Advises That Nrc/Idcor Technical Exchange Meeting on Fission Product Release & Transport Now Set for 840207-08 in Washington,Dc.Tentative Agenda,Table of Technical Issues W/ Names of Associated NRC Contractors & Others Encl
ML20214W422
Person / Time
Issue date: 01/06/1984
From: Bernero R
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Jankowski M, Pasedag W, Silberberg M
NRC
Shared Package
ML20213E209 List:
References
FOIA-87-113, FOIA-87-60 NUDOCS 8706160016
Download: ML20214W422 (8)


Text

_

1e O N r

Ja'nuary 6, 1984 ME::0RA"DU:i FOR: Tisose on Att(ached List FR0il:

Robart !4. i3ernaro, Director Accident Source Tar.a Prograta Office Office of iluclear Regulatory Research SUDJECT:

i:RC/IDCOR TECliiiICAL EXC ' AIDE ::2ETIiG 01 FISSIO:1 iM000CT RELEASE,AND TRA!iSPORT The. subject r.. acting is now set for February 7-3, 1934 in the l'ishington,

-D.C. area.

The neeting will be h21d at the :arriott 1:unt Valley Inn at Shauan Rcad and I-33 just north of the Caltinare, i:aryland, Beltt ay (I-695).

Infortation regarding reservations and directions will be forth-ccaing.

Attached to this n2:3randu:a are the tentative agsnda, a table of the technical issues with the nadas of the associcted :'RC contractors and others with responsibilities for the:a, and a copy of the namorandt::a from the iiRC Executive Director for Cperations which sets certain grcund rules for the !2C/IDCOR interaction, especially in this technical area.'

The agenda has allocated e::actly the same time to each of the six technical issues by each party. As presentation plans are cado firm please notify ne of any desire to shorten or lengthen your presentations so that I can refine the schedule before the meeting.

The presentations are expected to focus on the pertinent phencnena 'and the way they are :.cdelled.

The,aC centractor presentations should explicitly cover tie review of the IOCOR reports and congarison between the.IDCOR ucrk and NRC-sponscred w0rk.

The partinent IDCOR reports that are the subject of this neiting have 6en distribatad to fiRC participants, they cre:

Reort Task ilo._

Title pthor 11.1, 11.4, 11.5 Estiiaticn of Fission product EPRI and Core Icterial Source Characteristics 11.2 Identify Fathtisys on Fission I;IPELL Product Traasport 11.3 Fissica Pro.Iact Tra::spcet in I..? ELL Degraded Core Accidents E706160016.870610' PDR FOIA SHOLLYB7-60 PDR i

=

N33" i

1 e

i

.bitiple Addressees- ?

The presentations shonld use the technical issue papers as a context ra~thar

-"=--

than an explicit format. The draft technical issue papers will be exchanged by i:RC and IDC0.4 2-3 uaaks before the caeting.

Arproximately 3 ueaks after the c:eting I cxpect dRC and IDCO.4 to e:: chance any revisions of those,napers which are then varranted, for discussion in an URC/Il>COR r.anageant I: eating.

Plaase re.ne*er that the principal purpose of thesa iblC/IDCOR technical ex-citange acetings are to:

~

o Identify areas of technical concensus o

I.!catify areas of technical uncertainty or controversy that are not important to useful severe accident analysis o

Identify areas,of technical uncercainty or controvarsy which are furortant and require further attention.

f'*

Robert M. Barnaro, Director Accident Source Term Program Office Office of I uclear Regalatory Research Attachr.ent:

As stated Distribution:

RES Central File CIRC /CHRON ASTP0 Subject / Reading RBernero Reading 7

w ;1.ES/.ASTP0/.0

'R

, R 3c er.e c. o..
psS........

....l...

. 03RESSEES - !:5:3.WDU.'10ATED JA ;UARY (3, 19C3 "

i;RC.

Sill-i1. Silberberg D. Pcicrs

~

II. Jankoeski K. Earcaron H. Pasedag

'J.

Erockrc. ann R.. !!syar G. ifeicand C. Rydar G. ;'arino BCL R. Curtis T. Ualker J. Giesake J. Larkins li. Kuhinan

-L.

Chan K. Lee D.lRoss P. Cybulskis R. Deaning

0. Bassatt R. itattson T. Spais PHL R. Volluar E. Jordan K. Uiae;are:aer R. H. Nouston P. O',.'crarski D. tiu11er A. Thadani EGaG_

- W. - Butler J. P.osenthal P. itacDonald R. Carrett R. !!chbins J. Read S. Acharya APS F. Akstule.ficz

.L. G. Hulnan.

R. Wilson P. Easely Consultr.nts ACRS S. Levy A. ifang H. Casticuan A. Reyncids OPJll N. Kastescrg

~~~

J. Cobble T. Kress L. Zurtalt R. Ulchner A. !:right R. Lorenz e

gi............,.............

'A

.....i.

i

- {p j

ADDRESSEES - MEMORANDTI DATED JAliUARY 6.1983

  • i;RC.

SNL M. Silberberg D. Po.ters

~-

M. Jankortski K. Bargaron W. Pasedag

~

J. Brockmann R. !! eyer.

G.1 6tgand C. Rydar

-~

G. Marino BCL R. Curtis T. 1.'al ker J. Gieseke J. Larkins M. Kuhlman L. Chan K. Lee D. Ross P. Cybulskis

0. Eassett R. Danning R. !!sttscn T. Spais PNL R. Voll...ar E. J.ardan

' K. 1.*inegardner R. W. Ecuston P. C..czarski

- D. !! aller A. Thadani EGaG W. Eutler J. P.osenthal P. MacDonald R. Barrett R. H bbins J. Raad.

S. Acharya APS F. Akstule.ticz L. G. Hulman R. ~'n'il son P. Easely Consultants ACRS S. Levy A. '.'ang W. Castler.an A. Reynolds OR11L W. Kastenberg J. Cobble T. Kress L. Zumaalt R. i!ichner A. ?lright R. Lorenz e

e

_ j...........

....I.

7 it >,t...........'.l.

I l

.L J.

i _

i

-_3__.

AG ENDA--NRC/IDCOR TECHNICAL EXCHANGE MEETING ON FISSION PRODUCT RELEASE AND TRANSPORT FEBRUARY 7-8, 1984 Tuesday, February 7 8:30 a.m.

Opening Remarks and Agenda R. Bernero, NRC M. Fontana, TEC 8:45 a.m.

Issue 1.4.1, IDCOR Presentation R. Seghal, EPRI 9:30 a.m.

Issue 1.4.1, NRC Contractor Presentation R. Lorenz, ORNL 10:15 a.m.

Discussion of Technical Issue 1.4.1

'10:30 a.m.

BREAK 10:45 a.m.

Issue 1.4.2, IDCOR Presen,tation R. Burns, IMPELL 11:30 a.m.

Issue 1.4.2, NRC Contractor Presentation M. Kuhlman, BCL 12:15 p.m.

Discussion of Technical Issue 1.4.2 12:30 p.m.

LUNCH 1:30 p.m.

Issue.l.4.3, IDCOR Presentation R. Henry, FAI 12:15 p.m.

Issue 1.4.3, NRC Contractor Presentation D. Powers,-SNL 3:00 p.m.

Discussion of Technical Issue 1.4.3 3:15 p.m.

BREAK 3:30 p.m.

Issue 1.4.4, IDCOR Presentation R. Surns, IMPELL 4:15 p.m.

Issue 1.4.4, NRC Contractor Presentation J. Gieseke, BCL 5:00 p.m.

Discussion of Technical Issue 1.4.4 5:30 p.m.

ADJOURN e

A

L'[

  1. 1

. ednesday, February 8

'"I-e 8:15 a.m.

. Issue 1.4.5, IDCOR Presentation R. Burns, IMPELL/GE 9:00 a.m.

Issue 1.4.5, NRC Contractor Presentation P. Oscrarski,'PNL 9:45 a.m.

' Discussion of Technical Issue 1.4.5 10:00 a.m.

BREAK 10:15 a.m.

Issue 1.4.6, IDCOR Presentation R. Hanry, FAI 11:100 a.m.

Issue 1.4.6,h;RCContractorPresentation J. Gieseke, BCL 11:55 a.m.

Discussion of Technical Issue 1.4.6' 12:00 noon LUNCH 1:30 p.m.

_ Sun:. aries of Technical Issues Status 1:30

- Issue 1.4.1 IDCOR 1:40

- Issue 1.4.1 NRC Contractor 1:50 Issue 1.4.2 IDCOR 2:00 Issue 1.4.2.

NRC Contractor 2:10 Issue 1.4.3 IDCOR 2:20 Issue 1.4.3 NRC Contractor 2:30 Issue 1.4.4 IDCOR 2:40 Issue 1.4.4 NRC Contractor 2:50 Issue 1.4.5 IDCORL 3:00

-Issue 1.4.5 NRC Contractor 3:10 Issue 1.4.6 IDCOR 3:20

' Issue 1.4.6 NRC Contractor 3:30 p.m.

Concluding Remarks R. Sarnero, NRC M. Fontana, TEC 4:00 p.m.

ADJ0LRN s

e e

O 9

7 f

g y

a

~

.. ~.

s; TABLE 1 TECHNICAL ISSUES 1.4 F'ISSION PRODUCT RELEASE AND TRANSPORT

.4--_i

~

1.4.l

-Rate and Magnitude of-Fission Products from Fuel (in vessel)

Principal Spokescarson:

R.Lorenz(0RNL)

Supporting Contributors:.R. Kress (ORNL)

R. Hobbins (EG&G)

Others:-

-L. Chan (NRC)

R. fieyer -(NRC)

S. Levy (NRC Cortsultant)

J. Cobble 1(NRC Consultant)

L. Zucsalt (NRC Consultant)

' l. 4.' 2 Deposition of Fission Products During Frimary_ System Transport

- Principal Spokesperson: - M. Kuhlman (BCL)

T. Kress (ONRL))

Supporting Contributors:

A. Wright (ORNL Others:_

M. Jankowski (NRC)

A. Reynolds (NRC Consultant)

5. Levy,(NRC Consultant)

W. Kastenberg (NRC Consultant) 1.4.3 Rate and Magnitude of Release of Radionuclides and Aerosols from Fuel (ex-vessel)

Principal Spokesperson:

D. Powers (SNL)

Supporting Contributors: R. Wichner (ORNL)

J. Brockmann (SNL) 0thers:

T. Ualker.(NRC)'

'J. Cobble (NRC Consultant)'

L. Zumaalt (NRC Consultant) t 1.4.4 Deposition of Fission Froduct in Containment Due to Natural 6-Processes.

Principal Spokespceson:

J. Gieseke (BCL)

~ Supporting Contributors: K. Lee (BCL)(SNL)

- K. Sergeron Others :

W. Pasedag (NRC)

W. Castleman (NRC Censultant) s, 4

-2

-,,--v,

,,-,mn--n.,..,e o..,,,

,,.ny-g.cn--,,,,

,.,.-~-w-e.

...-,m-__

e

-..- we -, - - - - - - - - -.. -. - -.

, - -.e,--g,

=.

p 1.4.5 Effect of ESF on Fission Product Retention

~-

-i_

Principal Spokesperson:

P. Osczarski (PNL)

Supporting Contributors: K. Winegardner M. Kuhlman (BCL)

A. Postma (flRC Consultant)

A. Reynolds (NRC Consultant)

M. Jankowski (NRC)

F.Akstulewicz(liRC) 1.4.6 Ceposition of Fiss, ion Products in Other Plant Buildings Principal Spokesperson: J.Gieseke-(BCL)

Supporting Contributors: K. Lee (BCL)

K.Bergeron(SNL)

(NRC)

Others:

W..Pasedag(NRC)

P. Easley W. Castleman (NRC Consultant) t e

e W

Y.

4