllty or new unit at an existing facility, the Source Water Baseline Blologlcal Characterization Data ls the Information Included in (l) through (xll).

Identification of protective measures and stabilization activities that liave been Implemented, and a description of how these measures and activities affected the baseline water condition In the vicinity of CWIS.

List of fragile species as defined at 40 CFR 125.92(m) at the facility.

Information submitted to obtain Incidental take exemption or authorization for Its cooling water Intake struc:ture(s) from the U.S. Fish and Wllallfe Service or the National Manne Fisheries Service.

Narrative description of the operation of the cooling water system and Its relatlonshlp to CWIS.

N~mb,r of days of the_year the cooling water system Is In operation and seasonal changes In the operation of the system, Proportion of the design Intake flow that ls used ln the system

  • Proportion of design Intake flow for contact cooling, non-contact cooling, and proce55 uses.

Distribution of water reuse to Include cooling water reused as process water, process water reused for cooling, and the use of gray water for cooling.

I Provided in Report?

Yes, but not applicable.

Yes, but not appllcable as no new data have been collected.

Yes, noted in report that (I) through (xil) provide this Information.

Yes Yes Yes, but not applicable.

Yes Yes Yes Yes not applicable

Tillie (S)(I)

(S)(I)

(5)(1)

(S)(ll)

(S)(lll) 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Requirement Description of reductions In total water withdrawals Including cooling water Intake flow redu¢ons already achieved through minimized process waterwlthclrawals.

Description of any cooling water that Is used In a manufacturing process either before or after It Is used for cooling. Including other recycled process water flows.

Proportion of the source waterbody withdrawn (on a mo~ly basts).

Design and engineering calculations prepared by a quallfled professional and supporting data to support the description required by paragraph (r)(S)(i) of this section.

Description of existing impingement and entrainment technologies or operational measures and a summary of their perforrm1nce.

Provided in Report?

Yes not applicable Yu Yes Identification of the chosen compliance method for the entire CWIS or each CWIS at Its faclllty.

Yu (6)(1)

(6)(11)

Impingement Technology Performance Optimization Study for Modified Travellrng Screen.

Two years of biological data collection.

Demonstration of Operation that has been optimized to minimize Impingement mortality.

Complete description of the modified traveling screens and associated equipment.

Impingement Technology Performance Optimization Study for Systems ofTechnologles as BTA for Impingement Mortality.

Minimum of two years of biological data measuring the reduction In Impingement mortality achieved by the system.

No, not selected compliance path and thus not applicable.

Title fl C

(7)(1)

~

~

..5!

1: ~

Ill a (7)(11)

E VI i

,W E

(7)(1il)

(8)(1)

Ill (8){111

I

]§ VI ii C

0 ;;

I!

(S){lil)

Ill C.

0

§:

(B)(iv)

(S)(v) 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Requirement Provided in Report?

Slte-specfflc studies a~dresslng technolOl'f efficacy, through plant Yes; note that no slte-speclflc studles entrainment survival, and other Impingement and entrainment were contlucted at mortality studies.

thls faclllty.

Yes; note that studies Studies conducted at other locations Including an explanation of at other locations how they relevant and representative.

were not determined to be relevant.

Studies older than 10 yem must Include an explanation of why not applicable the data are stlll relevant and representative.

Description of Individual unit age, utilization for previous 5 year, Yes, need updated major upgrades In fast 15 years.

numbers Descriptions of completed, approved, or scheduled uprates and Yes, but not Nuclear Regulatory Commission relicensing status of each unit at applicable.

nuclear faf!lltles.

Other cooling water uses and plans or schedules for Yes, but not decommissioning or replacing units.

applicable.

For all manufacturing facilities, descriptions of current and future Yes, but not production schedules.

applicable.

Descriptions of plans or schedules for any new units planned Yes within the next 5 years.

A-4

Appendix B. Engineering Drawings of Cooling Water Intake Structure

Cl r

B-2 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT

..... s i~

  • i I

I 1-3 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT

~

1(1

~ I IJ M

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT I

I

(

,~.

~ *-

u*.

l!

'~1 i;;;;

  • -/-:*

i I

r I

I 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT

~*..... I I t

~

'l I

~

f 5

~

~

~ 4-

- j~

,i r

r I

'I' 4 I

  • r I

j lj,_ "

'-I

! I

.. 11 Jl i li 11

~-.,

I

~

- - I ~M-.. n fi

~

i- ':. * :*i _:,., I I

11- ""'

11*

. :t. *:---::---r. +.---:-:-:-f' I

. lJ

~

't~

~ ¥ ( Lr*~ :rru

  • 1--

1 =--

1*

' ~... '

111* I J

IJ i ~i-lt-1 ~~h

. r]

r

-~-

.:..- J

~--E_ i -,

I

,_ --t-f!

I

i, I
1 ~

~

~ ~

~

Ii.. -~;~ ~-

i~

  • i' ti
  • r ii*

ri

. -,*r, 1&t1 r I f

I

-~*

1*

~i

,-..~ '

  • . li i '.*.

I el-~.

-t1rr -

SJ

' \\'.

... I r~.. ~ I! '---:..I:.~,.

' 2....:.....:.:: *.- **

I ~r 5. c.JJP, -C-H

~i

--~w U:'

l'.

I

. -1

~

l

,,1:"::1.ZJ

~

I.

,(ij I el ~

.i.* H

  • ~,v 10 F:.:;: '*. '

~

.
..:_ --:..::.~r-* - ~,-
  • ..:.i... **

I

  • i

'... It,'"; f f'- fl C 1

,\\ I I

I 1 I 1

I I

1.

i '..

---~-~.-

.~ ~

I

\\

l
'I r.

I 1*

r

.}

iJ j, I

-* i '

I,_ e.

i t-L i ! I' r ?i i

.., i.I ii I

l 1*

l 1!...

I

-J~

I r

i

!l "i t ~

B-5

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT

'11 1

. JJ]

i:

r -*-

I i't t____

1 I

l L

~

r I

'tP, I I t.rr,

,/

..

  • 1! ij t,...

l f

~

l 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT

~!

I*

h -r I+

  • ~

t~.

1 1f l *

r. l.

1...

, 1 i

~...

t :; ju j r *. !*... ~n.

B-8 316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT i i!

i

i

! ij 11

~

-T 2~

r, l '.

~

[,s

~

I 7

i I

/.,.

- ~.......

~-

~

..,.. l I

I

-r- -i1P-l f I I

I ii r

f

~

j

~

]1 ~ **;

-~...,l_

lb

?'

1

-I r

I ti '

,!,t r I
  • la

~ l C

11; h..

El I*

I '

,p;.,

~

't -

.. "ti

~

- ~~,;J E?I; _'1-r. ;

I.~..-

' 11 IS

. tr I

!lij'"'!

~ l - -

i 1i

~ ilt

i ~-;
r:Ji I,' ;Jii1 I

~

i Ii ~-,1 ; If

~ I _I, f:......,,

316(b) Compliance Submittal Requirements SHEARON HARRIS NUCLEAR PLANT Appendix C: Engineering Calculations for Through-Screen Velocity C-1

HARRIS Traveling Screen Throu1h Screen Veloclty (TSV) Calculations Design Oata Mike Smallwood 2/15/2021 Ebasco Specs CAR-SH-AS-9. Page 9 cat Id associated with the component (lSC-EOOl & E0021 Indicates WIRE,304SS,WIRE MESH IS 1114 GA(0.080 DIA.)W/3/8" SQUARE OPENINGS TS 3.7.5 llsU mlnlmum level at 206'

3.

DESIGN COJCDlTlONS (Coat 'd)

.:oj Coo1tng Tover Hake-Up Screen*

I Main Reaervolr Intake Eaeraency Structure (Cont'd) ________ _

d - (Cont'd) v - ntah vater Elev (1&11.)

vl - Nonial vater Elev (IQL) vii.

  • Lov vater Elev (UIL) 255.00 ft 220.00 ft*

2<,!;rzn ft

  • l'utun 11.VL 250.00 ft.

e - Flw throuah one 100 percent clean acreen Water

'Depth, ft flow. cf*

At normal water At lOII veter JO.O 15.7

  • Ccmflnted by Sd~er.

67 63 Velocity, fp**

0.44 0.78.

f - Source of veter Coollng Tower Channel (Haln Jteaeryolr) g -

Lift:1111 speed of baaket** fpm (approximate) 215 *rd 10 f11111

.04 Screen Maah a* W & H vlre gage M14 ____ D.1&aeter._ __ o __.o_8;;..;;i_ft_*---

b

  • Clear openlns*

~3~(~8--=l~n~--*~g._ ____________ _

c

  • Koah material Stalple* e S£eel Type 304 d - Futener 111&terial Btalnle** Steel Bolt* or Attsci-,nt*

C,2 R2 ll2 R2 Water Depth Table Depth at MWIS Invert= 191.S feet Condition Laite level MWIS water depth High 2SS 63.5 Normal 220 28.S low 215 23.5 Low TS 206 14.S

HARRIS CTMU (normal pool) Traveling Screen Through Screen Velocity (TSV) Calculations normal pool = 220 feet, MWIS Invert = 191.5 feet Mike Smallwood 5/22/2020 updated 2/15/2021 INSERT REQUESTED INFORMATION INTO GREEN CEUS AND SHEET CALCULATES TSV Through-screen velocity calculated using Pankratz equation ("Screening Equipment Handbook", 1988)

V = Q / (WD

  • OA
  • TW
  • Kl where V = velocity, feet/second Q = flow rate, gallons/minute WO = wetted screen depth, feet TSV*

0.38 OA = proportion of screen open area to total screen area =,[mesh slze

  • mesh slze)/((mesh size+ wire size) * (mesh size+ wire size))

TW = screen basket width, feet K = 396 for through-flow screen and 740 for dual-flow screen pump flow rate, gpm depth of screen in water column, ft screen mesh opening, In HNP Reissuance Application 316(b) Supplement (01/27/2006)

HNP SD-139 Service Water System (rev9)

Ebasco Specs CAR-SH-AS-9

~~

0.679 screen mesh width, in same screen mesh length, in same screen mesh wire size, in same screen basket width, ft HNP S0-140 Traveling Screens... (rev6) number of screens for each pump same enter 396 for through-flow screen or 740 for dual-flow screen percent clogging C-3 cg factor=

1

HARRIS CTMU (low pool) Traveling Screen Through Screen Velocity (TSV) Calculations low pool = 215 feet, MWIS invert= 191.5 feet Mike Smallwood 5/22/2020 updated 2/15/2021 INSERT REQUESTED INFORMATION INTO GREEN CELLS AND SHEET CALCULATES TSV Through-screen velocity calculated using Pankratz equation ("Screening Equipment Handbook", 1988)

V = Q / (WO

  • OA
  • TW
  • K) where V = velocity, feet/second Q = flow rate, gallons/minute WO = wetted screen depth, feet TSV=

0.46 OA = proportion of screen open area to total screen area = (mesh size

  • mesh size)/((mesh size+ wire size) * (mesh size+ wire size))

TW = screen basket width, feet K = 396 for through-flow screen and 740 for dual-flow screen pump flow rate, gpm depth of screen in water column, ft screen mesh opening, in screen mesh width, in screen mesh length, in screen mesh wire size, in screen basket width, ft HNP Reissuance Application 316lbl Supplement (01/27/2006)

HNP 51>-139 Service Water System (rev9)

Ebasco Specs CAR*SH-AS-9 ope_!I.M!!!!

  • 0.679 same same same HNP SD-140 Traveling Screens *.. (rev6) number of screens for each pump same enter 396 for through-flow screen or 740 for dual-flow screen percent clogging C*4 c(qs factor =--""1 _ _.

HARRIS CTMU (normal pool) Traveling Screen Through Screen Velocity (TSV) Calculations low TS pool = 206 feet, MWIS invert = 191.S feet Mike Smallwood 2/15/2021 INSERT REQUESTED INFORMATION INTO GREEN CEUS AND SHEET CALCUlATES T5V Through-screen velocity calculated using Pankratz equation ("Screening Equipment Handbook", 1988)

V = Q / (WO

  • OA
  • TW
  • K) where V = velocity, feet/second Q = flow rate, gallons/minute WO = wetted screen depth, feet TSV*

0.74 OA = proportion of screen open area to total screen area =,jmesh size

  • mesh slze)/((mesh size + wire size) * (mesh size + wire slzel)

TW = screen basket width, feet K = 396 for through-flow screen and 740 for dual-flow screen pump flow rate, gpm depth of screen in water column, ft screen mesh opening, in screen mesh width, In screen mesh length, in screen mesh wire size, In screen basket width, ft H NP Relssuance Application 316(b) Supplement (01/27/2006)

HNP SD-139 Service Water System (rev9)

Ebasco Specs CAR-SH*AS*9 qP..!!!J l!fl!a

  • 0.679 same same same HNP SD-140 Traveling Screens... (re116) number of screens for each pump same enter 396 for through-flow screen or 7 40 for dual-flow screen percent clogging cg fact-:.:Of"

=--*-

--=1,._....J

HARRIS ESW (normal pooll Traveling Screen Through Screen Velocity (TSVI Calculatlons normal pool = 220 feet, MWIS invert = 191.5 feet Mike Smallwood 5/22/2020 updated 2/15/2021 INSERT REQUESTED INFORMATION INTO GREEN CELLS AND SHEET CALCULATES TSV Through-screen velocity calculated using Pankratz equation ("Screening Equipment Handbook", 19881 V = Q / (WO

  • OA
  • TW
  • Kl where V = velocity, feet/second Q = flow rate, gallons/minute WO= wetted screen depth, feet 0.37 OA = proportion of screen open area to total screen area= lmesh size
  • mesh slze)/((mesh size+ wire size) * (mesh size+ wire slzel)

TW = screen basket width, feet K = 396 for through-flow screen and 740 for dual-flow screen pump flow rate, gpm depth of screen in water column, ft screen mesh opening, in HNP Reissuance Application 316(b) Supplement (01/27/2006)

HNP SD-139 Service Water System (rev9)

Ebasco Specs CAR-SH-AS-9

~n area

  • 0.679 screen mesh width, in same screen mesh length, in same screen mesh wire size, In same screen basket width, ft HNP SD-140 Traveling Screens... (rev61 number of screens for each pump same enter 396 for through-flow screen or 740 for dual-flow screen percent clogging C*i cl!!g factor
  • 1

HARRIS ESW (low pool) Traveling Screen Through Screen Velocity (TSV) Calculations low pool = 215 feet, MWIS invert = 191.S feet Mike Smallwood 5/22/2020 updated 2/15/2021 INSERT REQUESTED INFORMATION INTO GREEN CEUS AND SHEET CALCULATES TSV Through-screen velocity calculated using Pankratz equation ("Screening Equipment Handbook", 1988)

V = Q / (WO

  • OA
  • TW
  • Kl where V = velocity, feet/second Q = flow rate, gallons/minute WO = wetted screen depth, feet TSV=

0.45 OA = proportion of screen open area to total screen area = (mesh size

  • mesh size)/(lmesh size + wire size) * (mesh size+ wire size)l TW = screen basket width, feet K = 396 for through-flow screen and 740 for dual-flow screen pump flow rate, gpm depth of screen in water column, ft screen mesh opening, in HNP Reissuance Application 316(b) Supplement (01/27/2006)

HNP SD-139 Service Water System (rev9)

Ebasco Specs CAR-SH-AS-9

~

n area=

0.679 screen mesh width, in same screen mesh length, in same screen mesh wire size, In same screen basket width, ft HNP SD-140 Traveling Screens... (rev6) number of screens for each pump same enter 396 for through-flow screen or 740 for dual-flow screen percent clogging C-7 l

HARRIS ESW (low pool) Traveling Screen Through Screen Velocity (TSV) Calculations low TS pool = 206 feet, MWIS Invert = 191.5 feet Mike Smallwood 2/15/2021 INSERT REQUESTED INFORMATION INTO GREEN CELLS AND SHEET CALCULATES TSV Through-screen velocity calculated using Pankratz equation ("Screening Equipment Handbook", 1988)

V = Q / (WD

  • OA
  • TW
  • Kl where V = velocity, feet/second Q = flow rate, gallons/minute WD = wetted screen depth, feet TSV=

0.73 OA = proportion of screen open area to total screen area= (mesh size* mesh size)/l(mesh size+ wire sizel * (mesh size+ wire size))

TW = screen basket width, feet K = 396 for through-flow screen and 740 for dual-flow screen pump flow rate, gpm depth of screen in water column, ft 1 screen mesh opening, in HNP Reissuance Application 316(b) Supplement (01/27/2006)

HNP Sl>-139 Service Water System (rev9)

Ebasco Specs CAR*SH*AS*9 open art!!_=

0.679 screen mesh width, in same screen mesh length, in same screen mesh wire size, in same screen basket width, ft HNP SD-140 Traveling Screens... (rev6) number of screens for each pump same enter 396 for through-flow screen or 740 for dual-flow screen percent clogging c~factor=

1

Duke Energy Progress, LLC Harris Nuclear Plant National Pollutant Discharge Elimination System Permit Number NC0039586 Form 2C - Section 2.1 - Line Drawing/ Water Balance/ Flow Table

Notes:

1. See attached pages 3.5 for

~

table of flow rates

---c service Auxiliary Reservoir ~

Fire Protection waler overflow 37 H

24 make-up 1nni;1 t t t cooling tower Harris Reservoir ~ Stomt Drains

'-*-*** 1;"a 5

L7 (See Detatil A on page 2) e11aporative 46 I

3 58 I.,,:

2 4s4 10041 t

I mo21 blowdown 001)

~

26 Cooling Tower Low Volume Waste +-

Water Pretreatment Potable Water 39 Sanitary Wastewater Settling Basin 32

~

Treatment 27

! 38

'40 sludge plant & HEEC sludge usage 21 Service Water 7

6 16 (OQll.

Metal Cleaning 18 Waste used oil t 50 Non-contam. Oily Make-up and 42 Condenser

~ Reactor Coolant r

IJ"l'Y\\_

Waste & Floor Drains!

Polishing Oilv Waste Seoarator Demineralizers -

System (005) 8 Radwaste 12 17 19 35 43 44 Processing System

/C:,fta n",~' C "" "* -- '>I I!-

I Condensate Waste Chemical and 48 Demineralizers Polishers Neutralization Basins !'2i Auxiliary Boilers Volume Control 49 Svstem

-~

13 34 9

11

~b3 I

10 Steam Generator Reactor Condensate Storage I* - Form 2C

~ I, All:

Duke Energy Progress, LLC Secondary Waste 22 non-radioactive Harris Nuclear Plant-Wake County, NC Holding Tanks n radioactive Schematic of Water Flow Page 1 of 5 January 2021

Storm Drains Secondary Waste Sample Tank Treated Hot Shower Tank Waste Monitor Tank Waste Evaporator Condensate Tank (005)

....._ To combined outfall (CTB) line e

~ -

II) 00 CJ) =

'iii II)

~

CJ e

~

~

II)

~

~

'0 (1

~

Treated water tank drains Yard & roof drains Condenser water box drains Fire protection system

.t')

49

'il n

'i2

'i'l

'id

'i'i Reactor coolant system Boron recycle Equipment drain Secondary waste Floor drain Laundry hot shower Laboratory Filter back flush L! Boron recy cle to chemical &

volume control system Detail A Detail B - Form 2C Duke Energy Progress, LLC Harris Nuclear Plant - Wake County, NC Schematic of Water Flow Page 2 of 5 January 2021

l0D11od "i Holding Tank H,

(0~IM9,DI Lab Wasle Cooling Tower Blowdown (OCI02MGDI EOF Building 4 Barscrcen Fin: Pump Once -through Engine Cooling I

Lift Station

,r H

.,:C:,;;5*;;:;000

    • .::D:::,:

ons semi r*_,mm.,.ua._1.1v...

1 -----,

Radiological Wastewalcr Holding Tank TTF Lill Stalion ~

Lill Stnlion I+

t

+

Boat Storage Sump C&OS Building Building Filter Backwash

, I,

,r Influent Pump I*

-+

~

Aeralcd Pond Slnbilization Pond Station (Lagoon 1)

(Lagoon 2)

(0.0ll MGD)

H

,j~

Blowers Al,

  • Discharge (0.0l7MGD)

De-chlorination I

I De-chlor Tablets I

T r -

- - - Chlorination System I

I t

Chlorine Contacl Tank

  • -,,a-----------'

NOE Building Polishing Pond -+

Sand Filter (Lagoon 3)

~

... - Form 2C Duke Energy Progress, LLC Harris Energy & Environmental Center Wake County, NC Schematic of Water Flow Page 5 of5 January 2021

Duke Energy Progress, LLC Harris Nuclear Plant and Harris Energy & Environmental Center National Pollutant Discharge Elimination System Permit Number NC0039586 Form 2C - Section 2.1 - Flows, Sources of Pollution, and Treatment Technologies Stream Flow @ Maximum Power*

Flow@ Temperature Notes Shutdown*

I 21,000 gpm 21,000 gpm Emergency/Testing/ Intermittent use 2

510 MGM 0- 5 MGM Varies with dissolved solids J

864MGM 9MGM Cooling tower make-up 4

648MGM 4MGM Average meteorological condition 5

0 - 14,000 gpm 0 - 14,000 gpm Cooling tower bypass line 6

500,000 gpm 0 - 284,000 gpm 7

500,000 gpm 0 - 284,000 gpm 8

JOO gpm 0- 176 gpm 9

20,800 0- 10,000 Intermittent operation 10 JOO gpm 0 - 176gpm 11 1.2 MGM 210,000 Condensate polisher regenerations and rinse (Intermittent operation) 12 24,000 gpm 0 - 16,500 gpm 13 24,000 gpm 0 - 16,500 gpm 14 JIS,900 gpm 0 - 185,000 gpm 15 Jl5,900gpm 0 - 185,000 gpm 16 6MGM SMGM 17 208,300 208,300 18 0

0 Very infrequent operation 19 666,600 666,600 20 500 500 Auxiliary boiler drains 21 50,000 gpm 50,000 gpm Service water system 22 1,220,800 220,000 Secondary waste (Nonradiological),

alternate route 23 0

0 Secondary waste (Radiological), not normally used 24 0- 1 MGM Make-up as needed 25 7,645,000 7,645,000 26 4,000,000 4,000,000 27 300 lbs/month 300 lbs/month Settling basin sludge 28 J,033 3,0J3 Treated water tank drains 29 11,000 I 1,000 Fire pump test 30 8,786,200 8,786,2000 Storm drains includes rainwater and firewater 3

31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Duke Energy Progress, LLC Harris Nuclear Plant and Harris Energy & Environmental Center National Pollutant Discharge Elimination System Permit Number NC0039586 1.2MGM 1.2 MGM Potable water 2,445,000 2,445,000 39,000 39,000 Reactor coolant system 1,200.000 1,200,000 Demineralized water 500 500 Demineralized water to auxiliary boilers 11,000 11,000 Fire pump test 1,167 I, 167 Hydrant and drain tests 693,000 693,000 Plant and HE&EC water usage 0.2MGM 0.2MGM Sanitary waste Sludge removal as necessary 8,340,000 8,340,000 Yard and roof drains 10,000 10,000 33,300 33,300 Makeup as required 1,220,800 220,000 Makeup 9 and 11 0.065 MGD 0.065 MGD Sanitary waste (average flow at <

0.025 MGD with peak flows to 0.065 MGD) 413,000 413,000 Radwaste 10,000 gpm 10,000 gpm Boron recycle 67,000 67,000 Boron Recycle/CVS letdown 30 30 Used oil 75,000 75,000 Equipment drains 316,000 316,000 Floor drains 7,000 7,000 Decontaminated waste 6,000 6,000 Laboratory waste (chemistry) 4,100 4,100 Varies with number of filter backwashes 5 - 10 gpm 5 - 10 gpm Water treatment steam heater drains 120,000 120,000 Condenser water box (approximately two drains/vear) 6,950,700 6,950,700 Low-volume waste

  • Units: Gallons per month unless otherwise noted 4

Duke Energy Progress, LLC Harris Nuclear Plant National Pollutant Discharge Elimination System Permit Number NC0039586 Form 2C - Section 3.1 - Flows, Sources of Pollution, and Treatment Technologies

Duke Energy Progress, LLC Harris Nuclear Plant and Harris Energy & Environmental Center National Pollutant Discharge Elimination System Permit Number NC0039586 Attachment S Form 2C - Section 3.1 Flows, Sources of Pollution, and Treatment Technologies HARRIS NUCLEAR PLANT The Harris Nuclear Plant (HNP) consists of a l,0 16 MW generating unit and associated facilities.

The HNP systems include a Westinghouse pressurized water reactor, three re-circulating steam generators, a turbine generator, a one-pass condenser, an open re-circulating (cooling tower) cooling water system, and a lake to makeup water lost by evaporation. In a pressurized water reactor design, steam is produced in the secondary system steam generators using hot water from the reactor core. The primary system does not nonnally come into contact with any other part of the generating system, such as the steam cycle which includes the turbine and the condenser.

Outfall 006 - Combined Outfall to Harris Lake The HNP operates on an open re-circulating cooling system using a natural draft cooling tower and 4100 acre makeup water storage reservoir. All five major wastewater discharges at the HNP are combined in a 36-inch diameter common pipe which discharges to the Harris Lake 500 feet offshore at 40 feet below the surface (Discharge Serial No. 006 in this application.) The individual waste streams contributing to the common outfall pipe are: cooling tower blowdown, sanitary waste treatment plant effluent, metal cleaning wastes, low-volume wastes, and radwaste system. (These waste streams are enumerated in the present pennit as Discharge Serial Numbers 001. 002, 003, 004, and 005, respectively.) Toxicity testing has been conducted on the combined outfall line since February 1990. Each of the waste streams, as well as miscellaneous discharge points, are described in this narrative. Also included is a list of chemicals which are expected to be in waste streams from the HNP (Attachment 6).

Outfall 001-HNP Cooling Tower Blowdown discharge to Outfall 006 The cooling tower provides the condenser with a supply of water for removing the heat rejected by the condensation of steam. (The circulating water temperature rise across the condenser is 2s*F.) This heat is dissipated primarily by evaporation as the water falls through the tower.

This evaporation is essentially pure water vapor, with the dissolved and suspended solids remaining to concentrate.

To prevent the solids from causing scale and corrosion problems, some of the concentrated cooling water is discharged from the cooling tower basin, i.e., blowdown.

During plant operation, the cooling tower basin continuously discharges for optimum perfonnance.

Blowdown currently averages approximately 6 MGD.

Makeup water for cooling tower evaporative losses and cooling tower blowdown is provided from the main reservoir. The cooling tower also serves as a partial source of service water, which is used for non-contact cooling of auxiliary equipment throughout the plant. The cooling tower is infrequently drained

Duke Energy Progress, LLC Harris Nuclear Plant and Harris Energy & Environmental Center National Pollutant Discharge Elimination System Permit Number NC0039586 for maintenance. The normal operating procedure includes draining the residual water to the lake via Discharge Serial No. 006.

Occasionally, the condensers are drained for maintenance and repairs. When the condensers are drained, it is necessary to route the residual water (approximately 60,000 gallons per condenser per event) to area storm drains which discharge to the lake. This water is monitored prior to discharge for appropriate parameters required for cooling tower blowdown in accordance with the NPDES permit. Presently, condenser draining events are reported with relevant monitoring data to DWQ on attachments to monthly Discharge Monitoring Reports.

Outfall 002 - HNP Sewage Treatment Facility discharge to Outfall 006 The HNP is served by a 0.065 MGD firm capacity sewage treatment facility comprised of:

a) a 0.015 MGD extended aeration sewage treatment facility (consisting of an equalization basin, aeration basin, sludge holding tanks, raw sewage holding tank, clarifiers, and chlorine contact tanks); This unit is current not being operated. and b) a 0.050 MGD recirculating packed bed filter system consisting of four T-Max settling units, six AX-Max treatment units, two AdvanTex polishing units, ultraviolet disinfection, and an effluent pump station serving the combined sanitary treatment units to discharge to Outfall 006.

Currently, treatment system residuals are land applied off site by a contract disposal firm (Granville Farms, Inc., Permit No. WQ0000838).

In addition to sanitary waste, HV AC condensate is discharged to the sewage treatment facility. Because the HNP sewage treatment facility receives industrial type waste as well as domestic type waste, the land application of the mixed sludge meets the exemption conditions stipulated at 40 CFR Part 503.6.

Outfall 003 - HNP Metal Cleaning Wastes discharge to Outfall 006 Infrequently, cleaning of heat exchanger equipment by chemical solutions may be necessary.

Cleaning solutions would be routed to the waste neutralization basin for pH adjustment (or other chemical neutralization) prior to discharge to the settling basin where further treatment by sedimentation occurs.

To date, the only metal cleaning which has been conducted was a preoperational flush. If a new system is added in the future or if an existing system is changed out, flushing could be necessary again. Also, metal cleaning may be needed in the future for plant systems (e.g., steam generators, auxiliary boilers, piping, etc.). Chemical solutions used may include phosphates, organic cleaners, citric acid, or oxalic acid.

2

Duke Energy Progress, LLC Harris Nuclear Plant and Harris Energy & Environmental Center National Pollutant Discharge Elimination System Permit Number NC0039586 Outfall 004 - HNP Low-Volume Wastes discharge to Outfall 006 In the operation of the HNP, there are many processes which result in intennittent low volumes of various waste streams. Low-volume waste is treated by neutralization (for pH adjustment),

sedimentation, and separation. These wastes may be treated in the oily waste separator and/or neutralization basin as needed prior to routing to the sedimentation basin, which ultimately discharges to the common outfall line. Periodically as a maintenance practice this basin may be physically cleaned using chlorine, a bisulfate is added after cleaning to remove the chlorine before discharge. Chemicals present in these systems may include corrosion products {such as copper and iron) corrosion inhibitors {such as nitrites, molybdates, ammonia, hydrazine, carbohydrazide, and ethanolamine), acids and bases from water treatment processes, and wastewater from ion exchange processes and ammonium bisulfite from dechlorination. Low-volume waste flow from the settling basin averages approximately 0.2 MGD. The various low-volume waste sources are described below:

a)

Water treatment system wastes from processing of demineralized water and potable water.

(The water treatment system includes coagulation, filtration, disinfection, and ion exchange. Wastes from treatment include filter backwash and demineratizer regeneration wastes.)

b)

Non-radioactive oily waste, floor drains, and chemical tank containment drains.

{Turbine building wastes which could contain oil are routed to the oily waste separator for treatment prior to routing to the neutralization basin. Used oil is collected by a contractor for reclamation.)

c)

Steam generator and auxiliary boiler draining following wet layup d)

Non-radioactive secondary waste from condensate polishers e)

Miscellaneous drains/leaks from condenser, steam generator, and secondary components t)

Auxiliary boiler system blowdown g)

Miscellaneous waste streams not otherwise identified elsewhere in this application.

Outfall 005 - HNP Radwastc Treatment System discharge to Outfall 006 The radwaste system is designed to collect, store, process, and release any radioactive or potentially radioactive liquids associated with operation of the nuclear power plant. The waste streams are collected in tanks and sampled for conventional pollutants and radioactivity. The 3

Duke Energy Progress, LLC Harris Nuclear Plant and Harris Energy & Environmental Center National Pollutant Discharge Elimination System Permit Number NC0039586 specific batch treatment is selected based on these analytical results. This allows for selection of the proper treatment processes for each individual batch. Most radwaste streams are treated by the Modular Fluidized Transfer Demineralization System (MFTDS) that uses filtration and ion exchange in a manner that minimizes the production of solid wastes. Boric acid is recycled. The secondary waste system (SWS) is for treating radioactively-contaminated water from the secondary steam cycle system; however, since that system is not normally contaminated, those flows are routed to the normal low-volume waste treatment system after radiological monitoring.

After treatment, the radwaste flows are stored in one of four tanks: the secondary waste sample tank, the treated laundry and hot shower tank, the waste monitor tank, or the waste evaporator condensate tank. After monitoring to verify adequate treatment, the tanks are discharged to the common outfall line.

The cooling tower bypass line provides a flow of lake water for radwaste releases, as regulated by the NRC.

Other BNP Discharges I.

Storm Drains Runoff from parking lots, outside storage areas, roof drains, and other areas on the plant site are collected in storm drains and ultimately routed to release points which discharge to Harris Lake. Flow contributed from those areas is estimated at 8.8 million gallons per month, based on average rainfall of 43 inches per year and a runoff assumption factor of 0.7.

In addition to stormwater, a few miscellaneous sources of water are also intermittently routed to the storm drains. These sources that have a minor contribution to overall storm drain flows are as follows:

a.
b.

Upflow Filter Clearwell System The upflow filter clearwell system has been abandoned in place and no longer has any drains which might discharge to Harris Lake.

Heat exchanger on the demineralizer feedwater It is necessary to heat the source water to the demineralized water treatment system to achieve optimum degassification. To accomplish this, steam is used to heat the feedwater. The condensed steam is discharged to the storm drains that flow to Harris Lake at approximately 5 - l O gallons per minute. This steam could contain trace amounts of hydrazine and ammonia used for chemistry control in the auxiliary boiler steam system. Due to the low flow rate and the long retention 4

Duke Energy Progress, LLC Harris Nuclear Plant and Harris Energy & Environmental Center National Pollutant Discharge Elimination System Permit Number NC0039586 time, the temperature of the condensed steam should be at ambient temperature upon reaching the lake.

c.

Condenser water box drains

d.

Prior to condenser maintenance or repairs 1t 1s sometimes (approximately twice/year) necessary to drain circulating water to the storm drains (approximately 60,000 gallons per condenser per event) that discharge to Harris Lake. This water is monitored for selected cooling tower blowdown parameters.

Filtered water storage and Demin water Storage Tanks Water is treated using a micro-filtration unit for turbidity control and then stored in a tank prior to subsequent filtration (nano-filtration unit) and disinfection.

Occasionally, some water from these tanks may be drained to the stonn drains that discharge to Harris Lake. This water may contain trace amounts of chlorine.

e.

Fire protection system

f.
g.

Approximately 5000 gallons of lake water used for annual testing of the fire protection system is routed to most of the stonn drains that discharge to Harris Lake. In the event of a fire, additional water could be discharged to stonn drains.

Condenser hotwell During outages (approximately once per 18 months) it is necessary to drain the condenser hotwell for condenser maintenance and inspection. Approximately 70,000 gallons of this water resulting from condensed steam is drained to stonn drains that discharge to Harris Lake.

It may contain trace amounts of ethanolamine, JOO ppb or less of boron, and 100 ppb or less ammonia.

Condensate storage tank Infrequently it is necessary to drain the condensate storage tank for maintenance.

Approximately 400,000 gallons per event is drained to stonn drains that discharge to Harris Lake. It may contain 200 ppb or less boron, 1000 ppb or less ammonia, and trace hydrazine.

h.

Air conditioning system condensate The condensate from various building air conditioning systems flows to various stonn drains to Harris Lake. The volume is generally low and is greatest in the humid summer months.

2.
i.
j.

Duke Energy Progress, LLC Harris Nuclear Plant and Harris Energy & Environmental Center National Pollutant Discharge Elimination System Permit Number NC0039586 Service water system strainers Infrequently, when service water strainers located at the makeup pumps from the cooling tower basin are backwashed to remove biofouling organisms or debris, a small volume of service water overflows the basin and runs to the adjacent stonn drain that discharge to Harris Lake.

Maintenance Activities During maintenance activities at the facility it may become necessary to drain all or some portion thereof of the following plant systems; nonnal service water, emergency service water, circulating water, potable water, and demineralized water. Maintenance activities at the facility may also require the hydrostatic flushing of system piping with discharge to the stonn drain system. In addition, the facility may find it necessary to wash equipment with eemiAereli:zee water and discharge to the stonn drains Emergency Service Water System This system primarily provides non-contact cooling water for nuclear safety-related equipment systems and during emergency conditions. The emergency service water system discharges to the auxiliary reservoir which is used as the plant's heat sink during emergency conditions, a feature required by Nuclear Regulatory Commission regulations to provide a reliable supply of cooling water. Under normal operating conditions, the auxiliary and the main reservoirs are isolated from each other; however, the reservoirs may be connected as necessary. In addition to emergency situations, this system is used periodically for to raise auxiliary reservoir basin level, system testing purposes or for containment cooling as needed. This water may contain traces of chemicals identified for the cooling tower blowdown.

Duke Energy Progress, LLC Harris Nuclear Plant and Harris Energy & Environmental Center National Pollutant Discharge Elimination System Permit Number NC0039586 HARRIS ENERGY & ENVIRONMENT AL CENTER The Harris Energy & Environmental Center (HE&EC) includes facilities that provide support services (laboratories and training classrooms) for the HNP and other CP&L operations. The sources of wastewater at the HE&EC are domestic waste. conventional laboratory waste, cooling tower blowdown, and potentially radioactive liquid waste from the radiochemistry and metallurgy laboratories. Additionally, floor drains from several shops and storage buildings are routed to the wastewater treatment facility.

All waste streams, with the exception of the radiological wastewater, receive treatment in the 0.020 MOD wastewater facility.

Components of the treatment facility include a bar screen, submersible pump station as an influent pump station, three treatment ponds, sand filtration, chlorination and dechlorination, as well as the various lift stations for the HE&EC's various buildings. The pond portion of the treatment facility consists of an aerated pond with a minimum retention time of IO days followed by a stabilization pond, also with a minimum retention time of IO days. The third pond is a polishing pond with a minimum 2-day retention time. Effluent from the treatment facility is discharged via the effluent discharge pipe into Harris Lake.

If necessary, sludge from the treatment facility will be removed and land applied by a contractor (a contractor for sludge disposal will be chosen when needed). Because the treatment facility receives industrial type waste as well as domestic type waste, the land application of the mixed sludge meets the exemption conditions stipulated as 40 CFR 503.6 Domestic Waste The maximum domestic waste flow from the HE&EC sanitary facilities is approximately 0.014 MOD. In addition to the approximately 200 permanent employees on the site, the HE&EC, serving as a company training facility and as a visitors' center for the nearby Harris Nuclear Plant, accommodates a fluctuating population (ranging from Oto 450 additional people per day).

Wastewater from the HNP may also be conveyed on private plant roads, to the HE&EC for treatment during times where sanitary flows generated onsite exceed the capacity of the HNP sewage treatment plant.

Laboratory Waste Laboratory waste flow, consisting primarily of rinse water from the chemical, metallurgical, and biological laboratories, is approximately 0.00 I MOD. HE&EC personnel are educated in the proper disposal of laboratory wastes and are encouraged to minimize the use of laboratory drains for chemical disposal. Most laboratory chemical wastes and oily wastes are drummed for off-site disposal.

7

Duke Energy Progress, LLC Harris Nuclear Plant and Harris Energy & Environmental Center National Pollutant Discharge Elimination System Permit Number NC0039586 Stormwater Stonnwater runoff from the HE&EC is composed of laydown yards, training areas, parking Iota, roof, and lawn drainage. This non-industrial stonnwater is not subject to the Phase [ stonnwater regulations of 40 CFR Part 122.

8

Duke Energy Progress, LLC Harris Nuclear Plant National Pollutant Discharge Elimination System Permit Number NC0039586 Form 2C-Section 8-Used or Manufactured Toxics

Duke Energy Progress, LLC Harris Nuclear Plant and Harris Energy & Environmental Center National Pollutant Discharge Elimination System Permit Number NC0039586 Form 2C - Section 8 - Used or Manufactured Toxics Although not added or produced, the following elements could potentially be present in the discharge due to nonnal pipe erosion/corrosion:

Copper Iron Silver Nickel Zinc The following elements could be present in oil which is used to fuel auxiliary boilers:

Antimony Arsenic Beryllium Cadmium Chromium Copper Lead Mercury Nickel Selenium Silver Thallium Zinc The following chemicals are used at the plant site and may be present within the waste treatment system:

Chemical Quantity Frequency Purpose (used per vear, estimate)

Ammonia 2000 gallons As needed pH control Ammonium Bisultite 12,000 gallons Daily Cb removal BETZ FOAMTROL 100 gallons As needed Foam control agent 1440 BETZ Flogard MS6208 1,800 gallons As needed Corrosion control BETZ Depositrol 7,000 gallons As needed Corrosion control PY5200 or BL 5325 BETZ Inhibitor AZ 7,000 gallons As needed Corrosion control 8104 BETZ Spectrus BD Amount varies depending As needed Corrosion control 1500 on biological activity and temperature of makeup water BETZ Flogard MS 9,000 gallons As needed Corrosion control 6222 BETZ Polymer 1192 600 gallons As needed Corrosion control Boron 13, 000 lbs As needed Reactivity control Detergent and Waxes 300 - 400 gallons Weekly Housekeeping

Duke Energy Progress, LLC Harris Nuclear Plant and Harris Energy & Environmental Center National Pollutant Discharge Elimination System Permit Number NC0039586 Ethanolamine 7,000 gallons Daily Corrosion control Hydrazine 1,000 gallons Daily Corrosion control Polyelectrolytes 200 - 300 gallons As needed Water treatment Sodium Carbonate or 200 - 300 lbs As m:eded pH adjustment Bicarbonate Sodium hypochlorite Amount varies depending 4 times/ Day Biocide (15% solution) on biological activity and temperature of makeup water Sodium hydroxide I, I 06,800 lbs As needed pH control and resin (50%)

regeneration Sodium or Potassium I 00 - 200 gallons As needed Corrosion control Molybdate Sodium EDTA I 00 - 200 gallons As needed Corrosion control Sodium or Potassium 500 lbs As needed Corrosion control Nitrite Sulfuric Acid 815,000 lbs As needed pH control and resin regeneration Potassium 200-400 gallons Daily Iron Control Permanganate 50% Citric Acid 200-400 gallons As needed System Cleaning Carbohydrazide As needed Corrosion Control GEBetz AD-20 200-400 gallons As needed System Cleaning GEBetz AK-110 200 -400 gallons As needed System Cleaning GEBetz Kleen MCT-200- 400 gallons As needed System Cleaning 511 GEBetz Kleen MCT-200-400 gallons As needed System Cleaning 103 GEBetz DCL-32 200-400 gallons Daily Chlorine Removal GEBetz Hypersperse 200-400 gallons Daily Membrane Deposit MDC-700 Control GEBetz Flogard POT 200-400 gallons Daily Corrosion Control SOL Zinc Phosphate GEBetz Spectrus 1300 1,440 gallons Daily Non-oxidizing Biocide GEBetz DT 140 I 2,700 gallons Dailv Buffering Agent Potassium Persulfate 100 gallons Daily Analyzer Reagent 0.6 M Phosphoric Acid I 00 gallons Daily Analyzer Reagent 0.6M Nalco 71 D5 Plus I 00 gal/yr As Needed Foam Control Agent 2

Duke Energy Progress, LLC Harris Nuclear Plant and Harris Energy & Environmental Center National Pollutant Discharge Elimination System Permit Number NC0039S86 Nalco 7384 1,800 gal/yr As Needed Corrosion Control Nalco 3DT 120 As needed Dispersant Nalco 3DT 179 7,000 gal/yr As Needed Corrosion Control Nalco 3DT 190 8,000 gal/yr As Needed Deposit Control Nalco 3DT 197 6,000 gal/yr As Needed Corrosion Control Nalco 3DT-198 100 gal/yr As Needed Corrosion Control Nalco 3DT-t99 8,000 gal/yr As Needed Corrosion Control Nalco 3DT-398 6,000 gal/yr As Needed Corrosion Control Nalco 3DT-098 6,000 gal/yr As Needed Corrosion Control Nalco 7357 100 gal/yr As Needed Corrosion Control Nalco 73550 or 7355 t Varies As Needed Biodispersant Nalco 3DTl 85 9,000 gal/yr As Needed Corrosion Control Nalco 8103 PLUS 600 gal/yr As Needed Settling Agent Nalco TRAC I 04 l 00-200 gal/yr As Needed Corrosion Control Nalco TRAC I 02 50-100 gal/yr As Needed Corrosion Control Nalco PC-33 200-400 gal/yr As Needed System Cleaning Nalco PC-87 200-400 gal/yr As Needed System Cleaning Nalco 7408 400-800 gal/yr As Needed Chlorine Removal Nalco PC-191 or PC-200-400 gal Daily Membrane Deposit 191T Control Nalco 7390 200-400 gal Daily Corrosion Control Nalco H-130 1440 gal As Needed Non-oxidizing Biocide Nalco H-550 5 gal As Needed Biocide NalcoCB70 16,000 gal Daily Chlorination Enhancement Nalcol9H 15 gal Daily Corrosion control/Oxygen Scaven2er Nalco Pretect 7080 10 gal Daily Corrosion control 3

Duke Energy Progress, LLC Harris Nuclear Plant National Pollutant Discharge Elimination System Permit Number NC0039586 Form 2C - Section 9.2-Toxicity Test Results

Duke Energy Progress, LLC Harris Nuclear Plant and Harris Energy & Environmental Center National Pollutant Discharge Elimination System Permit Number NC0039586 Form 2C - Section 9.2 - Toxicity Test Results A. Outfall Number Date Type of Test Results 006 02/03/2020 24 Hr Pass/Fail Acute PASS (TGE6Cl 006 05/04/2020 24 Hr Pass/Fail Acute PASS (TGE6C) 006 08/03/2020 24 Hr Pass/Fail Acute PASS (TGE6C) 006 11/02/2020 24 Hr Pass/Fail Acute PASS (TGE6C)

Duke Energy Progress, LLC Harris Nuclear Plant National Pollutant Discharge Elimination System Permit Number NC0039586 Form 2C-Section 10.2-Contract Laboratories

Duke Energy Progress, LLC Harris Nuclear Plant and Harris Energy & Environmental Center National Pollutant Discharge Elimination System Permit Number NC0039586 Form 2C - Section 10.2 - Contract Laboratories Laboratories involved with analyses conducted for Form 2C, Section 7, Table A - Conventional and Non-Conventional Pollutants (including DMRs);

Form 2C, Section 7, Table B - Toxic Metals, Cyanide, Total Phenols, and Organic Toxic Pollutants; Form 2C, Section 7, Table C - Certain Conventional and Non-Conventional Pollutants; and Form 2C, Section 7, Table E - 2,3,7,8 Tetrachlorodibenzo p Dioxin (2,3,7,8 TCDD):

Duke Energy Carolinas, LLC Duke Energy Central Laboratory 13339 Hagers Ferry Road, Mail Code MG03A2 Huntersville, NC 28078 NC DEQ DWR Laboratory Certificate No. 248 Duke Energy Progress, LLC Harris Nuclear Plant Laboratory 5413 Shearon Harris Road New Hill, NC 27562 NC DEQ DWR Laboratory Certificate Nos. 398 & 5145 Pace Analytical Services, LLC 9800 Kincey Avenue, Suite 100 Huntersville, NC 28078 NC DEQ DWR Laboratory Certificate Nos. 12, 40 & 67 Environmental Testing Solutions, Inc.

351 Depot Street Asheville, NC 28801 NC DEQ DWR Laboratory Certificate Nos. 037 & 600 GEL Laboratories, LLC 2040 Savage Road Charleston, SC 29407 NC DEQ DWR Laboratory Certificate No. 233