Forwards Listed Documents,Per Request,Including T O'Neill 840313 Pullman Message/Reply & E Hickey 850604 Affidavit. Documents Possibly Contain Info Re IE Investigations. Portions of Documents 2-5 Encl.W/O Document 1
ML20212F086
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/19/1985
From: Shackleton O
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Schierling H
Office of Nuclear Reactor Regulation
Shared Package
ML20209D027 List:
References
FOIA-86-197 NUDOCS 8701090167
Download: ML20212F086 (5)


Text

. . @

fT UNITED STATES I WK- V' f~

3*' '

  • g 8

NUCLEAR REGULATORY COMMISSION CU m CMA g h 3, Of f 8CE oF INVESTIG ATIONS FIELD OFFICE. REGION V

<'h *" 1460 M ARIA LANE. SUITE 214 WALNUT CREEK. CALIFORNIA M696

% aus.

- 1 July 19, 1985 MEMORANDUM TO: Hans Schierling, Diablo Canyon Pro ect Manager 'c '% y Licensing Branch #3 FROM: Owen C. Shackleton, Director Office of Investigations Field Office, Region V

SUBJECT:

RECEIPT OF DOCUMENTS FROM THE GOVERNMENT ACCOUNTABILITY PROJECT (GAP).

The attached documents were received from GAP by OI:RY on July 15, 1985.

These documents concern the Diablo Canyon Power Plant and possibly contain infonnation concerning O! investigations. Per your request, these documents are passed to you for review and appropriate action. The documents have been previously forwarded to Region V.

The documents and the information contained therein cannot be dissemi-nated outside the NRC without the consent of the Director:0I. Dis-semination of these documerits and the infonnation contained therein should be disseminated within NRC only on a need to know basis.

The attached documents are identified as follows:

~~

1. Pullman Message / Reply of T. O'Neill dated 3/13/84.
2. Seven page affidavit of E. Hickey, dated June 4, *1985 3'. Thirteen page affidavit of H. Hudson, dated June 17,1985, with attachments 1-18, 20-21 and 26.
4. Fif ty-three page affidavit of M. Th"ompson, dated June 8,1985, with attachments 1-11, 14-16 and 19-24 (Attachment 4 identi-fication placed by OI).
5. Twelve page affidavit of A. Wade, dated June 3,1985, with 6 pages of enclosures.

l 8701090167 870106 PDR FOIA O HOLMFS86-197 PDR s.

f

, @ts PUBLIC UTILITIES COMMISSION STATE OF CALIFORNIA

)

In the Matter of Pacific Gas )

and Electric Company. )

) ss Diablo Canyon Nuclear Power )

Plant, Units 1 and 2. )

)

)

AFFIDAVIT OF HAROLD HUDSON The above, being duly sworn, deposes and'says:

My hame is Harold Hudsen. I am submitting this affidavit to the Government Accountability Project (G.AP) as part of their PUC work order Number 0-48-Cl, Work Task 4 d.

This affidavit addresses a review and analysis of the Pui-Lman Power Products' Discrepancy Report (DR) Master. Log up to DR # 4500 with a limited review and analysis of additional DRs up to #4900. It should be ,noted that Pullman has generated over 94 9000DRs during its construction work at Diablo Canyon. All of these DRs required corrective action of some sort. This correct-ive action may have involved rework or repair of discrepant items.

This rework or repair may not be a justifiable cost due to the nature of the discrepancy. This affidavit presents information to help the PUC determine if the ER's corrective action is or is not justifiable and whether the cost should be passed onto the consumer.

g 7 'J BEFORE THE CALIFORNIA PUBLIC UTILITIES COMMISSION AFFIDAVIT OF EUGENE HICKEY

)

STATE OF CALIFORNIA )

)

i COUNTY OF ) ss

)

CITY OF )

)

_)

~

The above, being duly sworn, deposes and says:

My name is Eugene Hickey. I am submitting this affidavit freely and voluntarily to Mr. Thomas Devine,who has identified himself to me as the legal director of the Government Account- ,

ability Proj ect.

I worked at Diablo Canyon in 1973 for about a year as a pipe welder for Pullman Power Products and for another con-tractor, the S&Q Company. I also worked at Diablo again for Pullman for around two years, from 1982-84 This statement describes my frustrating experience trying to obtain corrective action on a grossly defective weld in the penetration of the Unit 2 containment wall at the nuclear power plant.

E .T H 1

r'

N ~ '- &

/

/

EaEF ORE OFTHE DUBLIC UTILITIES COMMISSION THE STATE OF CALIFORNIA AFF! DAVIT OF m CHAEL C. THOMDSON

) '

STATE 'OF CALIFORNIA )

COUNTY OF SAN LUIS OBI 5PO )

)

CITY OF SAN LUIS OBISPO i ss t

.______--- a----_--____-_-____,s The aeove. De t r.g cul y sworre, oeooses ar,o sayst ray reatne i s Mi c h a e l C.

Tnorossor . I arn suoratttir.9 tnt, afft-cavit freely ar.c volur tart !y to Mr.

e Thornas Dev1 rie, wno has toers-tified h a ra s e l f t c. ree as a 'c ores i t t a r,t coric uc t a r.g are t ravest i gat t ore for the Public Staff of the Ca11 forr 14 c uslic ut 111 t t es Cr reent s-s t ore (OUC). 7.%15 s t a t e'ne r.t orivices a recore of r.ty e.. toe rl er,cg.s at Di aolo Cariver. t6at are relevaret for t Se PUC' s "r.ea torsaDla r.er t review" of c or s t # uc t i ore costs at s no Di aDlo Careyor Diart.

e Nuclear aower M/ aff i t'a v i t 5 %ou l e e e e ac' . c. cor ,. .i r c ; l or, w1th rey Oc *. -

ODer 22, 199 4 a r.c

.*a r.ua r y IS$5 af*1cav.,;. to .

ne N.e: par pepu.a- '

t ory Core'nl s t er. (NTC).

! *AN .r.iVF.' .S T : ,i:iE

1. Ma rsa g erner,t ree v er f,g e..c e c, ;3e cras ; :na. ,pnn;1e,C the rec u i re'neret t, rfe our in g i r.etar r i e g s nar. . / 4 c a t a r..r., p s e c, (ESD1 s

..a.

eoually unoort a ret as recet .r ; snor. tecri .1;.nou es. r. . g ;e c e .

i t r st ruc t 1or was c :early cer,$or. ti s t ec .

, y t ene se t . e,.s.  : r. .v e ,

1963 the ou1 Iraar. Har.ger F1eie C.;....,., s ~;...oc f e. , ,1 1 , o ,: ,,,ia r e ,. .

." I

k.- BEFOP2 THE PUBLIC UTILITIES COMMISSION 0F THE STATE OF CALIFORNIA AFFIDAVIT OF ALLEN WADE 3

State of California )

)

County of San Luis Obispo , ) ,;

)

City of )

3 The above, being duly sworn, deposes and says : -

My name is Allen Wade. I am submitting this affidavit freely and voluntarily to Mr. Thomas Devine, who has identi-

- fied himself to me as a consultant conducting an investigation for the Public Staff of the California Public Utilities Commis-sion. . I am providing this statement as a confidential witness ,

under condition that I can withdraw the affidavit if my name or 4

identifying characteristics would be revealed to any third party without my prior consent.

1 I worked at Diablo Canyon for around two years during 1983 and 1984, until my December 20, 1984 resignation. During 1983 I and most of 1984 I worked for the H.P. Foley Company. On j

October 22, 1984 I started for the Bechtel Corporation. In ,

L