ML20207N293

From kanterella
Jump to navigation Jump to search

Forwards Request for Addl Info to Complete Review of DPC-NE-1103, Rod Swap Methodology Rept for Startup Physics Testing. Info Required within 30 Days to Meet Review Completion Prior to Approval of Plant Reloads
ML20207N293
Person / Time
Site: Mcguire, Catawba, McGuire, 05000000
Issue date: 01/12/1987
From: Hood D
Office of Nuclear Reactor Regulation
To: Tucker H
DUKE POWER CO.
References
TAC-62981, TAC-62982, NUDOCS 8701140104
Download: ML20207N293 (4)


Text

~

. 1 Docket Nos.: 50-369, 50-370 and 50-413, 50-414 Mr. H. B. Tucker, Vice President 17 M Nuclear Production Department Duke Power Company 422 South Church Street Charlotte, North Carolina 28424

Dear Mr. Tucker:

Subject:

Request for Additional Infonnation on Rod Swap Methodology Report - Catawba and McGuire Nuclear Stations, Units 1 and 2 The NRC staff is reviewing Duke Report DPC-NE-1103, " Rod Swap Methodology Report for Startup Physics Testing", forwarded by your coverletters dated October 1 and December 4,1986, on the McGuire and Catawba Nuclear Stations dockets. Our review is scheduled for completion prior to our approval of

, subsequent plant reloads or technical specification changes involving core

,, opera tion. Presently, due to the complexity of the rod swap technique and calculations, our approval of the use of rod swap is limited for use only by Westinghouse in accordance with the approval of WCAP 9863-A.

In order to complete this review to the present schedule, additional infonnation, identified by the enclosure, is needed within 30 days of this letter. Contact me at (301) 492-8961 if you have questions.

Sincerely, Darl Hood, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A

Enclosure:

As stated cc: See next page DlSIRIB4T40R:

7._.,__ Docket F11e j JPartlow NRC PDR- BGrimes Local PDR Edordan PRC System NThcmpson PWR#4 Rdg MChatter ton FDuncan MDunenfield DHood RLobel KJabbour OGC-Bethesda i ACRS(10) / c/ I WR-A

.ps H 5)

PWRd DPWR-A RW n PWR#4/DPWR-A SB/DPWR-A PWR Q M IR-A

- HDi., n (PW @ /mac DHood kJabbour CBerlinger BJY@n ocd

- miri, ~,,,,, 01i ,ic, 01,y .

8701140104 DR 870112 ADOCK 05000369 PDR__

ENCLOSURE t

REQUEST FOR ADDITIONAL INFORMATION REGARDING DUKE REPORT DPC-NE-1003,

" ROD SWAP METP0DOLOGY REPORT FOR STARTUP PHYSICS TESTING,"

MCGUIRE AND CATAWBA NUCLEAR STATIONS, UNITS 1 AND 2

1. Are all the rod worth calculations done with the EPRI-N0DE-P code, including both Pod Swap and Rod Worth for Shutdown Margin?
2. Section 3, "Measuren,ent Procedure": Subrait detailed procedures for the measureraents. Include the actual boron dilution rate and the flux level for each of the sets of tests included in the recert.

. 3. Section 4, " Calculational Procedure" - under 5: How many calculations

- are performed for each bank and at what positions?

4. Table 3. "a's": Are the values given at the predictec heights? -
5. Submit a copy of Refercrce 2.
6. Provide data for at least 2 sets of side-by-side comparisons of boron dilution and rod swap data - predicted and measured. The data r.ay be either for your plants or neasured cata f rom another plant and predicticrs by Duke.
7. What organization does the safety analyses for the Duke plants? When

- this is not dere by Duke, what is done (e.g., tests, ccmparisons, etc.)

to show that the startup test results adequately represent the plant features and assumptions used in the safety analyses?

9

o e

d p Mr. H. B. Tucker Duke Power Company McGuire Nuclear Station cc:

Mr. A.V. Carr, Esq. Dr. John M. Barry Duke Power Company Department of Environmental Health P. O. Box 33189 Mecklenburg County 422 South Church Street 1200 Blythe Boulevard Charlotte, North Carolina 28242 Charlotte, North Carolina 28203 County Manager of Mecklenburg County 720 East Fourth Street Charlotte, North Carolina 28202 Chairman, North Carolina Utilities Commission Mr. Robert Gill Dobbs Building o Duke Power Company 430 North Salisbury Street Nuclear Production Department Raleigh, North Carolina 27602 P. O. Box 33189 Charlotte, North Carolina 28242 Mr. Dayne H. Brown, Chief Radiation Protection Branch J. Michael McGarry, III, Esq. Division of Facility Services Bishop, Liberman, Cook, Purcell Department of Human Resources and Reynolds 701 Barbour Drive 1200 Seventeenth Street, N.W. Raleigh, North Carolina 27603-2008 Washington, D. C. 20036 Senior Resident Inspector c/o U.S. Nuclear Regulatory Conmission Route 4, Box 529 Hunterville, North Carolina 28078 Regional Administrator, Region II U.S. Nuclear Regulatory Commission, 101 Parietta Street, N.W. , Suite 2900 Atlanta, Georgia 30323 L. L. Williams Area Manager, Mid-South Area ESSD Projects Westinghouse Electric Corporation MNC West Tower - Bay 239 P. O. Box 355 Pittsburgh, Pennsylvania 15230

b

.Mr. H. B. Tucker Duke Power Company Catawba Huclear Station cc:

A.V. Carr, Esq. North Carolina Electric Membership Duke Power Company Corp. '

422 South Church Street 3400 Sumner Boulevard Charlotte, North Carolina 28242 P.O. Box 27306 Raleigh, North Carolina 27611 J. Michael McGarry, III, Esq.

Bishop, Liberman, Cook, Durcell Saluda River Electric Cooperative, and Reynolds Inc.

1200 Seventeenth Street, N.W. P.O. Box 929 Washington, D. C. 20036 Laurens, South Carolina 29360

?, North Carolina MPA-1 Senior Resident Insoector Suite 600 Route 2, Box 179N 3100 Smoketree Ct. York, South Carolina 29745 .

P.O. Box 29513

.Raleigh, North Carolina 27626-0513 Pegional Administrator, Region II U.S. Nuclear Regulatory Commission, L.L. Williams 101 Marietta Street, NW, Suite 2900 Area Manager, Mid-South Area Atlanta, Georgia 30323 ESSD Projects Westinghouse Electric Corp.

MNC West Tower - Bay 239 P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. Heyward G. Shealy Chief Bureau cf Radiological Health South Carolina Department of Health and Environmental Control

.2600 Bull Street Columbia, South Carolina 20201 County Manager of York County i _ York County Courthouse Karen E. Long York South Carolina 29745 Assistant Attorney General N.C. Department of Justice j Richard P. Wilson, Esq. P.O. Box 629 Assistant Attorney General Raleigh, North Carolina 27602 l S.C. Attorney General's Office

! P.O. Box 11549 Spence Ferry, Esquire l Columbia, South Carolina 29211 General Counsel Federal Emergency Manager.ent /gency Piedmont Municipal Power Agency Room 840 100 Memorial Drive 500 C Street Greer, South Carolina 29651 Washington, D. C. 20472 Mr. Michael Hirsch Federal Emergency Management Agency Office of the General Counsel Room 840 500 C Street, S.W.

Washington, D. C. 20472 l Brian P. Cassidy, Regional Counsel l Federal Emergency Management Agency, l Region I '

!- J. W. McConrach P0CH

! Boston, Massachusetts 02109 _