Provides Guidance on Flaw Evaluation & Repair,In Response to 800411 Memo
ML20214L879
Person / Time
Site: Limerick Constellation icon.png
Issue date: 05/02/1980
From: Reinmuth G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20214L874 List:
References
NUDOCS 8609100427
Download: ML20214L879 (1)


Text

. .. - _- _

t -

  • ~

i

' heir f UNITED STATES 8[7c. j g

i NUCLEAR REGULATORY COMMISS WASHINGTON, D. C. 20$55 *

%,[' ~ , '; ".$

..... MAY 2 1980 h

s

/

l'.EMORA'iDUM FOR: U. Potapovs, Chief Vendor Inspection Branch, RIV r

2 FROM: G. W. Reinmuth, Assistant Director, Division of Reactor Construction Inspection IE

SUBJECT:

FLA'4 EVALUATIO;i AND REPAIR The following guidance on the above subject is forwarded in response to your memorandum of April ll, 1980. The subject matter relates to the NRC's position on the evaluation / repair of flaws or indications of flaws that may be identified through casual or non-mandatory examination procedures.

It has been the NRC's traditional position that defects / flaws / indications in hardware must receive, as a minimum, an evaluation to determine their significance.

The method of detection, whether or not specifications required that method, is irrelevant to the finding or to the possible follow-up actions that the evaluation might suggest. Defects / flaws /in-

. oications once identified cannot be disregarded. This does not mean that

repair is required in every case.

> sideration the nature of the flaw (s) The evaluation should take into con-and the application of the component to ' determine whether or not further investigative effort and/or repair is necessary. Obviously the licensee has the ultimate responsibility for either performing the evaluation directly or seeing to it that an evalu-ation is in fact performed.

In the Anchor / Darling case you may want to call the specific facts to the attention of the affected Region so that the appropriate licensee can be informed of our findings.

.N.I'h.\.]V.w.Nh~

G. W. Reinmuth, Assistant Director Division of Reactor Construction Inspection Office of Inspection and Enforcement cc: H. D. Thornburg, IE G. T.

R. 3.Carlson, Georgiev, RI If C. E. Murphy, RII '

G. Fiorelli, RIII

'J. C. Seidel, RIV r -

.T G. S. Spencer, RV 8609100427 860028 PDR ADOCK 05000352' , (. I P PDR ' ,, .