{}')5 e
- m,
+
a Y RECENED g
n NOV 131986 )-r
'-f, U.S.hUCtEAR REGutATORY -f CO?!JA1331CR I
NMS3 f
Mail Sectioti \\p j
4/'y4 j
IW li 1
IEST VALEY DEMNISTRATION PIMMECT SAFETY ANALYSIS REPGtT i
VG.lDE IV i
REY. I CEPENT SOLIDIFICATION SYSTEM h
cocVITED g
ustlRC' wiu}9%6 9,1 wggt 7
tyET Cll
\\
g s
,S l ce w
8
)
Controlled Copy No.
CAF1107:ENG-308 8611210386 861111 PDR PROJ M-32 PDR
HE:86:0190 4
d SAFETY ANALYSIS FOR CEMENT SOLIDIFICATION SYSTEM J. M. Peterson, D. A. Dooley and P. M. Petrone October 1986 Revision I Requirement for Environmental Review Met by Referenced Document:
WVDP-037 Dated:
January 1985 Hazard Classification:
Low Met By Referenced Document No. WD: 85:0214 DW:85:0227 Appaovals:
[
Distri bution:
-e A_
IOIZ8f0b Cognizant Manager C. E.
w. son, Facility and System Design Manager, Dat e QA Manager M
/4!7<!M R/ES Manager Operations Manager S. Marchetti, Vice-Presid4nt hnd Technical Director, Date Facilities Manager J
,f S/EA Manager 4
e 4~ 4,a'
/ - /~~sh,
/
/Sr'Ut MRC-0706, 0713, 0717 R. A. Humpnrey, Chairman, WVNS Rad. & Saf ety Comm.,
Date L
EST VALIEY DEM)NSTRATION PROJECT SAFETY ANALYSIS REPGtT O
y TG.lRE IV, REV. 1 J
CEENT SG.IDIFICATION SYSTEM TABIE OF (X)NTENTS Section Py L IS T O F T AB L E S..........................................................
x L IS T OF F I GU R ES.........................................................
xil G.I.0 INTRODUCTIM AND GENERAL DESCRIPTION OF tie WEST VALLEY DEN)NSTRATION P ROJECT.....................
1 0.1.1 I nt ro d u c ti o n..............................................
1 G.1.2 G en er al P l ant D es cr i p t i o n.................................
1 G.1 3 Gener al Process D es cri p tion...............................
1 G.1.4 Identif ication of Agents and Contractors..................
1 G.1.5 Structur e of this Saf.ety Analysis Report..................
1 G.2.0 SIAftA RY S AFETY ANA LYS IS...................................
2 G.2.1 S i t e A n al ys i s.............................................
2 G.2.1.1 N at ur al P h e n om en a.........................................
2 G.2.1.2 Site Characteristics Affecting the Saf ety Analysis........
2 G.2.1 3 Effect of Nearby Industrial, Transporation, and 14 i11 tar y Facil i ti es...............................
2 G.2.2 Radiological Im pact of Normal Operations..................
2 G.2 3 Radiological Impact f rcxn Abnormal Operations..............
3 G 2.4 Accidents.................................................
3 G.2.5 Co n cl us i ons...............................................
4 G.3 0 SITE QiA RA CTE RISTICS......................................
5 G.3.1 Geography and Demography of West Valley Demons tration Proj ect E nvirons........................
5 CAF1107:ENG-308 i
TABLE OF CONTENTS (Continu;d)
Section Page G.3.2 Nearby Industrial, Transportation, an d M il i t ar y F a c il i ti es................................
5 l
I G.3.3 Meteorology...............................................
5 G.3.4 Sur f a ce H yd r ol og y.........................................
5 G. 3. 5 Su bs urf a c e H y dr ol ogy......................................
5 G.3.6 G eol ogy an d S ei smol ogy....................................
5 G.3.7 S i t e E col o gy..............................................
5 G.3.8 Summary of Conditions Affecting Facility Construction and Operating Re quirements...............
5 G.4.0 P RIN CIP AL DES IGN CR ITE RIA..................................
6 G.4.1 Purpose of the Cement Solidification System (CSS) Faci 11ty.........................................
6 G.4.1.1 CS S F un c t i o ns.............................................
6 G.4.1.2 Fe e ds t o t he CS S..........................................
6 G.4.1.3 CSS Prod ucts and By-Prod ucts..............................
7 G.4.2 Structural and Mechanical Saf ety Criteria f or the CSS.....
7 G.4.3 S af e t y Pr o t e c ti o n S ys t ems.................................
8 G.4.3 1 General 8
G. 4. 3.2 Protection by Multiple Confinement Barriers and Systems...
8 G.4.3.3 Protection by Equipment and Instrument Selection..........
8 G.4.3.4 N ucl e ar C ri ti cal i ty S af et y................................
8 G.4.3.5 Radi olo gi cal P rot ect i on...................................
9 G. 4. 3. 6 Fire and Expl osio n Pr ote c tion.............................
9 G.4.3 7 Radi oacti ve Was t e H an dl ing and S tor a ge....................
9 G.4 3.8 Ind us t ri al an d C h emi cal S af ety............................
10 G.4.4 Classification of Structures, Components and Systems......
10 CAF1107 :ENG-308 11
.l
TABM OF CONTENTS (Continund)
Section Page
/~~T G.4.5 Design Considerations for Decontamination and D e co mm i s s i o ni n g...........................................
10 G.5.0 CSS FA CIL IT IES DES IGN.....................................
12 G.S.1 Summ ary D es cr i pti on of the CSS............................
12 G.5.1.1 Loca tion and Facility Layout..............................
12 0.5.1.2 Pri nci pal Feat ur es of the CSS.............................
12 G.5.2 T he CS S B u il d i ng..........................................
12 G.S.2.1 S t ruc t ur al S p e ci f i cat i o ns.................................
12 G.5.2.1.1 Buil din g Mo d if i ca tio ns....................................
12 G.5.2.2 Layout of the CSS.........................................
14 G. 5. 2. 2.1 R a d i o a c ti ve O per a tio ns....................................
15 G.5.2.2.2 Nonr adioacti ve O per ati ons.................................
16 G.5.3 CSS Support Systems.......................................
16 G.5.3 1 Development of Support Requirements f or the CSS...........
16 G. 5 3 1.1 Buil di ng v en til ation......................................
16 G.5.3.1.2 Emer ge n c y P ow er...........................................
17 G.5.3.1.3 Mo ni t o ri ng Sys t em.........................................
17 G.5.4 Description of Service and Utility System.................
18 G. 5. 4.1 01-14 Building Heating and Ventilation Syst em.............
18 G.5.4.1.1 Maj or Components and Operati ng Charact eri stics............
20 G.5.4.1.2 Safety Considerations and control Interfaces Between C l e an an d C ont am i n at e d A r e as..............................
22 G.5.4.2 E l e c t r i c al................................................
24 G. 5. 4. 3 C om pr es s e d A i r............................................
25 G.5.4.4 Ste am Suppl y an d Dis t ri bution.............................
25 G.5.4.5 W at er S u p pl y..............................................
26
(~h G
CAF1107 :ENG-308 111
TABLE OF CONTEttrS (Continuid)
Section Page G.5.4.6 C ool i n g W a t er.............................................
26 G.5.4.7 Sewage Treatment 26 G.5.4.8 S af et y C omm uni ca tio ns an d Al arms..........................
26 G.5.4.9 F ir e P rot ect i on Sys t em....................................
27 G. 5. 4.10 Maintenance Systems.......................................
27 G.5.4.11 C ol d C hem i ca l S y s t em s.....................................
28 G.6.0 CSS PROCESS SYSTEMS..........
29 0.6.1 P roces s D es cr i pt i o n.......................................
29 G.6.1.1 N ar r a t i v e D es c ri p tio n.....................................
29 G.6.1.1.1 Was t e E ncaps ul at i on Su bs ys tem.............................
29 G.6.1.1.2 Dr um H an dli n g an d Loa do ut Sys t em..........................
32 G. 6.1.1. 2.1 Empty Drum Feed and Posi tioning Sys tem....................
32 G.6.1.1.3 C ement Tr ansf er and St ora ge Su bs yst em.....................
35 G. 6.1. 2 Flow Sheets...............................................
35 G.6.1 3 Identification of Items for Saf ety Analysis Concern.......
35 G.6.2 Process Chemintry and Physical Chemical Principles........
36 G. 6. 2.1 T he En ca ps ul a t i o n M e d i um..................................
37 G.6.2.2 Cement Chemistry and the Ef fect of Was te Materials........
37 G.6.2.3 H i g h-S he a r Te chnol o gy.....................................
38 G 6.3 M echani cal P roces s Sys t em s................................
39 G.6.3.1 Cold Chemical Receiving, Handling and Transf er............
39 G.6.3 1.1 Cement Recei ving, Hr.ndling and Transf er...................
39 G. 6. 3 1.1.1 C em en t S t or a ge S il o.......................................
40 G.6. 3 1.1. 2 Cement Transf er Mechanism 41 CAF1107 :ENG-308 iv 9
TABLE GF CONTENTS (Continusd)
Section M
es.
G.6.3 1.1.3 Gra vim et ri c Fee d Me chani sm................................
42 G.6.3.1.1.4 The C ement F e ed D iver t er Val ve............................
42 G. 6. 3.1. 2 Chemical Additive Receiving, Handling and Transfer........
43 G.6.3.2 Feed Transf er, Preparation and Handling...................
43 G.6.3.2.1 The Wast e Dis pensing V es s el...............................
44 G.6.3.2.2 The Was te Dispensing Vessel and Dewatering Pumps..........
44 G.6.3.2.3 V es s el-To-Mi x er V al ves....................................
45 G.6.3.3 Mat er i al Handl ing Su bs ys t em...............................
45 G.6.3.3 1 Empty Drum Feed and Posi tioning Syst em....................
45 G.6.3.3.1.1 Empt y Drum Loadi ng and S torage............................
45 0.6.3.3.2 F ull Drum Pro c essi ng Su bs ys t em.......................'.....
46 G.6.3.3.3 Drum S torage and Loadout Su bs ys tem........................
47 G.6.4 Wast e Enca ps ul atio n Sys t em................................
48 p
G.6.4.f Process System............................................
48 G.6.4.2 C om pon en t / E qui pm e n t S par es................................
49 G.6.5 Proces s Sup por t Sys tems...................................
49 G. 6. 5.1 M i xe r Fl us h Su bs ys t em.....................................
49 G.6.5.2 Ins trumentati on and C ont rol Sys tems.......................
50 G.6.5.2.1 Waste Encapsulation Subsystem Controls....................
50 G.6.5.2.2 Mat eri al Handl ing Su bsys tem C ont rol s......................
51 G.6.5.2.3 Cement Storage and Transf er System Control................
51 G 6.5.3 Sys tem and C om po nent Spar es...............................
52 0.6.6 CSS Co ntr o l R o cxn..........................................
52 G.6.7 CSS Sampling and Analytical Requirements and Procedures...
52 CAF1107 :ENG-308 y
(
I l
TABLE OF CONTENTS (Continu';d)
Section Page R ef er ences f or Se c tio n G. 6,0...............................
54 G.7.0 WASTE (I)NFINEEKr AND MANAGEENT..........................
55 G.7.1 W as t e M ana g em ent C ri t e ri a.................................
55 G.7.2 Radiological Wastea 56 G.7.3 No nr a di ol o gi c a l W as t es....................................
56 G.7.4 Off-Gas Treatm ent an d Ventil ati on.........................
C6 G. 7. 4.1 O per a ti n g C hara ct e ri s ti cs.................................
56 G.7.4.2 Saf et y C ri t eri a an d A s s ur an ce.............................
57 G.7.5 Li qui d Waste Treatment and Ret ention......................
57 G.7.6 Li qui d W as t e S ol i di f i cat i o n...............................
57 G.7.7 S ol i d W as t es..............................................
58 R ef er en ces f or S ecti on G. 7. 0...............................
59 G.8.0 RA DIA TION P ROTE CT ION......................................
60 G. 8.1 Assuring that Occupational Radiation Exposures are As Low As Reasonably Achievable ( ALARA) 60 G.8.1.2 D esi gn Co nsi der atio ns.....................................
60 G. 8.1. 3 Operational Considerations 61
- 0. 8. 2 R a d i a ti o n S o ur c es.........................................
62 G.8.2.1 C o nt ai ned S our ces.........................................
62 G.8.2.2 Air borne Radioa cti ve Mat erial Sources.....................
63 G.8.3 Radiati on P rotecti on D esi gn Feat ur es......................
63 G. 8. 3.1 Fa c il i t y D esi gn Fe a t ur es..................................
63 G.8.3.2 shielding.................................................
64 CAF1107 :ENG-308 vi O1 l
i 1
i TABLE T CONTErrS (Continusd)-
l Section M
[
G.8.3 3 V en t il a ti o n...............................................
65
" 8. 3. 4 Area Radiation and Airborne Radioactivity Monitoring i -
Instrumentation...........................................
66 f
G.8.4 Es timat ed On-S it e D os e A s ses sm ent.........................
66 G.8.5 He al th Physi cs Pro gr am for CSS............................
67 j.
G.8.6-Es ti mat ed O f f-S it e Dos e A sses smen t........................
67 l
t' G. 8. 6.1 E f fl uen t Mo ni t o ri ng Pr o gr am...............................
67 i
i G.8.6.3 Es ti mat e d E x po s ur es.......................................
68 G.8.6.4 L i qui d R el e as es...........................................
69 R ef er ences f or S e cti on C. 8. 0...............................
70 G.9.0 ACCIDENT SAFETY ANALYS IS...................................
71 i
j G.9.1 Abnorm al O pe r at i ons.......................................
71 G.9.1.1 Abnormal Events - Wast e Encapsulation System..............
71 G.9.1.1.1 Was te Dispens ing Vessel Failur e...........................-
71 i
G. 9.1.1.2 Failure of Val ves Between WDV and Mi xer...................
72 i
1 4-G. 9.1. 2 Abnormal Events - Material Handl ing Sys tem................
72:
i G. 9.1. 2.1 Failure to Place the Waste Package in Position............
72 '
l G. 9.1. 2. 2 M i no r F ai l ur es............................................
73 3
G. 9.1. 3 Abnormal Events - Ventila tion System......................
74 j
G.9.1.4 Abnormal Events - Liquid Sumps and Drains.................
74 I
G.9.2 Accidents.................................................
74 G.9.2.1 A c c i de n t s A n al y ze d........................................
74 1
I G.9.2.1.1 Source Terms..............................................
74 j
G.9.2.1.2 Ra di at i o n D os es...........................................
75 G. 9. 2. 2.
P ot en ti al N ucle ar C ri ti cal ity.............................
77 l
i m
i 4
l CAF1107:ENG-308 vil f.
6
,-m y-p
-y,, -
yw1-e-=,t,7 w
y-+,.i',-9 y
1 3 -
gr
-.-------o--w=-y-e-s-n st-ww-
,,7-%,
se
=s~---pr,.-g'y wem+---t-L---
--m--
-'w-----e$i 4--t 6-**iF'7
TABLE OF CONTENTS (Continu;d)
Section Pa ge R ef er en c es f o r Se c tio n G. 9. 0...............................
79 G.10.0 CON DUCT OF CSS OP ERATIONS.................................
80 G.10.2 Preoperational Tes ting and Operati on......................
80 G.10. 2.1 Administrative Procedures for C onduc ti ng t he T es t P ro gr am...........................
80 G.10. 2.2 T es t Pr o gr am D es c ri p tio n..................................
80 G.10.2.2.1 Ph ys i cal F a c i l i t i es.......................................
81 G.10. 2. 2. 2 P ro c es s O per a ti o ns........................................
82
{
G.10.2.3 Tes t D i s c us s i o n...........................................
83 G.10. 3 T r ai ni n g P r o gr ams.........................................
88 G.10 3.1 Introduction..............................................
88 G.10. 3.1.1 Scope......................................................
88
. G.10.3.1.2 Pr o gr am O bj e ct i ve..........................................
88 G.10. 3.1 3 Qual ifi cation Program C urric ulum Over vi ew..................
88 G.10.3.2 Personnel Selection........................................
89 G.10. 3. 2.1 E nt r y Re q ui r em e nts.........................................
89 G.10.3 2.2 P r er e qu i s i t es..............................................
89 G.10. 3. 2. 3 Tr a i ni n g R es o ur c es.........................................
90 G.10.3.3 Operat or Qualif icati on Program C ontent.....................
90 G.10. 3. 3.1 P r o gr am G o al s..............................................
90 G.10.3.3.2 Trai ni ng C ont en t o utl ine...................................
91 G.10 3 3 3 D oc um e nt a t i o n..............................................
95 G.10.3.3.4 Requalification............................................
96 G.10. 4 N o rm a l CSS O per a t i o ns.....................................
96 G.10.4.1 C S S P r oc e d ur es............................................
97 CAF1107 :ENG-308 viii l
l l
l l
TABI.E OF CONTENTS (Continuad)
Section Page R ef er en ces f or Se c tio n G.10. 0..............................
98 G.11.0 OPERATIONAL SANTY REQUIREMNTS...........................
99 i
G.11.4 Operational' Safety Requirements (OSRs) 99 G.11. 4.1 01 - 14 Bu il di ng Vent il ati on................................
99 G.11. 4.2 HEP A F il t e rs..............................................
100 G.11.4.3 C S S w as t e L i mi ts.........................................
102 G.11. 4. 4 Emer gency Power Re quirements..............................
'103 G.12.0 QU A LIT Y ASS TRANCE.........................................
105 G.12.2 Q ual i t y A s s ur an ce P rogr am.................................
105 G.12. 2.1 Q u al i t y L e v el s............................................
105 CAF1107:ENG-308 ix.
-. ~... - -
,,r------..
n
-.w..
r.,.
,,m_
me
,.m-.,7
_y n
__,.,7.,.,.,,,m,,
VOLUPE IV LIST OF TABLES G.4.4-1 Saf ety Classification of Important Structures, Systems and Components Associated with the Cement Solidification System G.5. 4-1 CSS Utility Requirements G.6.2-1 Compressive Test Results, Westinghouse High-Shear Mixer G.6.2-2 Westinghouse R/D Test Results on Supernatant and LLWTF Sludge Waste Forms, Westinghouse High-Shear Mixer G.8.2-1 Exposure Rates and Projected Number of Waste Drums to be Produced in the Cement Solidification System G.8.2-2 Radionuclide Inventory in High-Level Waste Tank 8D-2 (1987)
G. 8. 2 -3 Radionuclide Inventory in the Uranyl Nitrate Solution G.8.6-1 Radionuclide Inventory of the Liquid Wastes Assumed to be Processed in the CSS in One Year G.8.6-2 Annual Dose to the Maximally Exposed Off-Site Individual for the Significant Radionuclides During Normal Operations ( Airborne Releases )
G.8.6-3 Annual pose to the Maximally Exposed Off-Site Individual f'or the Significant Radionuclides During Normal Operations (Waterborne Releases )
G.9.1-1 Cement Solidification System Abnormal Events G.9.2-1 Dose to the Maximally Exposed Off-Site Individual for the Significant Radionuclides for the Evaporation of 230 L of Solution Associated with the 1,900 L Spill Accident (Condensate from SBS Scrubber and Melter Feed Concentrator Overheads, Combined)
G.9.2-2 Dose to the Maximally Exposed Off-Site Individual for the Significant Radionuclides for the Evaporation of 230 L of Uranyl Nitrate Solution Associated with the 1,900 L Spill Accident G.9.2-3 Dose to the Maximally Exposed Off-Site Individual for the Significant Radionuclides for the Evaporation of 1.4 L of Uranyl Nitrate Solution Associated with the Neutralization Accident CAF1107 :ENG-308 x
G.9.2-4 Dose to ths Mtximally Expossd Off-Site Individual for ths Significant Radionuclides for the HEPA Filter Failure Accident -
G.9.2-5 Dose to the Maximally Exposed Off-Site Individual for the O
Significant Radionuclides for a HEPA Filter Fire Accident G.9.2-6 Radionuclide Inventory in Reprocessed Spent Fuel (1987) i
'G.11.4-1 Maximum Allowable Fissile Material Solution Concentrations for CSS Operation (All Vessels)
G.12.2-1 Quality Level Classification of Important Structures, Systems and Components Associated. with the Cement Solidification System 1
lO i
i i
4 a
4 l
O CAF1107:ENG-308 xi j
VOLUME IV LIST OF FIGURES G.4.1-1 CSS Process Flow Diagram G.5.1-1 Layout of WVDP Facilities G.5.2-1 General Arrangement 01-14 Building, Plan Elevation 98.00 f t G.5.2-2 General Arrangement 01-14 Building, Plan Elevation 116.50 f t G.5.2-3 General Arrangement 01-14 Building, Plan Elevation 130.00 f t and Sections G.5.2-4 General Arrangement 01-14 Building, Plan Elevation 144.00 f t and Sections G.5.2-5 General Arrangement 01-14 Building, Sections G.5.2-6 General Arrangement 01-14 Building, Sections G.6.1-1 CSS-Cement Solidification System Building 01-14, Piping and Instrumentation Diagram (Sheets 1 through 6)
G.6 3-1 Drum Loadout Conveyor Layout for RTS G. 6. 6-1 CSS Instrumentation Conduit Plan at El. 98.00 f t (Sheets 1 through 4)
G.6.6-2 Control Room Equipment Elevation View G.7.4-1 Flow Diagram for the 01-14 Building Ventilation System G. 8. 3-1 Schematic of Major Radiation Sources and Points of E::posure Evaluation for the CSS G.8.3-2 Schematic of Major Radiation Sources and Estimated Exposure Rates G.10. 2-1 Sequence for Installation / Qualification of CSS CAF1107 :ENG-308 xii
G.
1.0 INTRODUCTION
AND EERAL DESCRIPTION OF TE EST VALLEY DEM)NSTRATION PROJECT O
G.I.1 INTRODUCTION See Section A.1.1 of Volume I.
G.I.2 GEERAL PULNT DESCRIPTION See Section A.1.2 of Volume I.
G.1.3 GEERAL PROCESS DESCRIPTION See Section A.1.3 of volume I.
G.1.4 IDENTIFICATION OF AGENTS AND CONTRACTGtS See Section A. I 4 of Volume I.
G.1.5 STRUCTURE & THIS SAFETY ANALYSIS REPORT See Section A.1.5 of Volume I.
CAF1107:ENG-308 1
O
-wr-wv---r-
-v----,v-e v wm m - ew te n
-w ww-w nw
-W=--
w
&t-d
G.2.0 SUPMARY SAETY ANALYSIS G.2.1 SITE ANALYSIS k)
G.2.1.1 NATIRAL PENOENA See Section A.2.1 of Volume I G. 2.1. 2 SITE CHARACTERISTICS AFECTING TE SAFETY ANALYSIS The components of the Cement Solidification System (CSS) associated with processing of radioactive wastes will be contained within the 01-14 Building; the only part of the system outside of the 01-14 Building is the cement silo, and it contains dry cement. The accidents analy::ed therefore occur within the 01-14 Building, and the resulting radioactivity is released through a stack on top of the 01-14 Building (airborne), or through the existing Low-Level Waste Treatment Facility (LLWIF).
The 01-14 Building is situated adjacent to the main plant at an elevation well above potential flooding. Other natural phenomena (earth' quakes, tornadoe's, high (v) winds and snow loading) and site characteristics were determined not to affect the conclusions presented herein. The dose to the maximally exposed off-site individual in the complete absence of engineered barriers, will be only a small fraction of the DOE limits.
G.2.1 3 EFFECT OF NEARBY INDUSTRIAL, TRANSPORTATION, AND MILITARY FACILITIES See Section G.2.1.3 of Volume I.
G.2.2 RADIOLOGICAL IPPACT OF NORMAL OPERATIONS Both on-site and off-site dose assessments were performed in order to determine the radiological impact of normal operations (Section G.8.0).
The dose to on-site personnel is due to work in areas of elevated radiation levels (gamma levels) relative to background. The annual collective occupational dose was estimated to be 10 person-rem (Section G.8.4).
)
m i
CA F1107 :ENG-308 2
4 a
i
r To estimate off-site doses, two pathways were considered:
the airborne pathway (radionuclides released from a stack on top of the 01-14 Building during normal operations) and the pathway from normal liquid releases (Section G.8.6).
An atmospheric dispersion code was used to estimate the atmospheric transport and diff usion of radioactive particulates. The r es ulting concentrations were coupled with models to estimate the dose to off-site indi viduals. The resulting dose to the maximally exposed individual was calculated to be 3.0E-04 mrem per year. The dose to the maximally exposed off-site individual was calculated as 0.58 mrem per year.
It should be noted that all CSS liquid wastes will be routed to the new Liquid Waste Treatment System (LWTS) once this system becomes operational. This is expected to reduce the maximum 5
predicted off-site dose.
G.2.3 RADIOLOGICAL IPPACf FROM ABNORMAL OPERATIONS Abnonnal operations are events which could occur from malf unctions of systems, operating conditions, or operator error. Abnormal events are only of consequence for those systems in the CSS which process;. control, or confine radioactivity.
The abnormal events considered (Section G.9.1) are of little consequence and do g
not result in a release of radioactive or hazardous material.
G.2.4 ACCIDENTS Four accidents associated with operation of the CSS were analyzed (Section 9.2).
The first accident is a spill of 1,900 L of liquid waste from the waste dispensing vessel; the second is associated with the addition of caustic to the uranyl nitrate solution; the third is a f ailure of a bank of HEPA filters.
For the first two accidents, the material was assumed to become airborne, transported by the 01-14 Building Heating and Ventilation (HV) System, and ultimately discharged through a stack on top of the 01-14 Building. For the last two accidents, the released radioactivity is assumed to be discharged directly f rom the stack on top of 01-14 Building. The doses f rom these acci-dents to the maximal 11y exposed off-site individual were calculated to be:
5.9E-04 and 4.6E-05 mrem for a spill from the waste dispensing vessel (the first value is associated with a spill of waste having a radionuclide distribution similar to that of the wastes in tank 8D-2 and the second value CA F1107 :ENG-308 3
is associated with a spill of uranyl nitrate solution); 2.8E-06 mrem for the
.Q neutralization of uranyl nitrate solution accident; 40 mrem for f ailure of the HEPA filters; and 22 mrem for the HEPA filter fire accident.
G.
2.5 CONCLUSION
S i
This safety analysis report was prepared to meet the requirements of DOE /ID Order 5481.1, " Safety Analysis and Review System for DOE /ID Managed Activities" and WNS Policy and Procedure W-906, " Safety Review Program".
The analysis indicates that the Facility as designed can be operated safely.
The Facility has been designed to reduce hazards to minimum levels by reducing the amount of waste in the process at any one time commensurate with process requirements and by conducting operations renotely within a sealed, shielded cell. The analyses contained herein show no doses of consequence to either on-site or off-site individuals. Conservative assumptions lead to an estimated normal worker collective dose of 10 person-rem /yr, in keeping with the philosophy of ALARA. Calculated doses to the maximally exposed off-site individual were determined for both normal and accident conditions.
In both cases, the doses are well within the requirements of DOE Order.5480.1 A'.
i 4
l O
CAF1107:ENG-308 4
G.3 0 SITE CHARACTERISTICS G.3.1 GEOGRAPHY AND DENGRAPHY OF )EST VALLEY DEENSTRATION PRGIECT ENVIRmS OG See Section A.3 1 or volume I.
G.3.2 EARBY INDUSTRIAL, TRANSPWTATION, AND MILITARY FACILITIES See Section A.3 2 of volume I G.3 3 METEOROLOGY See Section A.3.3 or volume I G.3.4 SURFACE HYDROLOGY See Section A.3.4 or volume I G.3 5.
SUBSURFACE HYDROLOGY See Section A.3 5. or volume I G.3.6.
GEOLOGY AND SEIS E LOGY t
See Section G.3.6. or volume I 3
G.3.7.
SITE ECOLOGY i
f See Section G.3.7. or volume I l
G.3.8.
SUPHLRY OF CONDITIONS AFFECTING FACILITY CONSTRUCTION l
AND OPERATING REGJIREENTS See Section A.3.8. or volume I l
1 CAF1107:ENG-308 5
G.4.0.
PRINCIPAL DESIGN CRITERIA 7
/
1 V
G.4.1.
PtNtPOSE & THE CEPENT Sm.IDIFICATION SYSTEM (CSS) FACILITY The purpose of the CSS is to solidify liquid and wet solid low-level and transuranic (TRU) radioactive wastes generated recm WVDP activities. The WVDP activities expected to generate the bulk of the waste streams to be processed by the CSS include supernatant processing, High-Level Waste (HLW),
Vitrification, Decontamination and Decommissioning. These activities result in a variety of liquid and wet solid wastes including decontaminated supernatant, secondary waste streams from HLW vitrification, spent solutions from decontamination operations, and spent resin slurries, Solidified wastes produced by operation of the CSS will meet all of the waste form criteria of US DOE Order 5820.2 and the intent of the 10 CFR Part 61 Sections 61.55 and 61.56 for low-level wastes.
G.4.1.1.
CSS FLNCTIGIS
[)
The CSS performs the following f unctions:
.%,,/
o Waste Encapsulation - mixing low-level or TRU radioactive waste with cement (and chemical additives when necessary); packaging the resulting mixture in 269-L square drums or 208-L round drums.
o Cement Storage and Transfer - bulk storage of dry cement powder and transfer of batch quantities to solidify the waste; and o
Materials Handing - remote handling of empty and filled drums with temporary storage in the 01-14 Building; loading filled drums onto vehicles for transport to the RTS Drum Cell.
G.4.1.2.
FEEDS TO THE CSS Three f eeds will be input to the CSS: Portland Type I cement, chemical additives (when necessary), and liquid and wet solid waste streams, During
(N batch operations, cement will be fed f rom a dry cement storage silo to the CAF1107:ENG-308 '
6
gravimetric feeder at the rate of approximately 4,500 kg/hr. Chemical additives make up the second feed. These will be mixed with the waste streams to increase or decrease the mixture setting time and their feed rate will therefore vary. The waste streams to be solidified constitute the third feed. A description of the waste streams is given in Figure G.4.1.-1.
G.4.1 3 CSS PRODUCTS AND BYPRODUCTS The principal product of the CSS will be 269-L s~quare and 208-L round drums of solidified low-level and TRU wastes.
Byproducts produced will be radioactively contaminated mixer flush solutions, spent HEPA filters, roughing filters, and swipes. These wastes will either be processed back through the CSS to produce a stable waste form of will be handled per existing WVDP procedur es.
In the short tenn, mixer flush solutions will be processed in the existing Low-Level Waste Treatment Facility (LLWTF) prior to discharge from the site. Once the new Liquid Waste Treatment System (LWTS) becomes operational, mixer flush solutions will be routed back through the LVrS.
G.4.2.
STRUCTURAL AND MECHANICAL SAFETY CRITERIA FOR THE CSS The CSS will be installed in the existing 01-14 Building. The only new construction f or the CSS is the cement silo, the steel building immediately south of the 01-14 Building which will house the empty drum storage area, the control room, an airlock and a concrete truck pad at the west end of the 01-14 Building.
The cement silo and support structure is designed for a site wind of 160 km/hr at 9.1 m above grade in accordance with ANSI A58.1 Exposure C distributed on the f ull projected area of the tank. No increase in the allowable stresses has been allowed in the tank design for normal wind loading. Since the tank is outdoors, no allowance has been made f or the wind shielding effects of other buildings.
The steel building to the south of the 01-14 Building and the airlock and truck pad to the west have been constructed in compliance with the New York State Building Code and applicable ACI standards.
CA F1107 :ENG-308 7
G.4.3 SAFETY PROTECTIGI SYSTEE G.4 3.1.
GENERAL The CSS has been designed in a manner to allow for its safe operation.
Control of radioactivity is the primary safety concern.
Specific saf ety protection systems are described in the following subsections.
G.4.3.2.
PROTECTION BY MULTIPLE CONFINEErr BARRIERS AND SYSTEMS The solidification of radioactive wastes will take place in a shielded cell within the 01-14 Building. The cell atmosphere will be maintained under a slight negative pressure relative to surrounding areas by the 01-14 Building Heating and Ventilation (HV) System to ensure that air leakage will be into rather than out of the cell. The exhaust blower that maintains this negative pressure is backed up with a diesel-powered blower that autanatically takes over if the primary blower f ails. These multiple barriers will provide for positive control of radioactivity.
G.4.3 3 PROTECTION BY EGJIPENT AND INSTRUPENTATION SELECTION (h '
h All equipnent and instrumentation will be selected and purchased in compliance with WVNS's Quality Assurance program which is described in Section A.12.0. of Volume I.
The quality levels of the individual conpanents for the CSS are given in Section G.12.2.1.
G.4.3.4.
NUCLEAR CRITICALITY SAFETY Because a nuclear criticality associated with the operation of the CSS is not considered to be a credible event (see Section G.9.2.2.), design criteria associated with preventing a nuclear criticality are not appropriate.
However, all batches of liquid wastes will be sampled and analyzed for fissile material concentration prior to processing in the CSS (see Section G.11.4.3.).
CAF1107:ENG-308 8
%)
C.4.3,5.
RADIOLOGICAL PROTECTION Radiological protection systems consist of those systems that ensure the confinement of radioactivity and reduction of general exposure rates. The three major radiological protection systems are the shield walls, the CSS Vessel Off-Gas System, and the 01-14 Building HV System. These systems have been designed to provide positive containment of radioactivity.
G.4.3.6.
FIRE AND EXPLOSION POTENTIAL The CSS has fire detection equipment, alarm systems, and suppression equipment connensurate with the fire hazards in the 01-14 Building. The following fire protection equipment will be installed as a minimum:
o An engineered Halon fire supression system in the CSS Control Panels; o
A fire alarm system that alarms in both the CSS Control Room and guard house; and o
Portable fire extinguishers and fire hoses at various locations throughout the 01-14 Building.
The CSS will not process any substances which have an explosion potential, a
G.4.3.7.
RADI0 ACTIVE WASTE HANDLING AND STORAGE Filled deurs will be stored on conveyors in the filled Drum Storage Area which is located immediately to the west of the process room. This storage area is separated from the process room by an air lock. Means will be provided to allow f or remote determination of drum locations within the storage area. The filled drums will be loaded onto a transport truck with line roller conveyors for transport to the Drum Storage Area.
Filled drums with a contact exposure rate exceeding 100 mR/hr will be remotely handled.
C A F1107 :ENG-308 9
G.4.3.8.
INDUSTRIAL AND CHEMICAL SAFETY The administrative controls for industrial and chemical safety to be
/\\
(, j implemented are presented in the WVNS Industrial Hygiene and Safety Manual, v
WVDP-011. Effects of a potential chemical accident (the vigorous reaction of a caustic with an acidic waste solution such as uranyl nitrate) is discussed in Section G.9.2.
G.4.4.
CLASSIFICATION OF STRUCTINtES, C0ffGIENTS AND SYSTEIE Table G.4.4-1 presents safety classifications for the structures, systems and components associated with the CSS.
The criteria and procedures used to determine class design are presented in Section A.4.4 of Volume I.
Since the dose to the maximally exposed off-site individual as a result of accidents does not exceed 500 mrem (see Section G.9.2.), none of the struc-tures, systems of components require a saf ety class of A or B.
Because the CSS will produce drums of solidified waste that have contact exposure rates in excess of 1 R/hr, any item whose f ailure could result in workers coming in
{'~'g close contact with either the radioactive waste streams or solidif'ied drums of
'~'
waste will require a safety classification of C.
Components in the vessel off gas and 01-14 Buildi.ng HV Systems are safety classified C to ensure confinement of radioactivity, and radiation monitors are safety classified C because their f ailure could result in undetected exposures. All other items are classified as N.
G.4.5.
DESIGN CONSIDERATIONS FOR DECONTAMINATION AND DEC099tISSIONING The CSS Facility has been designed in a manner to facilitate eventual decontamination and decommissioning. Specific design details include the following:
o The CSS Process Room floor slopes to a sump to allow for use of liquid decontamination solutions on the cell walls and exterior of vessels;
{}-
CAF1107 :ENG-308 10
o All sumps are lined; O
o The Waste Dispensing Cell is lined with stainless steel up to a height or 46 cm above the floor; o
The CSS Process Room is coated with a smooth epoxy paint, covered with a strippable coating; and l
o All process equignent and piping is designed to be 1 ushable.
)
e 9
0 o
O CAF1107:ENG-308 1i
TABE G.4.4-1 (1 W 3)
SAFETY CLASSIFICATION OF IMORTANT STRUCTURES, SYSTEl6 AND CONGIElfrS ASSOCIATED WITH THE CEPErr SOLIDIFICATION SYSMM O
G/
CONONErr OR SYSEM SAFETY CLASS STRUCTURES 01-14 Building (Modified)
C Shield Walls C
Shield Doors and Partitions C
Shielded Viewing Window C
Maintenance Access Doors N
Air Lock Doors N
Stainless Steel Liner N
N Sumps add Assoqiated Drainage Lines Floor Drains and Associated Drainage Lines N
Pipe Supports N
Conduit Supports N
HVAC Supports N
WASTE PROCESSING Cement / Additives Preparation and Delivery Cercop.t Fill Station N
Cdeat Silo N
l Cecent TraW:,3 Machine N
Additive Tanks (2)
N Cement Bin N
Cement / Additives Transport Lines N
Cement / Additives Transport Pumps N.
O Cement' Additives Transport Valves N
/
)
Loss-in-Weight Feeder N
iquid Radioactive Waste Preparation and Delivery Waste Dispensing Vessel '
N Waste Transport Lines (Note 1)
N Waste Transport Pumps (Note 1)
N Waste Transport Valves (Note 1)
N Mixer Flush System Flushwater Decant Pumps N
Sump Pumps N
Cement Solidification High-Shear Mixers (2)
N Cement Transport Lines N
f' waste trans port lines, pumps,
Note 1: This classification applies t)
<a and valves within 01-14 Bullo' c,.
[]
CA F1107 :ENG-308 v
2
.l.
"g
TABIE G.4.4-1 (2 0F 3)
SAFETY CLASSIFICATION OF Iff 0RTANT STRUCTWES, SYSTEPG AND COMPWENTS ASSOCIATED WITH THE CEPEffr SOLIDIFICATION SYSTEM COMPWElfr OR SYSTEM SAFETY CLASS Canent Solidificatica (Continued)
Fill Nozzle N
Drums N
Lid Crimper N
LOADOUT HANDLING EQUIPMEKr Air Lock Door Engaging System N
Drum Feed Conveyors N
Manipulator N
Transfer Drawer N
In-Cell Crane N
Drum Lif t Table N
Drum Overpack Conveyor N
Smear Station Automated Swipe / Label Robot N
Swipe Tool (s)
N Overpack Station N
Drum Transporter Shielded Cask C
Truck N
MONITORING SYSTEMS, CONTROLS AND INSTRUMENTATION Area Radiation Monitors C
Airborne Particulate Monitors C
Ventilation Monitoring System and Alarms C
Liquid Radioactive Waste Sampling System N
In-Cell TV Camera N
O I
CAF1107 :ENG-308 L
]
TABLE G.4.4-1 (3 0F 3)
SAFETY CLASSIFICATION OF IMORTANT STRUCTLRES, SYSTEE AND COWWENS ASSOCIATED WITH THE CEMNT SOLIDIFICATION SYSTEM CONNEN OR SYS1EM SAFETY CLASS MONITORING SYSTEMS, CONTROLS AND INSTRUMENTATION (continued)
In-Cell Radiation Monitors C
Communications Equipment N
Electronic Instruments and Controls C
In-Cell Alpha / Beta Swipe Counter N
Pneumatic, Hydraulic Instrumentation and Controls C
UTILITIES AND SUPPORTING SYSTEMS Electrical Power Systems
~
C 01-14 Building Supply Panels, Transformers and Motor Control Center C
Conduits C
Engine Drive C
Steam N
Utility Air N
Instrument Air N
Demineralized Water N
Utility Water N
Fire Detection and Protection C
VESSEL OFF-GAS SYSTEM Dycting
'C Blowers-C Exhaust Filtration C
HEATING AND VEffrILATION (HV) SYSTEM 01-14 Building HV System Ducting C
Blowers C
Exhaust Filtration C
i CA F1107 :ENG-308
, (>
v~
es--a s.-f[G4-
- :~r ~- -- -
1 ($$
g M T. @
T..
E.. n u n....c.,, c.... l..
5 N.*or4C E L...; <. %l 6
.c 7
w.
~~
a: 2.m
... ;- s.:vns,v.:.
--G mut
,,,.,,g gaw t t--.
orreas ~
g]
Taus i Taus. s
- f.
- l
]
Cttatut haimt eitut 5" 0 g
8
.i.
1 1
tg 8
vossst
.t
[66 g, g
,g
" ~ ~ '
..,..,[. %....
S -- &.
k,RMttait
- 5'~7 I -
T-*v i
s 9
j 636 1h,O
- "n*S"a'"V Q
+
.L. ~-
lE~i.r. n.g. 2.-.-- ; r M.'*
Q j
m's mn s
~
1 J
- ;. m
- .u..
...2-q-
l O
{
+
r.
r-e.:.
A n:_
66C 531j$
g
,G O
@ wurc ' '
-O 3
rio,,s i.u I
f
.u g
7 ht. Du.ap SS 6AL v.u.
)
I"'
L.ctutmat 1)
S E.:
anstsias b o.umsten.. or sociotrito wasts..
atuo m rum, qW set worti.
l meninus i
sa e
s 6
va I is I ic l sa
.. I oc an se _ac ion io n !
,.,p. ~ -
s.
- y 2.. >.u.
j
,.s.....,.
...u.._..... e..,_.
=
....,,.,...,,..u 3- - u.
2 u
== msiou.. _
j n
.....,4 rLoW R&Tt "
Y'.. ' %.sJ.o. _
b 1
.,y i.
mo -..
E
.m,-
7ttov natt :
,...,,c z
_ g,g j,_
.. 1
.s.
,, o g
. q,*,g t
~
11.0 11 0 11 0 MO TS O 11 0 110 11 0 11.
110 no 11.0 11 0 11 0 11 0 fto Tr.
1 ituecantunt
..g t
,..sq u..
a.i.
n t.
.t $.muamumn.,, is. n..
, ins
, ss a no.
nt
.o su....n s
'E vatta "y
g g,g,,g iN',#
3 y,w; arms
.l Frw sas.1s.-
31.
~
sms o6thi y
, gg:
,g ns g
-- huen am e-n.n or h: ') otsita stLTS. swas
)
r,':'n O
O O
O O
O O
O
. (t,I"c'iv v:
tigt).
.3.4 _
- 1..
E4 14 5.4 _
16 as.
n.e
- o. e 4tS
.LIS LiS Las 413 4tS kkS 4 t5 P
v o 2[ 14 25 24 11 28 I 19 7
4 31Rchu uQ.
18 &
18 C 49 h 19 8 69 C.
ton los : lo c 23 22
,m.tt
- o..,
o,,
,m..,,..
1 u.,La.am.L w
64
%. t. %ta 1
e-u.~ u -..
Thum T.
g e.La.s.
IE.how.
m
- .*88 bak eta
-ff.
AM N
'h M
g'7 '13tst& Mat tO N.
es,a.a hs.oa.s. atssas' t.
_g.
.t,e tes.t a
, e..P.v e sek. rw
, p pt 8 i..
.c,m u..
sa s
m
,g,,,
gg 7f w up.
an.m
,Z
,1 bqkas'6e EsD.u.n st as
.a L. A.L intese s tst<
6L.cl
.)
n.
ee. r u.
e.
3.maa y
t-
- flow thTE.
StS94 t.ut tows 1.et.S 1.Lb t t...a tog 343gy
- 'y",y, i. y.=m=
L; %.:
s
\\Y 101S h
..s
-,.rac g
gi,gg
- 4..m
, _.mt M_..1.u g g.y;u
,,,.,)...
,,,.e rtow..rt the 6sa iS4 o ooo eco nao nao eaa
,o_
.,, m e
g o,, g I-s i
htm
~
~
~
~
~
~
~
~
~
~
~
1 (st.471lun.Q
~
I' s
oo ao so So to 5.0 S.o 5o' to ss o so 40 55 0 IS O IS O 15 0 55 8 17.o 17 0 no 17 o tt o 17 o 7to 170 fro 7to 7to iro iro tio tto 1so ita
-4 i.
u
.,o t vntta
,,, 3 g 3g g,,, g,g,,u,n 3,3,,,
,,, g an.s,.g..
,,.,y
,ey 02 a.w 3.,,,g g, s
n t,.M y f
. as.u.i l
3 mv.ts1 e.tu (ttiheR)
{
~
i
~
. ns. *
%. 6s
,is. ss.a s t,as y
a 6sh 101$.b en1*LS 95495 tois b ttles 4549$,ois b ggges no,. tsa s
e s.
CtlAL%nT
,, g
,g y
.~ n.~,u..,
m..
i
. at.. au 1
- w. s m.t s nau am u
.s i s t
gg e
- "'..u
- 8 isu.s
-t s
t o' at* * * S stas I
m,..
p,, u,, g ia=..tsiaaveu i
di.i =,/th - -
O G
O e
e G
t tu r ste ot*
ans n.s n2 si ns n.t is s
- s. -
w iss a
s.
ars
- s..
5 at e a
- t :7.
l
[,I,'6 n'-E*If i
m.
i v
i-y.
r.
D- -
- ? = + j-,
i 3
r-y
. <. =. =.... =
,. m
4 4
l 3
l 4
6
.._ s_
n-.
q
.'. G.
....g..= m,= u *.. ~s R.
T16 w TS NESSEL CFFt&)
AtuT7tuCE om.,s nth i.
g
_g.,.
.,.-n.
- m..., g
- m..
? ** ~ - Ng
-1 r,..m~erw g..Urtq@if'"u h Stf tL.66 FlusM'.s AT E R tagg T anas
- n p
p TI e
e e
g.
... t.
.n..
~.
=
E-
-/..
CARD
. :. :=.-.- -.
y.a=4. 1:e
..w, g.
.m
. n..,.r.....
w w.J u;
,,u,,.o.i..
,m.,.a
~, v...... e u,.
.m 6.. ~ _,.,
~.
... m,,.
4
.y o Also AvaUnble On
~,.
a.
~
=. -:.:..r
S. = = =,.=.,=::.==.,:r==. r
= = -
==== _v
.A 'rtare Card a== =..::: :
P e
w..
w
-.~..--e..
~ _.
R
=::lr.'::!::-:f,'
2.:.~, ":,r.=::rll.
1 1
l
' sicau M = =. =..= =~= r 2..
.-4
@}1
.,t y*******'"**PH
e
.n a. m m l1au,0-4 I F
.q i toc na us luc i it a ns l itc is a ine tac l un lwe l n.c n isa tS e ISc ma me
.c I et a l 31e rv e.,
- se a,
- t at us.ae.? r.ga.4 e
_,'l L1't hi M.'s.e.1 LE S
-~
84 1 6 st eist huat' t 'ETL,E. sono,.*
t
- a. ort nt!
tat ase.nntb8'."#
rtit.m p ea gen.
u rate est astetat!aagsta,g a t s.ta f a.e ut e.a y
at.nnt;.estt L644rF.8 6 f
F**
e e go t
man t
'e foe vo m anes t.o. gv.su kuaa,PLE.D 't ME.# 10 rter.1aa.nswans.Me .6"6.,
.s se.a.r i tu.eu rea ro sofut
M' ti.so Fla ras See.t
.o.st.g ttta ton fe vos ro r.o.e.g 'R use.a MW
- N = *"a*t f M 18 4 18
'.O 1 *
"_'g"t.,.n atsita s.a.t aatti tou te
, ats..a eminattis ten.A na aui e
e
'wua.vw g g a'*v ta s:
a5 t'e 4hu at num sot to i.93g,sL. 30ER
- '" 8L hlfa t.g o"..n Stuant 11 o 94
.* *ut 1.L4 Y
o a ee,.
'241 O.f
,,3..,
,o....
m.4
- li,3. o.
a.s.
,om.es %%
t 161 o,f
..I ta.o Q
t.u 1.u
- ms ts noms sosa
- us.is to s east 16.a ski 65.5 14 4 stoot
_ t.
I so So tS o tS o is o
.=
eS o 19.
45 e 40 64 the 64 6o
=*
17 8 tio tto no tio Tv o 17 0 ti o 11 0 Tio no no 1to l
.F.'3 tha.11 *id as 310.8
- Eie LinD etts 1335 9 elt 16 8 * $
310 5
/-.-
.6
- u. u u
/--
c
[.u,f -
.[..
m
- u. a
,u,
=
,,s
'llEI.
1 4
stun 6ao.s 4s g
=r ns ia.ns
.a ms
. i.
(5 E
~*
Lt3 a9
- o. g ki5 kiS 6 tS
- 6. t3 b iS ktS 414 414 o.14 4 14.
=
D.
c-r 30 31 31 33 34 35 3bh 3bB 11 38 3*e ao 46 41 b 43
'5.N#3*]" ' ' '. *
- 44 45 41.
f.
. L"A.
u.dtt.al
- =r m e t us u-
.aum i.e.
sie.
aia.n"*=' u e t. i 0.. s
===*u
=
><"va rw wa
=.i a s
La t.un,k.i aa
=-
- v..
y=* =
.s.,
u* t"'
a.uu n
== %
eu.,e,.
n aa= *
- * =
s a
'a',t.**.,o,.uus.u.
- * =.
y. s,ano.
r..
- a'u
=a' v
n.u,
=
n, r===="
=
==
.ua. g ro s.t.
t ci.
n,
=
i='*
n.is ov
==
= *
- nu s.t m.
nsu-no
...t.
zw as
.u
.. a u..t.o n
- u..s =a.s.=.
nous m.,as m.
a.u s s=s anu 1.n s.
m su
.a b%
,l,,,. V,*,t p,;;i p,'.;* ta.m*
m.
..s =
=
u
=
.s
,un
.ss es s um.
m.
u.u.
wu u nadia.
..... I...
.t
'5255 6* o e*
==
- 5-c in.a.s = =.s.s==..$.=+Y;,'.*t'.0.r* *,':12Y,0.;; .* 10 O..a'r-a.
<a a,
1 u..s.
u..
t.
o.
o, n.
so
- a..soua u
.t n.
..n
..o l so so ao so is o ao a.
i is.s ao ao ' soo ao us oo oo ao is o ao
}
u.
n.
no n.
,s o
,20 n.
no v.
ao iso 6
l 6ao 6a o so o so o nao 6co so o 6o o 17 e gg m s.
..u
.u.
.n s. an.
a.
u..
=
an
=
.n e..
_f -
/
y'.
.o
- /-
W p
.n
/- s
-P;.-
o t u..
- n. u.,.6 o
i..o.
n t
o, a.
u u,
s.
s.i.s.a.
s on.6 su..
- , i l
.a oos 2 '.
... a
... a ar
.a n..un..s
)
se.n nu ao un n.
sus sse ta e. ass i.s s.
si tu s.
. s..
I sis e
as. I ist
.o ta. - 0,.
@l G
i I
l-n 1,=r.al..u:=.
l-l Hl
- -~~
.--L 8919103 % - 0 (
... '. =.
m W-.'
_,,d C.5 5 5
~ %.
PROCf.SS ROV DWGR AM-r-- -
f (( '
se t-m lg gue g.,.
I i
r.,
w e
=.m
.. x..#
e.
-...a
==<--
E.a-.=
I...% s.
i G.5.0 CSS FACILITIES DESIGN
~
G.5.1 SUP9tARY DESCRIPTION OF TIE CSS p
G.5.1.1 LOCATION AND FACILITY LAYOUT The CSS is located in the 01-14 Building. Figure G. 5.1-1 presents the location of this building in relation to the rest of the WVDP site. The radioactive operations of the CSS will be confined to three areas of the building; the Waste Dispensing Cell (WDC), the process room and the filled.
Drum Storage and Loadout Area. CSS operations conducted on the second floor (35.5 m elevation)' outside the WDC and operations in the clean Drum Storage Area will be nonradioactive.
G.5.1.2 PRINCIPAL EEATURES T THE CSS The site boundary, exclusion area, restricted area and site utility supplies are presented in Section B.5.1.2 (Volume II).
CSS utility supplies, electrical, compressed air, and water will be directed from the main plant systems (Section G.5.4).
'The stack for the 01-14 Building HV System will be O
located on top of the 01-14 Building.
O G.5.2 THE CSS BUILDING G.5.2.1 STRUCTURAL SPECIFICATIONS G.5.2.1.1 Building Modifications The following major modifications were made to the 01-14 Building to prepare it for installation of the CSS:
o Pump niches removed; o Ground floor slabs removed and replaced with a thicker slab in the Process j
Room; 1
l l
O CA F1107 :ENG-308 12 O
- - l
o A 0.35 m thick conertto shicld wall addid betwrzn thi support columna of the east and south walls of the Process Room; o Relocated stairway between the first and second floor; o A concrete shield wall 0.46 m thick at the base narrowing to 0.36 m added to the south end of the existing stairwell; o Added an internal 0.61 m thick shield wall to the Waste Dispensing Cell; o Standard steel under the second floor reinforced; 0.15 m of concrete shielding added to the floor; o Metal building and steel supports added to the south side of the 01-14 Building for the concrete storage silo; and o Metal building added to the east side of the 01-14 Building to house t e Motor Control Center.
o Added an airlock on the north side of the Waste Dispensing Cell for personnel entry.
o Added a 0 3 m thick shield wall to the west end of the Drum Storage /Loadout Area.
o Added a truck pad outside the west end of the Drum Storage /Loadout Area.
o Added an airlock on the west end of the Drum Storage /Loadout Area for personnel entry.
The design basis for these modifications are presented below.
C AF1107 :ENG-308 13
D'r.ign Considerations The following load conditions were considered in modifying the 01-14 Building:
I
'\\
Q,l o Dead load; o Live load; o Wind velocity of 160 km/hr; wind loads for silo supports per ANSI A58.1 importance factor of 1.0; o Snow load of 1.9 KPa; and o Seismic loads for shield valls per UBC Zone III, importance f actor of 1.5 (horizontal loads only). Seismic loads for silo and equipment supports have not been considered.
Applicable Codes and Specifications Reinforced con ~ crete design per America'n Concrete Ins titute ( ACI) 318-71 ;
p) structural steel design is per American Institute of Steel Construction
\\/
( AISC), Eighth Edition; all structural steel welding is per American Welding Society ( AWS) D1.1; maximum allowable soil bearing stress of 240 KPa. Ma ximum stresses for load combinations of steel and concrete design 'are per AISC and, ACI codes respectively.
G.S.2.2 LAYOUT OF THE CSS The layout of equipment and facilities associated with the CSS is given in Figur es G.5.2-1 through G. 5.2-6.
Figures G.5.2-1 through G.5.2-4 give the general arrangements of equipment and f acilities on the first through fourth floors and Figures G.5.2-5 and 0.5.2-6 show these facilities by elevation.
The equipment mentioned in this section is more fully described in Section G.6,0.
('
)
C AF1107 :ENG-308 14
./
RJ l
G,5.2.2.1 Radioactive Operati ns Radioactive operations will be confined to the Waste Dispensing Cell, the Process Room, and the filled Drum Storage Area. All three areas are maintained at a negative pressure in relation to clean process areas by the 01-14 Building Ventilation System described in Section G.5.4.1.
Liquid spills in these areas will be collected in one of three sumps and pumped to a hold tank buried in the ground north of the building for sampling and subsequent t reatment. In the short term, treatment will be in the existing LLVrF.
Treatment will be transferred to the LWTS once it beccmes operational.
The Waste Dispensing Cell contains the Waste Dispensing Vessel, the resin dewatering pump, and two sump pumps on the 98-f t elevation. The basic functions of this vessel is to f eed radioactive waste to the cement mixers and to dewater ion exchange resins.
The Process Room contains the Waste Dispensing Pump, the two High-Shear Mixers, the Drum Fill Head, the Cement Removal Pump, the Dump Tank Pump, the Drip Pan / Dump Tank Assembly, the empty Drum Air Lock, the Drum Lid Removal Crane, the Drum Capper, the Drum-Smear Station, the Drum Overpack Station and the Waste Dispensing Vessel sample valve. This equipment is designed to sample the liquid waste streams, mix low-level radioactive waste with cement, fill 269-L drums, cap the drums, survey the drums for contamination, weight drums, overpack drums (if necessary), and label drums.
Immediately to the west of the process room is the Drum Shielded Area (DSA) which is used to house the drurs received from the CSS during handling operati ons. This is part of the RTS Drum Loadout Facility which also consists of the Drum Loadout Handling and Monitoring Equipment (DLH/ME) and the Drum Transporter (DT).
The DLH/ME consists of a conveyor, crane, drum handling equipment, overpacks, shields, smear station, overpack station, CCTV system, swipe tools, associated instrumentation, controls, etc. used to handle, monitor, and remove the drums..
C A F1107 :ENG-308 15
The DT consists of a shield (transporter cask), truck and drive vehicle to bV transport the drums from the Drum Shielded Area to the Drum Cell.
G.5,2.2.2 Nonradioactive Operations Nonradioactive (clean) operations will be conducted on the second floor (elevation 116.5 f t) and in the clean drum storage area. These areas are maintained at a higher pressure than the Waste Dispensing Cell or the Process
' Room by the 01-14 Building Ventilation System described in Section G.5.4.1.
The second floor contains the gravimetric cement f eeder which is used to f eed cement to the waste encapsulation system in the Process-Room. Also located on the second floor is the 01-14 Building HV System inlet air heater (discussed in Section G.5.4) and all the solenoid valves controlling the air flow to the process equipaent and valves.
The clean Drum Storage Area contains the empty Drum Storage Conveyor, the empty Drum Entrance Conveyor, the Swipe Station Operating Area and the Hydraulic System. This equipment feeds empty drums to the process and provides a shielded area for an operator loading the empty drum conveyors.
The building housing the clean drum storage area also houses all the control panels required to operate the CSS. Located above the building on a steel platform is the Cement Bulk Storage Silo and transf er equipment required to supply cenent to the Gravimetric Feeder.
G.5 3 CSS SUPPORT SYSTEMS G.5.3 1 DEVELOPEKr OF SUPPGtT REQJIREEKr FOR THE CSS G.5.3 1.1 Building Ventilation The 01-14 Building HV S, stem (fully described in Section G.5.4.1) is designed to maintain a constant air flow from clean areas with higher potential for contamination. The air is filtered through two stages of HEPA filters =to O
renove contaminants before it is released from a stack.
i CAF1107:ENG-308 16
Areas of potential higher contamination are kept at a lower pressure than clean areas to ensure an air flow in the proper direction through ventilation ducts and controlled leakage through air locks. To prevent backflow into clean areas ducts are fitted with dampers that automatically close when the pressure differential between different areas drops below a set value. A minimum pressure diff erential of 1.3 cm w.c. is maintained between routinely occupied areas and potentially contaminated cell areas.
The exhaust blower that maintains the negative pressure is backed up with a diesel-powered blower that automatically takes over if the primary blower f ails.
G.5. 3.1. 2 Emergency Power Approximately 28 KVA and 73 kW at 480V, 3-phase, is required for approximately fif teen minutes to dump and flush the mixers.
The most severe consequence of a power f ailure would be the possible solidification of a cement / waste batch in a mixer (see Section G.5.4.2).
Replacing the mixer would cause a period of lost production and exposure to maintenance personnel doing the work, but neither loss of power nor replacement of the mixer would result in a breach of containment and release of contamination into the environment.
G.5.3.1.3 Monitoring Systen The CSS will have a Radiation Monitoring System to measure radiation levels and airborne contamination in various locations in the 01-14 Building.
Monitors will alarm both locally and in the control room to alert operators of hazardous conditions.
O CA F1107 :ENG-308 17
e G.
5.4 DESCRIPTION
OF SERVICE AND UTILITY SYSTEM G.5.4.1 01-14 BUILDING HEATING AND VENTILATION SYSTEM i -,)
v Redispersed contamination, contamination resulting from maintenance activities, and contamination present in cells and pump niches, are the sources of airborne radioactive materials for the 01-14 Building. The 01-14 Building HV System is designed to prevent airborne contamination in routinely occupied operating aisles by routing ventilation air from areas of low contamination potential to areas of higher contamination potential. There are at least seven air changes per hour in all potentially contaminated areas of the building. A minimum diff erential pressure of 1.3 cm w.c. is maintained between routinely occupied areas and potentially contaminated cell areas.
Except for air infiltration, inlet air is filtered and, if necessary, heated for personnel comfort.
Control of contamination within designated areas is accomplished by maintaining these areas at a negative pressure relative to clean areas. Air locks provide for entry into the contaminated areas and assure that the negative pressures are maintained and ventilation flow continues fr'om the clean areas to the contaminated areas, i
A pressure differential indicator that opens a butterfly valve controls the ventilation interfaces between the clean areas and cells. During normal operation air flows through a filter into the cell.
If the pressure differential between the cell and the clean area f alls below the set point,.
the valve closes to. isolate the cell from the clean operating aisle. Filtered supply air is introduced into the stairwells, air locks, control room, and clean Drum Storage Area. Transf er grills between the stairwells and the 3
operating areas are protected by fire dampers. Sixty-eight m / min of ventilation air in the operating aisles is routed directly to a roughing and HEPA filter in series. The balance of the supply air plus planned infiltration is drawn into the process cells. The building ventilation 3
balance is shown below (in m / min).
1 i
()
cAF1107:ENG-308 18
Intrk7 Exh' us t Filtered Supply Air 238 CTS /01-14 Building Trench 17 Air Infiltration 20 Operations Aisle Exhaust Roughing and HEP A Filters 68 Process Room Exhaust 207 TOTAL 275 27S Ventilation air leaving the process cells will be filtered by six parallel sets of two HEPA filters in series located on the third floor of the building. Each stage of filters is sized to allow one filter to be shut off for changing without overloading and remaining filters. The ventilation air then flows to two ventilation exhaust f ans located on the fourth floor of the buildi ng.
One ran is powered by an electric motor; the other is a diesel-driven backup f an designed to start automatically under the following co ndi ti ons ;
o Loss of sue, tion pressure, o Slow speed of electric motor (as indicated by a zero speed switch), and o Loss of electrical power All HV system components are designed to be maintained in areas free of airborne or surface contamination.
Pennanent or tanporary air locks will maintain proper air flow during maintenance operations involving the pump niche, Waate Dispensing Cell, or CSS Process Room.
During shut.down of the nupply air system for regular maintenance or because of f ailure, gravity dampers in the clean Crum Storage Room will open and allow outside air to enter the area and t he CSS Process Room.
Air infiltration and induced air flow through the air supply unit will provide air for the Of f-Gas C ell.
CAH 10/:ENG-308 19
G.5.4.1.1 Major ccaponents and operating characterictics Air Supply System
%/
The Air Supply System consists of an air inlet damper, preheat coil with bypass damper, prefilter, reheat coil, blewer, ductwork, and controls. The system is de' signed to maintain a 21 *C inside air temperature with a design outdoor dry bulb (DB) temperature of -29ac.
The unit is sized to deliver 3
238 m / min of heated and filtered air to the building.
Air is distributed from the supply to the stairwells and operating areas through galvanized steel ductwork sized and constructed according to standards of the American Society of Heating, Refrigerating and Air-Conditioning Engineers ( ASHRAE).
Ductwork Except for the supply air ductwork, all metal components that come into contact with the process ventilation air are constructed of either 304 or 304L
' stainless steel. Potentially contaminated ductwork is completely contain~ed I
within the process cells.
Filters The portion of the ventilation air flow which is not drawn into the process 3
cells (68 m / min) is exhausted through two parallel sets of two filters in series (the first filter is a roughing filter and the secJnd filter is a HEPA filter). Each filter is contained in individual filter housings located on the third floor of the 01-14 Building.
3 The air flow which has ventilated the process cells (207 m / min) is exhausted through six parallel sets of two HEPA filters in series. The first stage of HEPA filters is located in a glove box constructed of 1 3 cm stainless steel and provides for both containment of contamination and shielding to reduce
~
(v)
CAFi 107:ENG-308 20
~
a, p
r.
rtdiation l'.vals in th3 filt:r room. Th2 s;cond stage of filt'rs is locatcd in individual filter housings. Provisions have been made to DOP test the f il ters.
Process Cell Inlet Filters and Dampers 3
Except for design air infiltration through air locks and 17 m / min of air ventilating the CTS /01-14 Building Trench, all air enters the Process Cells througn a filter and 0.2 m butterfly damper assembly.
During nomal opera-tions, air flows through the filter and damper into the process room.
In the event that the diff erential pressure between the. Process Room Area and the Operating Aisle f alls below 0.6 cm w.c.,
the damper will close to seal off the cell. If a cell of pump niche is opened for maintenance purposes the dampers will also close and allow more air to flow through the maintenance area.
Exhaust Fans Two exhaust f ans located on the fourth floor provide the system draf t.
Each f an is rated for 100 percent flow capacity of the IW system with all of the filters at the changeout pressure drop.
The main exhaust blower is driven by an electric motor. The second exhaust blower is driven by a standby diesel engine and serves as a backup during maintenance of the primary ran or under energency conditions.
Both f ans are equipped with suction and discharge dampers. The discharge dampers are used only during maintenance operations on the f ans and are normally locked open; when a f an is on-line its suction damper is open. The f an and dampers are constructed of 304 or 304L stainless steel.
Discharge Ductwork Af ter the ventilation air has passed through the f an, it is routed to the stack on top of the 01-14 Building via a duct.
l
G.5. 4.1. 2 safety considerations and control Interfaces Between clean and Contaminated Areas Designated areas are maintained at a lower negative pressure than clean areas to control contamination within them. Air locks provide for entry into the contaminated areas, assuring that the negative pressures are maintained and ventilation flow continues from clean to contaminated areas.
A pressure differential indicator operating a butterfly valve controla ventilation interfaces between the clean areas and cella.
During nonnal operation air flows through a filter into the cell.
If the pressure diff erential between the cell and the clean area f alls below the set point, the valve closes to isolate the cell from the clean operating aisle. The dampers are designed to fail in the closed position in the event of loss of electrical power or loss of utility air pressure. The diesel-drive f an will automatically ccme on-line should electrical power be lost or the electric fan f ail.
Air Supply Unit O
The air supply system is designed so that on f an startup, the normally closed outdoor air damper will open f ully. A room thennostat will modulate a normally open steam valve to maintain space temperature. A low-limit thermostat mounted in the discharge will override the space thennostat to maintain a minimum discharge temperature. An outside air thermostat, located in the outdoor air will modulate a normally open steam valve toward the open position as air temperature drops f rom 5.6' to 1.7'C.
A discharge sensor mounted after the preheat coil will modulate the face and bypass dampers to maintain a 4.4'C discharge tempenature.
A freeze stat and a fire stat, located af ter the filter will stop the f an and sound an alarm when their set points are exceeded. On f an shutdown, the electric-pneumatic switch will turn 1
off the main air supply to the system.
CA F1107 :ENG-308 22
Erhaust Filter;
. All air leaving contaminated areas will be filtered by two sets of HEP A filters in series.
The first state HEP A filters will be enclosed within a glove box to provide contamination control during changeout. The existing glove box is constructed of a 1.3 cm steel plate that provides shielding to reduce radiation levels in the Changeout Room (not a nonnally occupied operating area). The second stage of HEPA filters is located in individual filter housings.
The differential pressure is measured across each filter holder in the 01-14 building HV system. Each filter holder also has a local low pressure alarm which sound a trouble annunciation in the Control Room.
A high differential pressure alarm in the control room records the differential pressure across each b$nk of filters.
If a first-stage absolute filter f ails, the activity and media will be caught on the second stage absolute filters.
It is doubtful that a f ailure of this t
type would release any measurable activity.
Failure of a second-stage fil' er would not be expected to result in a significant release of activity as the bulk of the entrained activity will be on the first-stage filters.
Fans Two f ans are provided for the Ventilation System.
One is driven by an electric motor, the other by a diesel engine.
Each ran is rated at 100 per-cent system capacity.
Under normal operating conditions, the electric driven f an is on-line. D uri ng maintenance of the electric f an or during any one of the following conditions, the diesel starting circuit will be energized and the diesel-drive f an brought on-lines o loss of site power for more than four seconds; o loss of suction pressure; and C A F1107 :ENG-308 23 1
I o slow spesd of sicctrically drivan f an as indicatsd by a 22ro spesd switch located on the f an shaft.
o The exhaust f ans are controllable both from a locally mounted panel on the g
i fourth floor and from the control room.
I i
f Once the diesel-driven f an has been started, only operator intervention can restart the electric f an.
Diesel fuel for the emergency diesel is supplied f rom a local 120-L day tank. The supply to the day tank is from the site Fuel Oil Storage Tank.
i A pressure recorder and controller located in the Control Room controls the j
transfer from t le electrically driven f an to the diesel driven f ans. when the controller senses a loss of suction pressure it closes the normally closed suction dampers of the electrically driven f an and opens the normally open auction damper to the diesel driven f an.
At the same time it engages the starting circuit of the diesel f an. This arrangement of nonnally open/normally closed suction dampers allows the diesel f an to operate when j
there is a loss of elec'tric power and utility air. The starting circuitry of the diesel f an is 12 volta DC supplied by batteries. An emergency power circuit operates a battery charger that maintains the battery at full charge.
I G.S.4.2 ELECTRICAL The Facility primary, secondary, and emergency power _ systems are described in i
Volume II of the SAR.
1 j
The power for the CSS is carried from the utility room approximately 9.1 m i
east of the 01-14 Building to a Motor Control Center (MCC) on the east end of the 01-14 Building. From the MCC, the power is distributed to CSS equipment i
and control panels through conduits embedded in the Process Room floor or running along the walls of the various areas. Normal electrical power requirements for operation of the CSS are 190 to 200 kW.
f j
)
CA F1107 :ENG-308 24 i
4 i
_ -. ~ _., - _ -.
Th3 CSS is d:Oign;d so that all v21v;s and squipment f ail in a sifG condition to prevent overfilling of vessels or otherwise spilling radioactive soluti ons. The severest consequence f rom a power f ailure would be the solidification of a cement / waste batch in one or both mixers. The mixer (s) would contain the solidified waste and contamination would not be released into the Process Room, but a loss of production, equipment, and unplanned maintenance exposure would result. The system would be shutdown to replace the mixer (s) in which the cement / waste mixture had solidified. This maintenance operation is a contact operation and would result in exposure to the maintenance personnel. The mixers are shielded to minimize such exposure.
The CSS is tied into the emergency power system to provide power to empty the mixers and bring the CSS to a saf e shutdown condition.
Approximately 28 KVA and 73 kW at 480V, 3 phase, would be required for approximately rif teen minutes to dump and flush the mixers.
G.5.4.3 COMPRESSED AIR Utility air and instrument air are required in the CSS to operate instruments, control valve's, and several air operated pumps. This air is supplied by the main plant systems which are described in Section B.5. 4.3 of Volume II.
The CSS is designed to f all safe during a loss of air pressure.
All valves in radioactive service f ail closed to stop transfers of radioactive waste except the mixer discharge valves. This allows any waste / cement mix in the mixers to continue to flow to the drum at the fill station.
G.5.4.4 STEAM SUPPLY AND DISTRIBlTTION Steam is used in the CSS for heating the 01-14 Building and for heating the air from the CSS Vessel Off-Gas System prior to discharge through the HV filters. This steam will be supplied by the plan steam supply system which is discussed in Section B.5.4.4 of Volume II.
C A F1107 :ENG-308 25
1 l
G.S.4.5 WATER SUPPLY The plant water supply system and the plant demineralized water systats are
()
described in Section B.5.4.5 of Volume II.
Flushing and seal water for the Waste Dispensing Vessel Pump are the two primary requirements for plant water in the CSS. Flush water is used for periodic flushing of the mixers during normal operation and for pipeline and vessel flushing for maintenance purposes.
Deionized water is required in the CSS only to dilute, dissolve, or slurry chemicals in the Chemical Addition System and to. flush the Waste Dispensing Vessel sample line. Failure of the Deionized Water System would have no saf ety impact.
G.5.4.6 COOLING WATER Not applicable to this SAR.
G.5.4.7 SEWAGE TREATMiri There are no sanitary f acilities within the 01-14 Building. Operators will use facilities in the Main Process Building.
There are'no chemical effluents from the CSS.
The only liquid effluents are mixer flush water and ion exchange resin transport water, both of which will be discharged to the LLWTF in the near tern. These liquids will be processed in the LWTS once this system beccmes operational.
G.5.4.8 SAFETY C0fMINICATIONS AND ALARMS The cement solidification system is provided witn instrumentation to monitor flow, pressure, level, weight and temperature to ensure system operations are proceeding as expected and system limitations are not exceeded. The equipment is principally operated from control panels located in the Control Room.
In the event of off-nonnal conditions, the process equipment can be manually shut off. Safety related systems such as the 01-14 Building HV System are designed
)
C A F1107 :E NG-308 26 6
to cchi;va a safety condition automatically should off-normal conditions occur (e.g., cell dampers close, diesel-drive f an starts). Autanatic controls for the material handling subsystem and the cement storage and transf er subsystem are provided with manual override capabilities.
The CSS has instrumentation and controls that allow it to be started, operated, monitored, and shutdown from a remote-control area. The instrumentation indicates or alarms, or both indicates and alarms abnormal or undesirable conditions that could adversely affect system releases or equipment performance.
During emergency conditions, external communications will use the plant telephone system. There are no CSS process alams at any locations other than the CSS Control Room. The Building HV System alarms sound in the Main Plant Control Room, and the fire alarms sound in the guard house.
G.S.4.9 FIRE PRUfECTION SYSTEM A fire in the CSS is considered highly unlikely. The Waste Dispensing Cell and the Process Roan are constructed of concrete and steel, and 'the materials processed in the CSS are nonflammable. The only potential fire hazards are the electrical wire insulation in the building and the hydraulic oil in the material handling hydraulic system; neither is a high risk hazard.
The CSS has fire detection equipnent, alam systems, and suppression systems commensurate with its needs as determined by WVNS Radiation and Safety Group.
Fire fighting procedures for the CSS will be per existing WVDP procedures.
G.5.4.10 MAINTENANCE SYSTEMS
.y The CSS has been designed as a contact maintenance Facility. All equipment not absolutely required in radioactive processing areas (such as solenoid valves on air lines) is located in clean areas for maintenance purposes.
As much as practical, valves and pumps are separated from high radiation fields CA F1107 :ENG-308 27
i
?
by distance and/or shield walls. All squipatnt and piping is remotely drainable and flushable to reduce radiation levels prior to manned entry. The i
w High-Shear Mixers will be shielded to reduce radiation exposure to maintenance personnel if a mixer full of waste / cement mixture needs to be changed, i
J 4
1 G.5.4.11 COLD CHEMICAL SYSTEMS
_j i
The CSS Cold Chemical Systems are described in Section G.6.1.1.1 under 4
i Chemical Additive Subsystem, G.6.1.1.3 Cement Transfer and Storage Subsystems,-
i i
j and G.6.3.1 Cold Chemical Receiving, Handling and Transf er.
i i
l 6
i l
i a
1 i
?,
r i
I I
4 I
i
}
i i
c I
{
l l
~
t i,
I i
1 l
l l
l l
CAF1107 ENG-308 28 t
f TABE G.S. 4-1 CSS UTILITY REQJIREPElfrS 5
- 1. 72 x 10 Pa Steam 545 kg Plant Water 132 L/ min (intermittent)
Demineralized Water 1.9 L/ min (intermittent)
Electrical Power 190 to 200 kW at 480V, 3-phase 3
1.9 m / min (intermittent)
Utility Agr 3.8 m / min (continuous) 3 0.85 m / min (intermittent)
Instrument Air 3
0.71 m / min (continuous)
O l
l l
l I
CA F1107 :ENG-308
,i -ib.-
- I6 (6.j c.e:
?*
r.:$ r p J
=
FF' A^-
\\
f, -
r+.s w
- t a
W j/
I'.%'*s's l
ii NN
'l
]
I,I
[
l
(;e*
\\\\
8 6
,\\ \\
8 saeg N%
r-j ls.
ca i
s s
- 's SW
- l a
t
% e)f-1, r.w
'N[
s...)+!
! ** 8 !
P g i
^ *.
1 e
e li w
?d i ;'l 10 0].
~
M..
i l.
y.;
i
.. w,..
.n i
l l
f 1,
,$,.3
,m,,
^4 4
t/
-- ~
pjj I
s' L
.ni
,N,'-
C
?%
"y u
'/ '
.m -
~
WP%frf 85
=
/1 I
'3' C
e 3
al I
C ca l
ll 1
O
- ,..g o
J(
) b
. mi maad
,t.e 0
T.
__)
~
_=.:-
i
(
g
- b t,j i
j
['.*j*
eN
+
~.out e.
N.%*%
's
{
J
,' -~~ ~,,,~~
,~,%.~~,
l y
~~~%~~.
,~~~,~~.~~. ~
.~~,
~ ~,, ' ~,,,, ~
,~
.~
~,, ~.
g\\
's #6'E-(,',' '
ss s,
/
s g
...... 3 ',
..________s,
... m.
g
).
f^
a tsar. rz.m E
~~l,
=
me, w, -
,.,..T
~... _ _ _ _. _ _... _ _ _ _... _.., -
I
,t
, t2.003 m.
.*te:
1 e
a a
1 u
a e,
O O
5
-m
.aO u.
o
)
TI iPERTURE CARD
\\
Also Available On Aperture Card Lr.
g6nwD386-O?u I
lr l.'.*ll' l.....,,,, ' lll l.= l
- \\".'.* l
" W."." '"
7,.
= a'
- f a.---
==.
- x. -.=.
m n...
me...
f;;;*
- ,,7 eon
. =.
t?.4 m
g
=
- g,'*a,;,".**;** C* **
.a oa e i. w.
.......,.c.
.. =
f LAYOUT OF WDP FACILITIES j
1
' ' = =.
er = 0.'s j.e. e.
l8 8 pg NaNI 4
bt.
l E
l a.- -
'=
i.a E m -.
^
3 s
i,
e i, 2
,e i e I
J 901 0 033 4.
3
- l e-. -.
r_._o_
gs 9-*
n-e c
..... -, l 3.;,,
m.
.i
.,,,,,.,.,m..,
c..
g.
...,.4..
.r p.
iu my:..
- u
- e.:n z.u.::. prv,. c
\\
,w.<.,.
a
.,.. ~. %w v-
.: m.:..
-tw, :m,.4 u /n c
a.:c ::
.r
. v:n
{pm%...:.,
- J QL l
c-
/. L
'>, a I'
.o l
V t.
M L,, _/77 3 M".'
~6T, D -
M 3
?
l 8
l u
p l:
n.
q e t
__v.[.a.',"*"g d.........
...,. p,_. a, JD 4
mm
-7
'g.;;;' pp? i
~g-y
.~
d
. i v.e.-
j pp-,o._
1 g
L
's I
..,... ~.:.. ;.:.'... e 4
. t.~. s
. 1
- as,,es
~
, t, y
. A-n'::,
l
- n
..N i...
%J j; g,
'w --n "_ ~'
m
- w. :
l p._
L.w
- e.-+
s..
,1 m =
4
) kl hhh.u...' ih..,,
pi--7 Y/
. [}
Ff" aj[
.,s. yj
.../
g
.. p.p g g-
[
iw.irw m
.i M..a-.,,k..Rh
-s t
t.
, _.,i
.,s
.._. r,e
.h
.i..w
,4 g.,
l '. s.
... =.,
=,.::
s F fi.. R.s. H.
e L ;.
u.N...
(
3
.. e.,
a
.,m c
- ,/
, 2., [.a -:::
- c. a'.. -
r.,,
v.,
n
- ~a 1
y a-
_.'. a. %
.r.
~
MMN ^,
(
- r{..
- p..g[y, su-
~-
s
?;' * [*
+
~
k sN[;7
' f
I I
~. '
J 6
-Q_ y p.-
..g. _
(
i f.'.'l.
+' i,,' *0.d,,..
+
g..c, p.an.aoa r
i r
v su m.
8
,.,x.
l Y.l.aa!5
~ %
(N.-
com ca
.,ue
, s.., f..
., s$ '#....
- r
c',7 I
.,f
.! l!
. ~.
s y.4 ] 78 E $ '.q. *., %e7+t.
/',
..y, 2,=g(yy(
3_,W.
- 0. r. x",,
4 g.7
+
- 6 4os s
..g:
a
-u
-u.
f.s f.,ry.
g44 fgg; i,t nty.
r 3
r
... +e.
-h
,-. W,.,!.J,(;/(AA 2
+
J
- m. Q,, YvN f,
i.M O.
l-
.J k
-.a
" " ' ~
i 3
4 Wj3...,s..M. :. e,. -
4.
i R
, :. I AAAA
,J..
n e
y yyy J c.%, $w=se 'si M.4
=W.. : - ".:.&-o, w
9 1
i i.. :..
i.3 4 AAX
'.L
-o
-o
-o p.
i p.#m.i. Ap.t %*..a
[
y
_---u
- p.,,..,,,
yyp/
x
.m
.-~
~. w --
s s
s AAj(j\\
l-
/
hxA
+
c
.L
, i,;'.'u*
qr i
,m
-o.m... -lr.----
i,
... w.u o,..,
., t...
l H
H I
i L
A, l
l g.
=g..g l
m I
a o
,._______7,,,-c.
~ ~_
a a
= m.
c.
' u'"9'. m..
-:p
~ '::
c '-
i.
i 3
a r
r
~
f j
[l N"""
N Nf/
l-
+'
/
'. I'g ',,8 F
- 04
__,f,t,...
{g l F
..ku..
Do,e i,s.
w
.g os g
l'..
{
h 4
.6 s,e -r a, *e F
N
,e. 0 6
N l
n. n.,,
.x
-.c f -W..-
j
,. oar l
t-
,A es air %
]
___ /
p
~
.n.
pas.u sese
.3 M,,," Q.,t,"r
.)
s y,"ga;,.
,n.,.
. nr.sv a
a w.r
.L(.t,'7...
et m
x 1
r4 CC I I,v4.
= = 9 }.
PL AN EL 98. 00'
~ -
F V.. ( EMk[:. r
,,s,
.\\
I
~~it r '-
-n
~
, i a
a 4
s e
i i e
- h.,, h'.II"FMs%*.f.D FWhMM'if'@l.'. TIN 8MfANM') N'MlhWW:A "4 M #2. *9 *. W
- 1 ***.e en:s, a ^/W ##:MJv.v y.2
]2 k.h....n..:tsw. vu:
f g
h 2
M.. ;..5.u.s.:+G.:'2 vaLac -.mm = !" *" ~*
n
- s..G."..... '... ::.*. s '
2.* nen c.u.:.x z
==
s.
.I,.
e 4
9 g,
,,I-g
k
- 7 t
- 3 88 e
is
- 6 9
e0 et i s.
Q i. 02 mo.
0 Art stutsrom ce cw APPaovt0 y _ _ y -. a. ~ :.
\\
.._.::=.............__.r..
- 1?iL1 Eb"C'"
_ _ J_'ex l _ _ _ _ _ _ _ _ _ _ _1 r._. tt'
_L%
u t... u :,,....,,
i I
e i ~ 4=.
_i _ g _ e _. t -' m i
u_
__ _m
. __ I
_x tex F c-3
...m,.,,
6 Ab p-g s
i l
f e ftL.sisees e a 8,:
. NOTES c
, 0."'I's !?l' 7'*
- 4. t=E st M't TO Bf %C 440.0At tivt GPtAA?!ON$ IN taiS arf A.
'N'/
cN'a t (Es.' sito s anvre g
,,(,,
,,,g,3 9,g 3 g,,,,
g, 1LPCR$f 0f 4 u on is ga X.O 1f )( E Ai. A*** tang! *t % '5 *t'l C -030
(
i c',
si
.w.
-o t
/
O
.k
- M' M'
REFERENCE DRAWINGS EI
~
}
'ct-0-03*
E E
'/
""8'"
m.a n.rs h;
f"l; CENTRAI, AARANCl*T%f-Cl#14 Su! Loth P et i
PL Ast EL 130.00' 4 $ECf!C45 901-0-035 g
2 ~
2 3
'\\
Ct ut aAL AAAAhCtat%f-01/14 Su!L0the E
{*
=
2 Pt A4 EL I44.00' & Sttf!ONS 901-0-036 t
t c.gan a.r* 'trocs
=
5**'
_ g Cthf PAL AARANCtet4f-01/t e 6 ult 0!=G SECTtcNS 901-0-0J7 Ct %t e At. AmeA%Ct'tist-01/14 Su!L DING
~
g SittIONS 901 0-038
= ' "
y==*
g,
.==:==.
us.
-~ --m-a
+
~
.A t,,,
e_.
e
. = =.
/:'.L"Jm" h
EE m
r Ba m
e Ls.
- F,
=w d-I._ i
=p.j g
~I Ce.
r-
[
y g
t
,. c g
@ 15
.p.4s10.
t C'L"w'"o" gg A :.>.p 4
....m a' q
-C atv rusi L
TI APERTURE iM m~i-CARD g/oll8,l o,38k03 _
~
PN6
~
J F0ft OmAW!sso IND(I $([ DRAW!$st eso.
- "T" EBASCO SERvlCES INCORPORAIED
~"'* -tm. '- - =" -
Also Avallable On Aperture Card n' e.t';'., " ".
w ST V
'l Y NUCLEAR S avic omAur ruc W ST V L Y. NEW YORK se ts Lam etw ee U
'"" 451 VALLET DEMONSTRAi!ON PR9JECI
/_D "A""
'" " ~
CENER4 ARRANCEKNi 1
ca
..__x 01/14 BUILDING PLAN EL 98.00' pas..
.n im.m.
n.sn_a p act.m a aL ive ct
- )O!D Oba o
.m:4
' " ' " " ' " ' ' " "?.',. ; "
'30'i".W h e e
io i4 ia i is i.
i is is w w...v.a....
.v.,.
-s
= +...
- r wern..... :. -........-.......__
[
l
~
~.
f f
F 3
4 9
6 i
?
O 901 D 034 s
2 i.
a
^
I k/
l l l i t i
n 46 iss ar t__ ____
,7 g, s.@y'gp.
j, q:;.j) q:;.!3
- j$y.'
.,-v.-
i
.- ' e n.
e.
,u.
r_____.
Husoia e' es.,t r=s L
e u
[gh,g 4, peertt$ (ILL i
~
6..
.,ge.. gO I'
..*.s s l
L.00f A
.l
- j. s*t +1 I
"II8G 8
g
- t t e,i.,n g gg go 3
e LWUt#-q
,, g,3,g g 3 8
.n
-.d.e s ',.
f a
p;.
3
- **>-i -nos
=
a F
--o-4,s..,-..-
.,c
,y..
\\.-
l.l
\\
=
_m i.
W.4,. p * *,* s.E,,-
e.
[:'
l gj
.j
>ia t=
i n.,,
4 :
's.
e n son.or a
't :
r------
+
.5.;. *
" gtm.. I g%
m p.c l
l L.. g in g
.1__
%. 'g.gl Q 5
}..,hi.or 93 g, <-
- f. ';"()/__ _ _.~.,.
l\\
/
j u;..
. Lm..
4 f '.*.
1,
-_g _a m.
l \\/
%n, - mv.
- .y N.
y.d i a.,
yy*p. 3 4i.e.
A".s"rh-
' r;,b,,-
g
. _ _ _MM 4.-
N t,s L
/
\\
- s..a?)
pi w..
.e e
=.c-
.,,..w.
q-v.x.Ee9 ^i.ine._
,.I'n~
c.
W
.w a,- 2_ m.:
_3-I u., u...y.;
p,,
g7 r
pp%cs0-..,~..
j
- (
j i
p.,3,.,,
I. r..N
."m -
.m rw /
me ---
.c.
g<.. k{?,d..W..e.
!,,i.f.!
an
. - c. L. c.
l i
v..
6
-.... F I
['
'#[.. -"i @
- *8~ ! ""
l-l
'w
,., ~....
p d' d.s,..
' k,,.,l
,-d
-M.,
y, f e.,
. +
$ D
- L8 SL AG t'.
ww e.
64 409.f.lD!.,E g,eteste
+
n na.se
.A.
3
. i. n.c.
I
%.I g[-[a *4
- e
,f 9
a-
. l l
b
.. $'..ar k',,.+ -
g e
N
- t.*70
~ !I
~
6
=t,O,S, I.M I 6 *c
.g j
, i, iF^ 4.hr T D::,s g..-
~1 s.
S nsa -
- a r.*: ' '. 3=.v. ;
e
....s s e..., <
r Bb r.
j
>s w..
- p w.,
i 3r.f e...
,~ '*..-
1 i um-e* I l I
4Jn b
~
ev.g
.p.p9...,. -
s hlnl u.,..
I l
,s.-
h p
gg*
Irt.
e ll 0
a e.,on=
- g '..'4.
- EL &ILOF 1
eipe et.t u..g3 g;2 ;
- 3,4 7 ;...
l 8'8 'S **
- neon a ni,se k
f l
\\
{
.m.-
- n..
n ns.u%
e E"
I
/
h
'c y
^
^
I y
J l
j i i Cb~
l 0
t i
_d.
n.,,c,
, e n n.-
sv. e r,.. r r-J i **t PLAN EL 116. 50' U
e l
l' 9;9 maats acar 3
=.
y,,,.! i '.'Q. W.a,;.s,,,
aw,-
s -
a
+
)
.Js 4
.+.
1CC cf T'-
,? J em rsevr n eri.se 7a If O
I I
I 4
5 6
5 I
4
> & ( YM'W $.'h *'G'*.N'-'.'"AN yy'44*h@ 24. '
y;36Y t; \\t! nw *rsa*s.%
'unti.W ' *.e.eDy.rret.=m.%e h e**pr.ns f;.--c.
s e s
- 4,. g.. A,.
+
r
~
{
v.' "..'.,.
?
t
.m.
x.
1 ff *
~~
2 t
it i o
i is is C1
.o se W.
CAft pt vistose Da Cn an a0vt0
]
. t.. cri.
. _ _ _ _ _ _ _ _ _.. r_
. _ _ _*'1 File.
j d
_ _ p....
.tJe_?_ol___________.le_L".tJ7.LM l p[
.. ~
l
..... ~.
.i.,s..
m...,
)!I e,
__ _,_, a o
I.
ri l Jt
/
/
?
1 TI
/,
APERTURE -
0 [
e p.
l CARD p
e I,*
aeor gg g34.33-d Ewo Avn11ahle On h'
~
d}H'Tture hd '
o p
gh
. ~......
ton mott5 meo ptrtetAct Daa.tues stt cwc sei-c-033.
E B
1 AnMss.ar
~
m v *'
E.
a vt _
l&
t.
l
+
"1 C
?!
.a Lu (c
\\
N came aer e
.rj
}
[
f Ba u
Qf
^
/
C1 I E
}$
=1,,
_N O
- 7 i
I Q
I,_y
".4-
- .:=,
e Q_.5. l [#
3 h
11
,k9
_g g '.q.I h -(-mgg;,,
g y
[.N w
j hm e......
r on.s. e.es 3 g*R g
r C
b att rta..
b rw I.?
3,s
-o j.
80II&ID3f%~ D'rl ti POR DaaviseC INDEI SE E DAAWIs4.so.
J
"';* gf *
.EB.AS..CO S.ERvlCES I.NCC.RP.O.RAIED h
s. tm.
u_
y
'hg WEST V.
Y NUCLEAR MP) kNklENkUYbN h1 c
'"* WESI VALLEY DEMONSlRATION PROICI 0( EIGe W
'ca
'JJ,"
CENERAL ARRANCEENT 1
f::L.'
01/14 BUILDING PLAN Et 116.50' i:
6
.....a.
ua
...c
~ <.
c 880 A f f Ab apua est.e et esig mae,-, res 30tD OM o r5 r
i-... - n.
- .g.., y m -.g g e
- y ls ao
.4
.: i
.3
.5
'r.
y
.o
-}b
m e.*'* nuJ e
t I f
3 I
I I
901 0 035 A
N
..F 1
.,, 2
.x.' f. #Qtya ss:.y. ' -
g.r..
49[
'~'
e e
P -fl B*
- Il
_ P'
- 9 g
3 J %, (#d-d v retet en
,. t.
.T %*
,,1..:-
,i, i, j
.*y*..-
- f.
e p
n ce,.'.(
- j i ey j * $
,,ngg, g'. e'
- *s
- 9 914 9"tm446 -
g*.i'....
e Er a
2 f.%
t/i
?
t I
N
- g j
. a
. a
- j. lo
.I e
/. 4 -
nie
.I p41 r.
I 4 J..
L
~~
~s 1
/
1{.
m,,
.v c,$-
7, t iA p
h.-.M.e, h.Id. * '.k.N. 'UNNS~> ;
cm i.
'*% )
r'- s -
e= EEtna t.
I.. l I 8,"N
~.f[;[' * ; c oes.TCar
' e'
- q...2
<m r_
r s
m n.
l y
,s.,
4.y..., s - w...sg.w,c,,..
n 3;;. -
m-vn 4
s J
-2 d h,g ~e-
~
.c
,,53
~ k 1
~
i
,r,,
\\
f up'g dp*'s? i -
4tn.
~ s c
<3i p.4
. f. e,,
..r.3 p; e
-.c.
i L.*c1llL.,
(,
-g rA,.
,, f.
. a.m., -
f
]
=== = p' t
y t!1. ); y, t...et ,'.'* e.
~,I 4., '
=>
'. 4. c
'seos at im or
\\
f.;.=M w-i
,s. yr.'
z.:..-
'@ D Mi
.*@:.. :6ci.
,. y
/
-1. -.
A., ~ %$$h. e dayk%-$r.>
i L
- h...
g 3 fiQ).
- ~~':
O
' w
~.or-
)
f I
s
,I
, p v.v.
g
.p... '..
w,.w u..r.
\\.
r.
- M.%.1. '.%,,,WM'%' f"9.%:
C t., -
,.e,..-
au f.,.s. iyM. <
i dei 8i'un L
~
i m c,,
- t..; %
,e uve =e u,,,
g
"?
.y 8
- M.
A, ' ',
m l '(d....h g >,.
' ~
TdET&un m.DDd_i h.f[ WW WMnk~:,W.% W
~
L
. % s.yw-e.w:.u : i e..s.x.
...,. m..
. ~.
a j..<n i..
s, !
's. 5,s (B,
"dTT.
2.n /
p
.i r
dy ;?'t':; M.
a c.
1:'
s F,'
Bb s ! A..
i
.m, q*
Q*
l z
I e6 us.or
~
~
1
=
a ave. lEF n.,, -
si im or em it all uk.
u A
A J
r i
i i
c g
yy
.e-u a t.
m.,,...v.
.. q. ;y., -
.:= 'J ' "
PLAN EL 130.00' n
o
.k
.[***
[
'{
?.a.
. g,.y.
J.
a.
4 4
2 3
4 5
6 I
I
. Y.%s.l 43e V.f7N.,.
r
- =
m_
,$5$d.."MJTeT EM "L-.=5: aM.. E c.
..t, av.e 4.a ;,2 A em f.
- t.,. p,
.a.-ni cc. - 4.... n.,. m.,.-....,..,......
-.m-----
-2,-v+----
.e
< y,v.'s
--r----
--s.
~ ;a
.le*~=t
-d N*g\\ p. e
).,+
% g.E* N..,. gJ.. wh 4 4 'Q 9.t 4 p.,**.N
,a s
IM.#4 'e ' we, (4 o '
.a. i s4
I.
I f
it i is se i is is l 4,,
9 o
e.
'T No.
cATE l Rivi5Iose OR CM APPRort0 i
"[Y
- -. -. '.. $................ I."...' b 5 l'!*.
n
<. s...... c
~
~
~ i
.C ~ U:li.~ ~.
- h. r
~~
4 U
c o
..m......
p 1 L; 2
, ut.,
f
.i s
I r-1-
).
j3 j
i Ut.
L
/,
l l
i c
3 j aw m.. w uw m i.i - = %u g
PART PLAN A 1 3
]f NOTES r o= 'ets u.c -t. : onct nu.: cs >.: rwc. c. m s.
I,'k t
o
[is g
APERTURE l<A CARD lj.
+-
- u
.x.
x h'k E
f Alm Available On Aperture Card O
-. = _
Qy w
a
~.
+
n 3
3,.
C
. nl 1q
-s o
c-
~
I -- 1
=-
i.u g
g g
l et nt u.
g j '"
,.O m-g
' O u
o
" ^..,, ~
?
u.
, i
- 4 et us - il
) 4 t,,
T teet
^
e j
q 6.......a 3
y u,,_
e n
S i m
= -,
\\
1 l
bjii 0'ta'"
1 Ti y
\\.?
- ',,,..m p;
n Jt Blal iOJi 038/o-D6 q
i m:, :..
6
.-- 4 '= t o siata Foa Da*w2"G INorr tre onawsuc no.
,57c,;,,,,y a
- 't **
E8ASCO SERVICE $ INCORPORATED l
g
"",,0,),"
una aco eu a4 m..s..e. tut
,ci VSTVA(YNUCLEAR i
'e$'Ye'e*cY S RVICE OTANY NC
- l tea..ssc aw.a
- W ST VALL Y, NEW k RK enn t
SECTION C 451 VALLEY DEMONSTRA110N PROJEC]
b.
' 'J,""
CENERAL ARRANCEKNT
' l [l 1
01/14 BUILDING PLAN EL 130.00'
& SECTIONS N i i
--...n un
... on,.
~..
5 k lgli pe0,ct euk sata psL itP CL estC
,,g,;;<py.
D 901D.035 o 9
g, j 4g;.'d "(hs e 1
to.... i=
9 to es4 s2 4
- )
se 4
is e6 was w:cw 3
I
~l
.ll
~
3 p.11
r
-~
g p
3 4
S 6
9
?
8 901 0 036 A
/ s J
y d
2 1* 1 1
4.4.ej (
is. so st. e WA";j s v..
m.
, J."*. N, i.
t.
p e
g, e
8 e.s
- s.. e
.. -.1, w r..'s;
- .t,.
r.--------
i e'
'e~
.ggir gg g33. 33 I
1 y
l
.D.,t....
8 g
. t.o g
hQ3. ;
.C t
a e stem.
I,,,#
=
e 81
.a 6.i. w
.-i stoa, et s.a. or e
,.0..
+
3:
.1s..Pe*$$cgy*
aj u..
~ g >:
y 5
g !:
a t.; G
, sm r4=
a s:;
G)4. :)* kg[O.".'" -W.h k'..'.!M.P,,-c.d s
'.3,, *
% 33
~
- 4
~.." 0 T7 A
'(
p
"**4 3.,g
. :*=
1-~,
,v:...
^~
n il,s,.'.[p 9,.
y.
- m,e s u./ \\qg.
k,gigg w ;~...,,
i==-"
m s.
'i...."
,,. p.
f.
! ^ yA.
. #. ne4L_,,.7 jlk Ml 8
4
.f.w,j $.lv., *yp6
.%p'M.... g. -'X.t f M m --
I h 7
)JJ s -f:
Ah
..) s.
E e.
L, 1
e., et e,
. ;. ;r o.
.m. w..W..,.
- r.,
c
..e
.+
_r;,,
7 4 ps..... -
,c.
N
/
jg
{
.s.., w.,. ';.
i
.. u.n L
i i
W,%.W...,.n,. ss..h/
e.Pev M.
,;-i N -
q,)-
..,.... s.
s 4-.c, --
4.
()
sm t -.
+ m
' r -
B
. L.... %m.. e. 4., w e' %...-
n.,.,.
p.-
b? kip:i,fG..;
2 M,-
~s
&pm
'.a r
s
- y,Q % % G8j'.w-y L.*-
7
~
- e.._.
E o.
=
. g r----- --- - R.?.F p
1 6 6.
i
'3.
entcw
'(p,t. z.,'My(:.MS
- M
- 'e
.- ~1 F %......e.,n. n,4y'S.j$1S.. *.v.Fr.4
..s l
JZ...
{
t de Cfi(..WWqw c.
.,p.
t,h p @ d ;
- ~'.
A e
- - -C.
p r
2 g.-
+,.<e..
v.,)
N f
, p-s s.
4
' y..
- 'ML' 3 AE Mif1EL
- J '.
[
l
\\
D
- -+-f-v[
i (B,
< i,.e ac s J
J. _i?.. Ti.c.:.,c 3 _3h$.e. 's -
I e mt i,i,
=
i.
Bb o
'""V
.c see som
-"~
..<.i g,,
..t l'..
L
(..-,..
e
_m o
i.
- Qs..,.
t.. u a-o a
ico.,
g E#O I
g
'.ie LeCa J
,d JA A.. _,
...-m.,-..-i.---+-
c
\\
l s
i, i i
\\.
... e, I
. p...
iM 1 jg ;
...y.
PLAN EL 144.00' a
w:.n z..:.1.
e
.. n r w% a.x'.-w. m..m'..a p,.",. w...-Lg.w}b.'-
3 N
.c m. e..- -
-.g&,,
w.
k D.
.q f
. -~
->g,. u m,,
E g
4 f glBi.
(,
y
,g rg,
,,eg, c..
,w.
s
{-1"7. N (*1,[.Jy; J. [; 748.N,. ',,t t~.--e w.---
w V 'P.5.. -
.'d~-~**~~#
' f' 'W.
w
.y.,_
, ' - ' - - - '. *...,.-~-
- * ~ " * ~
". e.lf; h *
.,O It'
'.,(.
'rb ' kap...L. d '.,. *
- ,",; L, _, *
$d
.o
.. +
i.
No.
DATE fitvl5108s Del Cw APPR0VfD t.
_ a....... _ _ _ _ _ _ _... r_ >_ __ l si te.
- ...t.
u.
_t J sel _ _ _ _ _ _ _ _ _ _ _ _1 r_ b.hhA i
N ct Al m A. at<:01W P w 1A 347 j
t o avefe s ans.s e
B e
I =I c
3,
.'?,
NOTES FOR Nott $ Ak3 atf lat%CE CeAw;%5 SIC D.C 901-D-033.
.T N.e d
o I
Q......
TI a
U APERTURE g
Y CARD
. I;.
c k~
C Also Available On d,,..,
Aperture Card 5
t r
~
.r
.p e
.m m
2 CT:
1 4-w v,s t.s w sus
/
O w stars-se va, or %g c
b it s i s. w C
M T- )
) 2(
,' x
(
n
.l
-i i !
=-2r kq
/
P-,i
...L : - Co.
F n
n
}/ L--l_e,i._;- fg,d.
8
. I
-y e
r=
v s _.
r.rO.:.:
-s a..U ug w.
b>;
s v
a m-w 6
....a p
af f PL AN I
~
o y,..., ~.
i :
0
- m. u. -
A.
Ski alD38k 06L
? i n
.,,..,,ao Fon paavinc tesota sgr onawtuc wo.
p hi risee n oss 16w-:
.o EBA "l,'"
=.S..C.O S.ERylCES I.NCO.RPO.RA1ED m
. uu eu _
~
'88"'
V TV.[YNUCLEAR
E
'.*Ns',*,sE, ' " "
- 8 S
ICE OWANY INC S
n.
W VALL Y. NEW YORK te.e sinc sum WEST VALLEY DEMONSTRATION PROJEC1 j'
SECTION D CENERAL ARRANGEKNT ^
1
, j j 01/14 BUllDING PLAN EL 144.00'
- 'n'll
- :
t"::" ".
3
- a 1 SECTIONS J, '
.c.a um i...c,.,.
j p, a.
i
-n v =
a me
,, w,yi 90tD-O% o j.
g.,,, ; m -.lo'id-b c
... a wi.
.e 7
i
, i e
b II 901 0 037
..am..
f r
-c <
f..t.1.%F -.
. in....
f 7X.
E
\\
a.
I W
\\
Ta':'a
- h" I
i TTa'ih i
c
.n n:.
i 9 '.'
s.
,e A
e e
F.EliE iA t
nt
. ;[8 4
4 W
{Aat I.i.
l"'"
s n m.,-
av.
'i o
-- ht fr~
ll l
s y%?.F
.f m '
-- 4 E---
9 fg.
i4~6) '. g,. fe 6.,. '-
.. gu=
u-g._
tt b--
-w
- p;_.,;>.-
,a 3.@
7;.
9-
- 1. Z,:,;c 1.
g; gi {._
g y.
ll
.g II
.v.....
- n. n i,.
e 2
..ws sea.
n..,
- .y.
~. Me..[/
' - a i Y:
I T "h.. (,~.:,p.,;m.,.....
I w.-
a.;ps$ $w'4/ -....
p g
.M y @
V-
.;.,. 3 e' :.*,. ~;
7 i
g.
s.,.,.
, a n...
4 *.
q,. ;.;,
p i,re,,,
- w.-l l::.'.c.
- a*.??C 1:W *w y.~..
4*
g
. sll4::
P's%.',- :
n
.., s.rn
. J. ).gb. ;,.;-
n U,.a. n o; i
wtt
.> r It'ns.a tE
',:rn,..
i
\\
a n..,e
- ...c.i t
4
"" N m 7.T.!
.n. u ia,y__.
.. a rJi,.
L..:
- p*,g,4, t
.,~.
e
=
n n oo.
7.,:,Y. - ~ ~.
m m
I 7,,q"D *L
.p I
e e( in.ce
..'i o.2 -ouo
'[
I Ik IE "O p
jq r..-
I l
gI's ca (L tle - 9 l
g a.et.,
su *0
\\
gg g,9 I* I' '
l g
s4 5
g F.cf.P a..C,
.t N g.
l
- ,=== W -rL y 1
I Pt m;en,se a.
_a_
-6 s
l l
4' 1.,F N 64
- =
m.
s 9
'a
'i
'g
/
- t. 10...rt sg.
_f g, a s
g.. I p.c3.o L
_I gg 3 3,
AID =6ML
-m am i i
am n...-
I a
a
~.
.n..._.
u
.. g.
. n.... $$NT 1$"'G$]
.... N U=wT I n --
a w
.L U.9a s. avg.,.
e g
.D..
t,a.se.55f.BL, gl
. 9. C00....
w isit,etc.
v n,=
.n N.
8 I
, 2,
,3,,,
4 6
6 8
i e
{
w.y6'%'.M -
<a -
t
- 1. s
~
~
4
.e
.a g
io
.. t it i is es wo.
DATE Riv!510se CA Cae arre0vt0
]
_ _ _ _ _ _ _... _ _ _... _ _... _n_- - _
.. l y : l. _..
8
_ _.hewl _ _ _ _ _ _ _ _ _ _ _ _1 r_ l"i7h La-
=--
cew..v u.r :m,,t.
u e'
. syses usa f.a-q J(
B L_ M'
.1 1;
.P l
'N s
3.-
c
_j
,Y I,
1 1
NOTES f oR 8ectts aNo at t i st Nct D6 A.NS ;EL L4 #>;-D-C SS.
j
t-0 g[
y[
ci.o m.
APERTURE CARD
,s
~
Also AvaMab On f
~
w 1
f A' perture Card 9
- J m
/
g.
3 e
m 1',
C2:
m n
g e
v-v.
[B:
u.
k!
y, l
a
.s I
. ~. c 3, i-1 u o i
n.:a c
p r-w. =2.
.. _ s.. <-
L.
+
w t
L i
p TC M
M j
y
. I
-Q,~n'frLJ.v'_a)n Nlu
,h
/
h y
4Ay-u Y
-a
~l UUd ' 4/ /
dh 3
1.,.
n emn
\\
- -....a
.t,-
+h.so.uc, 3
- s. o..
-a
< c,, -.
i!?R' S to lI O I O 3 8 W 0 7 L.
/
Tur"'
j _ _-
m.,.
r y
eoa ca-wrac =orr ser on. wine o.
E.B.AS..C.O SERYlCES I.NC.ORPO. RATED f,['4 q-_--,
i
~,;* 0 5*
i r--- )
W,5;ilV%!vnuctEARA w si vA[..
m__
. - tm r---
(i. 4(
2
,c, i.-
?"sNW 5
~
'IIE
-b -]
1
>::.:.;.=r....
- ~""
s est muY DEOSNHON NO.EU g
GENERAL ARRANGEKNT 01/14 BUILDING SECIIONS b.;
I_ _.l'"
/
a.co.
-r P
P,,,j.
i
=
O'k j'
,h '
_L '
- es ci.
u.
,,j, ',y II l ei. ei
.ie un g.i m,os yu_
.. c,,
u rr I
e a
P, w r.
..c m..w. s L
l Solb-OYi o F. TION A-A q'"!.CZ;",,,
-o m
i
- c;g, ; n
<=>
gg;._ig,.g, c
nu. a. c.itu u.
..+
r s
4 s
e i,
e 901 D 038
_.mu,......' l.1 S
~
A F
A
'A4 J,
rj
,g y
W:.
=
k' amar n ist.er
- O
.p}.
r hgy
,,..,.x,
/S.,<4 a
?e-~'<
s,............,a
'X
. 4.a
. e me r st se sa eas c's
, se<o s w -sas se. e a *
..., n.r..e e r.,r s
m een =
e.aciencs gqatuu ee. nuns.t. ee f
1-s
- n til -11 AlL1.*
- 4,*
Ep' <. "..;
. ora r 7**-
ti t en -e
,J.
..,/ /
a
< rt" -"
j.
.c..
st et s er.e T '1--F1 i
i c
eaar a si.ee n see.oe g
W*M
'N
%' ca l
Ig a.g..
..t.
-~
g...............g
..[
i,
- u..
3.- e.
I n,
ism. ass
.t..'
g-,' y
\\.si re.
,a t
3.f g
..j 7(,7..,e.g,;;,,.d.-
,s.fc 5 -...
4
-y l
.:t
-are ses
.s
-a
.-a p
N 3
e siin
.y, s
.c c.
c-gE rm ay*.
so-oo.
.ames pf'*,.. y
( ?.*
se c i.etaf 9 -
an onimi.e I
..i.
/,GF,)r,.Ga6 L i
- c.
e e
<3-
.a ce,s.
.'p. 4.yg.,
N e.
poi %
i e.$;
6 l
Qtf*,',,
~
-~
,c:
seg._.__ _ _
i l
f.,; p, $ }W'Y f":
o 5
us%
)a;;.%;<g,.
E W
v~N %n..w < yll e
\\.
p e
sc
)...,..c
-J--
I g.E I
( 3.. p,
g,. g.,
- n.y3, A~w;4,.
.a s..-
, u,,r m
l
~
{p 4p= '
t d.
vt n tie -o ete ci im e
- s.,.
c, t a.VM eA.f
.V.
2 rS
. %.y.
t l ' ~ ~'
i y.?#
Q:n&
.w.w. w.-.
, ~.. y,, c.,,. -
. m m.
i l
'::t n.y.7,hhN.3Y.sS M,5.5-N"rca7 f~;W.,l
[
- f N
4 a'
I N
s m in.
p'4., %...h..
.s J h*d"~
' ~ 5 5' s,.i
.1XR seer n ire.or-m;We
$.;r.;.M 1% M
- .y.,.,q g.q:
m...
i :. --
~...,
L..s..-
.L $#*
.p::;s.. e
~ tC..."
.~..,w
- .I
.e.
..-.. t v.y s:-
n C:
chT)'i
. 13 RW%WW.vWhm v
i
'wJ!bW E. <
@M peg
- r.=,
m t.
m n....e
- v..
re.;
" y.m, 7::;
'G:;;;,
a-
~~
4' we p
- ri'-
u.
m.
A. 4.c.r.
..cs,
W Es.edt
- ui
- E C !*C Et ist -6 o:
4./.
sanne s
- . ef
.y D"
11111L'-
P L111ll1 ;
1 l lll
~
wm l
'blLJ1E :8L p\\
^
k I
ii ll n uier
/
u Linua lljitii
.iijiynnia 6
c it
/..
- -4 N_sico
. 4o,
,.. *,*.t
- .,r.e.
t
o.=s"e* ante
- 3. *s aco
.n
.iais ama. raettvian as sevasis m
.f,e i I
.,f l
..e.e.
s
- m.,
s.sa,
u ca..n tws e um,,-
~
e----- t J
,t rt is
-e i
r;,
o 1
it at tw -e
- 0*.M*8K#
.s=-=
Sa t1 g
0 i
.. n io s
r--r ut;lM "1 vpp r~.:
r.'..
N' " W
- l l
i 4
econ i
.b//.I. 5
~ '
I.
- I. -
bie l
i conva ron
. se.s
,m..
~#
3e ' " -
I sc= met =
t l
{
1 c-L
- C 3 *C '*"
J s, ears seuse. mot, 3,
s n n ar i
4
\\
r L,/
i een n air e
r ' = *~ H I
l
_p E
e g3..4.-
9 SECTION B-B e i 2
3 4
s a
i i e
fl
^;,*9$h!@s=$ h,'wM.-4 W k -W..:.-w* f **i Gaims'. *n t**% t.s-~' )*:d..- s.v. * -
~~J
- +-".s*
~ +- A-
.-ham;,.~.uAu ;.: c..
".. 2 u w:. m w r.,; :
r
~~
. ~.
m
r-1:
h t
.3 5
is eso.
DATE Rtvistose DR CM APPROVED g:
J p;t.....
1
.r*.**.a.
+
- 1_
_.__p_r_a_c__t____________1_L_t_+_]__t>m-_
o n---
at ist -e t,# Ns e As set v t t i n et a
- A. ts t J
o Y/Ips sm 6e 6 geei-j Ne Q:s ens tem 9 '
a 5
".:SL i
~
~
l C
?L 6
~.
f.
NOTES F Oe m. nits AhD WLf ts*:M L LnRAis!*.7,5 5t L f,.* N1 03 3.
/
t.
/
i TI j.
APERTURE t
CARD
- f:
4 er g
k Also AvaIInhie on i
J 3
'?
F
~
' Aperture Card r
i t
N.
g'
~
+
4
~
tt.)
.b, i
e f
u#
y
- N s
6
['
a w
f
[
o n
f 1
l b.
Mr R
"I -- l
=U.
o..
r-
=..a -
m 6
--M
/
g g
e
,,J
- ~.f.lOm (J
[g^
{^'0\\.
A "d
e_
-9
~.
_sy
[
-8
( -~
3 3i
- o. m..,,,,,
,1 i
.m...
il Elf PLAN t-
/
/~Ei$.
l,i Y 3fg 3 3
[,
j 8bIloIo386-Oft f
._ =u- -
FOP OftAWINC INDEI GEE CRAWING MO.
?
E8ASCO SERV 1CES INC.ORPORAIED a"*;* "
- gy l
1 4c.,a.
_ i. aera cis,_
S.'
'." 7.',"sI,'
S RYICESVALL Y. NEW YbNC i
S RK i
W s
is gg am WESI VALLEY DEMONSTRA110N PRO.ECT h
1 CENERAL ARRANCEK NT 01/14 BUILDING SEC110NS i
"lll"
."'a 1,
i o.
un m. co.,.
i.
f
'803U M pfE.l 3A f fP ti s.If, g
n)D 038 o B
'i'.,ri =
i-n.
i F.
- *'~'
- pic.
- u. =
.. t
.r um.... c-i1.su. g,, ;--
gggeg,93, e g
i e
.o 9
a i
.3
.5 j
~
1 h
f.
5 E
G.6.0 CSS PROCESS SYSTD6 G.6.1 PROCESS DESCRIPTION
-q The Cement Solidification System (CSS) includes all piping, valves, instruments, controls, tanks, and equipment required to encapsulate waste in cement, store and transfer cement, and remotely move drums of waste and cement within the 01-14 Building. The Drum Handling Equipment will also move the drums to the RTS Drum Loadout Facility within the 01-14 Building, and on to a vehicle which will transport the drums either to temporary storage or to waste disposal. The sections that follow describe this system in detail.
G.6.1.1 NARRATIVE DESCRIPTION The CSS is divided into three primary subsystems:
[1] the Waste Encapsulation Subsystem;
[2] the Material Handling Subsystem; and
[3] the Cement Transfer and Storage Subsystem.
G.6.1.1.1 Waste Encapsulation Subsystem v
The Waste Encapsulation Subsystem (WES) featurcs in-line batch, High-Shear Mixing of radioactive liquid and wet solid waste with cement. The WES is an ensemble of subsystems designed around the High-Shear Mixing Subsystem. Other subsystems deal with the manner in which cement and waste liquids are delivered to the mixer. These include the Waste Storage and Dispensing Sub-System, the Mixer Flush Subsystem, the Chemical Additive Subsystem, and the Cement Metering Subsystem.
h.
CAF1107 :ENG-308 29 v
Waste Storage and Dispensing Subsystem O
Composed of the Waste Dispensing Vessel and the Waste Dispensing Vessel Pump, the Waste Storage and Dispensing Subsystem is the beginning of the treatment process. The waste liquid is collected and stored here before being mixed with cement, If the wastes to be encapsulated are ion exchange resins, the resins are dewatered at this stage so that the transport water may be returned to the plant's liquid waste system for treatment or reuse.
Recirculation through the Waste Metering Pump maintains homogeneity of the waste.
This part of the system is an acceptable point from which samples of the waste can be taken for chemical testing and used to determine if any chemical additives are needed. Samples will normally be taken uptream of the Waste Dispensing Vessel; the sampling system at this point in the process would serve as a backup.
The Waste Dispensing Vessel Metering Pump discharges the waste slurry frcxu this subsystem into the High-Shear Mixers.
Mixer Flush Subsystem This subsystem provides for easy regular maintenance of the encapsulation system, primarily the High-Shear Mixer and its vessel. The flushing procedure described below prevents cement f rcm hardening within the mixing subsystem.
(If cement solidifies within the mixer, the vessel's small overall dimensions f acilitate removal and disposal.)
Whenever the CSS needs to be shutdown, or at least once a day, the High-Shear Mixers will be flushed to prevent residue cement / waste mixture from hardening inside the mixing vessel.
This process is controlled by the operator recxn the Control Panel (discussed i n Section G.6. 5.2.2). When flushing is required, 57 kg of utility water is transferred to each mixer through a spray nozzle with the mixers off. The amount transf erred is controlled by weight. Tne mixers a"e then started on high speed, creating a highly turbulent transient wave which provides good flushing action.
(Waste is also added to the mixers with the mixers not running to reduce residue buildup between flushes).
df ter two or three CA F1107 :ENG-308 30
minutes of agitation et high speed, ths flush solutions are dumped to a 208-I, round drum at the fill station. The procedure is repeated with 114 kg of rinse water, except the waste is dunped directly to the underground storage (7D-13) p()
tank used to collect CSS liquid wastes. The initial flush removes the residue from the mixers, transferring it to a drum, and the rinse ensures clean mixers.
The Flush Drum at the Fill Station is transferred to the Flush Drum Storage Station where the residue is allowed to settle out and the drum is dewatered, to the underground storage tank. This drum is reused until it is half-full of residue (-102 litres). The drum is then filled with a water / cement mix and overpacked in a high integrity container f or disposal.
Chemical Additive Subsystem This subsystem can be activated in a variety of circumstances. For example, when the mixture setting time must be increased or decreased, chemical additives would be applied while the waste / cement mixture was in the mixing vessel.
In this subsy' stem, additive lines join waste lines carrying stream from the Waste Dispensing Vessel Valve. Chemical addition can be performed
[}
prior to mixing the slurry with cement if neutralization of acids (resulting in salts) is required.
For flexibility, the chemical additives can also be added directly to the Waste Dispensing Vessel.
The Cement Metering Subsystem This subsystem uses a gravimetric (loss-in-weight) f eeder to dispense metered amounts of dry coment from the Acrison day bin (the temporary location of the dry cement) into the mixing subsystem to be mixed with the waste as the system's solidification medium.
A bulk dry cener.', storage silo is located near the CSS to f acilitate the filling of the day bin and minimize free cement dust inside the f acility (Section G. 6.1.1. 3).
[a~ )
CAF1107 :ENG-308 31 e
y w-ma w
The High-Shear Mixing Subsystem Batch control for the High-Shear Mixer is automatic. The operator sets the panel controls for the type of waste to be drummed and initiates the process. The process parameters are controlled automatically. The waste f eed and the cement are metered into the mixer, which runs continuously during o peration. The batch is mixed (the time period of high-shear mixing depends upon the type of waste) and discharged into the container. The process is repeated until the container is filled.
Approximately 85 L of waste / cement mixture are processed per batch.
G.6.1.1.2 Drum Handling and Loadout System The Drum Handling and Loadout System provides a means of remotely providing empty drums to the WES, remotely processing drums f or disposal af ter they are filled with a waste / cement mixture and loading the full drums onto a transport ve hi cl e.
This system is a series of subsystems centered around several gravity and chain-driven roller conveyors, These subsystems are the empty drum f eed and positioning subsystem, the Full Drum Processing Subsystem and RTS Loadout Facility.
G.6.1.1.2.1 Empty Drtan Feed and Positioning Subsystea Empty 71 gallon square drums are manually loaded ontu gravity conveyors (M01, i
M02) which are permanently installed on the platform of a hydraulic scissors lift (M03 ). Pneumatic pin stops hold the drum in position.
A 16.5 cm drum lid is manually positioned on the empty drums.
The movement of the scissors lift aid subsequent discharge of the drums is manually initiated by pendant mounted push buttons and a frane mount release lever. The drums are discharged onto the upper and lower series of parallel gravity conveyors (M04, MOS, M06, M07) as determined by the operator. From this point on, the subsystem is automatically controlled by a Programmable C ont roll er.
O CA F1107 :ENG-308 32
(
Drums on the gravity conycyors are automatically pulled onto a conveyor -(M08),
mounted on another hydraulically operated scissors lift (M10) by a pneumatic drum grabber. The flow is controlled by means of pneumatic stop pins.
The scissors lif t discharges the drums onto a chain-driven roller conveyor (M12) at the 100 f t elevation. By means of photoelectric seasscs, the drums are indexed towards the Shield Door Air Lock.
The Shield Door Air Lock is composed of two carbon steel (18 cm thick) plates, one on the hot side and the other on the cold side. The shield doors are hydraulically actuated and interlocked such that only one may be opened at a time.
Inside the air lock is a short chain-driven roller conveyor (M13) with a photoelectric sensor for sensing that a drum is present. The empty 71 gallon drum with lid is indexed through the air lock and onto the drum staging conveyor.(M14) in the Process Room, and from there to the Fill Station
[N Conveyor (M15).
The Fill Station Conveyor (M15) receives the empty drum and provides an indication in the Control Room to show that the drum is properly positioned.
Once the drum is positioned and the lid removed, the conveyor holds the drum in place for filling. Af ter a signal from the HSCSS control' system that the drum is filled, the fill nozzle removed and the cap put in place, the conveyor then transfers the drum to the crimp station (M16),
The Fill Station is also capable of receiving and returning round 55-gallon drums from the Flush Drum Station (M15 A).
The Flush Drum Station Conveyor accepts a flush drum of standard 55-gallon F
size and shuttles that drum back and forth from M15.. An indication in the control room is provided to show that the flush drum is properly positioned.
Once the drum is positioned, the conveyor holds the flush drum in place for nozzle placement.
O N
CAF1107:ENG-308 33
The Contact Dose / Crimping Station conveyor accepts a filled drum from MIS or conveys it to the Smear /0verpack Station (M20). When the drum reaches the M16 Station it stops and indication is provided in the Control Room that the drum is in place. The conveyor holds that drum in position for lid crimping and radiation measurement. Af ter the lid is crimped the conveyor then conveys that drum to M20 (Drum Smear /Overpack Station).
The Drum Smear /Overpack Station (M20/20A) accepts capped drums f rom M16 and conveys it to the Airlock Station. The Airlock Station Conveyor (M25/25 A) accepts drums or overpacks fran M20/20A, and conveys them to the Shuttle Conveyor through an airlock. The Shuttle Station Conveyor (M40) accepts a drum cr drum overpack from the Airlock Conveyors (M25 and M25A) and conveys tha* drum /overpack to the Staging Conveyor (M41) to alternating sides. The shr table also accepta an empty overpack from the remote crane and conveys that rum into the airlock to conveyor M25 A.
The Staging Conveyor (M41) accepts a drum or overpack, one at a time and places them into a two-by-two four drum array, then delivers them to the Lif t Table (M45).
Indication is provided in the Control Room for each drum location.
i The Lif t Table Conveyor accepts four drums at one time from M41 (Sta ging Conveyor) and places them in a proper array to load the Truck Conveyor (M100 ). The Lif t Table Conveyor accepts the first four drums, places them at the west end of the conveyor, then accepts four more and places them on the east end of the conveyor. Mechanical stops assure that a proper array is delivered to the Drum Cask.
Indication is provided in the Control Room that all drums are properly placed. Af ter lir ting, the conveyor dispenses drums onto the Truck Conveyor.
CA F1107 :ENG-308 34
fm The Transport Vehicle Conveyor (M10) is capable of handling twelve (12) loaded drums and is mounted on a 4.3-metre long stake truck bed. To prevent the drums from f alling off the truck, a two (2) foot high rail is installed around the conveyor. The truck is loaded from the Lif t Table. The first load is eight (8) drums and then four (4) drums are added. Stcps and limits are provided to allow this loading to be conpatible with the Lif t Table Conveyor. The truck conveyor is powered electrically with a 480V, 3-phase 1
j plug located in the area of the loading dock. This conveyor also has reverse i
drive for unloading.
G.6.1.1 3 cement Transfer and Storage Subsystem 3
The Cement Storage and Transfer System provides bulk storage capacity of 70 m for dry cement and transfers this cement to the Cement Metering Subsystem.
Dry cement is delivered from off-site by truck and transferred pneumatically to the Bulk Storage Silo. The transf er air exits the silo through a dust filter on the top of the silo.
A blower is used to pneumatically transfer cement to the 0.42-m3 Aerison day bin in the Cement Metering Subsystem on demand. The transport air is vented back to the Bulk Storage Silo where it vents through the dust filter.
G.6.1.2 FLOW SIEETS The P/ ids applicable to the CSS are shown in Figure G.6.1-1 (Sheets 1 through 5).
G. 6.1. 3 IDErf1FICATION OF ITE76 FOR SAFETY ANALYSIS CONCEllN'
~
Operation of the CSS involves the transfer of liquid and wet solid radioactive wastes to the Process Room, solidification of these wastes with cement, and i
loadout of the solidified wastes onto transport vehicles. The three major ite=s of safety analysis co 1cern are:
'o maintaining occupational doses As Low As Reasonable Achievable (ALARA);
O o ensuring the confinement of radioactivity; and CAF1107:ENG-308 35
o maintaining the releases of radioactivity from the site in compliance with ALARA and below the limits specified in DOE Order 5480.1 A.
There are no unique chemical hazards introduced with the operation of this system.
The CSS has been designed to be remotely operated and contact maintained.
Occupational doses will be maintained ALARA through use of shielding; all routinely occupied areas will have exposure rates less than 0.25 mR/hr.
Proper saf ety precautions for maintenance activities will be specified in Radiation Work Permits (RWPs) and Industrial Work permits (IWPs) as appro pri ate.
The major mechanism f or ensuring the confinement of radioactivity is the 01-14 Building HV System. This system will maintain process areas at a slight negative pressure relative to surrounding areas to ensure that air leakage will be into, rather than out of, potentially contaminated areas. Two f ans are provided for this system.
One is driven by an electric motor; the backup f an is run by a diesel engine. Each ran is rated at 100 percent system capaci ty.
Effluents f rom the site are monitored to ensure that releases are in compliance with DOE Order 5480.1 A.
This monitoring progaam is described in Section A.8.6 of Volume 1.
- o G.6.2 PROCESS CIIEMISTRY AND PIIYSICAL CHEMICAL PRINCIPLES Encapsulation of wastes in cement will result in a waste form which has the radioactive material evenly dispersed in a monolithic, stable, and solid medium. Solidified wastes produced by operation of the CSS will meet the waste form criteria of US DOE Order 5820.2 and the intent of 10 CFR Part 61 Section 61.55 and 61.56 for low-level wastes.
O CA F1107 :ENG-308 36
G 6.2.1 TIE ENCAPSULATION EDIUM After evaluating the candidate media materials currently available, WVNS O
selected solidified cement, a chemically inert and noncorrosive compound, as the best material for long-term radioactive waste storage when contained in steel drums (Knabenschuh,1983). Sme of the reasons for this choice are:
(1) the noncombustibility of the final product, (2) long-term experience with concrete materials, and (3) the great availability of dry cuent.
Specifically, Portland Type I cement will be used because its properties and composition are defined within a narrow, well established range. As a dry powder, this type of cement has a bulk density of 1,500 kg/m3 and a proven shelf lif e of at least twenty-five years in dry, moisture tight environ-4 ments. Waste forms produced using this medium have demonstrated compressive strengths as high as 33.58 MPa (see Table G.6.2.1).
Encapsulated resins have been shown to have compressive strengths up to 13.62 MPa.
G.6.2.2 CEIErf CHEMISTRY AND THE EFFECT OF WASTE MTERIAI The central technical task in designing a cement encapsulation system is-selecting the manner in which the waste liquor and the cement are mixed.
In
(/
the encapsulation process, the water in a subject waste material itself serves as the hydration medium. Though the radioactive attributes of waste have no d
4 appreciable effect on solidification, problems arise in the romation of the
]
cement matrix because other chemicals in the waste actively interfere with the 7
hydration process. The chosen method of mixing cement with the waste must overcome the effects that the extraneous (nonhydrating) waste components have a
j on the hydration of the cement.
J In the first minutes of contact with water, the calcium solfate and the easily hydratable free lime in the cement dissolve. The surface of the clinker particles (the physically and chemically interacting cement grains) react with water to release calcium, alkali, and hydroxyl ions into the liquid phase.
After about eight hours, the surfaces of the clinker particles become
" blocked" by coats of hydration products. Thereaf ter, the reaction rate becomes diffusion-controlled; it reduces continuously as water diffusion into CAF1107:ENG-308 37 i
i k
_-,m-...-
~..
cnd calcium diffusion out of th3 coating ar@ hind: rcd by tht thickJ;ning hydration coat. Any extraneous material or procedure that affects the coating formation will affect the rate of hydration and thus affect the changes that take place in the physical, rheological, and bonding characteristics of the water-cement paste.
Waste liquids in the mixture retard the reaction in the crucial liquid phase and cause such undesirable effects as increased in bleeding, increases in setting time, and delays in strength development.
Additives such as thickening agents to hinder settlement in cement pastes prone to bleeding and hydration accelerators to offset the waste chemistry-induced retardation have been used in conventional mixing to improve resultant waste f orms. These may also be used to enhance the performance of the High-Shear System for the encapsulation of particular wastes, but high-shear mixing alone overcomes most of the undesirable effects caused by waste liquids.
G.6.2.3 HIGi-SHEAR TECHNOLOGY It has been demonstrated (Grant 1980, Smeltzer 1980a, Smeltzer 1980b, Smeltzer 1981a, Smeltzer 1981b, Smeltze,r 1984) that the retartation effects of adverse f eed chemistries, the bulk mixing problems, and the occurrence of free liquids can e overcome by highly shearing the cement / waste mixture. The result of high-shear mixing is that much more clinker particle surf ace area is exposed to hydration.
In this system, High-Shear Mixers provide the appropriate mechanical action.
In each mixer, a high-speed electric motor (with two speeds, 3000 and 1500 rpm) drives a discar-shaped blade through a close-fitting housing. sheari ng results from the action between the blade and the cement particles (mechanical shear) as well as between adjacent cement particles with different velocities (hydraulic shear).
CA F1107 :ENG-308 38
Tha ability of high-shear to oysrcome the advaras effects of various wasto chemistries was extensively tested.
A prototype unit was constructed and tested at the Westinghouse Research and Development Center. Af terward,
(x- /
successful trials were conducted on a full-scale unit at the Westinghouse Pensacola Plant in Pensacola, Florida.
These tests established the mixer's durability, the effects of additives, and various setting times for different waste " recipes" that act as simulated wastes in the material testing of the solidified product. Results of such testing can be seen in Table G.6.2-1.
Waste encapsulation recipes have been developed at Westinghouse R/D on West Valley specific wastes, and results of tests run on these wastes are given in Table G.6.2-2 (Smeltzer,1984).
It was found that the highly sheared cement product is tolerant to large variations in waste / cement mix ration (up to plus or minus ten percent), to a wide pH range (as low as 5 and as.igh as 12), and to chemical additives that may be used where desired to adjust the properties of the end product.
In addition, a process was developed for the encapsulation of ion exchange resins whereby the waste product can be immersed in water without impairing i
its structural integrity.
O
(~.)
G.6.3 MECHANICAL PROCESS SYSTEMS G.6.3.1 COLD CHEMICAL RECEIVING, HANDLING AND TRANSFER The only cold chemical required on a routine basis is Type I Portland cement. However, provision is made to add other chemicals as needed. This section describes the subsystems required to accomplish these additions.
G.6.3 1.1 Cement Receiving, Handling and Transfer Type I Portland cement is used as a binder in this system. The cement is stored and metered into the Waste Encapsulation Subsystem using the following-equi pment.
G.6.3.1.1.1 cement storage silo The Cement Storage Silo is a shop-welded silo 3.7-m diameter by 12-m overall height with a cylinder height of 6.1 m providing 70-m3 usable capacity.
It is 3
designed for material weighing 1,600 kg/m.
The silo is f abricated f rom carbon steel, the interior is epoxy coated, and the exterior is painted with one coat of primer and a top coat. The silo is supported on a bin skirt which is an extension of the storage silo steel to the platform with a 0.81-m by 2.0-m louvered steel door.
Various f eatures and accessories of the silo include:
o 60 degrees included angle concentric hopper with a 2.4-m diameter outlet providing 1.8-m clearance above the platf orm; o handrail and kick plate assembled around the deck; o bin vent filter flange; o four-level indicator openings; o a 0.51 m diameter combination quick opening manhole and pressure / vacuum relief valve in the deck, and a 0.51-m diameter bolted manhole in the hopper; o a ladder and and safety cage assembly with landing platforms at maximum 9.1 m spacing; o stub. inlets, as required, and o one set of pipe standoff brackets.
The Storage ' Silo is fitted with a bin vent filter (Model No. 848V9) with 8.8 m2 of dacron f elt cloth area, a continuous cleaning reverse air mechanisci 3
for maintaining porosity of tr.e filter media (0.14 m / min at 6.90 kPa plant air required), and an access door to the filter bags. The filter is carbon steel construction. Tne filter includes a differential pressure switch to shutdown the conveying system if filter bags becane plugged.
A pilot light on the smoot control panel will be activated so the operator will know what happened.
C A F1107 :ENG-308 40
The Storage Silo is filled with cement through a four inch schedule 40 carbon steel truck fill line and a convey target box located on the top of the silo. A delivery truck connects up to the fill line and uses a truck mounted blower to convey cement to the target box after the operator starts the bind filter.
G.6.3 1.1.2 Cement Transfer Mechanism The transfer mechanism is a dense phase system. To transfer cement to the gravime5ric feed system, the airslide discharge assembly is first activated to fluidize cement 1-n the silo. An 0.2-m discharge butterfly valve is then opened to allow cement to flow through the 0.2-m expansion sock assembly to the dense phase transmitter located below the silo.
The dense phase transmitter is a 6. 4-m3 bin 0.76-m in diameter by 1. 4-m high designed to operate at 690 kPa. The bin has a 0.05-m top outlet connection, a 0.2 m material inlet, and a 60 degree included angle hopper bottom. The transmitter is gravity fed from the storage silo through the 0.2-m material inlet until the proper weight of material has entered the transmitter. The inlet valve, the outlet valve, and the vent valve are closed, and the air O'
inlet valve is opened to aerate the cement in the transmitter and to pressurize the transmitter. When the transmission pressure is reached, the outlet valve is opened, and the cement is conveyed through 0.05 m schedule 40 carbon steel pipe to a convey target box, and into the Acrison day bin.
Air for the dense phase transmitter is supplied by a 7,460 watt reciprocating air compressor unit with an af ter cooler. 'The compressed air is stored in 2.5-m3 air received af ter being dried in an automatic regenerative dual tower dr yer. Air pressure in the tre.nsmitter is maintained constant during the conveying operation by an air pressure regulator.
C A F1107 :ENG-308 41 O
i
G.6,3 1.1.3 Gr;.vimetric Feed Mechanism Cement is moved pneumatically fecxn the outside Storage Silo to the Acrison day 3
bin, a hopper with usable volume of 0.42-m.
It is mounted on top of the gravimetric feeder and provides for batch sizes up to 180 kg and a possible continuous feed rate from the Acrison day bin of approximately 4,500 kg/hr.
The feeder uses a positive flow, dry solid metering mechanism which precisely controls the discharge rate on a cement weight loss basis. The control principle at work has proven to be the most accurate and reliable approach for continuous weighing of dry canent.
As the cement f eeds down into the mixer, the resultant decrease in weight is monitored by the feeder's Digital Weight Resolving System. Data is then fed to the microprocessor-based controller. Since the metering system must discharge a specific weight of cement in a specific amount of time, the controller adjusts the rate of feed continuously by increasing or decreasing the speed of the electric drive motor.
G.6. 3.1.1. 4 The Cement Feed Diverter Valve s
This bulk material valve is mounted vertically below the gravimetric feeder and directs dry cement into each of the mixers alternately.
It is a two-way nonjamming gate valve with a 0.15-m square opening size, constructed of 0.5-cm thick stainless steel with reinf orcing in selected spots. The pneumatically operated gate valve consists et a flanged bif urcated chute, an operator blade, and a curved gate blade. The inlet is vertically aligned and its discharge legs are each 30 degrees from the vertical (a 60 degree included angle) and connected to the 0.10-m lines (a square-to-round ou',let transition fitting was required) that carry the cement directly to the High-Shear Mixers. The diverter valve is controlled and monitored at the control panel.
C A F1107 :ENG-308 42
The cement cnters tha mixIrs through a hydraulically operatsd ram valve. Th2 cement inlet is vertical and the ram enters the opening at an angle. This valve closes off the opening when cement is not being added to prevent vapor
[ \\
from rising into the canent feed lines. This ram can also be fully extended
\\
into the mixing vessel if necessary to remove any cement pluggage.
G.6.3 1.2 chemical Additive Receiving, Handling and Transf er The only chemical additive identified for use in the CSS at this time is sodium hydroxide required to neutralize uranyl nitrate prior to solidification.
It is anticipated, however, that chemical set accelerators or retardants may be required for as yet unidentified waste streams. Provisions have therefore been made to add a wide variety of chemicals.
Because anticipated usage is small, chemicals will be metered from 208-L stainless steel drums using two pulsafeeder metering punps, one with a range of 0 to 3.8 L/ min and a second with a range of 0 to 7.6 L/ min.
Chemical drums will be brought to the cold chemical area where the contents will be transferred to the staintess steel drums with a drum pump. The
's stainless steel drums rest.on load cells with remote readouts in the Control Room. The metering pump output rate can be controlled from the Control Room, and once the rate is set, the total amount of chemical added is controlled by a timer whose setting will be dictated by the waste recipe involved. The amount of added chemical is also verified by the load cells under the drums and by load cells under the mixers.
G.6.3.2 FEED TRANSFER, PREPARATION AND HANDL NG Ra.dioactive waste from various sotrees is collected in the Waste Storage and Dispensing Subsystem where it is metered into the High-Shear Mixing Subsystem with the following equipment.
(}
C A F1107 :ENG-308 43 V
G.6.3.2.1 The Wasta Dirpensing Vesel The Waste Dispensing Vessel has a usable volume of about 1,900 L.
It has spray-headers and a conical bottom to ensure complete emptying of the waste and is designed to accept spent resin slurry, concentrated waste evaporator bottcxas, chemical drains, and other liquid wastes. A Johnson screen inside and near the bottom of the vessel permits drainage of the resin transport water. Water drained from the waste dispensing vessel is pumped back to the LWTS through a side connection in the conical bottom.
G.6.3.2.2 The Waste Dispensing Vessel and Dewatering Pumps The Waste Dispensing Vessel Pump is a Moyno progressing cavity pump which provides a predictable, accurate, and uniform measure of waste into the mi xer. The punp principle at work is one that enploys a single helic rotor revolving eccentrically within a double helix stator of twice the rotor pitch length. As the rotor turns within the stator, cavities form which progress toward the discharge end of the pump, carrying the waste material with the rotor as it moves. This pump recirculates waste to the WDV continuously during waste processing operations at 300 L/ min to ensure a homogenous waste is contained in the WDV.
O The progressing cavity pump is more durable than conventional pumps and requires less servicing.
It is easily disassembled for cleaning and can e repaired on-si te.
Moreover, it is equipped with an electronic fluid detector that can alert the operator or shut the pump down in the event that no waste material is reaching the pump.
The dewatering pump is provided to remove transport water f rom spent resin sl urri es.
This centrifugal pump la powered by a three phase, 746-watt electric motor.
Resin transport water is pumped to the 7D-13 tank for treatment in the LWTS.
C A F1107 :E NG-308 44
G.6.3.2 3 Veserl to Mixer valvea A three-way ball valve connects the Waste Dispensing Vessel to the two mixers
/T (j
and a second determines which mixer is connected at any given time. These valves are mounted above the High-Shear Mixers and allow alternate waste filling into the mixing vessels. The positions of the valves (open/ closed) are constantly indicated on the control panel (see Section G.6.5.2).
They are controlled by the batch program.
G.6.3 3 MATERIAL HANDLING SUBSYSTEM G.6.3.3.1 Empty Drum Feed and Positioning Syster G.6.3 3 1.1 Empty Drum Loading and Storage This system has the capacity to store and automatically feed 40 drums into the process. Empty drums with lids are manually loaded onto one of two 0.6-m wide by 0.6-m long Gravity Drum Loading Conveyors on a hydraulic scissors lif t.
This lif t is powered by a 560-watt motor and has the capacity to move 60 drums per hour to one of two levels. The drums roll off the drum loading conveyors b(\\
onto one of four 0.6-m wide by 4.9-m long, gravity T.eed, Drum Stor' age a
Conveyors (two racks at two levels per rack). Total capacity of the storage racks is 32 drums.
At the opposite end of the storage racks, a second 560-watt hydraulic scissors lif t lowers drums at the rate of six drums per hour onto a Chain-Driven Roller Conveyor capable of moving drums at a velocity of 12 m/ min. The drums are pulled from the gravity conveyors, onto the Chain-Driven Roller Conveyors with a Hydraulic Drum Puller. This device utilizes a suction cup at the end of a mechanical arm to grab drums. The hydraulic cylinder is then retracted to pull the drum onto the Chain-Driven Roller Conveyor.
The conveyor is made up of four sections 0.6-m wide by 0.6-m long, one section 0.6-m wide by 0.6-m long with a pneumatic pin stop, and one section 0.6-m wide by 1.4-m long, each section driven by a 373-watt motor. Drum storage capacity of these conveyors is four (including one inside the air lock). With two drums of storage capacity on each hydraulic lif t, the system total is 40.
O'(,,/
C A F1107 :ENG-308 45
Figura G.6.3-1 shows tha conysyor layout ct thJ 100-foot c1cvation of thm 01-14 Building. Empty drums enter at the southeast and filled drums exit out the west wall.
O This series of conveyors transf ers drums through an air lock to a Drum Staging Station and on to the Fill Position Conveyor, a 0.6-m wide by 0.8-m long chain-driven, bidirectional reversing, roller conveyor powered by a 190-watt motor in the north / south direction and a 560-watt motor in the east / west direction. This conveyor is located 90 degrees to the Empty Drum Conveyor, and when a drum reaches this conveyor, it is positioned precisely with a fixed stop. The drum position is confirmed and a permissive is transmitted to the WES to start a waste batch. This station is equipped with load cells to obtain a weight on the filled drum.
The air lock consists of two shield doors, each 0.18 m thick. These doors are interlocked to prevent opening both doors simultaneously. The section of conveyor between the doors has a photoelectric sensor that detects the pr es ence of a drum. When a drum is transf erred through the clean-side door and sensed by the detector, the clean-side door closes, and the hot-side door opens, allowing the drum to pass to the Drum Staging Station.
~
At this station, the drum stops until it is needed at the Fill Position Conveyor previously described. The lid is then removed from the empty drum and by a vacuum lif ter until the drum is filled.
G.6.3.3.2 Full Drta Processing Subsystm Af ter a drum is filled by the WES, the lid is replaced, and the drum is weighed.
It advances to the Capping Conveyor, (12 m/ min at 560 watts), chain-driven, roller-type conveyor 0.6-m wide by 0.84-m long. The drum travels at 12 m/ min until it trips a proximity switch for final positioning of the drum under the Capper. When the filled drum is in position, the Capper Assembly is lowered to the crimp position. A commercial-type pneumatic crimper widely used in the drum manufacturing industry, crimps the lid on the 'drwn.
In addition, the contact dose rate of the drum is determined with a GM survey
)
i nstr ument.
6l CA F1107 :E NG-308 46
When the Cepper is rctracted, a 560-witt motor drivsa ths rollers to mova tha drum to the Swipe Overpack Station. The capped drum is then lif ted and two swipes are taken to determine the extent of surf ace contamination.
a Swiping is accomplished by lif ting and separating the capped drum from the Roller Conveyor and circumferential swipes are taken f rom the top and bottom of the drum.
If the smear reading is within limits, the drum is passed through the airlock for loadout.
If the smear exceeds limits, the drum is overpacked, and an overpack surf ace contamination check is performed.
G.6.3.3 3 Drum Storage and Loadout Subsystem Drums /overpacks are passed through the airlock to the shuttle table which then places drums in a 4-drum array on the staging conveyor. The 4-drum array on the staging conveyor are then transferred to the lift table and accumulated for an 8-drum array. The lif t table lif ts the accumulated 8-drum array to the drum cask elevation (31.0 m).
The lif t speed of the table is 2.6 m/ min. Once the table reaches the drum cask elevation, the drums are then conveyored to
(
the ' Drum Cask for shipment to.the Drum Cell.
In addition to the two CCTV cameras mounted on the bridge crane, there are two more cameras in the Process Room, one near the Fill Station, and one near the swi pe s tation. Both of these cameras have remote pan tilt and zoom, and can be monitored from the Main Control Panel in the Control Room and from an auxiliary panel located at the Swipe Operator's Station.
Operation of the Drum Storage and Loadout Subsystem will be-in two phases.
The first phase will take place before the west shield wall has been co nstructed. During this phase, ventilation control will be maintained by a temporary wall which will eventually be replaced by a shield wall. During the period, no waste streams will be processed that could produce drums of solidified waste having contact exposure rates in excess of 100 mR/hr. All drums will be contact smeared before release, b
\\- /
C A F1107 :ENG-308 47
The west shield Ell will be constructcd prior to proceming wasts strrams that could produce drums of solidified waste having contact exposure rates in excess of 100 mDhr. During this phase, drum loadout will occur via a remotized, Shielded Loadout Subsysten.
G.6.4 WASTE ENCAPSULATION SYSTEM G.6.4.1 PROCESS SYSTEM The WES uses two mixing vessels, mounted vertically and set side-by-side.
Each is a 200-L carbon steel vessel that houses a High-Shear Cast Iron Impeller. The vessels are small to minimize the amount of flush water required and to facilitate disposal at the end of their service life. A level switch (a detector that will automatically discontinue the filling process if too high a level is attained) is provided to ensure that saf e levels are maintained within the vessel and that overfill conditions never develop. A load all is also provided for each mixer to monitor the amount of each component metered into the mixer to ensure that acceptable waste forms are produced. The mixer outlet valve is connected to a special fill assembly
~
designed to descend into the container, and seal the opening in order to prevent splashing. The fill assembly.is normally vented to the Process Roan and contains an integral drip tray to prevent spillage of radioactive materials. The mixing vessel has a flanged top through which passes the impeller shaf t.
Additionally, the top has three inlets, one for the liquid waste, one for the cement, and one for flush water as well as a vent.
(The mixer is vented through a roughing filter to the Process Roan to minimize amount of dust release.) The flushwater enters the mixer through a rotating spray nozzle which flushes the top and side walls of tha mixer.
At the end of the vertically aligned impeller shaft near the bottom of the mixing vessel in a close-fitting housing is the High-Shear Impeller itself.
Its shape is that of a disc cut into a deformed, four-pointed star called a discar. This unique shape together with the high rotational speed (3000 rpn) imparts high shear to the mix.
The impeller is driven by a vertically mounted two-speed 30-kW induction motor. Shearing takes place in the small gap between the discar and the housing. A sufficient discharge head ~1s produced to pump the mix out at the low mixing speed (15CO rpm).
C A F1107 :ENG-308 48
G.6.4.2 COfFGIEllT/EQJIPIElff SPARES Oig Spare components will be retained on-site to minimize down-time in the event of equipment f ailures or malfunctions. Two complete spare mixers and mixer tops will be kept in the warehouse to avoid unnecessary downtime should a mi xer f ail. For the other components, spare parts recommended by the supplier J
will be purchased and retained on-site. Examples of such items include spare parts for pumps, compressors, valves, conveyors, and hydraulic cylinders.
G.6.5 PROCESS SIPPORT SYSTEMS G.6.5.1 MIXER FLUSH SUBSYSTEM The Mixer Flush Subsystem is d'esigned to provide flush water to flush the High-Shear Mixers.
This subsystem includes the following components:
A.
Tanks p)
L (1) 208-L Flush Water Dump Tank, and a 30 gallon, cone bottcm, carbon steel tank.
B.
Pumps-(1) Decant Pump (top ported air-operated diaphragm tyne operates at 0-340 L/ min).
(2) Spare Decant Pump - same as B (1).
1
)
l O
V CA F1107 :ENG-308 49
,s.
G,6,5,2 INSTRiRENTATION AND CONTROL SYSTEMS G.6.5.2.1 Waste Encapsulation Subsystem Controls O
From the CSS Control Panel, the operator can remotely monitor and control all aspects of the system. The panel (which uses the Westinghouse Numa Logic 700 Series Programmable Logic Controller) provides for complete automatic control. This leaves the operator with the tasks of selecting the desired operations mode, selecting values to control the discharge of cement and waste, and selecting the mixing time.
The Control Panel provides for safe operation with an alarm system that alerts the operator to up to forty different conditions (including Data Acquisition System Alarms) and various electrical interlocks that ensure safe system operation during automatic batching. All electric motors and solenold-operated valves in the system can be operated in the manual mode.
Like the automatic, the manual mode provides for operator monitoring of all process conditions through panel-mounted instrumentation. This includes a panel-mounted graphic display flow diagram which indicates the positions of all solenoid-activated valves and the status of all motors.
The main panel is 2 3-m high,1.7-m wide, and 0.76-m deep. Some of the key panel components include:
A.
Westinghouse Numa Logic 700 Programmable Controller, B.
Westinghouse Numa Logic Input / Output Modules, C.
Servo-powered Current Indicating Controllers, D.
Tachometer Signal Conditioner Modules, E.
Panagraphic Indicating Display Cabinets, F.
Remote Logic Annunciator, G.
Westinghousa Veritrak Level Setpoint Station, H.
Westinghouse Veritrak DC Regulated Power Supply, I.
Westinghouse Veritrak Power Distribution Panel, and J.
Westinghouse Veritrak Signal Conditioner.
Ol CA F1107 :ENG-308 50
1 l
In addition to tha crin panel, thsre are two cmall(r wall-mounted panels. One controls the Cement Feed System, the other regulates the pumps.for auxiliary systems (that is, the two chemical additive tank pumps and sump pumps). These k
panels facilitate manual control. Each measures 0.91-m high, 0.91-m wide, and about 0. 46-m deep, G.6.5.2.2 Material Handling Subsysta Controls The Material Handling Subsystem will use two control panels to support all Drum Handling Equipment. The Main Control Panel will be a conventional sloping front design approximately 1.8-m wide by-1.2-m deep by 1.5-m high.
The bench section will represent the system graphically by indicators and controls mounted in the positions of the equipment they control. The upper section will contain TV monitors, crane controls, scale readout, and radiation monitoring equipment.
Inside the panel will be a Westinghouse Numa Logic Series 900 Programmable Controller, an Allen-Bradley Programmable Controller, motor starters, DC motor controls and terminal strips for interconnection. This panel will be located in the Control Room and will be capable of controlling the majority of the D) equipment including the bridge crane.
A second, panel will also be located in the Control Room and will control the Swipe Labeling Robot.
G.6.5.2 3 Cement storage and Transfer System Control J
The Cement Storage and Transfer System Control will use a prewired control panel in a NEMA 12 dust-tight enclosure with tne main disconnect operable from the panel exterior.
It will be located in the Control Room and used to control flow of cement to the gravimetric feed system. The panel will have legend plates as required to identify all controls, all required motor starters, relays, switches, and lights, and all other required control and monitoring devices. Hand-of f-auto controls will allow each electrically-controlled systen component to be operated manually, turned off independent of the rest of the system, or lef t to operate -automatically with other com ponents.
5 C A F1107 :E NG-308 51
A second control panel in a watertight NEMA 4 box will be located at the Truck Receiving Station. This panel has all the logic required to operate the components of the Cement Silo Filling System and provide an audible alarm when the silo reaches a high level.
The Storage Silo has a top-mounted continuous level probe with a sensing el ement, slack adj uster, bottom anchor, and insertion length down to the top of the cone to provide continuous level indications at the Main Control Panel. The Silo also has high, intermediate, and low-level controls. The high-level control shuts down the system when the Acrison day bin is f ull and triggers a pilot light in the main control panel. The intermediate-and low-level controls merely trigger indicator lights on the control panel.
G.6.5.3 SYSTEM AND COMPCNENT SPARES The entire system will not be duplicated and stored. Vendor recommended spares of selected components, i.e., logic circuits, specific modules, etc.
will be maintained on-site.
G.6.6 CSS CONTROL ROOM Figure G.6.6-1 shows the Control Room instrumentation layout.
Fi gur e G.6. 6-2 shows an elevation view of the Control Room equipment.
G.6.7 CSS SAMPLING AND ANALYTICAL REQUIRE!ElfrS AND PROCEDURES Samples of the waste streams will be taken from the holding tanks in the main plant building before being transf erred to the 01-14 Building.
In addition, a sampling unit is paovided in the 01-14 Building to obtain a sample of the Waste Dispensing Vessel under an unusual occurrence.
CA F1107 :ENG-308 52
The sampler for the Waste Dispensing Vessel was specifically selected for O'
handling materials and plant design conditions to assure that samples can be taken safely. This sampler will be installed in the Waste Dispensing Vessel recirculation line to ensure that a representative sample is obtained. The' sampler unit-is capable of operating in process lines having pressures up to 2.07 MPa. Pressure equalization capabilities in the body. provide an effective means of_ transf erring waste portions f rom the process stream to the sample.
container without degradation nonnally involved in rapid decompression. The sampler body design provides for a straight-through sampling for more discrete sample collection and control. A solvent flush can be directed downward directly in line with critical waste-contact areas of the sample chamber and discharge port to remove residual carryover of liquid and/or solids during sample container changeovers.
Waste recipes developed at Westinghouse R/D are based on tests using synthetic
~
waste fonnulated to closely approximate actual waste streams. To ensure compliance with these recipes, it is important to have a complete chemical analysis of' all waste s.treams, as well as a radioisotope analysis that includes transuranic isotopes. To minimize the number of samples taken, it is desirable to take the samples in the sending vessels which have a larger capacity than the Waste Dispensing Vessel.
The waste recipes have been selected so that any characteristic hazardous waste (as defined by 40 CFR 261) processed by CSS will result in a nonhazardous final product.
O CA F1107 :ENG-308 53 l
..a
REFERENCES FOR SECTION G.6.0 Grant, D. C., November 19, 1980, Leaching Studies on Simulated Radwastes.
O Knabens chuh, J. L., 1983, letter to W. H. Hannum, dated March 8,1983,
" Selection of the West Valley Demonstration Project Low-Level and Transuranic Waste Form, Rev.
1," WD:83:0118.
Smel tzer, E. E., Grant, D. C., Mueey, A. P., C amp, F. E., Schneider, G. N.,
Skriba, M. C., January 15, 1981, Radwaste Volume Reduction and Solidification System Programs-Septenber-October 1980a Process Memo 1.
Smeltzer, E. E., Grant, D. C., Schneider, G. N., Skri ba, M. C., January 20, 1981, Radwaste Volume Reduction and Solidification System Programs-November-December 1980b Progress Memo 2.
Smeltzer, E. E., Grant, D. C., Skri ba, M. C., May 26, 1981, Radwaste Volume Reduction and Solidification System Programs-January-February 1981a Progress Memo 3.
Smel tzer, E. E., Grant, D. C., Skri ba, M. C., May 26, 1931, Radwaste Volume Reduction and Solidification System Programs-March-April 1981b Progress Memo 4.
Smel tzer, E. E., Grant, D. C., Skriba, M. C., July 30, 1984, Report on Work Release No. 7 Low-Level Radioactive Waste Solidification.
CAF1107:ENG-308 54 i
e
0 O
O TAB E G.6.2-1 CDWRESSIVE TEST RESLR.TS 1ESTINGHOUSE HIGH-SIEAR MIXER RESIR.TS & CO&RESSIVE STRENMH TESTING (15 cm diameter by 30 cm Iong cylinders)
Comparison Data f
AVERAE AV ERAGE NO. &
LENGTH COWRESSIVE ENGH 00rlESSIVE TEST SANES
& CURE STRENGTH.
TEST
& CURE
- STRENGTH, NO.
COWOSITION TESTED DAYS Wa (psi)
NO.
DAYS Wa (psi) 20 18.5 w/o Borax 4
146 27.9 (4051) 22 12 w/o H B0 4
124 19.6 3 3
+ 2 percent NaOH (2840)
+ Resin 24 12 w/o H B0 4
122 33.6 19 105 28.4 3 3
+ 2 percent NaOH (4870)
(4122) 27 12 w/o H B0 4
96 22.7 3 3
+ 1.3 percent NaOH (3291)
+ 10 percent 011 28 12 w/o H 80 4
91 30.3 19 105 28.4 3 3
+ 2 percent NaOH (4391) 24 122 (4122) 33.6 (4870) 29 22 w/o Na SO 2
90 28.9 9
159 19.3 2 4 (4195)
(2802) b CA F1107:ENG-308
TABLE G.6.2-2 int.STINGIOUSE R/D TEST RESULTS ON SUPEICIATANT AND LLWTF SLLDGE WAS"IE FORHS WESTING 100SE IIIGI-SIEAR HIXER RADIATION TIERMAL WASTE 00MPRESSION STABILITY DEGRADATION IffERSION LEACII FORM MPa (psi)
MPa (psi)
MPa (psi)
MPa (psi)
INDEX BI0 DEGRADATION 39 w/o 3.1 4.1
- 3. 9 5.1 6.6 jo visible Su pernatant (450)
(640)
(570)
(740)
G rowth 53 w/o 2.6 2.6 2.9
- 2. 8 6.8 No Visible Su pernat ant (380)
(370)
(420)
(400)
Grwth LLWTF 10.1 10.0 12.7 9.7 6.9 No Visible Slud ge (1,470)
(1,450)
(1,840)
(1,410)
Grm th Requirements of 0.3
- 0. 3
- 0. 3
- 0. 3 6.0 min.
No Visible 10 CFR Part 61 (50 min.)
(50 min.)
(50 min.)
(50 min.)
Growth Sections 61.55 (afger (after (after and 61.56 10 ra ds) 30 cycles 90 days )
-4 0 *C
+ 60 *C )
1107 :ENG-308
.g?
.# v
,~
d 8
l 7
l 6
l 5
e i
To CT5 70LWISPANEL - 'sT3 Fm on lPPOCESS BL 7Dt3 FitD 70 I
4' L.
s.y.., r.
I-
- As4\\
~S
}l
)
-e 41 h
'# 8 !!
Q
- b &
@_.h'hY y a 9
fo
- =
{,
T y
l i..
$}f. - - -..
I'$
eTO LWT3 PANEL E
A84 A44 As4
}
g
}
q4 o
s
.b I
/
k s e...
m
!u m.p2.
- !" h i
'21' 2'"
A Jf 'n
$i
- Il 3
6 e\\
Q n
\\
I v
F5 g
Fs y
g,4-g-
= r, -
a-d (6-7e2-068 N
l s
D C
'~
(6-7i-t-oz. V
)
A.4 A
5 TO 7013 Vu AIR S
4
^'a t
9 z;.
1; h Kgg E
u t
y g
e j f
,I
- 3
[--
I ztL 17
.-x-t-,3. E k'
A g
T,'f i:
v-d Y
Y!
8 f
es lQ
~
j n
g S
f
/U a
d A
gl B
./
s g
g f
g $f Pr 3
$ UMP PuM 1
T
(
A A
- 3
) @.
- g. ~.mNo.o
<$',...f "sI[tr$'c$s a
[c,1 YM 7o owI 4; v-DEWATERING
/
PUMP 70-DR-i-04ll
,70-DA-i-cio }--
s t
. -$ UMP Na2 e
PROCE Tl 2
APERTURE A
e muy 2m 2 CARD e
.oEw m Pum e-SAME TYPE OF pasp As Govto Moott Ji46 57 l
SUMP PUMP No.I fi x i-8,20 G P.M., 50'T.O.H, 15 KP. 1750 R.P.M., 3 PH.,
i Also Avdlelle On e otuens exar.e caviPecnf Aperture Card PIPELINE DE$l6 NATION L FOR ib b oLNCilS NEW EQUIPHLNT.
lM y y y y y.yy.yyx l
,T 1
e ceNm,u m.
a====
PRoctS$
15
>=
wm-
- %a=
l-NAME OF
-LINC NUMS(A sseuse
\\
6 3-* *
(
9 900 D-3R 1
h 4
l 3
l r h50.o.3,7 l,l l
1 m e w e s e o es s
==
i
=
F80M OFF-GAS 7D13ORJFF GAS DNDU*dE.E' U**~
'~
I PAOct33 8 LOB CFF GAS 3 RLWS W lobwN M W
- W
%' u
$CRU68tR A*R SCAU8Bf.A 70 10 VE5SEL f Pee
+
3 MEYISEDs Ft38AwtJ PLA LCN*494
{
tat t g g h
'u i
@ +s e9, Le, s
s p
y 2f
'.fb-7t O -0 *9 ^/
g(
-- ~
g N
O t,
9 r70M4+053 h
.p I
6 i4 C i
i
-- l.
I-470 403b'1M
---< m cA-ipD ge a r.y n
p(
a y
9 e-Q<
h Yi@ V g
l O' T g
4 70-wat a itob N
D
( ',,
Q,3.pve g.007m
.9
(;
{3 La C
ely SPRAY;HEActa b2 W b
go, c
'Y LD WLGD connD i/
rg '
n6E. 7a.
! 70D-l W
u.
Co u
" f SLINO FLIdGCD I '3 3#
/
y g _j, i
I.. Tt
'.g g,;
g
(',,m,g o*
'Pumoto'J Aig g
{f g
9 y
et-h' f}4 n+
j f
u 3
is l '.
k
@y@.
v u
y r
z, it i,
ad 5
{2TL s.
gr v.
g,g.,,.
3
/a
,Q Q,
g
[,p-as 8s g
g E' M 70 0#H-M6 D f
3k
"(,
U t
\\
\\
E 6
F 2
El FLG'O. CONat-J. -
f
(;')
^ SUMP Puk'P No.1 I
I
{
O
- M
[.,I fo PUMP $0LEN0ior e
vAuE y iso 9
g qi' *
.. i..w.,... t n.
59a R
c sneer sefs
..>ed a
'5
}.;
l 70-PN-t,g b ?'a
.. =
W-~
s
' 16tt 073,.
'o.a y
/-^--
e WRYT+,co%
m
.- 4 4 te l
h
!$ CELL syyp y11 jpccisi 400M j$
G
_ SUMP _PvdE Not WARREN.RUPP MODEL NO.
$$li-A TYPE 4 C'APPA AGM L.,,.,,,
p rPf., th'500T10NS Dl5Ch'AoSE
J',,,',4 aowman.w ee I
- sv en
_ WASTE OtSPLNSINSVES$LL "1
1
- 'a*
I "'** *
- I j'
i MCC-T Jo4 STJ.iHLL35 STELL Panis LesT t*
- <D*DIA. x P 5* STR At6HTHEIGHT
,,,,,,,,,,,,,,w,,,
nia gre
- = = = = =
i.,
-@t$HED Mt.A) Top AND CONE i
5"*f,
A
,,,,,,,,,,g,,,,,,,,,,,,,,,,,
l
' 80TTLM WITH JACKET. REFER w6 NO. 900*D 520 vase.wss-se ame ocas t=a 71 g
70F DR4 WINGS 3(E Dv4 900 D 380
, " " f F'
sav Y
>+ +s C.51 CEMENT SouDIFIC ATISM SYSTEM h
a
~
$~ Da O rs BUILDNS Ol H, PiditJG AND 480L5 As.D LEGENDS 3tt DwG. 900 D 4%
. c ts-.
"*'s INSTRUMENTATIOPJ DIASRAM t
,,'p 3 0ES86NAT104$ $EE Dv4 900-D-580
..N" MU
==
.a.;t l e== i a LNCE E6ASc3 P9fD DaG Po.9Co-D-02:
S8
==-v.,out 1 0 M. -3,
l =3 P
gy*
(H i
.es 8
l 7
l 6
l 5
I
'~ ~
.Ei~.'e.witFi
_b%D y
. d.
4
^
<A.
3 p
j y
}yme2-co'} g, h' ro-on-t-oc14--
f
=
O g
SLURRY. M @
i s'
,f p
~"'c" g.g u
b a
-c.
s i
s.3
>,.. m:
WU
[s h-T' d
N$
8 "3 d(
W
?
g'1 4 re
~
4 (7o-pw-r-oi7P' g As 3.R g
1
- 8 ji e e"
H@
y;
$4,*+Y
- qe, 3
- =
y
~3
~
soy I
W '.'
TI
),e A4 4 g f g "I" " @:
~
E 8)
APERTURE
-7 y CARD e
y,%.#
32 I N' r->+e
=
"<ca^uc h
o W
?
g.O ii. Armani, o.
S.o*",31 co
-t To 70 3
%s O'x 7o.uw.,.o,,p f,
Aperture Cardg A
}
To 7013 0
3 3
t 32 Ik o
T
.-> 5; y
g,3 g
gg M70-cw'4-us) s Ig*
v.
y 6
A Es e
gg$
' :>n jg R
jj 35;;
g g
AA as oev m
4 4
e E
4 3
-s T,P /
? h,@.
"~''"' A r
(
.a
[:)
u a
v.
Oe c-stup-.
, 3 e
)
c 3
13
\\
,/
(
7 5N
.. h.
T a
$gir_J wo 2
Ws Suse PUMP Nos a
3 r,o.J...e, " i G"7 -*b*" N L
ETA 11FI5XNMQ hdh / V iqm I3a j #2 M
t VESSEL PUMP 1
Sc'
/
$o,3 0
I W="
k VALVE Y-63
^
-- 4 TO PUMPStiLEN0:0 po.on a en
- o Soor % DA-
{
o-ca4-o*9 X g3 Tuet riTTiN
{
CONT'D ON SMT*4 M EMALL M PROCE_5$.
eSUMP N0.3 PROCE:
3 2
.WA. $LE_Di$Pf 45tNG VE$$ ELE,tMP
,Higg 3!
c.,
M0YNO PvMA MCCELNo.2F0G5t-558 AAC WVNSDe SUMP PUMP NO3 MOTOR ts Awt37aNGH00:E GEARM0 TOR, SHEAR M
-*O SAME TYPE OF PUMPAS FR.210. TYPE U $cocP McurJTING.WITH KENT,Et p-SUMP PUMP No.1 283T MOTOR,7)eov.R,230 RPM OUTPUT, H
ite70 M.'.'
3 Pet 60Hz.-4 TEFC EeJCLoSUPE OR 3PHA I
CLAS$ 2. Cof;45.6 150* Artit-F.E,3UCT.
MODEL T 10N AND OtSCHAPGE.DENo.5831502 fol.
SLURRY SAMPLL8_
.T$0 LOK MODEL M-51-A SAMPLER.10CC CAPACITY PER CYCLE.uNirIS ESSENTIALLY
@ DENOTE $ EX1 STING EQUIPMD4T A PNEUMATICALLY OPERATED SAMPLING INSTRUMENT UTILI2ING AN APPROPRI-L3 DENOTE 3 NEW E00rPMENT ATE MANUAL CYCLE CoMTROL.
GAAV,M
@ OENcTC$ REDE$16NATED OR RELOCATED AcRisoN
['f goo.80F FEEDERc TROLLEP
~ ' - ' '
b;;..
8 l.
7 l
6 l
5 i
(..t
900 DUN
?-
s 4
l 3
-l f go.n.397 lzl I
1 nr wiseo a
'C avt.f 4T O'LO b ES A3 FILif P k
.,.ac. cm"..~.. O,c.:,.
~
[& w.-n f- -'
s
%.e.i. oo,.n- - -w k,,-
- Er
- LO.DC >3tws ?ER 0FC*L4,4
.H
% :s.,O.er.y J - t uSE3 M R DEC *S73. _.. _...
.n '*$y
<y j
(.. x w.)
_+ 3.LsLo.aganau ne_Ewug tt y :,..
4RAVIMETP 8C_
.CEPJEni FLEcER
^ p j q s.
W)
'91
~_.. :- - G Q s.
~ ~ - -
-{
fi
._ i
.1-sy n,",j/ -(h
.~
D yy i
1 *2C E
4 3.y u.g.o p h - h j
d h -- h i h k _(o HS-@
e
.,ie 4
As4 -
1 W
A8R 2
Qr Y
'a I
if
' [5 "h
9P OlVERTER VALVE Q,e.t,n.g. g....._
_ Q s
. g.
iH a - na og 43 o
POUGHING FILT 37 %
C g
g f
J@
g I
l rLuiD
}
M LM HYORAULIC FouiO
[
\\
h (LS n.
f.
fb5
\\
T g dEE WVNS. Ow& 40.
(;\\
0*a
,v (ow s.. \\"I si Joo.D. age L
~
- [.y 4.o9 pg.y 4
M I'I j
M i
SpanypiNo 5 f a ny p,wo -.
ii
[
[
s..m w. e u
.v.
m
,dl uTLET f
- ouTLer,
'70CwR4-g9 Il
. p i
g 3
o
(
Q CwR&2p?~
g A'A b'
~
l rl
~
) ' A'R NLt T
@f
/ (70 C i-23+)
hr m
,9
>Q e
g ip
/
mer bo[
t
(
r /
v-p/
5
+/
4, d.
u B
3 l
h e
Pg 3,r e.
1 t
w T
o
+
EA.g i
l I -
1 6
1 p
p jf " P
\\
k 9
F I
c y-#.
I
- h,/]
MIXER N0.1
\\- pt3(gcost,g[j M[; CA EQUALpt Ari'coit _
MIXER NO.2 g%
g..y.
3 O
]
l.
OR EQUAI.
i
- q TO$0LENolo 04 f
]
T3SOLEHotD CN
~
j F*
- i VALVE TCV LC47 r
i VALVC TCV 2ff 8 I ' ", ""
0 L'-
SHLLT *4 0F5 LHEET*4CF5
~ -Q,_
'.g[p d
r1 r1
.7 @
SEE SHEET NO.3 FCa OcNTNu4TsctJ
- 0OR-(-075J-EC r;r '
fe M To $ UMP NC 3 AT WA5TE ORUM, FILL HE.A0 ANO 10 SUMP 6 0.3 E
yooygg ORIO PAN $fAfs04 7(gg gyy,gg. j CO Tuti-L wito c j v.'.i NE.tLD j
-l
~
b(EAD MIX (R NO t @
DIVERTER VALVE 6
"t3H SHEQ Mly 2 _Q],
Id N
.No t.00-C 1236 H16H PEBCO MCOEL* TtlJ+PC:Tev3-wAf 5 AME O -MH SHEAkM'AER k
IXER StCOLCRETE CC.,
NON-JAMMlHG GATE VALVE Fa(e e'
h plat 10.PeRTPA D-CPENING.PNEUMATICALLYOPERATED "Q. rr.'
.ow.cmou es l
r e.
L, e
(ESTIMG HOUSE MOT INLET 15 VE:tTICAL AND DISCHAR$C I*
I ect.=d.o F,,,,,,,,,,c g
f
$E. 00 CYEL E.400 v0LT, LEGS ARE AT33*FROM VERTICAL.
Papirs Lisi UFC.57YLE NO E4S 5-g mus evie u esuciais.s * * * '. ' a'
?
g asons -
p,,
roe A
.. ven, n
, s.i.
ca. m..
minasers-se.oe ocas wa. e,,,
g s
p r,
' " " " / Mn';hver T7.es C15 CEMENT 50uolF: CATION SY3TEfd ETAIC CEMENT FEEDER I '
I "fmO SUILOING 01-14. PIPING AND
.M INSTRU M ENTATION DIAGRAM
'McCEL 4033-11000 400)-
/
t-M LCSS-N WEIGHT
'.[
I war tec 1 lo.e.o
."I' f'
\\
'4cT.co s 53 mrt WITH MiCRODATA 403 COJ.
L et w,r..t 1 QCO D-3C i k e
YN., no
"' a s D Is.n :
4 l
3
- l 2
l 1
i
~'
w.
.or m
/*
.,,. vw 8
l 7
l 6
l 5
/
I l( 1
"'" D b
h la 3-
- D I)
P?
bb a
e=._
4 c3 5E g.
l g.g m.g otAAY ActuAfoA8 h
g.1, s
C N
HYDRAULICALLY OPERArto
[', J \\
h-h-- c-_
- =
i u
wae tunes r
k, l
,3 o
j';To INTEAFACE
- d wiTH ATs HYo-d, g.t.33.o3
,m. owr.4os7p L i-L-33-o+
g,RAUuC $Y$ TEM SEE 04*4co.ows..(
- . i.-
l' To 7c13 g
Sc.
DUMP TANK
]
p, Ain L
$g:=
h or
+
^
r.
u 1
e :: e n
m.
?u(u
+
l
,c li a
s.--- :
s o
3 nu 11 G 7o-owr.4-ossi-l To sottuoiq) 7 l
"g o7o0/-
3
,l gf
'+
T g
-(
/
g*
-- l l
G 7o-owr- +-ewf-.
i F.QD. PUMP (Nal)F.D.Q PUMP (Nal) h
,3 (spAnt) 4 "* *'*~'N DEWAT cif70,3 i 3
STATION d FUTURE 2t
_ /
~
r$ UMP N0.3 3,
5 O
FLUSH ORUM DECANTPUMPMD1 8
.ELUS'iDRUM DECANU1EAD.
SANDP PE8L TYPEY, WARREN RUPP
_ AN O DRIP PAM 2
SM.4.S$ WifH NtoPRENE ELASim+
/,
E93 AMo SMr SS WETito paris. lQ*
PER WV.M.S.oWG.*9eo-NAT suction ANo oi5ctMAGE PORTS.
fb$jdl O DENOTES EmsTING toviPMcNT @IMM CANT PUMP No.2 DUMP TANK ASSEMBLY
.ER.. I e otnoTcs utW touPstui PUMP Nat EXCEPT usto A5 3PAAE PtA wyn.s. owa'qoo.
sAME As usH onuM occAuT EEE
.e etworcs accesisuArco og actocarts
?.... I y.
M.~ j
~.. '.
.a.. 8
... -. l. -. -.-.. 7.. -. l....- 6.......l 5
t
Jd
~
900D097 3 4
l 3
l p ga.3,3,,
l3l l 1
....io~.
i-i
.*.E#sLDtE EN &WIJ 8E9
- C*J'aqq gag
^
TI APERTURE D
CARD Aho AvnHahle On Aperture Card g
- sit SHEET Nat. FoA coNTinuarioN q i
{
@ HYDRAULIC f
Y CYLINDER v
R R
sHiAN f (.':L1-2-'o
$f a..'s*te s""&'r l'?'
yg*,g,;"l i--h
'------- h--h W Aim wits Ari nyDRA-A A
} ( ows'aoo tenset
!, J ] _ ENLA8GED V_ity, C
uuc sys
-AIR CYLINDER 8 i
o-i4at j
9 '-53*"
/
DECANT N0ZZLE
/-
/
( h *L*H *l2
'ut(prAc' #'IN
(
Lust ost untsTc To ScLENotD VAtyt y.doo
' ^TI HYDAL'L'C Stt SHtti No.5
' 3TT f tM 4,E C
~
Ai4 AIR VENT A ICN MePTR4Y
(.WH*l3 D4.*M14n CANT T
7 C'
, - ROTARY ActuAicR. /
e.
JiCN gygggggggggy'}pggg7g3 f
j I
,dNER *'
sit NL o$vLN.*b r
{@Y........
f.
^'
C' cg.
5 e
t
- OcWAftAiNG e.
h f
FsLTERIN$ SCAtgN3 VAcVUM Cup
- l.., {-
.,,j
{.
Lto LIFTER ARM
~ ~ "I A4
(' QUARE DRUM
\\
S 7tGALLON_
." m To scLeno' uc vstvL v-in B
$l m is-MorioH AcroATa setce!*oosv.9,r. m o
P PNtuMAT: Catty opigAtto 4
f44 3
'-55 GALLON _' N r
~ Est easto *. !N i
7 ROUND DRUM \\
f Lj
~
[-
RING
/
FlLL HEAD k
JCONVEYOR f ' STATION AT CONVEYCR t'
SA.
/
M-15
.Hg.t, 9
.c g(o l \\D.\\ D38to' I \\
b G
_ FILL HEAD A55F.M_%Y ir PERWyua owG.*4co-0-044 NOTE:
t 5tc NoTt*J ou A f L Owi' ammy,q'*
l jM'* '*,,, h'tamon Mt l
PAilTS Lis?
.(,,
wetse ormaems spacereas
'LE f j,. f r 7,') n
=,e d
N
/
7"M.
.3 s
La TRANSFER A33EMBLY y,
II-
,v.ii.,n sm ie ca. m.
Tatsassss-so nov ocar s n one s es erc maars l#
P ptR WVN.10Wra *4oo-D 094
/
C.iiC8 MENT $0UOlFICAT1045YSTEM h4 N
t ca si." "
BUILDIN3 01-14 PloNG AND s
INSTRUMENTATl34 OIAGRAM
.m uri a w e..a s
g.,
9 E 7 )Ur asat asssano.,
1 3,-D-If 7
/
f
- ' ' =
D I=ce s. >
y{
4 l
3 l
2 l
1
.s i
t ow* e,
8 l
7 6
l 5
h
=;-er.-e?S N I
I n n rt n L
m
- x
- ,i
.c 9
,-(
E.k'1b 5,(!
{
8 5tio# Plow SA0 47104
>p Iy
'ie
~
==
.b N-l MoeJef0A wlTH LEAo y-
$HIELDING y4
- p g
- ,] l' h
_]_
g RE1
~T A
1 <r
=
[a -
";' ' hr -
Al
,, g '
V-D, R
g l. "3W
.9
,. ;)
. 'M l
31 y; i a'*
f;y D
g! '-
Y Mr a
.v-u7 e
e c
'S 19 i
^
<S 5
l M
]
g Nj l[$)
.?
~~
6 RN 2* FLocR oe; 3I I
l 4
~ ~ ' ',
UTILITY STATio4 j'i
~
% p_
s1 g]h@ g.,
7
- +W@
D R,
o pti e To MH 5. A.T.L E
L i
OT e INTERFAC E 'N
' p.vw.. 3[$ "
h ig-
'"~ i CLEAN DAUM Pcct4
&) l &&
5 APE 7
ist rLoon E
UTILITY $7ATiou
)
4 g
m..
i kI
$/qf 5 i
A @pL
- hE4 U, *
~
3 O
s2w
?
To 3TARritR oN h
3 75 wavPuMP McToA C
a %'
?
o set SHEET t 1
21110 R
h ExisTNG 8'e 9
wArER sup To WASTE OtSPEN58NG Na 90o h3 70-UA 4-tCI i
- FRoM SoLENoiO STATioM VESOEL DISCHARGE z,9 TO LwE 70-Pw+00 g
LINE 70-UA 2-o(,0 PUMP SEAL WATER a5(
'd'ACCEM '80M UTILITY WATER to n#1 L;
@-RH8 T
EXISTsuG (e* HiGH PRE 15uRE 4 k
, FS...
330 pg.ia R gr, owg, qoo.o.+
~
HOSE CouptlNG VENTM
^
70-ADokio'2 I
,.r MOO 8 t-07th L1 L
v4LvEs v-io7,vhM V To PROCESS Roo N
_AQOITivE TANK Net ~. N r
s'
\\
55 GALLON ORUM '
r.)
'f B
.n as Q
v.
\\
Q(
y ADDITIVE PUMO No t ri?oH 's $$c$
~
^
W 4
ly/
REctP. DeAPHRAG*4 t{'
I i w r NPI Suctio#J 4 l*N. A C.55 AD0fTIVE SYSTEM N0.1 (70-A001-iH8 DiscHApot lHP-8750 AN iM j
a HOS E COUPLING m VENT y-
?{6,
- Yh bs 7
.j
'-~
t-l
.MsciiGW
,G&i l
- -te s's *,
g
) gdyo A002-e o72'
,.To PAccES$ Room 70 HP5-6-Zo o
VALVE 5 v-ios vio9
~
,o.c3.qg 2 J00iT.NE TANLNu-
- 3 l'
~
55 GALLON ORUM rg, l
- 70-cs-i-222 )
T
" 'E' i
' ' ^ * " " " ' '
A
.7
.i.
r^uts'AFEEoER Mo0EL*
0 7'vE PUMA No.z 4%
,_4t-u P
/
7izoH s-AE,o-2GoM
. wg uYs$7?o"nINi.h
'*
- C S
- E'I' S'
{ CSS. ADDITIVE SYSTEMNa1(70-Aeot4M E
DISCHApGE,lHP 175cm '
_4 7,.c,, g,g g 7
b DENOTES EXISTING EQUIPMENT d-El DENOTES NEW EQuPMENT ADDITIVE SYSTEM HIGH AN g
q
, gg g,
1 8
l 7
l 6
l 5
~ ~~
f
".OCMM DM l.
L*
4 I
3 I
[T32.o.3.u l; l !
1 a a v. s i o e. s
= = -
I.
' =..
p.
agy.313 * -CDJ AAy 0t4 Orc *2tt a
- ,, s ~. o. 0 =...,
- otuu num.u -t we w
~,
ab[.
J D Eie5CO.f.133.-py et_ROCsJ'M
-j* ',b '"'
j
- y HioH 3HEARIw tA w4 ;e:ctss 4:cM atv sra. -tne 4:tsto sta ccu' m
~
{
SEE 4HtLt*;*Fe FeA
- - - - - - - ~ ~
ib.w t
j,.
CS*JTinuATiert v-l '
I p) # @
l
.ma
- py 3., g yoy g,.,
-t b -<.b q'
- V i5 T
D 1
[
A I
f
.. * *. Hs TO SPRAY 8 f JG Cessrs
..."2 sg. dh.@,, f $
04 HtGH SFEAP Mi/IP TI h
s
~a>i. aee" " -
eg g
ug g ce. s,.ut :e,r,.,a u
APERTURE hw r.N ore.
h -t..t CARD y
L.'.
(70 crye-tse}! s Tic le87 raixta's Also Available On v.
~
[ -
T
- i.,
fuPt
.7--
stE,5witT *1 EXISTING Vo C00 LING-- g p ', -
C f CTIUTC (ATd P
t 4/
WATER REruRt4 AEF or(a.
)LETg%
4
' h.#.
-bg uo.900 D-400 SHT.*2
_)
-.J0 c}v$t.-i-3_5_)
P 7 vtNT
.b l
]f 7C 3
(-
4 m ii"- 3000* N PE f y3. -
C
, y, t,
g THREA03LET S
03 V-
- 0euno A i,[
6'
"{
i3,,
tt
' REF.
-d-
-1" 70.(ws.g.1'3's,
- D-C 70-cwg '-Q Q $HT.1 IA 1, /
,,,tg 1
'2..
O 10 Mixta comNo j
J FRes Mixc,t, co0u~3 VLUI WATER INLET CotsN.{
. V- - j WATEA 0uTLET CCHN.'g*
SLL SHLLT No.1 FCA
\\
L-CCNTINUATrora i
SLC SHCLTNO L CCNTO A
dp]*
- 0 4,- - 470-cm A-agS}
^
W TO Tic-tc58 5 E,'f l MisLA*& stl '
'N
-~ g
. $Hi.Er*1 5
.J Li' TO MixtA*2 C00uNG FROM MfxEA*1Co0 LING 4-
'b I'
yl
. REAM l(,T.rev i
- L wAtta iNLeicoNN.y wATcR OUTLET C0 4N.y R(
,o sHr. L sLL SHELT No.2.FOR
$LL $HLET Ho.L CCHTD r'~
y
.4 CouriNuATiON COOLING WATER RETURN 7
-- *cws+ us 3cc nerg.,
j
, i.
COOLING WATER SUPPLY
(
/
U3 3["C *'
Exl5 TING Z I.A. REF. 0WG NO. 90e-O-400 3ML*1 7
('
'~
Exis'T~o $ teiv Pacssunt O
I~l.
FN
'~
-3 4
B 9
N steam as es.ta.
j$
~f~
@5 I
/
0 y.dy 1
,h)2a.3Q3R o LPs 3-tial
~ '. - -
f'N
~
L
[r
~ UTILiff STAfiO4 D
- -TO ATHCSPHEAC
.1
, 70-tPs 3-zii f---
jl- ---- N]
[
- i O
'Ps :oiattocarro I'
[i#
y f,,,.,,_,,o 3s {
v.
t-.---
W -.
p i41 T3 A *.c p
g
@f
-{
.)
' NWA;E ild"tM a*e afIW A@
pc
_ 4._.fl.
Exist ~a 3-
_ g
{
CONOECAr[
'/-
H *b' (Qs (ioobstgecargo v)3 p
(ip To SAMPLE ITILITY 3 TAT!;N
'- 4
$rATicts -
(.
' DOTE:
y'B INSTRUNENT A!R y
L alpiN3, Fittings Arlo. AL.is TWAT l
F.y
[
t A=.t snawu cLet:to 70 :t Lc-
.o nLT-W SWAut43
,,y..
ATED sta CLEAN CPuf4 RCOM,
. 6ft.d l' iori.w, ear l re ssu IMI g... -
=at =]
o r cut, a.si.
F g
- j mu-y
}
PastTs Lisi
.}
j varis aves w eacciamo 8***
y, in
.s i
k s
"d' w/
\\.
.. v. i., ii, s.ie ca.me.
f
< =,,,, _,
p g
m..< u-- -,- u y
T-g biLT ies sinAiuta (70.c3. A-u0
/ EN0=Nw W/as C iS.-CEMi'JTSOLIDIFICATIJN SYST*.M
{J E !b D..s.'n"*,
P..
ButLDIN i OH4, DiPaK2 AP60 i.y INSTRU.AE.NuTON en0 RAM J-i
'v.
mrt s oon.a s.a.
-as D LOW PRES $UAE STEAM i==
i 900-3-3 U l-ll';;
- '. r e wi
=
N
. e :..r.
- .. s nac I
/
' T t';'. -
'T'. n D ii rv 4.,,
!y 4
l 3
{
2 l
1 i
,. : e u
8toI DID389o-I7 M
p
vv 8
l 7
l 6
l 5
4 470-v4.*o.o]
(~7o.uA 1 - *'L -
f
( 70 t'A-2-il? '
h 1r
=
r-t c4 53 q m
'i. qG.
a's.y @ m @
3; 7@ a--@
o
~[
-.. p\\.g Alst f
'T 1
. p A:R li f1 3-4 TO vatvE v.44 iN TO VALVE V-5 o or PC i
WASTE CISPENSING j
IN PRCCE55 PCCM p.F I
CELL y
ee e r E 70V 71N gt ?-
T VALV y
}-
^
, y, Qa--@
O
@ it '
..s AIR (TEMPOR ARY)H&
L p
g y
TO VALVE v-9 IN q
f 1E DtSPENSING p
pf car.
e a--@
e
,y, i*
1 j
C ont Y
s A,a (Lwr 3 V,tVt) yg j
TO VALVE FCH-027 PC, NV IN WASTE DISPENSING o
CELL
,ft 1
AIR (LWT5 VALVE)-3i p
y y
To VALVE FCH-024 PC INWASTC DISPCMSING jf
.-)
CELL M
k g
OP) D--&
OPl D---&
be 5 U" W
cat Y
,. uR A
Y To VAtvt 70v-4 N ya o-y Y
TO VALVE V-2 y
{
WASTE OtSPENSING j
14 PROCES5 ROOM 3
NY k
jf s
CELL 1,
Q 'D-@
Je Q &~@
^'R A
G b AIR no O-B a
TO VALVE 70V-6 IN TO VALVE V-i4 i
]
[
7 WASTC DISPENSING IN PRocE55 ROOM p
~
3 CELL
' SPARE
--3 TO DIVERTER VA IN PROCES5 R,
3 -.
H SPARE
--i f
/a tant O"
O-~
{ 70-U A nq t
A:R AIR s.
p 3
A To vetvt v sa iN b
TO vAtvE v-47 iN rn m y WASTE 015PDJ5ft4G I
$ WASTE DisPEN56NGCELL 77 Q
- CELL y
,,4 REFER 70 SHEET *l [i.
REFER To SHECT'l A q
ont To HAND Switch 2091 I.
I,_ i 70 HAND SWITCH 2090
)k L.*
4 AIR air 1-TO SUMP PUMP Na2 70 SUMP PUMP NO f
[3]--
,[
,"p IN WASTE DiSPEN5 in IN WASTE DiSPENS-w v
W CELL gyg cgtg
" - " * + +
I ni"e'!5"C e.
- ,o..... =
- g.
8 l
7 l
6 l
5
.i
's an
900w1"j' y
4 l
3 l
l-q. 3.zy l3 l
'. v e n t o.e s t
m g,
~
~~
~~
s ~~
~. -
.w - ;>
1 n c.
4
'I T
'14 8
REV 3f D 4 ;E3 DAWN 2iR OFC*;s t g6
.g 7o-va z-,is yhN j
-[#g,'ED I
EP,:C' n,,,,
..~,-. a.~a w.n.
_ 4i:g,3 g,_,
g'87 y,o,,v4Lvt v-qq uTitify STA icn 5 3pfgp3apsugec_aco s,cate (w3 T
e IN PROCESS Fcot4
' r
.h
~ bV.* 'O:UA.-30 w]p:,, E y' l l J T3 Ait re-5.s' y
'ty
- A as s'CLE m : sum 2?crA O
h.
. A.
p AIR
}f hy 1 IS' FL0cR to (Atyg y,g 1,
uTluTV STATIC 4 IN PROCESS PooM I
brh
[cor
".a l w 70-uA-4-o:_ p-1 d'"h 70-u A-i-io i 5 40 APE
+
^'R Vept
'hTo VALVE V-sc6 y
7 m
70-vA o,e i
m-1 r
14 PROCESS R00M W-pgs y ygyg
---3 SPARE
'i
'f E
%,:-g
?
Wr-3:_--P %
L70-uA.- E nt_ 7 I
%~L
- {e at A
l e3 To 08.UM T8tAtl5FER gg d
4 Q-4 STATiori$tt SHEET
- l-C f
TO VALVE V-107 ooT Sert,Feg conTi,Ju&
ttJ PROCESS Room g
g AIR Tio,3 TO VatvE FCH-030(LWT5'/ALVEh Ih)y O
IPS. T 3o pc ifI WASTE DISPiNSING CELL um
(-
PI REFER TO $wiET't i to HAN0 5 witch 2041 *
'53 Aig cat 10 VAtyE y io(,
X h A'R Fy..
IN PROCESS 900M to duMA PUMP no.3
-e c
,s (M PRCCESS RocM Y
HS h.
g' ;
i.
s*I g.. H5 IL "T
5 o.
p air (FUTURE)
^ N M
M 70 VALVE v3 f BPS TO OECANT PUMP NO.I rp
$r
- N PROCE33 ROCM kpc-y 7
sj e
WB :
IN PROCESS A00M 1
7-
@i@
TJ APERTURE F
k
-34 O
(,
CARD p AIR y
To VAtyt v-io iN PROCESS R00'.4 g
o vanag,gy 3
([,
,y,'
( $ m --- g g erhrte Card p
'~
T f g Aia A[
'T,PO-M
'N PROCfSS 70 c mnT p.,MD N02 tvE 47;6 kpc rh 5'
9 400M A;: %5 (5 PARE) s.
'cM l
9 j', g
[i]-h.Eg i
g
~!
soTE:
_ExHAU5T 4
y g 4:R ALL E0ul% INT SH;wV JtJ T*$ iHEET SH n 1.
i 70 VALVE V.a REtecATeo en Ex.sT,os ww5 yAtyg3 Aug i
p,
'N PROCESS Rc0M icuisvtur a.a 5satL.3s ReteCATto og 3
.E XT EN D Q,
?L0eq 30tgggg) 3 Aygg 43 3gggy gg g, 3
- ,j \\ ('oDT OWG.' W D-4de f HT.'4 0F3
[.
^
AETRAci j
hk
$1
- = = "
- l. = H -
-a i
$ ARE PAstTS Lisi j
- "E8
- eta ='==.==
u.s a. =* ~
t p.-
_EXMAu$ T wtss erieewiu sertviss
,f,e f
"'t,
h M rs Y
--]
3pAgg
'"' '*" "'j'j" C * *'* -
.}
tassa ses-so o, e_s ag 4 g
- % ' EXTEND fe s
s,_
CSS CB491T 50UDI lCATt]N S9T 4
.i i
, / M ETRACT S #^8 E
- cc 3U.LDit;3 0;04, Pif-filG ALD
< :4 er v
lf JSTPUMEMT/,TIOM OIA3AAv
\\-
hE '78
\\
' :.a
'f*.'E "J.;'. 3
.. m.
g,
= gg g.m I"*
.-l Do-ova-o.o h
... - = ~
.s'x.o.,
m o
is.. 5 p
4 l
3 l
2 l
1 i-a Biolld) 0386-3 ~ Qn
8 l
7
\\
6 l
5
~"
i i
- e <jr--
C '4 *A-CT C C
{
~
N 8.l. #4cTE*4 i
{'
? % A-Cl-60 7
VENT I
g-
"i
'~
h
' SEE N0fE*3 8
D.
. E,
.g
~
C A-A-Cl 13 D GL l
-=j s
,..., 4-m 3g:
[
.v-
\\ * " ' = *^ ^ '" =
-l^**""""*
O 7
b 1
o 9
' h -A-Co-tf
- VENT y
^
6 FY Y SEC NOTt*3 4' 4' ec h
D
~ (*,
Q h-A-Ct-ii. 7
\\
OL t--
_p T
in h:-
~
M k-A-C F40 E"4fbd
,MATFJttAL HANDuuG Sf5 TEM
- A
~~
NOTER,/
\\-A-Cl-18.___ M
'U VMI h.A.c,.3q (--
CAPPED W q
- #I
- Flu. NO11LE STAT 404'
'E PsN Stop r.a.cy4, f
JL
~~
M hA*Ct*S7
" M LJ I4*A-Ct
- g Q__%,.3%
- q y
s+Cl-,
e P.N s.
.c,.3, v.
437 g ~--
A g.A.ci.3, p..< (tgj
- ~
lM @
g,,
G N01Et f f*I (y y 4-A-Cl - 3 3 H g
Q PIN 310P g.n.c,.35 t,&f--M a to l I '
~
^
t=
m s
f,(
-4umj lt'Ok" M %-A-ci-43 4
^
y,,g, Q=s_ro_%,.-c,m g
e H A-^-c' n =
.A-et-e3 s j
(i l:{
i.-. + --
P
~~
$ k A-C1-Es f
)
ai y
,.. - g woTE:
1 r Mo.,
3 yggy 4
4 h-A-C I - 2 4 f---
i l 7-4t h--
P A
PN STOP g.g.c,.3 n
X
--} 4-A-Cl*50 l 7 44 h -
9h 108 3
] 70*UA*l-100
- l-A-CI-45 pg O wp j
{
'~
~
k" A"cI* 49
)
g.ya. g.,34
) 70-VA-4-132 Iag
- 4. A.cg.x,
)
a L
_( yo.yg.g.g33 )
b O
FV 70-UA-4-t*23
]
g Asa LOCATED IN t' 4-A-Ct-75 D
I So"o) "
$tniJ N' C*"UEA
@ ta- -(
g
- 1. Lit.$
gb a
,,A
~
4e NT VENT
~E W
70 IA-t-l077 v.
y.
u g.4.Cl-47
-b W MA CTECT04
^
1 (NOTE )
(NOTE )
/
l v
vtNt 3
(7N099 h
/
WCuuM Cup VM:uuM cup FY
' DRUM TRANSFER gtAreN g
g,,,
g 3
,.c.g,.44 p CAP D-0p V
' sdi was =
An UTILITY AIR veNr(worr3
~
. '... ~ a 8
l 7
l 6
l 5
2
\\
.6'._
-' g.. f -
N s dk e
.t
'/M M.>7/
d j
h 4
l
'3 l l n.3 3,7 l, l 1
navestoses i
tJcTES:
(
' * ~ ~
~
l ETec 23SITsont s.DETEraTED,0iAL o
THis Dassnas cptA Lo er( ECN'He
(*s e- * *. 6-
{
l SCLENCIO CONTROLLEO.
~uO O
- tiG1 l
l 2.Two POSITION.%',0LTENTED, MANUAL
{
l 3cc LEVEL CONTROLLED.
t
]
1 1 ALL SOLENOID WLVES D0y/tJSTREAM OF
[
1 MZ8-4 LUSRICATOR HAVE THEIR VENTS e
-"..o; TUSED TOGETHER OUTTo A FITTING 04 4
MULTeMcTea Tag wgLL tyist pp0 CESS ROOM.THE f
ACTUATOR fEyT3 og ALL you. LUBRICATED $3LEft
-ji SEE NOTC*T
$3 VALVES ACE Tuata TDGETHER TO A D
t r.
SEFA4 ATE SULKHEAD FITTING ON THE y
SiOL OF THL LNCLOSU9L.
t 4 TWO-90$1TacN,'4,DETENTED.
k s Two.poSir,oy,g 3pg,No REruaN.
)
P in ACCESS 70 ALL EQUtPMENT ANO FIAST l
g.A-Ct-eq vs PIPING MECHANICALJotNT ON ARR0%f 580E OF LINE MUST BC PCSSIELE WITH-
]
)
CUT HAVINS To CROSS INTO P90 CESS SIDE OF SHIELO WALL.
~
l 1 IllTERFACE AS SHon44 WITH EXISTING PHL@
i g.g,g, y PIPE Ut4ES AND INSTRUMENTATION OF g
EMPTY DRUM LIO JIS CRANE PET. A.T.I.
OMk't71-Pi c4.
Si
-h
& REDRAWW FROM THE FOLLOWINS Af t 00Ae
{ah
'NGS IT2*PI-Ot,17191-03 AND 172-P1-04.
ALL AJ.a. NOMENCLATU8E TOREMAIN AS f
4 gag IS,REFEA TO AT.L dug. IT&-Pt-00 FOR eta-C i
y GPAM LF.GEND.
4 AII.NUMSEPS WiLL SE M u-x, g WWN.S. NUMBERS WiLL BE xsr 09 Anx.
(
4 st-A-CES7 D
t- ----(
b P
aHrtNor a
4-A-C1:4
-- --E (VA-Ct M.
3 p
?
%-A-Ct-54 7 i
.f AaRAlsi.lhNKS-hCa* M, g
(Nort*3 g " r_
_, 75' sa o i
i
- MZ g T4=N3,UE0 ATOAW4, b
n CONTIN p
m SrAT.
g... c,.s, =
t
( I -A-Cort h
~
w o,L TA /
g j
A Ct n, t
M El-a c vA-et-"
APERTURE a
a i
b-f1, }---- =-(
4 4-A-Ch51 d
CARD
- t' g *-
. v-u m
2, qs a
F
& Availlable on C
(
4 4-A-Ct-51 h
't-----
(33-y 8* Ig-p p. or.
.- i Aperture Card
'th FV L
,p
.. __C i
d
@ DENOTES EXI$ilNG EQt#Pf'.ffiT COPPt.R TUBING Exr$TINO
- N.T DENOTES NEW EQUIPf4ENT 4
ho O DENOTES REDESIGNATED OR g
Smy.
l p,,,,,
>(-.
' 12 J REEcCATED F
CA,;p0-
,Am u.T
==... = n=v ie.
- y.,,,,
T!.,,
{
a - '-
lm
.2._..
_, E E'; e
.: G. :---
!a P
3 p
e
/
C.SS.CEMEtlT SOUDIFCATOil$v57EM 1
,'.m BUILDfh'G OH4. PIPING Ap.D P
ac.
~
E 4-A C1-14 m
' *os %
INSTRUMENTATFOP1 Cir.Gur4 L
4
\\
"a /4 E
b 03-D M7 1
$[E NOTE *(, -'"--"
s
/
3 Tt"J.-c.
D In,.
Ji 4
l 3
lV 2
l 1
}
8 to l l 9. I O S 8/.o - %
"I '
u m m V.@ ! $. $. @-- ! G,.< &j.;!f
$ men s u ms.a 3 F d. f' "J'es tg annedsomm '-
~
.-.-g m_4m.g
. ~. -
-n.
.. a:
gJJd%Na,& W
.. u QM:p
.'...... q__ m a " =. J,p.--.
ws.."
4
~.
= - -
w:eyr~.u;.m.,p
-mu-n -
..e.,
.~%
8 l
7 6
l 5
+
y OWG..P80 DESCRIPTION c
[
teeO-33GS * ( a ssfJ RTS-ORUM LOAD OUT. CONYCFOR LAFouf ~
ae 2.s k.D[i.(' ( * -.l.]
1000-13 3e.(8 S16J US. SWIPs/0vfRPACK a AS$tMdi.I
. ]' '
$000-f 33f = (3 TNT) R73
- SWrPf/OVERPAcK (NCLOSURf Socot:3s ta (t swil Ris% swrPr/ovtRPAtx-AsRLock oooR off.
O s.p
-a 'ye.l p..,* ][Jh icoo 833D(t sWtl RTS - 3WIPt/ovtRPACK - AIRLocs( couv. cer.
/[
9oo0- s 3s+-(5 See) Ris - SwsPE/ovtReack - TORNTAOLE OrTAIL
.'c.
?
10co-asss.(a ssit) ers - SwrPs/oveRPACM - sanovo otTAIL J
fi.
e
/-
ic e D- # 3 36-(13NT) RTS
- SWlPf/0VfRPACK-DRie PAN o(TAIL
.if]f Ih@ P2.'
~~
9000* 8337.(ISNT) RTS
- SWsPf/0vtRPACK - LIO LIF7 DET AIL M
I
&,,p ~Q,W. ;p$._
t-D 9eens 8274ct cr; 'd'TaK ?.'E'*"Il !".'W M+T* =
~. ~ -
- n_n :. - w,* -
. U %. "'.
M tn 4 p><
,.d-JL.y'%ti'.4;
....q, !.:
.a.
A g
.i.
g
%!. [n... g*
!??
g g
.. O,,
3
,,;a.
& W,. -
- .m.y
{
Lj
. p,.. !.-
}
%}
7
.d. m.M..ii.'. ! *;..D.3.*2-.. A i n.k*9.a -
'f.
P'ti:-
7EihO ~ ~ ' [
E
" *
- d* W W 0
sus Lo i
G".
~ '.::* :... J...
PtR3eNNtL
- n;
,;rp;jf. -
7
. Deet.
i T'#W.,,
u i,,c,.. '
.~..,....
-.r..
.J g,y Any n,,g,-_
y A.
..ft. :.
i 1
's.
~.
N 'ilf~.* ' ' ',1.* M.. *a " * *_,.2 L L. '[_....
C...W.J.
f 9* LFT TA4LS o 88 e (a"
- 8t a'
' N.
4 -
. f.P.
~
l r
t
_Id.. 17".I4.X. ;..
I.
? P 1,:. b U '. '
_. Mmf vtitTidAb.
J M454 d L*
g g.
. wa mvat..
}
...J.
l.
.C -- -'y W. %..f.T
,y y "f g,
{
Wtv
-i. g
.1, y
,n kTM.]
l l
't 3
- 5, r
s h
-)-
h.y l pl.1 g 4.Q R G
. l
~ ~
m
.+.r; =..
=
~
4' '
'a f.M ThiLd4 %.2::..p* ?i ~ ' ? ,.4 v.J J.%"" ':., _ '
!.Di t
24.'" b.
,:. 4 l
4.* ?
- '"b
,t
"'***?
L*'
' '* I..,. i p g;-
'.:*I..'*t.j,
'L.-.-.-
f
.p-
-d',2f D*.
4' d o.
...'7i
a I
i.J -17 7
.-4 Z
'~'
.w 4
.A7.e.._...j-6
.,~
g.
.e-
.~.
?.'.
1 4
.4.y, y..
I
.-[#.p @,.
].
,,4
..s
=.A..T.g,~r..$,.. J:'.K:..'C!.~T ' ~ *di.'.if CJ G7., ".
. ~
D
.'o,-
...>l
.r.q',... S,-
- Y
- e.x r
s
+
6
?p#.
v
~, ' * *,~
..&y.s,
. Qanu.
s.
, y u:2fQ{.:.
en m p.-
. e%.sr
.. M M etNS
.o.s.s, L*
w-
~.m.
a
-f fh?
.1 g
- e. ft b @a i
a s,.
b,e-g.,,,
- 4';* kN]R
.M:.
- 8:L,*'..
r,p, &. M;.a,-W. -
a C
66
} (;.Ql:l.,?
- e tb 1;4:04y's &. Q@
.C T.L r t..ir a
t.3
- e.. -
p.
.g-M
. e....
M 4h, J,
7.,_..,........
/ K, MdIl u,3%.,.f--~[jM6 @c ".'1*'y. - ' : 'l'; -m.lM IM.',C~.'s !..
O E*'
2.
+
.r#
.5.. k.5fkU b.r'?!b,.V $ U.:s$, g~fu.p4 tE
. 1:
7
.+ Lyre,.erm+r *
- t aerb it v-g m g
'frga!.
g,d,;,,,
2;
.m d M*.dI"T!*C UT J' ' ' '. l * * '
- tt. "J'*?
'?C
. t*g ' ' *:n. '*~.h'~uM. 'iM:
J..'...'...
- L' o
N' JD
- k k. g M
...o
. A...... ku..+ tmCW *;.u
" * * "- ' *W
.. u
--.w-R --.
, t..'
h.ZFir$5M8WHEElf!M4M,&S.7BAm;WlM_ tN&M 6 9 22l I5~
~
w
. e,w ;.
.n..
,a.
- ; r.t.=:,ma.1.
.? yewq~wg~,
- c2*h p U.Q$
f I~ ' l. '.lr. OtsW9G W l pr,w.vG ta,AG71,. l.
LFAMPd
.h__Y5f
.\\
'N
^
~
_ r.-:
~* &
4 4
l 3
l--
soon.iscs F l l 1
1 I
1 a g v ie e o se s I
o m.m o
c.
4 4
APERTURE l.
4-l " " " - - - " ~ ~ - ~
CARD om,.m s
I AlmAnualoOnj j
i Aperture Car'd D
g
- n..
f
', i ',
i, r-e i
r W _+ it 1
- ..~
.r-o
~.
os,.,m, p.....
s,...
i i
xx gratene ernroea BMLS
' s tsi.ent 4, cousaq eest v y,9Luse j
t
=s
~ #r snt
.vue e uwe<
rra um sr -
+
sr. _
~ r,-
3,.v s,.
- s..-
,.e
.v v.c e
r e na s.
3 o.. c...
y.
Moo) lsts'[
hM to; f
n+:
g
{
His MisA I
I
__;T-'
7 n--
L a-A.. IA-A J. h C
(
i
~
i
.v4.j 7
ll::::;*.::: 7: :':
Ji "l
-[ [
l q
m
+ e, p.+.+ *-e. *r*
-e. --a r
p l-
.-- w
=
,y I
y^
T.T T T.UT; ET:YYah%
I d
3[t c
I_ _
e 7,
8 i
y r;:f.gg' f,,rgry gere;
.o
==
w
...n,...
l (towv i
'I " t'I'.! !! '."
g.
O j g[ M U I,I N q
- h
/ "18'#I* # "
I, qT 4.",, ;:;l;;;C j
l 7,
'C
?
O k
l
,2
'M 10A L.,.
.J.
s' 4
i g.
/
,h_
m Y
h
=='
t-f:*
v M L$ Ad H ""
E I
3 I 6
i'-
J l
xx b
,_ g; O
s i
I
[
D,1 V
e, c.s-y
.e.e...s s r.
g:
x.o o...
V, 8
A i y f
. coLLest motv. si, t oo*. o*
k.-
svu l'7ll
""M" l,7l,'ea l sE*a'E na l
"8"' l l roe
"*ren A
e anos pants List s
asors coat sansets tas.rss or>enset arterro ce==ct am hwat hb assa C,_
eset
,,,,y,,,,,
,, g,,,4g,, g g,g, 7'llL-Irs fi"MM e.* = =r.n v.e m.".
. u Tottnaasces.co a.or SCALE g, -
%. _m _,
t s.
t 1, t%
Is ir rum si,,h Dil'JP4 L.oAOout e
k.
CosN r.Yop.
LAvo'r p '-
,,, m e w...o le.s en j eev e
aca, ras,,,
,eff g 9,,
mas gqooO.IMS 1 8 4.
- 1......a.
ry_g, g pigpygg Q j,,,,, e er :
- - --""" g a,,
fl ' -! M rj.,* '4 l
3 l
~
l 1
~ -*
2 3
i,
m s..,
8 l
7 l
6 l
5 h
- NEW s u Ya svf >.T k A *.br
- h'.w.f c Oss 4 ? L 0-# f.t ".. t a
CONTRM R"0M INSTRUVEN' PA r
/ U. *./C ill
- A asc::<:. Tra a:ste <se -
TC St Pis'.'.A*L' S*
D rervar c t r ' ' " C'.
5 l
're.4 + >
- I UJr,
Ms
\\
l
/
l
\\
\\
\\$,
\\
\\ LI!//,
ICRM\\
y 5J
'r yea 3 3in 1,7,, ['
yV a
. m ym
. *j//g-i T'-" f LWTS I/O
.b*a]ur.r g
I
/
Fast 7
p e
m
-P ej cJ Sa 0 CCNTtWED
[iv r__ m: M d,.
l
.-*2* I l c.ou *ws.st' t
h_
L 8
- s. N*4o e
a "cQL.3% bet.s a
f S
3Ch i l
S M
l
'83A 4890 #
r %
"**'N O
g 2 *t chDut?
(vasER 76U.9
,.s t 4 _/
E'.h jwgb,4 8
i
,;c
~~-
l 8
a2t c
T l
8 r--'-~
I l
e A-*
44/
i, i-i i
,L e
s e
L...
-..-l fa' 8.ts @
I
+
4 g,
g r_____.........L.I.......__.....
3 i
ei s.
g e
8 l..l LWTS PA!4CL
's.>'
s
.I e
e s.i r - -*
r 1
r-i c...
- u i
p B
.j I
O dj e
l l
A 1
I l
i b W m
$m. um 8
7 6
5 S
900D-389 s.4 4
l 3
l l Ge..w-11 l l 1
.c vi. o.
ammslevi l 884 I asseusse
! o l tRuxa et s.
a
- E A M 3 3 L t. : }4e" 3
. ? ** ? ! **. i*. A
- i
- A N T. s... '. I k * \\ ! ". ! '.
." > ".* * * - f T - s
- r y
- 1. * '
/
t5 E E *4 J'! *,.-' ' ' **
Et.
I.
ep%,
- 11 #."* C ON N*rt.N.s. *! * */.. -
- sd.
- )-
A s :, o, v -
y as:
-_s
/,
1"w.1*
)f f iL )\\
J.m 9
ea s t4
- T-AML;.
7 Ol[ Ah Oft' M F sh57RJWL.T =k%
/
.s a n.s.----- -.c +n
(
,L
?l nn.m rue.
. vre y
..--.e-
.a.
-p bO*8~NINT
' /*
ne.-. _
ga._ A y
. ' _tM.9.
.3l7g>
..s,.
f. - - - - 9.~.I W
m
.l F.
s 3a E
'r w-.*es.= e -w isi.erj.
.i, we.ne y
s 3
'Gi 4 I,.
~
.[-
- '---~'N.
NN_..._
\\s
- it g, ag.4 4,
, b, *# f -,. _-- eigT g 4 4. a g s"
D.*WYPIS Q'
'TTr i
9 4r.g, II
-O ! a; il
,- 4 < g;g---
- -.&,Te * ~ g en
-,% ff
. E t t.e'~
p g
HS;5 e!
- - - 'i'* 'q- ;cc 5
- e. -,a---g---
,i uaw
,l<
m
-Is. s.. _,:
G o-so e,eO. f t re' I w,
u c,
I
~ '
- [1..s.
l!,
-t.-
4 1
A I
p T
J c,f,.....-I-
]
_ s.ne E/
F,.E' i
e
. s s uma
./ /
i - -..
Ai*.P~
l
' C'J 'e O
[d!
W ILEV llO' G" 4
>.. p 1
D.
- r... g.E C 4 C,nr 7
i G :;t ". *
- C *.. 4
- 13. 7
(.c
/
IC '.'..'" r. - G 48!
g A i s
(',. 5.. ;.
L
, 's d
- L E T s
2 '.25.b -21)
.CD
.}
Lt.
. :s!. *i A* : i 1 - e.;. : t.....!*-
K*
,t ::.s :: :sst. s
-t :.1.s cas-TI B
". ~
APERTURE CARD
& Available on N Card g g a 03 W /G I
i pa,a,f,.O.s. r'-* ** *'ut Ott d
=1 suDef uCL.Af,tfet OR l.n.
=
eix- -
A nuts ust u- -
.. m c.r e m
--e-f
"'t roe wo==, x.
A w.ve, - s==
c.m..
?
j
'as'ia'as -= ='==8
'"jrf,g, 1
g
/
. 5 5.t.*/ENT 5. Li. Nr a Psi-Y
[,'
? ? 7"
. "7. i. BUILO'N 3 01." ! ". A T '.'.: -.' TI C N m
=rt
- U4 ' TC L Y L'_.
~4 emsm
- ' " fyA 5
j.,n 3g l"j i
""'88""'
T!.".C.A
"m r, D
[
r, 4
l 3
lf 2
l 1
l
a w.%
8 l
7 l
6 l
5 D
ef 1
C
.._.~.
AW.
ye PAmtL 44* a 43 w a 100.
-\\
\\
\\
N
\\
\\
'\\
\\
6 LHTS S wi98.
%fe RALK COukT f
9aNEL FufvRE c.
-~'S l
l RUE f
Q d
Futunt
{
((
I k' f
- 060ffC s'. o aam l
~ - -
c sK okt..L e
l S;O a 4'e RALK I
Task t i
Nives I
.-_1._
l
~
k ade ts Te.pe se.f.t R ag es.
cF e
\\
ELEVATION OF CONTROL R@
A LOOKING NORTN 1
(.
1 l
, 1 i
j t
i e.
l 7
l 6
l 5
i
~-
8
ii i
1 1
S.
I 4
4 l
3 l
r*~ sooo-e m nI l 1
1 f
sum 1.s.1 I sa a I _ ___
o E R.S D
'j)h *6 (so-3 C
i.i D
l' Y
f TI
-i
-uc APERTURE
..o.
.I CARD t
?
6 g
eq Also Avakble &
I e
1,.,..... p..,.
ana c.*
s..
Ape % g a
(
i, e
1
.s
.. u i
' r v......, L..
.e u
.c I".'P
=.
l 4
- " :::::n::-~
z-
~
y'~ a m.
..... l c
- -4 c.u.o J
. I
'Eili
._ _ _ j --
p l
emt,.~.e s 5
4 g
e r, e uann
\\ p..
'?
i j.
I r
/**
et eo
! '.E l "".E "_.
s --
4
-i
',':J" @=w_ i _., _
i e@
a o
h
,,a<
s O
s.-
1.
,.S.
i a p/,. J-w, C. U,s g.e,-
l u.
't
'8 O-c
- g. $
' ^
f,u.
/{
g r:
- r- -
~~
.< n e s o.
cear-r' s.m o o r
'E
(~
mc 5
.t..
7 (,"j NN pap,gt, t.
- 1 m-m raar6 pa se g g, in,,rx g
w
,g.,
- 3.,. u...co.
.r. x....,
c-w're m
y a:p m,,....
es rn.
- s nen
- es n p
"fs,) ?
-q, p,
s y
i
- u.-.
B
..t.
g
/ i- __-
!r pg yh ctraw cavm n.e.e
'l. y g t' i
i j
v ~h., ! y 3. k,
{
5 a
gr uts.
- ' -sr v e r natn i
<.r. s.
..co.
I" g-.,,. g g((>.u ll k. s,,,,.,,,,,,,,,,
f
-. w pr
- t.,. -
l j
p; b' p L-.
1 W h
,,,,w,...,
J j.
e':..
v.at:
${
- i,_____...
i }_y k.}:
i
- _ '*-~"EI"t._
'6**"
v
?
e...n,...,
.el.
an
_g-r t.]
lL,..Tu m.
?.'.'."'
,... _.; t
. g.
-......"l3....
errra ycc tem...gs_
IS g
,..,.,.,,m....:..,__,,_
m.._......,
. ~..
c......
'~
BbilalD386-W
+
m.
.=-
i_= r---.
f l
PARTS LIST wassee esensspesas. **f'l*,.. r e...
"l'l,. m ' " " * ' ' * " "
' * " ~ *
(d m,'l '
r.a t c.as A
M-
..rs
,uts css-o..e, ec.ts (QQ Q.g g w e ven., seniew ser.,wewe ca.he.
e..e ven.v..
7--
l 84m $catt
/..
C$sf g.WrS gy fil,p.
C oNTRc'. R0CM
('h.
e t
t e.
t.
e.
s.-
..,,6,
=V E t.EV A TION
- [
e*
- 4. s....
w%
een rw
. n u~ X
- n 7.','* "" '
l"Io"o'o m I"o'
- 3 q
TC.L6 Th D
i=="'
I@
p 4
}
=
1 1
.,e o
G.7.0 WASTE CONFINEME AND MANAGENT G.7.1 WAS'IE MANAGENT CRITERIA Criteria for the management of radioactive waste generated by the CSS and accompanying systems are described in the WVDP Long-Terra Radioactive Waste Management Plan (WVDP, 1985). The guiding principles followed in the preparation of this plan are:
O Minimize all waste generation as much as possible, O Provide as much flexibility as possible in designed facilities to 3
accommodate future uncertainties (e.g., liquid and solid was te voltmes, storage, process equipment, etc.),
O Segregate uncontaminated f rom contaminated waste as carly as possible to minimize additional storage, disposal, and transportation requirements,
O Minimize occupational exposures,
J 0 Minimize costs, O Protect the worker, public health, and the envirorment, and j
0 Conform to applicable DOE Orders and guidance from other regulations provided by DOT, EP A, NRC, and New York State.
1 j
i p
CA F1107 :ENG-308 55
G.7.2 RADIOLOGICAL WASTES O
The CSS and accompanying systems will generate minor amounts of radioactive wastes: spent roughing and HEPA filters, drum swipes and system flushwater.
Solid wastes will be disposed of per existing procedures; liquid wastes will be directed to the LWTS (once it becomes operational).
Because the CSS is a Waste Processing Facility, the product itself is a radiological waste from other Project systems. The cement stabilized waste form will be suitable for either on-site disposal. Cemented TRU waste will be suitable for on-site storage and for transport to an off-site disposal location.
G.7.3 NONRADIOLCGICAL WASTES Nonradiological wastes that will be generated by operation of the CSS include f ailed drums and caps, paper, and miscellaneous trash. The total volume of 3
such wastes is estimated to be 30 m tyr. This waste will be transported off-site for disposal.
G.7.4 TF-CAS TREATPENT AND VELTILATION G.7.4.1 OPERATING CHARACTERISTICS The 01-14 Building Heating and Ventilation (HV) System is schematically depicted in Figu'e G.7.4-1.
Outside air is supplied to the operating aisles 3
from the second floor supply f an (238 m / min) and through infiltration 3
3 (20 m / min).
A portion of this air (68 m / min) vents the operating aisles and is ultimately processed through a roughing and HEPA filter to a blower to be vented from a stack on the 01-14 Building. The reclainder of the inflow is 3
directed to: i.he CSS Process Rocxn (38 m / min), the Waste Dispensing Cell 3
3 (59 m / min), directly to twc HEPA filters (6.5 m / min), and to the off-Gas Cell 3
(86 m /m).
Air exiting the Process Room is directed to the Waste Dispensing CAF1107:ENG-308 56 0
~ _
the CTS /01-14 Building trench. Air exiting the Waste Dispensing Cell
[)
(115 3 3
3
/ min) is combined with 86 m / min from the Off-Gas Cell and 6.5 m / min
\\m /
from the operating aisles and exits through a series of two HEPA filters to be vented from a stack on top of the 01-14 Building.
The CSS vessel off-gas that vents the Waste Dispensing Tank, is heated and directed to the 01-14 Building HV System prior to being discharged from the stack on top of the 01-14 Building.
The ventilation systems generate minimal solid waste. Currently, the two HEPA filters in series and the roughing and HEPA filter are expected to be changed ye arly.
G.7.4.2 SAFETY CRITEFIA AND ASSURANCE The roughing and final HEPA filters ensure adequate removal of radioactive particulate matter before venting to the surrounding environnent. HEPA filters typically have a mass removal efficiency of greater than 99 percent. The
(N ventilation for nonradioactive areas should not contain radioactive particulate matter. As a safety feature, however, this air is also directed through a series of HEPA filters.
G.7.5 LIGJID WASTE TREATPElff AND RETElffION Spent vessel flushwater will be drained to the laundry and analytical drain catch tank (7D-13) and routed for processing to the LWTS.
G.7.6 LIQJID WASE SOLIDIFICATION J
Liquid wastes generated by the CSS will be treated and volume reduced in the LWTS. Concentrates, spent resins, and filter sludges from the LWTS will be solidified with cement in the CSS. Solidification, packaging, and storage procedures of these wastes are the same as for the primary feeds (Section G.6.0).
O
\\m, C A F1107 :ENG-308 57 1
. w
,m
G.7.7 SOLID WASTES O
Solid wastes generated by operation of the CSS consist of 208-L and 269-L drums of solidified waste, and the other radiological and nonradiological wastes identified in Sections G.7.2 and G.7 3 Handling of such wastes will be in accordance with procedures contained within the WNS Radiological Controls Manual and WNS Waste Management Plan.
O G
REFERENCES FGI SECTION G.7.0 WDP,1986, "WVDP Long-Term Radioactive Waste Managenent Plan," WDP-019, Rev. 5.
l CAF1107 :ENG-308 59
u, m a.s.
- e.
n _
u... -
'b de CTS /01-l 4
~ BUILDING TRENCH 3
17 m /m STACK css WASTE I I' "s#"
3 3
275 m /m 38 m /m PROCESS DISPENSING ROOM CELL 3
H H
SUPPLY FAN 59 m /m 3
3 E
E s
238 m /m OPERATING 6.5 m /m 207 m /m P
P
=
AISLES INFILTRATION _
A A
3 20 m /m 3
3 OFFGAS 86 m /m 86 m /m __
CELL R
O U
H G
E 68 m /m 3
3 s
68 m /m
/
H p
i A
N G
008 m /m CSS VESSEL HEATER 3
OFFGAS I
FIGURE G.7.4-1 FLOW DI AGRAM FOR THE O1-14 BUILDING VENTILATION SYSTEM
1 G.8.0 RADIATION PROTECTION p)
\\"
G 8.1 ASSURING THAT OCCUPATIONAL RADIATION EXPOSURES ARE AS LOW AS REASWABLY ACHIEVABLE ( AIARA)
G.8.1.2 DESIm CONSIDERATIONS The key design consideration to maintain exposures ALARA is to ensure the control of radioactivity. Design features that e,nsure the confinement of radioactivity include:
0 The CSS will be remotely operated within a sealed, shielded cell; O The cell atmosphere will be maintained under a slight negative pressure relative to surrounding areas to ensure that air leakage
~
will be into, rather than out of, the cell; O The radioactive liquids are transported between tanks via remotely
('"N opersted and. instrumented piping systems; O The radioactive liquids are processed in sealed vessels which are vented in a controlled manner; O Any contamination that gets into the cell air will be processed by the 01-14 Building HV System prior to being discharged through a stack; O Any liquid spills will drain to sumps where they can be collected for f urther processing; O Remote indicating radiological instrumentation will be used to monitor the product as well as cell and process conditions to provide verification that the facility is operating within design conditions; 13 (s,/
CAF1107:ENG-308 60 y
-e
0 Use is made of a remotely operated Material Handling System to move drums through the process; and 0 Use is made of shield walls and shield windows to reduce the dose to operators to less than 500 mrem /yr.
Additional design mitigative measures include:
0 Use of solid state electronic instrumentation and control equipment to provide high reliability; O Use of redundancy in critical aspects of the operation; O Ability to monitor the process via control panel indications; and 0 Use of a Closed Circuit Television System (CCTV) to provide a clear and unobstructed view of critical areas.
These design mitigative measures should provide a high degree of reliability in confinement of radioactivity.
G.8.1.3 OPERATIONAL CONSIDERATIONS The CSS operation methods were developed to ensure that occupational exposures are in conformance with ALARA. These methods include automatic and remote operations and remote viewing.
Waste is transf erred f rom the Waste Dispensing Vessel to the High-Shear Mixers through two three-way ball valves. The positions of the valves (open/ closed) are constantly indicated on the control panel (see Section G.6.3.2.3) and are automatically controlled by the batch program. The operator sets the panel controls for the type of waste to be solidified and initiates the process.
Process parameters are autmatically selected. The waste feed and cement are metered into the High-Shear Mixers.
C AF1107 :ENG-308 61
Empty drums are remotely positioned for fill by the Programmable Logic Controller (see Section G.6.1.1.2).
Drum position is confirmed and a permissive is given for filling. After a drum is filled, a permissive is required for drum removal.
A remotely operated Automatic Drum Capping Device caps the drums. Remote indication of lid engagement is provided.
The Swipe Station allows the entire circumference of a drum to be smeared without direct radiation to the operator and allows the operator to remotely retrieve and read radioactive smear papers. The contact radiation dose rate can be measured in the range frcxn 1 to 10,000 mR/h.
Contaminated drums are remotely overpacked'at the Drum Overpack Station.
Drums are removed to an interim storage location by a conveyor remotely operated from the Control Room (see Section G.6.3.3.3).
h G.8'.2 RADIATION SOURCES O
G.8.2.1 CONTAINED SOURCES The CSS will process a large volume of liquid wastes having a wide range of activity levels. Preliminary estimates of the properties of these waste streams have been made (Henshaw and Saha,1984; Saha,1984, Saha,1985, Saha, 1986). A summary description of these waste streams is given in Table G.8.2-1.
Isotopic composition and concentrations for these waste streams are not available, but have been estimated based on:
(1) the distribution radionuclides in Tank 8D-2 (Rykken,1984) and (2) measurements of the uranyl nitrate solution. The first distribution is assumed to be representative of all waste streams being processed in the CSS with the exception of the uranyl nitrate solution. This radionuclide distribution is shown in Table G.8.2-2.
The uranyl nitrate distrioution, shown in Table G.8.2-3, was based on radiochemical analyses performed in 1984.
h)
CAF1107 :ENG-308 62
i The radionuclide inventory in the various waste streams (with the exception of the uranyl nitrate solution) was estimated from the Cs-137 inventory (Ci/ drum) for the various waste streams given in Table G.8.2-1 and the Tank 8D-2 radionuclide distribution. The concentration of Cs-137 in these waste streams is calculated by noting that 6.0 pCi of Cs-137 per mL in the waste stream will result in 1 Ci of Cs-137 in a 269-L drum (using the reference waste loading value of 168L per drum). Thus, the concentration of Cs-137 (in uC1/m ) in the waste streams is estimated by multiplying the curies of Cs-137 per drum by 6.0.
Once the concentration of Cs-137 is known,.the concentration of the other radionuclides is estimated using the radionuclide distribution given in Table G.8.2-2.
The concentration of the radionuclides in the uranyl nitrate solution is given directly in Table G.8.2-3 G.8.2.2 AIRBORNE RADIOACTIVE MATERIAL SOURCES Air venting tne operating aisles is supplied from outside the 01-14 Building by 3
3 a supply f an and through infiltration (238 m / min and 20 m / min respectively; see Section G.7.4).
This air is drawn through the operating aisles to a roughing and HEPA filter. Air venting the cells is separately supplied. Thus negligible radionuclide concentrations are expected in areas occupied by operating personnel.
G.8.3 RADIATION PROTECTION DESIGN FEATURES G.8.3 1 FACILITY DESIGN FEATURES Facility design features ensuring that occupational exposures are ALARA include shielding, remote handling of radioactive material and ventilation.
Waste dispensing takes place in the shielded Waste Dispensing Cell. Cement mixing and drum filling and capping take place in the Process Rocm. These operations and movement of the drums in the Process Room are remotely controlled operations.
O CA F1107 :ENG-308 63
Ventilation is provided to.all areas of the f acility.
Air is vented separately
~~
(,,/
into the operating aisles and the cells.
In addition, air venting the cells moves from areas of low expected radioactivity to areas of higher expected activity. This air is routed through two HEPA filters in series for particulate removal prior to outside discharge.
G.8.3.2 SHIELDING Shielding analyses were performed or various locations and sources for the CSS. Figure G.8.3-1 shows a schematic of the locations of sources and the locations where exposure rates were estimated. The estimated exposure rates at these various locations are given in Figure G.8.3-2.
These elevations were performed assuming that the waste being processed in the CSS had radionuclide concentration of 6 pC1 of Cs-137 per mL of waste.
These evaluations were performed using the computer code QADMOD, a point kernel gamma ray shielding code (Radiation Research Associates,1979). The calculational method used by this comput'er code involves representing a volume
(
distributed source of radiation by a number of point isotropic sources and computing the distances through all regions traversed by line-of-sight from the source points to a receiver point of interest. Energy dependent exponential attenuation f actors and energy dependent buildup f actors are determined from the distances through the regions and the characteristics of the materials within them and applied to calculate the direct gamma ray exposure and the exposure with buildup. The gamma ray exposure with buildup represents the exposure from unscattered plus scattered gamma rays.
The exposure rate in normally occupied areas south of the Process Room is less than the 0.25 mR/hr design criteria limit except for exposure point 17 located opposite the center of the drum storage area. The exposure rate is 3.3E-02 4
mR/hr adjacent to the shield window and will be lower than in the Control Room. The exposure rate at the drum load-in air lock is 3.2E-02 mR/hr with the inner door closed and the outer door open. The predicted total exposure rate through the south wall and the east wall for points 8 through 15 will exceed 2.5 mR/hr under the original maximum design limit of 100 pC1/mL. It may O
therefore be necessary to post these areas as Radiation Areas if waste is processed at the system design limit.
CAF1107:ENG-308 64
Access to this area behind the east wall will only be required to maintain the Motor Control Center which is located behind this wall.
During such periods,
the inventory of radioactive waste in the Process Room will be reduced to maintain occupational doses ALARA. Ccrapliance with the 2.5/t mR/hr limit,
where "t" is the maximum average time in hours per day that the area is expected to be occupied by any one individual, will be achieved by the reduction of radioactive waste inventory in the Process Room. The area south of the drum storage is not expected to be occupied.
Additional shielding will be added to this area if needed.
Similar exposures are calculated for the west wall; they vary from 0.01 mR/hr to 0.075 mR/hr. The latter (maximum) value is about 30 percent of the design criteria exposure rate of 0.25 mR/hr.
The west shield wall will not be in place when the CSS begins hot operations.
Ventilation control will be maintained during this period by a temporary wall which will eventually be replaced by a shield wall. During this period, no waste streams will be processed that could produce drums with exposure rates in excess of 100 mR/hr. The waste streams to be processed during this period are expected to result in drums of solidified waste having contact e posure rates of a few mR/hr (e.g., the contact exposure rate of solidified uranyl nitrate solution is estimated to be 2 mR/hr). Temporary shielding will be used if needed.
G.8.3.3 VENTILATION The 01-14 Building HV System (described in Section G.7.4) provides fresh air to the operating aisles and cell areas. The air flowing through the operating aisles passes through a roughing and HEP A filter to remove radioactive par tic ulates. Air flowing through the cells is from regions with a low potential airborne radioactivity to areas of elevated radioactivity (i.e.,
Process Room to Waste Dispensing Cell).
A separate airflow is channeled through the Off-Gas Cell and combined and channeled through two HEPA filters in series to remove airborne radioactive particulates.
O CAF1107 :ENG-308 65
Filter changeout is via an air lock provided for entry into the Process Filter Room and the 01-14 Building Exhaust Filter Room on the third floor. A monorail hoist trolley is available for the transfer of filters from the filter housing area to a location at the southwest corner of this floor for packaging and disposal.
G.8.3.4 AREA RADIATION AND AIRBORNE RADIOACTIVITY MONITORING INSTRUMNTATION The CSS will be equipped with three radiation monitors to warn operators of elevated radiation levels. The first radiation sampler will monitor the utility water line to sense contamination. This monitor's efficiency is rated at 65 cpm per pCi of Cs-137 per m, sensitivity of 9.7E-04 C1/m with a maximte detectable range to 150 pCi/m at 1E+06 cpm. Two continuous air samplers monitoring airborne contamination (one in the Control Room and one in the Clean Drum Storage Area) will sound if elevated levels of airborne contamination occur in these areas. These beta / gamma systems are designed for readout of 10 to 100,000 cpm. Calibration of these instruments will be conducted on established schedules in accor. dan'ce with 'P,roj ect QA procedures.
Od G.8.4 ESTIMATED ON-SITE DOSE ASSESSEYfS Operation of the CSS will require personnel to work in' areas where radiation levels are higher than background radiation and thus incur radiation doses.
The annual occupational dose associated with operation of Lhe CSS is estimated to be 10 person-rem based on the following assumptions:
0 Operation of the CSS will require eight operators (four per shif t, two shif ts per day);
O Six maintenance activities will be performed annually; and 0 Each operator will receive an annual dose of 500 mrem, and each j
maintenance activity will result in an annual dose of 1 person-rem.
/O V
CAF1107 :ENG-308 66
Actual operation of the CSS will probably result in a somewhat lower occupational dose commitment since this estimate is based on Project design obj ective dose commitments.
Occupational doses associated with removal and transport of cemented drums recxn the CSS drum loadout to the RTS drum cell are discussed in the Class B/C Disposal Operations SAR.
G.8.5 HEALTH PHYSICS PROGRAM FOR CSS The CSS will be operated in compliance with the requirements given in the Radiological Controls Manual, WVDP-010. The health physics program for the CSS will be the same as f or other Project activities. The health hysics program for the Project is discussed in Section A.8.5 in Volume I.
G.8.6 ESTIMATED OFF-SITE DOSE ASSESSPElff G.8.6.1 EFFLUENT PONIT'ORING PROGRAMS Effluents f rom the CSS will be raonitored along with effluents f rcm other WVDP f acili ti es.
These programs are discussed in Section A.8.6.1 in Volume I.
The only new effluent release point associated with operation of the CSS will be from the new stack on top of the 01-14 Building. Monitoring equipment for this stack will be housed in a small equipment building adjacent to the stack. A multiport probe will be used to withdraw sample gas which will pass through a sampler, an alpha particulate monitor, and a beta particulate monitor simultaneously. These continuous r
particulate monitors will provide alam and chart indication in the Main Process Building Control Room of the radioactive particulate levels in the exhaust air. The sampler media will be screened weekly for gross radioactivity and quarterly composites of the glass fiber filters and charcoal media will be m alyzed for specific isotopes, including gamma-emitting radionuclides, I-:
and Sr-90.
Flow and count-rate sensors will actuate a backup vacuta pump and various alarms if equipment f ailures occur. Tuts system will be provided with emergency backup power.
O CAF1107:ENG-308 67
t t
G.8.6.3 ESTIMTED EXPOSURES
, O (Q
The CSS will process a variety of waste streams. For this analysis, it is conservatively assumed that the CSS produces 3,900 drtans of solidified waste having an average contact exposure rate of 1.2 R/hr in a year of operation.
The radionuclide distribution of these wastes is assumed to-be similar to that in Tank 8D-2.
l The amount of Cs-137 in a drum of solidified' waste can be determined from l
(1) the average exposure rate of 1.2 R/hr and (2) the exposure rate associated with 1 curie of Cs-137 in a drum of solidified waste. The exposure rate f rom 1 curie of Cs-137 in a 269-L drum of solidified waste was determined to be i
1,180 R/hr using the computer code QADMOD (Radiation Research Associates, 1979). Thus, each drum of solidified waste will contain one curie of Cs-137.
i Since 3,900 drums of waste will be produced, about 3,900 Ci of Cs-137 will be processed by the CSS. Using the Tank 8D-2 radionuclide distribution as representative of the liquid wastes to be processed in the CSS, the quantity l
and distribution of radionuclides to be processed is given-in Table G.8.6-1.
,D As Table G.8.6-1 shows, about 15,000 curies of activity are estimated to be processed in the CSS in a year, s
j Airborne emissions resulting from operation of the CSS will come' primarily from.
7 two sources:
(1) the Vessel Off-Gas System and (2) the ~01-14 Building HV System. One vessel is vented to the CSS Vessel Off-Gas System; the Waste Dispensing Vessel. The off gas is heated and then directed into the 01-14 Building HV System.
i l
i i
- O CAF1107
- ENG-308 68 i
.--w
.---rw,,
-.. - -, -., ~.,. -
.--e.-x-..
-4
-.,,e
The 01-14 Building HV System maintains the Process Room under a slight negative pressure to ensure that all air leakage is into, rather than out of, the Process Room. The 01-14 Building HV System air is passed through two HEP A filters in series before being discharged fran a stack. The overall DF of the 01-14 Building HV System is taken to be 100,000, that is, the DF for the first HEPA filter is taken to be 1,000 and the DF for the second HEPA filter is taken to be 100 ( American National Standards Institute,1981).
Assuming that 0.01 percent of the activity processed in the CSS is released to the 01-14 Building HV System, about 59 curies of activity will be released f rom the stack in one year from operation of the CSS assuming a DF of 100,000 for the 01-14 Building HV System. The released radionuclides will be dispersed fran a stack on top of the 01-14 Building into the surrounding envirorrnent.
The dose to the maximally exposed off-site individual is estimated to be 3.0E-04 mrem. The significant radionuclides giving rise to this dose and their resulting contributions are given in Table G.8.6-2.
G.8.6.4 LIQUID RELEASES For this analysis it is assumed that the liquid decontamination solutions remove 0.01 percent of the activity processed 'in the CSS to the LWTS. Given this assumption, about 1.5 curies of activity are added to LWTS from operation of the CSS. The incremental increase of atmospheric emissions arising from treating these solutions in an evaporator in the LWTS will be analyzed in the LWTS SAR module.
The dose to the maximally exposed off-site individual is estimated to be 0.58 mrem. The significant radionuclides giving rise to this dose and their l
resulting contributions are given in Table G.8.6-3 O
CA F1107 :ENG-308 69
. =.
1 REFERENCES FOR SECTION G.8.0 American National Standards Institute,1981, " Guidance for Defining Safety Related Features of Nuclear Fuel Cycle Facilities," ANSI N46.1 - 1980.
Henshaw, I. W. and Saha, A. K., memo to J. C. Cwynar, dated July 3,1984,
" Projection of Number of Solidified Drums and Their Contact Dose Rate to be Produced in CSS," Memo HF:84:0106.
Radiation Research Associates,1979, "QADMOD-G, A Point Kernel Gamma Ray Shielding Code," Radiation Shielding Information Center, Oak Ridge, TN, CCC-396.
Rykken, L. E., Technical Advisory to Mr. J. R. Carrell, dated October 18, 1984, TA Number 152, Letter Log Number HI:84:0029.
l Saha, A.
K., Memo to C. C. Chapman and J. M. Pope, dated July 2,1984, "RTS Waste Stream Data Sheets," Memo HF:84:0105.
Saha, A.
K., Memo to Distribution, dated April 17,1985, "RTS Waste Stream Data Sheets," Memo RF:85:0011.
Saha, A.
K., Memo to Distribution, dated March 27,1986, ' "RTS Waste Stream Data.
Sheets, Rev. 4, dated March 1986," Memo HH:86:0056.
f 4
a 1
1 OV CAF1107:ENG-308 70
TABIE G.8.2-1 (1 of 2)
EXPOSURE RATES AND PROJECTED NUMBER OF WASE DRUMS TO BE PRODUCED IN THE CEMENT SOLIDIFICATION SYSTEM [a]
Cs-137 Exposure Rate (aR/hr )
Des &iption Stream Number of Inventory Waste Stream Number 71 gal. Drums (Ci/ Drum)
Contact 1 Metre Decontaminated]
Lb supernatant 1
11,078 0.6 71 0 100 Wash solutions from sludge washing 2A, 2B, 2C 945 0.63 750 110 Internal de contamination solution 3
0 N/A N/A N/A Effluents from primary and secondary NO s crubber 5[ 3 0
NIA N/A N/A Condensate from SBS condenser and melter feed concentrator overheads (combined) 6[c]
O N/A N/A N/A Spent organic from RTS 7A 87 0.26 300 44 Spent zeolite slurry f rom RTS 7B 21 0.26 300 44 Filter backwash slurri es 9
1450 0.15 180 26 CAF1107:ENG-308
1 7S TABIE G.8.2-1 (2 of 2)
EXPOSURE RATES AND PROJECTED NUPEER OF WASTE DRUP6 TO BE PRODUCED IN TIE CE)ENT SG.IDIFICATION SYSTEM [a]
Cs-!37 Exposure Rate (mR/hr )
Description Stream Number of Inventory Maste Stream Number 71 gal. Drtas (Ci/ Drum)
Contact 1 Metre Uranyl nitrate N/A 138[d3 N/A 2
BKG Decon solutions N/A 350 0.74 870 125 J
O Note [a] - Modified from Saha (1986). All values have been rounded to two significant figures.
' [b] - This projection is based on decontaminated supernatant activity 3
level of 10 C1/cm,
[c] - These streams will be returned to the Vitrification Facility.
[d] - Number of 55-gallon drums.
O CA F1107 :ENG-308
TABLE G.8.2-2 (1 0F 2)
RADIONUCLIDE INVENTORY IN HIGH-LEVEL WASTE TANK 8D-2 (1987)
Normalized [a]
Total [b]
Activity Activity Isotope (Curies)
(C uri es )
- 1. 0 E+ 03 Ni-59 1.1 E -05
- 6. 5 E+03 S e-79 5.1E-06 3.7E+01 Sr-90 1.0
- 7. 4 E+06 Y-90 1.0 7.4E+06 Zr-93
- 1. 8E-05 1.3E+02 R h-106 1.8E-05 1.3E+02 Pd-107 1.6E-07 1.2 Sb-125 6.2E-04 4.5 E+03 Te-125m 1.4E-04 1.0E+03 S n-126 5.5E-06 4.0E+01 Sb-126m
- 5. 5 E-0 6
- 4. 0 E+ 01 Sb-126 7.7E-06
- 5. 6 E+01 I-129
- 2. 9E-08 2.1E-01 Cs-134 1.9E-03 1.4E+04 Cs-135
- 2. 2E-0 5 1.6E+02 C s-137 1.0
- 7. 3 E+0 6 Ba-137m 9.3E-01
- 6. 8E+ 0 6 C e-14 4
- 1. 9E-0 6
- 1. 4 E+ 01 P r-144 1.9E-06 1.4E+01
~
Pm-147 4.2E-02 3.1 E+05 Sm-151 2.9E-02 2.1E+05 E u-152
- 5. 8 E -05
- 4. 2 E+02 l
O CAF1107:ENG-308
i i
l TABIE G.8.2-2 (2 0F 2)
RADIONUCLIDE INVElfr0RY IN HICH-LEVEI. WASTE TANK 8D-2 (1987) i r
Normalized [a]
Total [b]
l Activity Activity-f Isotope (Curies)
(Curies )
Eu-154 1.8E-02
- 1. 3 E+05 Eu-155 3 2E-03 2 3E+04 i
- 1. 0 E-06 7.4 U-234 5.9E-07 4.3 U-235 1.3E-08
- 9. 5E-02 i
U-2 ?. i
- 4. 0E-08
' 2.9E-01 U-238
- 1. 2E-07
- 8. 5 E-01 Np-237 1.5E-06 1.1 E+01 Np-239 3 3E-04 2.4E+03 I
Pu-238 9.0E-04 6.6 E+03 J
Pu-239 2.3E-04 1.7E+03 Pu-240 1.8E-04 1 3E+03 Pu-241 1.2E-02 8.7E+04 Pu-242
- 2. 9E-06 2.1 E+01 Am-242m
- 2. 9E-06 2.1E+01 Am-243 3.3E-04 2.4E+03
]
~g Cm-242 3.0E-07 2.2 j
Cm-243 2 3E-05 1.7E+02 j
C m-244
- 3. 0E-03 2.2E+04 4
cm-245-
- 1. 4E-0 6
- 1. 0 E+ 01 Cm-246 5.9E-07 4.3 l
2.9E+07 I
Note [a] - Normalized to 1 Curie of Cs-137 t
[b] - Total activity in sludge plus supernatant l
1 J
t L
i CAF1107:ENG-308 n
y-.,em.-----
--na, n--~
--,-.----~,-,r,,,.r w
, -.,,--.,,-i
1 TABLE G.8.2-3 RADIONUCLIDE INVENFCRY IN TIE URANYL NITRATE SOLITTION[a]
Radionuclide Concentration ( C1/al)
T1-208 3.7E-04 Pb-212 2 s 3E-03 B i-212 4.8E-03 B i-214
- 7. 6E-03 Pa-234
- 4. 2E -03 U-2 38
- 1. 0E-01 [ b ]
Pu-238 1.5E-02 Pu-239/2 40 7.8E-02 Pu-241 1.7E-01[c]
Am-2 41
- 1. 0 E-02 Note [a] - Obtained from measurements perfortned in 1984 (Tank Al results were used since the radionuclide concentration was larger in this tank than in Tank A2).
[b] - Obtained f rom total uranium measurement of 310 g/L.
[c] - Obtained from gross beta measurement of 1.7E-01 pCi/mL.
{
l l
9 CA F1107 :ENG-308
TABLE G.8.6-1 (1 of 2) f-t RADIONUCLIDE INVENTORY OF TE LIQUID WASTES ASSUED TO BE PROCESSED IN THE CSS IN OfE YEAR
. Normalized [a]
Total Activity Activity Isotope (Curies)
(Curies)
- 6. 4E-07 2.5E-03 Se-79 5.1 E -06 3.4 Ni-63 8.8E-04 2.0E-02 Sr-90 9.5E-01 3.7E+03 Y-90 9.5E-01 3.7E+03 Zr-93 3.2E-05
- 1. 8 E-05 7.0E-02 Rh-106 1.8E-05
- 7. 0 E-02 Pd-107
- 1. 6 E-07 6.2E-04 p
g Sb-125 6.2E-04 2.4 Te-125m 1.4E-04 5.5E-01 S n-126
- 5. 5 E-06 2.1E-02 Sb-126m 5.5E-06 2.1E-02 a
Sb-126
- 7. 7E-0 6
- 3. 0 E-02 I-129
- 2. 9E-08 1.1E-04 Cs-134
- 1. 9E-03 7.4 Cs-135
- 2. 2E -05 8.6E-02 Cs-137 1.0 3.9E+03
~
Ba-137m
- 9. 3E-01 3.6E+03 Ce-144 1.9E-06 7.4E-03' P r-144 1.9E-06 7.4E-03 Pm-147 4.2E-02
- 1. 6 E+02 Sm-151 2.9E-02 1.1E+02 Eu-152
- 5. 8E-05 2 3E-01 E u-154 1.8E-02 7.0E+01 Eu-155 3.2E-03 1.2E+01 U-233 1.0E-06 3.9E-03 U-234 5.9E-07 2 3E-03 U-235
- 1. 3E-08 5.1 E-05 U-236 4.0E-08
- 1. 6 E-04 CAF1107:ENG-308 I
TABLE G.8.6-1 (2 of 2)
]
RADIONUCLIDE INVENTORY OF THE LIQUID WAS1ES ASSUMED TO BE PROCESSED IN THE CSS IN ONE YEAR j
Normalized [a]
Total Activity Activity Isotope (Curi es )
(Curies )
- 1. 2E -07 4.7E-04 Np-237
- 1. 5 E-06
- 9. 0 E-04 3.5 Pu-239 2.3E-04 9.0E-01 Pu-240
- 1. 8 E-04 7.0E-01 Pu-2 41 1.2E-02 4.7E+01 Pu-242
- 2. 3 E-07
- 9. 0 E-04 Am-241 9.9E-03
- 3. 9 E+ 01 Am-242
- 2. 9 E-0 6 1.1E-02 Am-242m
- 2. 9E-0 6 1.1E-02 Am-243 3.3E-04 1.3 Cm-2 42 3.0E-07 1.2E-03 C m-2 43
- 2. 3 E-05 9.0E-02 Cm-244 3.0E-03
- 1. 2 E+ 01 Cm-245
- 1. 4 E-06
- 5. 5E-03 c m-246
- 5. 9 E -07 2 3E-03
- 1. 5E+ 0 4 Note [d] - Normalized to 1 Curie of Cs-137
[b]
Total activity in sludge plus supernatant l
l O
CA F1107 :ENG-308
TABLE G.8.6-2 L
ANNUAL DOSE TO TE MAXIMALLY EXPOSED OFF-SITE INDIVIDUAL FOR THE SIGNIFICANT RADIONUCLI DURING NORMAL OPERATIONS ( AIRBORNE RELEASES) a]
Dose to Maximally Exposed Off-Site Individual Isotope Released Activity (aren )
- 1. 5 E-05
- 1. 5 E-04 Eu-154
- 2. 7E-07 2.7E-06 Pu-238 1.4E-08 2.4E-06 Pu-239 3.5E-09 6.7E-07 Pu-240 2.7E-09 5.1E-07 Pu-241 1.8E-07
- 3. 2E-05 Am-243
- 5. 0 E-09 1.1 E-06 cm-244
- 4. 5E-08
- 5. 0E-0 6 3
- 3. 0E-04 J
Note [a]- The significant radionuclides are identified by the product of released activity (C1) and dose conversion f actor (rem per curie released ). Those radionuclides contributing more than 0.1 percent of the total dose are included.
O CAF1107:ENG-308
TABLE G.8.6-3 ANNUAL DOSE TO THE MAXIMALLY EXPOSED OFF-SITE INDIVIDUAL FOR THE SIGNIFICANT RADIONUCLIDES DURING NORMAL OPERATIONS (WATEPSORNE RELEASES) [a]
Dose to Maximally Exposed Activity Released fran Low-Level [b] Off-Site Individual Isotope Ligeid Waste Treatment System (mren)
S r-90 7.0E-03 1.8E-03 Cs-134
- 1. 6 E-04
- 1. 5 E-02 5.4E-02 Am-243 5.0E-04 1.8E-03 Cm-244 4.5E-03 8.1E-03
- 5. 8 E-01 Note [a] - The significant radionuclides are identified by the product of released activity (C1) and dose conversion f actor (rem per curie rele ased ). Those radionuclides contributing more than 0.1 percent of the total dose are included.
[b] - Decontamination factors are assumed to be of 200 for strontium and 18 for cesium.
O CA F1107 :$NG-308
4 8
10
_1 12 13 1
5 l
T'--
i 10 t
i
_ _L _ _
i i
8 i
l 3
i 6-2 6 *-+
19/20
[
___k Mixer 1 Mixer 2 Dru at 22-0 Waste Lock Dispensing Fill Station Vessel Pump 23 ldShield Window
~ 18 %
A v
Drum Storage 3,,,
_7_
i l
t 20'
_ _ 1_
A A
A AA Not to Scale Source: Each Mix e r - 0.5 Cl Cs-137 Drum at Fill Station - 1 Cl Cs-137 Drum Storage Area - 1 Cl C s-13 7 / d ru m - 8 drums O
Evaluation Point s i
FIGURE G.8.3-1 SCHEM ATIC OF M AJOR O
RADI ATION SOURCES AND POINTS OF i
EXPOSURE EVALUATION FOR THE CSS 1
i
0.00939 0.173 0.22 0.174 0.0444 O
0.0069 0.45 0.314 0.45 0.0447 i
l l
,e-i 8
i l
I t-2 6 *-*
I t
I 0.05 0.11 l
Mixer Z Mixer 1 Air 0.032 -d 5.0E-06 Dru. at Waste Lock Fill Station Dispensing V e a s e l' Pump 0.033 Shield Window
~
e 1 8 *-=
0 0.17 Drum Storage Area 0.34
_ _ _ - 0;17 l
l
_ I' _
z e
-t 20*
__ _ _L _
0.0137 0.038 0.0745 0.035 0.0096 Not to Scale Source: Each Mi x e r - 0.5 Cl C s-13 7 Drum at Fill S ta tion - 1 CI Cs-137 Drum Storage Area - 1 Ci C J-t 3 7 / drum -8 druCO XX Exposure Rate mR/hr (1) T o psv alu e is 2.7 m above the floor Lower value is 1 m above the floor
, FIGURE G.8.3-2 SCHEM ATIC OF M AJOR R ADI ATION I
SOURCES AND ESTIMATED EXPOSURE RATES
G.9.0 ACCIDENT SAFETY ANALYSIS V
G.9.1 ABNORMAL OPERATIONS Abnormal operations are events which could occur from malfunctions of systems, operating conditions, or operator error.
Abnormal events are only of consequence for those systems in the CSS which process, control, or confine radioactivity or other hazardous substances. These include the 01-14 Building HV System, Waste Encapsulation System, and Material Handling System (Clare, 1984). Table G.9.1-1 presents a list of the systems and potential abnormal events.
Other possible abnormal events are of little consequence either because they do not pose a radiological or industrial hazard or because the impacts are less than the abnormal events described further in this section.
G.9.1.1 ABNORMAL EVEKfS - WASTE ENCAPSULATION SYSTEM C).
Wahte Dispensing Vessel Failure G.9.1.1.1 g
%d The largest volume of waste liquid that could spill on the floor of the Waste Dispensing Cell due to a rupture of the Waste Dispensing Vessel (WDV) or associated valves and piping is 1,900 L (see Section G.9.2.1 for a discussion of this accident). This is the maximum usable volume of the WDV during normal o peration.
A larger spill from the WDV cannot occur from within the CSS. The inlet valves to the WDV from the site waste holdup tanks are controlled by the level indicators in the WDV.-
In addition, the flow from the waste holdup tanks is metered from the control station associated with the holdup tanks. Even if the inlet valves f ail to close, more than 1,900 L of waste could enter the WDV only if the control station metering f ailed.
G('~h CAF1107:ENG-308 71
G.9.1.1.2 Failtre of Valves Between WDV and Mixer e
Failure to close the three-way ball valve (V-2) controlling the waste cischarge to the mixers could result in spilling 1,730 L of liquid waste from the WDV onto the floor of the Process Room. This volume is the difference br,ueen the 1,900 L of waste in the WDV and the 170-L volume of a single mixer which would overflow if the valve f ails.
The sequence of events required for this f ailure mode are:
A. the timer in the control panel f ails while the valve (V-2) is open; B. the level indicator in the mixer'f alls to indicate a high level; or A. a ball valve sticks in the open position; B. the limit switches on the ball valve provide a f alse signal to the control panel; C. the level indicator in the mixer f ails to indicate a high level.
It should be stressed that these sequences of events are considered to be extremely unlikely.
G. 9.1. 2 ABNORMAL EVENTS - MATERIAL HANDLING SYSTEM G. 9.1. 2.1 Failure to Place the Waste Package in Position Failure to place an empty 269-L drum into position under a mixer could result in the dumping of 269 L of contaminated wet cement on the floor of the Process Room. The cement would include liquid waste.
O CAF1107:ENG-308 72
If the Drum Position Indicator sent an invalid signal to the control panel
!Q indicating the placement of an empty drum when a drum was not there, and the lid lif ter vacuum switch f ails to detect that there is no drum lid to be picked up, the cement / waste mixture would spill on the floor. The signal indicating placement of an empty drum is supplied by the Material Handling System and is the result of extensive logic processing in that system. Failure to receive the proper drum position or lid signal are considered missing extremely unlikely events.
In addition, the system is monitored by the operator with a
, Closed Circuit Television (CCTV) System.
G.9.1.2.2 Minor Failures Four additional minor events leading to low-volume spills can occur within the material handling system ( Associated Technologies Inc.,1984). These events are sunmarized as follows.
0 Overfilling of a drum would require the fill station load cell to indicate a low weight when the weight is actually high.
Inattention on
(
the part of the operator would also be required because he normally monitors the fill time while visually monitoring the drum through the CCTV System.
O High acceleration of a full drum from the fill position would occur if the electronic acceleration control f ails. This would result in a spill of a minimal amount of the contents of a drum due to the amount of free board.
O Dripping of material from the fill assembly is another minimun spill event.
It would occur if a faulty permissive indicates that the cement / waste flow is stopped and the drip tray is in place under the fill nozzle when it actually is not. This could result from a f ailure in the Waste Encapsulation System or in the Programmable Logic Controller of the Material Handling System.
I l
1
'N J
CAF1107:ENG-308 73
G.9.1.3 ABNORMAL EVENTS - VENTILATION SYSTEM O
Above normal release of radioactive particulates could occur due to f ailures of the roughing or HEPA filters. A pressure gradient across the filter resulting in filter tearing and subsequent disintegration or a fire would cause the f ailure.
In either case, protection against uncontrolled release is afforded by a second filter in the filter train that limits the release. The loss of a filter would trigger an alarm, and operator response would include shutdown of the syst em.
The loss of a filter train is considered in Section G.9.2.
G.9.1.4 ABNORMAL EVENTS - LIQUID SUMPS AND DRAINS Liquids draining to the sumps and drains will be directed to the LWTS.
A rupture of the pipe transporting the liquids f rom the 01-14 Building to Tank 7D-13 would not result in a significant release of radioactivity from the site.
G.9.2 ACCIDENTS G.9.2.1 ACCIDENTS ANALYZED Four accidents are analyzed in,thi.s section:
a spill of 1,9Co L of waste liquid from the Waste Dispensing Vessel (WDV), airborne release due to the addition of caustic to the uranyl nitrate solution, the f ailure of a HEP A filter train, and a HEPA filter fire.
G.9.2.1.1 Source Ter:as The source terms for the accident analysis depend on the waste stream undergoing processing. Table G. 8.2-1 presents the expected concentration of Cs-137 in each drum of solidified waste f or the various waste streams. The condensate from SBS condenser and melter feed concentrator overheads (canbined )
waste stream represents the maximum curie content for the various waste streams that wily be processed in the CSS. This waste stream, along with the uranyl nitrate waste stream, is used to analyze the consequences of the waste spill accident. The condensate from SBS condenser and melter feed concentrate overheads (combined) waste stream. is also used to analyze the consequences of l
CAF1107:ENG-308 74
failure of the HEPA filter train accident. The uranyl nitrate waste stream is used for the analysis of the neutralization accident. The fourth accident, a HEPA filter fire, is waste stream independent; the distribution of radionuclides on the HEPA filter is assmed to be represented by that in Tank 8D-2.
G. 9. 2.1. 2 Radiation Doses All four of these accidents result in the off-site release of radioactivity.
The released material would primarily be in the form of an aerosol from the evaporation of waste solutions o'r particulates for' the HEP A filter f ailure and
]
fire. For the liquid spill accident, airborne effluents are estimated by l
assuming a pool release partition coefficient of 100 for the volatile radionuclides and 1,000 for the nonvolatile radionuclides (American National l
Standards Institute,1981 )EI 3 During a two-hour period, about 10 L of a
solution is estimated to evaporate. The airborne radionuclides will be released frm a stack on top of 01-14 Building via the 01-14 Building HV System (DF of 100,000).
OV The uranyl nitrate solution is highly acidic (pH of 0.20).
For this analysis, it is assumed that 100 L of this solution is mixed with caustic in a mixer in a manner which causes the solution to react vigorously. Such an accident is estimated to result in the evaporation of about 1.4 L of liquid based upon the heat of reaction associated with neutralizing this volume of uranyl nitrate solution with sodim hydroxide. For this accident a transient release decontamination f actor of 100 is assumed for both the volatile and nonvolatile radionuclides ( American National-Standards Institute,1981).E23 The airborne radionuclides will be released via the 01-14 Building HV System (DF of 100,000).
For the third accident, it is assumed that a bank of HEPA filters f ail and the f ailure remains undetected for a period of two hours. This accident is assumed to occur during processing of the waste stream containing the largest concentration of radioactivity [i.e., condensate from SBS condenser and melter El3The pool release partition coefficienct is the ratio of the activity concentration in the liquid to that in the air above the liquid pool.
[2]The transient release ~ decontaminated f actor is the ratio of the quantity l
,L of radioactivity in the liquid to that in the vapor.
CAF1107:ENG-308 -
75 t
feed concentrator overheads (combined)]. Using a solidification rate of six drums per hour and the Tank 8D-2 radionuclide distribution, about 620 curies of activity will be processed in this two-hour time period.
Assuming that 0.01 percent of this activity becmes airborne, about 62 mci of activity will be released f rom the stack on top of the 01-14 Building.
The last accident considered the impacts resulting frm a HEPA filter fire.
It is assumed that the HEPA filters will be changed out when the radioactive loading results in a dose of 100 mR/hr at approximately 0.3 m from the filter face. Analysis shows that 1 curie of Cs-137 uniformly distributed on a HEPA filter will result in an exposure of 1.34 R/hr at 0.3 m from the filter face (Pet erson, 1985 ). Thus each filter is assumed to conservatively contain 0.075 curies of Cs-137 before changeout. Activity of other radionuclides on the filter is assumed to be distributed according to the Tank 8D-2 radionuclide distribution.
It is assumed for the analysis that both the primary and secondary filters in the process com HV System (12 filters total) are fully loaded when the fire occurs. A release of one percent of the radionuclides on the loaded filters, or a tot,al of 0.036 curies, is assumed to occur as a result of this fire ( American National Standards Institute,1981).
The es timated dcscs to the maximally exposed off-site individual for the accidents considered are presented in Tables G.9.2-1 through G.9.2-5.
Table G.9.2-1 and 0.9.2-2 summarize the dose frca the significant radionuclides resulting from the 1,900 L spill accident for the two waste streams analyzed.
Table G.9.2-3 summarizes the dose f rm the uranyl nitrate neutralization accident.
In each of these cases, the dose is much less than one mrem. The doses f rom the significant radionuclides f or the HEP A filter accidents are presented in Tables G.9.2-4 and G.9.2-5.
The dose from the HEPA filter failure accident estimated to be 40 mrem while the dose from the HEPA filter fire accident is estimated to ba 22 mrem.
O CAF1107:ENG-308 76
a In the first three accidents the doses are low because the airborne effluent is
\\
assmed to be discharged from a stack on top of the 01-14 Building via the-01-14 Bui] ding HV System. The 01-14 Building HV System is assumed to have a DF
_ of 100,000. The doaea ar ts much larger for the two HEPA fil.ter accidents in
'which the radioactivity is released directly into the environment from this stack.
G.9.2.2 Potential Nuclear Criticality.
The CSS will process waste streams containing fissile radionuclides,-
principally U-235 and Pu-239. The subcritical limits for fissile material concentrations in the CSS were calculated (O'Ahoofe,1985) and are shown in Table G.11. 4-1.
From Table G.11.4-1, it. is seen that the most limiting situation occurs when the fissile uranium concentration is 0.05 g/L..
j In this case, the fissile plutonium concentration is 1.63 'g/L resulting in a total fissile radionuclide concentration of 1.68 g/L. All other combinations of fissile uranim and plutonita radionuclides have suberitical concentration limits greater than this value.
The waste streams containing the greatest concentration of fissile materials Will most likely be decontaminated supernatant, decontamination solutions and uranyl nitrate. The concentration of fissile radionuclides in the decontaminated supernatant is not expected to exceed 0.6 mg/L (O'Ahoofe, 1985). The concentration of fissile radionuclides in the interim '
decontamination solutions was estimated by using.(1) the estimated contact exposure rate of 870 mR/hr on a drum of waste (Table G.8.2-1), (2) the exposure rate of 1,200 mR/hr from a 269-L drum of solidified waste per curie of Cs-137,
}
(3) the spent f t.el radionuclide distribution given in Table G.9.2-6, and (4) and liquid waste voltne of 170 L per drum. Using these assumptions, the concentration of fissile radionuclides in the liquid waste being fed to the CSS k
is estimated to be about 9 mg/L. These values are several orders of magnitude below the previousi cited subcritical limit.
v i
CAF1107:ENG-308 77 i
The uranyl nitrate solution consists largely of depleted uranium. The concentration of fissile radionuclides in this solution is' estimated to be about 0.8 g/L (principally U-235 at an isotopic enrichment of about 0.25 percent) based upon a sample analyzed in early 1984 (Feuz,1984). There are no processes associated with operation of the CSS which will result in isotopic enrichment of U-235. Since the minimum critical isotopic enrichment of U-235 in aqueous solutions is about 1 percent, depleted uranium is innerently a noncritical substance. A nuclear criticality is therefore not considered to be a credible event.
However, all-batches of liquid wastes will be sampled and analyzed for fissile material concentration prior to pr] cessing in the CSS (see Section G.11.4.3).
O O
CA F1107 :ENG-308 78
l REFERENCES FGt SECTION G.9.0
'V i
American National Standards Institute,1981, " Guidance for Defining Saf ety Related Features of Nuclear Fuel Cycle Facilities," ANSI N46.1-1980.
Associated Technologies, Inc.,1984.
" Review of Potential Radiation Releases by the Materials Handling System," ATI Document No.172-Doc-002, Rev. O.
Clare, G. H.,1984, memo to J.. C. Cwynar, dated August 30,1984, " West Valley Cement Solidification System Failure Analysis," SE:CC:84:166.
1 Feuz, A. C.,1984, Analysis of Sample SD-15 A, dated January 4,1984, Log Number 84-28.
O'Ahoofe, K.
A., 1985, memo to J. C. Cwynar, dated March 26, 1985, " CSS Criticality Safety Evaluation," FB:85:0072.
Peterson, J.
M., 1985, memo to C. P. Bliss, dated February 5,,1985, 3
[.(
" Correlation of Exposure Rate with Radionuclide Inventory on a Loaded HEPA Filter," HE:85:0016.
s,m I
s lO ll CAF1107:ENG-308 79 4
s
- v.. -,. --,
7
>w,
.,n.,
TABUE G.9.1-1 CEENT SOLIDIFICATION SYS1EM ABNORMAL EVENTS Event Chemi cal System Natural Reaction /
Su bsysten Phenomena Spill Rupture Fire Explosion I.
Waste Encapsulation System Waste Storage and Dispensing X
X Chemical Additive X
Cement Metering High Shear Mixing II.
Material Handling System Empty Drum Feed and Position X
Full Drum Processing X
Drum Storage and Loadout X
X III. Cement Transfer and Storage System IV.
Ventilation System Operating Aisles X
X Cell Ventilation X
X V.
Liqui d Sumps and Drains X
VI.
Struct ures 01-14 Building X
Content Silo X
CAF1107 :ENG-308 O
O O
TABLE G.9.2-1 i
DOSE TO THE MAXIMALLY EXPOSED OFF-SITE INDIVIDUAL FOR THE SIONIFICANr RADIONUCLIDES FOR TIiE EVAPGtATION OF 230 L OF SOLITTION ASSOCIAED NITH TE 1,900-L SPILL ACCIDENT [a]
(CONDENSAE FROM SBS SCRUBBER AND ELTER FEED CONCENTRATOR OVEftlEADS, C0leINED)
Dose to tha Activity in Activity Maximally Exposed Liquid Partition [b]
Released O ff-Site Isotope Evaporated (C1)
Coefficient From Cell (C1)
Individual (arm)[c]
Sr-90 2.3 E01 1000 2.3E-02 1 3E-04 Cs-137
- 2. 3E01 1000
- 2. 3E-02
- 1. 7 E-0 6 Pu-238 2.1E-02 1000 2.1 E-05
- 7. 4E-0 6 Pu-240 4.1E-03 1000 4.1 E-0 6 5.7E-0 6 Pu-241 2.8E-01 1000 2.8E-04
- 2. 3E-01 1000 2.3E-04 3.5E-04 Am-243 7.6E-03 1000
- 7. 6E-0 6 1.1 E-05 Cm-244 6.9E-02 1000 6.9E-0 5 5.5E-0 5 5.9E-04 Note [a] - The significant radionuclides are identified by the product of released activity (C1) and dose conversion f actor (rem per curie r eleased ). Those radionuclides contributing more than 0.1 percent of the total dose are included.
[b] - The partition coefficient is the ratio of the activity concentration in the liquid to that in the air above the liquid pool.
[c] - A decontamination f actor of 100,000 is taken for the 01-14 building HV system.
O o
CA F1107 :ENG-308 l
TABIE G.9.2-2 DOSE TO THE MAXIMALLY EXPOSED OFF-SITE INDIVIDUAL FOR TIE SIGNIFICANT RADIONUCLIDES FOR TIE EVAPORATION OF 230 L OF URANYL NITRATE S(LUTION ASSOCIATED WITH THE 1,900-L SPILL ACCIDENT [a]
Dose to the Activity in Activity Maximally Exposed Liquid Partition [b]
Released Off-Site Isotope Evaporated (C1)
Coefficient From Cell (C1)
Individual (arem)[c]
U-238 2.3E-02 1000 2.3E-0 5
- 3. 5 E-03 1000
- 3. 5 E-06
- 4. 6 E-0 6 Pu-239 /240 1.8E-02 1000
- 1. 8 E-0 5
- 2. 5 E -05 Pu-241
- 3. 9E-02 1000
- 3. 9E-05
- 2. 3E-06 3.5E-0 6
- 4. 6 E -05 O
Note [a] - The significant radionuclides are identified by the preduct of released activity (C1) and dose conversion f actor (rem per curie rele ased ). Those radionuclides contributing more than 0.1 percent of the total dose are included.
[b] - The partition coefficient is the ratio of the activity concentration in the liquid to that in the air above the liquid pool.
[c] - A decontamination f actor of 100,000 is taken for the 01-14 building HV system.
l O
l C A F1107 :ENG-3 08
TABLE G.9.2-3
,-ss (V)
DOSE TO TE MAXIMALLY EXPOSED OFF-SITE INDIVIDUAL Fm TE SIGIFICAE RADIONUCLIDES FOR TE EVAPMATION & 1.4 L OF URANYL NITRATE SG.ITTION ASSOCIATED WITH TE EUTRALIZATION ACCIDEE[a]
l l
Dcse to the Activity in Activity Maximally Expoced Liquid Decontamipagion
- Released Off-Site tbJ From Cell (C1)
Individual (ares)EC3 Isotope Evaporated (C1)
Factor U-238 1.4E-04 100
- 1. 4 E -06 7.0E-07
.e Pu-238 2.1 E-05 100 2.1 E-07
- 2. 7 E-07 Pu-239 /240 1.1E-04 100 1.1 E -0 6 1.5E -06 Pu-241 2.4E-04 100
- 2. 4E-06
- 7. 2E-08 An-241
- 1. 4 E -05 100
- 1. 4 E -0 7 2.1 E -07
- 2. 8E -06 p-s
\\
Note [a] - The significant radionuclides are identified by the product of released activity (C1) and dose conversion f actor (rem per curie rele ased ). Those rationuclides contributing more than 0.1 percent of the total dose are included.
[b] - The transient release decontamination factor is the ratio of the quantity of radioactivity in the liquid to that in the. vapor.
[c] - A decontamination factor of 100,000 is taken for the vessel off gas system directed to the 01-14 building HV system.
e
("~')
\\
,/
CAF1107:ENG-308 l
TABIE G.9.2-4 DOSE TO TIE MAXIMALLY EXPOSED OFF-SITE INDIVIDUAL FW TIE SIGNIFICAffr RADIONUCLIDES Fm TIE IEPA FILTER FAILNE ACCIDENT [a]
Activity Dose to the Released Maximally Exposed frcut the Off-Site Isotope 01-14 Building Individual (ares)
- 1. 6 E-02
- 1. 4 E -0 5 1.8 Pu-239
- 3. 5 E-0 6 5.2E-01 Pu-240
- 2. 8 E-06 4.1 E -01 Pu-2 41
- 4. 7 E -05 3.8 40 Note [a] - The significant radionuclides are identified by the product of released activity (C1) and dose conversion f actor (rem per curie r eleased ). Those radionuclides contributing more than 0.1 percent of the total dose are included.
O 1
l CA F1107:ENG-308
TABLE G.9.2-5 DOSE TO TIE MAXIMALLY EXPOSED OFF-SITE INDIVIDUAL FCR T SIGNIFICAlff RADIONUCLIDES FOR A IEPA FILTER FIRE ACCIDElfrya]
Activity Dose to the Released Maximally Exposed fra the Off-Site Isotope 01-14 Building Individw'. (aren)
Sr-90 8.6E-03 4.8
^
Cs-137 9.0E-03 6.7E-02 Pu-238 8.1 E-06 1.1 Pu-239 2.1E-06
- 2. 9E-01 Pu-240 1.6E-0 6
- 2. 2E-01 Pu-2 41 1.1 E-0 4
- 2. 9E-0 6
- 4. 4E-01 C m-244
- 2. 7E-05 2.1 22 Note [a] - The significant radionuclides are identified by the product of released activity (C1) and dose conversion f actor (rem per curie r eleased ). Those radionuclides contributing more than 0.1 percent of the total dose are included.
e a
CA F1107 :ENG-308
~
p
TABIE G.9.2-6 (1 & 2)
RADIONUCLIDE INVENTORY IN REPROCESSED SPENT FUEL (1987)
Normalized [a]
Total [b]
Activity Activity Isotope (Curies )
(Curi es )
- 1. 4 E-04
- 1. OE+03 Ni-59 1.1 E -05
- 8. 2 E+ 01 Co-60
- 9. 5E-01
- 6. 9 E+0 6 Y-90
- 9. 5E-01
- 6. 9E+0 6 Zr-93
- 3. 2E -05 2.3E+02 Nb-93m
- 1. 8 E-05
- 1. 3E+ 02 R h-10 6.
- 1. 8 E -0 5
- 1. 3 E+02 Pd-107
- 1. 6 E-0 7 1.2 Sb-125
- 6. 2E-04
- 4. 5 E+03 Te-125m
- 1. 4E-04
- 1. 0E+03 S n-126
- 5. 5E -0 6 4.0E+01 Sb-126m
- 5. 5 E-0 6 4.0E+01 Sb-126
- 7. 7E -0 6 5.6 E+01 Cs-134
- 1. 9E-03
- 1. 4E+04 C s-135
- 2. 2E -05 1.6E+02 C s-137 1.0
- 7. 3E+0 6 Ba-137m
- 9. 3E-01 6.8 E+06 Ce-144
- 1. 9 E-0 6
- 1. 4E+01 P r-144
- 1. 9 E -0 6
- 1. 4 E + 01 Pm-147
- 4. 2E-02 3.1E+05 S m-151 2.9E-02 2.1 E +05 Eu-152
- 5. 8 E-05 4.2E+02 O'
I CA F1107 :ENO-308 l
l
' - ~
TABLE G.9.2-6 (2 0F 2) bD BADIGIUCLIDE INVENTGtY IN REPROCESSED SPEKr FIEL (1967)
Nonnalized[a]
Total [b]
Activity Activity Isotope (Cwies)
(Curles )
Eu-154 1.8E-02 1.3E+05 Eu-155
- 1. 4E-04
- 1. 0E+03 U-235 3.1 E-06
- 2. 2 E+01 U-236
- 9. 9E-03 7.2E+04.
Pu-241 6.6E-01 4.8 E+0 6 Pu-242 1 3E-05 9.2E+01 Am-241 3.7E-02 2.7 E+05 Am-242
- 2. 4E+ 03 C m-242 3.0E-07 2.2 l
Cm-2 43
- 2. 3E-05 1.7E+02 C m-244 3.0E-03 2.2E+04 C m-2 45
- 1. 4E-0 6
- 1. 0E+01 cm-246 5.9E-07 4.3 4
- 3. 4 E+0 7 i
Note [a] - Normalized to 1 curie of Cs-137
[b] - Total activity in the fuel reprocessed by NFS from 1966 to 1972, decay corrected to 1987.
4 CAF1107:ENG-308
G.10.0 (X)NDUCT & CSS @ERATIONS
%)
G.10.2 PRE (PERATIONAL TESTING AND OPERATIGi G.10.2.1 ADMINISTRATIVE PROCEDURES FOR CONDUCTING TIE 1EST PROGRAM All procedures and instructions for conducting the test program and documenting and evaluating the test results will be prepared, reviewed, and approved per the requirements of WNS Policy and Procedures Manual, Engineering Procedures Manual, and SOP-002. Data will be collected and maintained on data sheets contained in test procedures.
Preoperational checkout of the CSS will be performed by Engineering personnel involved with the design of the CSS and its various conponents, and by Operations personnel who have undergone training per the operator qualification plan for the CSS.
G.10.2.2 1EST PROGRAM DESCRIPTION
%)
The test program for the CSS will verify that systen modifications were accomplished in accordance with the plans and specifications prepared for that purpose and that the system operates as designed to produce a waste form consistent with the criteria of US DOE Order 5820.2 and the intent of US NRC's 10 CFR Part 61 Sections 61.55 and 61.56.
The preoperational checkout will culminate in a formal Operational Readiness Review which will be approved by DOE prior to the 400 drum campaign.
j Section' G.10.2.2.1 of this plan should be completed before Section G.10.2.2.2 but it is not absolutely necessary.
It is possible to provide signals to the Programnable Logic Controllers (PLC) to simulate field equipment using an IBM PC.
This will allow preliminary checkout of program PLC modifications before completing installation of all components to be checked out in Section G.10.2.2.1.
CA F1107:ENG-308 80
a Within Section G.10.2.2.1 the hydro tests and motor tests should be conducted at the time of installation. The first test following installation should be the valve checkout since proper operation of these valves is required to perform many of the other checkouts.
The remaining tests in this section can be conducted in any order, as soon as a component and control for that component are installed. However, the checkout of level switches, flow switches, and the waste metering system involve pumping water from the WDV to the mixer, and should be postponed, if possible until the mixer temperature controllers are checked out with clean utility water.
Figure G.10.2-1 is a recommended sequence for installation and checkout of the CSS.
G.10.2.2.1 Physical Facilities All modifications to mechanical and electrical components including piping and wiring will be tested during installation or checkout to ensure proper installation and operation.
Piping - Pref abricated spool pieces will be hydrotested at 1.5 times maximum design pressure for 10 minutes in the vendors shop per the requirements of B31 3 prior to acceptance by WVNS.
Following installation, the new piping systems will be hydrotested to the same criteria.
Motor - All motors will be tested f or rotational speed, and correct rotation.
Valves - All solenoid valves, automatic valves and actuators will be tested to ensure proper automatic valve operation.
Field Instrumentation - Test pressure, flow, and level switches for proper response to an initiating event. Tes t and calibrate, flow meters, continuous level sensors, thermocouples, and load cells.
Drum Fill Nozzle - Test Drum Fill Head for operation and adjust limits and position indicator.
Drip Tray - Test Drip Tray for proper operation. Adj ust actuators to ensure correct positioning of the tray in the fill nozzle.
C A F1107 :ENG-308 81
N 4
/
. (/
Lid Lif ter - Test Lid Lif ter for proper operation. Adjust actuators to ensure 1
correct positioning to remove and reinstall the caps.
Drum Capper - Test drum capper for proper operation. Adj ust to ensure correct positioning over drum and to ensure an adequate seal on the drum, i
Interf ace Signals - Test system to ensure that all required interf ace signals between the waste encapsulation, drum handling, and drum loadout systems are operational.
Waste Metering System - Check operation of waste dispensing pump, WD vessel, and feed valves. Calibrate magnetic flow meter, and pump delivery rate.
Data Acquisition System - Test Data Acquisition System for proper operation, including response to abnormal process conditions.
l G.10.2.2.2 Process Operations i
I The CSS will be fully tested using cement and synthetic waste to ensure operation of the system as designed and to ensure production of waste forms meeting the required criteria, a
Preliminary Testing - The components of the Westinghouse High-Shear Cement Subsystem including instrumentation and controls will be operated manually and autmatically from the Westinghouse control panel using Plant water to ensure proper operation of all components (except the Canent Feeder) before introducing cement. This testing will include all modifications made to this subsystem, all changes made to the program logic and the data acquisition s ys tem. When the results of the water tests are satisf actory, they will be repeated with cement and water.
Drum Conveyor System for the Drum Loadout Facility - Test the drum conveyor mechanical cmponents and instrumentation for proper operation.
The system vendor will provide test program / procedures f or this testing. The vendor Wi-ll a
shop test this system prior to delivery and provide a test supervisor for site tes ti ng.
i C AF1107:ENG-308 82
Int egr at ed T es ti ng - The f inal t es t will be a co nti nuo us, i nt egrat ed t es t of the entire system including cement transfer and drum handling. The f ull system will be run automatically at rated capacity to demonstrate its ability to meet system design requirements. The product will be randomly sampled to verify the adequacy of Process Centrol.
Sump Pump System - The sump pumps in the waste dispensing cell and the associated instrumentation will be checked out to verify proper operation.
G.10.2 3 TEST DISCUSSION Piping Test Purpose - Confirm that piping systems as installed are leak-tight.
Response and Acceptance Criterion - Piping will be hydrotested at 1.5 times the design pressure; the acceptance criteria is no visible leaks af ter at least 1 minut es. The test procedure shall be as submitted by the fabrication vendor and approved by WVNS for shop testing, and as detailed in the installation work order for field testing.
Motor Tests Purpose - Confirm that motors are wired and running properly.
Response and Acceptance Criterion - Each motor in the system will be started and operated for a short period of time. The acceptance criterion will be rotation in the correct direction.
Valve Tes ts Purpose - Confirm correct operation of each valve.
Response and Acceptance Criterion - Each valve will be operated from a manual switch and valves will be
' cually inspected to verify proper operation. Panel mounted lights will be observed to verif y the correct indications. The acceptance criterion will be a valve response in the correct direction (open/close, recirc/ discharge, etc.), and a simultaneous indication on the control panel. The valve position on loss of air (f alled position) will also be verified.
CA F1107 t E FG-308 83
Field Instrumentation Test
(
)
v Purpose - Confirm that field instrumentation responds to the physical stimulus in a proper manner.
Response and Acceptance Criterion - The acceptance criterion for switches is a correct response at the desired set point (i.e., open/close contact, sound alarm, acti vate light, etc.). The acceptance criterion for continuous sensors is a current or voltage change proportional to a change in the measured paraneter.
In addition, instruments will be calibrated to produce a chart or table of instrument reading vs. actual condition of measured variable for continuous reading instruments, where appropriate.
Instruments delivered with factory certified calibrations, will not be calibrated in the field.
Drum Fill Nozzle Test Purpose - Confirm correct positioning of Drum Fill Nozzle and a correct response to control signals.
Response and Acceptance Criterion - Acceptance criterion is a correct response
'}
to the command signal (i.e., raise / lower), with positioning at the correct
'^'
elevations, and a simultaneous indication on the control panel.
Drip Tray Tests Purpose - Confirm correct positioning of Drip Tray and a correct response to control signals.
Response and Acceptance Criterion - Acceptance criterion is a correct response to the command signal (retract / extend) and a simultaneous indication on the control panel.
Lid Lif ter Test Purpose - Confirm correct positioning of the cap removal lid lif ter crane, and proper operation of the cap vacuum lifter.
Response and Acceptance Criteria - Acceptance criteria are as follows:
r-'s
- 1) Correct response to control signals (Lid Lifter in/out; Lid lif ter -
(_,)
up/down; Lid vacuan on/c'f).
C AF1107:ENG-308 84
2)
Proper position indication on the control panel.
- 3) Ability to repeatedly renove cap from drum and hold for drum fill cycle (minimum of 10 consecutive operation).
- 4) Ability to repeatedly replace cap and correctly position for capping operation (minimum of 10 consecutive operations)
Drum Capper Test Purpose - Cor. firm proper operation of capping mechanism.
Response and Acceptance Criteria - Acceptance criteria are as follows:
- 1) Correct response of capping mechanism to control signals (up/down; crimp /r elease ).
- 2) Proper position indication on the control panel.
3)
Ability to repeatedly produce a smooth tight crimp (minimum of 10 consecutive operations ).
Interface Signal Tests Purpose - Confirm that interf ace signals and system interlocks inhibit operation if unsaf e or abnormal conditions exist (i.e., no drum in fill posi ti on). This will include alarm conditions determined by the Data acquisition system.
Response and Acceptance Criterion - Acceptance criteria will be an alarm, with interruption or inhibition of the processing sequence when an unsafe condition exists and no alarm with no interruption when saf e conditions exist.
O CAF1107:ENG-308 '
85
Waste Metering Systen Purpose - Confirm accurate metering of waste. Characterize metering rate of waste dispensing valve.
Response and Acceptance Criterion - The data obtained during this phase will be used to establish the capability of the waste dispensing syetem to consistently meter an accurate volume of waste to the mixers. This information will be ussd to establish tolerance bands for the Process Control Program. There are no acceptance criteria for this test, it is required to obtain data.
Date Acquisition System Tests
~
Purpose - Confirm accuracy of recorded data vs primary instrument readings, correct recording sequence, and proper response to abnormal process conditions.
Response and Acceptance Criteria - The acceptance criteria is as follows:
- 1) Agreement between reading on primary instrument and recorded reading within 12 percent.
- 2) The correct data point recorded at each step in the sequence where data recording is required.
- 3) The data acquisition system provides a signal to alarm and interrupt the auto-sequence whenever a parameter monitored by the system is abnormal (i.e., mixer weight compared to expected weight).
Preliminary Tests 4
Purpose - Confirm the proper operation of the High-Shear Cement Solidification Subsystem with cement and water, both in manual and automatic mode.
Response and Acceptance Criterion - Acceptance criterion will be production of I
ten drums of hardened cement automatically with no system failures.
i i
CA F1107 :ENG-308 86 l
I Drum Conveyor System for the Drum Loadout Facility Tests O
Purpose - Confim proper operation of Drum Conveyor System cmponents.
Response and Acceptance Criterion - Acceptance criterion will be as called out in equipuent specification WVNS-EQ-250.
System vendor will provide test program / procedures and acceptance criteria for this portion of test, and will perform shop tes ting. Vendor will also provide a test supervisor for site t es ts. WVNS Personnel will approve the procedures and acceptance criteria and will retain the right to witness all testing.
Integrated Testing Purpose - Confirm autanatic integrated operation of all subsystems of the CSS, and verify the adequacy of Process Control.
Response and Acceptance Criterion - Acceptance criterion will be continuous operation of the integrated CSS for a period of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> at a rate of four (4) s quar e _ drums / hr. Several drums will be randomly selected, and sampled f or f ree water, and homogeneity of the mix. Acceptance criteria will be no free liquid pres ent.
Sump Pump Tes ts Purpose - To confirm proper operation of the three CSS sump pumps, and the adequacy of the instrumentation and control system.
Respo'Ise and Acceptance Criterion - Pumps will be adj usted and operated to provide a pump out rate of approximately 30 gpm. The sumps will be flooded with water to verify response of level indicators, autanatic alarm and pump start-up at high-level set point and automatic pump shutoff at low level set poi nt.
O CAF1107 :E NG-308 87
G.10 3 TRAINING PROGRAMS v
G.10.
3.1 INTRODUCTION
G.10.3.1.1 Scope The primary purpose of the Cement Soldification System is to encapsulate radioactive waste solutions and slurries in cement drums, which will be stored in a temporary on-site storage area for future shipment to a permanent disposal site.
The system consists of three major subsystems, the Waste Encapsulation
]
Subsystem, the Cement Storage, and Transfer Subsystem, and the Materials Handling Subsystem. The entire system is located within and adjacent to the 01-14 Building at the WVNS Site.
I G.10.3.1.2 Program Objective The overall objective of the qualified program is to provide qualified personnel to safely operate the CSS in the areas as listed in the Qualification Program Contents Section (1.3), in accordance with DOE ORDER 5480.1 A, Chapter V, "Saf ety of Nuclear Facilities". Qualified personnel will be provided by training and testing operator candidates who meet certain pre-requisites for 1
the qualification program.
i G.10.3.1.3 Qualification Program Curriculta Overview The course curriculum for the CSS Operator Qualification Program is designed to include in detail, the following:
)
o System and Subsystem Description, H & V Systems included.
i o Modifications
[
o System and Subsystem Components, H & V Systems included:
{
Instrumentation and Controls Alarms and Response Procedures v
CA F1107:ENG-308 88 i
o Emergency Operating Situations e
o 01-14 Building Emergency Procedures and Fire Safety o Operational Safety Requirements o Data Aquisition System o System and Subsystem Interf aces:
LWTS, CTS, Utilities, Warehouse o Radiological and Environmental Monitoring o Ancilliary Systems, Sumps, Cranes, Closed Circuit TV, Electrical Motor Control Center, etc.
G.10 3 2 PERSOINEL SELECTION G.10 3.2.1 Entry Requirements The personnel selected for Flant Systems Operations shall have a high school education or equivalent with courses in algebra, chemistry and/or physics.
G.10.3.2.2 Prerequisites Furthermore, personnel who are selected and assigned to the CSS Operations group will possess, as a minimum, a Plant Systems "B" Operator Qualification.
Such personnel will have completed training in the following pre-requisites:
o Radiation Worker Training o Respiratory Protection Training o Procedural Compliance Training o Quality Assurance Training O
CAF1107:ENG-308 89
o Radioactive Materials Handling Training s s
~'
Lif ting and Handling Training o
o Nuclear Criticality Safety Training o General Plant and Chemical Safety o General Plant Emergency Plan & Procedtres Plant System "B" Operators possess the knowledge and are qualified to operate many areas of the main plant which utilize processes and instrument & cer.t. ols similar to those used in The CSS:
o Plant Ventilation o Waste Tank Farm Equipment o Water Treatment (FRS) o Low-Level Waste Treatment Facility G.10.3.2 3 Training Resources The WVNS Training Department will have the responsibility for overall coordination and documentation of the qualification program. The department will employ the expertise of the CSS Design Group to provide classroom instruction on the basic theory, process concepts, subsystem, components and procedures which compose the CSS process. This training will be supplemented by the use of vendor prepared materials related to basic functions of valves, pumps, instruments process controllers and/or other vendor material specific to the CSS. Further training reference material and information on procedures.
Temporary Operating Procedures, Standard Operating Procedures, Unusual Occurrence Report and Operational Safety Requirements will be kept in the Training Department personnel will also provide instruction, tutorial activities, operator qualification guidance and training material preparation including training aids and lecture videotaping.
l i
G.10 3 3 OPERATOR QUALIFICATION PROGRAM CONTErf G.10.3.3.1 PROGRAM GOALS
/~'\\
The CSS Qualification Progran will fulfill the ' specific needs determined for U
personnel to operate the facility and process in a safe and efficient manner.
C A F1107 :ENG-308 90
The Operator at the completion of the training / qualification progra.1 shall be
~
able to:
o Understand the theory and function of the system process, equipment and controls for generation of an acceptable product.
o Demonstrate the knowledge and perf orm the normal modes of operation for the CSS using established Temporary Operation Procedures, Standard Operation Procedures, R & ID's, and Operational Safety Requirements (OSR) o Detect and respond to abnormal or emergency conditions using the instrumentation on available and via visual monitoring of the comoonents.
o Mitigate emergency situations using appropriate procedures and bring the system to a safe shut down mode, if needed, o Operate the facility saf ely in accordance with DOE Order 5480.1 A, Chapter V.
o Maintsin and update their knowledge and skills as required to remain qualiried.
G.10 3.3 2 Training centent outline The content and depth of coverage for the CSS Operator Qualification Program will satisfy the specific needs for knowledge in all CSS Process areas.
The curriculum is divided into three blocks to enable a more through and organized method for The operator to learn the process and equipnent operation.
The following is an outline of the *.hree blocks of the CSS Operator Qualification Program with a detailed course listing.
Block 1 Technical training and System f amiliarization - includes trainee self-study and O
CAF1107:ENG-308 91
e i
p classroom lectures by CSS Design Engineer 'and/or Supervisory personnel. The V
Training Department will assist in training material preparation where needed, i.e. - training aids, videotapes, etc.
Fundamentals (week NO. 1) a.
CSS introduction and overview with tour, b.
Techniques and practices for equipment operators.
c.
Process concepts and controls.
o Introduction 2
o Inst.munentation diagrams and symbols.
(ISA) o Instrumentation diagrams and symbols.
(CSS) d.
Plant mathematics and chemistry fundamentals.
e.
Programmable controllers.
1 REVIEW AND QUIZ ON WEEK NO.1.
t Fundamentals (week NO. 2)
J Pu'mps - centrifugal and positive displacement.
l a.
b.
Eductors, air lif ts.
,1 c.
valve operations d.
CSS Valves - types, theory, operation e.
CSS Pumps - types theory, operation _ with field demonstration, - Diaphragm, Centrifugal, Submerged.
1, REVIEW AND QUIZ ON WEEK NO.2 CSS Equipment and Operation (week NO. 3) a.
Detailed CSS and 01-111 Building equipment overview with lecture tour, including modifications b.
Math and chemistry - specific to CSS.
Problem sol ving,.aecipe calculations, calibrations, molarity and PH actjustments.
c.
Bulk Cement Storage and Transf er, cement truck unloading, bulk cement i
transfer to day bin.
d.
Cement Feed Subsystem.
C AF1107 :ENG-308 92
e.
HSCSS System (Westinghouse) - waste dispensing system with Isolok Sampler, chemical additive system, mixer operations and flushing, drum filling, control panel, waste transf er, CSS Manual Solidification with PLC o perational.
REVIEW AND QUIZ ON WEEK NO. 3 CSS Equipment and Operation (week NO. 4) a.
Heating and ventilation system for 01-14 Building - H & V Filter changes for building and filter room filter change.
b.
Data Aquisition System - includes keyboard practical training - Hardware, operations, etc.
c.
Empty drum storage and transfer - empty drum delivery, conveyor loading, feeding empty drums into system. ATI alarm responses - manual drum operati ons.
d.
Full drum handling and loadout '- hardware; control's and operation.
o Conveyors o Material Flow Diagram o Drum Sealer o Contact Dore Rate Meter o Smear Survey Robot Reader (future) o Drum overpack station o Full drum loadout o Product loadout station o Transport vehicle REVIEW AND QUIZ FOR WEEK NO. 4 CSS Interf aces and Ancillary Systems (week NO.5) a.
CSS interf aces with:
o Warehouse - (empty drums), (cold chemicals) o LWTS - Waste Feed, 7D-13 o RTS - Drum Cell o Analtycal Labs C A F1107 :ENG-308 93
A b.
Ancillary Systems
,- s I
\\
y/
o Cell sumps o Cranes o Closed circuit TV system o Utilities - (air, water, steam, electrical motor control center) o MSM operations o Hydraulic system Emergency, Radiological and Safety Considerations a.
CSS emergency response for power f ailures b.
Emergency response procedures c.
Operational safety requirements d.
Radiological monitors - process, building and personnel e.
Radiological monitors - environmental (includes stack monitor system) f.
Fire safety systems: equipment to include:
o Monitorin'g o Fire fighting and extinguishing
^x (w/
i g.
System test plan, process control plan, which includes:
o Waste form requirements o Recipe developement and testing o QA plan o Run plan REVIEW AND QUIZ ON WEEK No. 5 Comprehensive Study and Review Comprehensive written exam on weeks 1 through 5.
BLOCK II Hands on training, cold operations and checkouts to include The following, documented by a checklist sheet for each CSS Operator.
/3 CAF1107:ENG-308 94
System Operations - Manual and Automatic, O
Where Applicable, o Waste Receiving in WDV - sampling o Waste Dispensing Sub-System o Cement Storage and Transf er Sub-System o Mixing, Flushing, Sub-System o Empty Drum Handling o Full Drum Handling, includes surveys, overpack system and loadout.
o H & V systems - startup, shutdown, emergency situations, filter changeouts, Control panel operation for HSCSS, AT1, EM00T o
BLOCK III Review and Testing Prior to becoming qualified as a CSS Operator, achievement of a passing grade on The following exams is required:
- a. Written exam on Block I, sub headin3s 3.2.1.1 through 3.2.1.6 (passing grade minimum of 80%).
- b. Operational walk-through exam by C."S Engineering or Supervisory personnel.
(passing grade minimum 80%).
G.10.3.3.3 Doctmentation o The qualification program shall be documented in sufficient detail to permit independent evaluation of The scope of The training program.
Procedures specific to training are found in WV-537. WV-538, WV-220 and The Training Policies & Procedures.
o Documentation for each block of The training program will include an account of The time spent in The various training activities.
O CAF1107:ENG-308 95
o A written training signature list (e.g. qualification standard) will.be
()
kept for each trainee, which covers all significant steps of 4
training. The OJT qualification sign-off checklist will be more detailed to assure proper instruction and reactice (under close supervision) on every aspect of CSS operations.
G.10.3.3 4 Requalification DOE Order 5480.1 states that retraining and re-examination shall be required at least annually on all pror<dtres for handling abnormal nuclear facility conditions and emergency situations relative to The employe's assigned r es ponsibili ti es.
And at least every 2 years on all other subjects in which The fissionable material handler, operator, or supervisor is expected to be proficient. Requalification on abnormal or emergency situations will be performed annually, 1
i The requalification program will be designed to review changes to procedures
)
and equipment and subject matcer not reinforced by direct use (e.g.
fundamentals, and operation of seld5m used equipment and procedures.) The requalification training program will provide for maintaining current knowledge and skills of The applicable operators. The requalification program will include, but not limited to:
o Equipment and Plant Modifications o SARs and OSRs o Changes in Operating Procedures o Unusual Occurrences, accidents, or near misses which occur locally or elsewhere if appropriate.
o Changing sources of radioactivity, criticality potentials or other potential enviromental hazards, o New outlooks or.nethods regarding The ALARA concept.
o Safety (fire, personnel i nj ury, etc. ).
r G.10.4 NORMAL CSS OPERATIONS
}
%d CAF1107:ENG-308 96 l
.,s
,m
-e,_
G.10.4.1 CSS PROCEDURES The CSS will be operated using procedures prepared, reviewed, and approved per the requirements of the WVDP Policy and Procedures Manual.
Procedures will be written to cover all aspects of CSS operation including but not limited to:
Waste transfer to the CSS, Waste sampling, Waste metering to the High-Shear Mixers, Bulk canent receiving, storage, and transfer to the Acrison Day Bin, Bulk cement metering to High-Shear Mixers, High-Shear Mixer operations, Clean drum loading and transfer, Drum fill operations, Drum capping, Drum weighing, smearing, and labeling, Drum overpacking, Remote crane operation, CCTV operation, Full-drum storage operations,
Full-drum load-out,
Conveyor operation procedures,
Analytical Laboratory interface, Mixer System flush Jrocedures, Mixer flush solution processing; Calibration procedures, Preventative maintenance, and Programmable Logic Controller program loading.
Data Acquisition System Operation g
CAF1107 :ENG-308 97
1 l
l t
i REFEREIICES FOR SECTION G.10.0 O
I 1
U.S. Department of Energy,1985, Guidelines for Evaluating DOE Non-Reactor Nuclear Facility Training Programs.
j U.S.' Department of Energy,1981, Order 5480.1, Radiation Standards for Protection of the Public In the Vicinity of DOE Facilities, Chapter V, Paragraph 8.
l WNS Training Policy and Procedures:
W-537, W-538 and W-220.
I 4
i I
1 t
O O
CAF1107:ENG-308 98 W..
/-
W~.
VALVE
'j CHECK-0UT 1
(SIP 86-04)
.1
.d -
4:#
PNEUMATIC TEMP INDICATOR
[i INSTALLATION CHECK-0VT.
el FOR VALVE 3 (SIP 86-09)
ELECTRICAL REWIRING LEVEL INDIC s' '
2nd FLOOR CHECK-0UT (SIP 86-07) fg
- LEVEL SWITCH 1
ELECTRICAL REWIRING CHECK-0UT j
CONTROL ROOM (SIP E6-06) l
- FLOW SWITCH 1
CHECK-0UT
$r ELECTRICAL REWIRING (SIP 86-05)
PROCESS CELL
- WASTE METERING SYS 5
HSC'SS PANEL CHECK-0VT REWIRINC (SIP 86-13) fi DECON PROCESS i[I ROOM q( 9 EQUIPMENT REMOVAL j
MIXER ASSY. TESTS
-l MIXER SKID MIXER LOAD CELLS RAM VALVE CYLINDER SUS-BASE MIXER PIPING INSTALLATION 1
i e1 PIPING j
' SPOOLS HOSES
- INVOLVES PUMPING WATER FROM WDV TO MIXERS
MODlFTED ATT SYSTEM CHECX-0UT (SIP 86-08)
HARDWIRED INTERLOCK CHECK-0UT (SIP-12)
CONVEYOR SHOP CHECK M01-14 MODS i
TI CONVEYOR APERTURE i
INSTALLATION CARD
. HYDR & REMA NING PNEUM Also Available On PIPING INSTALLATION ATI P L
Aperture Card p
SQUARE DRUMS cl i Y
CHECK-0UT CHECX-0UT CHECK-0UT C
PROGRAM CONTROLLER w/
' PROGRAM w/ BYPASS COMPLETE BYPASS OF CEMENT, FILL OF CEMENT & DAS PROGRAM HEAD, CONVEYOR & DAS (SIP 86-15) w/DAS (SIP 86-15)
MCC M005 5 DRUM RUN MIXER ACCESS (SIP 86-15)
PLATFORM (SIP 86-14)
MANUAL DECANT -
20 DRUM STATION QUALIFICATION RUN (SIP 86-16)
FILL HEAD INSTALLATION INSTRUM
& CHECK-0VT INSTALL (SIP 85-10)
& CHECK CRIMPER l
INSTALLATION S
hhf h
~
SEQUENCE FOR INSTALLATION / QUALIFICATION OF CSS.
4
)
v h
y 2
G.11.0 TERATIONAL SAFETY REGJIREMirFS (r^h
\\~ /
G.11.4 OPERATIONAL SAFETY REQUIREENTS (OSRs)
G.11.4.1 01-14 BUILDING VENTILATION Applicability - This specification applies to the operability requirements of the 01-14 Building Heating and Ventilation (HV) System.
Objective - To assure that ventilation equipment necessary for containment and control of airborne contamination is operable and provided with appropriate backu p.
Specifications -
Limiting Conditions for Operation 1.
Processing of liquid waste in the CSS shall not be done without adequate
~
ventilation of the process area! At a minimum, the electric powered blower and a diesel powered backup blower shall be available at the start of a campai gn.
If during a campaign the primary blower is lost, the backup blower sh ul be used to provide ventilation while the CSS is brought into a saf e shutdown status and shall continue to provide area ventilation until the primary blower is again operational. Waste processing shall not be restarted until adequate backup ventilation is restored.
Surveillance Req 11rements 1.
Operability of the backup blower and the automatic switching relay shall be tested every two weeks. This check shall test the automatic switch over, atartup and operation of the backup blower. The backup blower shall be run for 30 minutes during each test.
O,
\\.
CAF1107 :ENG-308 99
Basis - The 01-14 Building HV System provides the appropriate air flow to assure control of airborne contamination.
Operation of this system is important to maintenance of negative pressure differentials between operating aicles and process areas thereby assuring that airborne activity is contained within the cells.
Failure of this system would eliminate this pressure differential and would allow contaminac.'on to spread into operating aisles.
G.11.4.2 HEPA FILTERS Applicability - This specification applies to the High-Efficiency Particulate Air (HEPA) filters installed 1.c the 01-14 Building HV System.
Objective - To assure that particulate airborne contamination is properly filtered from air being discharged from the 01-14 Building HV System so that it is below the release limits given in DOE Order 5480.1 A, Chapter XI.
Specifications -
Limiting Conditions f or Operation
~
1.
One complete filter train in the Operating Aisle Filter System and five of the six filter banks in the Process Room Ventilation System sh'all be operational at all times during processing.
2.
Pressure differential instrumentation shall be operational across each filter bank at all times. This may be accomplished by pressure diff erential alarms low and high or a pressure differential recorder'for each bank.
3 The 01-14 Building HV Stack Monitor shall be operational at all times.
Alarm instrumentation on this Monitoring System shall provide a continuous readout in the Main Plant Control Room and shall signal an. alarm in both the CSS Control Room and Main Plant Control Rom, if stack discharges exceed 75 percent of discharge limits. This Monitor shall be provided with suitable redundancy and backup power to assure uninterrupted operation.
O CA F1107 :ENG-308 100
gs Surveillance Requirements k
1.
HEPA filters shall be checked with a standard DOP test prior to initial use and after each changeout to assure that they will operate at an efficiency of at least 99.95 percent.
2.
Ventilation filters shall be changed when the pressure differential across the filter is 15 cm w.c. or the dose rate on the filter exceeds 100 mR/hr.
Basis - Filters are provided in both parallel and series in the 01-14 Building HV System. The cell ventilation air passes through two banks of filters, each bank containing six HEPA filters.
Individual filters may be valved out to allow replacement, hence the requirement of five filters can be met even during filter changing operations.
The operating aisle ventilation is filtered through a roughing filter and HEPA filter prior to discharge. A redundant filter train, in parallel to the first, is provided to allow for continuous filtration even during filter ' hangeout.
c rh 4
Pressure differential monitoring instrumentation is provided in several forms. Pressure differential alarms (low) are installed across each filter, whereas pressure differential alarms (high) are installed across each bank of filters. These instruments are backed up by pressure differential recorders.
The filters shall,also be monitored for radiation exposure rate to assure compliance with the 100 mR/hr limit. This may be accomplished by either fixed area radiation detection instrumentation or by portable survey instrumentation.
The Stack Monitor will provide an isokinetic sample of ventilation discharge from the 01-14 Building stack and will monitor to assure that this discharge is within DOE limits. The alarm point is set sufficiently low to assure that the system can be shut down until the cause of elevated activity can be identified without violating the discharge limit.
(V Cf.F1107:ENG-308 1 01
G.11.4.3 CSS WASTE LIMITS' O
Applicability - This specification applies to the concentration of Cs-137 and/or fissile material in the waste being processed.
Objective - To assure that waste feeds to the CSS are of sufficiently low activity to maintzin exposure rates in routinely occupied areas below 0.25 mrem /hr and to assure that the system remains suberitical.
Specifications -
Limiting Conditions for Operation 1.
The Cs-137 concentration of wastes entering the CSS shall be less then 6 uCi per mL of waste solution. Solutions above this concentration shall not be processed without written approval of the Radiation and Safety Manager.
2.
The following fissile material limits shall be applied to each batch of waste processed in CSS:
0 For unrestricted batch processing, the allowable and/or limiting fissile material solution concentration for each process step for each CSS batch operation shall not exceed the values given in Table G.11.4-1.
O If the solution sample analysis results of a CSS batch show fissile material concentrations exceeding the limits given in Table G.11.4-1, the CSS processing operation shall not proceed. Written concurrence and authorization of the Radiation and Safety Manager will be required before the operation can proceed.
Basis - The Cs-137 concentration limit was derived f rom the design waste loading of 1 Ci of Cs-137 per drum of solidified waste. This value was used for shielding design of the Drum Loadout Facility. Processing of waste containing Cs-137 concentrations above this concentration may result in higher exposures in the operating aisles.
CA F1107 :ENG-308 102
i
-g The fissile material limits were derived from a criticality safety evaluation s,)
for allowable fissile material solution concentrations for liquid transfers (FB:85:0037). The concentrations presented in Table G.11.4-1 represent the safe subcritical concentrations for fissile material.
G.11.4.4 EMRENCY POWR REQJIREENTS Applicability - This specification applies to the emergenc,y power requirements for vital components in the CSS.
Objective - To provide sufficient emergency power to the CSS for bringing the system to a saf e shutdown status and maintain vital services throughout the power outage.
Specifications -
Limiting Conditions for Operation
's 1.
Ventilation O Sufficient diesel fuel shall be stored on-site to allow continuous operation of the backup blower for eight hours.
O Electrically operated controls and relays utilized to switch blowers or filter trains 'shall be provided emergency electrical service from the Utility Room or shall be equipped with battery backup.
O The Stack Monitoring System shall be provided emergency electrical' power from the Utility Room or shall be equipped with battery backup capable of sustaining the Monitoring System for eight hours.
O CAF1107:ENG-308 103 I
~ -.,, -
2.
Process 0 The High-Shear Mixers and Cement Removal Pump shall be provided with sufficient backup electricity from the Utility Room to dispense a full mixer volume of cement and to flush the mixer with water.
O Lighting in the 01-14 Building shall be included in the site mergency power distribution system.
3 Instrumentation 0 Ventilation filter instrumentation shall be provided emergency electrical power or shall be equipped with battery power capable of maintaining instrumentation continuously for eight hours.
Basis - Emergency power is required to safely shut down the CSS process while maintaining the contairment provided by the 01-14 Building HV System. To shut down the CSS requires that the cement mixers be emptied and flushed. The above specification, provides for this.
Once the CSS is shut down, ventilation will still be required to assure the contairnent of airborne activity.
Backup ventilation is provided by a diesel driven blower. This specification assures an adequate fuel supply is on hand for this blower.' The eight-hour f uel supply provides sufficient time to res tore power or obtain more f uel.
Instrumentation and lighting will be required to monitor the system duaing its shutdown status.
Backup power for these services is assured by this specification.
l O
CAF1107:ENG-308 1 og
/~N TABW G.11.4-1 MAXIMJM ALLOWABE FISSILE MATERIAL SOLITfION CONCENTRATIONS FGt CSS OPERATION ( ALL VESSEIS)I Column 1 Column 2 Concentration of Uraniurc Corresponding Maximum Plutonium (U-233 + U-235)
Concentration (Pu-239 + Pu-241) grams / litre grams / litre 4
Greater than But less than 0
0.0u9 1.35 0.05 0.499 1.63 0.5 0.99 1.39 1.0 1.99 0.92 2.0 2.49 0.68 2.25 2.99 0.44 3.0 3.49 0.20 Greater than 3.5 Not authorized for 4
processing: Special written authorization required 4
(1) Each CSS solution batch shall be sampled for fissile radionuclides prior to processing. For a sample containing a combined U-235 plus U-233 concentration in the range shown in Column 1, the corresponding value in Column 2 is the safe limiting and allowable combined Pu-239 plus Pu-241 i
concentration for processing.
l l
U CAF1107:ENG-308 1
4
. ~]
G.12.0 QUALITY ASSIRANCE a
G.12.2 QUALITY ASSLEANCE PROGRAM G.12.2.1 QUALITY LEVELS Table G.12.2-1 presents Quality Levels and Service Classes for the structures,
systems, and components associated with the CSS.~ The criteria and procedures used to determine Quality Level and Service Class designation are presented in Section A.4.4 of Volume I.
The exposure rate within the CSS Process Room could exceed 100 mR/hr should an accident occur resulting in either a spillage of liquid waste or cement setting up within one of the Mixers.
If such a situation were to occur, it would be necessary for workers to enter the cell to repair or replace various pieces of e qui pment. These workers could receive a dose in excess of 100 mrem should they be required to work within the Process Room for several hours. For this reason, certain components within the Process Room have been assigned a Service
{
Class of III. Components exterior to the Process Room, which are all standard industrial components which have a proven history of industrial reliability, are assigned a Service Class of IV.
The exception to this is the WDV and associated transport components. The Quality Level designations given in Table G.12.2-1 are based on the Saf ety Classification of structures, systems, and components given in Table G.4. 4-1.
Section A.12.0 of Volume I discusses the implementation of the Quality Assurance Program based on DOE Order 5700.6A, DOE-ID Order 5700.6B and the eighteen criteria of ANSI /ASME NQA-1, 1983 CAF1107:ENG-308 105
,,r--w-,
,.-,n e
,,,,n
TABLE G.12.2-1 (1 cf 3)
QUALITY LEVEL CLASSIFICATION AND SERVICE CLASS W INGtTANT STRUCTURES, SYSEMS AND COMPWElfrS ASSOCIAED WITH THE CEENT SG,IDIFICATION SYSTEM 9
C0ffMENT OR SYSEM SERVICE CLASS QUALITY LEVEL STRUCTURES 01-14 Building (Modified)
III C
Shield Walls III C
Shield Doors and partitions III C
Shielded Viewing Window III C
Access Doors IV N
Air Lock Doors IV N
IV N
Stainless Steel Liner IV N
Sumps and Associated Drainage Lines Floor Drains and Associated Drainage Lines IV N
Pipe Supports IV N
Conduit Supports IV N
HV Supports IV N
WASTE PROCESSING Cement / Additives Preparation and Delivery IV Cement Fill Station IV N
Cement Silo IV N
Pneumatic Cement Transport System IV N
Additive Tanks (2)
IV N
Cement Bin IV N
Cement / Additives Trans port Lines
- IV N
Cement / Additives Transport Pumps IV N
i Cement / Additives Trans port Valves IV N
Loss-in-Weight Feeder IV N
Liquid Radioactive Waste Preparation and Delivery Waste Dispensing Vessel III C
Waste Transport Lines (Note 1)
III C
Waste Transport Pumps (Note 1)
III C
Waste Transport Valves (Note 1)
III C
Mixer Flush System Flushwater decant pumps III N
Sump Pumps III N
Cement Solidification High-Shear Mixers (2)
III N
Cement Transport Lines IV N
Note 1:
This classification applies only to the Waste Transport Lines,
Pumps, and Valves within 01-14 Building.
O CA F1107 :ENG-308
TABE G.12.2-1 (2 of 3) i gm QUALITY LEVEL CLASSIFICATION AND SERVICE CLASS OF INGtTAE STRUCTIRES,
(
SYSTEMS AND CONGIENTS ASSOCIATED WITH THE CEEKr SM.IDIFICATION SYSEM CONGIEtt OR SYSTEM SERVICE CLASS QJALITY LEVEL Cement Solidification (Continued)
Fill Nozzle IV N
Drums IV N
Lid Crimper IV N
LOAD 0UT HANDLING EQUIPMENT Air Lock Door Engaging System III C
Drum Feed Conveyors III C
Manipulator III C
Transfer Drawer III C
In-Cell Crane III C
Drum Lif t Table IV N
Drum Overpack Conveyor III N
Smear Station Automated Swipe / Label Robot III C
Swipe Tool (s)
III C
Overpack Station Drum Transporter Shielded Cask III C
Truck IV N
MONITORING SYSTEMS, CONTROLS AND INSTRUMENTATION Area Radiation Monitors III C
Airborne Particulate Monitors III C
Ventilation Monitoring System and Alarms III C
Liquid Radioactive Waste Sampling System IV N
In-Cell IV Camera IV N
e e
i i
CAF1107:ENG-308 i
TABLE G.12.2-1 (3 of 3)
QUALITY LEVEL CLASSIFICATION AND SERVICE CLASS OF Iff0RTANT STRUCTURES, SYSTEMSAND COMPONENTS ASSOCIATED WITH THE CEMENT SOLIDIFICATION SYSTEM COMPCNENT OR SYSTEM SERVICE CLASS QUALITY LEVEL MONITORING SYSTEMS, C0KTROLS AND INSTRUMENTATION (Continued)
In-Cell Radiation Monitors III C
Communications Equipment IV N
Electronic Instruments and Controls III C
In-Cell Alpha / Beta Counter III N
Pneumatic, Hydraulic Instrumentation & Controls III C
UTILITIES AND SUPPORTING SYSTEMS Electrical Power Systems 01-14 Building Supply IV C
Panels, Transformers and Motor Control Center IV C
Condui ts IV C
Engine Drive IV C
Steam IV N
Utility Air IV N
Instrument Air IV N
Demineralized Water IV N
Utility Water IV N
Fire Detection and Protection IV C
VESSEL OFF-GAS SYSTEM Ducting III C
Blowers III C
Exhaust Filtration III C
HEATING AND VENTILATION (HV) SYSTEM 01-14 Building HV System Ducting III C
Blowers III C
Exhaust Filtration III C
SYSTEM CHECK 0UT AND TESTING N/A" C
- N/A Not Applicabl e O
CAF1107 :ENG-308