Submits Tentative Schedule for Breakwater Problem Solving & Status rept.Marked-up H Denton 810714 Memo to Eisenhut Encl
ML20197F595
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/31/1981
From: Lear G
Office of Nuclear Reactor Regulation
To: Vollmer R
Office of Nuclear Reactor Regulation
Shared Package
ML20197F583 List:
References
FOIA-86-679 NUDOCS 8108210266
Download: ML20197F595 (2)


Text

__

c

(

(

-hs i

JUL 311981 W_

f,'\\ OW~ q%,s

~

9nt.KIVjn'Y,)

%. ' L L l]$*j y y b ' s Docket flos. 50-275/323

-c; La n N O 6 jg3; 3 _ !

Q m. emu aY*g! O t1Ef10RAtlDUt! FOR

Richard 11. Vollaer, Director Division of Engineering "WW e

a, n,

TifRU:

James P. Knight, Assistant Director for Components and Structures Engineering N M. n S I I D

-d\\

Division of Engineering FR0il:

George Lear, Chief

!(ydrologic and Geotechnical Engineering Dranch Division of Engineering SUDJECT:

TEllTATIVE SCllEDULE FOR DIABLO CAf;YOI! DREA!GJATER PROBLEi!

S0LVI!S ATID STATUS REPORT In response to your request (enclosure 1), the following tentative schedule of events with time lapses is shown to illustrate when the breakwater problem might be resolved. tiote that the start date is dependent on the applicant / consultant completion of his work, as discussed in nore detail in the status report attached (enclosure 2).

Event A Time Total time 1.

Visit to model by staff and 1 week consultant during tests 2.

Applicant submits report of R date test and evaluation 3.

Review by CERC (Dr. Sorenson) 5 weeks R + 5 weeks and Dr. Fliegel 4.

Preparation, approval and 1 week R + 6 weeks transmittal of ?!RC questions 5.

Applicant response 4 weeks R + 10 ueeks hAcotroSooo275 o2663 10731 e

9

  • a h

........L.e-d.

OFFICE )

.....-...........~.I conn.=c >

om)

-. ~ ~......

l nne ronu sis oow sacu ono OFFICIAL RECORD COPY usomini-us co l

('

(~

o JUL 3 ' 1981

^

Richard 11. Vollmer Event a Time Total time 6.

Review by CERC and Dr. Fliegel 4 weeks R + 14 weeks 7.

Preparation and approval of 2 weeks -

R + 16 weeks input to SER supplement Original signed by George Lear George Lear, Chief Hydrologic and Geotechnical Engineering Branch Division of Engineering

Enclosures:

1.

Denton Hote 2.

Status Report cc:

D. Eisenhut R. Tedesco F. fliraglia B. Buckley fl. Fliegel 1}

6

.HGEB:DE '.............g.

..,. /..D : C..S..E..:..DE...

H Pg...E.....

A cmes >

...a sua

< >....E...i.es.e.!h ;..G..L.s.az...

}H9 31

..P.Kn.i.9h.t....,,

).

9.......

om>

..HJ4.1.al.....11.gG/.al....

Nac ronu sia paio3 uncu oua

'OFFIClAL RECORD COPY uso mi-m