Submits Info on Status of Crdr Mods for Human Engineering Observations (Heos).Util Resolved 25 Heos Prior to Current Outage.Based on Review of Control room,24 New Heos Identified as Result of Implementation of Mods
ML20234C250
Person / Time
Site: Rancho Seco
Issue date: 06/25/1987
From: Andognini G
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Miraglia F
Office of Nuclear Reactor Regulation
References
GCA-87-220, TAC-56158, NUDOCS 8707060391
Download: ML20234C250 (2)


Text

,

fesuun SACRAMENTO MUNICIPAL UYlLITY DISTRICT O P. O, Box 15830, Sacramento CA 95852-1830,(916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA JUN 2 51987 GCA B7-220 U. S. Nuclear Regulatory Commission Attn: Frank J. Miraglia, Jr.

Associate Director for Projects Philips Bldg.

7920 Horfolk Avenue Bethesda, MD 20014 DOCKET 50-312 RANCHO SEC0 NUCLEAR GENERATING STATION UNIT #1 STATUS OF THE CRDR MODIFICATIONS

Dear Mr. Miraglia:

As a result of discussions with the staff, the District has been requested to provide information on the Control Room Design Review (CRDR) Human Engineering Observations (HEO). The CRDR Summary Report was provided to the staff in December,1985. It contained 516 HE0's, of which 25 were resolved prior to the current outage and 120 were recommended to be left "as-is." In addition, 16 type "B" HE0's are being resolved during the current outage. These 16 items are included in attachment 2 of the Main Control Room (MCR) System Investigation Report (SIR). The MCR SIR is being transmitted to the NRC by separate cover letter. It is important to note that none of the 516 items identified are type "A" HE0's.

A recent review of the Control Room was performed to ensure the modifications to the Control Room have not introduced new human engineering problems. As a result of this review, 24 new HE0's have been identified. These items are discussed in the MCR SIR which is being transmitted to the staff. No type "A" HE0's were identified in this evaluation.

Therefore, at the end of this outage 379 HE0's will remain. These HE0's can, in general, be divided evenly with approximately half applying to front consoles and the remainder applying to the back panels.

A schedule for resolution of the HE0's was originally incorporated into the Living Schedule (Proposed Amendment 106). Subsequently, PA 106 has been withdrawn until after restart of the plant. However, it is expected that the HE0's for the front consoles will be resolved by the end of the Cycle 8 outage and those itens dealing with the back panels by the end of the Cycle 9 outage. At the present, conceptual design is complete for approximately 80%

of the HE0's.

%[$

P P

QQd 0

lll RANCHO SECO NUCLEAR GENERATING STATION D 1444o Twin Cities Road, Herald, CA 95638 9799;(2o9) 333-2935

i j

GCA 87-220 Frank J. Miraglia, Jr. If there are any questions, please contact John Atwell of my staff at extension 3906.

Sincerely, llChiefCar G'. / ini Ando Executive Officer, Nuclear cc: G. Kalman, NRC, Bethesda (2)