Forwards Corrected Pages Re SG Tube Rupture Analysis,To Be Inserted Into SE
ML20216C600
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 03/11/1998
From: Dick G
NRC (Affiliation Not Assigned)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20216C605 List:
References
TAC-M97315, TAC-M97316, TAC-M97317, TAC-M97318, NUDOCS 9803160087
Download: ML20216C600 (4)


Text

.

I s.

o2)

March 11, 1998 Mr. Oliver D. Kingsley, President Nuclear Generation Group Coiiivienwealth Edison Company Executive Towers West til 1400 Opus Place, Suite 500 Downers Grove, IL 60515

SUBJECT:

REVISED STEAM GENERATOR TUBE RUPTURE ANALYSIS - BYRON STATION, UNITS 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2 (TAC NOS. M97315, M97316, M97317 AND M97318)

Dear Mr. Kingsley:

On January 28,1998, the NRC issued a Safety Evaluation (SE) documenting our review of the revised steam generator tube rupture (SGTR) analysis for Byron, Unit 1, and Braidwood, Unit 1.

Subsequently, during discussions with the Commonwealth Edison Company staff, several errors or inconsistencies were identified in the SE. Enclosed are the corrected pages which are to be inserted into the SE. Changes are noted by the bars in the margin. We apologize for any inconvenience that these changes may have caused.

Our evaluation of the SGTR analysis for Byron; Unit 2, and Braidwood, Unit 2, will be issued by a

- separate letter.

Sincerely, Original Signed By:

George F. Dick, Jr., Senior Project Manager Project Directorate ill-2 Division of Reactor Projects - Ill/IV Office of Nuclear Reactor Regulation Docket Nos. STN 50-454, STN 50-455, GTN 50-456, STN 50-457

Enclosure:

As stated cc w/ encl: See next page l

ff DISTRIBUTION:

Docket Files PUBLIC PDill-2 r/f EAdensam (EGA1) 3 RCapra CMoore GDick JHickman SBailey GWest JHayes CJackson n, )

OGC ACRS MJordan, Rlli

'l

.I l.ilL. l.il.l!ll Il.l ll DOCUMENT NAME: G:\\CMNTSP\\ BRAID-BY\\BB97315.LTR To RECEIVE A COPY oF THis DOCUMENT, INDICATE IN THE box: "c"

  • COPY WITHouT ENCLOSURES "E" = COPY WITH ENCLOSURES "N" 1

OFFICE PM:PD3@

f fLA:@ 2 O

PM:PD32 6

PM:PD32 D:PD32 8

GDICKh IC_MbbkE SBAILEY :r4 JHICKMAN @,aRCAPRA M NAME DATE 3/ /l

/98 3/ kD

/98 3/ h

/98 3/ //

/98 3/

l'

/98 9803160087 980311 ICIAL RECORD COPY PDR ADOCK 05000454 P

PDR

~

a Rig UNITED STATES j

g a

NUCLEAR REGULATORY COMMISSION

.I l

WASHINGTON, D.c. 3oee6 4001

\\

  • n *
  • March 11, 1998 j

i Mr'. Oliver D. Kingsley, President l

, Nuclear Generation Group l

Commonwealth Edison Company

~'

l Executive Towers West lli 1400 Opus Place, Suite 500 Dovmors Grove,IL 60515

SUBJECT:

REVISED STEAM GENERATOR TUBE RUPTURE ANALYSIS - BYRON l

STATION, UNITS 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2 (TAC NOS. M97315, M97316, M97317 AND M97318)

Dear Mr. Kingsley:

1 On January 28,1998, the NRC issued a Safety Evaluation (SE) documenting our review of the 1

revised steam generator tube rupture (SGTR) analysis for Byron, Unit 1, and Braidwood, Unit 1.

Subsequently, during discussions with the Commonwealth Edison Company staff, several errors or inconsistencies were identified in the SE. Enclosed are the corrected pages which are to be inserted into the SE, Changes are noted by the bars in the margin. We apologize for any inconvenience that these changes may have caused.

i Our evaluation of the SGTR analysis for Byron, Unit 2, and Braidwood, Unit 2, will be issued by a separate letter.

.j Sincerely, j

i Georg F. Dick, Jr., enior Project Manager Project Directorate 111-2 Division of Reactor Projects - lil/IV i!

Office r'f Nuclear Reactor Regulation

!l r

I Docket Nos. STN 50-454, STN 50-455, STN 50-456, STN 50-457 l

Enclosure:

As stated cc w/orscl: See next page

l O. Kingsley Byron /Braidwood Stations Commonwealth Edison Company cc:

Ms. C. Sue Hauser, Project Manager George L. Edgar Westinghouse Electric Corporation Morgan, Lewis and Bochius Energy Systems Business Unit 1800 M Street, N.W.

Post Office Box 355 Washington, DC 20036 Pittsburgh, Pennsylvania 15230 Attomey General Joseph Gallo 500 S. Second Street Gallo & Ross Springfield, Illinois 62701 1250 Eye St., N.W., Suite 302 j

Washington, DC 20005 Illinois Department of Nuclear Safety i

Office of Nuclear Facility Safety

' Michael 1. Miller, Esquire 1035 Outer Park Drive Sidisy and Austin Springfield, Illinois 62704 One First National Plaza Chicago, Illinois 60603 Commonwealth Edison Company Byron Station Manager i

Howard A. Leamer 4450 N. German Church Road Environmentallaw and Policy Byron, Illinois 61010 9794 Center of the Midwest 203 N. LaSalle St. Suite 1390 Commonwealth Edison Company Chicago, Illinois 60601 Site Vice President-Byron 4450 N. German Church Road U.S. Nuclear Regulatory Commission Byron, Illinois 61010-9794 Byron Resident inspectors Office 4448 N. German Church Road U.S. Nuclear Regulatory Commission Byron, Illinois 61010-9750 Braidwood Resident inspectors Office RR 1, Box 79 Reg %nal Administrator, Region til Braceville,lilinois 60407 U.S. Nuclear Regulatory Commission 801 Warrenville Road Mr. Ron Stephens Lisle, Illinois 60532-4351 lilinois Emergency Services and Disaster Agency Ms. Lorraine Creek 110 E. Adams Street RR 1, Box 182-Springfield, Illinois 62706 Manteno, Illinois 60950 Chairman Chairman, Ogle County Board Will County Board of Supervisors Post Office Box 357 Will County Board Courthouse Oregon, Illinois 61061 Joliet, Illinois 60434 Mrs. Phillip B. Johnson Commonwealth Edison Company 1907 Stratford Lane Braidwood Station Manager Rockford, Illinois 61107 RR 1, Box 84 Braceville, Illinois 60407

~

1 e

O. Kingsley Commonwealth Edison Company Byron /Braidwood Stations Ms. Bridget Little Rorem Ms. Irene Johnson, Licensing Director j

Applessed Coordinator Nuclear Regulatory Services 117 N. Linden Street Commonwealth Edison Company Easex, Illinois 60935 Executive Towers West 111 1400 Opus Place, Suite 500 Document Control Desk-Licensing Downers Grove, IL 60515 Commonwealth Edison Company 1400 Opus Place, Suite 400 Commonwealth Edison Company Downers Grove, Illinois 60515 Reg. Assurance Supervisor-Braidwood RR 1, Box 79 Commonwealth Edison Company Bracoville, Illinois 60407 Site Vica President-Braidwood RR 1, Box 84 Commonwealth Edison Company Bracoville,IL 60407 Reg. Assurance Supervisor 7 Byron 4450 N. German Church Road i

Mr. David Helwig Byron, Illinois 61010-9794 Senior Vice President Commonwealth Edison Company Mr. Michael J. Wallace Executive Towers West lli Senior Vice President 1400 Opus Place, Suite 900 Commonwealth Edison Company Downers Grove,IL 60515 Executive Towers West 111 1400 Opus Place, Suite 900 Mr. Gene H. Stanley Downers Grove,IL 60515 PWR's Vice President Commonwealth Edison Company Executive Towers West lli 1400 Opus Place, Suite 900 Downers Grove,IL 60515 1

Mr. Steve Perry BWR's Vice President j

Commonwealth Edison Company Executive Towers West lli 1400 Opus Place, Suite 900 Downers Grove,IL 60515 Mr. Dennis Farrar Regulatory Services Manager Commonwealth Edison Company Executive Towers West 111 i

i 1400 Opus Place, Suite 500 Downers Grove,IL 60515 1