Forwards Rev 0 to, Main Control Room Investigation Rept & Human Factors Rept for 1987 Control Room..., Providing Info to Resolve Main Control Room Sys Items
ML20235N573
Person / Time
Site: Rancho Seco
Issue date: 07/02/1987
From: Andognini G
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Miraglia F
Office of Nuclear Reactor Regulation
Shared Package
ML20235N576 List:
References
GCA-87-208, TAC-56158, NUDOCS 8707200135
Download: ML20235N573 (2)


Text

_ _

esuun SACRAMENTO MUNICIPAL UTluTY DISTRICT C P. O. Box 15830, Sacramento CA 95852 1830,(916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA

'd V L 0 2 198'l GCA 87-208 U. S. Nuclear Regulatory Commission Attn: Frank J. Miraglia, Jr.

Associate Director for Projects Philips Bldg. i 7920 Norfolk Avenue Bethesda, MD 20014

(

DOCKET 50-312 RANCHO SECO NUCLEAR GENERATING STATION UNIT #1 MAIN CONTROL ROOM SYSTEM INVESTIGATION REPORT

Dear Mr. Miraglia:

In the staff's letter dated February 2,1987 " Report on September 29,1986 to October 2,1986 Audit at Rancho Seco Site," Enclosure ! identified additional information required to complete your review of the Control Room Design Review (CRDR). The Distrfct committed in letter JEW 87-379 to provide responses to these unresolved issues. This letter and it's enclosure provide the information necessary to resolve these items.

The Main Control Room (MCR) System Investigation Report (SIR) problems 4 and 5 identified that MCR modifications and procedure changes had the capability of invalidating the CRDR Summary Report docketed on December P.7,1985. In order to verify the affect, an evaluation was performed on the Revised E0P's and modified Control Roon mock-up to insure that no safety significant (Category A) human engineering observations (HE0's) had been introduced into the Control Room. A task analysis and verification was perforn.ed on all of the E0P's (see Attachment 2 to the enclosure) including Cautions, Notes, Status Tasks and Information Pages. This included a validation (walk-thru) of two scenarias on the modified Control Room mock-up along with observation of operator performance during training sessions at the Lynchburg simulator. In addition, a task analysis and verification was performed on the " Hydrogen Purge Procedure" ( A.52), which resulted in no HE0's being identified. A static Control Room survey was also performed on the modifications to the MCR and the Control Room inventory data base was updated.

Twenty Four HE0's were identified during the Human Factors Team's (HFT) analyses. An assessment of each was performed and evaluated by the HFT. No Category A (safety significant) HE0's were identified. These analyses should resolve the issues in Sections 6.1, 6.3, 6.4, 6.5 and 6.7 of Enclosure 1 to your letter dated February 2,1987.

8707200135 07070P DR ADDCK 0500 2 i

RANCHO SECO NUCLEAR GENERATING STATION D 14440 Twin Cities Road, Hercid, CA 95638-9799;(209) 333-2935

c:; -

a, GCA 87-208 Frank' J, Miraglia, Jr. NUL 0 2 1987

[

It is the District's understanding that this letter addresses all known CRDR -

. issues required for the' staff to complete its review. Continuing efforts in the District's Human Factors program will be considered unreportable unless a Category A (Safety Significant) HE0 is discovered. If you have any further questions, please contact John- Atwell of nty staf f at extension 3906.

l Sincerely,

.{.

. Car Andognini Chief Executive Offic , Nuclear Enclosure cc: G. Kalman, NRC, Bethesda (2)

A. D'Angelo, NRC, Rancho Seco l

l l

1 l

t _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .m