ML20215D900

From kanterella
Jump to navigation Jump to search
Final Response to FOIA Request.Forwards App a & B Documents. App B Documents Also Available in PDR
ML20215D900
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/06/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Bishop T
O'BRIEN-KREITZBERG & ASSOCIATES, INC.
Shared Package
ML20197F583 List:
References
FOIA-86-679 NUDOCS 8610140354
Download: ML20215D900 (3)


Text

.spM6 Sa nto UNITED STATES

[ o NUCLEAR REGULATORY COMMIS$10N g g W ASHINGTON. D. C. 20555 e  :;

OCT 6 1986

  • g,.....,/

Mr. Thomas W. Eishop Vice President O'Brien-Kreitaberg & Associates, Inc.

188 The Embarcadero IN RESPONSE REFER San Francisco, CA 94105 TO FOIA-86-679 Dear Mr. Bishop.

This is in regard to your request, pursuant to the Freedom of Information Act, to which the NRC assigned the above number.

This is a partial response to your request. We will notify you upon completion of search for and review 1 of any additional records subject to your request.

_X_ The staff has completed the search for and review of records subject to yvur request, and this is the final response to your request.

The NRC has no records subject to your request.

._X_ Records subject to your request are available for public inspection and copying at the NRC Public Doctunent Room (PDR), 1717 H Street, NW, Washington, DC 20555, as not+d on the enclosure (s). The PDE accession number is identified beside each record description.

_X_ Records subject to your. request are being made available for public inspection and copying at the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555, in the PDR file folder under the above number and your-name. These records are listed on the enclosure (s).

_X_ We are enclosing a notice that provides information about charges and procedures for obtaining records from the PDR.

Sine, rely,

/ .

gcc

/Ab)

Dunnie H. Grimsley, Director Division of hules and Records Office of Administration Enelvsurete): As stated 8610140354 861006~

PDR FOIA BISHOP 86-679 PDR

Appendix A F0lA-86-679 Date Description

1. 3/18/81 Memo from R. Tedesco to the Diablo Canyon ASLB -

Breakwater damage (BN-81-04)

2. 7/29/81 Memo from M. Fliegel to G. Lear, subject: Status of Evaluation of Diablo Canyon Intake Structure Flooding - Breakwater Damage (based on information obtained by NRC consultant, Dr. Sorenson, Coastal Engineering Research Center).
3. 7/31/81 Memo from G. Lear (thru: J. Knight) to R. Vollmer, subject: Tentative Schedule for Diablo Canyon Break-water Problem Solving and Status Report.
4. 9/23/81 Memo from B. Buckley to F. Miraglia, subject: Notice of Meeting with PG&E on Diablo Canyon Breakwater Structure.
5. 10/14/81 Memo from M. Fliegel to G, Lear, subject: Me.e ti ng ,

with Applicant to discuss damaged breakwater.

6. 11/17/81 Memo from M. Fliegel to G. Lear, subject: Site Visit to Physical Model of Diablo Canyon Breakwater.
7. 11/27/81 Memo from R. Tedesco to D. Eisephut, subject: Proposed Board Notification of Additional Damage to Diablo Breakwater.
8. 1/12/82 Memo from G. Lear to F. Miraglia, subject: Status of Diablo Canyon Breakwater / Intake Problem Review.
9. 8/5/82 Memo from R. Jachowski (thru: M. Fliegel) to G. Lear, subject: Meeting with Applicant on Diablo Intaxe/ Break-water Studies.
10. 2/15/83 Memo from R. Ballard (thru: W. Johnston) to G. Knighton, subject: SER Supplement, Hydrologic Engineering Section.

i Re: F01A-86-679 APPENDIX B (Documents Already Available in PDR)

DATE DOCUMENT DESCRIPTION

'l. April 1981 SSER # 13 " Breakwater Structure Damage" (NRC ANO 8104160561)

2. 11/16/81 PN-V-81-66 " Storm Damage to Plant Intake Area Breakwater" (NRC ANO 8111230555)
3. Feb 1984 SSER # 17 " Effects of Breakwater Damage on Salt Water Intake Structure" (NRC AN0 8403070104) f

{

I i

. - - _ , ., , _ _ _ _ , _ _ _ . _ . . __ _ . _ . _ _