Georgia Power Company.

e 333 Piedmont Avenue

Atlanta, Georgia 30308 Telephone 404 526-6526 Mailing Address:

Post Office Box 4545 Atlanta. Georgia 30302 GeorgiaPower L. T. Gucwe inc souteem ekt:nc sywm Manager Nuclear Safety.

and Licensing SL-2780 1195C X7GJ17-H200' July 14, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk.

Washington, D. C. '20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 0UTSTANDING LICENSING SUBMITTALS Gentlemen:

Enclosed, for your information and use, please find updated listings of those ' items of correspondence with the N!!C to which a written response is expected.

Enclosure 1,

tabulated chronologically by Georgia Power Company's submittal date, lists items which are ready for closure.

i ' prioritizes the. ten most significant outstanding submittals i

in terms of value to Georgia Power Company. ' is a listing of-those items requiring submittal of' additional information by Georgia Power.

Georgia Power is prepared to discuss modifications' to these status reports and will promptly address any questions you may have regarding these licensing issues.

During the past month the NRC has completed licensing action on:

1) our June 20, 1986, proposed Technical Specifications change which would allow single loop operr. tion and modify jet pump surveillance; 2) our November 14, 1986, request for relief from ASME Section XI testing requirements for buried piping; 3) our February 20,1987, Unit 1 outage inservice inspection plan; 4) our March 4,

1987, proposed Technical Specifications change related to containment isolation valve testing; and 5) our May 8,1987, proposed Technical Specification change related

.to analysis requirements for Boron concentration.

Georgia Power Company acknowledges and appreciates these efforts.

6707200151 B7071A-

PDR ADOCK 05000321 P-PDR;

\\

i I

k Georgia Power h l

U. S. Nuclear Regulatory Commission July 14, 1987 Page Two 1

If you have any questions in this regard, please contact this office at any time.

l Sincerely, l

l ec n-

)

L. T. Gucwa MJB/lc

Enclosures:

1.

Outstanding Licensing Submittals Requiring NRC Action 2.

Outstanding Licensing Submittals Prioritized List 1

3.

Outstanding Licensing Submittals Requiring Additional Information 1

c: Georgia Power Comoany l

Mr. J. P. O'Reilly, Sr. Vice President - Nuclear Operations Mr. J. T. Beckham, Jr., Vice President - Plant Hatch GO-NORMS U. S. Nuclear Reaulatory Commission. Washinaton. D. C.

Mr. L. P. Crocker, Licensing Project Manager - Hatch U. S. Nuclear Regulatory Commission. Region II Dr. J. N. Grace, Regional Administrator Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch l

l 1195C 1

700775

Georgia Power b ENCLOSURE 1 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 OUTSTANDING LICENSING SUBMITTALS REOUIRING NRC ACTION LETTER HATCH DAlf L! Nil SUBJECT Key 0-APPROVAL OF ITEM REQUIRED FOR UPCOMING OUTAGE C-NRC ACTION COMPLE1E ON ITEM SINCE LAST REPORT N-ITEM ADDED SINCE LAST REPORT 05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION -

SEISMIC 1

SPECTRA BROADENING l

01/06/86 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

DELETE REQUIREMENT FOR HYDROGEN RECOMBINEPS l

01/07/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

AUTOMATIC ISOLATION OF PURGE AND VENV ON HIGH RADIATION SIGNAL (TMI ITEM) 02/17/86 331,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

REORGANIZATION RESPONSIBILITY FOR RADIOLOGICAL I

ENVIRONMENTAL MONITORING, MET TOWER LOCATION, QA

RECORDS, DELETE EPDD, ETS PROCEDURE APPROVAL, PRB/ SRB COMPOSITION AND QUORUM, AUDIT REQUIREMENTS I

02/28/86 321,366 PROPOSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING LICENSE VICE CONSTRUCTION PERMIT 03/27/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

l EQUALIZING REACTOR PROTECTION SYSTEM SPECIFICATIONS BETWEEN UNITS 03/31/86 321,366 PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS -

EMERGENCY POWER DIESEL GENERATOR TESTING GENERIC LETTER 84-15 04/04/86 366 PROPOSED DELETION OF BUILDING SETTLEMENT TECHNICAL SPECIFICATIONS WITH INCORPORATION OF SETTLEMENT CRITERIA FROM OUR 12/1/78 LETTER INTO PLANT PROCEDURES 06/20/86 321,366 C

CHANGE TO TECHNICAL SPECIFICATIONS - SINGLE LOOP OPERATION AND JET PUMP SURVEILLANCE l

1195C El-1 7/14/87 SL-2780

l 1

Georgia Power b I-ENCLOSURE 1(Continued)

OUTSTANDING LICENSING SUBMITTALS 1

LETTER HATCH DAIE UNil SUBJECT 08/25/86 321,366 CHANGE TO RHCU LEAKAGE DETECTION TECHNICAL-SPECIFICATIONS - HIGH TEMPERATURE ISOLATION 09/09/86 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - RIVER LEVEL-10/24/86 321,366 PROPOSED TECHNICAL SPECIFICATION CHANGE FOR FIRE PROTECTION COMPLIANCE ADD REQUIREMENT OF PERFORMING EVERY THIRD TEST OF.

EQUIPMENT CONTROLLED FROM REMOTE SHUTDOWN PANELS FROM SAID PANELS 10/27/86 321,366 PROPOSED REVISION' TO TECHNICAL SPECIFICATIONS ---

DELETION OF ORGANIZATIONAL FIGURES, REALIGNMENT OF HNP STRUCTURE 11/06/86 321 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION -

1 COMMENTS REGARDING IGSCC INSPECTION AND REPAIR -

l UT SUBCONTRACTORS 11/14/86 321 C

INSERVICE INSPECTION RELIEF REQUEST TO CLOSE-OUT FIRST 10 YEAR ISI INTERVAL j

11/14/86 321,366

RESPONSE

TO VERBAL REQUEST FOR' ADDITIONAL l

INFORMATION - CABLE TRAY SUPPORTS 12/23/86 321,366 DETAILED CONTROL ROOM DESIGN REVIEH 02/13/87 321,366 REQUEST TO REVISE REPORTING REQUIREMENT' TECHNICAL SPECIFICATIONS.TO FIT LICENSEE EVENT REPORT REQUIREMENTS 02/20/87 321 C

INSERVICE INSPECTION PLAN FOR NEXT. HNP-1 OUTAGE -

AUSTENITIC STAINLESS STEEL 03/04/87 321,366 C

PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS APPENDIX J VALVES 03/04/87 321,366-REQUEST FOR. ADDITIONAL INFORMATION - SEISMIC S0IL' ANALYSIS 03/20/87 366 CHANGES TO TECHNICAL SPECIFICATIONS - HYDR 0 GEN HATER CHEMISTRY 1195C El-2 7/14/87 SL-D80 700775 '

Georgia Power b ENCLOSURE 1(Continued)

OUTSTANDING LICENSING SUBMITTALS LETTER HATCH DATE EU SjlBXCT 03/27/87 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

CORE SPRAY DELTA P

(BREAK DETECTION)

INSTRUMENTATION 05/01/87 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

GASEOUS EFFLUENT RELEASE POINTS 05/08/87 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS TURBINE VALVE TESTING 05/08/87 321 C

PROPOSED ATHS TECHNICAL SPECIFICATIONS BORON CONCENTRATION IN STANDBY LIQUID CONTROL 1195C El-3 7/14/87 SL-2780 700775

Georgia Power d ENCLOSURE 2 1

PLANT HATCH - UNITS 1, 2 l

NRC DOCKETS 50-321, 50-366

)

OPERATING LICENSES DPR-57, NPF-5 OUTSTANDING LICENSING SUBMITTALS PRIORITIZED LIST 1

REASON SUBJECT I

FOR l

PRIORITY l

'l 1.

Unnecessary Plant CHANGE TO RHCU LEAKAGE DETECTION TECHNICAL i

Isolations SPECIFICATIONS - HIGH TEMPERATURE ISOLATION l

2.

Operational Hardships PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

l GASE0US EFFLUENT RELEASE POINTS 3.

Hardware Installed CHANGES TO TECHNICAL SPECIFICATIONS - HYDROGEN HATER CHEMISTRY 4.

Piping Replaced with REQUEST TO RESCIND CONFIRMATORY ORDER ON Nuclear Grade Material REACTOR COOLANT SYSTEM STAINLESS STEEL PIPE i

5.

Frequency of Testing PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS -

EMERGENCY POWER - DIESEL GENERATOR TESTING GENERIC LETTER 84-15 6.

Agreements with Union PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

Imminent SHIFT OVERTIME REQUIREMENTS 7.

Unnecessary Testing PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

TURBINE VALVE TESTING 8.

Instrument Setpoint PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

Too Low (LCO Potential) CORE SPRAY DELTA P (BREAK DETECTION)

INSTRUMENTATION 9.

Frequency of Surveil-PROPOSED DELETION OF BUILDING SETTLEMENT lances TECHNICAL SPECIFICATIONS

10. Preclude Potential CHANGE TO TECHNICAL SPECIFICATIONS Future Problems

- RIVER LEVEL 1195C E2-1 7/14/87 SL-2780 700775

1 Georgia Power d i

ENCLOSURE 3 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 I

OPERATING LICENSES DPR-57, NPF-5 OUTSTANDING LICENSING SUBMITTALS RE0VIRING ADDITIONAL INFORMATION

)

LETTER HATCH DATE ILNII SUBJECT 09/12/84 321 PROPOSED TECHNICAL SPECIFICATIONS - OPERABILITY l

DEFINITION 01/10/85 366 REQUEST TO RESCIND CONFIRMATORY ORDER ON REACTOR COOLANT SYSTEM STAINLESS STEEL PIPE I

1 06/03/85 321,366 REQUEST FOR ADDITIONAL INFORMATION GENERIC LETTER 83 SALEM EVENT - SCRAM BREAKER FAILURE 06/25/85 321,366 PROPOSED CHANGES TO IST PROGRAM 1

01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

SHIFT OVERTIME REQUIREMENTS i

1195C E3-1 7/14/87 SL-2780