AUG 5 1982 5b-275/323 Docket f30s.:
!!E 'ORAtlDUM FOR: George Lear, Chief flydrologic and Geotechnical Engineerina Branch Division of Engineering TilRU:
Myron Fliegel, Leader flydrologic Engineering Section flydrologic and Geotechnical Engineering Branch Division of Engineering FRO:i:
Robert Jachowski, liydrologist flydrologic Engineering Section flydrologic and Geotechnical Engineering Cranch Division of Engineering
SUBJECT:
MEETIrlG UITil APPLICA';T 0:i DIABLO CA':YOU It!TAKE/RREAKFATER STUDIES Plant Name: Diablo Canyon !!uclear Power Station Unit 1 and 2 An infornal meeting was held with the applicant Pacific Cas and Electric Company (PG&E) at Bethesda, f1d. on July 29, 1982 to discuss the status of their studies on.the vent nodifications to the service water intake con-partment, the wave and ship collision inpact forces and the renairs to the breakwaters.
Tentative plans.were also discussed regarding.a llRC staff visit to the nodel at Encondido, California and the plant site during the week of September 13.
Attached is a copy of the necting agenda and list of attendee's.
Robert Jachowski, flydrologist flydrologic Engineerinq Section flydrologic and Geotechnical
_ Engineering Branch Division of Engineerinn 9
Enclosure:
As stated SIA-b-6 cc:
R. Vollner J. Knight B. Buckley II. Fliegel R. Jachowski 8208130344 820805 D
5000275 g
01rLl AI qv
.G...i.0,E,,,,,,
..h.,,. ;.. E,,,,,,
sununue >
usk.i...
..ME11egel....
.m
.81..f.282...... 8/..bf..LB 2......
orn >
. ~ -.. - -
/
@770@0AfL RECOR D COPY usam mi-m nne ronu rset nneu om
(
(
o INFORMAL BREAKWATER MEETING July 29,1982 (RLK) 1.
INTRODUCTION 2.
VENT EDDIFICATION (Hil) a)
Status
( B1) b)
Description i.
Configurations
- 11. Criteria 111. Design Concepts iv.
NTO Telecon Questions 3.
ADDITIONAL EVALUATIONS (JBicC) a)
Status (Bt) b)
Model Tests (LUI) c)
Ship Collision (LUI) 4.
BREAKWATER a)
Status b)
Description 1.
Tribars
- 11. Grout 111. Criteria (RIX) 5.
SUmtARY OF STATUS a)
Meeting Action Itons b)
Submittals c)
Future Staff Visit
(
Lists of Attendees Infomal Breakwater Meeting Diablo Canyon Nuclear Power Station July 29,1982 G. Lear NRR M. Fliegel NRR R. Jachowski NRR R. Lipinski NRR B. Buckley NRR B. Lew PG&E R. Kelmenson PG&E G. Moore PG&E L. Harrison PG&E E. Matsuda Bechtel J. McCall Bechtel l
l l
e
^