Proposed Tech Specs Re Containment Leakage Tests
ML20245C750
Person / Time
Site: Crystal River 
Issue date: 06/12/1989
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20245C733 List:
References
NUDOCS 8906260272
Download: ML20245C750 (1)


Text

_

03GhINElfT S15HBE l.

03fN.IMENT IEhKAGE Iaxrrnc rnenwrnr FaR OMWPION

/

3.6.1.2 Containment leakage ratts shall be limited to:

An overall integrated rate of 5 Ig, 0.25 percent by weight of the a.

containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at 2 P, 53.3 psig.

a b.

A canbined leakage rate of 5 0.60 In for all' penetrations and valves subject to Type B and C tests, when pressurized to 2 P -

a APPLICABII2TY: IO[ES 1, 2, 3 and 4.

AcrIW:

With either (a) the measured overall integrated containment leakage rate ave,aaMng 0.75 Ig or (b) with the measured crmbined' leakage rate for all pua::Lations and valves subject to Type B and C tests avr'aMLng 0.60 I,

g restore the leakaga rate (s) to within the limit (s) prior to increasing the Reactor Coolant System temperature above 200*F.

-, aanm

..c_m 4.6.1.2

'1he containment leakage rates shall be h.---Lated at the following test scharhile and shall be determined in conformance with the criteria j

specified in Appendix J of 10 CFR 50:

I Ihree Type A tests (overall Integrated Containment Isakage Rate) a.

shall be carv*v+M at 40 10 month intervals during shutdown at 2P, 53.3 psig, during each lO-year service period.

The third a

test of eacti set shall be conducted durb, dm dutdown for the lO-year plant inservice inspecticn.

8906260272 890622 DR ADDCK 05000302 PNU CRY RIVER - UNIT 3 3/4 6-2 Aii==diinui No.

.