Text
,
g
%w.
DONNELL DOUGLAS A$
ONAUTICS COMPANY wasreuw ouvesson Donald W. Douglas Laboratories. 2955 Ccorge Wastungton Way, Richland, WA 99352 May 4, 1970 A55-830-70-55 mmmo.M 9' fQQeMW 7:,a m
D. A. Nussbaumer 4
b\\
\\
Source & Special Nuclear for Div' of M'I
! M~M <(; h-D Materials Branch b
~
U. S. Atomic Ener6y Commission Washington, D. C. 20545 1.t te r.
' /
O!
k..\\ +. /
Q.,
f.:1
SUBJECT:
SUPPORT MATERIAL FOR THE AMENDMENT OF SPECIAL h N..
7',h N
N NUCLEAR MATERIALS LICENSE SNMll56
. p'v%-
A
Dear Mr. Nussbaumer:
Inc. we are hereby submitting to you the subject As requested by'Medtronic,X W data.
tnouve. eu The Betacel manufactured by McDonnell Douglas Corporation at Richland, Washington is fabricated in the manner shop in the attached drawings 1D12301, 1D12302,,. _,
and 1D12304.
Please note that these drawings contain proprietary information._ _,-
The sub-assembly consisting of parts 1D12304-1,1D12305-1,1D12308-1 and 1D12309-1 is assembled and the ceramic parts cemented in place. The inner structure is placed in this sub-assembly and the outer shell, part #1D12304-501, which is a 0.002-in. interference fit, is placed over it and the two parts are pressed together. The lead wires are then connected, and this assembly is placed in part 1D12311-1 shown in drawing 1D12301. The lead wires are put through the tubulation in the feedthrough/ lid, part A12456-6, and it is pressed into place..
The completed assembly is velded in accordance with the detail shown on drawing 1D12301. After smearing, inspection of the ucld by x-ray or ultrasonics is performed, and the Betacel is leak-checked.
If free of leaks, the protective shield 1D12312-1 is installed over the ceramic to metal seal and welded as shown.
Specific quality control procedures exercised during the above assembly process are:
1.
Parts Inspection Upon receipt, all parts are inspected for dimensions. In addition, each Each feedthrough/ lid is inspected to assure continuity of both brazes.
is helium lenk checked to assure no leak greater than 10-9 cc/sec at 1 atmosphere pressure difference. Microscopic inspection of each ceramic
, insulator assures that it has no visible flaws.
Cans and lids are matched to provide 0.001" fit-up before welding.
'W
/
kICEIVEg o N
\\
& #'h's mg r
da 5p%, v
=
v a o mo i
.o x '
McDONNCLL UOUGLANQ V
W, 0610020343 060811 b,
1.408 REG 3 LIC70 j
"""""* noa, PDR q
s SNM-1156
~+
_ u 1
o OP
~
~
D. A. Ilussb:umir A
8 0-70-55 2.
Welding Electron beam velding is used to fasten each lid to its can and to seal the feedthrough tubulation. Welds are inspected by x-ray or ultrasonics for vidth of weld nugget and for evidence of imperfections or cracks.
After closure each scaled capsule is placed in a helium bomb at 100 psig for a minimum of 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. Within 2 minutes of depressurization each capsule is bubble tested in water. A helium leak detector is then used_to verify that leakage is less than 10-9 cc/sec.
If any further information is required, or if there are questions concerning the information supplied, please contact M. L. Smith, 509-946-4151, ext. 278 or by mail at the Donald W. Douglas Laboratories, 2955 George Washington Way, Richland, Washington 99352.
Very truly yours, t
W. E. Matheson Director Donald W. Douglas Laboratories cc:
J. D. Ilixson, Medtronic, Inc.
File l
4 4
(
WEM:ji Attachments - Drawings 1D12301, 1D12302, 1D12304 r
1 i
\\
[
l' e
l m c o o u mara.n. o o a.a
, w I
cone =onarnont L'-
_k
-v 3 -.
m 1,...
/
- 31 DOCKET NO: 70-1209 I;
DATE: May 12, 1970 I;,
li t'
/
NMICE TO AEC PUBLIC DOCUMENT ROOM AND MHERS T
The following items, submitted by letter (A55-830-70-55) dated May 4, 1970 fros the McDonnell Douglas Astronautics Company, will be furnished as soon as additional copies are made available:
DWG..No. 1D12301 DWG. No. ID12303 DWG. No. 1D12304 I-5 o
Y s
4 e
e R W.M 77 ~~" w ;E 8 7.5 % T {); M ~
- V*
~
o -
,1..u
,