Forwards Insp Rept 50-298/89-19 on 890501-05 & 15-19 & Notice of Violation.Nrc Understands That Util Committed to Review All Calculations for Class in Pipe Support Code Qualifications Performed by Contractor Prior to Startup
ML20244C793
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/08/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20244C796 List:
References
IEB-85-003, IEB-85-3, IEIN-88-072, IEIN-88-72, IEIN-89-011, IEIN-89-11, NUDOCS 8906150141
Download: ML20244C793 (2)


See also: IR 05000298/1989019

Text

- . _ _ _ _ _ _ . - --

}

'

v 3

< ,

JUN 81989

,

sin ITply Refer To:

Docket: 50-298/89-19

Nebraska Public Power District

ATTN: George A. Trevers

Division Manager - Nuclear Support g

.. ~P.O. Box 499 1

l Columbus, NE 68602-0499

Gentlemen:. ,

'

This refers to the inspection conducted by Mr. P. C. Wagner of this office

during the period of May 1-5 and ,15-19,1989, and Mr. A. Singh of this'

office during the period of May 15-19,:1989. The inspection was conducted of..

activities authorized by NRC Operating License DPR-46 for the Cooper Nuclears

Station, and included' discussions of our findings.with Mr. Guy Horn and other

members of your staff during, Land at the conclusion ^of.the inspection.

Areas examined during the inspection included motor operated valve testing,

'

instrument calibration; piping supports', surveys of,drywell temperatures -

and diesel fuel. oil conditions. .The NRC inspectors also' discussed the status'

of the actions being implemented in response to'IE Bulletin 85-03, Infonnation

Notices 88-72 and 89-11, the implementation of, Regulatory Guide (RG)1.97'

instrumentation, and the repair of electricali cables provided by General

Electric Company.

As the result of the inspection of the' implementation of RG 1.97, members.of

your staff committed to provide a revision to your. December 4 - 1985, submittal

to the NRC by August 21, 1989. In addition, during the May 19, 1989, exit:

meeting, Mr. G. R. Horn of your staff committed to review all the calculations-

for the Class IN Pipe Support Code Qualifications performed by your contractor.

We understand that this commitment will be completed, and modifications will be

made if required, prior to startup from the present refueling outage. If our y

l understanding of your commitment is not correct, please contact us at once.  !

We have also examined actions you'have taken with regard to previously

identified inspection findings. The' status of these items is, identified in I

paragraphs 6 and 7 of the enclosed report. l

1

During this inspection, it was found that certain of your' activities were in

violation of NRC requirements. Consequently, you are required to respond to -

this violation, in writing, in accordance with the provisions of Section 2.201 1

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal  !

Regulations. Your response should be based on the specifics contained.in the  !

Notice of Violation enclosed with this letter, j

RIV:RI:PSS* RI:PSS* C:PSS* D:DRS*

h

D:0RF

j

j

PCWagner/tw A. Singh TFStetka LJCallan JLMil)oan ,

'

-/ /89 / /89 / /89 ~/ /89 .f /f/89 >

  • previously concurred l

8906150141 890608 jJ ;

PDR ADOCK 05000298 .

!

O PDC i  :

- .___ _-

-_.

7

"

t ,

o

'

e

'

..

,

i Nebitska Public Power District -2-

.The response directed by this letter and the accompanying Notice is not subject-

l.

to the~ clearance procedures of the Office.of Management and Budget as required

by the Paperwork Reduction Act of 1980, FL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you. ]

Sincerely,

Origint.1 Signed By, I

J. L Milboan j

' James L. Milhoan,' Director

Division of Reactor Projects

Enclosures:- l

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-298/88-19

w/ attachments j

]

cc w/ enclosures: 1

Cooper Nuclear Station

ATTN: Guy Horn, Division Manager

of Nuclear Operations

P.O. Box 98

Brownville, Nebraska 68321 "

Kansas Radiation Control Program Director ,

J

Nebraska Radiation Control Program Director  ;

i bectoDMB(IE01)

'

bec distrib. by RIV: y

  • R. D. Martin, RA .

'

  • RRI
  • SectionChief(DRP/C) Lisa Shea, RM/ALF I
  • RPB-DRSS * MIS System
  • RIV File * Project' Engineer (DRP/C)
  • RSTS Operator *DRP '
  • DRS G. F. Sanborn, E0
  • P. O'Connor NRR Project Manager (MS: .13-D-18)  !