ML20209G696

From kanterella
Jump to navigation Jump to search

Proposed Tech Specs Reflecting Permanent Removal of RHR Reactor Pressure Vessel Head Spray Line Piping & Associated Primary Containment Isolation Valves
ML20209G696
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/05/1986
From:
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20209G682 List:
References
NUDOCS 8609150056
Download: ML20209G696 (3)


Text

.

NOTES FOR TABLE 3.2.A (cont'd.)

Group 2 Isolation Signals:

1.

Reactor Low Water Level (+12.5 in.)

2.

High Dry Well Pressure (1 2 psig)

Isolations:

1.

RHR Shutdown Cooling System 2.

Drywell floor and equipment drain sump discharge lines.

j 3.

TIP ball valves 4.

Group 6 isolation relays Group 3 Isolation Signals:

1.

Reactor Low Water Level (+12.5 in.)

2.

Reactor Water Cleanup System High Flow (200% of system flow) 3.

Reactor Water Cleanup System High Area Temperature (1 200*F) 4.

Reactor Water Cleanup System High System Temperature (3140*F)

Isolations:

1.

Reactor Water Cleanup System Group 4 1

Isolation Signals:

Provided by instruments on Table 3.2.B (HPCI) i l

Isolationst Isolates the HPCI steam line Group 5 Isolation Signals:

Provided by instruments on Table 3.2.B (RCIC)

Isolations:

Isolates the RCIC steam line.

Group 6 Isolation Signals:

1.

Group 2 Isolation Signal 2.

Reactor Building H&V Exhaust Plenum High Radiation (<100 mr/hr) i i

I f*609150056 860905

-52a-PDR ADOCK 05000298 p

PDR

_.. _ _ _.. _.. _ _ _ _ = _._ __ __ ___,..___._.._. _ _

m

]

1 t

j

  • ?

COOPER NUCLEAR STATION j

?ABLE 3.7.1 (Page 1) l PRIMARY CONTAINMENT ISOLATION VALVES l

I l

Number of Power Maximum Action On Operated Valves Operating Normal-Initiating I

Valve & Steam Inboard Outboard Time (Sec) (1)

Position (2)

Signal (3) 1 1

i Main Steam Isolation Valves j

MS-AO A,B,C, & D 4

3<T<5 0

GC

(

l MS-AO A.B.C. & D 4

3<T<5 0

GC l

Drywell Floor Drain Iso. Valves 1

1 15 0

GC i

j RW-AO-82, RW-AC-83 t

Drywell Equipment Drain 1

1 15 0

GC i

j s

Iso. Valves RW-AG-94, RW-AO-95 l

k 8

Main Steam Line Drain 1

1 30 C

SC i

l Valves MS-MO-74, MS-MO-77 Reactor Water Sample Valves 1

1 15 0

GC I

RRV-740AV, RRV-741AV t

I Reactor Water Cleanup System 1

1 60 0

GC i

j iso. Valves RWCU-MO-15. RWCU-MO-18 1

2HR Suction Cooling Iso.

1 1

40 C

SC i

Valve RHR-MO-17. RHR-MO-18 l

l RHR Discharge to Radwaste 1

1 20 C

SC I

Iso. Valves RHR-MO-57. RhR-MO-67

)

)

Suppression Chamber Purge &

2 15 C

SC i

Vent PC-245AV, PC-230MV i

l Suppression Chamber N Supply 2

15 C

SC y

PC-237AV, PC-233MV i

e

~

TABLE 3.7.4 PRIMARY CONTAINMENT TESTABLE ISOLATION VALVES TEST PEN. NO.

VALVE NUMBERS MEDIA X-7A MS-AO-80A and MS-AO-86A, Main Steam Isolation Valves Air X-7B MS-AO-80B and MS-AO-86B, Main Steam Isolation Valves Air X-7C MS-AO-80C and MS-AO-86C, Main Ste am Isolation Valves Air X-7D MS-AO-80D and MS-AO-86D, Main Steam Isolation valves Air X-8 MS-MO-74 and MS-MO-77, Main Steam Line Drain Air X-9A RF-15CV and RF-16CV, Feedwater Check Valves Air X-9A RCIC-AO-22, RCIC-MO-17, and RWCU-15CV, RCIC/RWCU Connection to Feedwater Air X-9B RF-13CV and RF-14CV, Feedwater Check Valves Air X-9B HPCI-AO-18 and HPCI-MO-57, HPCI Connection to Feedwater Air X-10 RCIC-MO-15 and RCIC-MO-16, RCIC Steam Line Air X-11 HPCI-M0-15 and HPCI-MO-16 HPCI Steam Line Air X-12 RHR-MO-17 and RHR-MO-18. RHR Suction Cooling Air X-13A RHR-MO-25A and RHR-MO-27A, RHR Supply to RPV Air X-13B RHR-MO-25B and RHR-MO-27B, RHR Supply to RPV Air X-14 RWCU-M0-15 and RWCU-MO-18, Inlet to RWCU System Air X-16A CS-MO-llA and CS-M0-12A, Core Spray to RPV Air X-16B CS-MO-11B and CS-MO-12B, Core Spray to RPV Air X-18 RW-732AV and RW-733AV, Drywell Equipment Sump Discharge Air X-19 RW-765AV and RW-766AV, Drywell Floor Drain Sump Discharge Air X-25 PC-232MV and PC-238AV, Purge and Vent Supply to Drywell Air X-25 ACAD-1305MV and ACAD-1306MV, Supply to Drywell Air X-26 PC-231MV, PC-246AV, and PC-306 MV Purge and Vent Exhaust from Drywell Air X-26 ACAD-1310MV, Bleed from Drywell Air

-173-