Forwards Insp Repts 50-412/86-25,50-412/86-27 & 50-412/86-28 on 860902-1003 & Notice of Violation.Actions Taken or Planned to Improve Implementation of Preoperational Test Program Should Be Described
ML20214C667
Person / Time
Site: Beaver Valley
Issue date: 11/17/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20214C670 List:
References
NUDOCS 8611210190
Download: ML20214C667 (3)


See also: IR 05000412/1986025

Text

, - - - ~- _ _

.

i s

f

NOV 171986

Docket No. 50-412

Duquesne Light Company

ATTN: Mr. J. J. Carey

Vice President

Nuclear Group

Post Office Box 4

Shippingport, Pennsylvania 15077

Gentlemen:

Subject: Inspection Report Nos. 50-412/86-25, 50-412/86-27, and 50-412/86-28

This refers to three routine safety inspections conducted by Mr. Henri F.

vanKessel of this office on September 2-5, 1986, September 15-19, 1986, and

September 30 - October 3,1986 at the Beaver Valley Power Station, Unit No. 2,

Shippingport, Pennsylvania, of activities authorized by NRC License No.

CPPR-105 and to the discussions of our findings held by Mr. vanKessel with

senior members of your staff at the conclusion of the inspections. The

violations and the observations noted below were discussed with Mr. Swiderski

and Mr. Noonan of your staff on November 7,1986, by Messrs Bettenhausen and

Florek.

Areas examined during these inspections are described in the NRC Region I

Inspection Reports which are enclosed with this letter. Within these areas,

the inspection consisted of selective examinations of procedures and represen-

tative records, interviews with personnel, and observations by the inspector.

Based on the results of inspection 50-412/86-28, it appears that certain of

your activities were not conducted in full compliance with NRC requirements, as

set forth in the Notice of Violation, enclosed herewith as Appendix A. These

violations have been categorized by severity level in accordance with the

" General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR

Part 2, Appendix C (Enforcement Policy). You are required to respond to this

letter and in preparing your response, you should follow the instructions in

Appendix A.

These three inspection reports, which include the observations and findings of

our inspector as well as your own QA organization, identify three areas where

we are concerned on the adequacy of the implementation of the preoperational

test program. These include adequacy of the implementation and knowledge of

both test and operations personnel in the drawing and document control system

including changes, adequacy of the implementation and knowledge of both test

8611210190 861117

PDR

G ADOCK 05000412 n

PDR \)

f

0FFICIAL RECORD COPY IR BV2 86-28 - 0001.0.0

11/07/86 l I

- __ _ _ - - - - - _ - - - _ _ - - - - - _ _ - - - - _ - - - _ _ - - - - - _ - - - - - - - - - - - - - - . - - - - _ _ _ - --------------------J

<

.

. ,, .

'

Duquesne Light Company 2

and operations personnel in the administrative controls of the preoperational

test program and the fragmentation of system level preoperational tests into

subsystem or component level tests. Consequently, in your reply, you should

particularly describe those actions taken or planned to improve the implemen-

tation of the preoperational test program.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

Original Signo E ,-

.

/fcStewartD.Ebnete, Director

Division of Reactor Safety

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Region I Inspection Reports Number 50-412/86-25, 50-412/86-27, and

50-412/86-28

cc w/ encl:

E. J. Woolever, Vice President, Special Projects

E. Ewing, Quality Assurance Manager

R. J. Swiderski, Manager, Startup Group

J. P. Thomas, Manager, Engineering

R. E. Martin, Manager, Regulatory Affairs

C. O. Richardson, Stone and Webster Engineering Corporation

Public Document Room (POR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC. Resident Inspector

Commonwealth of Pennsylvania

0FFICIAL RECORD COPY IR BV2 86-28 - 0002.0.0

11/07/86

_ _ _ _ - _ _ - _ _ __ _ - . . _ _ _ - _ _ - _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ . _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ -

. .. . .

Duquesne Light Company 3

bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

A..Cerne, SRI, Seabrook

W. Troskoski, SRI, BV-1

P. Tam, LPM, NRR

T. Martin, DRSS

S. Ebneter, DRS

Robert J. Bores, DRSS

L. E. Tripp, Chief Section #3A, RP#3, DRP

.

g

% >6vitbtr W W g.s WV

RI:DRS RI:DRS RI:DRS hRI:DRS

yn el

gs Bettenhausen Ebneter

11/ 7 /86 11/ 7/86 11/ 7/86 11// y/86

0FFICIAL RECORD COPY IR BV2 86-28 - 0002.1.0

11/07/86