ML20214K493

From kanterella
Jump to navigation Jump to search
Final Response to FOIA Request Re Diablo Canyon.App Documents Encl & Available in Pdr.App T Documents Totally Withheld (Ref FOIA Exemption 5)
ML20214K493
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/22/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To: Holmes G
MHB TECHNICAL ASSOCIATES
Shared Package
ML20213E357 List:
References
FOIA-86-151 NUDOCS 8705280460
Download: ML20214K493 (4)


Text

U.S. NUCLEAR CE7ULATORY COMMISSl!N hac *Oia uoutST NuvatnSi

,p""%,o%

e!

FOIA-86-151 c

wtSPONSE TYPE 5

E I

RESPONSE TO FREEDOM CF X l *^'

I l '^N i c

\\e..e/

^

INFORMATION ACT (FOIA) REQUEST gy22 g e

DOCKET hum 8ERisi ta appaceaes.

IEOutSTER Mr. Gregory A. Holmes PART 1.-RECORDS RELEASED OR NOT LOCATED (See checked bones)

No agency records subject to the request have been located.

No additenal agency recsds subeset to the request have been located.

Agency records subject to the request that are identifed in Appendix are already available for public inspection and copying in the NRC Public Document Room, 1717 H Street N W., Washmgton. DC.

Agency records subsect to the request that are identified in Appendix S

are being made available for public inspecten and copying in the NRC Public Document y

Room 1717 H Street. N.W.. Washington DC. in a folder under the FOIA number and requester name.

The nonproonetary versen of the proposaus) that you agreed to accept in a telephone conversaten with a member of my staff is now beang made avadable for public inspection and coying at the NRC Public Document Room.1717 H Street. N W., Washington, DC. in a folder under the FOIA number and requester name.

Enclosed is informaten on how you may obtain access to and the charges for copying records placed in the NRC Public Document Room,1717 H Street. N.W., Washington, DC.

Agency records subsect to the request are enclosed. Any applicable charge for copies of the records provided and payment procedures are noted in the comments section.

Cocords subject to the request have been referred to another Federal agencytes) for review and direct response to you.

X in view of NRC's response to this request, no further action is being taken on appeal letter dated Ik/11/bb PART ll.A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain informaten in the requested records o bemg withheld from public disclosure pursuant to the FOIA exemptons desenbod in and for the reasons stated in Part 11. sec-N tions B. C and D. Any released portens of the documents for which only part of the record is being withheld are being made available for public inspection and copying in the NRC Puble Document Room 1717 H Street, N.W., Washengton DC. in a folder under this FOIA number and requester name.

Comments r

SIG E. DIRECTOR. Div?Sr0 OF R AND RECORDS

'OM

- / U W

8705280460 870522 l

PDQ FOIA HOLMES86-151 PDR NIC FIRM 464 iPan 11 to ni

F;EEDOM OF INFZRMATION ACT RESPONSE FOIA NUMBEntSI:

86-151 DATE:

PAWT hi 8-APPUCA: LE FOIA EXEMPTIONS uw 9 9 m07 Records subject to the request that are described in the enclosed Appendices I

are being withheld in their entirety or in part under FOIA Exemptions and for the reasons set forth below pursuant to 5 U.S.C. 552(b) and 10 CFR 9.5(a) of NRC Regulations.

1. The wthheld informaton is property classited pursuant to Executwo Order 12356 (EXEMPT'ON 1)
2. The withheld information relates solely to the internal personnel rules and procedures of NRC. IEXEMPTION 2)
3. The wthheld information is specifcally exempted from public disclosure by statute indicated: IEXEMPTION 31 Section 141145 of the Atomic Energy Act whch prohibits the declosure of Restrcted Data or Formerty Restricted Data (42 U S.C. 2161-2165L Section 147 of the Atomic Energy Act which prohbits the disclosure of Unciassifed Safeguards informaton (42 U.S.C. 2167L
4. The wthheld information is a trade secret or commercial or fmancial information that is being withheld for the reason (s) indicated IEXEMPTION 4)

The mformation is censidered to be confidential bus ness (propnetaryn information.

The informaton is considered to be proonetary informatoa pursuant to 10 CFR 2.790 ldh 1L The informaton was submitted and recewed in confidence from a foreign source pursuant to 10 CFR 2.790(dM2L

5. The withheld information consists of interagency or intraagency records that are not available through d scovery dunng litigaton. Osclosure of predecsional informaton X

would tend to inhibit the open and frani6 enchange of ideas essentsal to the deliberatwe process. Where records are wthheld in their entirety, the facts are inextricably intertwned with the credecisenal informaton. There also are no reasonably segregable factual portons because the release of the facts would permit an indirect inqury mto the predecisional process of the agency. (EXEMPTION 58

6. The withheld mformation is exempted from public disclosure because its disclosure would result in a clearfy unwarranted invasion of personal prrvacy. (EXEMPTION 6)
7. The withheld informaton consets of investigatory records comoded for law enforcement purposes and is bemg wrthheld for the reasonts) indicated. (EXEMPTION 7)

Ossclosu e would interfere with an enforcement proceeding because it could reveal the scope. dwecten, and focus of enforcement efforts. and thus could r

possibry allow !bem to take acton to sheld potential wrorigdoeng of e volation of NRC requwements from investigators. (EXEMPTION 7(AH Declosues would constitute an unwarranted invasion of personal pnvacy (EXEMPTION 7tCH The informaton conssts of names of indwiduals and other informaton the disclosure of which would reveal identities of confidental sources. (EXEMPTION 7(DI)

PART ll C-DENYING OFFICIALS f'ursuant to 10 CFR 9 9 and/or 9.15 of the U S. Nuclear Regulatory Commason regulatons. it has been determined that the informaton wthheld is exempt from producten or disclosure.

and that its production or disclosure is contrary to the public interest. The persons responsible for the denial are those offcials identifed below as denying officials and the Drector, Divoon of Rules and Records. Office of Adminstraten, for any dernals that may be oppealed to the Executive Drector for Operations IEDoL DENYING OFFICIAL TITLE / OFFICE RECORDS DENIED APPELLATE OFFICIAL Assistant Secretary of 5"*"

John C. Hoyle the Cnmmissinn T-1 X

Assistant General Counsel

.lampt A. Fi t m.,o ra l d fnr Ad.indicatinns and T-7 X

Opinions i

PART 18 D-APPEAL RIGHTS -

The denial by each denying official identified in Part II.C may be appealed to the Appellate Official identified in that section. Any such appeal must be in writing and must be made within 30 days of receipt of this response. Appeals must be addressed as appropriate to the Executive Director for Operations or to the Secretary of the Ca.nn.n;e.;en, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an initial FOIA Decision."

mac Pomu ese IPeet a U.S. NUCLEAR REGULATORY COMMISSION

  • asi FOlA RESPONSE CONTINUATION

l Re: F01A-86-151 APPENDIX S RECORDS MAINTAINED IN THE PDR UNDER THE AB0VE REQUEST NUMBER 1.

11/16/82 Memo for Palladino and Comissioners from Eisenhut, subject: Information Items Regarding the Design Verification Program - Phase I for Diablo Canyon, Unit 1 (Board Notification No.62-119).(44pages) 2.

12/6/83 Ltr to Harold Hudson from Roxanne Goldsmith.

(2 pages) 3.

2/28/83 Memo for Palladino and Commissioners from Dircks, subject: Comission Testimony on Diablo Canyon Before Subcommittee on Energy and Environment. (12 pages) 4.

3/1/83 Memo for Palladino and Comissioners from Dircks, subject: Comission Testimony on Diablo Canyon Before Subcomittee on Energy and Environment. (12 pages) 5.

4/7/83 Memo for Denton from Hayes, subject: Allegations Regarding Diablo Canyon (BN-83-48)

(1page) 6.

7/6/83 Memo for Denton from Hayes, subject: Allegations Regarding Diablo Canyon (BN 83-48) (1 page) 7.

8/5/83 Memo for Palladino and Comissioners from Dircks, subject: Diablo Canyon SER Regarding Seismic Design.

(1page) 8.

8/25/83 Memo for Palladino and Comissioners from Dircks, subject: Status of Diablo Canyon, Unit 1 Design Verification Program. (2 pages) 9.

10/20/83 Memo for Eisenhut from Bishop, subject: Recommendation for Diablo Canyon Board Notification Regarding Allegations Received October 19, 1983. (12 pages) 10.

10/26/83 Memo for Chilk from Dircks, subject: Commission Infonnation Request on Diablo Canyon (3 pages)

11. 11/14/83 Memo for Palladino and Comissioners from Chopko, subject: Stay of Diablo Canyon Fuel Loading (1 page) 12.

11/17/83 Ltr to William M. Thomas from Martin Malsch (3 pages)

13. 12/16/83 Memo for Denton from Hayes, subject: Telecon Re Harold Hudson Report (6 pages) l

-l 1

f Re: F01A-86-151 APPENDIX T-RECORDS TOTALLY WITHHELD I

DATE DESCRIPTION EXEMPTION

. 1.

7/13/82 Memo for Palladino and Commissioners 5

from John Ahearne, subject: Diablo Canyon Phase II. (1 page) 2.

9/21/83 Memo for Palladino and Commissioners 5

from Herzel Plaine, subject: Diablo Canyon Schedule. (4 pages) k 4

I

TECHNICAL ASSOCIATES TECHNICAL CONSULTANTS ON ENERGY & THE ENWRONMENT Dale G Bocenbaugh 1723 Hamdton Avenue-Suite x Richard B Hubbard San Jose. Cattfornia 95125 Gregory C. Minor March 4, 1986 Phone:(408) 266 2716 Mr. Donnie H. Grimsley, Director Division of Rules and Records Office of Administration pggg Oc, at /t ION U.S. Nuclear Regulatory Commission ACT REQUEST Washington, D.C.

20555 hpg RE: FOIA REQUEST

Dear Mr. Grimsley:

Pursuant to the Freedom of Information Act, please make available at the Commission's Washington, D.C.,

Public Document Room single copies of records in the following categories:

A.

From the Chron Files of Mr. Hans Schierling from September 1, 1981, through December 31, 1983, all records concerning in any way the Diablo Canyon Nuclear Power Plant, Units 1 and/or 2.

B.

From the Reading Files of Mr. Hans Schierling from September 1, 1981, through December 31, 1983, all records concerning in any way the Diablo Canyon Nuclear Power Plant, Units 1 and/or 2.

Please provide partial responses as batches of documents become available.

If you have any questions concerning this request, please contact me at the telephone number given above. Your prompt attention to this request will be appreciated.

Very Truly Yours, re o Holmes Associate Consultant 1

i l

l i

s 4

$ bO"f (Y I