Letter Sequence Other |
---|
|
|
MONTHYEARML20245D5701988-08-15015 August 1988 Technical Evaluation Rept of Dcrdr for Public Svc Electric & Gas Co Hope Creek Generating Station Project stage: Other 1988-08-15
[Table View] |
|
---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20199B2251997-09-10010 September 1997 Proposed Resolution Approach NRC Bulletin 96-03 Hope Creek Generating Station Technical Evaluation Report ML20107K0161995-12-31031 December 1995 TER of Hope Creek Nuclear Station IPE Back End Submittal, Final Rept ML20107K0231995-12-27027 December 1995 TER of IPE Submittal Human Reliability Analysis, Final Rept ML20107J9961995-12-20020 December 1995 TER on IPE Front End Analysis ML18101A3751994-11-30030 November 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:Hope Creek & Salem-1/2. ML20126M1861992-12-31031 December 1992 High Pressure Coolant Injection System RISK-BASED Inspection Guide for Hope Creek ML20099C0281992-07-21021 July 1992 Rev 1 to Topical Rept GENE-770-06-1, Bases for Changes to Surveillance Test Intervals & Allowed Out-Of-Svc Times for Selected Instrumentation TS, Technical Evaluation Rept ML20085C1721991-08-26026 August 1991 Final Rept SAIC-91/6662, Technical Evaluation Rept,Hope Creek Generating Station,Station Blackout Evaluation ML20079A0201990-08-31031 August 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Hope Creek Generating Station ML19324A9101989-10-31031 October 1989 Revised Final Technical Evaluation Rept on Response from Pse&G to Generic Ltr 88-01 Pertaining to Hope Creek Generating Station. ML19332B5851989-09-30030 September 1989 Conformance to Generic Ltr 83-28 Item 2.2.1--Equipment Classification for All Other Safety-Related Components:Hope Creek. ML20246B8151989-04-30030 April 1989 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept ML20245D5701988-08-15015 August 1988 Technical Evaluation Rept of Dcrdr for Public Svc Electric & Gas Co Hope Creek Generating Station ML20150C6411987-12-31031 December 1987 Technical Evaluation Rept for Evaluation of Offsite Dose Calculation Manual,Rev 8 ML20237B4701987-11-30030 November 1987 Technical Evaluation Rept on First 10-Yr Interval Insp Program Plan:Pse&G,Hope Creek Generating Station,Docket 50-354, Informal Rept ML20214S2791987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Hope Creek, Informal Rept ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20140D5751986-01-29029 January 1986 Review of Hope Creek Tech Specs, Technical Review Rept ML20136G8631985-11-30030 November 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,Hope Creek Unit 1 ML20138P6561985-10-30030 October 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Hope Creek Nuclear Station,Unit 1, Technical Evaluation Rept ML20205D3621985-09-30030 September 1985 Audit of Pump & Valve Operability Assurance Program for Hope Creek Generating Station ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities 1997-09-10
[Table view] Category:QUICK LOOK
MONTHYEARML20199B2251997-09-10010 September 1997 Proposed Resolution Approach NRC Bulletin 96-03 Hope Creek Generating Station Technical Evaluation Report ML20107K0161995-12-31031 December 1995 TER of Hope Creek Nuclear Station IPE Back End Submittal, Final Rept ML20107K0231995-12-27027 December 1995 TER of IPE Submittal Human Reliability Analysis, Final Rept ML20107J9961995-12-20020 December 1995 TER on IPE Front End Analysis ML18101A3751994-11-30030 November 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:Hope Creek & Salem-1/2. ML20126M1861992-12-31031 December 1992 High Pressure Coolant Injection System RISK-BASED Inspection Guide for Hope Creek ML20099C0281992-07-21021 July 1992 Rev 1 to Topical Rept GENE-770-06-1, Bases for Changes to Surveillance Test Intervals & Allowed Out-Of-Svc Times for Selected Instrumentation TS, Technical Evaluation Rept ML20085C1721991-08-26026 August 1991 Final Rept SAIC-91/6662, Technical Evaluation Rept,Hope Creek Generating Station,Station Blackout Evaluation ML20079A0201990-08-31031 August 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Hope Creek Generating Station ML19324A9101989-10-31031 October 1989 Revised Final Technical Evaluation Rept on Response from Pse&G to Generic Ltr 88-01 Pertaining to Hope Creek Generating Station. ML19332B5851989-09-30030 September 1989 Conformance to Generic Ltr 83-28 Item 2.2.1--Equipment Classification for All Other Safety-Related Components:Hope Creek. ML20246B8151989-04-30030 April 1989 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept ML20245D5701988-08-15015 August 1988 Technical Evaluation Rept of Dcrdr for Public Svc Electric & Gas Co Hope Creek Generating Station ML20150C6411987-12-31031 December 1987 Technical Evaluation Rept for Evaluation of Offsite Dose Calculation Manual,Rev 8 ML20237B4701987-11-30030 November 1987 Technical Evaluation Rept on First 10-Yr Interval Insp Program Plan:Pse&G,Hope Creek Generating Station,Docket 50-354, Informal Rept ML20214S2791987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Hope Creek, Informal Rept ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20140D5751986-01-29029 January 1986 Review of Hope Creek Tech Specs, Technical Review Rept ML20136G8631985-11-30030 November 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,Hope Creek Unit 1 ML20138P6561985-10-30030 October 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Hope Creek Nuclear Station,Unit 1, Technical Evaluation Rept ML20205D3621985-09-30030 September 1985 Audit of Pump & Valve Operability Assurance Program for Hope Creek Generating Station ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities 1997-09-10
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20199B2251997-09-10010 September 1997 Proposed Resolution Approach NRC Bulletin 96-03 Hope Creek Generating Station Technical Evaluation Report ML20107K0161995-12-31031 December 1995 TER of Hope Creek Nuclear Station IPE Back End Submittal, Final Rept ML20107K0231995-12-27027 December 1995 TER of IPE Submittal Human Reliability Analysis, Final Rept ML20107J9961995-12-20020 December 1995 TER on IPE Front End Analysis ML18101A3751994-11-30030 November 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:Hope Creek & Salem-1/2. ML20126M1861992-12-31031 December 1992 High Pressure Coolant Injection System RISK-BASED Inspection Guide for Hope Creek ML20099C0281992-07-21021 July 1992 Rev 1 to Topical Rept GENE-770-06-1, Bases for Changes to Surveillance Test Intervals & Allowed Out-Of-Svc Times for Selected Instrumentation TS, Technical Evaluation Rept ML20085C1721991-08-26026 August 1991 Final Rept SAIC-91/6662, Technical Evaluation Rept,Hope Creek Generating Station,Station Blackout Evaluation ML20079A0201990-08-31031 August 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Hope Creek Generating Station ML19324A9101989-10-31031 October 1989 Revised Final Technical Evaluation Rept on Response from Pse&G to Generic Ltr 88-01 Pertaining to Hope Creek Generating Station. ML19332B5851989-09-30030 September 1989 Conformance to Generic Ltr 83-28 Item 2.2.1--Equipment Classification for All Other Safety-Related Components:Hope Creek. ML20246B8151989-04-30030 April 1989 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept ML20245D5701988-08-15015 August 1988 Technical Evaluation Rept of Dcrdr for Public Svc Electric & Gas Co Hope Creek Generating Station ML20150C6411987-12-31031 December 1987 Technical Evaluation Rept for Evaluation of Offsite Dose Calculation Manual,Rev 8 ML20237B4701987-11-30030 November 1987 Technical Evaluation Rept on First 10-Yr Interval Insp Program Plan:Pse&G,Hope Creek Generating Station,Docket 50-354, Informal Rept ML20214S2791987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Hope Creek, Informal Rept ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20140D5751986-01-29029 January 1986 Review of Hope Creek Tech Specs, Technical Review Rept ML20136G8631985-11-30030 November 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,Hope Creek Unit 1 ML20138P6561985-10-30030 October 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Hope Creek Nuclear Station,Unit 1, Technical Evaluation Rept ML20205D3621985-09-30030 September 1985 Audit of Pump & Valve Operability Assurance Program for Hope Creek Generating Station ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities 1997-09-10
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20199B2251997-09-10010 September 1997 Proposed Resolution Approach NRC Bulletin 96-03 Hope Creek Generating Station Technical Evaluation Report ML20107K0161995-12-31031 December 1995 TER of Hope Creek Nuclear Station IPE Back End Submittal, Final Rept ML20107K0231995-12-27027 December 1995 TER of IPE Submittal Human Reliability Analysis, Final Rept ML20107J9961995-12-20020 December 1995 TER on IPE Front End Analysis ML18101A3751994-11-30030 November 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:Hope Creek & Salem-1/2. ML20126M1861992-12-31031 December 1992 High Pressure Coolant Injection System RISK-BASED Inspection Guide for Hope Creek ML20099C0281992-07-21021 July 1992 Rev 1 to Topical Rept GENE-770-06-1, Bases for Changes to Surveillance Test Intervals & Allowed Out-Of-Svc Times for Selected Instrumentation TS, Technical Evaluation Rept ML20085C1721991-08-26026 August 1991 Final Rept SAIC-91/6662, Technical Evaluation Rept,Hope Creek Generating Station,Station Blackout Evaluation ML20079A0201990-08-31031 August 1990 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Hope Creek Generating Station ML19324A9101989-10-31031 October 1989 Revised Final Technical Evaluation Rept on Response from Pse&G to Generic Ltr 88-01 Pertaining to Hope Creek Generating Station. ML19332B5851989-09-30030 September 1989 Conformance to Generic Ltr 83-28 Item 2.2.1--Equipment Classification for All Other Safety-Related Components:Hope Creek. ML20246B8151989-04-30030 April 1989 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept ML20245D5701988-08-15015 August 1988 Technical Evaluation Rept of Dcrdr for Public Svc Electric & Gas Co Hope Creek Generating Station ML20150C6411987-12-31031 December 1987 Technical Evaluation Rept for Evaluation of Offsite Dose Calculation Manual,Rev 8 ML20237B4701987-11-30030 November 1987 Technical Evaluation Rept on First 10-Yr Interval Insp Program Plan:Pse&G,Hope Creek Generating Station,Docket 50-354, Informal Rept ML20214S2791987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Hope Creek, Informal Rept ML20245A4481986-09-30030 September 1986 Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 ML20140D5751986-01-29029 January 1986 Review of Hope Creek Tech Specs, Technical Review Rept ML20136G8631985-11-30030 November 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,Hope Creek Unit 1 ML20138P6561985-10-30030 October 1985 Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Hope Creek Nuclear Station,Unit 1, Technical Evaluation Rept ML20205D3621985-09-30030 September 1985 Audit of Pump & Valve Operability Assurance Program for Hope Creek Generating Station ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities 1997-09-10
[Table view] |
Text
_. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
l i
SAIC-88/3031 5 t TECHNICAL EVALUATION REPORT OF THE I
DETAILED CONTROL ROOM DESIGN REVIEW
'g !' FOR W PUBLIC SERVICE ELECTRIC AND GAS COMDANY'S i HOPE CREEK GENERATING STATION !
l TAC NO. 65228 !
A
\
August 15, 1988 5AIC E
4 Prepared for:
U.S. Nuclear Regulatory Comission Washington, D.C. 20555 Contract NRC-03-82-096 Task Order No. 19 E
E 1
E g .-~e. ,,, - .-.<- ---
(6Foas02vdA
L l
[
.I ~
TABtE OF CONTENTS i l
l I Section Eggg l 1.0 g INTRODUCTION ............................................... I 2.o E m u m oN ................................................. 2 l
2.1 Establishment of a Qualified Multidisciplinary )
Review Te:A ........................................... 2 j l 2.2 System Function and Task Analysis ..................... 2 2.3 Comparison of Display and Control Requirements !'
With a Control Room Inventory ......................... 2 2.4 Control Room Survey ................................... 3 l 2.5 Assessment of Human Engineering Discrepancies (HEDs) to Determine Which Are Significant and Should Be Corrected ................................... 3 2.6 Selection of Design Improvements ...................... 3 2.7 Verification That Selected Design Improvements I Will Provide the Necessary Correction ............ .... 5 2.8 Verification That Selected Design Improvements 1 Will Not Introduce New HEDs ........................... 5 2.9 Coordination of Control Room Improvements With I Changes From Other Improvement Programs, Such as the Safety Parameter Display System, Operator Training, Regulatory Guide 1.97 Instrumentation, and Upgraded Emergency Operating Procedures ............... 6 3.o CoNCtuSloNS ................................................ e l
4.0 REFERENCES
................................................. 7 I
I I
I ii I
i
L g...
1 TECHNICAL EVALUATION REPORT 0F THE I DETAILED CONTROL ROOM DESIGN REVIEW FOR l PUBLIC SERVICE ELECTRIC AND GAS COMPANY'S HOPE CREEK GENERATING STATION I
1.0 INTRODUCTION
Public Service Electric and Gas Company submitted a Sumary Report for g the Hope Creek Generating Station to the Nuclear Regulatory Comission (NRC) on August 6, 1984 (Reference 1). The NRC reviewed the Sumary Report and a preimplementation audit was conducted from November 13 to 15, 1984. Certain analyses were not completed when the Sumary Report was submitted and the licensee comitted to documenting the completion of these activities in g supplemental reports. In a letter to the NRC dated December 6, 1986 (Reference 2), the licensee also documented comitments made during the preimplementation audit.
The licensee has thus far submitted three DCRDR Supplemental Reports.
l DCRDR Supplemental Report I, submitted on December 27, 1985 (Reference 3),
presented a sumary of tasks completed and the status of Hope Creek 4
Generating Station with respect to each comitment. The staff's DCRDR Safety Evaluation Report for Hope Creek Generating Station was forwarded to the licensee in April, 1986 (Reference 4). Results of tasks remaining to be l completed after submission of Supplemental Report I were incorporated into Supplemental Report II (Reference 5), dated November 6,1986.
Following the submittal of the Supplemental Reports I and II, one DCRDR analysis comitment and several followap tasks remair.od to be performed in order to meet the DCRDR requirements of NUREG 0737, h pplement 1 (Reference 5). The comitment, as stated in Supplemental Safety Evaluation Report 1, g Appendix I, page 13, (Reference 7) was to resolve "...HED A69 by doing a study of zone markings and reporting the results to the NRC one year after fuel load." On April 23, 1987, the licensee submitted Supplemental Report I III (Reference 8) which documented the completion of the zone marking study, I I I
at well as follow-up tasks performed to complete commitments addressed in l
Supplemental Reports I and II.
Science Applications International Corporation reviewed Supplemental l Report III with respect to the nine DCROR requirements specified in NUREG-0737, Supplement 1, and the criteria in NUREG-0800 (Reference 9). This Evaluation Report reflects the I Technical consolidated findings, rad conclusions of the teview team members.
observations, l 2.0 EVALUATION g The purpose cf the evaluation was to determine whether the nine DCRDR requirements in NUREG-0737, Supplement I had been satisfied. The evaluation was performed by comparing the information provided by Pubile Service Electric and Gas Company with the criteria in NUREG-0800, Section 18.1, Revision 0, Appendix A of the Standard Review Plan. The reviewers' l evaluation of the DCRDR for the Hope Creek Generating Station is provided below.
2.1 Establishment of a Multidisciolinary Review Team l It is the review team's judgment that Public Service Electric and Gas Company has met the NUREG-0737, Supplement I requirement for establishment of a qualified multidisciplinary review team.
2.2 System Function and T nk Analysil It is the review team's judgment that Public Service Electric and Gas Company meets the NUREG-0737, Supplement I requirement for a function and task analysis to identify control room operator tasks and information and control require:nents during emergency operations.
2.3 Comoarison of Disolav and Control Reagirements with a Control Room Inventorv l It is the review team's judgment that Public Service Electric and Gas I Company meets the NUREG-0737, Supplement I requirement for a comparison of l display and control requirements with the control room inventory. )
i 2
I
i I 2.4 Control Room Survey It is the review team's judgment that Public Service Electric and Gas
{
Company meets the NUREG-0737, Supplement I requirement for a control rnom l survey to identify deviations from accepted human factors principles.
I 2.5 Assessment of Human Enoineerino Discrepancies to Determine Which Are Significant and Should Be Corrected It is the review tet.a's judgment that Public Service Electric and Gas i Company meets the NUREG-0737, Supplement I requirement for an assessment of g HEDs to determine which are significant and snould be corrected.
2.6 Selection of Desion Improvements As stated earlier, following the submittal of Supplemental Reports I g and II, the licensee had one analysis commitment, regarding zone markings on control room instrumentation, which remained open. In Supplemental Report III tne licensee discussed the methodology and results of the zone marking I study. The method used to establ.a.h appropriate zone marking consisted of the following five tasks:
I 1. Identification of applicable instrumentation
- 2. Establishment of conventions and standards
- 3. Determination of appropriate ranges for zone markings
- 4. Conduct of a trial implementation ard operator evaluation l S. Verification that the final zone marking solutions complied with established human factors principles 4 As a result of the analysis, zone marking was permanently applied to 257 instruments. No new HEDs were identified, nor were any problems identified by operators in using the zone markings.
In addition to the remaining analysis commitment, the licensee also provided information regarding the additional requirements to complete three E
3 I
l
l.' l tasks previously reported in Supplemental Reports I and II. The tasks and their results are described below. I
- 1. HED Q7 and HED Q8: These illumination HEDs were omitted from 'the Supplemental Report II Review Findings. These HEDs were both assessed as Category 4 HEDs ated no corrective action is planned.
Adequate justification was provided for the lack of corrective action.
- 2. The review of the implementation of 85 HED corrections resulted in I the reassessment of two HEDs. HED A25 identified a concern with discriminating the function of indicator lights and pushbuttons on the turbine panel (D Console). The original disposition stated I that this HED would be corrected; however, upon reassessment the l revised disposition is that no correction is planned for this HED.
The licensee adequately justified the revised disposition by j
stating that: indicator lights and pushbuttons are clearly labeled, the red and green color c.onventions of turbine panel status lights are followed throughout the control room, and that
{
because procedures direct the operator in use of this panel, there is low probability for operator error.
HED A4 stated that legend pushbuttcns and indicator lights exceed g three lines of lettering. The original disposition stated that 4 this HED would be corrected. The revised disposition stated that no correction is planned for this HED. Adequate justification for l not correcting this HED was provided by explaining that the specific indicators in question have a larger surface area than most Hope Creek indicators and thus have sufficient area to include more than three lines of lettering, as well as larger lettering. In addition, the licensee stated that if the information appearing on these indicators were to be condensed, the message would no longer be meaningful.
I 3. The Safety Parameter Display System (SPDS) was removed from the Control Room Integrated Display System (CRIDS) in order to meet I the minimum requirements for SPDS. The licensee stated that the SPDS is being revised, and, as part of the new design, a human I 4 I
M factors evaluation using NUREG-0700 guidelines will be conducted.
The results of the final review of the SPDS will be submitted to the NRC upon completion of the SPDS.
CRIDS HEDs were reviewed for potential changes to the dispositions as a result of removing the SPDS. Reassessment was conducted for the following four CRIDS HEDs using the method as documented in the Summary P.eport: M5, M22, M41, and M50. All four were assessed as Category 4 HEDs. Originally, all four were to be corrected. The revised dispositions state that HEDs M5 and M50 will be partially corrected, and that no correction is planned for HEDs M22 and M41. Adequate justification was provided for each of the revised dispositions.
It is the review team's judgment that the Public Service Electric and Gas Company meets the NUREG-0737, Supplement I requirement for selection of design improvements.
2.7 Verification that Selected Desian Improvements Will Provide the Necessary Correction it is the review team's judgment that the Public Service Electric and Gas Company meets the NUREG-0737, Supplement I requirement for verification that selected improvements will produce the necessary correction.
2.8 Verification that Selected Desion Improvements Will Not Introduce New I It is the review team's judgment that the Public Service Electric and g Gas Company meets the NUREG-0737, Supplement I requirement for verification T that the selected improvements do not introduce new HEDs.
t '
5
~
I 2.9 Coordination of Control Room Improvements With Chanaes From Other g Proarams, such as the Safety Parameter Disolav System. Doerator su Trainino. Reaulatory Guide 1.97 Instrumentation. and Uoaraded Emeraency ODeratino Procedures It is the review team's judgment that the Public Service Electric and Gas Company meets the NUREG-0737, Supplement I requirement for coordination of the DCRDR with other Supplement 1 improvement programs such as SPDS, i operator training, Regulatory Guide 1.97 instrumental %n, and upgraded E0Ps. I
3.0 CONCLUSION
S Public Service Electric and Gas Company submitted a Sumary Report for the Hope Creek Generating Station to the NRC on August 6, 1984. The NRC reviewed the Sumary Report and a preimplementation audit was conducted from November 13 to 15, 1984. Certain analyses were not completed when the l Sumary Report was submitted and the licensee comitted to documenting the r completion of these activities in supplemental reports. In addition, the licensee also documented comitments made during the preimplementation audit
)
in a letter to the NRC dated December 6, 1986. On December 27, 1985, and j November 6, 1986, the licensee submitted, respectively, Supplemental Reports )
I and II. The licensee submitted Supplemental Report III on April 23, 1987, l which documented the results of the final analysis comitment and additional j follow-up tasks performed to complete comitments addressed in Supplemental
{
Reports I and II.
l Science Applications International Corporation reviewed Supplemental Report III with respect to the nine DCRDR requirements specified in NUREG-0737, Supplement 1. This Technical Evaluation Report reflects the I consolidated observations, findings, and conclusions of the review team members. The review team found that Public Service Electric and Gas Company I has met all nine DCRDR requirements.
- 1 I ; 6
_ _ _ _ _ _ - - - - - - - - - - - - 4
4.0 REFERENCES
- 1. " Detailed Control Room Design Review Final Summary Report for Hope Creek Generating Station," Letter from PSE&G to NRC, August 6, 1984.
- 2. Letter from PSE&G to NRC, December 6, 1986.
- 3. "DCRDR Supplemental Report I," Letter from PSE&G to NRC, December 27, 1985.
- 4. NUREG-1048, Supplement No. 5, " Safety Evaluation Report Related to the g Operation of Hope Creek Generating Station," U.S. NRC, April, 1986.
- 5. "DCRDR Supplemental Report II," Letter from PSE&G to NRC, November 6, E 1986.
- 6. NUREG-0737, Supplement 1, " Requirements for Emergency Response Capability" (Generic Letter No. 82-33), Dece.mber 17, 1982.
- 7. " Supplemental Safety Evaluation Report 1," Letter from NRC to PSE&G.
- 8. "DCRDR Supplemental Report III," Letter from PSE&G to NRC, April 23, 1987.
- 9. NUREG-0800, " Standard Review Plan," Section 18.1, " Control Room," and Appendix A, " Evaluation Criteria for Detailed Control Room Design Reviews (DCRDR)," September 1984.
7
_ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _