For Comment Issue of Draft Reg Guide,Task DG 1060, Financial Accounting Standards Board (Fasb) Standards for Decommissioning Cost Accounting
ML20216G586
Person / Time
Issue date: 09/30/1997
From:
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To:
References
TASK-*****, TASK-DG-1060, TASK-RE REGGD-01.XXX, REGGD-1.XXX, NUDOCS 9709150237
Download: ML20216G586 (5)


Text

\\

U.S. NUCLEAR REGULATORY COMMISSION September 1997

[

<n OFFICE OF NUCLEAR REGULATORY RESEARCH Division 1

,m C}

k*e.*

/

5 Draf t DG 1060 DRAFT REGULATORY GUIDE

Contact:

B.J. Richter (301)415 622L DRAFT REGULATORY GUIDE DG-1060 FINANCIAL ACCOUNTING STANDARDS BOARD (FASB) STANDARDS FOR

,p DECOMMISSIONING COST ACCOUNTipe ksbku

%W)

A. INTRODUCTION In 10 CFR Part 50, " Domestic Ucensing of Producti and Oliidtion Facilities," paragraph y

r mit its annual financial report to 50.71(b) requires, in part, that each licens.ee and perrjrgol the Commission. Also,10 CFR 50.75(g)(3) requir cah see to keep records of the cost

(

)

estimate performed for the docommissioning fyodir or of the amount certified for

%.)

decommissioning, as well as records of the fu method used for assuring funds if either a funding plan or certification is used.

N This draft regulatory guide airgveloped in regard to the Financial Accounting Standards Board' (FASB) draf t stepdard o.158-8, " Accounting for Certain Liabilities Related to gg, Closure or Removal of Long Lived AdeIts." The NRC plans to endorse the final version of the FASB g-f standard as a means o ;providing guidance for licensees on complying with those portions of theE 9

EE Commission's regut aggarding a licensce's reporting on the status of its decommissioning g

~

funding.

O

~

[i

'FASB pr ft@a sociation that establishes authoritative financial accounting and reporting

$ U, standard Copies of the draft standard may be obtained from the Order Department, Financial Accountingv$tandards Board,401 Merritt 7, P.O. Box 5116, Norwalk, CT 06856-5116.

,e o'ts.O TNe regulatory guide ja being issued in draf t forrn to involve the public in the early stages of the development of a regulatory positionIn this area.

It has not received complete staff review and does not represent an othcial NRC staff position.

Public comments are being solicited on the draf t guide (includ ng any implementation schedule) and its associated regulatory analysis or value/ impact statement. Comments should be accompanied by oppropriate supporting data, Written comments rney be submitted to the Rules

- /G - end o.rectives Branch, office of Admmistration. U.s. Nuclear Regulatory Commission, Washington, oC 20555. Copies of comments received (v}

may be examined at the NRC Public Document Room. 2120 L Street NW., Washington, DC, Comments will be most helpfulif received by November 24,1997, i

Requests for eingle copies of draf t or active regulatory guides (which may De reproduced) or for placement on an automatic destnbution liet for single copies of future draft guides in specific divisions should be made in writing to the U.S. Nuclear Regulatory Commission. Washington, DC

.l 20555, Attention: Printing, oraphics and Distribution Branch, or by f ax to (3011415-5272.

.1 d s Ih f

Regulatory guides are issued to describe and make evailable to the public information such as methods acceptable to the NRC staff for implementing specific parts of the NRC's regulations, techniques used by the NRC staff in evaluating specific problems or postulated accidents, and guidance to applicants. Regulatory guides are issued in draft form for public comment to involve the public in the early stages of developing the regulatory posith & Is.?ft regulatory guides have not received a complete NRC staff review and do not represent criMal NRC staff positions.

The information collections contained in tnis draf t regulatory guide are covered by requirements which were approved by the Office of Management and Budget, approval number s

3150-0011.

The pub'ic reporting burden for this collection of information is estimated to average 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> per response, including the time for reviewing instructions, searching existing data i

sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Branch (T-6 F 33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet electronic mail to BJS1@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Aff airs, NEOB 10202, (3105-0011), Office of Management and Budget.

Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

B. DISCUSSION The use of industry consensus standards has long been part of an overall approach to meeting the requirements of 10 CFR Part 50 when developing safety systems for nuclear power plants. Similarly, when dealing with financial areas having potential safety impacts on NRC licensees, industry consensus standards may provide an acceptable basis for meeting NRC requirements. The Securities and Exchange Commission (SEC), the primary Federal Agency involved in accounting and auditing requirements for publicly traded companies, has taken the position that FASB should set accounting standards for the private sector. The SEC has accepted standards set by FASB for the preparation of financial statements, which are commonly referred to as " generally accepted accounting principles" or GAAP.

2 i

m

~

The draft FASB standard, " Accounting for Certain Liabilities Related to Closure or j]l A

Removal of Long-lived Assets," addresses severalissues that are pertinent to the NRC's financial assurance for decommissioning reporting requirements: Recognition of liabilities for closure or removal obligations, measurement of closure or removal obligation, capitalized costs of closure or removal, reporting and disclosures, end effective date and transition.

C. REGULATORY POSITION When the NRC promulgated the 1988 decommissioning rule (53 FR 24018 (June 27, 1988)),it did not require beensees to report periodically on the status of their decommissioning funds. The NRC viewed licensee compliance with the funding assurance requirements as a matter to be determined through the inspection process when nec6ssary. However, with deregulation of the electric power generating industry, the NRC considers it necessary to have an additional assurance for the accumulation of decommissioning funds on the part of the licensees who are no longer subject to rate regulation.

The requirements' stated in draft FASB standard No.158 B provide a means by which O

the NRC may obtain such information.

The NRC has concluded that endorsement of the draft FASB stendard will provide a cost effective, nonburdensome rneans by which licensees may provide information on decommissioning funding. The draf t FASB standard, when adopted, will r%uire licensees to report information on the status of their decomrnissioning funds in their annual financib!

statements, which are required to be submitted to the NRC in accordance with 10 CFR 50.71(b). Most power reactor licensees will he required by financial regulators to comply with

-the draft FASB standard as a matter of good accounting practice. The NRC is not requiring at this time that power reactor licensees report any information other than that covered by the draft FASB standard, which was developed independently of the NRC. Therefore, there would be minimal additional reporting burden associated with the NRC's endorsement of this

' standard.

aln this regulatory guide, the term " requirements" refers to requirements imposed by the O

NRC's regulations as well as to requirements that must be met in order to comply with a

standard, 3

s

D. IMPLEMENTATION The purpose of this section is to provide guidance to applicants and licensees regarding the NRC staff's plans for using this regulatory guide.

This draf t guide has been released to encourage public participation in its development.

Except in those cases in which the applicant or licenseo proposes an acceptable alternative method for complying with the specified portions of the Commission's regulations, the method to be described in the final guide reflecting public comments will be used in the evaluation of submittals reporting the status of a licensee's decommissioning funding.

O i

O 4

REGULATORY ANALYSIS A separate regulatory analysis was not prepared for this regulatory guide because there is minimal additional burden on licensees associated with the issuance of this guide. The NRC is in the process of developing modifications to its regulations to address rate deregulation of nuclear power reactor licensees. Any values and impacts associated with those regulations will be addressed in the rulemaking.

D 4

O e

r 1

4 ma ee I

i l

s l

5 k

i n

l I

I 1

i l

1 i

4 I

4 i

e on recycled O

~ ~~ ~-

A -

~

NUC WL E e P

A A EN Sr R A

C LT O N H U E

Y F G

N FF T GI OC OUT R

LE A

PL

,N AD R B D

I T S AS C O T VU TI R A ENE 2 Y T US 0 C E SS 5

S

.E 5O 5

5M

-0 3

0M 00 0I i*

SS 1

IO N

O PO S

P TIF E

AR R

GS IM ET T

AC O

NL N

D A O.

S FS G

E EM 6

SA 7

I P L A

ID lll