ML20238D649

From kanterella
Jump to navigation Jump to search

Advises of Rev to Design of ATWS Mitigation Sys Actuation Circuitry Submitted on 870227 & 0424,due to Revised Generic Design Submitted by Westinghouse Owners Group in 870803 Rev to WCAP-10858
ML20238D649
Person / Time
Site: Beaver Valley
Issue date: 08/31/1987
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
2NRC-7-199, TAC-62943, NUDOCS 8709110305
Download: ML20238D649 (3)


Text

_- -___

I f

'Af Telephone (412) 393-6000 -

r:--

j senppinopon. PA 1MU4M4 August 31, 1987 2NRC-7-199 i

U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 10 CFR 50.62, ATWS Rule Implementation Gentlemen:

l On' February 27, 1987 and April 24, 1987, we provided design

'information on the ATWS Mitigation System Actuation Circuitry (AMSAC)

L to_ be ' installed in Beaver Valley Power Station Units 1 and 2 as required by 10 CFR 50.62.

In these submittals, we indicated that we are implementing' an AMSAC' design consistent with the Westinghouse Owner's Group'(WOG) generic design' described in WCAP-10858.

On _ August 3, 1987, the WOG submitted Revision 1 of WCAP-10858 for NRC review.

Accordingly, we are revising our AMSAC design to be consistent with this revision.

In summary, the changes to the AMSAC design are as follows:

(1) The' time -delay for the actuation timer has been changed from 25 seconds to a

variable delay that is a function of power level._

To determine the power level for timer setting, the two existing turbine impulse chamber pressure signal in AMSAC will be

delayed, via a

log function, and then auctioneered high.

The -bases for this change is to allow the reactor proteciton system to respond first at power levels less than 100%.

'(2) The. time delay for the C-20 permissive has been changed from 120 seconds to longer than the variable timer.

This is to ensure that AMSAC will remain armed long enough to actuate.

]

A more detailed description of these

changes, including the variable. time delay function was provided in WCAP-10858, Revision 1, submitted on August 3, 1987 by the WOG (OG-87-35).

1 g%%l%'Nohd*

0 P.

- -------- -- ---------------------- ----- ----. -----)

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 10 CFR 50.62, ATWS Rule Implementation Page 2 i

If you have any question on this subject, please contact my office.

~a v>

Very truly yours,

.s,

. D.

r Vice President, Nuclear i