ML20216G356
| ML20216G356 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 06/22/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20216G362 | List: |
| References | |
| IEB-72-03, IEB-72-3, IEB-85-003, IEB-85-3, IEC-77-01, IEC-77-1, IEC-78-16, IEIN-86-003, IEIN-86-029, IEIN-86-29, IEIN-86-3, NUDOCS 8707010075 | |
| Download: ML20216G356 (2) | |
See also: IR 05000498/1987021
Text
~
.
.
In Reply Refer To:
g gg g
Dockets:
50-498/87-21
l
50-499/87-21
Houston Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
President, Nuclear
P. O. Box 1700
Houston, Texas
77001
Centlemen:
This refers to the inspection conducted by Mr. D. E. Norman of this office
during the period April 13 through May 1,1987, of activities authorized by NRC
Construction Permits CPPR-128 and CPPR-129 for the South Texas Project, Units 1
& 2, and to the discussion of our findings with members of your staff at the
conclusion of the inspection.
Areas examined during the inspection included your actions relative to IE
Bulletins 72-03 and 85-03, IE Circulars 77-01 and 78-16, and IE Notices 86-03
and 86-29. Within these areas, the inspection consisted of selective examination
of procedures and representative records, interviews with personnel, and
l
observations by the NRC inspector. The inspection findings are documented in
j
the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
Six unresolved items are identified in paragraphs 2.a(2), 2.b(1), 2.b(3)(b),
2.b(3)(c), 2.b(3)(d), and 2.b(3)(f) of the enclosed inspection report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Id ElFo! O
8707010075 a70622
rr
ADOCK 0500
B
gg
G
,
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
(see next page)
&
.
.
RIV: RSB/ES
ES/
RPB/C
A:RSB
RPB
/
DENorman/cg
REIreland
GLCons able
REIreland
l
JfGag/plj - o
,
6 /2 /87
6 /2 2/87
4 /f/87
5 /2 2/87
,//y'
l
L/11/91
L
6
.
j
l
Houston Lighting & Power Company
-2-
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-498/87-21
50-499/87-21
cc w/ enclosures:
Houston Lighting & Power Company
' ATTN:
M. Wisenberg, Manager,
Nuclear Licensing
P. O. Box 1700
Houston, Texas
77001
Houston Lighting & Power Company
ATTN:
Gerald E. Vaughn, Vice President
Nuclear Operations
P. O. Box 1700
-
Houston, Texas
77001
Texas Radiation Control Program Director
'
bec to DMB (IE01)
bec distrib. by RIV:
- RPB
DRSP
- RRI-0PS
R. D. Martin, RA
- RRI-CONST.
- Section Chief (RPB/C)
- R&SPB
- MIS System
- RIV File
- D. Weiss, RM/ALF
.
- RSTS Operator
R. Pirfo, 0GC
j
- R. G. Taylor, RPB/C
- RSB
1
- Project Inspector
- R. Hall
l
- Section Chief (RSB/ES)
- D.
Norman
- w/766
!
-
i