Forwards Rept Drf A12-00117, Prediction of Onset of Fission Gas Release from Fuel in Generic Bwr
ML20141A126
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/06/1997
From: Hughey W
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141A130 List:
References
GNRO:97-00034, GNRO:97-34, NUDOCS 9705140163
Download: ML20141A126 (4)


Text

Entergy oper tbn2,Inc.

jh

/

V PO. Box 756 Port Geson, MS 39150 Tel 601437-6470 j May 6,1997 QHughey u say s.seguum U.S. Nuclear Regulatory Cornmission Mail Stop P1-137 Washington, D.C. 20555-0001 Attention: Document Control Desk

Subject:

Submittal of BWROG Report - Prediction of the Onset of Fission Gas Release from Fuel in Generic BWR Application of NUREG-1465 Source Terms for Grand Gulf Nuclear Station Rebaselining Study Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29 GNRO: 97/00034 Gentlemen:

By this letter, Grand Gulf Nuclear Station is submitting a report, ' Prediction of the Onset of Fission Gas Release from Fuelin Generic BWR." The development of this report was sponsored by the Boiling Water Reactors Owners Group (BWROG) to supplement the information given in NUREG-1465, " Accident Source Terms for Light-Water Nuclear Power Plants."

The final report for NUREG-1465, was published in February,1995. With regard to fission product release, Sections 3.2 and 3.3 discuss the results of calculations to / /

determine a realistic estimate of the shortest time for fuel rod failure and estimated I I durations for each release phase. The NUREG, which focuses on PWRs only, states that fuel failures may occur significantly later for BWRs; therefore, the coolant activity phase would be expected to last longer than that of a 7)Of Westinghouse or Babcock & Wilcox plant. However, unless plant specific ,

calculations are made, these shorter durations for the coolant activity phase would be applied to BWRs.

To further the development of the NUREG, the BWROG has performed the BWR-

. specific calculations necessary to replace the extremely conservative coolant activity phase times applied to BWRs. The results of these calculations are provided in the attached report.

$ 0017.1 .,

, *i if'fl)llllfljll'l 9705140163 970506 2 . . PDR ADOCK 05000416; P PDR ij

l l GNRO-97/00034 Page 2 of 4 Specifically, the report provides the results of an analysis to determine the minimum time for fuel perforation given a Design Basis Accident Recirculation Line Break with no Emergency Core Cooling System injection assumed and is intended to be generic for BWR plants. Therefore, the limiting plant configuration and fuel type were selected for the analysis. The analysis uses NRC-approved codes to calculate the minimum duration of the coolant activity phase of 121 seconds. GGNS requests that the information in this report be reviewed to replace the duration of the coolant activity phase currently given in the NUREG. It should be noted that the time of 121 seconds is a limiting value for BWRs and a GGNS-specific analysis would likely justify a longer duration. While this analysis is important to supplement the infon. ation in NUREG-1465 for future implementation of the revised source term for BWRs, it is equally important to be considered in the BWR rebaselining effort underway at Grand Gulf Nuclear Station. We request that this information be used in the calculations to be performed during this effort, as well. We appreciate the opportunity to participate as the BWR rebaselining plant and look forward to continued cooperation between us and the NRC on this project. We believe this cooperation willlead to timely implementation of the revised source term which is important to the industry and the NRC. If you have any questions concerning this submittal, please contact Sheri Mahoney at 601-437-6552. Yours truly, WKH/SBM attachment: BWROG Report," Prediction of the Onset of Fission Gas Release from Fuel in Generic BWR" cc: (See Next Page) ene i

May 6, 1997 GNRO-97/00034 Page 3 of 4 cc: Ms. S. C. Black (NRC/NRR) Mr. K. Cozens (NEI) Mr. J. Smith (Wise Carter) Mr. N. S. Reynolds Mr. H. L Thomas Mr. J. W. Yelverton GGNS Resident inspector Mr. E. W. Merschoff (w/a) Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. J. N. Donohew, Project Manager (w/2) Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 Mr. Wendell Fiock (w/a) General Electric Company Mail Code 182  : 175 Curtner Avenue San Jose, CA 95125 l 1 l 1 s' .

   -... . ..... .   . .   . . . .-. __ . _ - . . ~ .               - _ . . . . - . .. - - . - - . .. . . . _ .. - . . . ..-__-.

Attachment 1 to GNRO-97/00034 i i a ! Attachment 1 4 Prediction of the Onset of I Fission Gas Release from Fuelin Generic BWR f .1 4 i 1 4 i l l ' l , l 4 I i 4' d i 4

                                                                                                                                             -*}}