Further Response to Appeal Re Denial of FOIA Request for Documents Re NRC Comanche Peak Task Force.Forwards Documents K-396 & K-301 Through K-307.All Other Documents Partially & Completely Withheld (Ref FOIA Exemptions 4 & 5)
ML20234B824
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/26/1987
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20234B826 List:
References
FOIA-85-59, FOIA-86-A-104 NUDOCS 8707060220
Download: ML20234B824 (2)


Text

  1. p' cyo uq'o UNITED STATES

'g

[ ) y. g NUCLEAR REGULATORY COMMISSION g WASHING TON, D. C. 20555 3p k..../ JUN 2 61987 Billie Pirner Garde. Esquire Guvernment Accountability Project Midwest Office IN RESPONSE REFER 104 E. Wisconsin Avenue TO F01A-86-A-104 Appleton, WI 54915-8605 (F01A-85-59)

Dear Ms. Garde:

This is in further response to your letter dated June 25, 1986, in which you appealed Mr. Donnie H. Grimsley's letter dated May 27, 1986.

Mr. Grimsley's letter denied documents in whole or in part that were subject to your Freedom of Information Act (F0IA) request for documents a related to the NRC Comanche Peak Task Force. My letter to you dated April 10,1987, addressed the agreement which was the basis for deleting certain information in the requested documents. This letter addresses those entire nine documents and the portions of 84 documents listed on Appendices K and L which were initially denied pursuant to F0IA exemptions.. This letter also addresses additional documents, K-111 and L-263, for which Mr. Grimsley's letter dated May 27, 1986, failed to indicate that portions of the documents were withheld from public disclosure pursuant to Exemption (5) of the F0IA. For your information, document K-241 was placed in the NRC Public Document Room among the documents disclosed in Mr. Grimsley's letter dated May 27, 1986.

Acting on your appeal, I have carefully reviewed the record in this case and have determined that document K-396 in its entirety and portions of documents K-301 through K-307 can now be made publicly available. This information is enclosed. I have also determined that the previously l withheld information in whole or in part in seven documents will continue I to be withheld from public disclosure pursuant to Exemption (4) of the l F0IA (5 U.S.C. 552(b)(4)) and 86 documents will continue to be withheld f from public disclosure pursuant to Exemption (5) of the FOIA (5 U.S.C.

L 552(b)(5)) and 10 CFR 9.5(a)(4) and (5) of the Comission's l

regulations. Your appeal is, therefore, partially granted and partially '

i denied.

The withheld portions of documents K-301 through K-307 contain the tests and procedures required for the Brand Industrial Services, Inc. (BISCO)

! to successfully complete the installation of penetration seals at a nuclear power facility. BISCO considers this information to be commercial (proprietary) infonnation the disclosure of which would harm its competitive position.

As stated in Mr. Grimsley's letter dated May 27, 1986, the withheld information, in whole or in part, in 86 documents relates to the subject of potential violations. The withheld portions were predecisional to the issuing of the enforcement action on Comanche Peak. Exemption (5) shields from mandatory disclosure information generated in the I

deliberative process that precedes most decisions of government agencies.

I B707060220 870626 PDR FOIA GARDE 86-A-104 PDR L ~ -

_,.~.-

  • Billie Pirner Gurde JUN 2 6 }gg7 This is a final agency action. As set forth in the F0IA (5 U.S.C.

' 552(a)(4)(B)), judicial review of this decision is available in a district court of the United States in the district in which you reside or have your principal place of business or in the District of Columbia.

Sincerely, I

Y ctor S 11 Jr.

xecuti ' Di ctor for Operations

Enclosures:

As stated i

l L-l l

l' l

r .,

~

parso

+8' o

'g . UNITED STATES

'8 n NUCLEAR REGULATORY COMMISSION  !

3; a wAsmNG TON, D. C. 20555

'+,,,,,* MAY 2 71986'

, Docket Nos. 50-445/50-446 Ms. Billie Pirner Garde Director, Environmental Whistleblower Clinic Government Accountability Project 1555 Connecticut Avenue, NW, Suite 202 IN RESPONSE REFER Washington, DC 20036 TO F01A-85-59 L

Dear Ms. Garde:

.This is in further response to your letter dated January 21, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), records related to the NRC Comanche Peak Task Force established in March 1984. .

We'are now placing two boxes of records (boxes two and three) in'the mechanical / piping category in the NRC Public Document Room (PDR) in file F01A-85-59 under your name. In particular, with the exception of those records indicated by asterisks on the enclosed Appendices K and L, which are i

undergoing further staff review, we are making available for public inspection -

and copying at the PDR the 420 records listed on the enclosed Appendix K and the 360 records listed on the enclosed Appendix L. ,

With regard to records identified on Appendix K, the records identified at numbers 301 through 307 and 396 are being withheld from public disclosure pursuant to Exemption ~(4) of'the F0IA (5 U.S.C. 552(b)(4)) and 10 CFR 9.5(a)(4) of the Comission's regulations because they contain comercial information provided in confidence to the NRC. The record identified at number 420 and portions of the records identified at numbers 5 through 7, 9 through 15, 21 through 23, 25 through 28, 55 through 62, 88 through 96, 116, 117, 119 through 123, 143 through 148, 176 through 179, 196, 207, 241, 258, 259, 268, and 290 are being withheld from public disclosure pursuant to Exemption (5) of the FOIA (5 U.S.C. 552(b)(5)) and 10 CFR 9.5(a)(5) of the Comission's regulations. The withheld portions contain the advice, opinions, and recommendations of the staff concerning potential violations. The nonexempt portions of the Appendix K records are being placed in PDR file F01A-85-59 under your name.

In accordance with the agreement reached between you and the NRC staff at a

- meeting held on May 8,1985, as sumarized in Mr. J. M. Felton's letter to you dated May 15, 1985, we are not disclosing the records identified at numbers 1, 3, 87,168, and 420.and portions of the records identified at numbers 4, 6 through 9, 11 through 15, 24,~29, 30, 55, 56, 63 through 65, 97, 98, 115, 118, 141, 169, 180 through 183, 208, 242, 244, 245, 255, 258, 263, 264 through 267, 269, 287, 300, 319, 374, and 375. The information not disclosed, without invocation of an F0IA exemption, consists of names and other identifying information concerning allegers, interviewees, and other individuals.

r r $

L/ Uf *f)I

0 i Ms. Garde With regard to the records identified on Appendix L, portions of the records  !

identified at numbers 34, 35, 107 through 110, 112 through 114, 116, 125, 148 through 150, 213, 214, 218, 219, 262, 264, and 278 through 283 are being withheld from public disclosure pursuant to Exemption (5) of the F0IA (5 U.S.C. ,

552(b)(5)) and 10 CFR 9.5(a)(5) of the Commission's regulations. The withheld portions contain the advice, opinions, and recommendations of the staff concerning potential violations. The nonexempt portions of the Appendix L  ;

records are being placed in POR file F01A-85-59 under your name.  !

In accordance with the agreement noted above, we are not disclosing the  ;

records identified at numbers 144 through 146 and 151 and portions of the records identified at numbers 32, 106, 111, 116, 117, 147, 153, 203, 218, 277, 284, and 285, without an invocation of an F0IA exemption.

Pursuant to 10 CFR 9.9 of the Commission's regulations, it has been determined that the information withheld pursuant to Exemptions (4) and (5) of the F0IA is exempt from production or disclosure and that its production or disclosure is contrary to the public interest. The persons responsible for this denial are the undersigned and Mr. Harold R. Denton, Director, Office of Nuclear Reactor Regulation.

This denial may be appealed to the Executive Director for Operations within 30 days from the receipt of this letter. Any such appeal must be in writing, I addressed to the Executive Director for Operations, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial FOIA Decision."

A separate set of the released records is being made available for public inspection and copying at the Local Public Document Room (LPDR) located at the University of Texas Library, 170 South Cooper Street, Arlington, Texas.

Additional boxes of records subject to your request are currently under review and will be placed in the POR and LPDR in the coming weeks.

Sincerely, M

Donnie H. Grimsley, Director j Division of Rules and Records 4 Office of Administration

Enclosures:

As stated

_____________ - _ ______ _________ _-_ ___ A

4 Re: FOIf.-85-50 i EPENDIX K,.

Documents 'in PDR file F0lI-85-59 Mechanical and Piping DATE PAGES

1. 9/15/82 . Testimony of A11eger 4 2- 12/3/82 Letter to R.J. Gary 27 from G.L. Madsen .

Transmittal of Inspection Report

3. 3/2/84 Memorandum to E. Johnson 2 from R. Taylor

Subject:

More CPSES Allegations

4. 3/7/84 Testimony of A11eger 20
5. 10/29/84 SSER AQ-23 Draft 5 16
6. 11/15/84 SSER AQW-5 Draft 5 6
7. 1/8/85 SSER AQW-5 Draft 7 9
8. 1/25/85 Confidential Interview 6 of A11eger
9. 1/31/85 SSER AQW-5 Draft 8 8
10. 3/12/85 SSER AW-34, AW-35, AW-38 14 Draft 14
11. 3/18/85 SSER AQW-5 Draft 10 8
12. 3/18/85 SSER AQW-5 Draft 10 9 (withcomments)
13. 3/18/85 SSER AQW-5 Draft 10 9 (withcomments) 14, 3/18/85 SSER AQW-5 Draft 10 13 (withcomments)

A11eger

15. No Date DCP SSER AQW-5 Draft 9 14 1

Re: FOIA 95-50 o APPENDIX K j

(Continued) 16, 7/2/79 RIV Rpt. 79-15 14 Transmittal of Inspection j Report '

17. 5/24/82 Partial Testimony 1
18. 9/10/82 CPSES NCR M-80-0009 R5 2 DG Aux. Skids
  • 19. 3/7/84 AQW-5 Partial 3 Testimony
20. 3/4/85 TUGC0 Office Memorandum to file 6 1

SUBJECT:

Re-Numbering / Deletion of Procedures / Instructions l

21, 12/5/84 SSER Category 20 Draft 5 5

22. 1/31/85 SSER Category 26 Draft 6 -

5 23, 2/26/85 SSER Category 26 Draft 7 7 24, 3/5/85 NRC Technical Review Team 23 Feedback

25. 3/18/85 SSER Category 26 Draft 8 9 26, 3/18/85 SSER Category 26 Draft 8 7 (Withc,omments) -
27. 3/18/85 SSER Category 26 Draft 8 6 ,

(Revision)

28. 3/18/85 SSER Category 26 Draft 8 3 (Comments on Page 5 and 6)
29. No Date AQW-2 84-006 6 Testimony
30. No Date TRT Notes 1 2

s Re: F0f A-85-59 APPENDIX K (Continued)

31. 7/31/78 Perfomance Qualification 4 Test (Brown & Root)
32. 5/14/79 RIV 79-11 Transmittal 15 of Inspection Report 33, 6/29/79 Perfomance Qualification 1 Test PQt No. AZC 88021Rf Brown & Root 34, 7/3/79 RIY 79-15 11 Transmittal of Inspection Report
35. 8/15/79 Performance Qualification 1 Test PQT No. BHI-88021-Rf-1 Brown & Root
36. 8/27/79 Welder Performance Qualification 17 Record Standard Tests
37. 8/31/79 Perfomance Qualification 1

Test BJI-88021R

38. 10/4/79 RIV 50-445/79-20; 9 50-446/79-20
39. 11/5/79 BJI-88023-Rf-1 1 Perfomance Qualification Test-
40. 11/27/79 RIV 50-445/Rpt 79-22 11 RIV 50-446/Rpt 79-21 Transmittal of Inspection Report 41, 2/18/80 Welder Perfomance 19 Qualification Record Standard .

Tests 42, 2/28/80 Perfomance Qualification 1 Test PQI-88021-Rf/2

43. 3/17/80 Welder Performance 18 Qualification Record Standard Tests 3

e APPENDIX K Re: F01A-85-59 (Continued) 44 5/30/80 Gibbs & Hill ltr CPPA-5205 15 to Merritt from Heim

SUBJECT:

B&R Welding ')rocedure Specification 45, 8/26/80 Brown & Root Weld 8 Data Cards

46. 9/15/81 Perfonnance Qualification 1 Test AZC-88023-Rt
47. 11/10/81 Brown & Root Memo to 1 Distribution

SUBJECT:

WPS Qualification Suspension

48. 4/9/82 Gibbs & Hill ltr CPPA-17,945 11

SUBJECT:

B&R Welding Procedure

. Specifications 49, 11/1/83 Brown & Root ltr. 6 ORF #11285 RE: Approval of Welding Procedure Specification -

50. 11/19/82 Brown & Root Memo

SUBJECT:

7 Approval of Welding Procedures IM #24566

51. 5/24/82 Partial Testimony ,

2

52. 7/22/84 Welder Perfonnan'ce 11 Qualification' Record Standard Tests
53. No Date Brown & Root Memo 1

SUBJECT:

Welder Qualification

54. No Date Welder Qualification Matrix 7 I

1

. 4 I

Re: F01A-85-59 a

APPENDIX K (Continued)

Pages

55. 1/16/85 SSER AQW-67, 25, 29, 67, 72 9 Draft 6
56. 1/31/85: SSER AQW-67, 25, 29, 67, 72 9 Draft 7(withcomments)
57. 3/4/85 SSER AQW-25, 72, 29, 83 14 Handwritten Draft 1-A -
58. 3/18/85 SSER AQW-25, 72, 29, 83 9 Draft 2(withcomments)
59. 3/18/85 SSER AQW-25, 72', 29, 83 9 Draft 2 '
60. 3/18/85 SSER AQW-25, 72, 29, 83 8 l Draft 2, Revised
61. 3/18/85 SSER AQW-25, 72, 29, 83 9 Draft 2 (commentt pgs-4, 5, 7 & 8)
62. 3/18/85 .SSER AQW-25, 72, 29, 83
  • 8 Draft 2 (Rewrite)
63. No Date Partial Testimony of A11eger 7
64. No Date Partial Statement of A11eger 24
65. No Date Partial -

Testimony of A11eger 3 AQW-25

~* 66. No Date Partial Statment of A11eger 3 AQW-72 ,

5

Re: F01A-85-59 d

APPENDIX K (Continued)

67. 9/26/79 Manufacturing Record 3 Sheet ISO / SPOOL 4Q3 Rev. 0
68. 2/6/81 Brown & Root Dwg. No. 2 BRP-MS-2-RB-019 Rev. 1
69. 4/29/82 Material Verification Checklist 2 Hanger Mark #CC-1-028-003-A33R
70. 6/7/82 -

Brown & Root Inc. Quality 30 Dept. NCR M-3425 RI

71. 6/30/82 Attachment 7 Documentation ~ 29 Checklist Package Mark No. MS-1-RB-00 FWI 72 11/8/82 Brown & Root Dwg. Mark No. 2 CC-1-028-003-A33R Rev. 3
73. 2/1/83 Brown & Root Inc. Quality 30 Assurance Dept NCR No. M-3425 R2 74, 5/17/83 Brown & Root Inc. Quality 1 NCR No. M71225
75. 6/15/83 Brown & Root Inc. 5 Quality Assurance Dept NCR No.

. M7912

76. 6/20/83 Brown & Root Inc. 3 Quality Assurance Dept. NCR M-79495
77. 6/23/83 Brown & Root Inc. 2 Dwg. Mark No. CC-1-028-003-A33R

. Rev. 5

78. 8/15/83 Brown & Root Inc. 10 Quality Assurance Dept.

NCR No. 10216 6

Re: F01A-85-59 .

APPENDIX K (Continued)

79. 8/18/83 Brown & Root Inc. 2 Dwg. Mark No. CC-1-028-003-A33R Rev. 6
80. 8/29/83 Brown & Root Inc. 2 Dwg. Park No. CC-1-028-003-A33R Rev- G
81. 12/28/83 Brown & Root Inc. 1 Component Cooling Water Dwg. BRP-CC-2-AB-003 Rev. 8
82. 1/12/84 Brown & Root Procedure 5 CP-CM 6.9D Pages 35-39
83. 6/1/84 Partial Applicant Response 1 AQW-29 84 7/10/84 Brown & Root Procedure 3

CP-CPM 6.9G Pages 12-14

85. No Date Material Identification 2 Log
86. No Date
  • Partial Statement 1 AQW-29
87. 8/4/84 NRC Technical 35 Interview with alleger
88. 12/10/84 SSER AQW-1, 12, 26, 70 13 Oraft 7
89. 1/31/85 SSER AQW-1, 12, 20, 70 24 Draft 9(withcorrections)

Partially Handwritten

90. 1/31/85 SSER AQW-1, 12, 26, 70 13 .

Draft 9 (with comments) 91 2/25/85 SSER AQW-1, 12, 26, 70 16 Draft 10(withcorrections)

I 7

Re: F01A-85-59 6

l APPENOXX K l (Continued) i

92. 3/18/85 SSER AQW-1, 12, 26, 70 18 Draft 11 (with corrections)

Partially Handwritten I

93. 3/18/85 SSER AQW-1, 12, 26, 70 17 Draft 11 (with corrections) l 94 3/18/85 SSER AQW-1, 12, 26, 70 15 Draft 11 (with corrections)
95. 3/18/85 SSER AQW-1, 12, 26, 70 5 Draft 11 (comments on page 3,6,11,15)
96. 4/12/85 Partial SSER AQW-1, etc 15 (with coments &. changes)
97. No Date TRT Reviewers Notes 3
98. No Date Partial Statement of alleger 1 with TRT Reviewer notes l -

1

99. 7/11/75 Brown & Root Welding 3 Procedure Specification l No. 121288103 Rev. I Shielded Metal Arc 100.3/12/75 Brown & Root Procedure 5 l

35-1195-CCP-18 Rev. 0 101. 4/21/78 ASME Code Interpretation 1 IX-78-58 102. 10/6/78 Brown & Root Purchase 10 Order No. 36-1195-20762 103.1/22/79 Gibbs & Hill ltr to TUGC0 43 RE: 05217 MISC. Embedded Steel Rev. 2 104.3/2/79 Notes on G&H Spec. 2323-55-10, 4 Rev. 4 Reinforcing Steel 105. 3/12/79 35-1195-CCP-18 Rev. 0 7 Reinforcing Steel Activities 8

d

Re: F01A-85-59 4 4 APPENDIX K I (Continued) 106. 3/?7/81 TUSI Office Memorandum 10 CPPA-9234 T0: D.C. Frandkum

SUBJECT:

Approval of Welding Procedure Specifications

}

Ref.1) BRF-10500 2) BRF 10502 107. 12/4/81 Welders Certification 6 Update. Rod House No. II 108. 8/2/82 NRC Report of Inquiry 7 SUB. Alleged Improper Weld Practices at CPSES (Q4-82-0005) 109. 8/13/82 NRC Memorandum for G.L. Madsen 2 )

from R.G. Taylor SUB. Alleged Improper Weld Practices at CPSES 110. 9/27/83 Brown & Root ltr BRF #11281 25 to TUSI RE: Approval of Welding <

Procedure Specification 111. 3/18/85 -

Partial Draft SSER 16 AQW-1,12,26,70 t 112. No Date Partial Affidavit of allger 2 AQW-26

  • 113. No Date Partial Affidavit of alleger 2 AQW-12 114. No Date Partial Draft 12 SSER Handwritten  :

1 l

I 115. 8/23/84 Technical Interview 22 of alleger 116. 9/10/84 SSER AQW-78 Draft 1 5 117. 11/3/84 SSER AQW-78 15 Draft 4(2 copies) 118. 11/14/84 Technical Interview 38 of alleger 9

]

Re: F0!A-85-59 r # APPENDIX K (Continued) 119.1/15/85 SSER AQW-78 10 Draft 6 120.2/25/85 SSER AQW-78 Draft 7 6 121.3/13/85 SSER AQW-78 6 Draft 8 122.3/18/85 SSER AQW-78 6 Draft 8(withcomments) 123.3/18/85 SSER AQW-78 Draft 8 7 (with corrections and additions) 124.1/17/77 35-1195-IEI-19 1 Page 2 of 2 125.11/3/80 Brown & Root Memo 1 l T0: J.P. Clarke III, Sr.

Staff Engineer FROM: J.D. Martin, Calibration Supervisor

SUBJECT:

Oxygen Indicators 126.12/9/80 Brown & Root Interoffice 1 Memo to: J.D. Martin FROM:

J.P. Clarke III

SUBJECT:

Disposal of Calibration Records 127.4/27/81 Brown & Root Procedure 3 i CP-CPM-18.1 R0 RE: Construction Maintained QA Records i

128.5/11/81 Brown & Root Procedure 7 CP-CPM-2.1 RI RE: Calibration Personnel Requirements and Training 129.12/9/81 Brown and Root Procedure 21 CPM-13.1. R7 RE: General Calibration Procedure 130.12/20/81 Brown & Root Interoffice 1 Memo (IM #22385) FROM:

4 J.P. Clarke III TO: Distribution i RE: Compliance with CP-CPM-13.1 10 1

Re: F01 A 59 APPENDIX K j

(Continued)  !

\

131. 4/26/83 Brown & Root Memorandum 1 T0: R.G. Tolson FROM: D.C. Frankum

SUBJECT:

Retention of M&TE Issue Cards j

1 32. 6/22/83 TUGC0 Office Memo 1 I (TUQ-1713) FROM: R.G. Tolson T0: D.C. Frankum

SUBJECT:

Retention of M&TE Issue Cards 133. 1/17/84 TUGC0 Office Memorandum 1 (TUQ-1916) FROM: R.G. Tolson T0: 0.C. Frandkum

SUBJECT:

M&TE Historical' Records 134. 7/4/84 CPSES Calibration Report '1 135. 3/18/85 Partial SSER AQW-78 Draft 8 2 1 136. No Date Blank Brown & Root 1 Equipment Calibration System File Maintenance Data Sheet 137. No Date Confidence Check Record 1 for MTE 1902 138. No Date Blank form-Issue 1 Record CT & M&TE 139. No Date Booklet-0perating Instructions 19 for Edmont Oxygen Analyzer 140. No Date Brochure-Ecolyzer ., 2 0xygen Analyzer 141. 8/8/84 Technical Interview 11 of alleger

  • 142. 8/23/84 Technical Interview 42 of alleger  !

143, 9/10/84 SSER AQP-3 3 Draft 1 11

- . . .a

Re: F01A-85-59 APPENDIX K

~

(Continued) 144. 11/4/84 SSER AQP-3 4 Draft 3 145. 1/15/85 SSER AQP-3 5 Draft 5 146. 2/24/85 Handwritten SSER 6 Draft AQP-3 147. 3/18/85 SSER AQP-3 8 Draft 2 148. 3/18/85 SSER AQP-3 3 Draft 2 (with changes) 149.6/20/81 Westinghouse Dwg. 1554E35 R2 1 150.6/22/81 Westinghouse Dwg. 1554E33 R2 1 151.7/1/81 Westinghouse Dwg. 1554E34 R2 1 152.9/24/81 TUSI ltr (CPPA-12, 719) T0: 5 Tom Parker FROM: David H. Wade

SUBJECT:

Comanche Peak Steam Electric Station 10" 5.I. Line Restraints Ref. W Dwg. 1554E33 153.9/24/81 TUSI ltr (CPPA-12, 720) T0: 5 Tom Parker FROM: David H. Wade

SUBJECT:

Comanche Peak Steam Electric Station 10" S.I. Line Restraints Ref. 1) W Dwg.

1544E33 2) W Dwg. 1544E35 3)

CPPA-12, 719 154.10/8/81 Westinghouse 1tr T0: J.T. 1 Merritt (TUSI) FROM: A.T.-Parker

{

SUBJECT:

Texas Utilities Generating Company Comanche Peak Steam Electric Station 10" SI Pipe Whip Restraints l

)

12

Re: F01A-85-59 APPENDIX K t.' -

(Continued) 155. 10/31/81 Brown & Root Traveler 10 ME 81-2118-5500 156 11/24/81 Brown & Root Traveler 8 ME-81-2153-500 157. 10/8/81 Westinghouse 1tr WPT-4406 1 T0: TUSI

SUBJECT:

Texas Utilities

. Generating Company Comanche Peak Steam Electric Station 10" SI Pipe Whip Restraint 158. 3/12/82 CPSES (CMC) 66599R3 3 T0: Document Inst. Supports to Avoid hanger interference 159. 5/25/82 CPSES(CMC)66648R3 2 To Document Inst. Supports  !

Documentation 160. 11/15/83 CPSES (CMC) 66652 R2 1 To Document Inst. Support 1 61. 2/28/84 CPSES (CMC) 66718 R3 5 To Document Inst. Support Documentation 162. 5/27/82 Westinghouse Dwg. I 1554E32 R3 163. 7/21/82 CPSES Design Change 3 I Authorization 13976 164.. 9/1/82 CPSES Design Change 2 i

Authorization 14, 339 . 0 165. 12/1/82 CPSES Design Change 2 Authorization 15, 257 166. 12/6/83 CPSES Design Change 4 4

Authorization 16, 813 R5 167. 12/10/83 CPSES Design Change 12 Authorization 19, 245 R1 m I

)

9

^

Re: F02A-85e59 APPENDIX K (Continued) 168. 4/8/81 CPSES Inspection Report 1 Identifying alleger 169. 1/9/85 Transcript of alleger 5 Interview pg. 211-215 170. 2/8/80 Brown & Root Hanger Sketch 1 TW-X-039-714-A35R AQH-2 1 71 . 4/4/81 Component Modification Card 3 32798 R-4 AQH-2 1 72. 8/19/82 Brown & Root NCR No. M-3913 5 3 AQH-17 173. 5/18/83 Brown & Root NCR No. M-45685 R1 4 AQH-17 174, 8/11/83 Brown & Root NCR No. M-4989 S R1 7 AQH-17 175. 2/13/84 CPSES Inspection Report l' MH5-1-002-4147 AQH-2 176. 9/14/84 SSER AQP-2, AQB-3 29 Draft 1 177. 11/15/84 SSER AQP-2 9 Draft 2 ^

178. 11/15/84 SSER AQP-2, ABQ-3 10 Draft 5 14 i

i

i l

Re: F01A-85-59 l a . ,

APPENDIX K '

(Continued) 179. 12/7/84 SSER AQP-2 23 Draft 6 180. 6/1/84 Applicant Response 9 I

1 81 . 10/?5/84 Allegation Summary 2 l

182. 12/10/84 Technical Review of 17 Applicant 183. No Date A11eger Statement 7 184. -9/1/82 CPSES (CMC) 80104 8 Pump Cavitation' Problem 185. 9/2/82 Brown & Root Inc. NCR 17 M-40155 R5 186. 9/14/82 Brown & Root Inc. NDE 3 Radiographic Report ~

187. 9/16/82 Brown & Root Weld Date 2 Card WDC Serial 688148 g 188. 1/12/83 Brown & Root NCR M49425 7 189. 4/15/83 Brown & Root Procedure 7 WEI-4.6. Rev. 4 Instruction for Control of Welding Engineering CMC's 190. 4/24/83 Manufacturing Record 1 Sheet BPR-CT-1-5B014-7 j 191. 3/16/84 NRC-Clarification 21 of open Issues 192. 5/9/84 Brown & Root Procedure 3 DCP-3 Rev. 18 CPSES Document Control Program 193. 6/1/84 TUGC0 ltr TXX-4187 12 To NRC RE: CPSES Units 1 and 2 '

Allegations Transm.itted by letter of April 24, 1984 Additional Response file No. 10125 15- l 1

  • ,. Re: F01A-85 59 APPENDIX y (Continued) 194. No Date TRT Reviewers Notes 28 195. No Date Brown & Root Dwg. TSRP-CT-1-58-014 1 Rev. 20 196. 1/30/85 SSER AQ-68 and SRT-8 10' Draft 7 197. 2/2/77 Joseph Oat Corp. Draw #5774 1 Rev. 5 198. 12/21/77 G&H Draw #2323-51-0654 Rev. 1 1 199. 8/23/83 Travler No, ME-83-1154-5800 1 200. 9/21/83 NCR No. M-9918 Rev. 1 42 201. S/12/84 NCR No. M-14244 1 202. 6/12/84 NCR No. M-14243 5 203. 7/18/84 DCA Log List for Dwg. 5773 1 204,7/18/84 DCA Log List for Dwg. 57'14 1 205. No Date Allegation Sumary 1 206. No Date SRT Report Pg. 45 1 -

207. 1/30/85 SSER AB-12, AB-7, 8 SRT-9,AQP-3 208. 6/27/83 Affidavit of Alleger 3 16

Re: F0!A-85-59

/* .

APPENDIX X (Continued) 209. 1/17/77 TUSI Dwg. N-2640-359 1 .

Sh 2, Rev. 4 210. 1/17/77 TUSI Dwg.-N-2640-359 1 Sh 2 Rev. 5 211. 2/19/77 Gibbs & Hill Dwg.-2323-51-0550 1 Rev. 4 212. 3/7/77 Gibbs & Hill Dwg. 2323-51-0544 1 Rev. 2 213. 9/13/77 Afco Steel Dwg.-303 1 Sheet 1 of 1 214. -10/10/78' Brown & Root Traveler 4 ME78-108-1101 215. 11/27/78 CPSES Design Change 1 Authorization 216. 3/2/79 TUSI 1tr CPP-00825 2 To Allied Engineering RE: CPSES 1981-83 2300 MW Installation Misaligned Concrete Anchor Bolts for CCW Surge Tank 217, 3/28/79 APC0 Nuclear ltr 2640-422 2 to TUSI

SUBJECT:

CPSES TUSI P.O. Box #CP0065 APCO Job No. N-2640 Component Cooling Water Surge Tank 218. 5/30/79 APC0 ltr 2640-435 1 to TUS1

SUBJECT:

CPSES I TUSI P.O. No. CP-0065 APC0 Job N-2640 Misa11gned i Holes in Support Plates 219. 9/17/80 TUSI Dwg-2323-51-0585 1 Rev. 4 i7

o <

Re: F01A-85-59 APPENDIX K ,

(Continued) 220. 9/17/80 Traveler CP80-031-3401 1 221. 11/4/79 Brown & Root Dwg MRB-0550-013 1 Sheet 1 222. 12/4/79 TUSI Dwg. 2323-51-0584 1 Rev. 5 223. 10/2/80 CPSES Design Change 2 Authorization 8656 224. 4/10/81 CPSES Design Change 3 Authorization 9909, Rev. 1 225. 4/22/81 CPSES Design Change 2 Authorization 1967 Rev. I 226. 7/28/82 TUGC0 Instruction No. 4 QI-QP-11.18-4 Rev. O Ultrasonic Examination of Hilt: .

Bolts 227. 3/29/83 TUSI Dwg. 2323-51-0581 1 Rev. 2 228. 3/31/83 TUSI Dwg 2323-S1-0581 1 Rev. 3 229. 12/16/83 CPSES Design Change 3 Authorization 5290,. Rev. 1 ,

230. 1/10/84 CPSES Design Change 2 Authorization 14, 813 Rev. 2 2 31 . 5/1/84 CPSES Design Change 10 Authorization 11648 Rev. 10 232. 6/1/84 TUGC0 Instruction No.

QI-QP-11.18-3 Rev. 4

SUBJECT:

Ultrasonic Thickness measurement 233. 7/26/84 CPSES Design Change 1 Authorization 18, 853 Rev. 2 234. 8/27/84 Open Design Change Log 1 Affected Document Update Report 235. 9/6/84 CPSES NCR M84-100384 15 Reactor Building 236. 9/19/84 TUGC0 Memorandum to M.D. Warner 2

SUBJECT:

Installation Inspections of the Steam Generator Upper Lateral Supports Ref: MH 2323-51-550 18

Re: F01A-85-59

= -

APPENDIX K (Continued)

  • 237. 2/14/85 TUGC0 ltr to NRC RE: 8 Thread Engagement of Bolts for Unit 1 Steam Gen. Upper Lateral Support Beam 3 238. No Date SRT Report Pages 48849 2 Category 17 AB-5, AB6, AB-7a, AB-8, AB-9  !'

AB-10,AB-14,ABQ-1,ABQ-2 I

  • 239. 8/2/82 NRC Report of Inquiry 5 i

SUBJECT:

Investigation of Alleged B&R Termination in Violation of Section 210 Energy Reorganization Act, At CPSES .

  • 240. 3/7/84 Telephonic Interview of 8 A11eger 241. 1/31/85 SSER AB-5, AB-6, AB-7a, 17 AB-8, AB-9, AB-10, AB-14,

. ABQ-1,ABQ-2 242. No Date TRT Reviewer Notes 1

  • 243. No Date Affidcvit of A11eger 5 244. No Date Allegation Sumary 2 245. No Date Partial Affidavit of A11eger 3 246. 8/22/80 Inspection Report 11 RIV 80-16 247. 9/19/80 NRC ltr to TUGC0 13 RE: Transmittal of Inspection Report 19

o Re: F01A-85-59 APPENDIX K (Continued) 248, 10/21/80 TUGC0 ltr to NRC RE: Comanche 11 Peak Steam Electric Station Hilti-Kwik Concrete Anchor Bolts File No. 10110 249. 4/16/82 Memorandum for Roger Fortuna 13 (01) from John T. Collins (RIV)

SUBJECT:

Alleged Coverup of Weld Defects at CPSES 250. 7/29/83 USNRC Proposed Initial 61 Decision Concerning Aspects of Construction Quality Control.

Emergency Planning and Board

-Questions) 2 51 . 8/24/83 Partial Statement 1 .

Alleger 252. 8/26/83 A,ttachment C. Affidavit 4 ofRonaldG.Tolson(CPSES) 253. 9/23/83 USNRC Memorandum and 2 order (Emergency Planning, Specific Quality Assurance Issues and Board Issues)

  • 254 3/2/84 Memorandum to E. Johnson from 1 R. Taylor,

Subject:

More CPSES Allegations (partial) 255. No Date (CPSES)Allegationsand/or 2 Investigations Summary 256. 8/28/83 Telephonic Interview 1 of alleger 257. 11/14/84 Technical Interview 85 of alleger 258. No Date SSER AH-8 2 259. No Date SSER AH-8 2 (withcorrections) {

20

_ )

= ,

Pe: FOIA-ss_gg APPENnly y (Continued) 260. 6/4/84 Comanche Peak allegation 2 Work Pkg - Hanger Design Problems 261. 11/9/84 TRT Reveiwers notes 1 262. No Date Mechanical and Piping 1 A11e'gation Review Categories Page 2 263. No Date Allegation Summary 4 (Handwritten)

~

264 11/8/82 NRC Interview Between 35 RIV Inspections and A11eger 265. 12/13/82 Comments of A11eger Regarding 3 feelings following mtg with NRC (CASEAttachment11) 266. No Date Affidavit of A11eger 10 (2 copies) 267. No Date Questions for A11eger 2 .

268 No Date SSER AH-5 5 i (Handwritten) 269. No Date CPSES Allegations and/or 1 Investigations Summary 270. 7/13/79 TUSI Procedure " Field Support 10 Design Design Group Design Control Instruction" Revision 1 I

C1

Pe: FoIR P5-59 APPENDIX K (Continued) -

271, 10/25/79 TUSI Procedure "On Site Hanger 17 Design Group Engineering Instruction" Revision 0 272. 10/31/79 TUSI Procedure " Field Support 7 Design Group Design Review Instruction for Field Analyzed Piping and Supports" Revision 0 273. 11/20/79 TUSI Letter CPPA 3466 To Gibbs & 2 -

Hill " Comanche Peak Steam Electric Station 1981-83 2300 MW Installion Dispositioning of Uncompleted Support

. Designs" 274 2/18/80 TUSI Procedure " Pipe Support 4

Design Group Design Control Instruction" Revision 0

?75 5/5/80 TUSI Letter CPPA3150 FROM 1 Lou Montanaro TO Bundt, Hal Goodson, Bill Padon "H-Designations" 276. 5/6/80 Brown & Root BRHL CC-1-F3-002 1 Revision.0 277 5/8/60 Brown & Root BRHL CC-1-5B 015 1 Revision 0 278 6/13/80 TUSI Hanger Drawing No 2 H-CC-1-SB-045-010-3 Revision 0 279 6/13/80 TUSI Hanger Drawing Np. 1 H-CC-1-SB-045-003-3 Revision 0 280. 6/20/80 TUSI Hanger Drawing No 1 H-CC-1-SB-028-005-3 281. 7/1/80 TUSI Hanger Drawing No 1 H-CC-1-SB-028-001-3 Revision 1 202 8/1/80 TUSI Letter CPPA 5971 FROM: 1 Lou Montanaro To George Bundt "Typicals for Pipes 2" Ref:

CPPA-3150."

22

pe: FnI A 5'5-59

. . APPEN"IX K j

(Continued) l 283. 8/6/80 TUSI Letter CPPA 6014 From 1 l

Lou Montanaro To George Bundt I "Typicals for Pipes 2" Ref:

(PPA-3150 & CPPA-5971" 284. 8/12/80 TUSI Procedure "BRHL 2 (Brown & Root Hanger Location)

Drafting Guide" Revision 0 295. 1/22/82 .- Brown & Root BRHL CC-1FB-002 Revision 5 1 i 286. 8/25/83 Brown & Root BRHL CC-1-SB-015 1 Revision 6 287- No Date TRT Reviewers Notes 16 (Handwritten) 289. No Date Parial Statement of A11eger 1

  • 289 3/1/84 A11eger Interview 36 Pages 22-51 290, 10/2/84 SSER AM-8, AM-9, AM-10 5 Draft 2 2 91 . 1/19/7ti G&H Specification 2323-MS-23, 53 Revision 2, Main Condensers 292. 12/1/76 TUSI letter TGH-2931. Transmittal 1 of Signed Purchase Order CP-0023, Supplement No. 5 Main Condensers 293 10/2/81 TUGC0 Office Memorandum 50-81134, 2 Condenser Tube Sheet Leakage 23

Pe: FnIR 05-59 o  !

APPEt!DlX X

(':ontinued)

  • 294, 6/19/84 NRR, File No. 10066, Matters 30 Related to Improper Construction Practices with attached.NRC letter dated 6/19/84 and alleger interview pages 22-28 & 38-51 295. 7/9/84 . TUGC0 Letter TXX-4219, 2 Construction of CPSES Condensers 296. 8/20/84 Notes 1 297 Undated CPSES Alleged Improper 2 Construction Practices 298 Undated Commanche Peak Allegation 1 Work Package, Category 14 299. Undated Commanche Peak Open Issue 2 Action Plan 300 Undated Allegations and/or Investigations 4 Summary, pages 1-3, 8 I

301. 9/26/79 B15C0 Procedure SP 504, 14 Revision 0, Fabrication -

BISCO Flexible Boot 302. 6/2/81 BISCO Procedure SP-505-1, 6 Revision 2, Installation -

BISCO Pressure Seal (Boot) 303. 6/2/82 BISCO Procedure SP 505-2, 6 Revision 1, Installation -

BISCO Fire Barrier (Boot) 304 8/2/82 BISCO Procedure SP-505, 10 Revision 3, BISCO Flexible '

Boot Installation j 24 l

Re: F01A 95-59 APPENDIX K (Cohtinued) 305, 10/26/82 BISCO Procedure QCP-5T)?, 7 Revision 1, BISCO Flexible i

Boot Inspection 306 9/14/83 BISCO Procedure SP 504, 7 Revision 1, Fabrication I

Flexible Boot

{

307, 12/12/83 BISCO Procedure SP-505, 12 Revision 4, BISCO Flexible Boot installation

'l

. i 308. 8/24/83 NRC Region IV cover letter 19 and attached IR 50-445/83-24; 50-446/83-15 ,

309, 8/3/84 TUGC0 Office Memorandum, 1 Penetration Seals - Procedure Approval 310. No Date Note 2 311 1/10/77 G&H Drawing 2323-SI-0546, 1 Revision 2 .

312. 1/10/77 G&H Drawing 2323-SI-0549, 1 Revision 3 31 3 12/27/79 G&H Drawing 2323-SI-0545, 1 Revision 4  !

314. 12/27/79 G&H Drawing 2323-SS-0547, 1 Revision 4 31 5 4/1/83 G&H Drawing, 2323-SI-0548, 1 Revision 4 31 6 , 12/9/83 CP-SAP-6, Revision 9, Page 17 1 25

Pe: FoIA. 5-59 APPENDIX K (Continueri) 31 7. 2/2 1/84 TUGC0 Procedure CP-QP-19.5, 6 Revision 4 31 9 2/29/84 Note 1 31 9 3/7/84 Partial Affidavit of Alleger 1 320 Undated WNTO-7606, IV-1.13 Sketch

, 1 321 Undated BMI Tube Area, Sketch  !

1

  • 322.

3/7/84 Partial Affidavit al 2 Alleger AP-7 323 7/1/77 ITT Grinnell pipe spool sketch 2 No. PI-SFF-33-19X,,no Revision 324 7/5/77 ITT Grinnell pipe spool sketch 2

No. PI-SFF-33-31X, no revision 325 7/5/77 ITT Grinnell pipe spool sketch 2 No. PI-SFF-33-30X,.no revision 2 326 2/20/78 ITT Grinnell pipe spool sketch 2 No. PI-SFF-33-23X, Revision 1 327 4/4/78 ITT Grinnell pipe spool sketch 2 No. PI-SFF-33-5X, Revision 1 328 4/4/78 ITT Grinnell pipe spool sketch 2 4 No. PI-SFF-33-18X, Revision 1 329, 4/24/78 ITT Grinnell pipe spool sketch 2 No. PI-SFF-33-24X, Revision 1 330, 4/24/78 ITT Grinnell pipe spool sketch 2 No. PI-SFF-33-6X, Revision 2 ,

331 9/19/78 B&R Manufacturing Record Sheet, 4 BRP-SF-X-FB-027-01, Rev. 2, pages 2 of 4 & 3 of 4 2:

Re: F91A-95-59

.c ,

RPPEPTX K (Continued.)

339 8/31/79 B&R NCR M-1192-R3, Page 1 of 22 1 333 12/7/79 B&R NCR M-1860, page 1 of 5 1 334 1/23/80 B&R Manufacturing Record Sheet, 1 BRP-SF-X-FB-27 335- 1/23/80 B&R Manufacturing Record Sheet, 1 BRP-SF-X-FB-27 335, 1/23/80 B&R Manufacturing Record Sheet 1 BRP-SF-X-FB-27 337 1/23/80 Weld Data Cards, Welds FW3A and 4-W3 339 1/24/80 B&R Manufacturing Record Sheet, 2 BRP-SF-X-FB-30 and 30R8 330 2/15/80 Weld Data Card Package, S/N

{

5 60198, Weld FW 3B 340 3/18/80 B&R NCR M-1931 RI, Page 1 of 18 1 341.- 3/18/80 B&R NCR M-1931 RI, Page 1 of 18, I

~

marked copy 342, 6/26/80 B&R Manufacturing Record Sheet, 1 BRP-SF-X-FB-030  !

3a3, 2/13/81 B&R Manufacturing Record Sheet,, 1 BRP-SF-X-FB-030 344. '.2/13/81 B&R Manufacturing Record Sheet, 1 BRP-SF-X-FB-027 345. 2/13/81 B&R Manufacturing Record Sheet, 1 BRP-SF-X-FB-041 346, 2/13/81 B&R Manufacturing Record Sheet. 1 BRP-SF-X-FB-44  !

347, 2/24/81 B&R Manufacturing Record Sheet, 1 BRP-SF-X-FB-044R8 349, 2/27/81 B&R Manufacturing Record Sheet, 1 BRP-SF-X-FB-041R8  !

349, 3/8/81 Component Modification Card 2 46408R2 .

35n. 4/2/81 B&R Manufacturing Record Sheet, 3 BRP-SF-X-FB-041 i

27

Pe: Fn1A 45-59 APPENDIX K (Continuert) 351 1/11/82 Documentation Check List, 9 Mark No. SF-X-FB-030, Welds FW-3, FW 3A 152, 4/20/82 TUGC0 XCP-ME-4, System 18 Cleanliness Verification, P,evision 5 351 4/28/82 Documentation Check List, Package 6 Mark No. SF-X-FB-27, Weld FW-la 354, 6/23/82 TUGC0 Office Memorandum TN0-82495, 1 Interim Change to XCP-ME-4, System Cleanliness Verification 155 7/15/82 B&R Drawing BRP-SF-X-FB-041, 1 Revision 13 156 8/17/82 TUGC0 Office Memorandum TN0-82682, 2 Interim Change to XCP-ME-4, Revision 5 357 9/16/82 System Cleanliness Plan, 8 XCP-ME-4; Revision 5

  • 358 12/7/82 B&R drawing BRP-SF-X-FB-044, 1 j Rev. 12 150

.1/13/83 TUGC0 NCR M-83-0014S Rev. 1 2 and attached inspection report SL-0081 360 3/28/83 NRC Cover Letter with attached 18 -

Notice of Violation and Region IV IR 50-445/83-03; 50-446/83-01 l 361. 4/12/83 B&R Manufacturing Record Sheet, 1 BRP-SF-X-FB-27R6, page,4 of 4 j 352 5/10/83 TUGC0 NCR M-83-013015 with 4

{

attached inspection report j IRSL-0106 353 5/18/83 B&R NCR M71835, page 1 of 4 1 364 6/9/83 B&R Drawing BRP-SF-X-FB-030, e Rev. 10 .

365 7/19/83 Note 1 28

Re: F01A-95-50 APPENDIX K' (Continued) 366. 7/21/83 B&R Drawing BRP-SF-X-FB-027 1 Rev. 10 367 8/3/83 TUGC0 procedure CP-SAP-24, 18 System Cleanliness Requirements and Control. Revision 1 36P. 8/3/83 'TUGC0 Procedure XCP-ME-4, 11 Revision 8. System Cleanliness Verfification 359, 8/18/83 'Cor.ponent Modification Card S/N 2 94288 and attached B&R drawing BRP-SF-X-FB-051, Revision 4 370 '8/18/83 Component Modification Card, S/N 2 94289 attached B&R drawing BRP-SF-FB-Oll, Rev. CP '

371 8/24/83 Note 1 372. 10/8/83 TUSI drawing '2323-MI-0235, 1 Revision CP-4

  • 373, 11/27/84 USNRC Allegation Interviews 28 pages 55-81 374 No Date. Interview of Alleger-AP-16 3 375. No Date Interview of Alleger-AP-15 3
  • 376. No Date Partial Interview of Alleger 13 29

Re: r0fA-95-59 APPENDIX K (Continued) 377 9/27/82 Document Checklist, Package 9 Mark No. CT-1-SB-014 for Weld FW 11-4A a)WDC688148b)RT28394 c) RT 28403 d) WFML 688148 .s e) UT thickness, S/N A4514 f) Visual Examination Checklist 378. 9/2/82 B&R NCR M-40155 document 19 package (revisions 1 e

through 5 + related records) 379. 9/3/82 Component Modification Car.d. 2 S/N 80104, rev 3 -

380. 9/15/82 Component Modification Card, 2 S/N 80104, revision 4 391. 11/2/82 Compo*nent Modification Card, 2 S/N 80104, revision 5 382 1/12/83 B&R NCR M49425 package 7 393. 4/24/83 Documentation Checklist, .

Package Mark No. (T-1-SB-014) 12 ITT-2 (Mod) for weld 13-4 384. 4/24/84 US NRC Letter, CPSES Units 1&2 5 Allegations 345. 5/1/84 US NRC Letter, CPSES Units 1&2 2 Allegations 396. 5/25/64 TUGC0 TXX-4180, CPSES, 24 Allegations Transmitted by Mail of April 24, 1984 3R7. 6/1/84 TUGC0 letter TXX-4187, CPSES, 16 Allegations Transmitted by Mail by April 24, 1984, Additional Response File No.

10125 30

Pe: FOIA E-59 "E a "

APPENDIX K (Continued) 308 7/20/84 B&R drawing BRP-CT-1-SB-014, I Revision 20 pages 55-81 3?9 No date ASA B36.19-1965 8 Stainless Steel Pipe 390. No date notes & calculations 5 391 No date Section III, Division 1, 12 Subsection NB, pages 22, 24 - 26, 161, 164, 179 392. No date SA - 312, Specification for 6 Seamless and Welded Austenttic Stainless Steel Pipe 391 No date SA-530, Specification for 6 General Requirements for Specialized Carbon and Alloy .

Steel Pipe 394 undated A11eger interview, pages 2 32-34, allegation AP-15 395 undated A11eger interview, pages 2 32-34, allegation AP-16 31

Pe: F0fA- 5 40 APPENDIX K ei .

, (Conti.nued) yl  ?

a IJ 396. 5/10/72 Equipment Specification 5 676413,Rhy 4. pages 1, 3, 35, 55 & Cover Sheet 397 5/13/75 Westinghouse Electric Corp. I drawing 10773-121-003, no

. revision 39a. 7/7/75. B&R CD-NDEP-400, Magnetic 22 .

3 Particle Examination including attachments

,l399. 3/3/76 Westinghouse drawing 1 11773-121-001, rev. 00 400. 5/21/76 Westinghouse drawing 12 1

^' 10E59, Revision 2 401. 6/25/76 Tele. dyne Brown Engineering, 1 drawing 21906 Revision B, i Sheet I

> 402. 9/14/76 Westinghouse drawing 10773- 1 121-005, Revision 3 l

403. 9/14/76 Westinghouse drawing 10773- 1

~

121-004, Revison 2 404, 9/14/76 Westinghouse drawing 10773- 1 121-002, Revision 2 405 11/16/76 Teledyne Brown Engineering, I drawing 21906 Revision D Sheet 4 406 5/3/78 B&R NCR M-962 with attachments 4 407 6/16/78 D&R HCR M-999R1 with attachments 6 32

Re: F01A-85-59

. . APPENDIX K (Continued) 409 6/27/78 B&R NCR M-1004 8 with attachments 409. 6/27/78 Westinghouse Memorandum 1 TBX-M-152 SUB: Reactor Vessel Support Pads.

Damage of and subsequent Repair REF: NCR-M-1004

'S.O. 105 410 6/27/78 B&R NDE Magnetic Particle 1 Report, No. 1.D. number 411 6/30/78 B&R Message with attached 33 traveler package ME78-033-5505

  • 41 3 8/22/84 Request for Copies 2 414 no date Notes TRT Reviewer 4 415. no date FSAR, Figure 5.4-12 1 41 6 no date ASME B&PV Code, Section 6 III, NB-2000 23-27, 28-34 41 7 no date ASME B&PV Code,Section II, 3 SA-533, pages 677-679 41 9 no date ASME B&PV Code,Section II, 2 SA-516, pages 651-2 41 9. no date ANSI /ASME B31.1-80 page 82 1 420. no date Open Issue Sunnary 18 33

Appendix L Documents In POR File F01A-85-59 Mechanical / Piping Date Pages 1.. - 11/29//9 . Brown & Root 1 NCR M-1850

2. 12/3/79 TUGC0 office memo 3 TUQ-669

Subject:

Comanche Peak Steam Electric Station

, 1981-1983 2300 W Installation Ref: CP-79-11 ,

l 3, 12/3/79 TUSI office memorandum 1-CPP-2323 To: R. G. Tolson From: J. T. Merritt

Subject:

Comanche Peak Steam Electric Station 1981-83 2300 MW Installation SDAR No. CP-79-11 Ref: TUQ-669

4. 1/10/80 Westinghouse memorandum 3 To: CPSES (J.T. Merritt)

Subject:

Nonconformance Report M-1850; Reactor Coolant Pipe Elbow to S/G Number Two; W FOR/TBX-10039; Review of S. O. 140

c. .

Re: F01A-85-59 5.- 1/15/80 TUSI office memorandum 9 CPP-2507 To: Tolson From: Merritt

Subject:

Comanche Peak Steam Electric Station 1981-83 2300 MW Installation 50AR No.

CP-79-11 Ref: TUQ-669

6. 1/29/80 TUSI office memorandum 1 CPP-2567 To: R. G. Tolson From: _J. T. Merritt

Subject:

Comanche Peak Steam Electric Station 1981-83 2300 MW Installation SDAR No. CP-79-11 Ref: TUQ-669

7. 1/31/80 Brown & Root message 1 To: Tolson Re: SDAR-79-11
8. 7/17/78 Brown & Root NCR 2 4 M-1028 Rev. 1 .
9. 7/24/78 Brown & Root NCR 5 M-1038 i
10. 10/12/78 Brown & Root 2 NDE Liquid Penetrant Report - Serial No. PT-0078
11. 11/15/78 Brown & Root 38 Quality Assurance Dept.

Quality Assurance Stop Work i Notice Notice No. 21 t

)

Re: F01A-85-59

12. 11/22/78 Brown & Root Quality 2 Assurance Dept. NDE Liquid Penetrant Report Serial No. 1280  ;

i l

13. 11/27/78 Brown & Root Quality 5  :

Assurance Dept. NDE Liquid Penetrant Report Serial No. 1282 14, 12/6/78 Brown & Root Quality 1 Assurance Dept.

Nonconformance Report NCR No, M-1226

15. 2/1//9 Brown & Root Quality 1 Assurance Dept.

Nonconformance Report (NCR) No. M-1322

16. 2/12/79 Brown & Root Quality 1 Assurance'0ept.

Nonconformance Report NCR M-1313 17, 3/6/79 Brown & Root Quality 1 Assurance Dept. NCR No. M-1350

18. 3/26/79 Brown & Root Quality 1 Assurance Dept.

NCR No. M-1377

.o ..

-4 Re: F01A-85-59

19. 6/27/79 Brown & Root Quality 1 Assurance Dept.

NCR No. M-1495

20. No date NCR M-1197 R 2 2 Page 9 and 10 of 25
21. No date Figure 1, " field weld repairs, 2 RCS Unit #1
22. 5/21/82 Field weld - Owg. No. 56 RC-1-520-001 Serial No.

FIN-18 AW-41

23. 6/15/82 Field weld Dwg. No. 57 RC-1-520-001 Serial No. FIN-19
24. 10/25/78 Brown & Root 217 NCR M-1227 Rev. O Thru 6 Package
25. 8/2/84 Weld FW-18 13 (Handwritten notes) )
26. No date Reactor Coolant System 2 (notes) 27.No date AW-32,AW-41,AQW-33 16

&AP-12(notes)

28. No date Notes on Allegation 1 AW-32

Re: F01A-85-59

29. No date Reactor Coolant loop #1 1 Stress Node and Break Point and restraint locations
30. No date Reactor Coolant Loops Layout 3 and Details Owg. No.

BRP-RC-1-520-001 Rev. 10

  • 31. No date Partial ' Statement of Alleger 10
32. No date Comanche Peak Nuclear Power 4 Plant Allegations and/or Investigations Sumary
33. No date Comanche Peak Open Issue 3
34. 11/8/84 SSER Draft 5 10 AP-12, AQ-32, AQ-41 and AQW-33
35. 1/29/85 SSER Oraft 7 AP-12, AW-32, AW-41 and AQW-33 7
36. No date Figure 1 2 Field Weld Repairs, RCS Unit #1
37. No date TRT Reviewer Notes 8
38. 9/4/75 Brown & Root 7 Quality Assurance Stop Work Notice No. 3 l

Re: F01A-85-59

56. 12/16/77 CPSES Design Change / 1 Design Deviation Authorization No. 795
57. 12/20/77 TUSI Dwg. 2323-S-0832 1 Rev. 5 58, 12/20/77 TUSI Dwg. 2323-S-0833 1 Rev. 5
59. 12/20/77 TUSI Owg. 2323-8-0800 1 Rev. 5
60. 12/20/77 TUSI Dwg. 2323-5-0831 1 Rev. 5
61. 12/20/77 TUSI Owg. 2323-5-0834 1 Rev. 5
62. 1/13/78 CPSES Design Change / Design 2 Deviation Authorization ,

No. 792

63. 6/12/78 CPSES Design Change / Design 2 . l Deviation Authorization No. 1858
64. 7/10/78 CPSES Design Change / Design 1 Deviation Authorization l No. 2048 l
65. 9/5/78 CPSES Design Change /0esign 1 l

Deviation Authorization l No. 102 Rev. 2

66. 9/6/78 CPSES Design Change / 1 1

Re: F0!A-85-59 Design Deviation Authorization -

No. 2158, Rev. 1

67. 9/8/78 CPSES Design Change / Design 1 Deviation Authorization No. 2520
68. 9/26/78 CPSES De'ign s Change / Design 1 Deviation Authorization No. 2716
69. 11/13/78 CPSES Design Change / Design 2 Deviation Authorization No. 2946, Rev. 1
70. 11/15/78 CPSES Design Change / Design 2 Deviation Authorization No. 2651, Rev. 2
71. 11/28/78 CPSES Design Change 1 Authorization No. 3221
72. 1/9/79 CPSES Design Change 1 Authorization 3288, Rev. 1-
73. 6/7/79 TUSI Dwg. WRB-10559 1 Sheet 6
74. 7/12/79 CPSES Design Change 5 Authorization No. 5151

Re: F01A-85-59 .i Design Deviation Authorization No. 2158, Rev. 1  !

l

67. 9/8/78 CPSES Design Change / Des'ign 1 Deviation Authorization' No. 2520
68. 9/26/78 CPSES Design Change / Design 1 Deviation Authorization No. 2716
69. 11/13/78 CPSES Design Change / Design 2 Deviation ~ Authorization No. 2946, Rev. 1
70. 11/15/78 CPSES Design Change / Design 2 Deviation Authorization No. 2651, Rev. 2 71, 11/28/78 CPSES Design Change 1 Authorization No. 3221
72. 1/9/79 CPSES Design Change 1 Authorization 3288, Rev. I
73. 6/7/79 TUSI Dwg. WRB-10559 1 Sheet 6
74. 7/12/79 CPSES Design Change 5 Authorization No. 5151

o ..

Re: F01A-85-59

75. 9/18/79 CPSES Design Change 1 Authorization No. 5687 l
76. 2/21/80 CPSES Design Change 1 Authorization No. 6791
77. 8/5/80 CPSES Design Change 4 l Authorization No. 1489 Rev. 1 78, 2/5/81 CPSES Design Change 2 Authorization No. 9434 Rev. 1
79. 3/4/81 CPSES Design Change 2 Authorization No. 7900-Rev. I
80. 3/25/82 CPSES Design Change 1 ,

Authorization No. 12,785 I

81. 7/6/82- CPSES Design Change 2  ;

Authorization No. 423, Rev. 2

82. 3/18/83 TUSI Owg. WRB-10559 1 Sheet 7
83. 3/22/83 TUSI Dwg. 2323-M 1-0581 1 Rev. 6 i
84. 8/24/83 CPSES Design Change 7 4 Authorization No. 16628 Rev. 2
85. 9/13/83 CPSES Nonconformance 18

Re: F01A-85-59 Report No. M-83-01311 Rev. 3

86. 11/1/83 CPSES Design Change 1 Authorization No. 15668
87. 1/5/84 Brown & Root CCP-38 1 Rev. 4 Page 19 of 19
88. 8/3/84 Open Design Change Log 6 Affected Document Update Report
89. 1/3/85 CPSES Design Change 1 Authorization No. 21251
90. 8/4/84 TRT Reviewer Notes 2 Re: Category 3, AW-40,42 l
91. 12/5/84 TRT Reviewer Notes 1 Re: Category 3
92. 1/15/86 Handwritten Note From 1 TRT Reviewer CP-TRI
93. 3/6/85 TRT Review Notes 9 Re: Interview of 8&R Employee
94. 3/8/85 Note to: Herb Livermore 1

& Larry Shao From Joe Scinto Re: Comanche TRT SSERs

I

-l Re: F01A-85-59

]

?

95. 8/15/85 Note to Larry Shao and 1 Shou Hou From Charles Richards j
96. No date TRT Reviewer Notes Re: 8 i Gibbs & Hill 2323-SS-18 Rev. 3 l
97. No date Page 6 of Unidentified 1 SSER
98. No date TRT Reviewer Notes 5 Page 100 of CPSES/FSAR
99. 9/14/84 Fort. Worth Star-Telegram Article 1

" Comanche Peak Inspectors Used Wrong. Form for Years" 100. 1/25/79 NRC Memo from: 2 G. W. Reinmuth For: D. B.

Vassallo

Subject:

Classification of Spent Fuel Pool Liner Plates (AITS f12193H1) (AITS f30382H1) 101. 2/6/79 NRC Memo From G. W. Reinmuth 1 For: R.T. Carlson

Subject:

Classification of Spent Fuel Pool Liner Plates (AITS f12193H1)

(AITS f3038281) l l

102. 7/8/81 NRC Ltr to: Regulatory 2 Guide Distribution List (Division 1) From Robert Minogue

Subject:

Withdrawal of Six Division 1 Regulatory Guides

Re: F01A-85-59 103, 12/21/84 NRC Memo from George Lear 3 For: Olan Parr

Subject:

Preparation of a Statement on the NRC staff's Position on the Spent Fuel Pool Liner for Comanche Peak NPP 104, 2/26/85 NRC Memo fro Vincent S. 1 Noonan From: Olan D. Parr

Subject:

Staff Position on Liner Plate for the Refueling Cavity.

105 No date NRC Memo for Vince S. Noonan 6 From: Olan D. Parr

Subject:

Staff Position on Spent Fuel Pool Liner 106. 8/23/84 TRT Reviewer Notes 2 107. 10/12/84 SSER AM-11, AW-40, AW-42 14 Draft 3 108, 10/12/84 SSER AM-11, AW-40, AW-42, 13 AQW-80, AW-81 and AW-82 Draft 3 (with comments) 109, 11/2/84 SSER AM-11, AW-40, AW-42 13 AQW-80, AW-81, and AW-82 Draft 4 (with comments) 110. 11/2/84 SSER AM-11, AW-40, AW-42 13 AQW-80, AW-81 and AW-82 Oraft 4 (for review) l

\ s -

Re: F01A-85-59 111. 11/21/84 TRT Reviewer Notes 3 112. 1/29/85 SSER AM-11, AW-40, AW-42 12 AQW-80, AW-81 and AW-82' Oraft 5 113. 3/5/85- SSER AM-11, AW-40, AW-42 17 AQW-80, AW-81 and AW-82 Oraft 6 114. 3/5/85 SSER AM-11, AW-40, AW-42 13 l AQW-80, AW-81 and AW-82 Oraft 6 (with comments)

  • 115. 3/7/85 Partial Testimony 7 AM-11 116. 3/20/85 SSER AM-11, AW-40, AW-42 27 AQW-80, AW-81 and AW-82 Oraft 7 117. No date TRT Reviewer Notes I l i

118, 11/21/84 Prefiled Testimony for 18 Texas Utilities Generating Company 119. 11/26/84 Category 43 (Partial 1 Testimony) Fuel Pool Liners 1 l

120. No date TRT Reviewer Notes 1 121. No date Partial SSER with 9 Written Additions

l Re: F01A-85-59 122. No date TRT Review and Position to 5 Docket No. 50-445-2 and 1

50-446-2

Subject:

CASE's Evidence of a Quality Control  ;

Breakdown 123. No date Comanche Peak Open 6 j Issue Action Plan ,

124. No date Partial Testimony of A11eger 2  ;

125. 1/29/85 SSER AW-60, AW-84, AW-43 .16 AW-65 and AQW-77 Oraft 9 126. 3/24/76 Westinghouse Owg. 1 No. 5776 Rev. 5 l

127, 3/24/76 Westinghouse Owg. 1 No. 5773 Rev. 3 l 128. 10/29/82 TUSI Procedure 2 CP-EP-16.1 Rev. 2 (Processing Nonconformance Reports) 129. 11/4/82 TUSI 1tr. CPPA-23,499 33 From: McBray To: Joseph Oat Corporation Re: CPSES Con-tainment Spray Heat Exchangers 130, 11/4/82 Brown & Root Procedure . 10 CP-QAP-2.4 Rev. 0 (Program for Repair or Alteration of ASME N-stamped Components)

a .

Re: F01A-85-59 131. 11/30/82 TUSI Dwg. No. C-7420 1 Rev. 0 132. 1/6/83 CPSES Design Change 64 Authorization DCA 15628 11-a 133. 1/6/83 CPSES Design Change 42 Authorization OCA 15628 10-a 134, 1/20/83 SIS Daily Inspection Record-- 3 Inservice Contract No. G61029530C visits 14-16 135, 2/8/83 Startup Work Authorization 1 Attachment C No. 8218 136. 2/23/83 Brown & Root NCR 27 No. M-5102S R 2 137. 2/23/83 Brown & Root NCR 25 No, M-51035 R 2 138, 5/11/84 CPSES Maintenance Engineering 10 Manual " Authorized Nuclear Inservice Inspector Interface" Instruction No. MEI-028 Revision No I 139. 6/11/84 Brown & Root Procedure 3 CP-QAP-18.6 Revision 3 (Control and Application of ASME Code Symbol Stamps)

)

Re: F01A-85-59 140. 7/10/84 Brown & Root Procedure 43 CP-CPM-6.9G Revision 6 (CP-CPM 6.9 (Appendix G)

Documentation for ASME Welding, Fabrication, and Installation Activities) 141. 9/8/84 TUGC0 Dwg. No 1 2323-M1-0229 Sheet 1 of 3 1

142, 9/21/84- Brown & Root Message to 1 Jim Melanson (NRC)

Subject:

C.T. Heat Exchanger's.

143. No date TRT Reviewer Notes 6 l

144. 8/8/84 Technical Interview with 15 A11eger (Partial) 145. 8/23/84 Technical Interview with 14 with A11eger (Partial)

'146. 11/14/84 NRC TRT Technical Interview 7 (Partial) 147. 8/13/82 Partial Review of Allegations 3 with A11eger 148. 11/15/84 SSER AW-43, 60, 65, 73 14 AQW-77 Draft 7 '

149. 1/29/85 SSER AW-43, 60, 65, 73 16 AQW-77 Oraft 9 i

Re: F01A-85-59 l

150. No date SSER AQW-77 9  !

151. No Date Attachment "A" letter from 2 Alleger

  • 152. No date Partial Testimony of Alleger 12 153. No date TRT Reviewer RIV Notes 1 154. 12/3/82 USNRC Region IV Report 3 50-445/82-11 and 50-446/82-10 Category A2 155. No date Comanche Peak Open Issue 4 Action Plan Category.45 156. No date Partial SSER 8 1 157. 5/30/79 Brown & Root Weld Data 1 j Card Serial No. 09666 )

158. 8/20/79 Brown & Root Weld Data Card 1 Serial No. 09682  ;

159. 8/24/81 Brown & Root 2 WDC Serial No. 18942 Weld Data Card 160. 9/23/81 Brown & Root 2 Weld Data Card 161. 10/12/83 Brown & Root Owg. 1  ;

No. 8RP-BR-X-AB-025 Rev. 7

Re: F0!A-85-59 162. 11/8/83 Brown & Root Owg.- l' No BRP-BR-X-AB-052 Rev. 5 163. 12/13/83 Brown & Root Dwg. 1 No. BRP-BR-X-AB-036 Rev. 5 164. No date TRT Reviewer Notes 1 165. 8/10/82 Brown & Root Message To: 1  !

George Tanely/0. C. Frankum ,

]

166. 8/30/82 CPSES NCR M-82-01178 8 167. No date Westinghouse Owg. 1 1457f29 168. No date Westinghouse Owg. 1 J

1457f30 I 169. No date Westinghouse Owg. 1 i

j 1457f31 '

170. No date Westinghouse Dwg. I 1462f74 1 1

171. No date Comanche Peak S.E.S. 1 Final Safety Analysis Report ]

Units 1 and 2 Typical Steam Generator Supports Figure 5.4-13 172. No date TRT Reviewer Notes 1 173. 7/25/75 TUSI Owg. No 2323-s1-0512 1

Re: F01A-85-59 174. 9/16/75 Westinghouse Electric Owg 1 No. 1209E53 175. 9/16/75 Westinghouse Electric Dwg. 1 No. 1209E54 176. 10/18/76 TUSI Dwg. No. 2323-51-0513 1 Rev 9 ,

177. 10/18/76 TUSI Dwg. No. 2323-S2-0513 1 Rev. 3 178.'12/15/76 TUSI Dwg. No. 2323-52-0500 1 l Rev. 3 179. 12/15/76 TUSI Owg. No. 2323-S1-0500 1 i Rev. 4

-180. 6/2/77 TUSI Dwg. No. 2323-S1-0560 1

{

Rev. 4 181. 10/26/77 TUSI Dwg. No. 2323-S1-0511 1 Rev. 8 181. 6/8/76 TUSI Dwg. Valve Isolation 1 Tank Expansion Joint Details I (TYPEI) 182, 12/8/76 TUSI Dwg. Service Water Pump 1 ,

Discharge Expansion Joint Arrangement 183. 12/8/76 TUSI Dwg. Service Water Pump 1 Discharge Expansion Joints Details (TYPE IV)

E

- 21'- (

Re: F01A-85-59 184. 12/8/76 TUSI Dwg. Fuel Transfer Tube 1 Expansion Joint Arrangement 185. 12/20/77 TUSI Dwg. No. 2323-S-0833 1 Rev. 5 I I

186. 6/8/78 .TUSI Dwg. No. MX-72A-8 1 Butt-weld end Preparation '

for 26" 0.0. 1/2 inch wall Piping (nuclearpiping) 187. 6/8/78 TUSI Dwg MG-71A-2 Valve 1 Isolation Tank Expansion Joint Arrangement 188. 6/8/78 TUSI Dwg. No. MS-71A-3 1 Fuel Transfer Tube Expansion Joint Details (TYPE II) 189. 6/8/78 TUSI Dwg. No. MS-71A-4 1 Fuel Transfer Tube Expansion Joint--Details (TYPE III) 190. 3/2/79 TUSI Dwg. No. 2323-s2-0559 1 R. B. Internal Structure Refueling Cavity Liner Sheet 1 191. 4/30/79 TUGC0 Dwg. 0-5-4570 1 Sheet 1 of 1 192. 6/4/79 TUSI Dwg. No. 0-3-4570 1 Sheet 1 of 1 Rev. E

o .

Re: F01A-85-59 193. 7/23/79 TUSI Owg. No. 0-4-4570 1 Sheet 1 of 1 Rev. H 194. 3/27/80 TUSI Owg. No. 0-4-45'/0 1 Sheet 1 of 1 Rev. J l 195. 10/3/79 TUSI LTR. CPPA-3059 4 From: B. J. Murry to:

Bob Funk of Pathway Bellows, Inc.

Re: Fuel Transfer Tube Expansion i Joints Misalignment of Sleeves i P. O. CP-0071A 196. 10/31/79 Bellows Inc. ltr to TUSI 7 Re: Comanche Peak Sleeve Misalignment 197. 6/23/80 Category 45 AW-65 Welder 18 Performance Qualification Record Standard Tests 198. 7/21/80 Welder Performance Qualification 19 Record Standard Tests 1

199. 7/28/80 Welder Performance Qualification 19 Record Standard Tests 200. 8/27/80 TUSI ltr. CPPA-6281 to Pathway 4 Bellows, Inc.

Re: Unit 2 Fuel Transfer Tube Expansion Joints Misalignment of Sleeves. P.O. CP-071A m

)

Re: F01A-85-59 201. 8/26/81 CPSES Design Change Authorization 5 202. 4/1/83 TUSI Dwg. No. 2323-S1-0559 5 Rev. 5 203, 8/3/84 TRT. Reviewer Notes Fuel 7

. Transfer Tubes 204. 8/21/84 Attachm5nt1.Part8 10 Open Design Change Log Affected Document Update Report 205. No date Site Installation Procedures 5 2-1-2-4; Section 2, 1-4; Section 1 1

I 206. No date Design Change Authorization 4 l

  1. 6560, Rev. 2 (Partial) I 207. No date Figure 7-1, Assembly Diagram 1 of Fuel Transfer System (Sheet 8 of 8) 208. No date Figure 7-10. Assembly Diagram 1 of Fuel Transfer Tube of Fuel l Transfer System 209. No date Figure 7-15. Diagram of 1 Installation Requirements for Fuel Transfer System (Sheet 1 of 2) 210. No date Figure 7-11, Diagram of Transfer 1 Tube Valve of Fuel Transfer System.

211. No date Figure 7-1. Assembly Diagram 1

'of Fuel _ Transfer System (Sheet 2 of 8) 212. No date TRT Reviewer Notes 1 One sheet.

213. 11/16/84 SSER AQW-74 4 214. No date SSER Oraft 3 215. 6/4/82 Brown & Root NCR M-3407 3 216. 8/2/82 Attachment 10 6 Documentation Check List Package Mark No. CS-2-AB-088 217. No date TRT Reviewer Notes 3 218. 11/2/84 SSER AQW-75, AQW-76 6 Draft 4 ,

219. No date SSER Oraft 6 (Handwritten) i 220, 5/13/75 Gibbs & Hill ltr. GTN-3324 20 to TUGC0 Re: "05216.1 and 05216.2 Specifications 2323-SS-16a and 2323-SS-16B

- 221. 7/8/76 Brown & Root Field Design 1 Change Request No. 0272 i

Re: F01A-85-59 222. 4/21/78 Design Change / Design 1 Deviation Authorization {

No. 1545 I i

223. 6/6/78 Design Change / Design 1 Deviation Authorization No. 1828 224. 7/13/78 Designdhange/ Design 1.

Deviation Authorization No. 2087 i

'225. 9/7/78 Design Change / Design -1 Deviation Authorization No. 2514 '

226. 9/18/78 Design' Change /0esign 1 Deviation Authorization No. 2529 22/. 9/26/78 Telephone Conversation 1 Record Call by: Rich' Barber To: Ed Bezkor

Subject:

Changes to Specification 2323-SS-16B Paragraph 6.4 Ref:0C-00A 2718 228. 9/27/78 Design Change / Design 1 Deviation Authorization No. 2718

229. 11/16/79 Design Change Authorization 2 No. 6130 230, 6/18/80 Design Change Authorization. 1 No. 2703, Rev. 3 231, 1/11/80- TUSI Dwg. 2323-5-0792 1 Rev. 4 (Auxiliary Building Pipe Whip Restraints Supports--

Sh.2) 232. 12/17/81 Design Change Authorization 1 OEA. No. 22,817, Rev. 1 233. 12/20/81 TUSI Dwg. 2323-S-0790 1 Rev. 5 (Auxiliary Building Pipe Whip Restraints Supports--

SH. 1) 234. 12/30/81 Design Change Authorization 1 DCA. No. 12,002 235. 1/29/82 Design Change Authorization 1 DCA No. 12,277 236, 2/17/82 Design Change Authorization 1 DCA. No. 12,441 237. 2/27/82 Brown & Root, Inc. 1 Sketch

Subject:

Asbuilt Detail

  1. 8 Dwg. S1-792, Also for Asbuilt to Establish Shin Thickness 238. 6/8/82 Design Change Authorization 1 OCA, 13,580

Re: F01A-85-59 239. 12/1/82 Design Change Authorization 1 OCA No. 15,028, Rev. 1 240. 3/1/82- TUSI Owg. No. 2323-5-0793 1 Rev. 7 241. 3/20/82 Repair Process Sheet 2 NCR-M-82-00161 242. 7/9/82 TUGC0 CPSES NCR 4 M-82-00161 243. 7/20/82 Brown & Root Sketch 1

Subject:

Asbuilt Pipe Whip Restraint Detail #16 on Owg. S-0793 Sheet #3 244. 3/31/83 TUSI Dwg. No. 2323-51-0595-02 1 Rev. 2 245, 8/9/83 Gibbs & Hill ltr (GTN-67097) 5 to TUGC0 Re: Pipe Whip Restraints NCRs Ref: GTT-9816 246. 9/19/83 Design Change Authorization 1 DCA 18,729 247. 12/8/83 Design Change Authorization 2 OCA No. 12,303, Rev. 1 248. 3/13/84 Design Change Authorization 1 DCA No. 19,745 249. 3/16/84 Design Change Authorization 1 DCA No. 20081

a Re: F01A-85-59 250. 7/3/84 Design Change Authorization 1 0CA No. 739 Rev. 2 251. 8/8/84 Attachment I, Part B 3

.]

Open Design Change Log Affected Document Update Report l

l. 252. 11/16/82 ITT Grinnell Corp. ltr. to 3 TUSI Sub' ject: ITT Grinnell figure 306/307 mechanical Snubber Attachment Clearances 1

l 263. 3/10/83 NRC ltr to ITT Grinnell 13  !

Re: 10 CFR Part 50.55(e)  ;

Construction Deficiency Report 254. 3/28/83 ITT Grinnell Corp. to NRC 12 i

Subject:

Safety and Integrity l of Critical Piping Systems

255. 4/13/83 IE Information Notice 3 No. 83-20: ITT Grinnell Figure 306/307 Mechanical Snubber Attachment Interface
', Addresses
All Nuclear Power 1 Reactor Facilities Holding an y[.j i.. Operating License (OL) or Construction Permit (CP) 256. 4/14/83 !_TT, Grinnell Corporation ltr. 5 te NRC

Subject:

Response to Notice of Violation

^

l I

t. :

k .

. _ i-

29 -

Re: _F01A-85-59 257. 6/14/83 ITT Grinnell Corp. ltr 3 to TUS.'

Subject:

ITT Grinnell Fig. 306 f307 Mechanical Snubber Attachment Clearances Re:

P.O. No.CP-004A & B 258. 8/19/83 NRC.ltr to ITT Grinnell 1 i Re: Compliance with 10 CFR, Part 21,' to Correct Violation 259. 9/13/83 TUSI Office Memorandum 5 To: A.W. Latham From:

John C. Finnerman

Subject:

I.E. Information Notice No. 83-20 Ref: TSG-2374 260. No date TRT Reviewer Notes 3 261. No date DC P7-Task No. AV-5 1 Task: Defects in Vendor Supplied Snubbers 262. 10/24/84 SSER AV-5 6 Oraft 3 263. 1/31/85 SSER AV-5 4 Draft 7 264. 3/19/85 SSER AV-5 4 Oraft 8 l

l 265. No date TRT Reviewer Notes 6 j I

l

Re: F0!A-85-59 266. No date. Comanche Peak Nuclear Power 1 Plant Allegations and/or Investigations Summary 267. 6/27/79 TUSI Dwg. 2323-S1-0581-01, I Rev. 4 4

268. 6/4/81-I Brown 8, Root, Inc. 5 Quality Assurance Receiving Inspection Report No. 16771 269. 6/8/81 Westinghouse Electric 3 Corporation Field Deficiency Report 270. 2/4/82 Construction Operation 4 Traveler 35-1195 Traveler No. ME-82-2207-5500 271. 6/23/82 Comanche Peak Steam Electric 7 Station NCR M-82-00079 272. 9/13/84 List of Drawings and Welds 6 273. No date Report of Alleger Interview 1 274. No date TRT Reviewer Notes 1 275. No date Westinghouse Electric Corp. 1 I

Owg. 1554E34 276. No date Westinghouse Electric Corp 1 Dwg. 1554E35

... o Re: F01A-85-59 277. 8/2/84 NRC Technical Interview 43 of Alleger 278. 2/1/85 SSER AM-31-1 to AM-31-280 30 Oraft 9 (Partially handwritten) 279. 2/1/85 SSER AM-31-1 to AM-31-280 25 Oraft 9 ,

280. 2/26/85 SSER AM-31-1 to AM-31-280 16 Oraft 10 281. 3/20/85 SSER AM-31-l'to AM-31-280 21 Draft 12 282. 3/20/85 SSER AM-31-1 to AM-31-280 24 Oraft 12 (with comment) i 283. No date Partial SSER 21 l

284. No date Partial Affidavit 5 l

l l

285. No date Partial Affidavit 3 .-

With Sketch 286. 3/12/76 Comanche Peak Steam Electric 18 Station Construction Procedure 35-1195-CCP-22 Structural Steel Erection, Rev. 0 287. 3/12/76 Comanche Peak Steam Electric 16 Station Construction Procedure 35-1195-CCP-22 Structural Steel Erection Rev. 1

_ _m

-Re: F01A-85 288. 2/1/79 CPSES Traveler 5 ME-79-214-5505 (R.P.V. Head Assembly) 289. 7/16/79 Brown & Root, Inc. 2 MK. No. CC-1-246-020-C33R Rev. I 290. 8/27/79 TUSI Dwg. 2323-51-0581 1 Rev.3(R.B. Internal Structure Pipe Whip Restraints) 291. 11/15/79 CPSES Traveler 13 ME-79-389-550 (Install Thermal Sleeve Guides and House Guides)

~292. 3/18/80 CPSES Traveler 3 CP80-010-2802 (Pipe Whip Restraint Support Installation) 293. 4/7/80 TUSI Owg. 346 82105, Rev. 3 1 (Shop Assembly) 294. 4/7/80 TUSI Dwg. 345 82105 Rev. 1 1 l (Field Assembly)

(

i 295. 4/22/80 CPSES Traveler 6 j C080-023-3401 (Pipe Whip Restraint Support Installation) 296. 5/28/80 CPSES Traveler 3 CD-029-3401 297. 8/7/80 TUSI Dwg. 2323-S1-0666 1 3

Re: F01A-85-59 Rev. 3 (Safeguards Building Pipe Whip Restraints Support-SH-3).

298. 9/23/80 - CPSES Traveler 3 C080-067-5700 299. 9/23/80 CPSES Traveler 3 C080-065-5700 300. 9/24/80 'CPSES Travelar 5 C080-068-5202 301. 1/28/81 CPSES Traveler 4 CE-81-002-2800 302. 4/2/81 Brown & Root Dwg. 1 MSB-0680-MRW, Rev. 2 Sheet 1 303. 5/6/81 Brown & Root Owg. 1 MSB-0680-MRW, Rev. 2 Sheet 2 304. 9/9/81 CPSES Traveler 2 COB-1-116-5500 305. 10/21/81 Brown & Root Inspection 2 Report.(nonumber) 2" dia. Bolt Torque Valve 306, 12/9/81 CPSES Design Change 3 Authorization DCA No.11,817

Re: F01A-85-59 307. 12/17/81 CPSES Design Change 1 Authorization OCA No. 11,817.

Rev. 1 308. 1/4/82 TUGC0 QI-QP-11.14-1, Rev. 2 9 (Inspectionofsite fabrication and installation of structural and miscellaneous steel.)'

309. 1/21/82 Brown & Root Procedure 10 CCP-22,Rev.2(Structural Steel Erection) 310. 2/8/82 CPSES Nonconformance Report 5 M-82-00112 311, 2/11/82 CPSES Traveler 15 ME82-2203-5500 (Install Housing Gu'ide) 312. 3/4/82 Brown & Root, Procedure 18 No. CCP-22, Rev. 3 '

Structural Steel Erection 313. 3/29/82 CPSES Nonconformance Report 2 NCR No. M-82-00216 314. 8/9/82 Southwestern Laboratories 1 Report of Tests on Metal Specimens  !

315. 8/31/82 Attachment 1, ME81-2153-5500 3 Oper. No. 15

.Re: F01A-85-59 316. 12/1/82 CPSES Design Change 1 Authorization DCA No. 15,028 Rev. 1 317. 8/19/83 Westinghouse Owg. I 1219E49, Sheet 1 of 2 318. 8/19/83 Westinghouse Dwg. -1 1219E49; Sheet 2 of 2 319. 8/23/83 Brown & Root Owg. 2 CT-1-121-001-S22S 320, 10/3/83 CPSES Nonconformance Report 2 M-82-00216, Rev. 1 321. 10/6/83 Brown & Root Owg. 1 CC-1-162-723-A43R Sheet 1 of 2. Rev. 3 322. 11/8/83 Brown & Root Dwg. 1 BRP-AF-1-SB-023 Rev. 14 323. 12/7/83 Brown & Root Owg. 1 BRP-MS-1-SB-011, Rev. 6 324. 12/13/83 Brown & Root Owg. 1 BRP-CS-1-SB-052, Rev. 14

  • 325. 12/28/83 Brown & Root Owg. 1 BRP-CS-SB-054, Rev. 8

a .

Re: F01A-85-59

'326. 12/28/83 Brown & Root Owg. 1 BRP-MS-1-SB-005, Rev. 10 327. 1/20/84 'CPSES NCR M-84-00188 1 328. 3/7/84 TUSI Dwg. MRB-0538-013 1 Sheet E-29. Rev. 6 329. 3/7/84 TUSI Dwg. MRB-0438-013 1 Sheet E-29, Rev. 6 330. 4/6/84 Brown & Root Owg. 1 MSB-0688-001, Sheet E-14 331. 4/6/84 Brown & Root Owg. 1 MSB-0688-003, Sheet E-23 332. 4/6/84 Brown & Root Owg. 1 MSB-0688-001,.Rev. 4 333. 4/26/84 TUSI Owg. 2323-51-0680 1 Rev. CP-2 334. 4/6/84 TUSI Dwg. MSB-0688-003 1 Sheet E-23, Rev. 5 335. 5/1/84 TUSI Dwg. MSB-0688-012 1

Re: F01A-85-59 336. 5/5/84 TUSI Owg MSB-0688-014 1 Sheet E-6 337. 5/5/84 TUSI Owg. MSB-0688-014 1 Sheet E-6, Rev 4 338. 5/7/84 TUSI Dwg. MSB-0688-013 1 i Sheet E-5, Rev. 4 339. 5/7/84 TUSI Owg. MSB-0688-006 1 Sheet E-26 340. 5/15/84 TUSI Owg. MSB-0688-024 1 Sheet E-40 341. 5/15/84 TUSI Dwg. MSB-0688-025 1 Sheet E-41 342, 5/15/84 TUSI Dwg. MSB-0688-017 1 Sheet E-9, Rev-. 3 343. 5/15/84 TUSI Dwg. MSB-0688-025 1 Sheet E-41 344. 5/30/84 TUSI Dwg. MRB-0538-014 1 Sheet E-30 345. 6/7/84 TUSI Dwg. MRB-0538-007 1 Sheet E-19, Rev. 6 346. 6/27/84 Brown & Root Owg. 1 MSB-0680-MRW, Sheet 3, Rev. 0 1

1 j

Re: F0!A-85-59 347. 7/17/84 Brown & Root Owg. 1 BPP-MS-1-SB-011, Rev. 9 1 348. 8/3/84 Brown & Root Dwg. 1 j BRP-51-1-RB-021, Rev. 14 f 349. 8/6/84 -List of Deficiencies from 4 A11eger, Oraft 2 350. 8/13/84 Brown & Root Inc. 12 , j Procedure CCP-22, Rev 4 351. 8/31/84 Documentation Package Index 39 352. No date TUSI Dwg. 2323-S1-0667 1 Rev. 6 353. No date Structural Joints Using ASTM 12 A325 or A490 Bolts 354 No date TRT Reviewer Notes 28 355. No date TRT Reviewer Notes 28 356. No date .TRT Reviewer Notes 41 357. No date TRT Reviewer Notes 10 358. No date List of Documents 5 359. No date List A (Orawings) 4 360. No date List Drawings 6 Sheet E-4, Rev. 2

,. v .- .

OVERNMENT ACCOUNTADILITY PROJECT bSS Connec icut Awnue. N.W.. Suite 202 NVoshington. D.C. 20036 (202)2324550 G:85:104 January 21, 1985 FREEDOM OF INFORMATION ACT REQUEST FREEDOM OF INFORMATION {

ACI REQUESI Fca"A-84y i

D1 rector {

Office of Administration Nuclear Regulatory Commission Washington, D.C. 20555

&M*}l g Q To Whom It May Concern:

i j

Accountability Project (" GAP") requests copies of any a information, . including but not limited to notes, letters, memoranda, drafts minutes, diaries, logs, calendars, tapes, transcripts, sumaries, interview re- ,

charts, maps, photographs, agreementsports, procedures, instructions, eng ,

runoffs, any other data compilations, interim and/or ports, with theand any and all other records relevant to and/or generated in connection overv by any person,iew, ragulation and investigation of the Comanche Peak Nuclear Plant branch, or department of the NRC since January18, 1985.

~ This request includes all agency records as defined in 10 C.F.R whether they currently exist in the NRC official, " working,"

other files, or at any other location, including private If any records as defined in 10 C.F.R. 5 9.3a(b) and the NRC Manual, supra, and covered by this request have been destroyed and/or removed after this request, please provide all surrounding records, including but not limited to a list of all records which have been or are destroyed and/or removed, a description of the

. toaction (s) taken

' implement relevant the action (s). to, generated in connection with, and/or issued in order GAP requests that fees be waived, because " finding the information can be con-GAP is a non-profit, non-partisan public interest organizatio honest and open government.

whistleblowers as agents of government accountability.Through Through its Citizens public outreac seeking to ensure the health and safety ofThetheir communities. C Citizens Clinic is currently assisting several citizens groups, local governments and ,

intervenors in the central Texas area concerning the construction of the Comanche Peak nuclear power plant. .

b ) 9

. .. r .,

/

. . l Director Office of Administration .

Page Two We are requesting the above information as part of an ongoing monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.

i For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portions of documents withheld. The index should provide a detailed jusitfication of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document. withheld. This index is required under Vaughn v. Rosen (I), 484 F.2d 820 (D.C. Cir.1973), cert. denied, 415 U.S.

977(1974).

We look forward to your response to this request within ten days.

Sincerely, iW Billie Pirner Garde Citizens Clinic Director t

9 1

L_._. . _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ . _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ - _ _ _ _ _ _ . _

v4 4 eti '

  • _

OVERNMENT ACCOUNTADILITY PROKCT 665 Connscricut Awnue. N.W. 5 vite 202 WosNngton. D.C. 20036 (202)232 8550 G:85:104 January 21, 1985 FREEDOM OF INFORMATION ACT REQUEST FREEDOM OF INFORMATION ACI REQUESI Director

' Office of Administration fora-d-s7 kd4.g8/.g-g 1 Nuclear Regulatory Commission Washington, D.C. 20555 To Whom It May Concern:  !

Accountability Project (" GAP") requests copies of any information, including but not limited to notes, letters, memoranda , dra f ts ,

minutes, diaries, logs, calendars, tapes, transcripts, sumaries, interview re-ports, procedures,_ instructions, engineering analyses, drawings, files, graphs charts, maps, photographs, agreements, handwritten notes, studies, data she ,

notebooks, books, telephone messages, computations, voice recordings, compute runoffs, any other data compilations, interim and/or final reports, status re-with the overvports, and any and all other records relevant to and/or generated in conn by any person,iew, ragulation and investigation of the Comanche Peak Nuclear Plan

~

branch, or deoartment of the NRC since January 18, 1985.

the NRC Manual, Appendix 0211. Parts 1.A.2 ,1980) and A.3 (app other files, or at any other location, including private residen If any records as defined in 10 C.F.R. $ 9.3a(b) and the NRC Manual, supra, a covered by this request have been destroyed and/or removed after this request, please provide all surrounding' records, including but not limited to a list of all s records which have been or are destroyed and/or removed, a description of the )

action to ' implement (s) taken relevant the action (s). to, generated in connection with, and/or issued in order l

GAP requests that fees be waived, because " finding the information can be con-GAP is a non-profitsidered as primarily benefitting the general _ public," 5 U.S.C honest and open gove,rnment.non-partisan public interest organization concerned with whistleblowers as agents of government accountability.Through Through its Citizens public outreac seeking to ensure the health and safety of their communities.{

The Citizens Clinic is currently assisting several citizens groups, local governments and ,

j intervenors in the central Texas area concerning the construction of the Comanche Peak nuclear power plant. (

{

,cs 'f 1 s [( If f ye

/.- ,

~

director Office of Administration .

Page Two We are requesting the above information as part of an ongoing monitoring project i on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.

For any documents or portions that you deny due to a specific FOIA exemption. l please provide. an index itemizing and describing the documents or portions of documents withheld. The index should provide a detailed jusitfication of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document. withheld. This index is required under Vaughn v. Rosen (I), 484 F.2d 820 (D.C. Cir.1973), cert. denied, 415 U.S.

977 (1974).

We look forward to your response to this request within ten days.

Sincerely, LW Billie Pirner Garde Citizens Clinic Director 9

1 e

e 6