Text
,
-
-
y
c-
,
AUG 141987
l
[
In Reply Refer To:
l
,
i
Dockets:
50-313/87-22
50-368/87-22
!
I
l
Arkansas Power & Light Company
ATTN: Gene Campbell, Vice President'-
Nuclear Operations
!
P. O. Box 551-
'
/
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. W. D. Johnson,
M. E. Murphy, and C. C. Harbuck of'this office and Mr..R. S. Lee of the Office
of Nuclear Reactor Regulation during the period July 1-31,1987, of activities-
authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,
Units 1 and 2, and to the discussion of our findings with Mr. E. C. Ewing
and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included operational safety verification,
!
maintenance, surveillance, followup on previously identified items, followup on
k
licensee event reports, the plant safety committee, and pressurizer dummy
heater plug seal weld repairs.
Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
1
with personnel, and observations by the NRC inspectors. The inspection
i
findings are documented in the enclosed inspection report.
I
l
i
During this inspection, it was found that certain' of your activities were in
violation of NRC requirements.
Consequently, .you are required to respond to
l
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations. Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
'
We are concerned that Violation A is similar in nature to a previous violation
discussed in NRC Inspection Report 50-313/87-13; 50-368/87-13. We believe
J
that specific management attention is needed in this area and request that your
l
response specifically address corrective actions planned, or taken, to. prevent
.
l-
this type of violation.
i
l
i
i
8708190213 870814
!
ADUCK 05000313
1
J
O
_
. . . . _ _ _ _ _ .
_-
M
l
RIV:
h
P
V
C:
C: RPB
/
l
\\
l
WDJo
o /dp
arbuck
M
phy
D Hunter
JEGa li
o
D
9 /\\ 87
/ii/87
g/ti/87
/l(/87
f/ / 7'
/
i
k
i
-- -
_ - - - -
B'
3
Arkansas Power & Light Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with.you.
Sincerely,
Orla?ns! Strned Dy
J. E. Gag !crdo
J.-'E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1. . Appendix A - Notice of Violation
l
2.
Appendix B - NRC Inspection Report
50-313/87-22
j
50-368/87-22
,
cc w/ enclosures:
l
J. M. Levine, Executive Director
'
Site Nuclear Operations
Arkansas Nuclear One
Rt. 3, Box 137G
i
Russellville, Arkansas 72801
i
Arkansas Radiation Control Program Director
bcc to DMB (IE01)
bec distrib. by RIV:
- RPB
- RRI
Robert D. Martin, RA
,
- EP&RPB
- Section Chief (RPB/B)
- D. Weiss, RM/ALF
i
- RIV
DRSP
- RSB
l
- MIS SYSTEM
- RSTS Operator
- Project Inspector
I
- R. Hall
Bob Lee (NRR)
George Dick (NRR)
- w/766
-i
-
..
l
'
1
- N