Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20259A21014 September 2020Updated Final Safety Analysis Report, Chapters 3 Through 5, Figures
ML20259A21114 September 2020Updated Final Safety Analysis Report, Chapter 11, Figures
ML20259A20814 September 2020Updated Final Safety Analysis Report, Chapter 1, Figures
ML20259A20914 September 2020Updated Final Safety Analysis Report, Chapter 2, Figures
IR 05000247/201600921 November 2016Davis-Besse Nuclear Power Station, Unit 1, Revision 31 to Updated Final Safety Analysis Report, Drawing E-0058B, Rev 12, Sheet 0015A
NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Figures19 September 2016Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Figures
ML16280A16819 September 2016Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings
NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings19 September 2016Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings
NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Figures19 September 2016Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Figures
NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Drawings19 September 2016Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Drawings
NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Figures19 September 2016Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Figures
NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing19 September 2016Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing
NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Figures19 September 2016Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Figures
NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings19 September 2016Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings
NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Figures19 September 2016Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, FiguresLoop seal
NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System19 September 2016Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant SystemHot Short
Safe Shutdown
Boric Acid
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Earthquake
Fuel cladding
Liquid penetrant
Unidentified leakage
Unidentified leak
Power Uprate
NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures19 September 2016Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures
NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures19 September 2016Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures
ML16280A18919 September 2016Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing
ML16280A19419 September 2016Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Figures
ML16280A19219 September 2016Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Drawings
ML16280A19519 September 2016Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings
ML16280A18819 September 2016Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Figures
ML16280A19119 September 2016Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Figures
ML16280A19719 September 2016Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Figures
ML16280A16519 September 2016Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures
ML16280A16719 September 2016Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, FiguresLoop seal
ML16280A16019 September 2016Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures
ML16280A16619 September 2016Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant SystemHot Short
Safe Shutdown
Boric Acid
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Earthquake
Fuel cladding
Liquid penetrant
Unidentified leakage
Unidentified leak
Power Uprate
NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings17 September 2014Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings
NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures17 September 2014Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures
NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings17 September 2014Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings
NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures17 September 2014Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures
NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures17 September 2014Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures
NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings17 September 2014Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings
NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures17 September 2014Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures
ML14287A34317 September 2014Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings
ML14287A35617 September 2014Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures
ML14287A35117 September 2014Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings
ML14287A35017 September 2014Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures
ML14287A34817 September 2014Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings
ML14287A34717 September 2014Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures
ML14287A34217 September 2014Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures
ML11236A2266 October 2010Partially Released Updated Final Safety Analysis Report for Indian Point Unit 2. (Redacted Information: Figures 5.1-2, 5.1-3, 5.1-4, 5.1-5, 5.1-6 & 5.1-7 Are All Plant Drawings). Table of Contents - Chapter 7, Page 18 of 108
ML11236A2276 October 2010Partially Released Updated Final Safety Analysis Report for Indian Point Unit 2. (Redacted Information: Figures 5.1-2, 5.1-3, 5.1-4, 5.1-5, 5.1-6 & 5.1-7 Are All Plant Drawings). Chapter 7, Page 19 of 108 - Chapter 14 Figure 14.3-129
ML1012603796 May 2010Drawing No. A205454, Revision 4, Containment Building Restraint & Support Design, Line 351.
ML1000402914 January 2010Chemical and Volume Control System - Sheet 1, Figure 9.2-1Boric Acid
ML11083A0546 March 2009Lr Hearing - Slides from ACRS Subcommittee Meeting on March 4, 2009Fire Barrier
Aging Management
Fire Protection Program
Scaffolding
NL-08-074, Amendment 4 to License Renewal Application (LRA) Letter Dated April 30, 2008 from Entergy Nuclear Northeast (NL-08-074)30 April 2008Amendment 4 to License Renewal Application (LRA) Letter Dated April 30, 2008 from Entergy Nuclear Northeast (NL-08-074)
ML09040089529 February 2008No. 3 Nuclear Power Plant - Electrical Distribution & Transmission System Diagram