Text

.

4 TENNESSEE VALLEY AUTHORITY DIVISION OF NUCLEAR POWER SEQUOYAH NUCLEAR PLANT MONTHLY OPERATING REPORT TO THE NUCLEAR REGULATORY COMMISSION December 1, 1985 - December 3I, 1985 UNIT 1 DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77

)'

UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79 o.e ut%'

Subciitted by:

P. R. Wallace, Plant Manager

!!gR*!BanP4h7 a

4

-2 V{

l

)

L..............>.

TABLE OF CONTENTS I.

Operational. Summa ry Page Performance Summary 1

Significant Operational: Events 1-Fuel. Performance and Spent Fuel Storage Capabilities 2

PORVs and Safety Valves Summary 2

Licensee Events and Special Reports-2-3 Offsite Dose Calculation Manual Changes 3

II.

Operating Statistics A.

NRC Reports Operating Data Reports-4-5 Unit Shutdowns and Power Reductons 6-7 Average Daily Unit Power Level 8-9 B.

TVA Reports Nuclear Plant Operating Statistics (December 1985) 10 Unit Outage and Availability.

11-12 Reactor Histograms 13 III. Maintenance Summary Electrical Maintenance 15 Instrument Maintenance 16-23 Mechanical Maintenance

'24-26L Modifications-27-35

. IV.

Quarterly Schedule Summary 36-38

$_n.e

T j

Operations Summary December 1985 Tbe fc' lowing si-.iry describ s the significant operati)nal. ctivities for th-month 31 retc;Lec. In support of this summary, a ch anological log of significant events is included in this report.

Unit 1 Unit one, cycle three refueling / modification outate ended at 2400c, December 19, 1985. The unit remained in an administrative slutdown due to documentation concerns relating to the environmental quals fications of various electrical equipment (NUREG 0588). Maintenance and <ther modifications remain in progress. The present schedule for synchroni. cation of unit one is February 10, 1986. Actual start-up is dependent upon NRC ret iew of the Sequoyah Start-up Readiness Plan and the resolution of significant emIloyee concerns.

The unit has been off-line 131 days.

Unit 2 The unit remained in the administrative shutdown the entire n > nth due to documentation concerns relating to the environmental qualific ition of various electrical equipment (NUREG 0588). Outage related maintenant a and mcdifications are being performed. The present schedule has the unit prepa red to return to service on February 2,1986. Actual start-up is dependent uIon NRC review of the Sequoyah Startup Readiness Plan and the resolution of significant employee concerns. The unit has been off-line 132 days.

Significant Operational Events Unit 1 Date Time Event 12/1/85 0001C Cycle 3 refueling /modifica. ion outage continued. The reactor wai in mode #5.

12/19/85 2400C All refueling outage actisities were completed.

The unit entered a fc rced idministrative outage due to documentation conce rns relating to NUREG 0588 equipment.

12/31/85 2400C The reactor was in mode #5.

The adninistrative shutdown due to NUREG 0588 concerns continues.

Unit 2 Date Time Event 12/1/85 0001C The reactor was in mode #5.

The administrative shutdown due to NUREG 0588 concerns continues.

12/31/85 2400C The reactor was in mode #5.

The administrative shutdown due to NUREC 0588 concerns continues.

1

't f

Fuel Performance Unit 1 The core average fuel exposure accumulated during December was 0.00 HUD/ff!'U.

Unit 2 The core average fuel exposure accumulated with the total accumulated during December was 0.00 MWD /MTU with the total accumulated core average exposure of 8097.51 MWD /MTU.

Spent Fuel Pit Storate Capabilities The t.otal storage capability in the spent fuel pit (SFP) is 1,'86.

However, theri are five cell locations which are incapable of storing sient fuel. Four locations (A10, All, A24, A25,) are unavailable due to a. suction strainer conflict and one location (A16) is unavailable due to an instrumentation con-flict. Presently, there are a total of 348 spent fuel bundles stored in the SFP. Thus, the remaining storage capacity is 1,033.

PORVs and Safety Valves Summary No PORVs or safety valves were challenged in December 1985.

Licensee Events and Special Reports The following licensee event report (LER) was reported to the Vuelear Regulatory Commission in December 1985.

I{R DESCRIPTION OF EVENT l-85046 On November 14, 1985, at 1305 CST, with unit 1 in mode 6, a deluge valve,1-FCV-26-231, on high pressure fi re protection (HPFP) inadvertently opened and charged the fire hose stations in unit containment annulus and the area arouns the reactor coolant pumps (RCPs). After investigation, the valse was manually isolated and the Unit Operator (U0),. fter reviewing

.the HPFP drawings, determined that only the ho e stations -

around the RCPs were being isolated. In actuality, the annulus hose stations are supplied by this header also ind therefore, they were isolated. Since the annulus contains equipment that was required operable, a failure to comply with action (a) of Technical Specification LCO 3.7.11.4 occurred in that backup hoses were not run (, quired within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />). This condition remained until'its discovery on November 18. 1985, at approximately 1345 CST, during the performance of a HPFP surveillance on valve positions. At that time, the header and associated hose stations were returned to service.

1-85047-Technical Specification 6.12.2 requires access to high radiation areas be controlled by locks with keys administrative 1y controlled by the shift engineer and/or health physics.

On December 15, 1985, it was discovered that several employees may have had keys to locks for six high or potentially high radiation areas.

2 u

i.

~QR DESCRIPTION OF EVENT (cont.)

1-85048 An NRC inspection team on December 6, 1985, identified that the maintenance program guidelines (SQM-2 and SQM-57) were required to be PORC reviewed and failure to do so was a violation of the technical specification 6.8.2.

Special Reports There were no special reports for the month of December 1985.

Offsite Dose Calculation Manual Changes No changes were made to the Sequoyah Offsite Dose Calculation tanual during the month.

3

vetbHIING DATA REPORT DOCKE1 NO. 50-32; DATE JANUARY 6 15 06 COMPLETED BY D.C.DUPREE TELEPHONE (615)810-6544

. OPERATING STATUS 1.

UNIT NAME: SEGUOYAH' NUCLEAR PLANT, UNIT 1

2. REPORT PERIOD: DECEMBER 1985 NOTEst
3. LICENSED THERMAL POWER (MUT):

3411.0

4.

NAMEPLATE RATING (GROSS MWE):

1220.6 5.

DESIGN ELECTRICAL-RATING (NET MWE)*

1148.0

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):1183.0 7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1148.0 8.

IF CHANnES OCCUR IN CAPACITY RATINGS (ITEMS NUMBERS 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONSt-------_----

=---------------

'9 POWiR LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE)t----


~~------

10.

REA3ONS FOR RESTRICTIONS,IF ANYt--------.---..----------

THIS MONTH YR.-TO-DATE CUMULATIVF

11. HOURS IN REPORTING PERIOD 744.00 8760.00 39481.00 12.

NUMBER OF HOURS REACTOR WAS CRITICAL O.00 3797.25 24444.91 13.

REACTOR RESERVE SHUTDOWN HOURS 14 HOURS GENERATOR ON-LINE 0.00 0.00 0.00 O.00 3762.18 23871.13

15. 'JNIT-RESERVE SHUTDOWN HOURS O.00 0.00 0.00 16.

3ROSS THERMAL ENERGY GENERATED (MWH) 0.00 12383:85.96 77060971.91 17.

)ROSS ELECTRICAL ENERGY GEN.

(MWH) 0.00

- 18. NET ELECTRICAL' ENERGY GENERATED (MWH)-196.OO 4239970.00 25976336.00

.19.

4061107.00 24942737.00 UNIT SERVICE FACTOR

20. 11 NIT AVAILABILITY FACTOR O.00 42.95 66.46 O.00' 42.95 60.46
21. UNIl CAPACITY FACTOR (USING MDC NET) 0.00
22. UNIl CAPACITY FACTOR (USING DER NET) 40.38 55.03 0.00 40.38 55.03
23. JN11 FORCED OliTAGE RATE y

38.71 17.89 10.27 24 3HU1 DOWNS SCH! DULED OVER NEX1 6 MONTHS'(TYP


E, DATE. AND DURATION OF EACH):

CF SHUTDOWN AT END OF REPORT PERIOD,__--.--------------------------------------------------------

25.

EBRUARY. 10.1986, FENDING N.R.C.

ESTIMATED DATE OF STA:tTUF s

-(EADINEt.S PLAN.

REVIEW OF SEQUOYAH NUCLEAR PLANT STARTI'P

. - - - - -. - - - - -. - - - - - -. - - - - - - - - - - - - - - - ~ ~ ~ - - - - - - - - - - - - - - - - -

ilOTE THAT THE THE YR.-TO-0 ATE AND

UMULAT;VE VALUES HAVE BEEN UPDATED.

4

OPERATING DATA REPORT DOCKET NO.50-32G DATE JANUARY 6,1986 COMPLETED BY D.C.DUPREE TELEPHONE (615)S70-6544 OPERATING STATUS 1.

UNIT NAME: SEQUOYAH NUCLEAR PLANT,' UNIT 2

NOTES:

2. REPORT PERIOD: DECEMBER 1985 3.

LICENSED THERMAL POWER (MWT):

3411.0 4.

NAMEPLATE RATING (GROSS MWE):

1220.6

5.. DESIGN ELECTRICAL RATING (NET MWE):

11'48.0

~ ~'

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

1183.0 7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1148.0 8.

IF CHANGES. OCCUR IN CAPACITY RATINGS (ITEMS NUMBERS 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS:----____---_

9. POWER LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE):----_--_

=-_-----------------------------------------

10. REASONS FOR RESTRICTIONS IF ANY:---..-

THIS' MONTH YR.-TO-DATE CUMULATIVEL

11. HOURS IN REPORTING PERIOD 744.00 8760.00 31441.00
12. NUMBER OF HOURS REACTOR WAS CRITICAL O.00 52G9.42 21984.54-
13. REACTOR RESERVE SHUTOOWN HOURS O.00 0.00 0.00
14. HOURS GENERATOR ON-LINE.

0.00 5224.24 21494.42

15. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 0.00 16.~ GROSS THERMAL ENERGY GENERATED (MWH) 0.00 17128966.35 69127977.22'
17. GROSS ELECTRICAL ENERGY GEN. (MWH) 0.00 5845100.00 23536780.00 18.-NET ELECTRICAL ENERGY GENERATED (MWH)

-4096.00 5610949.00 22631957.60

19. UNIT SERVICE FACTOR O.00 59.64 68.36
20. UNIT AVAILABILITY FACTOR O.00 59.64 68.36-
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.00 55.79-62.70
22. UNIT CAPACITY FACTOR (USING DER NET) 0.00 55.79 62.70
23. UNIT FORCED OUTAGE RATE 100.00 40.32 19.05

- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF'EACH):

25. IF SHUTDOWN AT END. 0F REPORT PERIOD, ESTIMATED DATE OF STARTUo:

FEDRUARY O2,1986 PENDING N.R.C.

REVIEW OF SED!!OYAH NUCLEAR PLANT STARTUP READINESS PLAN.

NOTE-THAT THE THE YR.-TO-DATE AND e

CUMULATIVE VALUES HAVE DEEN UPDATED.

5

e 1

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-327 UNIT NAffE SEQUUYAll UNE DATE JANUARY 2, 1986 COMPLETED BY D. C. DUPREE REPORT !!0NTil DECEMBER 1985 TELEPl!0NE (615)S70-9544 Y

1.icensec g-s,

  • ^

Cause & Corrective gg c 4, Action to No.

Date g

g Sg g

ygm Event ug gy c:

Report #

go gu Prevent Recurrence g

go g

g tj o.c u

x m h.

av n:

ca ca 6

850822 S

456 C

4 Refueling / Modification Outage 7

851220 F

288 F

9 NUREG 0588 Documentation Concerns 4 Exhibit G-Instructions 2

'3ttethod:

IF:

Forced Reason:

for Preparation of Data S: Scheduled A-Equipment 1ailure (Explain) 1-11a nua l.

Entry Sheets for Licensee B-Ilaintenance or Test 2-flanual Scram.

C-Refueling-3-Automatic Scram.

Event Report (LER) File D-Regulatory Restriction 4-Cont. of Existing (NUREG-0161)

E-Operator Training T License' Examination Outage F-Administrative 5-Reduction S

G-Operational Error (Explain) 9-Other Exhibit I-Same Sourcei li-Other (Explain) 6-

e

<1

.(

4 4

'7 2

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET WO.

50-328 151T NAME cro"m An ltft v

n DATE JANUARY 2. ___^

'C00tPLE9ED BY D. C. LEDGER D CNR 1985 REPORT HONTH TELEPN6HE (615)870-6544 y,

3af

.?..,

we c

Cause 6'CutacctIn gg N,

oyu Licensee g-s, g

ty y3g Event ug gy Action to No.

Date o

o 4

o9 g

g tj c:

Report 1

g. o gu Prevent Recurrence

=-

c:

o.c -

u

cin{

ce n

9 850821 F

744 F

4 NUREG 0588 Documentation Concerns 4 Exhibit G-Instructions 3 Method:

IF: Forced 2pe,3,n; S: Scheduled A-Equipment Failure (Explain) 1 -itanu a l for Preparation of Itata B-!Iaintenance or Test 2-Ilanus1 Scram.

Entry Sheets for Licensec C-Refueling 3-Automatic Scram.

Event Report (LEH) File D-Rep,ulatory Rest riction.

4-Cont, of Existing (litIREC-0161)

E-uperator Traininr. & Licenw Examination Outage F-A<! mini s t rative 5-Herinction G-Operational Error (Explain) 9-Other sExhibit I-Same Source-li-Other (Explain) 7

6 o

SEQUOYAH NUCLEAR PLANT AVERAGE DAILY POWER LEVEL DOCKET NO. : 50-327 UNIT : ONE CATE : JANUARY 6,1986 COMPLETED BY : D. C. DUPREE TELEPHONE :CE15)S70-6544 10 NTH DECEMBER 1985 AVERAGE DAILY POWER LEVEL AVERAGE DAIL! POWER LEVEL DAY CMWe Net)

DAY CMWe Net) 01 0

17 3

02 0

18

)

03 0

19 0

04 0

20

)

05 0

21 0

06 0

22 0

07 0

23 0

4 08 0

24 0

09 0

25 0

10 0

26 3

11.

0 27 0

12 0

28 0

13 0

29 0

14 0

30 0

35 0

31 0

16 0

8

t' SEQUOYAH NUCLEAR PLANT AVERAGE DAILY POWER LEVEL DOCKET NO. : 50-328 UNIT.:TUO DATE : JANUARY S.1986 COMPLETED BY : D. C. DUPREE TELEPHONE :(S15)S70-6544 MONTH DECEMBER 1985 AVERAGE DAILY. POWER LEVEL AVERAGE CAIL/ PCWER LEVEL DAY CNWa Net)

DAY (f1We Net) 01 0

17 3

02 0

18 3

03 0

19

)

04 0

20

)

05 0

21

)

06 0

22 3

07 0

23 3

08 0

24 0

09 0

25 0

10 0

2G 0

11 0

27 0

12 0

28 0

13 0

29 0

l't 0

30 0

15 0

31 0

16 0

9

Tva ns:Ascre m an NUCLEAR PLANT OPERATING STATISTICS SEQUOYAll NUCLEAR Plant Period Hours.

740 Month DECEMBER gg 85 Item No.

Unit No.

UNIT ONE UKIT TWO Pl. ANT I

Averace Hourly Gross Load, kW 0

0 0

2 Maximum Hour Net Generation. MWh 0

0 0

3 Core Thermal Enerav Gen, GWD (t)2 0

0 0

4 Steam Gen. Therma! Energy Gen., GWD (t)2 0

0 0

5 5

Gross Electrica' Gen., MWh 0

0 0

5 6

Station Use, Mwn 196 4069 4265 5

7 Net Electrical Gen., MWh

-196

-4069

-4265 8

Station Use, Percent N/A N /A N/A 9

Accum. Core Avg. Exposure MWD / Ton!

0 8098 8098 3

CTEG This Month,10 8TU 6

0 0

0 11 SGTEG This Month,10 BTU 0

0 0

6 12 13 Hours Reactor Was Critical 0.0 0.0 0.0 14 Unit Use. Hours. Min.

0:00

):00 0:00 15 Capacity Factor, Percent 0.0

). O 0.0 y

16 Turbine Avali. Factor. Percent

0. 0 i.0 0.0 g 2 Generator Avail. Factor. Percent
0. 0 00 0.0 e l Turbooen. Avail. Factor. Percent
0. 0 0.0 0.0 19 Rextor Avail. Factor Percent 0.0
0. 0 0.0 0 2 Unit Avail. Factor. Percent 0.0
0. 0 0.0 21 Turbine startuos 0

0 0

22 Reactor Cold Startuos 0

0 0

21 24 Gross Heat Rate,8tu/kWh N/A N/A N/A j

25 Net Heat Rate 8tu/kWh N/A N/A N/A

,5, 26 D

27 g

28 Throttle Pressure, psig N/A

!i/A N/A 29 Throttle Tempe ature. *F '

N/A N/A N/A d,

30 Exhaust Pressure, inHg Abs.

N/A N/A d/A E

31 Intake Water Temp., *F N/A N/A N/A F

32 33 Main Feedwater. M lb/hr N/A N/A N/A E

34

[

35

~'

i 36 37 hill Power Capacity, EFPD 404.86*

363.65 768.51

}

j __ 38 Accum. Cycle Full Power Day., EFPD 0.0 210.8416 210.8416 39 Oil Fired for Ge ieration Gallons

~

2 40 - Oil Heatenti Value. Btu / Gal.

2.244 138,u00

41. M Generatic1. MWh a?

34 Max. Hour Net Gen.

Max. Day Net Gen.

Load i

MWh Time Da te MWh Date Factor, %

l 3

43 N/A N/A N/A N/A N/A N/A I or 8FNP this value is MND/STU and for SGNP and W8NP this value is MWD /MTU.

O Remai ks:

F j

2(t) indicates Thermal Energy.

3

  • Approximately e

i l

Date Subnutted Date Revised 10 Plant Superintendent

TvQ 656C;C (PP.) 76) g I

~

UNIT OUTAGE AND AVAILABILITY SEOUOYAH Nuclear Plant Lnensed Heactor Power 3411

- r MW(th)

Unit No. ONE Generatnr Piten)1220.5 MW(e)

Month / Yea, DECEMBER 1985 Desigri Gross Electrical Rating 1183 MW w g,,

744 Teme Umt #' wide Tame Not AveHatfe METHOD OF UNt T MMCTM ACTION Totad Ge s.

Not Used Turtnne Gen.

Reactor unet Ou

^"

URI G Dag **s j u.fm ; u.n m ! u.n Hrs ; u.n m lu.n m !u.o Mrs ' u.n ess ! u.n tus ' u.n REACTOR OUTAGE P Tl N

I 00 ' OC.f 'C l 00 I

24 8 00 24 ' 00 24 500 248 00 i

i Refueline Outaem Continues N/A Mode #5 2

nn ' art

J__,

inn f

71 I on 7& ! no 7A 800 76 ? nn a

T nn I co_ 20 'en 74 i 00_ 14_109 M"~r'50.T" i_bQ.

  • ).

i 4

00.00 00700 l

24 e00 24 !00 e

i 5

00 e00 00 #00 i

24 a 00 2T:00 24 100 24' 00 e

6 00 100 00 400 e

24 ' 00 24 iOO 24 '00 24i 00 8

7 00 300 06 700 24:00 74 ' 00 24 '00 24e 00 e

~

8 00 l00 00.'00 24 s00 24 00 24 l00 24; 00 i

8 9

00 00 00 iOO e

24!00 24 800 10 00 ;00 00 iOO I

?4l 00 24 l00~

24 !OO 24e 00 I

24 iOO 24! 00 I1 00 iOO 00 '00 l

24800 24 iOO 24 800 24i 00 i

12 00 800 00 :00 i

24 : 00 24 s00 24 00 24s 00 i

13 00 l00 00 iOO 24 e00 24 00 2 BOO 24! 00 8

e 14 00 ;00 00 800 24 l 00 44 i OO 24 800 24; 00 15 00 ;00 00 !OO 24 s 00 24 ! 00 24 l00 24s 00 i

i 16 00 e 00 00 !00 s

24:00 24iCO 24 !00 24I 00 e

a 17 00 000 00 !00 24i00 24 ! 00 24 ;00 24! 00 18 00 ! OO 00 i00 2+!00 24 l 00 24 800 24; 00 e

i 19 00 00 00 #00 e

24 i OO 24 t00 24 iOO 24i 00

?

?

Refueling Outage ends @2400C N/A Mode #5 20 00j00 00 100 s

24 ! 00 2Q' 00 24 !00 24: 00 NUREG 0588 Outage begins N/A Mode #5 21 00 s00 00 [00 l

24 ; 00 24 00 24 ;O0 248 00

@ 0001C i

22 00 000 00 100 a

248On 24 !OO 24 800 24! 00 s

e 23 00 '00 00 800 1

24 ! 00 24 i OO 24 l00 24; 00 e

8 24 00 00 00 !OO

~

24 00 24 ! OO 24 iOO 241 00 8

25 00 ; 0 )

00 iOO i

24a00 24 l 00 24 '00 24: 00 i

~~

26 00 iOO 00 000 4

2_4 ;00 24 iOO 24 l00 241 00 e

27 00 800 00 !OO l

26 e on 2 e 00 2,.00 24! 00 e

t 5

?8 00 100 00 #00 e

24 l 00 24.00 24 ;00 24 ; u0

~ ~~'

29 y I OO 00 !OO I

24e00 24 ! 00 24 ?OO

24. 00 30 Ogloo 00 ;00 24 : 00 24 iOO 24 iOO 26: 00 i

31100,*0_

00 600 i

24 i 00 24 t00 24 !OO 24T 55 i

lotas i Ou f ut uo l00 744000 744 l 00 744i OO 744; 00 M XM X

X_

Il 4

?

g.

4 k

1 t

[

,_ = z i

zo,_

w

.i u>o I

<u WEE B o o-

  • - - g i

=

S:

a 8

mJE w

.4 g4 hi o$

~

c v

=

5 o

i k~Z A f.3 "

s 7 si;2 0 "3E 8S].

5 -

e-2 2 u

J os x etzo Et o: 0 ; <

$2 0 a

,o i

I i

5 w

8 U

a E

c W

e

> -=

o a

e.

s }

a e

3o o

o

-c

=

f a

=

f 0-Z<..,.

.c.

3

[s ?......

w i 8 s

I c

sS 1

x 5-j

.o I_

d g

a f

, s 5 8_88 8_8 88 8_8_8..8__8_8-88_8_88 8 8_8_ 8..88 8_8 8 8_8 88 8_

g

q rk I *

~

g y

-El88- - -

. -., --8.88 888l88 8 8 8 888 8 8 888 8 8 88 8 I

1 5 8 888 8

' 3- --', J4,'--

r.... - -

-=,--

e r e

,, - 4 4

4..

,(

I NN t e*I, NN es N N

et N N

N N

N NN N

N NN N

N f4N N

N N N NN 4

z 1888 8 8.88 8828 8 8 8 88 8 8 8 8 8 8 8 8 88 8 8 88 8 2

7 j

4.,_,......,...

Te...N }4.._

., 4

< r,e <

-e 4

,e

,, 4,

4 44

-,,,.e

., 4

f. NNN N N[N Ne.

N N

rw N N

elN N

N NN

.'d c4 N N

1NN N NN 4

5 j 1 888 8 8 8'8 8 88 88 88 88 8 8 8 8 83 8 8 8 8 8 8 8 88 8

..a.

- -4 12 2

e c

t 2

s _i... _i_

.... _j s

3

. s z

1 1

i l

5

--r 1

i i

1 88_!.?

8 8 88 8 8 _8_88 8__8_88 88 8 8 88 8 8 8 8 8 8 8 8 8 8 gg 7 j e

g~

y 1 88l3 8 8 8 8 8 8 8 8 8 8 8 88 8 8 8 8 8 8 8 8 8 8 8 8 8 E 8 8 I

!. E 5, 5 8 88 8 8 8d8 8 8 8 8 8 8 8 88 8 8 8 8 8 8 8 8 8 8 8 88 E 8 8 3

g-5 " '

,8 1 8 8 8 8 8 8 8 8 8 8 8 8 8 E E8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 l

1, xi +

2 = = = s = u =

=w e

?

55 b 0

e t

SEQUOYAH ONE REACTOR HISTOGRAM 110 100 -

90 -

h 80 -

O!

70 -

k 60 -

El 50 -

o 43 Eo 30 -

20 -

10 -

0-5

~

I

-10 i

i i

i i

i i

i i

i i

i i

e i

0 4

8 12 18 20 24 28 32 DECEMBER 1995 v

CTC1.E 3 RO ENDED SEQUOYAH TWO REACTOR HISTOGRAM 100 90 -

g.,

80 -

2; 70 -

E 60 -

50 -

>c 40 -

E 30 -

g 20 -

8 10 -

0

-10 i

i i

e i

e i

i i

i e

i a

8 4

8 12 is 20 24 28 32 DECEMBER 1985 13

I 16; m ay 01 vi-66 ELECTRICAL MAINTENANCE FDITit.Y REPORT FOR DECEMBER DATE....

CDNPONENT.....

FATi ll0F DicCRIPTION......

CALSE OF FAILURE.........

CORRECTIVE ACTION........

MP.NO..? AGE 1 3 11-05-85 1-CRN-079-JN MM!!l'ULATOR CRAE WDULD LR1 RESISTOR H A500FP REPLACED LR1 RESISTOR M A546239 nC1 NOT MOVE PRINTED CIRCull BOARD WAS AMXFP PRINTED CIRCUII DEFECTIVE BOARD 11-12-85 2-CENB-087-M0 2A-A DIESEL CENERATOR CABLES WIleINGS M BOLTS FEGGERED, BRIDGED @

A328112 2A-A TRIPPED ON DIFFERENTIAL WERE DEFECTIVE HIPOTED 6.9NV CABLES APO RELAY R87 RETOROUED BG.TS 11-15-85 2-11V0P-001-001 RESET LIMIT SWITCH TO GREASE IN SWITCH REPLACED BAD TGleLE A299905 7

PREVENT BACMSEATING APO COW ARTMENT, CONTACTS ON SUITCH Afe ADJJ6TED. REF:

PRENATURE BYPASS SWITCH LIMITS WERE CORRODED Afe PWt A547801 TRIP Di3T TORGUE SWITCN UAS COVERED WITH OIL 11-20-85 2-FSV-067-0338 C014 TROL C1kCU11 wAS SOLENDID WAS BURED Up REPLACED SOLEleID AlO A546023

-8 CONTIltJALLY BLOWING FUSES CECNED FCBt PRWER OPERATION 11-21-85 1-FCV-090-0116 VALVE WOULD HOT STAY IN LIMIT SWITCH ACTUATGt ARM ADJJSTED LIttITS APO A336247

-S OPEN POSITION OUT OF AJUSTfENT CECNED FGt PRWER OPERATIONS 11-22-85 0-Clit-311-0156 CHILLER WAS NOT WORKING LNIT WAS OUT OF ALIGPfENT RESTARTED (MIT WITH A594569

.0171 CAUSING TEFFERTURE TO PROPER ALIQtENT Ale RISE TO DiKR 85 DEGREES CECKED FOR PROPER RESULTING IN CON UTER OPERATION FAILURE 11-25-85 2-ZS-067-0354 LIMIT SWITCH DID HOT LIMIT GUITCH WA6 OUT OF ADJUSTED LIrtIT SWITCH A>O A546246 ACTUATE PRODERIY UHEN AWMW (WYYFD Fno PRW ER vHLVE CHANGED POSITIDHS ACTUATION 11-26-C";

1-FSV-043-0251 CONDUIT COL 9L1HG LEADING POSSIBLY HAD BEEN STEPPEu ktPLACED Col #X CODMECION, A541841

-A TO 1-FSV-63-71 IJo? R9Nm ON BY PERSup0EL CGOUIT AND WTRING 11-27-95 1-HS-031-04758 JLITER FPOM 1-HS 4758 CUT WAS DUE TO CLOSIls OF REPLACED UTWE #1117V7 A!22257 14

11:58:39 OA vc oo ELECTRICAL finnic.mrce f.LNIHLY rep 0M Fait DECErBER PAGE 2 DATE....

(DPPONENT......

FAILLRE DESCRIPTION......

CAUSE OF FAIL 1RE.........

CORRECTIVE ACTION........

rJt. ND..

-A TO TERf11NAL BLOCK 1117V7 DOOR ON 1-L-572C FRori A 572-C HO 6EOs Gi 9 records listed.

h 4

l t

l h

Y 15 t,

~

INSTRUMENT MAINTENANCE Unit 1 An inadvertant containment vent isolation occurred on 12-/-85.is a result of power loss to radiation monitor 1-RM-90-112A (PRO-1-85-362). The power supply plug was verified to be connected to the correct plug sold. Recorder 1-RR-90-112 indicated that the monitor lost power for approximately ten minutes.

It was believed that the monitor's power supply failed in service.

However, the power supply was removed from service, placed under a load test, and was determined to-be functioning properly. Further investigation revealed that the radiation analyzer (RP-30) connector pins could have momentarily opened the power circuit. The connector pins were cleaned and 1-RM-90-112A was returned to service.

The reactor coolant system narrow range RTD manifolds on loops 2,3, and 4 were found damaged during performance of SMI-0-68-28 to install new RTD's for lualified life replacement. MR's were initiated to allow repair by Mechanical Maintenance. Six of eight RTD's have already been replaced.

The remaining two will be completed after the manifolds are repaired.

Unit _2 During performance of a required soldering modification to 2-PT-68-66, RHR suction valve 2-FCV-74-2 was inadvertantly closed, isolating he suction to the RHR pumps (PRO-2-85-134).

Investigation revealed a de'iciency with SI-484 that caused the isolation. The instruction was revisei under a temporary change to include additional steps for prevention o RHR isolation when working on the loop.

2-PT-68-323 was found out of tolerance during performance of efueling calibration, SI-94.1.

PRO-2-85-133 was initiated, the transa tter was re-calibrated, and the loop was returned to service.

Common Contracted with Westinghouse to perform a re-analysis of Sequ( fah's setpoint methodology report. This was necessary to consider maintenante and test equipment inaccuracies and new equipment installations to. ensure safety.

margins are not compromised. Preliminary calculations from Westinghouse are expected to be submitted and reviewed before startup.

During performance of SI-620, auxiliary air compressor pressure switch 0-PS-32-62 was found out of tolerance. PRO-1-85-359 was initisted and the switch was recalibrated.

Continued support for the environmental qualification program. Received QMDS binders and began verification of essential maintenance requirements.

Coordinated with OE to resolve binder discrepancies and equipment installati'n o

problems.

i f

16 i

i m -,._,

INSTRU1LHi MAINTENANLL MONUiLY CumARY 01-03-86 PAE 1 Corp rR. Car U FUNC SYS ADORESS. DATE....

DESCRIPIl0N.............................

CORRECTIVE ACTION.......................

A005196 2 DT 0@

??? 12/13/85 2-PT-068-322, uNPRDu RECALIB XnTH TErv miiprtrHT tlSED TO CM T09 ATE FOUND BECAUSF N TEST EG OUT OF TOLERANCE OUT OF TOLERANCE, CECK CALIBRATION RECAL IF E CESSARY A085197 2 PM 001 13 12/13/85 2-Pn-001-13, AIR LEAK DEFECTIVE REGULATUR REPLACE REGULATOR A005200 2 Ut 003 9CP001 12/11/85 2-LR-003-9BP001, PEN IS BROKEN REPAIR BROKEN PEN REPLAE PEN A122992 0 090 12/17/85 0--090-,COORD W/ ELECT NOD 8 HAVE TE NOE ASSIST ELECTRICAL MG)IFICATIONS IN C0rP0ENTS ON THE ATTACED LIST TESTING EERCIZED AS REG'D TO A MAX LOAD COM) SO SMI O 317 23 CAN BE PERFORED 4230512 0 Rn 090 12212/12/85 0-RM-090-122,n0H BACKGROUM) TOO HIGH PARTICULATE CONTN11 NATION CLEAN OUT CLEAR #10N MONITOR A298561 2 Rn 090 271 12/20/05 2-Rn-090-271, FOUL () OUT TOLERANCE ON Snl DEFECTIVE DETECTGt INSTALL NEW DETECTOR 0 901 WHEN DETECTOR PLACED IN 100 R FIELD. REPAIR PER VALIDATED GA MANUALS R244 A299299 1 XIS 068 388 12/03/05 1-XIS-068-388, CUT DUT EXISTING ISOL AM) DEFECTIVE ISOLATGt INSTALL NEW HYCRALIC WELD EU ISOL IN PLACE ISOLATOR A300327 2 PX 003 170 12/23/85 2-PX-003-170,PWR SUP IS READING APPROX DEFECTIVE DIODE IN POWER SUPPLY REPLACE 55 VDC SHOULD BE READING APPROX 35 VDC DIODE VERIFY PROPEN VOLTAGE OUTPUT I REILRN TO SERVICE FR A300827 SI-97 A300028 2 PX 003 16312/23/85 2-PX-003-163,PWR SUP IS LDADING APPROX DEFECTIVE DIODE IN POWER SUPPLY REPLACE 55VDC SHOULD DE READING APPROX 35 VDC DIODE VERIFY PROPER VOLTAGE OUTPUT A80 RETURN TO SERVICE FR A300828 SI-97 A300829 2 PX 003 14712/23/85 2-PX-003-147,PWR Stp IS READING APPROX DEFECTIVE DIODE IN POER SUPPLY REPLACE 55 VDC SHOULD BE READING APPROX 35 VDC DIODE VERIFY PROPER VOLTAGE OUTPUT Ale RETIRN TO SERVICE tR A300829 SI-97 A300835 1 LI 003 175 12/23/85 1-LI-003-175, NDPRDa IlO POINTER BROKEN ABMRMAL SHOCK ON TE ETE8t REPAIR PETER NEEDED 10 Cur &LETE SI 207 POINTER CHECK CALIGRATIDH & RE1LRN TO SERVICE AJuutsJ6 0 RE 090 122 ;2/~?'00 0 RE-Orv-Ate, ii;C I'O:::!CR BACKGROUlO IS PARTICULATE CCHTAMINATICtl CLEAM CA.:PLE APPROX 100,000 CPn 8 WILL NOT RENSE DGM CHAPEER EWH UITH THE ACID FlilSH DECON AS NECESSARY FOR LIGUID RELEGSE ND TAG RNG A300839 2 XI 092 bw1A 12/27/85 2-AI-0?e-5001A,381m SR DISPL RAPID INCR N0hE LUULD bt FOLH) PERFORn S1-2/8 NO FROM APPPGX 12 APPROX 40 CPS LMILE PROBLEn FOUlO RETIRED TO SERVICE DIGITAL INSTR IM)ICATED APPROX ORIGINAL READING CF 11 CPS A301070 2 FI 001 3412/17/85 2-FI-001-3A,NEEDS TO BE CALIB. READING FLEX HOSE FEEDING TRANSnITTER LEAKING,

.5X106 PPH WHILE OTER CHAl4EL(S) OPPH TRANSMITTER DUT (F CALIBRATION. REPAIR FLEX HOSE LEAK Af0 RECALI8 RATE TRANSnITTER FR A301070, A54m61 17

INSTRttTNT MATNTFN,WT MONTHI i mMM W V 01-03-86 PACE 2 COnP ret.CtyF U FUNC SYS ADOPFSS. DATE....

DESCRIDT!0N.............................

FORRECTIVE ACTION.......................

A301665 1 TF 06R 2A 12/26/851-TF-0!9-2A, REPLACE EXISTING NARROW EPO OF QUALIFIED LIFE OF DEVICE. REPLACE RANCE RID DtE TO TE EXPIRATION OF THE RTD WITH EQUIVLENI TYPE.

GUALIFIED LIFE A301666 1 TE 068 2B 12/26/851-TE-068-28, REPLACE EXISTING NARROW EPO OF GUALIFIED LIFE. REPLACE ATD WITH RINGE RlD DUE TO THE EXPIR ATION OF THE EQUIVALENT TYPE GUAL1FIED LIFE A301667 I TE 068 IM 12/26/t6 1-TE-068-1M, REPLACE EXISTING NARROW EPO OF QUALIFIED LIFE OF DEVICE. REPLACE RANGE RID DUE TO THE EXPIRATION OF THE RTD WITH EQUIVALENT TYPE.

GUALIFIED LIFE A301668 1 TE 068 140 12/26/85 1-TE-068-148, REPLACE EXISTING NARROW END OF GUALIFIED LIFE OF DEVICE. REPLACE RANGE RfD DUE TO THE EXPIRATION OF TE RTD WITH E9UIVALENT TYPE.

QUALIFIED LIFE A523201 0 RR 090 205 12/17/85 0-RR-090-205,REPGtTER PEN SLIPS HOLDING SCREW WORKING ITSELF LOOSE SLIGdlL FRON DRIVE CORD HOLDING SCREW TIGHTEED SCREW MAY BE WORKING ITSELF OUT A523203 0 Rr1 090 133A 12/11/85 0-Rn-090-133A, uNPRDSu THE Rn SHOWS A BACK GROWO TOO HIGH CHAKiD SETPOINT HIGH RAD COND THAT NEEDS TO BE FERIVIED PER SI-204 CHECM RAD MONITOR FOR PROPER (PERATION A323204 0 RI1 090 21212/10/85 0-En-090-212,= INST F1ALFUNCTION WILL NOT CLOCGED SENSING LIE TO ROT 0ETER CLEAN CLEAR DUT SENSING LIE A523205 0 Rf1 090 140A 12/11/85 0-Rn-070-140A, RAD MONITOR SPIKES HIGH BACMGROUPO TOO HIGH FOR SETPOINT CHANGE AND L0u HO ACTIVITY FOUPO IN WATER ALARn SETPOINT PER SI 204 CONTDOUSLY cones IN OH 0-N-12 A523207 2 PCV 001 12 12/13/85 2-PCV-001-12,uW RDSu AIR LEAK ON HO FAILURE NORf1AL POISTIGER AIR BLEED CONTROLLER NWE A523578 I Pf1 001 31 12/17/95 2-PN-001-31, AIR FLTR REGULATOR FOR 2 Pn DEFECTIVE REGULATOR INSTALL EW 1 31 AND 2 NCV 1 31 HAS AIR BLOWING FROM REGULATOR SrA L HOLES A522575 2 8.IV 003 171 12/13/85 2-LCV-003-171,uwRDu LCV OPERATES TE POSITIVE LEAD FEEDING THE POSITIOER 00ferve v IN ANTO BUT Wfy4'T PFr: POND IN WAS G ROUNDED IN TE CONOULET. REPATR nMUAL GROUlOED WIRE AND FUCTIONALLY TEST FWl523579 A523715 s TS 032 64 12/13/85 0-TS-032-64, ulu CHECK CALIB 0F TEFF SW SWITCH OUT OF CALIBTATION RELALIBRATE AUY ATP COMDR AA CWITCH A527379 2 Rf1 090-29212/18/85 2-Rn-090-292,BROEN CABLE TO DETECTOR BROKEN CABLE TO DETECTOR RFSAIR CABLE FOUND ON SI 685.2 A329607 2 RI 090 27812/13/85 2-RI-090-278, DOICATOR IS DEAD. REPAIR LOOSE WIRE 8 STINING DOICATOR TIG.! TEN FOUPO DURING PERFGinANCE OF SI 685.2 WIRE 3 REPAIR ItOICATOR A529608 2 RI 090 275 12/18/85 2-RI-090-275,IleICATOR WILL POT CALIB DEFECTIVE DOICATOR INSTALL EU FOLND DURING PERFGtnANCE OF SI 685.2 DOICATOR A529609 ? RI 090 276 12/18/85 2-RI-090-276,Il@ICATOR WILL TOT CALIB DEFECTIVE INDICATOR INSTALL K W 18

~ _ ____

_~

~.

INSTRLENT mil 4IENANCE MOUTHL) SU'1 NARY 01-03-86 PAGE 3 C0r1P ft.(XNF U FUNC SYS ADDRESS. DATI....

PfsrPIPTI0H.............................

CORRECTIVE ACTION.......................

FOUND DURING PERFmnANCE OF SI 685.2 ItOICATOR A53418u 4 LEV 003 156A 12/13/85 2-LCV-00J-136A, Mt@hDa LCV 156A HAS AIR DEFECTIVE RCCULATOR AND LOOSE 80l#ET TO LEAK YONE CCe#ECTING SOLTS REPLACE REGLA.ATOR AIO TIGHTEN COP 9ECTING BG.TS MANE STROKE ADO LIFT-OFF ADJUSlltNTS 19t A534198 A536009 1 PCV 032 12/13/85 1-PCV-032-,STOP SLP AIR REG AIR ' LEAN BLOWN CASMET BETIEEN THE GAUGE MAi!IFOLO AfD PO SITIOERREPLACE DEFECTIOVE CASMET A53F502 2 RE 090 27312/20/85 2-RE-090-273,REnUVE THE R AD ELEnENT NDHE REINSIALL DETEl:10R FR0rl 2 Rn 90 273 A539504 2 RE 090 274 12/20/85 ' 2-RE-090-274, REMOVE THE R AD ELEFENT NOK REINST?LL WEN TEST IS CCIPLETE FR0rl 2. Rn 90 274 I

N539521 2 LT 003 3812/04/85 2-LT-003-28,HARD WIRE PIN C0l#4ECTOR FOR HARDWIRE PIN COMEC10RS TO 11AINTAIN BARTON LOT 2 XnTR TO MAINT AIN GUALIFICATIONS HARDWIRE CONNECTORS GUALIFICATIONS PER StlI 2 317 23 I

A539525 2 LT 003 51 12/04/85 2-LT-003-51,HARD WIRC PIN C0l#ECTOR FOR PIN COPDECTOR EEDS HARDWIRING TO BARTON LOT 2 XnTR TO MAINTAIN MINTAIN GUALIFICATIONS HARDWIRE QUALIFICATIONS PER Snl 2 317 23 00ttECTOR N53T527 2 LT 003 3912/04/85 2-LT-003-39,HARD WIRE PIN Col #ECTOR FOR PIN Col #ECTORS HEED HARDWIRING TD BARTON LOT 2 XnTR TO MINTAIN 11AINTAIN QUALIFICATIONS GUALIFICATIONS PER Sn! 2 317 23 A539529 2 LT 003 10612/04/95 2-LT-003-106,HARD WIRE PIN CG#ECTOR PIN COP 0ECTOR DEEDS HARDWIRING TO I

FOR BARTON LOT 2 XnTR TO MAINTAIN 11AINTAIN SUALIFICATIONS HARDWIRE GUALIFICATIONS PER SnI 2 317 23 COPDECTOR

~

~

N53F530 2 LT 003 9812/04/85 2-LT-003-98,HARD WIRE PIN C019ECTOR FOR PIN CDP 9ECTOR PEEDS HARDWI41NG HARDWIRE BARTON LOT 2 XnTR TO MAINTAIN CopeECTOR QUALIFICATIONS PER Snl 2 317 23 4539531 2 LT 003 9712/04/85 2-L1-003-77,HARD WIRE PIN C0l#ECTOR FOR PIN COP 90ECTWt IEED6 HARDWIIIING TO BrFTON LOT 2 XnTR TO 11AINTAIN FIAINTAIN GUALIFICATIONS twt 0 WIRE GUALIFICAlIONS PER SMI 2 317 23 CODDECTOR l

AS39532 2 LT 003 521'N04/85 2-LT-003-52,HARD WIRE PIN C0ptECTOR FOR PIN CONNECTOR NEEDS HARDWIMING HARDWIRE BARTON LOI 2 XnIR 10 flAINIAIN CmOECTCR GUALIFICATIONS PER SrlI 2 317 23 M3F533 2 LI 063 179' 12/05/85 2-tT-063-179,HARD WIRE PIN COPGECTOR PIN Col #ECTER NEEDS HARDWIRING TO FOR BARTON LOT 2 XrtTR f1AINTAIN GUALIFICATION HARDWIRE COPOECTWt Srl! 2-317-23 l

M 39534 2 LT 063 17712/06/95 2-LT-063-177, NARD WIRE PIM CO#ECTOR PIN Col #ECTOR 7EEDS HARDWIRING TO f

? FOR BARTON LOT 2 XHTR f1AINTAIN GUALIFICATIONS HARD WIRE CmeircmR M 3F535 2 LT 003 111 12/04/85 2-LT-003-111,HARD WIRE IN ColfECTOR FOR PINC0peECTOR HAf0WIRItG Foi BARTON LOT 2 XMTR TO f1AINTAIN OUALIFICATIONS HARDWIRE C0f9ECTOR GUAL lilC ATIONS Pf R Sn12 317 23 19

INSTR 1r1ENI MAINILr.i m

i.UreirCu TfV1m 01 03-HA PACE 4'

CL4IP

~

f9t.C0rP U F1)NC S I S ADDR ESS. DAT E.... CLSCR I P T I ON............................. CORRECTIVE ACTION.......................

A539536 2 LT 003 107 l'N!o "r7 ^" W.HARD WIRE PIN CONNECTOR PIN CONNECTCR NEmfi HARDWINIrlG HARDWIRE

~

FOR BARTON LOI 2 AnlH TO MAINTAIN PIN CONNECTOR GUALIFICATIONS PER Sr1I 2 317 22 A539537 2 PT 068 323 12/06/85 2-PT-068-323,HARD WIRE PIN CONNECTOR PIN Cot #4ECTOR EEDS HARDWIRE TG FIAINTAIN FOR DARTON LOT 2 XMTR TO f1AINTAIN GUALIFICATIONS. MRDWIRE CONMCTOR GUA!IFICATIONS PER Snl 2 317 23 A539538 2 PT OAR 322 12/0A/M 2-PT-063-322.HARD WIRE PIN CONNECTOR PIN C0t#ECTOR NEEDS HARDWIRING TO FOR BARIGN LOT 2 XMTR TO riAINTAIN FIAINTAIN GUALIFICATIONS HARDWIRE GUALIFICATIONS PER Snl 2 317 23 CONNECTOR.

A335539 2 PT 068 69 12/10/85 2-PT-063-69,HARCWIRE CONNECTOR FOR CONNECTOR NEEDS MNDRINGS TD f1AINTAIN BARTON t.0T 2 XnTR TD flAINTAIN GUALIFICA'iIONS HARDWIRE PIN C0t*ECTOR GUALIFICATIONS PER SnI 2 317 23 A539544 2 PT 068 34012/06/85 2-PT-068-3M,HARD WIRE PIN C0144ECTOR PIN CONNECTOR KEDS HANDWIRING TO FOR LOl 2 BARION XMTR TO FIAINTAIN FIAINTAIN GUALIFICATIONS HARDWIRE i

GlMLIFICATIONS PER Sl1I 2 317 23 CONECTOR.

A545926 1 Rr1.090 1128 12/13/85 1-Rn-090-1128-TSC,TSC READINGS ERE FlO TSC OUT OF CALIBRATIDH RECALIBRATE TSC OUT OF CAL PER SI 83 A545927 1 151 090 112A 12/13/85 1-RTr-090-112A-TSC,TSC READINGS ARE OUT TSC OUT OF CALIBRATIDH RECALIBRATE TSC OF TOLERANCE PER SI 83 AS46509 1 LI 003 172 12/16/85 1-LI-003-172, hlfRDu LVL Ito POINTER IS POINTER BROKEN OFT, REPAIR I@ICATOR OFF BROKEN NEEDG TO COnPLETE SI 207 AS46561 2 PS 068 668/E 12/09/05 2-PS-068-668/E,INVESTICATE PROB U/2 PS COLA.D NOT BE DETERrIINED. RECALIBRATE 68 668/E AND 2 FCV 74 2 RHR VLV WHICH PRESSURE SWITCH Nt AS46561 l

WENT CLOSED A547678 0 Rn 090 212 12/19/85 C-Rn-090-212,PunP OR MOTOR BEARING IS BAD BEARINGS REPLACF BEARINGS LOUD nM BE GOING BAO A547695 2 HTCK 234 12312/19/85 2-NTCK-234-123, TERR 10 STAT CONTACTS ARE DEFECTI E TErPERATURE CONTROLLER REPLACE VIBRATING WHEN MACZ TEnPERATURE CONTROLLER A547496 2 HTCK 234 69 12/19/85 2-HTCK-234-69,NO GRN OR RED I@ ON BAD THERf10 STAT REPLACE TERf10 STAT TWDrif% TAT AS48051 2 LI 070 63A 12/19/85 2-LI-070-63A, CHEM CAL ON LT SUSPECT WATER IN DRY LEG OF TRANSr1ITTER DRAIN FAULTY LVL INO WATER FRan DRY LEG fWt A56051 A56052 2 LI 070 99A 12/19/85 2-LI-0/O-99A,DEG CUT ON LT SUSPECT WATER IN DRY LEG (F TRANSrlIITER DRAIN FAULTT LVL IND WATFP FR0r1 DRY LET: tie A549052 N56798 2 IE 090 271 12/20/85 2-RE-090-271,RErIOVE THE R ADIATIG4 NOE REINSTALL DETECTOR ELErIENT FR0rl 2-Rrt-90-271

(

A5 m 2 RE 090 272 12/20/85 2-9E-090-272,REF10VE THE R AD ELEFENT NOE REINSTALL DETECTOR FR0rl 2 Rf190 277 A54858 2 Ilr1 090 112C 12/13/85 2-Rf1-090-112C-TSC TSC C0fipUTER FtO OUT TSC OUT OF CALIBRATIDH RECALIBRATE TSC OF CAL f*4 SI 205.2 A54859 2 PM 090 100 12/11/85 2-RM-0?O-100, REPAIR FAILTER FAIL ALARrl DEFECTIVE SLOW FIUTOR REPLACE SLOW t0 TOR 20

/

INSTRt!"ENT MAINTENANCL MONTHLY SilMNARY 01-03-86 PACE 5 C0r1P fft.C0rp U FtHC SYS ADDRESS. DATE.... DESCRIPTION............................. CORRECIIVE ACTI0H.....

A54R960 1 RE 09n t io 12/06/85 1-RF-000-117.Rf1 FLOW SIGHT CLASS NEEDS DIRTY GLASS CLEAN Sn.ris tr A

~

TO BE LLEANED OR REPLACED A54BB61 2 FS 001 3 12/17/85 2-FS-001'-3-A, mNPRDu HI STn FLOW ALARM IN FLOW TRANSnITTER OLIT OF CALItSRATION AND BYSTABLE LIGHT IS LIT 121 12/04/85 2-Rh-0VO-121. LOW TRIP DOES t40T WORK RECALIBRATE FLOW TNANSf1ITTER NR A548661 A5 eB72 2 Pr' L

DEFECTIVE PUSHBUTTON SUITCH REPLACE FND DURING PERFORn DF SI 204.2 TAG ON PUSHBUTTON SWITCH RP 30 A54BB77 1 PDT 065 80 12/09/85 1-PDT-065-80, win INSTALL ET'S INCLINE NONE INSTALL TEST EQUIPMENT AND REn0VE (1ANOMEIEk 0-10*' AOiOSS MID PT FOR WEN NO LONGER PEEDED SI-264 A5 m 1 Rf1 090 106 12/09/85 1-Rn-070-106,nCR INSTR TIALFUNC AL ARM DIRTY ROTonETER CAUSING LOW FLOW DLEAN WON'T CLEAR DUE TO LCW 10 DIE FLOW OUT ROT 0 E TER A5 EBB 2 O PDIS 026 7A 12/11/85 0-PDIS-026-7A, DELTA DID NOT DROP DOWN NO PROBLEn FOUPO, NONE AFTER APPROX 15 f11H OF BACguA911NG C/ LIB DELTA P CAUCE A5 EBB 3 0 lW 082 5036/312/13/85 0-TR-032-5036/3,RECCRDER STAnPING ON CONTACTS ON RECORCLN DIRT (,

CLEAN OtE P0lHT BUT STAYING RIGHT CONTACTS A5 EBB 7 1 Rf1 090 112A 12/26/851-RM-090-112A,1 Rf190112A FAILED LOOSE SCREWS & DIRTY PIHS ON RP-30 t'OnENTARILY ON 12/7/85 CAUSING A CVI PRO TICHTEN SCREWS & CLEAN PI!L3 PR 1 85 362 A5 4091 1 PT 001 20A 12/16/85 1-PT-001-20A, NNPRDa ItGTR WAS CALIB TRANSt1ITTER WAS CALIBRATED WITH TEST W/r1&TE E00244 WHICH WAS FNO OUT OF EQUIPr1ENT THAT WAS DUT OF CALIBRATION.

TOLERANCE AT THE LAB. VERIFY OR RkiCALIB RECALIBRATE PRESSURE TRANSf1IT INSTR. GIVE RESULTS TO ORIG 54N1 A54893 1 P11 090 11212/26/851-Rn-Oy0-112, AUDIBLE ALARf1 DOES NOT WORK BROKEN WIRE ON ALARf1 RESG.CER BROKEN WIRE A5 e910 0 PS 032 6212/07/85 0-PS-032-62.RECALIB OPS 32 62 OUT OF CALIBRATID4 RECALIBRATE SWITCH A550516 1 LIC 003 17412/10/M 1-LIC-003-174, \\ SERVO r.0TCP. APPEARd.C OEFECTIVE POTEhiIG.ETG A:0 SERVO t10 TOR BE BAD UN..BLE TO ORIVE PROCESS INDILATOR REPLACE POTENTI0rETER AND S tu U..' C

.. A M0516 A550517 1 LIC 003 15612/18/851-LIC-003-156,SERVD n0 TOR APPEAftS TO BE DEFECTIVE RIBBON CABLE CaiNECTOR INS C.T PTE",S INDICATOR HANGS OCCASIONALLY NLW RIBBON CABLE LUNNECTOR CALIBRATE CONTROLLER R RETLRN TD SERVICE ret eu m i/ PM 1334-003 A550518 2 ts TO 210A10 12/19/80 2-LS-O'0-?10A19. CHECK LS FOR PROPER WATER IN DRY REFERENCE LEC OF Su!TCH OPER DRAIN WATER FRon SWITCH A550519 7 LS 070 209A/B 12/19/85 1-LS-070-20?MB.OCCK iS FOR PROPER OPER WATER TN DRY REFERENCE LEC DRAIN UATER FR0rl DRY REFEREN E IEG A550664 2 097 12/16/85 2--099-. CONFUTER NOT RECEIVING SICML MF5TTIT !Prur CONTACT BUFFER CARD IN CHN4GE UNIT 2 P250 C0rFUTEN REPLACE DEFECTIVE ON; V03200; V0321D; V0'i22D; YO32004 YO32IO; YO CARD I

21 I

l t

3 INSTRtt1E.H1 MAINTENANCE rMINTH Y SUr1n,'.RY 01-03-116 PACE 6 COnp pg.tXN U FUNC SYS A00RESS. DATE.... DESCRIP110N.............................' CORRECTIVE ACTION.......................

3220 A560058 2 Rn 090 27212/20/85 2-RM-0VO-272, TROLELE SHOOT AND DEFECTIVE DETECT (R REPLACE DETECTOR ADJUST / REPAIR AS FEEDED TO CLEAR RAD NCH OF NI RAD ALARM A562131 2 FT T 062 10 12/26e BS 2-FIT-062-10,REMC'!E TRANSnIITERS FR0n NONE REINSTALL TRANSMITTER PIPE FOR REPAIRING OF FLANGES ON MR A564777 9

22

INSTRit1ENT 11AINTENANCF MONIHLY

SUMMARY

01-03-86 PAGE 7 Lut m NR 2.... O FUNC SYS ADDRESS. DAIE.... DESCRIPT10tl.............................

CORRECTIVE ACTI0H.......................

i A300820 2 PHL 500 381 12/06/85 2-PNL-500-381, CHANGE COVERS & ID TAGS PERSOPOEL ERROR. INSTALL COVERS 8 TAGS ON 2 f n 3142 A 3 2 FM 46 57 ON PR(PER DEVIES A701674 1 TE 068 44A 12/31/05 1-TE-OcJ 4%,RF PLACE EXISTItC HARROW EPO OF GUALIFIED LIFE OF DEVIE. REPLA N RANGE RlD DLE 10 THE EXPIR ATION. 0F THE RTD WITH E9UIVALENT. TYPE.

GUALIFILD LIFE A3016/6 1 IL 068 4'4B 12/31/ 03 1-I t.-Ood 448,REFLI.CC EXISTING NARROW 0 0 CF QUALIFIED LIFE OF DEVICE. REPLACE RANGE RTD DLE TO TE EXPIRATION OF THE WITH EGUIVALENT TYPE.

wu ssi iLe L1Fi.

A301677 1 TE 06D

' 56A 12/31/05 1-TE-060 -56A, REPLACE EXISTING MARROW END OF GUALIFIED LIFE OF DEVICE. REPLACE RANGE RTD DUE TO THE EXPIRfTIDH OF TE WITH EGUIVALENT TYPE RTD.

GUALIF]ID LIFE A301670 1 TE 068 568 12/31/05 1-TE-068-568, REPLACE EXISTING HARROW EPO OF GUALIFIED LIFE OF DEVIE. REPLACE RANGL Klo DLt_101HE EXPIR ATION OF THE WITH EQUIPfENTVALENT TYPE RTD.

GUALIFIED LIFE A301681 1 lE 068 79A 12/31/95 1-TF-N ~'9A, REPLACE EXISTING HARROW DO OF GUALIFIED LIFE OF DEVIE REPLACE RANGE PIO DOE TO THE EXPIRATION OF TE WII'H EeUIVALENTRTD.

QUALIfnFD LIFE A301682 1 TE 040 798 12/31/05 1-TE-Ood-/Yli, REPLACE EXISTING HARROW E!C OF GUALIFIED LIFE. REPLACE WITH RANGE R f D DUF 10 THE EXPIR ATION OF TE EQUIVALENT TYPE RTD GUALIfIED LIFE A523577 1 PT 068 337C 12/30/85 1-PT-063-W/C, kHPRDu ZERO SHIFTS ON TRAH5n!TTER DUT (F CALIBRATI(M PERF(Rf1 XnTR UlitH IEST PRESS IS DROPPED BELOW STATIC ALIGPEENT 1 FLEXIAE ADJET t700 P3s CALIBRATE PER SI-92 A548895 2 LT 003 Y7 12/31/85 2-LT-0 0 ?/.mHDRDn INST FAILED HIGH TRANSMITTER OU1 (F CALIBRATICH RECALIBRATE LEVEL TRANSMITTElt FR 4540095 I

A559963 I )3 068 66 12.02/85 1-XS-068 %6, RETURN INJ SU XS 68 66 MIDE. RETURN SW TO HERf14L LMILE VESEL IS PS/403 Art Ih > 10 NORf1AL UHILE RX BEING FILLED ADO VENTED VESSEL IS BEING FILLED 1 VENTED. LOOP IS HJt i,Lu. IFl f DFD F?!LE. irlin As u.

TO ALLuu OP

% records h.,ted.

23

e MONTHLY REPORT DEC 1985

~

MECH. MAINT.

UNIT O 1.

WORK ON RUX. BOILER COMPLETED RND BRCK IN SERVICE 2.

REPLACED. SEAL AND COMPLETED isLIGNMENT ON CDWE VRPOP BODY RECIRCULATION PUMP.

7 HNETOoPFD tINFS ON FDWE 4.

COMPLETED MONTHLY AND QURRTERLY SI ON 2RA D/G.

5.

D STATION RIR COMPRESSOR COMPLETE.

6.

INSTALLED UNLORDER VALVE ON C RIR COMPPESSOR

.l 7.

PERFORMED P.M.

ON RUX. BLDG. CRANE.

8.

HPFP ST.RRINERS THAT FEED RX BLDG COMPLETE 9.

COMPLETED MONTHLY RND QUARTERLY SI ON 288 D/G 10 RO<EVIN7 HIGH RRO SECURITY DOORS 11 COMPLETED MONTHLY INSPECT 1Uf4 ON 1RR D/G 12 CLOSED UP R CCS HTX.

g e

24

MONTHLY REPORT DEC. 1985 NtCH. MH I N f.

UNIT 1.

1.

INSTALLED NEW SOLENOID ON 1-FSV-063-166 2.

COMPLETED SI-239 ON DIVIDER BARRIER SERL 3.

COMPLETED THRUST RSSEMBLY ON 1R RFPT 4.

PRES 5URIZED CONTAINMENT

~

5.

UNIT 1.

BLDG HE9TI?n OILS BACK ZN SERVICE 6

REPHIRED OIL LERK ON A RFPT 7..

COMPLETED INSPECTION ON 2B RFP 8

REPRC5<ED 1-FCV-001 -4 9.

COMPLETED IN5PECTION OF 1-FCV-030-134, REASSEMBLED 10 COMPLETED NDE ON PT,NE T 5 TEM estw BODY OF 1-FCV-003-100 11.

INSPECTION COMPLETE ON 1-LCV-106A&1068, RERSSEMBLED 12 COMPLETED STERM GENERATOR CLEANUP

'j i

..___ _ q 1

i 1

l l

1 1

25 m._

MONTHLY REPORT DEC 1985 8

-MECH. MAINT.

'JNIT ?

1.

2B RFP X-RRY GOOD ON DISCHARGE PIPE 2.

6 OF 7 BUILDING HERTING COILS BACK IN SERVICE 3.

LUBE OIL-PUMP COUPLIN3 INFECTION ON 28 CCP COMPLETE 4.

WATERBOX WORK COMPLETE AND CLOSED UP s enmo!even evoeee oe: Tec ny op pep 6.

INSPECTION COMPLETE ON 2R RFP 7 COMPLETED' INSPECTION OF 2-FCV-043-22, REASSEMBLED 8

COMPLETED GENERATOR C* AWL THAU 9

COMPLEJED UNIT 2 NOZZLE COVER WORK 10 COMPLETED INSPECTION ON 2-LCV-106A&106B, REASSEMBLED 11 RLIGNMENT COMPLETE ON 2A928 RFP,5 IT

'C i! %L.; 5.';7 I 'i.~ ~ T.. _ T 2: ':MGE AIR FAN MOTOR BASE 13 COMPLETED NDE ON 2-FCV-003-33 26

SUltlARY OF W0ttK COMPLETED i

. MODIFICATIONS j

DECEMBER 1985 NUREG 0588-ECN 6231 - Remove Interferences A-train ERCW piping has been reroute'd. Work has begun on B-train.

' Supports will be installed later.

1 APPENDIX R ECNs 5265, 5435, and 6343 - Fire Doors Door C-50 tested satisfactorily; however, it still lacks final electrical hookup and testing. When door C-50 is complet e and operable, work will begin on door C-49.

Additional work"lans for ECN 6343 were prepared and placed in the: approval cycle.

ECN 6235 - Reroute Various Cables Work is on hold for the nine workplans previously in work.

Workplan writing is on hold.

ECN 6305 - Elevation 714 Fire Barrier Framing is complete, and the installation of the firebored and door is in progress.

ECN 6311 - Operator Extension on PORV Work is complete except for.postmod' fication testing scheduled i

during startup.

ECN 6315 - Replace Fuses Fuse installation was begun.

ECN 6319 - Fire Protection Piping Installation of piping and hangers continues.

0THER ITEMS

'ECN 5009 - ERCW Piping Changeout From Carbon Steel to Stainless Steel The installation of A-train piping to the unit I upper campartment cooler is complete. The installation of B-train ts complete with i

the exception of the two additional check valves which i s in prcgress.

The additional hanger for the auxiliary air compressor w.is inrtalled.

27

OTHER ITEMS (C:ntinued)

ECNs 5034, 5713, 5743, and 6064 - Various Platforms in Lower Containment The application of protective coating continues. The inttall.i-tion of platforms between Nos. 2 and 3 steam generators continues.

The safety gates for the upper platforms have been installed.

ECN 5200 - Postaccident Sampling Facility No work was performed this period.

ECN 5202 - Fifth Diesel Generator The backfilling was completed and tested. Missile barri r concrete will be poured at the first opportunity. The workplans will be prepared for electrical interface work.

ECN 5237 - Laundry Facility No work was performed this period.

ECN 5252 - Label Node Voltages in Manholes No progress on this job this period; four manholes remait.

ECN 5347 - Replace Doors C-49 and C-50 (Electrical Portion)

This work is on hold until door C-50 passes the leak test.

ECN 5373 - Condensate Demineralizer Air Compressor The new design was received, and installation was begun.

ECN 5620 - Add Instrumentation for Auxiliary Feedwater Pimp Work is on hold.

ECN 5645 - Replacement of Flow-Control Valve 2-329 The installation of the unit 2 valve is almost complete. The vendor representative will not be here until January to nodify both valves.

ECN 5657 - Installation of NSR Drain Valves The installation of the unit 2 valve asaemblies is well inderway.

28

OTHER ITEMS (C:ntinu:d) i ECN 5795.- Field Services Building-Fire detection ~ system work is on hold for materials.

ECN 5914 - Improve Reliability of Steam Dump Conduit is complete; valve remains to be! wired in.

ECNs 5938 and 6506 Feedwater Heater Replacement All mechanical work was completed. Installation work continues.

ECN 6057 - Cable Tray Covers s

Approximately 240 out of 290 cable tray overs have been remanufactured or replaced.

ECN 6147 - Airlock Packing Nut The unit I airlocks were tested with satisfactory result.. The antirotation devices were installed on unit 2, thus compteting this modification.

ECN 6152 - SPDS All consoles have been installed.

ECN 6196 - Pressurizer Hangers and Valves Unit I support work was completed. Final installation of the mirror insulation remains. Installation of the last support on unit 2 was started.

ECN 6204 - Electrical Penetration Overcurrent Protection Fuse replacement and fuse block installation are complete. We are awaiting a technical specification change to place tie circuits in operation.

ECNs 6251 and 6532 - Waste Disposal Hangers This work was completed.

ECN 6259 - Moisture Separator Reheater Tube Bundle Replacement Reinstallation of the doghouses continues. The repair of inadequate SECO welds continues. Reinsulating work is in progress.

ECN 6263 - Feedwater IIangers Lower Containment This work is complete.

29 4

I0tHERITEMS(C:ntinu:;d)

ECN 6352 - Fire Protection Isolation Valves This work is complete.

ECNs 6402 and 6439 - Pressurizer Instrumentation Relocation The unit I work was completed. The unit.2 workplan was written and approved, and work was started. The: core drills have been

-completed, and piping work is in progress.

ECN 6417 - Install Alternate Seal Water for Pumps, CDWE Electrical drawings remain to be issued.

ECN 6491 - ERCW Supports Eighteen of the first twenty supports are complete. The final two are awaiting approval of the FCR. The workplan for he final 21 supports was written and approved, and the work was s acted.

ECN 6494 - ERCW Pipe Replscement at CCW Heat Exchangers The degraded valve body was replaced with a new body. T: e old body will be refurbished. This completes this work.

ECN 6495 - Modification of Pressurizer Pots This work was completed.

Dry Active Waste Building (DCR 1898)

Work began on dismantling the old carpenter shop and clet ning up the site to begin construction. The workplan is in the 4pproval cycle. Concrete foundation work will be done as weather permits.

The transfer of structural steel for the : building from Yellow Creek Nuclear Plant has been completed.

Preliminary indications are that several additional work item.. may be forthcoming that will be required to be completed before startup.

Preliminary work has begun on these items as follows:

L.

ECN 5667 - Double Isolation Valves for Flow Orifices (Unit 2)

- Removal of EGTS Backdraft Dampers ECN 6548 - Additional Support for Incore Drive Cart ECN 6552 - 0588 Solenoids l

- Replacement of Degraded Secondary Side Piping 4

1 r

30 i

W

^;

i e

's i

E Date: 1/2/ 6 Estimated Date of Ccapletton SCR No.

Description Memo FCN issued ' Drawings ' Engineer Workplan No.

U-l U-2' Comewnt s EQP 8501 Disconnect I- & 2-MS-62-61 9/18 6524 Yes 11/29-30 Peters 11901 Workplan in approval cycle. 4 dh EQP 8502 Replace penetrations 23, 48 9/13 6490 Yes Yes' Peters 11801, 11802, 1/3 C

Pinal laydown and meyger in progress.

11810, 11811 Assembling Q1R Iva Llww

.r.

EQP 8503 Relocate RE-90-273, -274

-9/25 6500 Yes Yes Peters 11810, 11811 C N/A Preparing QIR for closure.

EQP 8504 Splice methode not correct 10/2 N/A N/A.

N/A Stockton 80 MRs C

C Preparing QIR for closure.

EQP 8505 Drawing 10/11 N/A N/A N/A N/A N/A N/A N/A EQP 8506 Seal catet isolation valve 10/17 6514 Yes Yes Kinsey 11880 1/5 1/5 Workplan in field. ganaer Design is impeding installation.

EQP 8507 Rewire MOV 10/29 N/A N/A N/A Rutledge 11866, !!853 1/5 12/31 on U-2,127 rewired; 126 functioned; :

90 MOVATS. On U-1, 72 rewired; 10 functioned; _ MOVATS.

EQP 8508 JB weepholes.(press) 10/17 6523 12/12 Alas 11898 C

C Preparing QIR for closure.

EQP 8509R1 Conduit seals 11/6 6529 11/29 12/16 Kinsey 11903,'11904 Writing workplans.

EQP 8510 Disconnect local hand-11/12 6527 12/8 Peters 11901 1/20 1/13 Workplan in work.

switches EQP 8511 Submerged JB inside entet 11/13 6549 12/5-12/18' Peters

!!901 1/5 Workplan in rk.

.EQP 8512R2 Rewire JB, N/A N/A N/A N/A Amburn

. 11855, 11856 1/20 1/13 on U-2, 71 of 83 rewired. On U-1, 56.

of 70 rewired.

EQP 8513 Weep holes (moisture) 11/14.6547 11/29 12/5 Alas 11898 C

C Preparing QIR for closure.

EQP 8513R2 Weep holes (moisture) 6565 12/18 1/2 Ala s ' '

1/10 1/10 EQP 8514 Motor insulation 74-1, -2 11/14 6540 12/3 Branham 11906 N/A,

/8_, Workplan in field. Need PRT

. _ requirements. clarified. y,p,g

,g.

Holdup on release of motors f rom ware 31 w....

l

. ~..

.n_,

1 Page 2.

Date: 1/2/86 i

~3' Estimated Date of Completion SCK No.

Description Memo ECN issued Drawings Engineer Workplan No.

U-!

U-2 Comments EQP 8515 Replace 2-PDT-30-43 11/15 ' 6554 12/6 12/11 Legg

!!912 t/12 1/12 Workplan in field.

~

EQP 8516 Replace 2-LT-3-174 11/15 12/29' Inst.

Maint.

E4P 8517 ABGTS humidity control 1/7 1/20 1/20 EQP 8518 Submerged cables 11/15 6533 11/27 12/8 various/6 various

. 2/8 1/23 on schedule.

EQP 8519 Tee drains 11/22 N/A N/A N/A Elect.

C 6

E1. Maint turned in OIR.

Maint.

1 EQP 8520 Expired cables 11/22 6553 12/5 12/12 c'arslex 11902 1/26 t/11 unrkplan in field 12/30/85.

EQP 5521 Delete TM and rework splices !!/22 6550 12/5 12/14 Stockton 11914, !!915 1/20 t/13 Workplan in approval cycle.

EQP 8522. Rewire local panels

!!/26 Stockton 11914, !!915 1/20 1/13 Workplan in approval cycle.

EQP 8523 Missing bolts and washers N/A N/A N/A N/A

,Stockton 18914, 11915 1/20 1/6

. orkplan in approval cycle.

W

- and sisplaced brackets -

-.(MR)....

EQP 8524 Change setpoints 11/26 6551 12/6 12/17 Inst.

11916

.Unkn.

Unkn. Workplan in approval cycle.

- Maint.

EQP 8525 Reterminate hydrogen N/A N/A N/A N/A Elect.

1/6 1/6,

recombiner (MR)

Maint.

EQP 8526 Replace FSVs U-l I, U-2 11 11/26 6552 12/5 12/14 Nech.

Hech. Mode. has workplan to resolve

Mode, comments.

32 1

1 O

b

.~

b

qJ i

Fage 3

' Date: 1/2/86 e

Estim.ited

.Date of Completion SCR No.

Description Memo ECN issued Drawings Enaineer Workplan No.

U-!

U-2 Comments EQP 8527. Coat YB. U-l 3. U-2 8 N/A N/A N/A N/A

'Stocktoa

!!914, 11915.1/5 1/5 workplan to approval cycle.

(M)

EQP 8528 Solder strain gause Barton 11/26 IMI Inst.

Unkn. Unkn.

treasmitters Maint.

EQP 8529 PDY-30-42. -43 capacitor 11/26 6554 12/6 12/11 Le8s 11912 1/12 1/12 Workplan in. field.

EQP 8530 Casket,*:c.mco L/9

's / 4 M/A N/A N/A Plect.

Unkn. Unkn. 152 of 185 complete.

(MR)

Maint.

EQP 8531 Delete MOV heaters Yes 6544 11/27 12/2

'Rutledge

!!866, 11853. 1/5 C

Work with MOV rewire.

EQP 8532-Delete L/S 1 2-43-201, Yes 6563 12/18 12/24 Alas 1/23 -1/16 Writing W/P.

-202, -207, and -208 EQP 8533 Delete dual voltage splice Yes N/A N/A N/A Rutled e 11866. 11853 1/12 C Work with MOV rewire.

8

. _ _ _ _.. _. EQP 8534 Resplice valve positioner Maxwell MK 1/13 1/13 gges in field.

3-174 and -175 EQP 8535 Replace limit switches.

Yes 6556 12/7 12/18 Stockton 1/30 1/23 U-1 10. U-2 12 EQP 8536 valve room submersence 6561 Mech.

1/23 Elect. Mods.tff Mode.

EQP 8537 Rebuild or replace JB 3078 6579 12/27 1/2 haburn 1/16' N/A ' Hold for design resolution.

~ ~..

EQP 8538 Replace capacitors Maxwell 1/18 1/18

  • FCo-31-475, -476 33 s

4 e'

'3

.. - _ - - - _ _ - ~ - _,. _ - - -,. -

...,n.

+.n-n,.,.-~,.~-.>.

+...~,..~.

.e r

s-(j

. s.-

Page 4 Deter 1/2/86 7' ',,

Estimated

~ -

Date of

_SCR Ma.

Description Memo ECN

!ssued Drawings Enalueer Workplan No.

U-!

U-2 bomments Coseletton ~

EQP 8539 Replace capacitors inst.

Unka.' Unka. -Capacitors casite.

n int.

EQP 8540 Replace pigtails to Target Rock solenoid valves Maxwell

'1/31 1/20 - Writing workplan. Need drawings.

EQP 8541 Delete brakes-g Branham 1/31 N/A 1-FCV-43-93, -94.

EQP 8542 Replace ungwalified cable =

n111 Unkn. ::/A i~;4 ius a 1;t1As of issue.

j EQF 8543 Replace JB wire Amburn 1/31 1/20 Writing functionals.

t k

b p. aw

.gm,

.+4-w.--.---.-e,-.w.'-

sw.,

Ju.-%.

m.

-ee--+--..e e+ew e*v

-,-maw'se-d-

w=-'

.s+4

  1. .s e6+ ht re->av,

+

.6 b

-t i

I t

5 I

34 i

t

. 'a

~

i Pygs 5 Date: 1/2/86, s,

Estimated 7

lute et Completton

- SCR No.

Description Memo ECN issued Drawings Engineer Woikplan No.

U-1 U-2 Commente N/A Move surge suppression N/A 5773 Yes

.Yes Kinsey 11883 1/6 1/4 on U-2, comotete. On U-1,'.

. network for PORY l-PCV-68-340 in hold.

EEB 8523 Penetration overcurrent 6204 'Yes Yes Legg C

C

-All fuse blocks instelled. Need to 6219 run functional when submerged conduit

  • 6452 11891 is complete. Preparing gik tur

' closure.

N/A Work FCR to delete I,

N/A 5883 Yes Yes Itall Need 51-166.

2-PS-3-160A, -1608, -!C3.1, and -1655 l

4 N/A Replace 1-FT-1-3A

-3B, N/A 6347 Yes Yes

' Inst.

. Unka. N/A

-10A, -108, -21A, -21B, Naint.

-28A, -288 i

NEB 8510 Relocate LT-68-320, N/A

.6439 U-1 U-1 Carrasquillo Various 1/18 1/23 On schedule.

I

.. _..._. _. _ _,..___,PT,-68-323,

.320-

-- - ~.,... - ___. _,.,_ _,_,_ _ _

0-2 Peters-Remount 63-71, 68,-308' N/A 6496 Yes Yes Legg 11865'

~C

'C Replace LS-65-4, -5 N/A 6504 Yes Yes

i. egg 11865 N/A Unkn. 65-5 complete. 65-4 in hold for maintenance.

l MES 8410R3 Replace LS-77-127 11/22 6525 Yes Yes tagg 11865 N/A C

Delete brakes FCV-62-61 6521 Yes 12/3 Branham 11905 Workplan in approval cycle.

EEB 8517 Replace pressure switch 6488 12/24 S w4 k ~

Writing W/P 65-80 and 65-82.

4 4

35

}'

t 1

?

b i

eg +

1 4

h i

.i 4

I

efa.,

.SEQUOYAH NUCLEAR PLANT.

s:

DATE SUlstARY OF UPCOMING OUTAGES n

i

_(

'i

' Start Durati m Finish

-Unit 1 Date (Days)

Date Initial

-Criticality 07/05/80 7

U1, oC3 08/22/85 173*

-02/11/86*

Surveillance / Ice 04/03/87

'17 04/19/87 U1, C4 06/26/87*

50 08/14/87*

-Surveillance / Ice 10/07/88' 17 10/23/88 U1, C5 12/30/88*-

51 02/18/89*

Surveillance / Ice 04/06/90 17 04/22/90 U1, C6

.07/06/90*

75 09/18/90*

Surveillance / Ice 10/04/91 17 10/20/91 U1,'C7 01/31/92*

45 03/15/92*

Start Duration Finish Unit 2' Date (Dayf)

Date Initial Criticality 11/05/81 U2, C3-09/05/86*

50 10/24/86*

Surveillance / Ice 10/30/87*

17 11/15/87*

U2, C4 03/18/88*

51 05/07/88*

Surveillance / Ice 05/12/89*

17 05/28/89*

U2, C5 09/22/89*

45 11/05/89*

' Surveillance / Ice 11/09/90*

17 11/25/90*

l U2, C6

_03/22/91*

75 06/04/91*

l Surveillance / Ice 06/05/92*

17 06/21/92*

U2, C7 10/23/92*

45 12/06/32*

NOTE:- The unit 2 schedule assumes a 02/02/86 return-to-service from the forced outage that began on 08/21/85 and a 75% operating car. city factor (OCF) for the 153 effective full power days that rerain in the unit 2 core..

I

  • Denotes changes since'last update.

ATP:CCM 01/08/86 36

= - -

4 s ') 8.

'l lI SEQUOYAH NUCLEAR PLANT FUEL CYCLE DESIGN BASIS INFORMATION.SilEET Unit 1 1

i Cycle 3 Cycle 4 cycle 5 Cycle 6 Cycle 7 ji ll Operating Cycle

!l

-Length (Days) 492 499 503 502 499

  • Operating Capacity Factcrs 76

'85 85.

- 85 '

85

)

.Schetuted Mid-cycle Outage Days-37 17-17 17 17 Estir ated Coastdown Days 1

5 3

2 0

Core Full Power i

-Days 345 405 410 410 410 Unit 2

^

Cycle 3 Cycle 4 Cycle 5 Cycle 6 Cycle 7 Operating Cycle Lengt h -(Days) 618

-510 502 501 506

  • 0penating Capacity Facters 61 85 85 85 85 Scheduled Mid-cycle Outapn Days 0

17 '

17 17-17~

l Es tiinated ' Coas tdown Days 12 9

2 1

6 Core Full Power i

Days 364 410 410 410 410 l

ATP:CCM'01/03/86 4

f l

r i

4 37 l

--_-.__.u.,.__._.,_.-

_ _., ~...,. _ _ _. - -,. - _. _ _. -

% ')Ae >

S qu'y*h Nu11mer Pimt Qu rterly Schedu19 Summary This schedule summary includes outage information from the first quarter of FY 86.

Plans for the remainder of-FY 86 and subsequent fiscal years will be included after the impact of employee concerns and Environmental Qualification (EQ) work is accurately definsd.

The unit I refueling and unit 2 forced outage schedules have been revised on a biweekly basis since November 1985 as a' result of required Environmental Quali-fication wort..

The total scope of work to be performed has not been completely defined; however, at least 28 Engineering Change Notices (ECNs) have been issued this FY and 21 scheduled ECNs are in work or have been completed. At least 6 ECNs have not been issued and 4 of these have not been scheduled. At least 31 schedule (. ECNs are in work or have been completed since the outages began.

O S

O t

I l... -.

~

m

?

5 0

a TENNESSEE VALLEY AUTHORITY Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, Tennessee 37379 uanuary 10, 1986 Nuclear Regulatory Commission Office of Management Information and Program Control Washington, DC 20555 Gentlemen:

SEQUOYAH NUCLEAR PLANT - MONTHLY OPERATING REPORT - DECEMBER 1985 Enclosed is the December 1985 Monthly Operating Report to the NRC for Sequoyah Nuclear Plant.

Very truly yours, TENNESSEE VALLEY AUTHORITY OR.lA h -

P. R. Wallace Plant Manager Enclosure cc (Enclosure):

Director, Region II INP0 Records Center Nuclear Regulatory Commission Suite 1500 Office of Inspection and Enforcement 1100 Circle 75 Parkway 101 Marietta Street Atlanta, CA 30339 (1 copy)

Suite 3100 Atlanta, GA 30323 (1 copy)

Director, Office of Inspection and Enforcement Nuclear Regulatory Commission Washington, DC (12 copies)

Mr. A. Rubio, Director Electric Power Research Institute P. O. Box 10412 Palo Alto, CA 94304 (1 copy)

Mr. R. C. Goodspeed MNC 461 Westinghouse Electric Corporation Pittsburgh, PA 15230 (1 copy)

Mr. K. M. Jenison, Resident NRC Inspector Sequoyah Nuclear Plant g

i 1983-TVA SO7H AN NIVERS ARY An Equal Opportunity Ernployer L