Monthly Operating Repts for May 1986
ML20211H132
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/31/1986
From: Porter R
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20211H129 List:
References
NUDOCS 8606230175
Download: ML20211H132 (10)


Text

'

W OPERATING DATA REPORT Docket No. 50-317 Date:

June 10, 1986 Completed by R. Porter Telephone: (301) 260-4868 OPERATING STATUS i

1. Unit Name:

Calvert Cliffs No. 1

2. Reporting Period:

MAY

3. Licensed Thermal Power (MWT):

2,700

4. Nameplate Rating (Gross MWe):

918

5. Design Electrical Rating (Net MWe):

845

6. Maximum Dependable Capacity (Gross Mwe):

860

7. Maximum Dependable Capacity (Net MWe):

825

8. Change in Capacity Ratings:

None

9. Power Level to Which Restricted (Net MWe):

N/A

10. Reasons for Restrictions:

N/A r

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 744 3,623 96,996
12. Number of Hours Reactor was Critical 744.0 3,456.4 76,321.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,019.4
14. Hours Generator On-Line 744.0 3,436.5 74,796.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,980,161 9,138,842 186,463,035
17. Gross Electrical Energy Generated (MWH) 667,919 3,092,208 61,695,020
18. Net Electrical Energy Generated (MWH) 640,776 2,964,611 58,880,906
19. Unit Service Factor 100.0 94.9 77.1
20. Unit Availability Factor 100.0 94.9 77.1
21. Unit Capacity Factor (Using MDC Net) 104.4 99.2 74.0
22. Unit Capacity Factor (Using DER Net) 101.9 96.8 71.8
23. Unit Forced Outage Rate 0.0 5.1 8.9
24. Shutdowns Scheduled Over Next Six Months (type, date and duration):

Refueling Outage October 25, 1986 - January 4, 1987 l

25. If Shutdown at End of Report Period, Estimated Date of Startup:

N/A i

8606230175 860610 DR ADOCK 05000317 PDR

UNIT SIRrilX)WNS AND l'OWIR REDIK'TIONS INXXET NO.

50-317 IINIT NAlf. Calvert Cliffs 1 DNIE June 10, 1986 CUMPIFIED IW R.J. Porter REI' ORT M)N111 MAY 1El.EPIK)NE (301) 260-4868 m

L.,

O 9

c-ei o to a c

,o y

,c g 1irensee y

gg Cause & (,orrect t ve c

h yg h

,_ g y

Event, yl "g

Act.n_ on t.o o

No.

Dat.c H

t. c:

o ac Report. #

u Prevent. Recierrence a-HE u

8 86-04 860510 F

O B

4 N/A CH

'IURBIN Power was reduced to allow the shutdown of 11 Steam Generator Feed Ptnp to repair an oil leak.

l I

3 4

F:

Forced Reason:

33,g i,xi, E.xhibit G-Inst niet. ions S: Sciuxhitect A-E<ptipment, Failure (Explain) 1 ->Lmual for Preparat. ion of Data ll-Maint enance or Test, 2->1anual Scram.

Ent ry Sheet.s for I icense l

l C-Refneling 3-Ant..omat,ic Scram.

Event, Regnrt, (l ER) File D-Regulat.ory Rest,rict. ion 4-Other (Explain)

(NUREG-0161)

E-Operator Training & I,icense Examinat ion F-Administ.rative 5 Exhibit,1 - Same Sonrce G4)perat ional Error (Explain)

Il-Ot her (Explain)

AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 Date:

June 10, 1986 Completed by R. Porter Telephone: (301) 260-4868 MAY Average Daily Power Level Average Daily Power Level Day (MWe-Net)

Day (MWe-Net) 1 875 17 792 2

872 13 795 3

873 19 852 4

874 20 871 5

875 21 871 6

876 22 862 7

875 23 865 8

872 24 867 9

861 25 870 10 750 26 869 11 873 27 869 12 873 28 869 13 874 29 870 14 873 30 869 15 875 31 868 16 870 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

l

~

OPERATING DATA REPORT Docket No. 50-318 Date:

June 10, 1986 1

Completed by R. Porter 4

Telephone: (301) 260-4868 OPERATING STATUS l

j

1. Unit Name:

Calvert Cliffs No. 2

2. Reporting Period:

MAY l

3. Licensed Thermal Power (MWT):

2,700

4. Nameplate Rating (Gross MWe):

918 4

5. Design Electrical Rating (Net MWe):

845

6. Maximum Dependable Capacity (Gross Mwe):

860 f

7. Maximum Dependable Capacity (Net MWe):

825

8. Change in Capacity Ratings:

None i

9. Power Level to Which Restricted (Net MWe):

N/A-

10. Reasons for Restrictions:

N/A This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 744 3,623 80,351
12. Number of Hours Reactor was Critical 703.3 3,540.9 66,983.9
13. Reactor Reserve Shutdown Hours 0.0 24.3 1,285.0
14. Hours Generator On-Line 697.7 3,530.1 65,941.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 4
16. Gross Thermal Energy Generated (MWH) 1,624,478 9,106,146 165,588,182
17. Gross Electrical Energy Generated (MWH) 564,324 3,101,162 54,622,686
18. Net Electrical Energy Generated (MWH) 538,960 2,972,580 52,122,837'
19. Unit Service Factor 93.8 97.4 82.1 4
20. Unit Availability Factor 93.8 97.4 82.1
21. Unit Capacity Factor (Using MDC Net) 87.8 99.5 78.8
22. Unit Capacity Factor (Using DER Net) 85.7 97.1 76.8
23. Unit Forced Outage Rate 6.2 1.8' 5.9
24. Shutdowns Scheduled Over Next Six Months (type, date'and duration):

None

25. If Shutdown at End of Report Period, Estimated Date of Startup:

N/A

1 UNIT Siltfl1XMNS AND I4MIR REIMICTIONS INXXIN NO. _50-318 IINIT NAPE Calvert Cliffs 2 DATE June 10.1986 COPE *IFIED DY R.J. Porter REI1RT PUN'I11 MAY

'IT.I.ElilDNE (301) 260-4868

'?.

Y tc 0 c

c-en o'n Canse & L.orrect,.ive oe c

co 1.icensee g

No Date b.

'd 5 0

l 'U E Evesit A

Act ion to O

l'revent, Recurrence N

2$

j j*

Regw>rt. #

,f g

b

s. un 5 t) 8 86-04 860521 F

26.9 A

1 86-04 CH INS'IRU

'lhe unit was tripped on a loss of a Steam Generator Feed Ptrrp.

Failure in the control systen is the apparent cause of the trip.

86-05 860523 S

O B

4 N/A CH INS'IRU Power was held at 60% to allow feed ptrrp cmtrol testing.

86-06 800527 F

19.4 A

3 86-04 CH INSTRU

'lhe unit tripped on a loss of a Stean Generator Feed PurTp.

Failure in the control systen is the apparent cause of the trip.

86-07 860528 S

O B

4 N/A CH INSTRU Power is being held at 60% for trrubleshooting of the feed plurp control systen.

I 3

4 F:

Forced Reason:

hk Lluxt:

Exhibit, G-Inst ruct. ions S: Scheduled A-Eclinigunent, Failure (Explain) 1-Manual for Preparat, ion of Dat-a 11-Maint enance or Test 2-Marnial Scram.

Ent ry Sheet.s for I,icense C-Refneling 3-Ant <wnat,ic Scram.

Event, Regx>rt, (LER) File

- D-Regilatory Restrict, ion 4-Other (Explain)

(NIREG-0161)

E-Operator Training & License Examinat, ion F-Administ rative 5 Exhi bi t, 1 - Same.% nirce G-Operat.ional Erior (Explain)

II-Other (l;xplain)

AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318 Calvert Cliffs Unit No. 2 Date: June 10, 1986 Completed by R. Porter Telephone: (301) 260-4868 MAY Average Daily Power Level Average Daily Power Level Day (MWe-Net)

Day (MWe-Net) 1 856 17 868 2

853 18 869 3

855 19 868 4

867 20 867 5

865 21 828 6

869 22 0

7 869 23 296 8

865 24 485 9

865 25 519 10 867 26 842 11 868 27 354 12 867 28 314 13 868 29 499 14 869-30 502 l

15 868 31 506 16 868 J

INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

i

SUMMARY

OF UNIT 1 OPERATING EXPERIENCE May 1986 5/1 Unit 1 began this reporting period at full Reactor Power (825 MWe) 5/9 At 2145, Reactor Power waw reduced to 740 MWe to clean Condenser Water Boxes.

5/10 At 0530 power was further reduced to 565 MWe to repair an oil leak on 11 SGFP. (Steam Generator Feed Pump) 5/Ir* At 1218, SGFP repairs were completed and the Unit began increasing power to 740 MWe.

At 1335, Water Box cleaning was completed and the Unit increased power to full load (825 MWe) 5/16 At 2150, the Unit began reducing power to 790 MWe so a new type of Traveling Screen could be installed.

5/19 At 0400, the new Traveling Screens were installed and rotating, and the Unit began increasing power.

5/31 The Unit was at full Reactor Power (825 MWe) at the end of this reporting period.

.. - ~

SUMMARY

OF UNIT 2 OPERATING EXPERIENCE May 1986 5/1 Unit 2 began this reporting period at full Reactor Power (825 MWe).

t 5/21 At 2302, the Unit was tripped manually because of a loss of a SGFP.

5/22 At 2255, the Reactor became critical.

5/23 At 0157 the Breaker was shut.

No cause for the incident had been found, but all additional checks required by POSRC had

]

been completed.

5/23 At 0500 the Unit was held at 160 MWe for a chemistry hold.

j At 1005, Chemistry hold removed, began increasing power.

I 5/23 At 1500 the Unit stopped increasing power and began testing Main Feed Pumps.

5/25 At 1355 the Unit began increasing Reactor Power.

j 5/26 At 0518 Unit 2 was at full Reactor Power (825 MWe).

5/27 At 1024 the Unit tripped automatically because of a loss of-SGFP.

5/28 At 0310, the Reactor became critical.

5/28 At 0548 the Unit was paralleled and began increasing power.

The apparent cause of the trip was a failure of the Feed Pump Instrumentation.

l 5/28 At 1100 the Unit stabilized at 60% (520 MWe) for troubleshooting.

5/31 The Unit remained at 60% power to the end of this reporting period.

' I 1

i c.,._e,

,-,-r o,%_, -,

w..

--,,y,,

,v,,.

,.-r.

+.., --,.

7,,

+,

. =

June 6,1986 REFUELING INFORMATION REQUEST i

4 F

1.

Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1 2.

Scheduled date for next Refueling Shutdown: October 25,1986 l

3.

SchedulM date for restart following refueling: January 4,1987 4.

Will refueling or resumption of operation thereafter require a technical specification j

change or other license amendment?

a Resumption of operation after refueling will require changes to Technical 4

l Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

l 5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

j September 29,1986 l

j 6.

Important licensing considerations associated with the refueling.

[

{

Reload fuel will be similar to that reload fuel inserted into the previous cycle.

f

}

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 1000 Spent Fuel Pools are common to Units 1 and 2 8.

(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

F (a) 1830 (b)0 9.

The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off e

load.

April,1991 l

f I

June 6,1986 REFUELING INFORMATION REQUEST

1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
2. Scheduled date for next refueling shutdown: March 14,1987.
3. Scheduled date for restart following refueling: May 22,1987.
4. Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?

Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

February 13,1987

6. Important licensing considerations associated with refueling.

Reload fuel will be similar to that reload fuel inserted in the previous cycle.

7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool, t

(a) 217 (b) 1000 Spent Fuel Pool is common te Units 1 and 2.

8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.

(a) 1830 (b)0

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

April,1991

.-,