Notice of Violation from Insp on 890501-05 & 15-19.Violation Noted:No Test Procedures Found for Routine Calibr of Following Instrumentation Used to Verify Equipment Operability
ML20244C797
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/08/1989
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20244C796 List:
References
50-298-89-19, NUDOCS 8906150142
Download: ML20244C797 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _

e APPENDIX A NOTICE OF VIOLATION Nebraska Public Power District Docket:

50-298 Cooper Nuclear Station Operating License: DPR-46 During an NRC inspection conducted during the periods of May 1-5 and 15-19, 1989, a violation of NRC requirements was identified. The violation involved the failure to properly calibrate instrumentation utilized in system or component testing and operation.

In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the violation is listed below:

Technical Specifications (TS) 6.3.3.D requires test procedures for the routine calibration of instrumentation used to verify equipment operability.

Contrary to the above, there were no test procedures for the routine calibration of the following instrumentation used to verify equipment operability.

1.

The lube oil filter inlet and outlet pressure gauges and the voltage frequency, and current meters for the Emergency Diesel Generators, which are specified to be used for a shutdown from outside of the control room; and

(

2.

The motor currerit ammeter for the Core Spray System Pumps, which is specified for use during routine surveillance tests.

This is a Severity Level IV violation.

(Supplements)(298/8919-01)

Pursuant to the provisions of 10 CFR 2.201, Nebraska Public Power District is hereby required to submit to this office, within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation:

(1) the reason for the violation if admitted, (2)thecorrectivestepswhichhavebeentakenandtheresultsachieved, (3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

i Dated at Arlington, Texas, this 8t/v day of puAtt./

1989 8906150142 890608 PDR ADOCK 0500 8