Letter Sequence Request |
---|
|
|
MONTHYEARML20210H5991986-09-0909 September 1986 Proposed Tech Specs,Changing Min River Level Required for Continued Plant Operation Project stage: Other ML20210H5861986-09-0909 September 1986 Application for Amends to Licenses DPR-57 & NPF-51,changing Tech Specs Re Min River Level Required for Continued Plant Operation.Fee Paid Project stage: Request ML20212L1801987-03-0606 March 1987 Forwards Request for Addl Info Re 860909 Proposed Mods to Tech Specs for Min River Level.Response Requested within 30 Days Project stage: RAI ML20214A4111987-05-0808 May 1987 Forwards Response to 870306 Request for Addl Info on Proposed Tech Spec Changes Re Min River Level.Setdown Induced by 100-yr Recurrent Wind Velocity Should Not Be Considered in Determining Low River Level for Safe Shutdown Project stage: Request ML20195G8811987-12-15015 December 1987 Submits Rev to 860909 Application for Amend to Licenses DPR-57 & NPF-5 Revising Tech Specs to Add Throttling Requirement to Plant Svc Water Pumps at Low River Level,Per NRC Request.Vendor Also Encl Project stage: Request 1987-12-15
[Table View] |
Similar Documents at Hatch |
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARHL-5770, Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons1999-10-0101 October 1999 Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons HL-5811, Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys1999-07-29029 July 1999 Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys HL-5591, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC1999-02-0505 February 1999 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC HL-5694, Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors1999-01-21021 January 1999 Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors HL-5698, Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.21998-12-0404 December 1998 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.2 HL-5658, Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors1998-07-22022 July 1998 Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors HL-5400, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect1997-12-18018 December 1997 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect HL-5413, Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl1997-08-0808 August 1997 Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl HL-5362, Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys1997-05-0909 May 1997 Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys HL-5368, Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4)1997-05-0909 May 1997 Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4) ML20138H4021997-04-29029 April 1997 Application for Amend to License DPR-57,revising TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits HL-5345, Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-14014 April 1997 Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits HL-5276, Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done1997-01-0707 January 1997 Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done HL-5270, Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 141996-12-0303 December 1996 Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 14 HL-5054, Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware1996-10-29029 October 1996 Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware HL-5230, Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV1996-10-0707 October 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV HL-5213, Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves1996-09-19019 September 1996 Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves HL-5163, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel1996-05-21021 May 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel HL-5004, Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F1996-02-21021 February 1996 Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F HL-5051, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B1995-11-10010 November 1995 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B HL-4861, Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria1995-06-0606 June 1995 Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria HL-4816, Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events1995-05-0404 May 1995 Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events HL-4789, Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS1995-04-14014 April 1995 Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS HL-4724, Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 21995-01-13013 January 1995 Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 2 HL-4723, Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes1994-12-0202 December 1994 Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes ML20078G7051994-11-0101 November 1994 Application for Amends to Licenses DPR-57 & NPF-5,converting TS to Improved TS Consistent w/NUREG-1433 HL-4587, Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained1994-10-13013 October 1994 Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained HL-4695, Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions1994-09-20020 September 1994 Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions HL-4648, Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys1994-08-16016 August 1994 Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys HL-4661, Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-14331994-08-0808 August 1994 Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-1433 ML20072B7441994-08-0404 August 1994 Application for Amend to License NPF-5,revising TSs for Traversing Incore Probe Operability Requirements HL-4651, Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable1994-07-19019 July 1994 Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable HL-4620, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 14331994-07-0808 July 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 1433 HL-4561, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt1994-06-0707 June 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt HL-4495, Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/41994-02-25025 February 1994 Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/4 HL-3433, Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions1993-11-0909 November 1993 Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions HL-3416, Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips1993-10-19019 October 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips ML20045E7261993-06-28028 June 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 3.7.A.4 & 3.6.4.1,respectively,to Allow One or More Suppression chamber-drywell Vacuum Breakers to Open During Surveillance Testing ML20044D0771993-05-0303 May 1993 Suppl to 920921 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Administrative Controls Section Re Semiannual Radioactive Effluent Release Rept to Reflect New 10CFR50.36a,per GL 89-01 HL-3048, Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F0231992-12-21021 December 1992 Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F023 HL-2962, Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-161992-11-10010 November 1992 Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-16 HL-2006, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure..1992-10-19019 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure.. HL-2409, Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-011992-10-14014 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-01 HL-2390, Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-011992-09-21021 September 1992 Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-01 ML20118A5761992-09-18018 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,allowing Southern Nuclear Operating Co,Inc to Possess,Manage,Use, Operate & Maintain Facilities.Certificate of Concurrence from Southern Nuclear Operating Co,Inc Encl HL-2335, Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level1992-09-0202 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level HL-2355, Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error1992-07-30030 July 1992 Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error HL-2231, Application for Amends to Licenses DPR-57 & NPF-5,proposing to Revise Several Portions of TS Involving Shutdown & Refueling Operations1992-07-17017 July 1992 Application for Amends to Licenses DPR-57 & NPF-5,proposing to Revise Several Portions of TS Involving Shutdown & Refueling Operations HL-2225, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs to Add Addl Electrical Sys Requirements,Per Generic Ltr 91-11, Resolution of Generic Issues 48, 'Lcos for Class 1E' & 49, 'Interlocks & LCOs for Class 1E Tie Breakers....'1992-07-17017 July 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising TSs to Add Addl Electrical Sys Requirements,Per Generic Ltr 91-11, Resolution of Generic Issues 48, 'Lcos for Class 1E' & 49, 'Interlocks & LCOs for Class 1E Tie Breakers....' HL-1946, Application for Amends to Licenses DPR-57 & NPF-5,changing Snubber Functional Test Insp Interval to 18 Months,Per Generic Ltr 90-091992-02-20020 February 1992 Application for Amends to Licenses DPR-57 & NPF-5,changing Snubber Functional Test Insp Interval to 18 Months,Per Generic Ltr 90-09 1999-07-29
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARHL-5770, Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons1999-10-0101 October 1999 Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons HL-5811, Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys1999-07-29029 July 1999 Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys HL-5591, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC1999-02-0505 February 1999 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC HL-5694, Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors1999-01-21021 January 1999 Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors HL-5698, Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.21998-12-0404 December 1998 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.2 HL-5658, Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors1998-07-22022 July 1998 Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors HL-5400, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect1997-12-18018 December 1997 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect ML20211J9351997-10-0606 October 1997 Corrected TS Pps to Amends 208 & 150 for Licenses DPR-57 & NPF-5,respectively,consisting of Pps 3.4-8 & 3.5-6 for Unit 1 & Pps 3.4-8 & 3.5-5 for Unit 2 to Reflect Revised SRV Setpoints HL-5413, Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl1997-08-0808 August 1997 Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl HL-5368, Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4)1997-05-0909 May 1997 Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4) HL-5362, Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys1997-05-0909 May 1997 Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys ML20138H4021997-04-29029 April 1997 Application for Amend to License DPR-57,revising TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits HL-5345, Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-14014 April 1997 Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits ML20137N1751997-04-0404 April 1997 Amends 206 & 147 to Licenses DPR-57 & NPF-5,respectively, Revising Surveillance Requirements Addressing Reactor Vessel Pressure & Temperature HL-5276, Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done1997-01-0707 January 1997 Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done HL-5270, Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 141996-12-0303 December 1996 Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 14 HL-5054, Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware1996-10-29029 October 1996 Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware HL-5230, Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV1996-10-0707 October 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV HL-5213, Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves1996-09-19019 September 1996 Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves HL-5163, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel1996-05-21021 May 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel HL-5004, Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F1996-02-21021 February 1996 Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F HL-5051, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B1995-11-10010 November 1995 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B HL-4861, Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria1995-06-0606 June 1995 Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria HL-4816, Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events1995-05-0404 May 1995 Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events HL-4789, Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS1995-04-14014 April 1995 Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS HL-4724, Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 21995-01-13013 January 1995 Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 2 HL-4723, Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes1994-12-0202 December 1994 Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes ML20078G7051994-11-0101 November 1994 Application for Amends to Licenses DPR-57 & NPF-5,converting TS to Improved TS Consistent w/NUREG-1433 HL-4587, Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained1994-10-13013 October 1994 Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained HL-4695, Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions1994-09-20020 September 1994 Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions HL-4648, Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys1994-08-16016 August 1994 Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys HL-4661, Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-14331994-08-0808 August 1994 Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-1433 ML20072B7441994-08-0404 August 1994 Application for Amend to License NPF-5,revising TSs for Traversing Incore Probe Operability Requirements HL-4651, Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable1994-07-19019 July 1994 Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable HL-4620, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 14331994-07-0808 July 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 1433 HL-4561, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt1994-06-0707 June 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt HL-4495, Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/41994-02-25025 February 1994 Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/4 HL-3433, Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions1993-11-0909 November 1993 Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions ML20059E6831993-10-21021 October 1993 Amends 190 & 129 to Licenses DPR-57 & NPF-5,respectively, Relocating Procedural Details Contained in Radiological Effluent Ts,Incorporating New Part 20 & Revising Frequency of Reporting Radiological Effluent Releases HL-3416, Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips1993-10-19019 October 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips ML20045E7261993-06-28028 June 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 3.7.A.4 & 3.6.4.1,respectively,to Allow One or More Suppression chamber-drywell Vacuum Breakers to Open During Surveillance Testing ML20044D0771993-05-0303 May 1993 Suppl to 920921 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Administrative Controls Section Re Semiannual Radioactive Effluent Release Rept to Reflect New 10CFR50.36a,per GL 89-01 HL-3048, Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F0231992-12-21021 December 1992 Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F023 HL-2962, Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-161992-11-10010 November 1992 Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-16 HL-2006, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure..1992-10-19019 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure.. HL-2409, Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-011992-10-14014 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-01 HL-2390, Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-011992-09-21021 September 1992 Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-01 ML20118A5761992-09-18018 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,allowing Southern Nuclear Operating Co,Inc to Possess,Manage,Use, Operate & Maintain Facilities.Certificate of Concurrence from Southern Nuclear Operating Co,Inc Encl HL-2335, Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level1992-09-0202 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level HL-2355, Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error1992-07-30030 July 1992 Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error 1999-07-29
[Table view] |
Text
..
Georga Power Corrpany 333 %kn,i *v &w:
Attarf a. Georg a 30308 Tc!cphone 404 526 7020 Maang Address Post Oftce Bcx 4S45 Attanta Georgua 30302 Georgia Power J. T. Beckham. Jr.
vce ereooent and connx vanager SL-1044c Nuclear Genera *,on 0641C September 9,1986 Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-51 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 TECHNICAL SPECIFICATIONS CHANGES PERTAINING TO RIVER WATER LEVEL Gentlemen:
Georgia Power Company proposes an amendment to the Technical Specifications (Appendix A to the Operating Licenses) for Plant Hatch Units 1 and 2. The proposed amendment pertains to the minimum river level required for continued plant operation. The revised Technical Specifications are consistent with the Standard Technical Specifications in that the minimum allowable river level will be based upon the requirements for safe shutdown of the plant.
The proposed amendment would make the following changes to the Technical Specifications:
- 1. Specify the water level in the intake structure necessary to assure Plant Service Water (PSW) system operability and the minimum river level for safe shutdown of the plant.
- 2. Provide an alternate requirement for determination of equivalent river level when a temporary weir is in place.
- 3. Change the level at which an increased frequency of river level surveillance is required.
- 4. For Unit 1, remove the throttling requirements for the PSW system pumps.
- 5. Amend the Bases to reflect the above changes.
\
0 h0 8609260209 860909 ,I i PDR ADOCK 05000321 P PDR l
Qec) u)lC&cc IL [f30 'OO
GeorgiaPower d Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 September 9, 1986 Page Two The Plant Review Board and the Safety Review Board subcommittee have reviewed the proposed changes.
Enclosure 1 provides a detailed description of each proposed change and the basis for the change.
Enclosure 2 details the bases for our determination that the proposed changes do not involve a significant hazards consideration.
Enclosure 3 provides page change instructions for incorporating the proposed chantms.
The proposed changed Technical Specifications pages follow Enclosure 3.
Payment of a filing fee in the amount of one hundred and fifty dollars is enclosed.
Georgia Power is presently implementing contingency actions to assure the continued availability of necessary river stage at the Plant Hatch intake structure. These contingencies include providing a supplemental flow from upstream reservoirs and constructing a temporary weir across the Altamaha River, downstream of the intake structure, to increase the usefulness of available river flow.
Because the proposed amendments are considered to be vitally important to the continued availability of Plant Hatch for the generation of electricity during the periods of low river fl ow, Georgia Power Company has assigned a high priority to this submittal. Therefore, we request that the NRC also assign a high priority to the consideration of the proposed amendment. We are prepared to discuss the details of this request with your staff on an expedited basis.
Pursuant to the requirements of 10 CFR 50.91, a copy of this letter and all applicable attachments will be sent to Mr. J. L. Ledbetter of the Environmental Protection Division of the Georgia Department of Natural Resources.
0641C 700775
Georgia Powerd Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director
- BWR Project Directorate No. 2 September 9, 1986 Page Three Mr. J. T. Beckham, Jr. states that he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief, the facts set forth in this letter are true.
GEORGIA POWER COMPANY By: h - N- %
- p. T. Beckham, Jr. '
Sworn to and subscribed before me this 9th day of September 1986.
&, scu, e.n Au,: c ,g ,. ,2,9 m. ,,, Notary Public Wmmmion 6o.:es sc ,3 2 i ,,s RDB/lc Enclosures c: Georgia Power Company U. S. Nuclear Regulatory Commission Mr. t . P. O'Reilly Dr. J. N. Grace, Regional Administrator Mr. H. C. Nix, Jr. Senior Resident Inspector GO-NORMS State of Georgia Mr. J. L. Ledbetter 0641C rxns
P Georgia Power d ENCLOSURE 1 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 TECHNICAL SPECIFICATIONS CHANGES PERTAINING TO RIVER WATER LEVEL BASIS FOR CHANGES The proposed amendment would make the following changes to the Technical Specifications:
- 1. Specify the water level in the intake structure necessary to assure. Plant Service Water (PSW) system operability and the minimum river level for safe shutdown of the plant.
- 2. Provide an alternate requirement for determination of equivalent river level when a temporary weir is in place.
- 3. Change the level at which an increased frequency of river level surveillance is required.
- 4. For Unit 1, remove the throttling requirements for the PSW systen pumps.
- 5. Amend the Bases to reflect the above changes.
The proposed amendment represents a revision of the basis for the Technical Specifications for PSW operability and minimum river level.
The current Plant Hatch FSARs and Technical Specifications reflect the minimum water levels for full-power operation requirements of the PSW system, rather than the minimum river level which would ensure safe plant shutdown. Georgia Power Company believes that the appropriate basis is assuring that ~ sufficient cooling capacity is available for continued operation of safety-related equipment during safe shutdown (long-term) conditions. Safe shutdown flow requirements for the PSW system are about one fifth of those required during full-power operation. Full-power operation requires 3 PSW pumps at approximately 7840 gpm each. Shutdown operation requires only one PSW pump at approximately 4500 gpm.
The current Plant Service Water Technical Specifications represent one of the few places where normal operational considerations serve as the basis for the Specification, rather than safe shutdown. If the change is implemented,' decisions regarding continued plant operation would be based upon the real safety basis of the plant rather than upon full-power constraints. Note that the complementary changes to the Hatch FSARs will be made in the next annual revision, 'following your approval of the enclosed changes. Revisions will also be made to the Emergency Plan, as appropriate.
El-1 0641C 9/9/86 700775
GeorgiaPower A TECHNICAL SPECIFICATIONS CHANGES
, PERTAINING TO RIVER WATER LEVEL BASIS FOR CHANGES
. The terms " river level" and " pump well level" appear to be used synonymously in the Hatch FSAR: and the Technical Specifications.
Therefore, the terminology. requires the following clarification. The river and the pump well are separated by a fixed position trash rack and a traveling trash screen which remove debris from the water to prevent damage to the pumps. When the screen is clean, the river level and the pump well level are nearly the same. However, if debris accumulates on the screen, a difference between the level of the river and the level in the pump well can occur. It is more technically valid to measure the level in the pump well for pump operational considerations. A certain i level above the pump suction is necessary for both net positive suction
! head (NPSH) and vortexing considerations for the protection of the
- pumps. Thus, a more certain measurement of the submergence at the pump l provides a better assurance that the requirements for pump protection are <
being met.
Operational considerations may necessitate construction of a downstream weir, thus creating an artificially high river level at the intake structure and on the gauge located at the U.S. Route 1 bridge. To assure safe (long-term) shutdown of the plant, the true " natural" river level must be determined. Therefore, the proposed Technical Specification i requires monitoring of the river level at a location not affected by the weir (during periods of operation with the weir in place) and correlated i to the level in the pump well . The weir is currently being installed.
i The downstream gauge was installed and correlated to the gauge located at the U.S. Route 1 bridge prior to construction of the weir. Installation of the weir will not significantly increase the rate of siltation in the intake structure.
Al so, river flow can be supplemented by upstream reservoirs. The
- reservoir used for supplemental flow is approximately 5 days upstream.
In other words, from the time a change in supplemental flow at the reservoir until the time the effects of the change can be measured at the l
plant is approximately 5 days. Therefore, sufficient time exists to take action, if necessary, as a result of changing supplemental flow.
Operation at a reduced river level may slightly increase the head loss i through the trash screen. However, this result will not impinge upon l safe shutdown operation unless the level in the pump well falls below 59.9 ft mean sea level (msl). The differential temperature between the inlet water and the end of the discharge mixing zone is not expected to exceed any thermal limits or permits.
El-2 0641C 9/9/86' I l
- 7-m
Georgia Power A ENCLOSURE 1 (Continued)
TECHNICAL SPECIFICATIONS CHANGES PERTAINING TO RIVER WATER LEVEL BASIS FOR CHANGES The PSW pump vendor has specified the necessary level above the pump suction for both NPSH and vortexing considerations for rated conditions.
This level is 48 in. above the suction for a rated flow from 4 PSW pumps of 8500 gpm each, which translates to a pump well level of 61.2 ft ms1.
The current Technical Specifications requirement is 61.7 ft msl river level for all conditions. For safe shutdown, only 1 pump is needed, and the flow requirements are reduced to about 4500 gpm. The pump well level needed to achieve shutdown operation is 59.9 ft. However, the proposed level in the Technical Specifications provides an additional margin of pump submergence above 59.9 ft to ensure availability of the ultimate heat sink (Altamaha River) for 30 days during low river flow periods.
Proposed Change 1:
In Technical Specification 3.5.I (Unit 1), change the words to read: "If the water level as measured in the pump well decreases to less than 60.7 feet (MSL)..." In Technical Specification 3.7.1.2.a (Unit 2), change the words to read: "The water level in the pump well of the intake structure greater than or equal to 60.7 feet mean sea level, and..."
Basis for Proposed Change 1:
Current practice is to monitor the river water level as the parameter required for PSW operability and, hence, continued full-power reactor operation. .However, this level can differ from the water level in the pump well due to flow restrictions introduced by the trash rack, intake screen, and debris. PSW operability and capacity are directly affected by the pump well level. Therefore, we are specifying that the location of parameter monitoring should directly affect the PSW operability, rather than including a hypothetical trash loading of the screen. The change in monitoring point has no effect upon safety. In fact, the monitoring of conditions that directly affect pump performance results in additional assurance of safe operation. Monitoring pump well level will assure that there is an adequate water supply at the pump.
The design and accident analyses contained in the FSAR which form the design bases for Plant Hatch assume that an adequate supply of river water is available to support a safe plant shutdown. In order to establish a minimum water level in the river intake structure at which the plant can be safely shut down, the minimum submergence requirements El-3 0641C 9/9/86 l
roorts
Georgia Power d ENCLOSURE 1 (Continued)
TECHNICAL SPECIFICATIONS CHANGES PERTAINING TO RIVER WATER LEVEL BASIS FOR CHANGES of the PSW pumps and the Residual Heat Removal Service Water (RHRSW)
Pumps must be considered. The PSW and RHRSW systems provide essential cooling water and remove decay heat from the containment to the ultimate heat sink ( Altamaha River). The ultimate heat sink must be available for approximately 30. days post shutdown to be consistent with the design bases.
- a. Decay Heat Removal Considerations The decay and sensible heat removal from the reactor vessel to the containment are not affected by low river level. However, this heat must be transferred from the containment to the ultimate heat sink. This safety function is provided by the PSW and RHRSW systems.
Per the pump vendor, the PSW pumps require 48 in, of submergence at their rated flow (8500 gpm) for NPSH and vortexing considerations. At 7000 gpm, the minimum submergence is 32 in.,
which corresponds to a level in the pump well of 59 ft 10 in, msl . Normal operation requires 7840 gpm. for each of 3 pumps, while emergency shutdown requires only about. 4500 gpm out of a single pump.
The RHRSW pumps uill produce rated flow (4000 gpm per pump) below 59 ft 10 in., which is the required level for PSW operability for safe shutdown. Therefore, RHRSW pump operability will be assured by maintaining adequate submergence for the PSW pumps.
- b. Hydrological Considerations The Altamaha River is the ultimate heat sink for Plant Hatch.
The area of the drainage basin affecting the Altamaha at the plant site is about 12,000 mi 2, including 3 major dams upstream. For large rivers, such as the Altamaha, there is some minimum base flow (level) that can be sustained from ground water and aquifer flows. During periods of extreme drought, these aquifers are depleted very slowly, and the river flows approach a low asymptotic limit. The hypothetical minimum flow at the Plant Hatch site is estimated to be 950 cfs, which corresponds to a river level of 60.8 ft msl. Assuming a 0.1-f t head loss through the trash rack and traveling screen the proposed Technical Specifications level yields a river level of 60.8 ft msl, which corresponds to the hypothetical minimum level.
El-4 0641C 9/9/86 700775
Georgialower A ENCLOSURE 1 (Continued)
TECHNICAL SPECIFICATIONS CHANGES
> PERTAINING TO RIVER WATER LEVEL BASIS FOR CHANGES l
The equivalent river level for a pump well level of 59.9 ft is similarly calculated to be 60.0 ft, which correlates to a river flow of 660 cfs. This level is far below any postulated low 4 flow condition which could occur in the Altamaha River. In addition, frequent surveillance of the approach channel to the intake structure and the topography of the river near the intake structure assures that a postulated gross shift in river flow away from the intake is highly unlikely, as discussed in the 4
Hatch 2 FSAR, Chapter 2.
- c. Summary The pump well level proposed for the Technical Specifications is 60.7 ft. This level corresponds to a river flow rate equal to the hypothetical low flow level. Establishment of the Technical Specifications level at 60.7 f t, when the shutdown PSW flow
! requirements can be met at 59.9 ft, provides an additional margin that ensures that Plant Hatch is protected against incredibly low flows and that the ultimate heat sink is available for the required 30-day period. Since shutdown PSW flow requirements can be supported at 59.9 ft, accident analyses are not adversely affected by this change, and 'the basis for the Technical Specification is unchanged. Al though this revision
. allows plant operation to continue at lower river levels, no new
_ type of accident is introduced. The margin of safety is not affected.
Proposed Change 2:
In Technical Specification 3.5.I (Unit 1), change the words to read: "the level in the river would correspond to a level in the pump well of the
- intake structure of less than 60.7 feet..." In' Technical Specification .
4 3.7.1.2.b (Unit 2), change the wording to read: "The river level equivalent to greater than or equal to 60.7 feet MSL in the pump well, and..."
j Basis for Proposed Change 2:
The logical basis for the level used in Proposed Change 2 is the same as the logic in Proposed Change 1. The basis for Proposed Change 2 is that operational considerations may include the installation of a temporary El-5 0641C 9/9/86 i
700775
Georgia Power d ENCLOSURE .1 (Continued)
TECHNICAL SPECIFICATIONS CHANGES PERTAINING TO RIVER WATER LEVEL BASIS FOR CHANGES weir downstream of the intake structure. Depending upon the exact location and height of the weir, the level gauge located in the intake structure might not accurately reflect the level in the river.
Regardless of the installation of a weir, the same minimum river level is necessary to bring the plant to safe shutdown conditions. Therefore, we are specifying that, with a weir installed, an additional reading of river level must be taken at a location not affected by the weir and correlated to the level in the pump well. Ho new accidents are introduced by this change. Modes of operation are not affected. The margin of safety remains the same as in Proposed Change 1.
Proposed Change 3:
In Technical Specifications 4.5.I (Unit 1) and 4.7.1.2 (Unit 2), change the level at which an increased frequency of level surveillance is required.
Basis for Proposed Change 3:
The basis for the frequency of surveillance is to provide increased awareness of the decreasing river level in order to prevent the level from dropping to an unsafe level without warning. Since we have proposed a decrease in the shutdown level, we are proposing a similar decrease in the level for initiating increased surveillance. The level for initiating increased surveillance is 1-ft above the level requiring plant shutdown. Note that the proposed levels and frequencies are consistent between the two units. This change does not involve an unreviewed safety question, because the accident analyses and the margin of safety are not affected.
Proposed Change 4:
In Technical Specification 3.5.I (Unit 1), delete all reference to throttling the pump discharge.
Basis for Proposed Change 4:
The basis for throttling the pumps was based upon continued full-power operation. Since we are proposing to change the basis to safe shutdown operations, there is no need to retain a throttling requirement. This change does not involve an unreviewed safety question, because the accident analyses and the margin of safety are not affected.
El-6 0641C 9/9/86 700775
Georgia Power d ENCLOSURE 1 (Continued)
TECHNICAL SPECIFICATIONS CHANGES PERTAINING TO RIVER WATER LEVEL BASIS FOR CHANGES Proposed Change 5:
Amend the Bases to reflect the above changes.
Basis for Proposed Change 5:
These changes are consistent with the new basis for the Technical Specifications described above.
l l
l El-7 0641C 9/9/86 700775 I
r Cicorgia Ftnver sabL ENCLOSURE 2 NRC 00CKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 TECHNICAL SPECIFICATIONS CHANGES PERTAINING TO RIVER WATER LEVEL 10 CFR 50.92 EVALUATION Proposed Change 1:
In Technical Specification 3.5.I (Unit 1), change the words to read: "If the water level as measured in the pump well decreases to less than 60.7 feet (MSL)..." In Technical Specification 3.7.1.2.a (Unit 2), change the words to read: "The water level _ in the pump well of the intake structure greater than or equal to 60.7 feet mean sea level, and..."
Basis for Proposed Change 1:
This change does not involve a significant increase in the probability or consequences of an accident, because no new modes of operation are introduced.
The possibility of a different kind of accident from any analyzed previously is not created by this change, because no new accidents are introduced.
Margins of safety are not significantly reduced by this change, because the proposed allowable values preserve appropriate margins to the analytical limits, as specified by the pump manufacturer.
Proposed Change 2:
In Technical Specification 3.5.I (Unit 1), change the words to read: "the level in the river would correspond to a level in the pump well of the intake structure of less than 60.7 feet..." In Technical Specification "The river level 3.7.1.2.b (Unit 2), change the wording to read:
equivalent to greater than or equal to 60.7 feet MSL in the pump well, and..."
Basis for Proposed Change 2:
This change does not involve a significant increase in the probability or consequences of an accident, because no new modes of operation are introduced.
I E2-1 0641C 9/9/86 700775
~-
GeorgiaPower d ENCLOSURE 2 (Continued)
TECHNICAL SPECIFICATIONS CHANGES PERTAINING TO RIVER WATER LEVEL 10 CFR 50.92 EVALUATION The possibility of a different kind of accident from any analyzed previously is not created by this change, because no new accidents are introduced. l Margins of safety are not significantly reduced by this change, because the proposed allowable values preserve appropriate margins to the analytical limits, by assuring that sufficient river level is available to bring the plant to safe shutdown.
Proposed Change 3:
In Technical Specifications 4.5.I (Unit '1) and 4.7.1.2 (Unit 2), change the level at which an increased frequency of . level surveillance is required.
Basis for Proposed Change 3:
This change does not involve a significant increase in the probability or consequences of an accident, because no new modes of operation are introduced.
The possibility of a different kind of accident from any analyzed previously is not created by this change, because no new accidents are introduced.
Margins of safety are not significantly reduced by this change, because the proposed allowable values preserve appropriate margins to the analytical limits, by assuring that sufficient river level is available to bring the plant to safe shutdown.
E2-2 0641C 9/9/86 7C3775
Georgia Power A ENCLOSURE 2 (Continued)
TECHNICAL SPECIFICATIONS CHANGES PERTAINING TO RIVER WATER LEVEL 10 CFR 50.92 EVALUATION Proposed Change 4:
In Technical Specification 3.5.I (Unit 1), delete all reference to throttling the pump discharge.
Basis for Proposed Change 4:
This change does not involve a significant increase in the probability or consequences of an accident, because no new modes of operation are introduced.
The possibility of a different kind of accident from any analyzed previously is not created by this change, because no new accidents are introduced.
Margins of safety are not significantly reduced by this change, throttling is no longer required for continued full-power operation.
Proposed Change 5:
1 Amend the Bases to reflect the above changes.
Basis for Proposed Change 5:
This change is consistent with the new basis for the Technical Specifications described above.
E2-3 0641C 9/9/86 700775
Georgia Power d ENCLOSURE 3 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 TECHNICAL SPECIFICATIONS CHANGES PERTAINING TO RIVER WATER LEVEL 4
The proposed changes to the Technical Specifications (Appendix A to Operating Licenses DPR-57 and HPF-5) would be incorporated as follows:
Remove Page Insert Page UNIT 1 l 3.5-11 3.5-11 3.5-19 3.5-19 i 3.5-20 3.5-20 UNIT 2 3/4 7-3 3/4 7-3 3/4 7-4 3/4 7-4 3/4 7-5 3/4 7-5 B 3/4 7-1 B 3/4 7-1 ,
B 3/4 7-la 0641C 9/9/86 700775
_ _