ML20234B469
| ML20234B469 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/11/1987 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| SL-3225, NUDOCS 8709180423 | |
| Download: ML20234B469 (6) | |
Text
_ _ - - - _ - -
Georgia Power Company 333 Piedmont Avenue Allanta, Georgia 30308
- Telephone 404 526 6526 Malling Address
Post office Box 4545 i
Atlanta, Georgia 30302 L
Georgia Power 1
L T. Oucwa '
trei sournern electne sg; tem Manager Nuclear Safety and (Jcensing SL-3225 1195C X7GJ17-H200 September 11, 1987 l
U. S. Nuclear. Regulatory Commission ATTN:
Document Control Desk Washington, D. C.
20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 OUTSTANDING LICENSING SUBMITTALL Gentlemen:
Enclosed, for your information and use, please find updated listings of those items of correspondence with the NRC to which a written response is expected.,
tabulated chronologically by Georgia Power Company's submittal date, lists items which are ready for closure. prioritizes the seven most significant outstanding submittals in terms of value to Georgia Power Company. is a listing of those items requiring submittal of addi tional information by Georgia Power.
Georgia Power is. prepared to discuss modi fications to these
-status reports and will promptly address any questions you may have regarding these licensing issues.
During the past month the NRC has completed numerous licensing i
- actions, including the issuance of the six Technical Specifications Amendments described below:
l 1.
Amendment Nos.144 and 79 (Units 1 and 2, respectively) revised the high room temperature setpoints for the Reactor Water Cleanup System.
2.
' Amendment Nos.145 and 80 (Units 1 and 2, respectively) revised the Organizational Structure of Plant Hatch.
3.
Amendment No. 81 (Unit 2) deleted the surveillance requirement which tested the extraction steam non-return valves.
4.
Amendment Nos.146 and 82 (Units 1 and 2 respectively), revised the Unit 2 Core Spray Sparger differential pressure alarm setpoint and added this setpoint to Unit 1.
A 8709100423 870911 PDR ADOCK 05000321 dg P
PDR.
\\
i t
GeorgiaPower n(
U. S._ Nuclear Regulatory Commission l
September 11, 1987 Page Two i
i 5.
Amendment Nos.147 and 83 (Units 1 and.2, respectively) revised -
the testing requirements of the emergency diesel generators.
6.
Amendment No.
84 (Unit 2) deleted the Class 1
structures settlement requirement.
Georgia Power. Company acknowledges and appreciates this effort.
l l
If you have any questions in this regard, please contact this office at any time.
Sincerely, g4e L. T. Gucwa i
JCJ/lc
Enclosures:
1.
Outstanding Licensing Submittals Requiring NRC Action 2.
Outstanding Licensing Submittals Prioritized List 3.
Outstanding Licensing Submittals Requiring Additional Information c: Georgia Power Comoany Mr. J. P. O'Reilly, Sr. Vice President - Nuclear Operations Mr. J.
T., Beckham, Jr., Vice President - Plant Hatch GO-NORMS l
U. S. Nuclear Reaulatory Commission. Hashinaton. D. C.
Mr. L. P. Crocker, Licensing Project M1 nager - Hatch U. S. Nuclear Regulatory Commission. Reaion II Dr. J. N. Grace, Regional Administrator l
Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch L
i 1195C 700775
Georgia Power d ENCLOSURE 1 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 OUTSTANDING LICENSING SUBMITTALS REOUIRING NRC ACTION LETTER HATCH DAIE ILt{II SUBJECT Key 0-APPROVAL OF ITEM REQUIRED FOR UPCOMING OUTAGE C-NRC ACTION COMPLETE ON ITEM SINCE LAST REPORT N-ITEM ADDED SINCE LAST REPORT 05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION SEISMIC SPECTRA BROADENING 01/06/86 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
DELETE REQUIREMENT FOR HYDROGEN RECOMBINERS 02/17/86 331,366 C
PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
REORGANIZATION - RESPONSIBILITY FOR RADIOLOGICAL ENVIRONMENTAL MONITORING, MET TOWER LOCATION, QA
- RECORDS, DELETE EPDD, ETS PROCEDURE APPROVAL, PRB/ SRB COMPOSITION AND QUORUM, AUDIT REQUIREMENTS 02/28/86 321,366 PROPOSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING LICENSE VICE CONSTRUCTION PERMIT 03/27/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
EQUALIZING REACTOR PROTECTION SYSTEM SPECIFICATIONS BETHEEN UNITS 03/31/86 321,366 C
PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS -
EMERGENCY POWER - DIESEL GENERATOR TESTING -
GENERIC LETTER 84-15 04/04/86 366 C
PROPOSED DELETION OF BUILDING SETTLEMENT I
TECHNICAL SPECIFICATIONS HITH INCORPORATION OF l
SETTLEMENT CRITERIA FROM OUR 12/1/78 LETTER INTO I
PLANT PROCEDURES
]
08/25/86 321,366 C
CHANGE TO RHCU LEAKAGE DETECTION TECHNICAL SPECIFICATIONS - HIGH TEMPERATURE ISOLATION l
l 1195C El-1 9/11/87 SL-3225 700775
Georgia Power d ENCLOSURE 1(Continued)
OUTSTANDING LICENSING SUBMITTALS LETTER HATCH DAIE UfLIT SUBJECT 09/09/86 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - RIVER LEVEL 10/24/86 321,366 PROPOSED TECHNICAL SPECIFICATION CHANGE FOR FIRE PROTECTION COMPLIANCE ADD REQUIREMENT OF PERFORMING EVERY THIRD TEST OF EQUIPMENT CONTROLLED FROM REMOTE SHUTDOWN PANELS FROM SAID PANELS 10/27/86 321,366 C
PROPOSED REVISION TO TECHNICAL SPECIFICATIONS -
DELETION OF ORGANIZATIONAL FIGURES, REALIGNMENT OF HNP STRUCTURE 11/14/86 321,366
RESPONSE
TO VERBAL REQUEST FOR ADDITIONAL INFORMATION - CABLE TRAY SUPPORTS 12/23/86 321,366 DETAILED CONTROL ROOM DESIGN REVIEH 02/13/87 321,366 REQUEST TO REVISE REPORTING REQUIREMENT TECHNICAL SPECIFICATIONS TO FIT LICENSEE EVENT REPORT REQUIREMENTS 03/04/87 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC S0IL ANALYSIS 03/20/87 366 CHANGES TO TECHNICAL SPECIFICATIONS - HYDR 0 GEN HATER CHEMISTRY 03/27/87 321,366 C
PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
CORE SPRAY DELTA P
(BREAK DETECTION)
INSTRUMENTATION 1
05/01/87 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
GASEOUS EFFLUENT RELEASE POINTS 05/08/87 366 C
PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
TURBINE VALVE TESTING 7/13/87 321 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
ELECTRICAL SURVEILLANCE INTERVAL 1195C El-2 9/11/87 SL-3225 j
mm
1
}
i Georgia Power A
~
i ENCLOSURE 2 l
i PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 0UTSTANDING LICENSING SUBMITTALS PRIORITIZED LIST i
REASON SUBJECT I
FOR j
PRIORITY j
1.
Operational Hardships PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
GASE0US EFFLUENT RELEASE POINTS
^
i 2.
Hardware Installed CHANGES TO TECHNICAL SPECIFICATIONS - HYDROGEN l
HATER CHEMISTRY 3.
Piping Replaced with REQUEST TO RESCIND CONFIRMATORY ORDER ON Nuclear Grade Material REACTOR COOLANT SYSTEM STAINLESS STEEL PIPE 4.
Unnecessary Plant PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
Shutdown ELECTRICAL SURVEILLANCE INTERVAL 5.
Agreements with Union PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
Imminent SHIFT OVERTIME REQUIREMENTS 6.
NRC SER has been issued PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -
I on Generic Topical EQUALIZING REACTOR PROTECTION SYSTEM Report SPECIFICATIONS BETHEEN UNITS 7.
Preclude Potential CHANGE TO TECHNICAL SPECIFICATIONS -
Future Problems RIVER LEVEL l
1 1195C E2-1 9/11/87 SL-3225
'700775
f Ge'orgiaPower1 ENCLOSURE 3 PLANT HATCH'- UNITS-1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 0UTSTANDING LICENSING SUBMITTALS REOUIRING ADDITIONAL INFORMATION i
LETTER-HATCH l
QAIE UH1I SUBJECT 01/10/85 366 REQUEST TO RESCIND' CONFIRMATORY ORDER ON REACTOR-COOLANT SYSTEM STAINLESS STEEL PIPE 06/25/85 321,366 PROPOSED CHANGES TO IST PROGRAM 07/17/86 321,366 REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION AMENDMENT TO GASEOUS EFFLUENT RELEASE POINTS
.j I
i l
l l
q s
1195C E3-1 9/11/87 SL-3225 9