ML20235E711
| ML20235E711 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 07/06/1987 |
| From: | Domer J TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8707130060 | |
| Download: ML20235E711 (14) | |
Text
_ _ _ - _ _ _ _.
TENNESSEE VALLEY AUTHORITY CH ATTANOOG A, TENNESSEE 374o1 SN 157B Lookout Place
)
I UUL 0 61987 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 l
Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) UNIT 2 - RESTART TEST PROGRAM (RTP)
Reference:
TVA letter to NRC dated May 26, 1987 The system functional reviews, which input to the Functional Review Matrix (defined in the referenced letter), have been completed.
provides a listing of additional tests (i.e., those tests in addition to normal routine testing) recommended by the RTP to prove system functionality. provides a listing of the routine scheduled testing that, when performed, will demonstrate acceptably the functions remaining to be tested that are associated with the systems reviewed by the RTP.
The Functional Review Matrices will be submitted to the Joint Test Group (JTG) for review and approval in accordance with the RTP.
This process may result in changes in the identified testing.
Following approval by the JTG, a copy of each Functional Review Matrix will be sent to the site resident inspector for information.
If you have any questions, please telephone M. R. Harding at (615) 870-6422.
Very truly yours, TENNESSEE VALLEY AUTHORITY k
J. A. Domer, Assistant Director Nuclear Safety and Licensing Enclosures cc:
See page 2 B707130060O{00 27
/ Ok ADOCK g PDR PDR 7
e I
An Equal Opportunity Employer
1 f U.S. Nuc1 car Regulatory Commission 0Et cc (Enclosures):
Mr. G. G. Zech, Assistant Director
)
for Inspection Programs
]
Office of Special Projects U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. J. A. Zwolinski, Assistant Director for Projects Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission 4350 East West Highway EWW 322 Bethesda, Maryland 20814 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 1
1
ENCLOSURE 1 System 030 - Develop functional test for Diesel Generator Building space heaters, shutdown transfer room space heaters. To be performed before mode 2 entry.
System 031 - Verify low temperature cutout on electric board roam air handling units; verify failure position of all air-operated cutouts; verify time delay for starting. battery room exhaust fan C-B following the loss of both the operating and the standby fans on low airflow.
To be performed before mode 4 entry.
System 067 - Operate flow control valve (FCV) 2-FCV-67-67 from the auxiliary control point; verify the 35-percent position limit switch setpoint for 0*FCV-67-152.
To be performed before mode 4 entry.
l System 070 - Verify operati'on of the thermal barrier booster pumps for a blackout followed by a safety injection signal; verify manual operation of the Component Cooling System (CCS) seal leakage return pumps; verify proper operation of the thermal barrier booster pumps (will not auto-start following either a blackout or a safety injection signal). To be performed before mode 4 entry.
System 072 - Verify containment spray pump performance curves; measure l
containment spray system differential. pressure across the CCS heat exchangers. To be performed before mode 4 entry.
System 082 - Verify the operation of the diesel generators (functions to be l
tested still under development).
To be performed before mode 4 entry.
System 003 - (Auxiliary Feedwater) - Verify automatic swapover of the steam I
supply valves to the turbine-driven auxiliary feedwater pump from steam generator No. I to steam generator No. 4 during dynamic stean flow conditions. To be performed before mode 2 entry.
System 074 - Verify interlocks associated with the residual heat removal j
supply valves from the Reactor Coolant System and the containment j
sump. To be performed before mode 2 entry.
1 System 003 - (Main Feedwater) - Verify operability of the high-pressure (HP) feedwater isolation valve handswitches; verify the operability of the HP feedwater heater solenoid-operated valves; verify operation of the main feed pump turbine (MFPT) minimum flow control valves. To be tested before mode.4 entry.
System 046 - Verify operability of the main feed pump turbine control oil trip relays. To be performed before mode 4 entry.
~
D S
l ENCLOSURE 2
~~
Page No.
1 06/29/87
)
RESTART TEST GROUP LIST OF TESTS TO BE PREFORMED TEST TO TITLE M
BE OF O
RUN FOR TEST D
RTG E
IMI-1 MAIN STEAM SYSTEM - UNITS 1 AND 2 5
4 IMI-68 REACTOR COOLANT SYSTEM - UNITS 1 AND 2 5
1 IMI-99 REACTOR PROTECION SYSTEM - UNITS 1 AND 2 5
j PMT-28 STEAM GENERATOR BLOWDOWN SYSTEM 3
PMT-061 RCS PRESSURIZER SAFETY VALVES LOOP SEAL 4
INSULATION TEST l
SI-2 SHIFT LOG, - UNIT 1 AND 2 3
SI-6 CONTAINMENT BUILDING VENTILATION ISOLATION 5
(18 MONTH) - UNITS 1 AND 2 SI-6.1 CONTAINMENT BUILDING VENTILATION ISOLATION 5
(100 HRS /7 DAY), - UNITS 1 AND 2 SI-7.3 DIESEL GENERATOR FUEL OIL TRANSFER PUMP 5
PERFORMANCE TEST SI-12 ECCS VALVE ALIGNMENT VERIFICATION UNITS 1 AND 5
2 SI-14.2 VERIFICATION OF CONTAINMENT INTEGRITY - UNIT 5
I 2
SI-15 EMERGENCY CORE COOLING SYSTEM RER LOOP 4 RCS 4
i ISOLATION UNITS 1 AND 2 SI-16 BIT HEAT TRACING - UNITS 1 AND 2 4
SI-26.1A LOSS OF OFFSITE POWER WITH SAFETY INJECTION -
5 D/G 1A-A CONTAINMENT ISOLATION TEST, UNIT 1 SI-26.1B LOSS OF OFFSITE POWER WITH SAFETY INJECTION -
5 D/G 1B-B TEST - UNIT 1 SI-26.2A LOSS OF OFFSITE POWER WITH SAFETY INJECTION -
5 D/G 2A-A CONTAINMENT ISOLATION TEST - UNIT 0 SI-26.2B LOSS OF OFFSITE POWER.WITH SAFETY INJECTION -
5 D/G 2B-B TEST - UNIT 2 SI-28 CONTAINMENT AIR RETURN FANS - UNITS 1 AND 2 5
Page No.
2 06/29/87 RESTART TEST GROUP j
LIST OF TESTS j
TO BE PREFORMED TEST TO TITLE M
BE OF 0
1 RUN FOR TEST D
RTG E
SI-31 ACCUMULATOR ISOLTION VALVES AUTO-OPENING SIS 5
I
- UNITS 1 AND 2
}
SI-31.1 ACCUMULATOR ISOLATION VALVES AUTO-JPENING -
3 P UNITS 1 AND 2 SI-45.1 ESSENTIAL RAW COOLANT WATER PUMPS - UNITS 1 5
AND 2 i
SI-62 CONTAINMENT VACUUM RELIEF VALVES AUTO-OPEN, -
5 UNITS 1 AND 2 SI-70.2 CHANNEL CALIBRATION OF RCS WIDE RANGE, AND 5
PRESSURIZER RELIEF DISCHARGE TEMPERATURE INSTRUMENTATION - UNIT 2 SI-75 REMOTE SHUTDOWN MONITORING INSTRUMENTATION 5
STEAM GENERATOR LEVEL (18 MONTHS), - UNITS 1 AND 2 SI-83 CHANNEL CALIBRATION FOR RADIATION MONITORING 5
SYSTEM, - UNITS O AND 1
)
SI-83.2 CHANNEL CALIBRATION FOR RADIATION MONITORING 5
SYSTEM - UNIT 2 SI-86 REMOTE SHUTDOWN MONITORING INSTRUMENTATION -
5 STEAM GENERATOR PRESSURE CHANNEL CALIBRTION (REFUELING OUTAGE), - U1 AND U2 SI-90.12 REACTOR TRIP INSTRUMENTATION MONTHLY 4
FUNCTIONAL TESTS (RACK 2) - UNIT 2 SI-90.12A REACTOR TRIP INSTRUMENTATION QUARTERLY 4
FUNCTIONAL TESTS (RACK 1) - UNIT 2 SI-90.22 REACTOR TRIP /ESF INSTRUMENTATION QUARTERLY 4
FUNCTIONAL TESTS (RACK 3 AND 4 - UNIT 2 SI-90.32 REACTOR TRIP INSTRUMENTATION MONTHLY 4
FUNCTIONAL TESTS (RACK 5) - UNIT 2 SI-90.32A REACTOR TRIP INSTRUMENTATION QUARTERLY 4
FUNCTIONAL TEST (RACK 5) - UNIT 2 SI-90.42 REACTOR TRIP /ESF INSTRUMENTATION QUARTERLY 4
FUNCTIONAL TESTS (RACKS 7.AND 8) - UNIT 2
}
Page No.
3 i
06/29/87 RESTART TEST GROUP LIST OF TESTS TO BE PREFORMED TEST TO TITLE M
BE OF 0
RUN FOR TEST D
RTG E
SI-90.52 REACTOR TRIP INSTRUMENTATION MONTHLY 4
FUNCTIONAL TESTS (RACK 10) - UNIT 2 SI-90.52A REACTOR TRIP INSTRUMENTATION QUARTERLY 4
FUNCTIONAL TESTS (RACK 9) - UNIT 2 SI-90.62 REACTOR TRIP /ESF INSTRUMENTATION OUARTERLY 4
i FUNCTIONAL TESTS, (RACK 11) - UNIT 2
)
1 SI-90.72 REACTOR TRIP INSTRUMENTATION MONTHLY 4
FUNCTIONAL TEST (RACK 13) - UNIT 2 SI-90.72A QUARTERLY FUNCTIONAL TET OF REACTOR TRIP /ESF 4
4 INSTRUMENTATION, RACK 12 - UNIT 2 SI-90.82 REACTOR TRIP INSTRUMENTATION MONTHLY 5
FUNCTIONAL TEST (SSPS), - UNIT 2 SI-92 REMOTE SHUTDOWN MONITORING INSTRUMENTATION -
5 PRESSURIZER PRESSURE CHANNEL CALIBRATIONS, (REFUELING OUTAGE) - UNITS 1 & 2 8
SI-93 REACTOR TRIP INSTRUMENTATION FUNCTIONAL TESTS 3
i CONDITIONAL 7 DAYS (PRIOR TO STARTUP) - UNIT 1 AND 2 SI-93.1 REACTOR TRIP INSTRUMENTATION FUNCTIONAL TESTS 3
TURBINE AUTO STOP OIL DUMP & THROTTLE VALVES (CONDITIONAL 7 DAYS PRIOR TO STARTUP) UNITS 1 AND 2 SI-93.2 REACTOR TRIP INSTRUMENTATION FUNCTIONAL TESTS 4
SR AND IR NUCLEAR INSTRUMENTATION - UNITS 1 AND 2 SI-94.1 REACTOR TRIP INSTRUMENTATION REFUELING OUTAGE 5
CHANNEL CALIBRATION (RCS PRZ PRESS & LEVLS),
- UNITS 1 AND 2 SI-94.2 REACTOR TRIP INSTRUMENTATION CHANNEL 4
CALIBRATION (RCS TEMPERA'IURE AND FLOW), -
UNITS 1 AND 2 SI-94.3 REACTOR TRIP INSTRUMENTATION REFUELING OUTAGE CHANNEL CALIBRATION (NUCLEAR INSTRUMENTATION SYSTEM) - UNITS 1 AND 2
t Page No.
4-06/29/87 1
RESTART TEST GROUP LIST OF TESTS I
TO BE PREFORMED TEST TO TITLE M
BE OF 0
RUN FOR TEST D
j RTG E
j i
SI-97 CALIBRATION OF AUXILIARY FEEDWATER FLOW RATE 5
FOR REMOTE SHUTDOWN AND ACCIDENT MONITORING, (REFUELING OUTAGE) UNITS 1 AND 2 i
SI-98.3 CHANNEL CALIBRATION FOR ENGINEERED SAFETY 4
FEATURE INSTRUMENTATION (CONTAINMENT
-PRESSURE / TURBINE IMPULSE PRESSURE) (REFUELING '
OUTAGE) - UNITS 1 AND 2
]
SI-98.4 CHANNEL CALIBRATION FOR ENGINEERED SAFETY
'5 J
FEATURE INSTRUMENTATION - CONTAINMENT SUMP UNITS 1 AND 2 SI-98.5 CHANNEL CALIBRATION FOR ENGINEERED SAFETY 5
FEATURE INSTRUMENTATION RWST (18 MONTHS)
UNITS 1 AND 2 SI-102 DPSO/SA FUNCTIONAL TEST OF DIESEL GENERATOR 5
PROTECTION RELAYS - UNITS 1 AND 2 SI-105 VITAL BA*ITERY BANK AND NORMAL CHARGER 5
PERFORMANCE TETS - UNIT 0 SI-106 ICE CONDENSER - ICE BED, - UNITS 1 AND 2 5
SI-107 ICE CONDENSER FLOOR DRAINS 5
SI-108 ICE CONDENSER DOORS, - UNITS 1 AND 2 4
SI-118 MOTOR-DRIVEN AUXILIARY FEEDWATER PUMP AND 4
VALVE AUTOMATIC ACTUATION, - UNITS 1 AND 2 SI-118.1 TURBINE-DRIVEN AUXILIARY FEEDWATER PUMP AND 4
VALVE AUTOMATIC ACTUTION - UNITS 1 AND 2 SI-130.1 TURBINE-DRIVEN AUXILIARY FEEDWATER PUMPS -
3 I
UNITS 1 AND 2 SI-136 EGTS CLEANUP SUBSYSTEM FUNCTIONAL TEST -
5 UNITS 1 AND 2 SI-142 EMERGENCY GAS TREATMENT SYSTEM FILTER TRAIN 5
TEST - UNIT 0 SI-149 AUXILIARY BUILDING GAS TREATMENT SYSTEM 5
VACUUM TEST - UNIT 0 l
~
I.
Page No.
5 06/29/87 RESTART TEST GROUP LIST OF TESTS TO BE PREFORMED TEST TO TITLE M
BE OF 0
RUN FOR TEST D
RTG E
SI-151 SIX MONTH TET REQUIREMENT ON ELECTRIC 3
HYDROGEN RECOMBINER SYSTEM, - UNITS 1 AND 2 SI-155 REACTOR COOLANT FLOW VERIFICATION - UNITS 1 1
AND 2 SI-158.1 CONTAINMENT ISOLATION VALVE LEAK RATE TEST -
5 UNITS 1 AND 2 SI-159.1 PERSONNEL AIRLOCK OPERABILITY AND OVERALL 5
LEAKAGE TEST UNITS 1 AND 2 SI-159.2 AIRLOCK RESILIENT SEAL LEAK RATE TEST - UNITS 5
1 AND 2 SI-159.3 CONTAINMENT HYDROGEN ANALYZER SYSTEM LEAKAGE 3
TEST SI-159.4 PERSONNEL AIRLOCK OPERABILITY - UNITS 1 AND 2 5
SI-161 CHANNEL CALIBRATION OF SIS ACCUMULATOR TANK 5
WATER LEVEL AND PRESSURE INSTRUMENTATION -
UNITS 1 AND 2 SI-166
SUMMARY
OF VALVE TESTS FOR ASME SECTION XI -
5 UNITS 1, 2 AND COMMON SI-166.1 FULL STROKING OF CATEGORY "A"
AND "B" VALVES 5
DURING OPERATION - UNITS 1 AND 2 SI-166.10 ACCU ULATOR/ INJECTION PRIMARY AND SECONDARY 5
CHECK VALVE INTEGRITY - UNITS 1 AND 2 SI-166.11 UHI CHECK VALVE INTEGRITY - UNITS 1 AND 2 4
SI-166.12 SIS /RHR/UHI - CHECK VALVE OPENING TEST -
5 UNITS 1 AND 2 SI-166.2 PARTIAL STROKING OF MAIN STEAM ISOLATION 5
VALVES DURING OPERATION - UNITS 1 AND 2 SI-166.23 ERCW CHECK VALVE TEST DURING COLD SHUTDOWN 4
SI-166.3 FULL STROKING OF CATEGORY "A" AND "B" VALVES 5
DURING COLD SHUTDOWN - UNITS 1 AND 2
Page No.
6 06/29/87 RESTART TEST GROUP LIST OF TESTS TO BE PREFORMED TEST TO TITLE M
BE OF 0
RUN FOR TEST D
RTG E
SI-166.31 FEEDWATER CHECK VALVE TEST DURING COLD 5
SHUTDOWN - UNITS 1 AND 2 SI-166.6 TESTING OF CATEGORY "A"
AND "B" VALVES AFTER 5
MAINTENANCE OR UPON RELEASE FROM A HOLD ORDER
- UNITS 1 AND 2 SI-193 PERIODIC CALIBRATION OF VENTILATION SYSTEM 5
(REFUELING CYCLE) - UNITS 1 AND 2 SI-194 PERIODIC CALIBRATION OF ICE CONDENSER SYSTEM 5
SI-195 PERIODIC CALIBRATION OF FLUID COMPONENTS, 5
INC. FLOW SWITCHES (SYSTEMS 30, 31, 65)
(SEMI-ANNUAL) - UNITS 0, 1, AND 2 l
SI-196 PERIODIC CALIBRATION OF UPPER HEAD INJECTION 5
l SYSTEM INSTRUMENTATION (18 MONTHS) - UNITS 't AND 2 j
SI-202 CALIBRATION OF SAFETY INJECTION SYSTEM 5
INSTRUMENTS (REFUELING OUTAGE) - UNITS 1 AND 2
SI-205 CHANNEL CALIBRATIONS FOR RADIATION MONITORING 5
j SYSTEMS (18 MONTHS) - UNITS 1 AND 0 SI-205.2 CHANNEL CALIBRATIONS FOR RADIATION MONITORING 5
SYSTEMS (18 MONTHS) - UNIT 2 i
SI-209.1 &.2 PERIODIC CAL OF VOLTMETERS 5
SI-217 PERIODIC CALIBRATION OF RCP - UNDERVOLTAGE 5
RELAYS (REFUELING CYCLE), UNITS 1 AND 2 SI-217.2 PERIODIC CALIBRATION OF REACTOR COOLANT PUMP 5
UNDERVOLTAGE RELAYS - UNIT 2 SI-218.2 PERIODIC CALIBRATION OF RCP UNDERFREQUENCY 5
RELAYS - UNIT 2 SI-219 CHANNEL CALIBRATION OF THE CONTAINMENT 3
HYDROGEN ANALYZERS TRAIN A AND B (QUARTERLY)
- UNITS 1 AND 2 SI-220.1(REV)
UNIT 1 LOAD SEQUENCE TIMER FUNCTIONAL TEST 5
~
~
Page No.
7 06/29/87 RESTART TEST GROUP LIST OF TESTS TO BE PREFORMED TEST TO TITLE M
BE OF 0
RUN FOR TEST D
RTG E
SI-220.2(REV)
AUTOMATIC LOAD SEQUENCE TIMER FUNCTIONAL TEST 5
- UNIT 2 SI-227 RESPONSE TIME TESTING REACTOR PROTECTION 5
SYSTEM TRIP FUNCTIONS (REFUELING OUTAGE),
UNITS 1 AND 2 SI-228.2 FUNCTIONAL TEST OF REACTOR COOLANT PUMP 5
UNDERVOLTAGE RELAYS - UNIT 2 l
SI-229 UPPER HEAD INJECTION RUPTURE DISK BURST TEST 5
3
- UNITS 1 AND 2 l
SI-230.2 PERIODIC FUNCTIONAL TEST OF RCP -
5 i
i UNDERFREQUENCY RELAYS - UNIT 2 SI-235(REV) 6,9 KV EMERGENCY BUS LOSS OF VOLTAGE 5
)
OVERVOLTAGE AND DEGRADED VOLTAGE RELAY j
CALIBRATION (6 MONTHS) - UNITS 1 AND 2 SI-246 RECALIBRATION PROCEDURE FOR REACTOR COOLANT 1
j FLOW CHANNELS - UNITS 1 AND 2 l
SI-247.100 RESPONSE TIME TESTING OF THE ENGINEERED 5
SAFETY FEATURE INSTRUMENTATION (REFUELING l
OUTAGE) - UNITS 1 AND 2 l
1 SI-247.900 ENGINEERED SAFETY FEATURE RESPONSE TIME 3
l VERIFICATION (REFUELING CYCLE) - UNITS 1 AND i
2 I
SI-257 PERIODIC FUNCTIONAL OF RCP PROTECTIVE DEVICES 5
(18 MONTHS) - UNITS 1 AND 2 REISSUED SI-264 EGTS ANNULUS VACUUM DRAW DOWN TEST - UNITS 1 5
AND 2 1
SI-268 VERIFICATION OF P4 INTERLOCK INPUT TO SSPS -
3 i
UNITS 1 AND 2 l
SI-268.3 VERIFICATION OF TOTAL INTERLOCK FUNCTION -
3 P-4 INTERLOCK - UNITS 1 AND 2 l
SI-269 CHANNEL FUNCTIONAL TEST OF ESF 4
INSTRUMENTATION FOR AUTOMATIC SWITCHOVER TO l
CONTAINMENT SUMP (MONTHLY) - UNITS 1 AND 2 I
l
Page No.
8 06/29/87 RESTART TEST GROUP LIST OF TESTS TO BE PREFORMED TEST TO TITLE M
BE OF 0
RUN FOR TEST D
RTG E
SI-270.1 &.2 FUSES FOR CONT. PENT. OVER CURRENT PROTECTION 5
SI-270.2 FUSES FOR CONTAINMENT PENETRATION CONDUCTOR 5
OVERCURRENT PROTECTION - UNIT 2 (COMMON)
SI-276 AUXILIARY FEEDWATER AUTOMATIC CONTROL VALVES 4
OPERABILITY - UNITS 1 AND 2 SI-282.1 CALIBRATION OF FLUX IMBALANCE PENALTY 4
FUNCTION GENERATOR (F Q) XM-92-5005K (NY-411A, RACK 2 - UNITS 1 AND 2 SI-282.2 CALIBARION OF FLUX IMBALANCE PENALTY FUNCTION 4
GENERATOR F (
Q) XM-92-5006K (NY-421A, RACK
- 6) UNITS 1 AND 2 SI-282.3 CALIBRATION OF FLUX IMBALANCE PENALTY 4
FUNCTION GENERATOR F (
Q) XM-92-5007K (NY-431A, RACK 10) UNITS 1 AND 2 SI-282.4 CALIBRATION OF FLUX IMBALANCE PENALTY 4
I FUNCTION.GENERTOR F (
Q) XM-92-5008K i
(NY-441A, RACK 13) UNITS 1 AND 2 SI-287 WEEKLY FUNCTIONAL TEST OF THE CONTAINMENT 3
HYDROGEN ANALYZERS - TRAIN A AND B (WEEKLY)
UNITS 1 AND 2 SI-297 PRESSURIZER HEATER CAPACITY - UNITS 1 AND 2 5
~
SI-298.2 FUNCTIONAL TEST OF CONDENSATE STORAGE TANK 5
HEADER PRESSURE TO AUX FEEDWATER SYSTEM SI-305.2 HYDROGEN MITIGATION SYSTEM OPERABILITY - UNIT 3
2 3
SI-307.1(REV)
DEGRADED VOLTAGE TIMER FUNCTIONAL TEST FOR 5
UNIT 1 SI-307.2(REV)
DEGRADED VOLTAGE RELAY RESPONSE TIME TEST AND 5
TIMER CALIBRTION UNIT 2 SI-478 RESPONSE TIME TESTING REACTOR COOLANT 3
SYSTEM-NARROW RANGE RTD'S - UNITS 1 AND 2 SI-480 CHANNEL CALIBRATIONS FOR THE EBERLINE 5
ACCIDENT RADIATION MONITORING SYSTEMS -SPING MONITOR (R-90-400) 18 MONTHS - UNITS 1 AND 2 f
e - _ - _ _ _ _. _
O Page No.
9 06/29/87 RESTART TEST GROUP LIST OF TESTS TO BE PREFORMED TEST TO TITLE M
BE OF O
l RUN FOR TEST D
RTG E
SI-480.1 ACCIDENT MONITORING SYSTEM SHIELD BUILDING EXHAUST HIGH LEVEL RADIATION MONITORING CHANNELS (RE-90-401, -402, AND -403) - UNITS 1 AND 2 SI-480.2 EBERLINE ACCIDENT MONITORING SYSTEM CONDENSER 5
VACUUM EXHAUST HIGH LEVEL RADIATION MONITORING CHANNELS (RE-90-404, AND -405)
UNITS 1 AND 2 SI-488 RCS RTD VERIFICATION OF CALIBRATION - UNITS 1 3
AND 2 SI-506.7 CONTAINMENT PURGE AIR EXHAUST FILTER TEST -
3 UNITS 1 AND 2 SI-566 ERCW FLOW VERIFICATION TEST - UNITS 1 AND 2 5
SI-621(REV)
PERIODIC FUNCTIONAL TEST OF LOSS OF VOLTAGE 5
l 1
RELAYS ON SHUTDOWN BOARD (REFUELING CYCLE)
UNITS 1 AND 2 SI-685.2 CHANNEL CALIBRTION FOR LOW RANGE ACCIDENT 5
l RADIATION MONITORS, 18 MONTHS - UNIT 2 l
SI-686.2 CHANNEL CALIBRATION FOR MID RANGE ACCIDENT 5
RADIATION MONITORS 18 MONTHS - UNITS 0 AND 1 SI-689 AUXILIARY CONTROL AIR OPERABILITY TEST -
5 j
UNITS 1 AND 2 j
SI-700.1 CONDENSATE AND FEEDWATER HEATER HI-HI LEVEL 5
1 SWITCH TEST j
i SI-720 CALIBRATION OF AUXILIARY FEEDWATER TERRY 4
1 TURBINE CON'IROLS REFUELING OUTAGE - UNIT 2 j
SI-728 FUEL HANDLING EXHAUST DAMPER TIME TEST 5
SMI-0-18-1 SET POINT VERIFICATION FOR DIESEL GENERATOR 5
l DAY TANK LEVEL SWITCHES UNIT 1 AND 2 SMI-0-63-1 FUNCTIONAL TEST OF MANUAL REACTOR TRIP 5
FUNCTION FROM THE MANUAL SI HANDSWITCHES SMI-0-99-2 REACTOR PROTECTION SYSTEM TEMPORARY 5
ALTERATION TO CLEAR ANNUNCIATORS j
i
o Page No.
10 1
06/29/87 RESTART TEST GROUP
{
LIST OF TESTS TO BE PREFORMED j
TEST TO TITLE M
BE OF 0
i RUN FOR TEST D
RTG E
t 501-67-1 UPPER HEAD INJECTION ACCUMULATOR 5
TI-60 INCORE THERMOCOUPLE AND RTD CROSS CALIBRATION 4
i i
l l
l i
l l
l
\\
l l
l l
1