Text
_
03GhINElfT S15HBE l.
03fN.IMENT IEhKAGE Iaxrrnc rnenwrnr FaR OMWPION
/
3.6.1.2 Containment leakage ratts shall be limited to:
An overall integrated rate of 5 Ig, 0.25 percent by weight of the a.
containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at 2 P, 53.3 psig.
a b.
A canbined leakage rate of 5 0.60 In for all' penetrations and valves subject to Type B and C tests, when pressurized to 2 P -
a APPLICABII2TY: IO[ES 1, 2, 3 and 4.
AcrIW:
With either (a) the measured overall integrated containment leakage rate ave,aaMng 0.75 Ig or (b) with the measured crmbined' leakage rate for all pua::Lations and valves subject to Type B and C tests avr'aMLng 0.60 I,
g restore the leakaga rate (s) to within the limit (s) prior to increasing the Reactor Coolant System temperature above 200*F.
-, aanm
..c_m 4.6.1.2
'1he containment leakage rates shall be h.---Lated at the following test scharhile and shall be determined in conformance with the criteria j
specified in Appendix J of 10 CFR 50:
I Ihree Type A tests (overall Integrated Containment Isakage Rate) a.
shall be carv*v+M at 40 10 month intervals during shutdown at 2P, 53.3 psig, during each lO-year service period.
The third a
test of eacti set shall be conducted durb, dm dutdown for the lO-year plant inservice inspecticn.
8906260272 890622 DR ADDCK 05000302 PNU CRY RIVER - UNIT 3 3/4 6-2 Aii==diinui No.
.