NOV 171986
Docket No. 50-412
Duquesne Light Company
ATTN: Mr. J. J. Carey
Vice President
Nuclear Group
Post Office Box 4
Shippingport, Pennsylvania 15077
Gentlemen:
Subject:
Inspection Report Nos. 50-412/86-25, 50-412/86-27, and 50-412/86-28
This refers to three routine safety inspections conducted by Mr. Henri
F.
vanKessel of this office on September 2-5, 1986, September 15-19, 1986, and
September 30 - October 3,1986 at the Beaver Valley Power Station, Unit No. 2,
Shippingport,
Pennsylvania, of activities authorized by NRC License No.
CPPR-105 and to the discussions of our findings held by Mr. vanKessel with
senior members of your staff at the conclusion of the inspections.
The
violations and the observations noted below were discussed with Mr. Swiderski
and Mr. Noonan of your staff on November 7,1986, by Messrs Bettenhausen and
Florek.
Areas examined during these inspections are described in the NRC Region I
Inspection Reports which are enclosed with this letter. Within these areas,
the inspection consisted of selective examinations of procedures and represen-
tative records, interviews with personnel, and observations by the inspector.
Based on the results of inspection 50-412/86-28, it appears that certain of
your activities were not conducted in full compliance with NRC requirements, as
set forth in the Notice of Violation, enclosed herewith as Appendix A.
These
violations have been categorized by severity level in accordance with the
" General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy). You are required to respond to this
letter and in preparing your response, you should follow the instructions in
Appendix A.
These three inspection reports, which include the observations and findings of
our inspector as well as your own QA organization, identify three areas where
we are concerned on the adequacy of the implementation of the preoperational
test program. These include adequacy of the implementation and knowledge of
both test and operations personnel in the drawing and document control system
including changes, adequacy of the implementation and knowledge of both test
8611210190 861117
ADOCK 05000412
n
G
\\)
f
0FFICIAL RECORD COPY
IR BV2 86-28 - 0001.0.0
I
11/07/86
l
-
- - - - -
- - -
- - - - -
- - - -
- - -
- - - - -
- - - - - - - - - - - - - - . - - - -
-
. - - .
- --
J
<
.
. ,,
.
'
Duquesne Light Company
2
and operations personnel in the administrative controls of the preoperational
test program and the fragmentation of system level preoperational tests into
subsystem or component level tests.
Consequently, in your reply, you should
particularly describe those actions taken or planned to improve the implemen-
tation of the preoperational test program.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
Original Signo E
,-
.
/fcStewartD.Ebnete, Director
Division of Reactor Safety
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Reports Number 50-412/86-25, 50-412/86-27, and
50-412/86-28
cc w/ encl:
E. J. Woolever, Vice President, Special Projects
E. Ewing, Quality Assurance Manager
R. J. Swiderski, Manager, Startup Group
J. P. Thomas, Manager, Engineering
R. E. Martin, Manager, Regulatory Affairs
C. O. Richardson, Stone and Webster Engineering Corporation
Public Document Room (POR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC. Resident Inspector
Commonwealth of Pennsylvania
0FFICIAL RECORD COPY
IR BV2 86-28 - 0002.0.0
11/07/86
_ _ _ _ - _ _ - _ _
__
_ - .
. _ _ _ - _ _ - _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _
_ _ _ _ _ . _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ -
. ..
. .
Duquesne Light Company
3
bcc w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
DRP Section Chief
A..Cerne, SRI, Seabrook
W. Troskoski, SRI, BV-1
P. Tam, LPM, NRR
T. Martin, DRSS
S. Ebneter, DRS
Robert J. Bores, DRSS
L. E. Tripp, Chief Section #3A, RP#3, DRP
.
g
%
>6vitbtr W W g.s
WV
RI:DRS
RI:DRS
RI:DRS
hRI:DRS
yn
el
Bettenhausen
Ebneter
gs
11/ 7 /86
11/ 7/86
11/ 7/86
11// y/86
0FFICIAL RECORD COPY
IR BV2 86-28 - 0002.1.0
11/07/86