ML20247R732
| ML20247R732 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 07/25/1989 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20247R704 | List: |
| References | |
| 50-413-89-16, 50-414-89-16, NUDOCS 8908080093 | |
| Download: ML20247R732 (1) | |
Text
.,~e.
'f e
a-I'i ENCLOSURE 2 l
NOTICE OF DEVIATION l
Duke Power Company Docket Nos.
50-413, 50-414'
- Catawba Nuclear Station License Nos. NPF-35 and NPF-52 i
Units 1 and 2 The following deviation was' identified during a Nuclear Regulatory Commissien a
(NRC) inspection conducted on May 28 - July 1, 1989.
l The Catawba Nuclear Station Final Safety' Analysis _ Report (FSAR)_ Section 9.5.1.3 states that a comprehensive safety evaluation of the Fire Protection System was performed in the Response to Appendix A to Branch Technical Position 9.5-1.
The Catawba Nuclear; Station Response ~ to-Appendix A to Branch Technical fosition i,C-1, section E.2 states that fire pumps and fire pump power supplies arc arranged in accordance with the intent. of hational Fire -
Protection Association-('NFPA) 20.
NFPA 20 section 11-3.1 requires that flow tests of fire pumps shall be performed tn determine their ability to attain satisfactory performance at shutoff, rated and peak loads.
Contrary to the abov6, PT/0/A/4400/01A, - Exterior Fire Protection Functional Capability Test, which is used by the licensee to perform flow tests on the fire pucps, does. not test. the pumps to determir3e. their; ability to attain satisfactory performance at shutoff.
Please provide to the U.S. Nuclear Regulatory Commission, ATTN:-. Document
~j Control Desk, Washington, DC.20555,_with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector, in writing within 30 days.
of the date of this Notice, the reasons for the deviation, the corrective' steps i
which have been taken'and the results achieved, the' corrective steps which will l
be taken to avoid further deviations, and the date when your corrective ' action
]
will be completed.
Where good cause is shown, consideration will be given to extending the response time.
~
)
FOR THE NUCLEAR REGULATORY COMMISSION hL b
Alan R. Herdt, Chief._
Reactor Projects Branch 3 i
Division of Reactor Projects i
i Dated at Atlanta, Georgia this 25th day of July 1989 890808o093 890725 i
ADOCK0500g3 PDR 0
- _.