MONTHYEARML20217D7031999-10-0707 October 1999 Informs That USNRC Had Dicussions with Licensee on 990908 Application for License Amend to Relocate 18-month Standby Diesel Generator Insp Sr.Forwards Preliminary Info Submitted by Licensee Re Supplement to Application ML20212L3481999-10-0101 October 1999 Forwards Document Re Replacement SG Water Level Trip Setpoint Differences to Be Placed in PDR ML20216F9021999-09-21021 September 1999 Notification of 991005-07 Meeting with STP Nuclear Operating Co in Bay City,Tx,To Review Plant Categorization & Feedback Process of Risk Ranking Components ML20211J2141999-08-27027 August 1999 Notification of 990831 Meeting with Util to Discuss Issues Associated with STPNOC Recent Request to Exclude safety- Related Low Risk Significant & non-risk Significant Components from Scope of Special Treatment Requirements ML20211G7001999-08-25025 August 1999 Forwards Examination Rept with as Given Written Exam Administered on 990706-15 for Distribution Under Rids Code IE42 ML20211G2501999-08-25025 August 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990706-15 ML20211F3801999-08-20020 August 1999 Notification of 990831 Meeting with Util in Rockville,Md to Discuss Issues Associated with STPNOC Recent Request to Exclude safety-related low-risk Significant & non-risk Significant Components, Designated Under Gqa Program ML20210P9351999-08-0909 August 1999 Notification of 990923 Meeting with Util in Arlington,Tx to Introduce New Director,Safety Quality Concerns Program & Status of Activities to Support Confirmatory Order Modifying License ML20210M6841999-08-0505 August 1999 Notification of Licensee Meeting with Util on 990914 in Arlington,Tx to Discuss New Mgt Team Introduction & Site Status ML20209D5751999-07-0909 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Licensee Proposed SG Water Level Trip Setpoint TS & Setpoint Impact on Pressurizer Water Level TS Per 10CFR50.36 ML20196L1481999-07-0707 July 1999 Forwards Info Provided by Licensee to Facilitate Conference Calls Re Licensee Desire to Propose Emergency Technical Specification Changes on Fuel Handling Building Exhaust Air Sys ML20212J2641999-06-24024 June 1999 Forwards Addl Info from Licensee Re Clarification of Sentence in Util (on Page 4 of 7) Which States That, Isolation Valves in This Sys Designed to Be Operated remote-manually from Control Room ML20195J0441999-06-14014 June 1999 Refers to Discussions with Licensee on Future Suppl to Application on Replacement Steam Generator Reactor Coolant Flow Differences ML20195J0841999-06-14014 June 1999 Forwards Info Re Suppl to Application on TS 3.6.3,action B, to Clarify Use of Check Valve with Flow Through Valve Secured as Means to Isolate Affected Containment Penetration,To Be Placed in PDR ML20207E8961999-06-0303 June 1999 Discusses Which Submitted Relief Request RR-ENG-2-8 Which Requested Relief from ASME Code Based on Provisions of Code Case N-491-2.Requests That Encl Be Placed Into PDR ML20207D9911999-05-28028 May 1999 Informs That NRC Requested That Licensees Respond to Survey on Hydrogen Storage Facilities,To Support Preliminary Evaluation to Determine If Addl Study Warranted.South Texas Project Licensee Response Encl for Placement in PDR ML20207A6671999-05-20020 May 1999 Notification of 990602 & 03 Meeting with Util in South Texas Project Nuclear Support Ctr,Southwest of Bay City,Tx,In Order for Licensee to Present low-power Shutdown Risk Model ML20207A3381999-05-19019 May 1999 Informs of Discussions with Licensee on 980831 Application for License Amend to TS 3.4.9.3 to Reflect Revised Cold Overpressure Mitigation Curve Associated with Replacement Sgs.Request That Encl Documents Be Placed in PDR ML20206N6411999-05-13013 May 1999 Refers to Discussions with Licensee on Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20206G5041999-05-0404 May 1999 Requests That Enclosures 1 & 2 Re 990412 Conference Call, Discussing Preliminary Results of SG Insp,Be Placed in PDR ML20206G2041999-05-0404 May 1999 Discusses 981201 Telcon Between NRC Staff & STP Re 10CFR50.59 Evaluation of MSLB Reanalysis & Effect on Isolation Valve Cubicle & Rcb.Requests That Encl Draft Info Be Placed in PDR ML20206A4851999-04-26026 April 1999 Informs That Staff Needs to Conduct Phone Call with Licensee on Licensee Response to GL 95-07.In Order to Conduct Phone Call,Staff Needs to Provide Licensee with Attached Info ML20205Q8251999-04-15015 April 1999 Forwards Documentation on Licensee 980928 Proposed Changes to TS on Control Room & Fuel Handling Bldg Ventilation Sys, Per 990304 Discussion with Util ML20205Q7961999-04-15015 April 1999 Forwards Documentation from Preliminary Discussions with Licensee on Proposed Changes to Atmospheric Steam Relief Valve Tss.Licensee Subsequently Made Formal Application on 990322 (Accession Number 9903300195) ML20205Q8111999-04-15015 April 1999 Forwards Draft Undated Rev 6 to Operations QA Plan Independent Technical Review, Per Discussions with Licensee on 990407 Re Proposed Change to TSs on Independent Safety Engineering Group ML20204H7731999-03-22022 March 1999 Notification of Significant Licensee Meeting with Util on 990419 in Arlington,Tx to Present Overview of Licensee Emergency Plan ML20207G8201999-03-0404 March 1999 Notification of Significant Licensee Meeting with Util on 990325 to Discuss Plant Performance Review Results ML20207K2301999-03-0404 March 1999 Notification of 990315 Meeting with STP Nuclear Operating Co in Rockville,Md So Licensee May Present risk-informed Exemptions Util Need for Implementation of Graded Quality Assurance at South Texas Project ML20199D1891999-01-11011 January 1999 Notification of 990126 Meeting with STP Nuclear Operating Co to Discuss C/As for Incomplete Control Rod Insertion Anomaly & to Discuss Need for Future mid-cycle Control Rod Drop Testing ML20198H3281998-12-15015 December 1998 Forwards Draft Info Submitted by Util Re 980728 Application for Amend Concerning Operator Action to Mitigate Sbloca,Per 981117 Telcon & for Placement in PDR ML20196G1521998-12-0303 December 1998 Forwards Draft Outline to NRC to Facilitate Discussions Between Util & NRC Re Actions Believed Needed to Address Restraints to Implementation of Graded QA ML20196F1751998-11-27027 November 1998 Notification of Licensee Meeting with Util on 981210 in Arlington,Tx to Discuss Certain Issues of Comprehensive Cultural Assessment for South Texas Project Site ML20196A8641998-11-24024 November 1998 Notification of 981208 Meeting with Util in Rockville,Md to Discuss Status of Current & Proposed Licensing Actions & Activities for Plant ML20195B9251998-11-10010 November 1998 Forwards,For Placement in Pdr,Draft Proposals That Were Provided by Licensee at Request of Staff,In Order to Assist Staff in Developing Commission Paper on Options for Making 10CFR50 More risk-informed ML20155H7471998-11-0505 November 1998 Notification of 981117 Meeting with STP Nuclear Operating Co in Arlington,Tx Re Presentation by Rosen,Manager,Risk Mgt& Industrial Relations on Licensee Perspective on Probablistic Risk Analysis ML20155C2651998-10-29029 October 1998 Forwards SG Insp Results Conducted in Oct 1998,to Be Placed in Pdr.Licensee Provided Info to Facilitate 981015 Conference Call ML20155C2231998-10-29029 October 1998 Forwards Draft Ltr from STP Nuclear Operating Co on Action Needed for Implementation of Graded QA for Plant Units 1 & 2 for Placement in PDR ML20155C2171998-10-26026 October 1998 Notification of 981109-10 Meeting with Util to Obtain Info from Licensee for NRC Proposed risk-informed Insp & Assessment Program.Agenda Encl ML20154L4101998-10-0909 October 1998 Forwards NRC Operator Licensing Exam Repts 50-498/98-301 & 50-499/98-301,including Completed Graded Tests Administered on 980602-04 ML20154L9261998-10-0909 October 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980602-04 ML20154A0331998-09-24024 September 1998 Informs That Based on Review of Licensee 10CFR50.59 Evaluation of Environ Qualification of Mechanical Components,Staff Found That Proposed Change to UFSAR to Eliminate Meq Program Would Not Alter Any Plant Sys ML20151Y7231998-09-12012 September 1998 Notification of Licensee Meeting with Util on 981013 in Arlington,Tx Re Licensee Presentation Concerning Graded Quality Assurance Program at Plant ML20239A0941998-09-0303 September 1998 Notification of 980915 Meeting W/Util in Rockville,Md to Discuss Problems W/Implementing Graded QA,10CFR50.59,impact on risk-informed Applications & Comments on NRC Proposed Rev to 10CFR50.59 ML20239A1171998-09-0202 September 1998 Notification of 980915 Meeting W/Stp Nuclear Operating Co in Rockville,Md Re Licensee Presentation of Uses of Probabilistic Safety Assessment ML20151T6061998-09-0101 September 1998 Notification of Significant Licensee Meeting W/Util on 980918 to Discuss Licensee Insp Plans for Units 1 & 2 Replacement Steam Generators ML20236X8171998-08-0303 August 1998 Notification of Licensee Meeting W/Util on 980820 in Arlington,Tx to Discuss Certain Issues Ongoing at STP Site ML20249A6781998-06-16016 June 1998 Forwards Confirmatory Order Modifying Licenses NPF-76 & NPF-80 (Effective Immediately),For Transmittal to Ofc of Fr for Publication.W/O Encl ML20216J4491998-04-16016 April 1998 Notification of 980506 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Aep & Central Southwest ML20217K9381998-04-0303 April 1998 Notification of 980413 Meeting W/Util in Rockville,Md to Discuss Licensee Desire for Update on Schedule for NRC Review of Licensee Application for Conversion to Improved Std TSs ML20197B0551998-03-0505 March 1998 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam submittal,2nd & 3rd Exam Submittal as Given Operating Exam Administered on 971020-1205 1999-09-21
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217D7031999-10-0707 October 1999 Informs That USNRC Had Dicussions with Licensee on 990908 Application for License Amend to Relocate 18-month Standby Diesel Generator Insp Sr.Forwards Preliminary Info Submitted by Licensee Re Supplement to Application ML20212L3481999-10-0101 October 1999 Forwards Document Re Replacement SG Water Level Trip Setpoint Differences to Be Placed in PDR ML20216F9021999-09-21021 September 1999 Notification of 991005-07 Meeting with STP Nuclear Operating Co in Bay City,Tx,To Review Plant Categorization & Feedback Process of Risk Ranking Components ML20211J2141999-08-27027 August 1999 Notification of 990831 Meeting with Util to Discuss Issues Associated with STPNOC Recent Request to Exclude safety- Related Low Risk Significant & non-risk Significant Components from Scope of Special Treatment Requirements ML20211G2501999-08-25025 August 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990706-15 ML20211G7001999-08-25025 August 1999 Forwards Examination Rept with as Given Written Exam Administered on 990706-15 for Distribution Under Rids Code IE42 ML20211F3801999-08-20020 August 1999 Notification of 990831 Meeting with Util in Rockville,Md to Discuss Issues Associated with STPNOC Recent Request to Exclude safety-related low-risk Significant & non-risk Significant Components, Designated Under Gqa Program ML20210P9351999-08-0909 August 1999 Notification of 990923 Meeting with Util in Arlington,Tx to Introduce New Director,Safety Quality Concerns Program & Status of Activities to Support Confirmatory Order Modifying License ML20210M6841999-08-0505 August 1999 Notification of Licensee Meeting with Util on 990914 in Arlington,Tx to Discuss New Mgt Team Introduction & Site Status ML20209D5751999-07-0909 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Licensee Proposed SG Water Level Trip Setpoint TS & Setpoint Impact on Pressurizer Water Level TS Per 10CFR50.36 ML20196L1481999-07-0707 July 1999 Forwards Info Provided by Licensee to Facilitate Conference Calls Re Licensee Desire to Propose Emergency Technical Specification Changes on Fuel Handling Building Exhaust Air Sys ML20212J2641999-06-24024 June 1999 Forwards Addl Info from Licensee Re Clarification of Sentence in Util (on Page 4 of 7) Which States That, Isolation Valves in This Sys Designed to Be Operated remote-manually from Control Room ML20195J0841999-06-14014 June 1999 Forwards Info Re Suppl to Application on TS 3.6.3,action B, to Clarify Use of Check Valve with Flow Through Valve Secured as Means to Isolate Affected Containment Penetration,To Be Placed in PDR ML20195J0441999-06-14014 June 1999 Refers to Discussions with Licensee on Future Suppl to Application on Replacement Steam Generator Reactor Coolant Flow Differences ML20207E8961999-06-0303 June 1999 Discusses Which Submitted Relief Request RR-ENG-2-8 Which Requested Relief from ASME Code Based on Provisions of Code Case N-491-2.Requests That Encl Be Placed Into PDR ML20207D9911999-05-28028 May 1999 Informs That NRC Requested That Licensees Respond to Survey on Hydrogen Storage Facilities,To Support Preliminary Evaluation to Determine If Addl Study Warranted.South Texas Project Licensee Response Encl for Placement in PDR ML20207A6671999-05-20020 May 1999 Notification of 990602 & 03 Meeting with Util in South Texas Project Nuclear Support Ctr,Southwest of Bay City,Tx,In Order for Licensee to Present low-power Shutdown Risk Model ML20207A3381999-05-19019 May 1999 Informs of Discussions with Licensee on 980831 Application for License Amend to TS 3.4.9.3 to Reflect Revised Cold Overpressure Mitigation Curve Associated with Replacement Sgs.Request That Encl Documents Be Placed in PDR ML20206N6411999-05-13013 May 1999 Refers to Discussions with Licensee on Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20206G2041999-05-0404 May 1999 Discusses 981201 Telcon Between NRC Staff & STP Re 10CFR50.59 Evaluation of MSLB Reanalysis & Effect on Isolation Valve Cubicle & Rcb.Requests That Encl Draft Info Be Placed in PDR ML20206G5041999-05-0404 May 1999 Requests That Enclosures 1 & 2 Re 990412 Conference Call, Discussing Preliminary Results of SG Insp,Be Placed in PDR ML20206A4851999-04-26026 April 1999 Informs That Staff Needs to Conduct Phone Call with Licensee on Licensee Response to GL 95-07.In Order to Conduct Phone Call,Staff Needs to Provide Licensee with Attached Info ML20205Q8251999-04-15015 April 1999 Forwards Documentation on Licensee 980928 Proposed Changes to TS on Control Room & Fuel Handling Bldg Ventilation Sys, Per 990304 Discussion with Util ML20205Q8111999-04-15015 April 1999 Forwards Draft Undated Rev 6 to Operations QA Plan Independent Technical Review, Per Discussions with Licensee on 990407 Re Proposed Change to TSs on Independent Safety Engineering Group ML20205Q7961999-04-15015 April 1999 Forwards Documentation from Preliminary Discussions with Licensee on Proposed Changes to Atmospheric Steam Relief Valve Tss.Licensee Subsequently Made Formal Application on 990322 (Accession Number 9903300195) ML20204H7731999-03-22022 March 1999 Notification of Significant Licensee Meeting with Util on 990419 in Arlington,Tx to Present Overview of Licensee Emergency Plan ML20207G8201999-03-0404 March 1999 Notification of Significant Licensee Meeting with Util on 990325 to Discuss Plant Performance Review Results ML20207K2301999-03-0404 March 1999 Notification of 990315 Meeting with STP Nuclear Operating Co in Rockville,Md So Licensee May Present risk-informed Exemptions Util Need for Implementation of Graded Quality Assurance at South Texas Project ML20199D1891999-01-11011 January 1999 Notification of 990126 Meeting with STP Nuclear Operating Co to Discuss C/As for Incomplete Control Rod Insertion Anomaly & to Discuss Need for Future mid-cycle Control Rod Drop Testing ML20198H3281998-12-15015 December 1998 Forwards Draft Info Submitted by Util Re 980728 Application for Amend Concerning Operator Action to Mitigate Sbloca,Per 981117 Telcon & for Placement in PDR ML20196G1521998-12-0303 December 1998 Forwards Draft Outline to NRC to Facilitate Discussions Between Util & NRC Re Actions Believed Needed to Address Restraints to Implementation of Graded QA ML20196F1751998-11-27027 November 1998 Notification of Licensee Meeting with Util on 981210 in Arlington,Tx to Discuss Certain Issues of Comprehensive Cultural Assessment for South Texas Project Site ML20196A8641998-11-24024 November 1998 Notification of 981208 Meeting with Util in Rockville,Md to Discuss Status of Current & Proposed Licensing Actions & Activities for Plant ML20195B9251998-11-10010 November 1998 Forwards,For Placement in Pdr,Draft Proposals That Were Provided by Licensee at Request of Staff,In Order to Assist Staff in Developing Commission Paper on Options for Making 10CFR50 More risk-informed ML20155H7471998-11-0505 November 1998 Notification of 981117 Meeting with STP Nuclear Operating Co in Arlington,Tx Re Presentation by Rosen,Manager,Risk Mgt& Industrial Relations on Licensee Perspective on Probablistic Risk Analysis ML20155C2231998-10-29029 October 1998 Forwards Draft Ltr from STP Nuclear Operating Co on Action Needed for Implementation of Graded QA for Plant Units 1 & 2 for Placement in PDR ML20155C2651998-10-29029 October 1998 Forwards SG Insp Results Conducted in Oct 1998,to Be Placed in Pdr.Licensee Provided Info to Facilitate 981015 Conference Call ML20155C2171998-10-26026 October 1998 Notification of 981109-10 Meeting with Util to Obtain Info from Licensee for NRC Proposed risk-informed Insp & Assessment Program.Agenda Encl ML20154L9261998-10-0909 October 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980602-04 ML20154L4101998-10-0909 October 1998 Forwards NRC Operator Licensing Exam Repts 50-498/98-301 & 50-499/98-301,including Completed Graded Tests Administered on 980602-04 ML20154A0331998-09-24024 September 1998 Informs That Based on Review of Licensee 10CFR50.59 Evaluation of Environ Qualification of Mechanical Components,Staff Found That Proposed Change to UFSAR to Eliminate Meq Program Would Not Alter Any Plant Sys ML20151Y7231998-09-12012 September 1998 Notification of Licensee Meeting with Util on 981013 in Arlington,Tx Re Licensee Presentation Concerning Graded Quality Assurance Program at Plant ML20239A0941998-09-0303 September 1998 Notification of 980915 Meeting W/Util in Rockville,Md to Discuss Problems W/Implementing Graded QA,10CFR50.59,impact on risk-informed Applications & Comments on NRC Proposed Rev to 10CFR50.59 ML20239A1171998-09-0202 September 1998 Notification of 980915 Meeting W/Stp Nuclear Operating Co in Rockville,Md Re Licensee Presentation of Uses of Probabilistic Safety Assessment ML20151T6061998-09-0101 September 1998 Notification of Significant Licensee Meeting W/Util on 980918 to Discuss Licensee Insp Plans for Units 1 & 2 Replacement Steam Generators ML20236X8171998-08-0303 August 1998 Notification of Licensee Meeting W/Util on 980820 in Arlington,Tx to Discuss Certain Issues Ongoing at STP Site ML20249A6781998-06-16016 June 1998 Forwards Confirmatory Order Modifying Licenses NPF-76 & NPF-80 (Effective Immediately),For Transmittal to Ofc of Fr for Publication.W/O Encl ML20216J4491998-04-16016 April 1998 Notification of 980506 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Aep & Central Southwest ML20217K9381998-04-0303 April 1998 Notification of 980413 Meeting W/Util in Rockville,Md to Discuss Licensee Desire for Update on Schedule for NRC Review of Licensee Application for Conversion to Improved Std TSs ML20197B0551998-03-0505 March 1998 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam submittal,2nd & 3rd Exam Submittal as Given Operating Exam Administered on 971020-1205 1999-09-21
[Table view] |
Text
Pow
- [ % UNITED STATES
, ['- ) $, NUCLEAR REGULATORY COMMISSION
, I S
- f REGloN IV h, ,
- [ 611 RYAN PLAZA DRIVE. SulTE 1000 ARLINGTON. TEXAS 76o11 AUG 191987 MEMORANDUM FOR: Thomas E. Murley, Director, Of fice of Nuclear Reactor Regulation FROM: Robert D. Martin, Regional Administrator, Region IV i i
SUBJECT:
SOUTH TEXAS PROJECT (S'TP), Unit 1 (DN 50-498) - LOW POWER LICENSE RECOMMENDATION l
This memorandum provides a supplement to the Region IV conditional.Iow power ..
i license recommendation for South Texas Project (STP), Unit 1 dated August 12, 1987. The conditional recommendation was based on an assessment of plant status and applicant activities as of that-date. q Region IV inspections of operational readiness activities continue to indicate that STP Unit 1 is ready to load fuel and begin low power. operations. New allegations
- have been received since my August 12 submittal, but our technical review of these allegations concludes that they would not impact fuel load.
Houston Lighting and Power Company (HL&P) has maintained their schedule of complction of operational readiness activities.
Region IV preoperational security inspection activities are now complete. The STP, Unit 1 security program is now being satisfactorily implemented. Our assessment of the STP security program is provided in the enclosure.
The intrusion detection system has not yet demonstrated long term reliable operation despite applicant efforts to establish meaningful operability. I have little confidence that the system will not require extensive compensatory ,
measures for significant parts of an extended period of time while the I applicant continues their efforts to correct problems. We believe that the !
established license conditions, Region IV's augmented inspection efforts during ,
the Startup Testing Phase (MC 2514 program), and additional NRC review prior to l operation above 5 percent power provide reasonable assurance that satisfactory ,
resolution of this issue will be established. Region IV inspectors have verified that HL&P has the capability to post the required compensatory personnel for those periods of time when the intrusion detection system is inoperable.
~~the status of allegations as addressed in our August 12 letter indicates those allegations which have been reviewed and/or inspected to. address the technical aspects of the allegation and their potential impact on reactor safety. The Allegation Management System may indicate that some of these l allegations remain open because of non-technical issues which have not yet been resolved or because of the time delay in effecting the final closecut on i the tracking system. ,
B708250013 DR B70819 ADOCK 05000490 i
PDR
. _ _ _ - __ _ _ -_____ - ~
Thomas E. Murley AUG 191987 At this time, I find that the construction of STP, Unit I has been j substantially completed in accordance with Construction Permit CPPR-128, the 1 STP Final Safety Analysis Report and NRC regulatory requirements. I also find that, subject to completion of the open items at the milestones recommended in Enclosure 5 to my lester dated August 12, 1987, the licensee is capable of operating the plant safely at low power. Region IV will continue with a j heightened followup effort to assure timely completion of these items.
i
'We recommend issuance of a low power operating license for STP, Unit 1 as {
conditioned by the issues discussed above and those items listed in the '
enclosures to our August 12 letter.
l
(( b Robert D. Martin Regional Administration Region IV
\
Enclosure:
Supplement to Enclosure 1 of Memorandum of August 12, 1987, Robert D. Martin to Thomas E. Murley; STP, Unit 1 (DN 50-498) - Conditional Low Power License Recommendation cc w/ enclosure:
V. Stello, EDO H. Thompson, NMSS J. Calvo, NRR R. Martin, RIV J. Callan, RIV g l R. Hall, RIV l I
L. Yandell, RIV J. Gagliardo, RIV D. Carpenter, SRI-OPS for STP !
T. Martin, EDO R. Bangart, RIV D. Crutchfield, NRR F. Shroeder, NRR j
/ Kadambi, NRR W. Fisher, RIV T. Westerman, RIV G. Constable, RIV l C. Johnson, SRI-CONST for STP j H. Bundy, RIV j R. Taylor, RIV j R. Pirfo, OGC j l
Enclosure Page 1 of 3 SUPPLEMENT _TO ENCLOSURE 10F MEMORAMDUM 0F AUGUST 12, 1987, ROBERT D. MARTIN TO THOMAS E. MURLEY: STP, UNIT 1 (DN 50-498) - CONDITIONAL LOW POWER LICENSE RE;0MMENDATION 8.0 Security .;
The staff has reviewed and approve'd the HL&P Physical Security Plan,- the l
Training and Qualification (T&Q) Plan, and the Safeguards Contingency Plan. Regional-based security inspectors have condacted several site inspections and provided daily coverage onsite since June 23, 1987- Major .
portions of the plan were not implemented until late in the'preoperational period and applicant personnel were afforded little opportunity 'to perform-under actual operating conditions. Numerous weaknesses were identified in the areas of procedures, hardware, and personnel. As late as July 10, 1987, a few original procedures still lacked final review by the Plant Operations Review Committee. . This ef fort is now conplete and all required -
procedures are approved and in place. . Numerous pro:edure changes have geenpromptedbyfurtherNRCandapplicantreview,and.thisprocess'has continued to the present time. In addition, instan:es were identified where procedural steps allowed actions that were contrary to regulations and/or plan commitments, and the applicant has perf:rmed a complete' review of procedures versus plan requirements to ensure that all plan commitments were covered by procedures. The applicant has initiated a review program to ensure and document that all new procedures and -evisions are.in-conformance with regulations and/or plan commitments. Safeguard system acceptance tests were found inadequate and in some :ases failed to incorporate plan commitments into the testing program. The applicant has completed a review of safeguards system acceptance :ests to ensure that i all plan commitments have been incorporated.
Security system hardware was found to be inoperable in many cases and incapable of performing its task in others. Major tardware deficiencies were identified and the applicant has performed extensive corrective maintenance. For hardware items that could not be :orrected immediately, license conditions acceptable to the NRC staff have been proposed in Attachments A to HL&P letters dated July 24, July 33, and August 7,1987.
The applicant's training program for security perso.nel was found to be inadequate, and numerous deficiencies in the training records were identified. Interviews by NRC personnel with appli: ant guards indicated a poor level of knowledge and a failure by applicant management to adequately prepare the security force for its assigned tasks. As a result of these findings, a comprehensive examination was administered to the entire guard force, and ' appropriate retraining was performed as indicated by the examination results. The NRC insgectors con:iucted extensive interviews with a large sampling of guards to evaluate their knowledge' and verify that they possessed the minimum level of skill and understanding necessary to perform their job. In addition, the applicant committed to developing a comprehensive training program incorpo ating all the elements
Enclosure Page'2 of'3 identified in the training and qualification plan.and 10 CFR 73, Appendix B. . This development effort has been initiated, and the schedule for implementing this upgraded training program will be submitted to the NRC for review and approval. The NRC has completed its evaluation of the applicant's guard force and has concluded that they possess the. minimum l level of knowledge and understanding necessary to perform their assigned I tasks. The applicant has taken action to hire and train sufficient personnel to meet the' anticipated manpower requirements.
By letter dated August 18, 1987, the applicant ~ stated that requalification training for the first two groups of security offices would not be done "under the old training program and within the one (1) year time frame but i will be done under the new systematic approach to training . . . ." Due .
j to the extensive performance testing and decertification that was done during the past four months, Region IV considers this extension of the .j requalification period to be-justified and believes that any training performed under the new program will be a benefit to HL&P's security organization.
During the review of the applicantis security personnel training. records, j it was determined by NRC investigators that the State of Texas .
certification for the security of ficers was invalid. : On July 24, 1987, the applicant removed all weapons from the security force and. initiated a .)
retraining and decertification program. Decertification training was j conducted in two groups by an authorized outside organization, and .j approximately 100 guards were successfully ' decertified and were authorized i by the state to carry weapons again on July 31, 1987. j l
A final walkdown and inspection of the security program (Manual l Chapter 2513, Series 81000 Inspection Procedures) could not begin .until -]
July 8, 1987. This effort was completed on August 19, 1987, and all l regulatory issues identified were corrected by the applicant or. resolved ]
with NRC licensing personnel. Because of the problems identified above, l the applicant was unable to " lock down" until August 2,1987, and operate I the security system in a normal configuration. This late date for " lock l down" was a major obstacle in completing the inspection program in a ,
timely manner.
The applicant has addressed all of the open items identified during the '
preoperational test period and dispositioned each one to the satisfaction i of the NRC. The post-license issues and conditions identified and discussed above are described in HL&P letters dated July 24, 30, and August 7,.1987, which should be incorporated into the operating license.
l The Region IV staff recognizes the need for continued effort and improvement on the part of the applicant in the areas of hardware and. .
personnel development. HL&P reorganized the security department on August 3, 1987. Region IV-expects this to have a positive effect on the. .
security program. This new organization has not been functioning long l enough to demonstrate the applicant's capability to maintain an acceptable i level of perfonnance and implement changes to improve overall program
Enclosure Page 3 of 3 quali ty, This will be an area of particular attention to the NRC inspectors during Region IV's performance of the_Startup Testing Phase ,
(MC 2514) of the Inspection Program.
On the basis of these identified license conditions and the corrective actions taken by the applicant, no open items in the area of security j facilities and programs exist which preclude issuance of a fuel load license to HL&P.