| Issue date: | 06/16/1989 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Creel G BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML20245F253 | List: |
| References | |
| NUDOCS 8906280070 | |
| Download: ML20245F249 (2) | |
See also: IR 05000317/1989012
Text
_
_
_-
-
- - -
--
- ~
-
--
7--- =
g)
N
,
,
.
.
.
,
- o
.
} h_ . '
N. ;
'
[
J. ;
-
,
-
l
t
v,
.
-
L
~JUN 161989
l
9'
Docket No.'50-317,
150-318-
- Baltimore Gas.and Electric Company
-
ATTN:1 Mr. George C. Creel-
Vice President'
Nuclear Energy
.
. Calvert Cliffs Nuclear Power Plant-
L
.MD Rts 2 & 4,.P.O. Box 1535
Lusby, Maryland 20657f
iJ
Gentlemen:
f
Subject: NRC Inspection No. 50-317/89-12 and 50-318/89-12
i
This letter refers to the routine safety; inspection conducted by Mr.'R. K. Mathew:
of this office _on.May 1-5, 1989, at the Calvert Cliffs Units 1 and 2, Lusby,_
Maryland of activities authorized by NRC License Nos. DPR-53 and DPR-69 and to
,
the discussions of o'ur findings held by Mr. Mathew with Mr. L.: Russell at the.-
conclusion of the. inspection.
Peas.' examined during this inspection are described in the NRC Region 1
' '
inspection Report which is enclosed with this letter. Within.these areas, the
,
L
inspection' consisted of selective examinations ~of procedures and~ representative
L
. records,. interviews with personnel, and observations by the. inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance _with NRC requirements,'as set
forth in.the Notice of Violation, enclosed herewith as' Appendix A.
These vio--
lations~have been categorized by severity. level in iccordance'with the " General
. Statement of Policy and Procedure for NRC Enforcement Actions, "10 CFR Part 2,
Appendix C (Enforcement Policy)." You are required tn respond to this letter
and in preparing your response, you should follow the instructions in Appendix A.
In addition, it is important that proper management attention be given to the
MOV maintenance program deficiencies identified in this report. We understand
th'at you are in- the process of implementing a new program to address current
deficiencies. During the inspection, your staff agreed to provide the NRC a
written description of plans to upgrade the MOV maintenance programs.
L
'
OFFICIAL RECORD COPY
CIR CC 89-12 - 0001.0.0
06/16/89
9906280070 890616
lI
gDR
ADOCK0500g7
3'.Q l
c
.- .
_
_ _ . __ __
_
_
l
.
-
. _ _ _ _ _ _ _ _
._
_
__ _ _ .
_ _ _ _ _ _ _ _ _ _ -
. . ,
'JUN 161989
.
,
' Baltimore Gas'and Electric Company
2
<
Your cooperation with us in this matter is appreciated.
Sincerely,
Original Signed By:
Jcck R. Strosnider
Jacque P. Durr, Chief
Engir.eering Branch
Division of Reactor Safety
Enclosures:
1.
Appendix A, Notice of Violation
2.
Combined NRC Region I Inspection Report Number 50-317/89-12 and
50-318/89-12
cc w/ enc 1:
W. J. Lippold, General Supervisor, Technical Services Engineering
T. Magette, Administrator, Nuclear Evaluations
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maryland (2)
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
J. Wiggins, DRP
L. Tripp, DRP
D. Limroth, DRP
P. Wilson, DRP
R. Bores, DRSS
S. McNeil, NRR
PA0 (14) SALP Reports Only
(, $ b l
Cf
RI: RS
RI:DRS
RI:DRS
Matbew/geb/rw
Anderson
Durr
6//G'/89
6//4/89
6/ /k89
0FFICIAL RECORD COPY
CIR CC 89-12 - 0001.1.0